A modular aerated grit chamber

By designing a prefabricated aerated grit chamber, integrating aerated grit settling, scum treatment, sand and gravel collection and conveying, and sand-water separation functions, the dependence of existing facilities on on-site civil engineering and peripheral equipment has been solved, and the integration and compactness of the aerated grit settling treatment unit have been achieved.

CN123105874APending Publication Date: 2026-11-17SICHUAN MEIYUAN HUANENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611319562.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-28
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing aerated sedimentation facilities rely heavily on on-site civil engineering tanks and peripheral decentralized equipment, resulting in a dispersed structure and complex connections between equipment, making it difficult to achieve integration and compactness.

Method used

Design a prefabricated aeration grit chamber, including a prefabricated aeration grit chamber body, support frame, water treatment zone structure, aeration device, end water outlet and slag discharge structure, grit output structure and grit storage and separation device. By integrating aeration grit chamber, scum treatment, grit collection and transportation and grit separation functions, it forms an integrated layout.

Benefits of technology

It reduces reliance on on-site civil engineering tanks and external equipment, achieves integration and compactness of aerated grit treatment units, reduces the complexity of connections between equipment, and improves the integration of treatment functions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123105874A_ABST
    Figure CN123105874A_ABST
Patent Text Reader

Abstract

This invention discloses a prefabricated aerated grit chamber, relating to the technical field of wastewater pretreatment equipment, solving the problems of existing aerated grit chamber facilities relying on on-site civil engineering tanks and peripheral dispersed equipment, and complex structures and equipment connections. The prefabricated aerated grit chamber includes a long, trough-shaped prefabricated aerated grit chamber body and a prefabricated main support frame forming the equipment room below it. Inside the main body, length-dividing structures, width-dividing structures, and bottom sand-guiding structures form an end functional area, an aerated grit chamber, a scum chamber, and a spiral conveying trough. The aerated grit chamber and the scum chamber are connected at the bottom. The spiral conveyor transports the grit to the effluent and scum discharge end, and through a downwardly extending sand discharge channel, it enters the sand storage and separator within the equipment room. The end effluent and scum discharge structure discharges scum through liquid level adjustment. It is used for aerated grit chambering, scum treatment, and sand and gravel separation and discharge of urban sewage and industrial wastewater.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of wastewater pretreatment equipment technology, and in particular to a prefabricated aerated grit chamber. Background Technology

[0002] In urban sewage and industrial wastewater treatment processes, aerated grit chambers are a common pretreatment unit. Their core function is to use the spiral water flow effect generated by aeration to keep organic particles in the sewage in a suspended state and carry them away with the water flow, while inorganic gravel with a larger specific gravity (such as silt, cinders, etc.) settles to the bottom of the tank under the action of gravity, thereby achieving efficient removal of gravel.

[0003] Existing aerated grit removal facilities typically use a tank built on-site as the main body, surrounded by corresponding aeration, sand collection, sand conveying, sand lifting, sand-water separation, and scum treatment equipment. For example, the sand and gravel that settle to the bottom of the tank usually need to be collected by scraping or other methods before being transported to a separately set up sand-water separation device for further treatment via sand pumps or air lifting devices; for scum on the water surface, specialized scum scraping or skimming equipment may also be installed. Thus, a complete aerated grit removal treatment unit usually consists of a tank and various auxiliary equipment distributed inside or around the tank.

[0004] While the above-mentioned methods can achieve aerated grit settling and subsequent treatment of sand, gravel, and scum, the entire treatment unit is highly dependent on on-site civil engineering and the layout of external equipment. On the one hand, the tank body needs to be constructed on-site according to the specific project, and its location and structure are relatively fixed after construction. On the other hand, functions such as sand collection, sand conveying, sand-water separation, sand discharge, and scum treatment are undertaken by multiple relatively independent pieces of equipment, and each piece of equipment requires corresponding connection, conveying, and installation space, making the overall structure of the aerated grit settling treatment unit relatively dispersed and the connection between equipment relatively complex. Summary of the Invention

[0005] The purpose of this invention is to provide a prefabricated aeration grit chamber that reduces the dependence of aeration grit chamber facilities on on-site civil engineering tanks and external dispersed equipment, and integrates aeration grit chamber, scum treatment, grit collection and transportation, sand-water separation and grit discharge into a compact set of equipment.

[0006] To achieve the above objectives, the present invention provides a prefabricated aeration grit chamber, comprising a prefabricated aeration grit chamber body, a prefabricated body support frame, a water treatment zoning structure, an aeration device, an end effluent slag discharge structure, a grit output structure, and a grit storage and separation device.

[0007] The assembled aerated grit chamber is an elongated trough structure extending along its length, and has a first end wall and a second end wall arranged opposite to each other along its length, and a first side wall and a second side wall arranged opposite to each other along its width. The first end wall is located at the effluent and slag discharge end of the assembled aerated grit chamber, and the second end wall is located at the influent end of the assembled aerated grit chamber.

[0008] The prefabricated main support frame is disposed below and supports the prefabricated aerated grit settling body, forming an equipment room below the prefabricated aerated grit settling body. Thus, the prefabricated aerated grit settling body and the equipment room for arranging related equipment can be integrated along the vertical direction.

[0009] The water treatment partition structure is set inside the prefabricated aerated grit chamber and includes a length partition structure, a width partition structure and a bottom sand guiding structure.

[0010] The length dividing structure is disposed near the first end wall and extends along the width direction of the assembled aerated grit chamber, so as to form an end functional area between the length dividing structure and the first end wall, and to form a main treatment area extending along the length direction of the assembled aerated grit chamber between the length dividing structure and the second end wall.

[0011] The width dividing structure is disposed within the main treatment area and extends along the length direction of the prefabricated aerated grit chamber. The width dividing structure is spaced apart from the second sidewall along the width direction of the prefabricated aerated grit chamber, forming an aerated grit chamber between the first sidewall and the width dividing structure, and a scum chamber between the width dividing structure and the second sidewall. The aerated grit chamber and the scum chamber are arranged side-by-side along the width direction of the prefabricated aerated grit chamber and both extend along the length direction of the prefabricated aerated grit chamber.

[0012] The width-separating structure extends downwards from the upper part of the prefabricated aerated grit chamber into its interior. The upper part of the width-separating structure is above the normal operating liquid level, while the lower edge is below the normal operating liquid level but above the bottom of the prefabricated aerated grit chamber. This arrangement allows the aerated grit chamber and the scum chamber to be interconnected below the width-separating structure and share a common operating liquid level. Through this arrangement, the upper spaces of the aerated grit chamber and the scum chamber can be partitioned while maintaining hydraulic connectivity between them.

[0013] The bottom sand guiding structure is disposed at the lower part of the aerated sand settling zone and forms the bottom of the aerated sand settling zone. The bottom sand guiding structure has a bottom surface that slopes towards the lower position, and a spiral conveying trough extending along the length direction of the assembled aerated sand settling body is formed at the lower position. The spiral conveying trough is offset towards the first sidewall in the width direction of the assembled aerated sand settling body. The lower space of the aerated sand settling zone and the bottom sand guiding structure together form a sand settling chamber, so that the sand and gravel settling in the sand settling chamber can be collected along the bottom surface towards the spiral conveying trough.

[0014] The aeration device is located on the side of the aerated grit chamber near the first sidewall and arranged along the length of the assembled aerated grit chamber body. It is used to introduce air into the aerated grit chamber so that the sewage entering the aerated grit chamber forms a water flow state suitable for aerated grit chamber.

[0015] The end-feed slag discharge structure is located in the end functional area and includes a water outlet area, a water outlet trough, a slag trough, a water outlet weir plate, a slag discharge weir plate, a level gauge, an automatic water outlet valve, and a water outlet control system. The water outlet area is connected to the main treatment area. The water outlet weir plate is located between the water outlet area and the water outlet trough. The slag trough is correspondingly located to the slag area. The slag discharge weir plate is located on the path from the slag area to the slag trough.

[0016] The crest of the effluent weir is lower than the normal operating liquid level, while the crest of the slag discharge weir is higher than the normal operating liquid level. A level gauge is installed in the effluent zone, and an automatic effluent valve is installed on the effluent path of the effluent trough. The effluent control system is connected to both the level gauge and the automatic effluent valve and can control the automatic effluent valve to close, thereby raising the operating liquid level of the interconnected aerated grit chamber and scum chamber from the normal operating liquid level to a slag discharge level higher than the crest of the slag discharge weir. This allows the scum in the scum chamber to cross the slag discharge weir and enter the scum trough. Thus, the scum discharge can be achieved by utilizing the change in the operating liquid level of the aerated grit chamber and the scum chamber.

[0017] The gravel output structure includes a spiral sand conveyor and a sand discharge channel. The spiral sand conveyor is disposed in the spiral conveying trough and extends along the length of the assembled aerated sedimentation body, and is used to convey the gravel collected in the spiral conveying trough to the sand conveying end near the first end wall. The sand discharge channel is disposed at the sand conveying end and extends downward from the sand conveying end.

[0018] The sand storage and separator is vertically installed within the equipment room, located along the length of the prefabricated aerated grit chamber near the first end wall and below the conveying end of the spiral sand conveyor. The sand storage and separator has an inlet at its upper part and a discharge port at its bottom, with the inlet communicating with the discharge channel. Thus, the sand collected at the bottom of the aerated grit chamber is conveyed by the spiral sand conveyor to the side near the first end wall, and then enters the sand storage and separator located below the prefabricated aerated grit chamber via the downward-extending discharge channel. This allows for continuous connection of sand collection, conveying, storage, and separation within the overall structure of the prefabricated aerated grit chamber.

[0019] Furthermore, the spiral conveying trough is located in the middle region of the bottom of the aerated grit settling zone and is offset from the first sidewall relative to the width center of the aerated grit settling zone. The bottom sand guiding structure has a transverse sand guiding bottom surface that slopes downward toward the spiral conveying trough from both sides of the width direction of the aerated grit settling zone, so that the sand and gravel settled at different positions at the bottom of the aerated grit settling zone will collect along the transverse sand guiding bottom surface toward the spiral conveying trough under the action of gravity.

[0020] Furthermore, the cross-section of the spiral conveying trough is U-shaped, and the spiral sand conveyor is a shaftless spiral sand conveyor installed in the spiral conveying trough, so that the U-shaped spiral conveying trough can form a sand conveying space adapted to the shaftless spiral sand conveyor while collecting sand and gravel; the inner wall of the spiral conveying trough and the spiral blades of the shaftless spiral sand conveyor are both provided with a wear-resistant nylon layer.

[0021] Furthermore, the equipment room includes a sand storage room and a blower room that are separated from each other. The sand storage and separating device is located in the sand storage room, and the aeration blower and electrical control cabinet of the aeration device are located in the blower room. By separating the sand storage room and the blower room, the sand storage and separating equipment, aeration blower, and electrical control cabinet can be arranged in separate zones.

[0022] Furthermore, the sand storage and separator has a cylindrical section at the top and a conical section connected below the cylindrical section. The inlet of the sand storage and separator is located at the top, and the discharge port is located at the bottom of the conical section. The sand-water mixture entering the sand storage and separator through the discharge channel can be separated into sand and water within the sand storage and separator by utilizing the density difference between the sand and wastewater, and the settled sand and gravel can be stored. The conical section collects the settled sand and gravel towards the discharge port, allowing the sand and gravel separated by sand and water to be discharged from the bottom of the sand storage and separator.

[0023] Furthermore, the sand storage and separator is also equipped with a level detector, an inlet automatic valve, a pressure balancing valve, and a sand discharge automatic valve. The inlet automatic valve is located at the inlet of the sand storage and separator, the pressure balancing valve is located at the pressure balancing port at the top of the sand storage and separator, and the sand discharge automatic valve is located at the sand discharge port. The sand discharge control system is connected to the level detector, the inlet automatic valve, the pressure balancing valve, and the sand discharge automatic valve respectively. When the level detector detects that the sand and gravel in the sand storage and separator has reached a preset upper limit position, it sequentially controls the inlet automatic valve to close, the pressure balancing valve to open, and the sand discharge automatic valve to open. This first cuts off the channel for the assembled aerated sedimentation body to continue supplying the sand-water mixture to the sand storage and separator, then balances the internal pressure of the sand storage and separator, and allows the sand and gravel stored therein to be discharged from the sand discharge port by gravity.

[0024] Furthermore, the sand storage and separator is also provided with an air purging port connected to a compressed air source. The air purging port is located at the lower part of the sand storage and separator and can introduce compressed air into the deposited sand and gravel in the conical section to loosen the deposited sand and gravel and move it toward the sand discharge port, which helps to reduce the possibility of blockage of the deposited sand and gravel during the sand discharge process.

[0025] Furthermore, the sand discharge control system can also sequentially control the automatic sand discharge valve to close, the air pressure balance valve to close, and the inlet automatic valve to open after the sand storage and distribution device completes the sand discharge, so that the sand storage and distribution device can be restored from the sand discharge state isolated from the prefabricated aeration and sedimentation body to the sand storage state connected to the sand discharge channel, and can then receive the sand and gravel transported by the screw conveyor again.

[0026] Furthermore, both the prefabricated aerated grit settling body and the prefabricated body support frame are structures assembled from steel components, thereby enabling the prefabricated aerated grit settling body and the prefabricated body support frame to be formed in a modular manner.

[0027] Furthermore, the first end wall, the second end wall, the first side wall, and the second side wall are connected end to end and together form the outer perimeter of the rectangular trough of the assembled aerated sedimentation body.

[0028] The present invention forms an integral structure of a prefabricated aeration grit chamber by the prefabricated aeration grit chamber body and the prefabricated main support frame located below it, and uses the prefabricated main support frame to form an equipment room below the prefabricated aeration grit chamber body, so that the water treatment space and equipment layout space can be integrated along the height direction, which helps to reduce the dependence of the aeration grit treatment unit on the space for the layout of dispersed equipment around the tank.

[0029] The length separation structure and the width separation structure form the end functional area, the main treatment area, the aeration grit removal area and the scum removal area within the prefabricated aeration grit removal body, enabling the aeration grit removal, scum removal and effluent discharge functions to be centrally arranged within the same prefabricated aeration grit removal body, which is beneficial to improving the integration of aeration grit removal treatment functions.

[0030] The settled sand and gravel are collected into the spiral conveyor trough through the bottom sand guiding structure, and then the spiral sand conveyor transports the sand and gravel along the length of the assembled aerated sand settling body to the sand conveying end near the first end wall. The sand discharge channel extends downward and connects to the sand storage and distribution device located in the equipment room below, so that the sand and gravel can be continuously transferred along the path of "bottom collection - longitudinal conveying - downward entry into the sand storage and distribution device". This helps to reduce the auxiliary equipment required for additional lifting and transfer of sand and gravel between different treatment equipment.

[0031] By connecting the aerated grit chamber and the scum chamber below the width separation structure and having a common operating liquid level, and by setting up the effluent weir plate, the scum discharge weir plate, the liquid level gauge, the automatic effluent valve, and the effluent control system, the scum can be allowed to pass over the scum discharge weir plate and enter the scum tank by changing the operating liquid level of the aerated grit chamber and the scum chamber. Thus, the scum can be discharged by utilizing the water level changes of the assembled aerated grit chamber itself.

[0032] By integrating the sand storage and separator into the equipment room, and making the sand storage and separator have the functions of sand-water separation, sand and gravel storage and bottom sand discharge, the sand-water mixture after the spiral sand conveyor can continue to complete sand-water separation and sand and gravel discharge within the structure of the prefabricated aerated sand setter itself. This helps to reduce the need for sand-water separation and sand and gravel transfer equipment that is independently set up on the periphery of the prefabricated aerated sand setter.

[0033] Therefore, by integrating the prefabricated aerated grit chamber, the prefabricated main support frame, and related structures for aerated grit chamber, scum treatment, sand and gravel collection and conveying, and sand storage and separation, this invention enables the structures and equipment that perform different treatment functions in traditional aerated grit chamber units to form an interconnected whole structure in a prefabricated aerated grit chamber. This facilitates the equipment-based, integrated, and prefabricated layout of aerated grit chamber facilities.

[0034] The present invention will now be further described in conjunction with the accompanying drawings and specific embodiments. Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice. Attached Figure Description

[0035] Figure 1This is a top view of an embodiment of the assembled aerated grit chamber of the present invention.

[0036] Figure 2 for Figure 1 The diagram shows a cross-sectional view of the assembled aerated grit chamber along the AA direction.

[0037] Figure 3 for Figure 1 The diagram shows a cross-sectional view of the assembled aerated grit chamber along the BB direction.

[0038] The diagram is labeled as follows: 10, prefabricated aerated grit chamber; 11, first end wall; 12, second end wall; 13, first side wall; 14, second side wall; 20, water treatment zoning structure; 21, length partition structure; 22, width partition structure; 23, bottom sand guiding structure; 30, aeration device; 40, end effluent and slag discharge structure; 41, effluent trough; 42, scum trough; 43, effluent weir plate; 44, slag discharge weir plate; 45, level gauge; 46, automatic effluent valve; 231, spiral conveyor trough; 51, spiral sand conveyor; 60, sand storage and separator; 61, cylindrical section; 62, conical section; 63, level detector; 64, inlet automatic valve; 65, air pressure balance valve; 66, automatic sand discharge valve; 70, prefabricated main support frame; Aerated grit chamber A; scum chamber B; effluent zone C; grit chamber D. Detailed Implementation

[0039] The specific embodiments of the present invention will be described below with reference to the accompanying drawings. These embodiments are used to illustrate the structure and working process of the present invention and are not intended to limit the scope of protection of the present invention. The accompanying drawings are mainly used to illustrate the relative positions and fits between the various structures; the actual dimensions and proportions of each part can be set according to processing capacity, installation site, and operating conditions.

[0040] like Figures 1 to 3 As shown, this embodiment provides a prefabricated aerated grit chamber. The prefabricated aerated grit chamber consists of a prefabricated aerated grit chamber body 10 and a prefabricated main body support frame 70 located below it, forming the overall main frame. The prefabricated main body support frame 70 supports the prefabricated aerated grit chamber body 10 and forms an equipment room below it. Aerated grit settling, scum treatment, and effluent sludge discharge are mainly completed within the prefabricated aerated grit chamber body 10. The sand storage and separator 60, aeration blowers, electrical control cabinets, and other equipment are arranged in the equipment room below, thus integrating multiple treatment functions that were originally performed separately by the tank body and its surrounding equipment into the same prefabricated aerated grit chamber.

[0041] The prefabricated aerated grit chamber 10 is an elongated trough structure extending along its length. To facilitate the explanation of its internal structural relationships, the main extension direction of the prefabricated aerated grit chamber 10 is defined as the length direction, the horizontal direction intersecting the length direction is defined as the width direction, and the vertical direction is defined as the height direction.

[0042] The prefabricated aerated grit chamber 10 has a first end wall 11 and a second end wall 12 arranged opposite each other in the length direction, and a first side wall 13 and a second side wall 14 arranged opposite each other in the width direction. The first end wall 11 is located at the effluent and sludge discharge end of the prefabricated aerated grit chamber 10, and the second end wall 12 is located at the influent end of the prefabricated aerated grit chamber 10. Wastewater to be treated enters the prefabricated aerated grit chamber 10 from the side near the second end wall 12, undergoes aeration and grit treatment, and then flows towards the side near the first end wall 11 and is discharged.

[0043] In one specific embodiment, the first end wall 11, the second end wall 12, the first side wall 13, and the second side wall 14 are connected end to end, together forming the outer periphery of the rectangular trough of the assembled aerated sedimentation body 10 (e.g., Figure 1 (As shown). The first end wall 11 and the second end wall 12 form the two ends of the elongated groove in the length direction, and the first side wall 13 and the second side wall 14 form the two sides of the elongated groove in the width direction.

[0044] The prefabricated aerated grit chamber 10 is equipped with a water treatment partition structure 20. The water treatment partition structure 20 includes a length partition structure 21, a width partition structure 22, and a bottom sand guiding structure 23. Through the above structure, corresponding areas are formed inside the prefabricated aerated grit chamber 10 to perform functions such as main body aeration and grit settling, scum treatment, end water discharge and scum removal, and bottom sand collection.

[0045] The length dividing structure 21 is located near the first end wall 11 and extends along the width direction of the prefabricated aerated grit settling body 10. An end functional area is formed between the length dividing structure 21 and the first end wall 11, and a main treatment area is formed between the length dividing structure 21 and the second end wall 12. The main treatment area extends along the length direction of the prefabricated aerated grit settling body 10 and is mainly used to complete the separation of aerated grit and scum; the end functional area is mainly used to arrange structures related to the discharge of treated wastewater and scum.

[0046] A width partition structure 22 is provided within the main treatment area. The width partition structure 22 extends along the length of the prefabricated aerated grit settling body 10 and is spaced from the second sidewall 14 along the width of the prefabricated aerated grit settling body 10, thereby forming an aerated grit settling zone A between the first sidewall 13 and the width partition structure 22, and a scum zone B between the width partition structure 22 and the second sidewall 14. The aerated grit settling zone A and the scum zone B are thus arranged side-by-side along the width of the prefabricated aerated grit settling body 10 and both extend along the length of the prefabricated aerated grit settling body 10.

[0047] In the illustrated embodiment, the width separation structure 22 can be a scum baffle used to separate the upper space of the scum zone B and the aerated grit chamber A. The width separation structure 22 extends downward from the upper part of the assembled aerated grit chamber 10 into the interior of the assembled aerated grit chamber 10. Its upper part is higher than the normal operating liquid level, and its lower edge is lower than the normal operating liquid level but higher than the bottom of the assembled aerated grit chamber 10. Thus, the width separation structure 22 separates the upper water surface areas of the aerated grit chamber A and the scum zone B, while the two areas remain connected below the width separation structure 22.

[0048] Because the aerated grit chamber A and the scum chamber B are interconnected below the width separation structure 22, the two areas form a connected water body and share a common operating liquid level during operation. The width separation structure 22 thus spatially separates the water surface area of ​​the scum chamber B from the strongly aerated area of ​​the aerated grit chamber A without severing the hydraulic connection between the two areas, providing a structural basis for subsequently discharging scum by changing the overall operating liquid level.

[0049] Aeration devices 30 are disposed on the side of the aerated grit chamber A near the first sidewall 13 and arranged along the length of the assembled aerated grit chamber body 10. In the illustrated embodiment, multiple aeration devices 30 can be arranged at intervals along the length direction. Each aeration device 30 is connected to an aeration fan, which supplies air to the aerated grit chamber A.

[0050] After air enters the aerated grit settling zone A, it forms rising bubbles, which in turn create a circulating water flow suitable for grit separation. Denser inorganic particles such as sand and debris in the wastewater gradually settle to the bottom of aerated grit settling zone A under the influence of water flow and gravity, while relatively lighter organic particles continue to be transported towards the effluent with the water flow. Floating scum, on the water surface, gathers in scum zone B under the influence of water flow and buoyancy, allowing grit treatment and scum treatment to take place in their respective zones.

[0051] The end functional area is equipped with an end water outlet and slag discharge structure 40. The end water outlet and slag discharge structure 40 includes a water outlet area C, a water outlet trough 41, a slag trough 42, a water outlet weir plate 43, a slag discharge weir plate 44, a level gauge 45, an automatic water outlet valve 46, and a water outlet control system.

[0052] The effluent zone C is connected to the main treatment zone. Wastewater that has undergone aeration and grit removal treatment enters the effluent zone C from the main treatment zone. An effluent weir plate 43 is installed between the effluent zone C and the effluent trough 41, with the weir crest of the effluent weir plate 43 lower than the normal operating liquid level. Under normal operating conditions, the treated wastewater entering the effluent zone C can pass over the effluent weir plate 43 into the effluent trough 41 and be discharged through the effluent path of the effluent trough 41.

[0053] The scum trough 42 is correspondingly set up to the scum zone B, and the scum discharge weir 44 is set on the path from the scum zone B to the scum trough 42. The crest of the scum discharge weir 44 is higher than the normal operating liquid level. Therefore, at the normal operating liquid level, the scum mainly accumulates in the scum zone B and does not enter the scum trough 42 in large quantities through the scum discharge weir 44.

[0054] The level gauge 45 is located in the effluent zone C. Compared to the continuously aerated grit chamber A, the effluent zone C is not directly affected by the rising bubbles and strong local circulating water flow generated by the aeration device 30, and its liquid level is relatively stable. Therefore, placing the level gauge 45 in the effluent zone C helps to reduce the impact of local liquid level fluctuations caused by aeration on the liquid level detection, so that the liquid level detected by the level gauge 45 can more stably reflect the operating liquid level within the assembled aerated grit chamber 10.

[0055] The automatic effluent valve 46 is installed on the effluent path of the effluent tank 41, and the effluent control system is connected to the level gauge 45 and the automatic effluent valve 46 respectively. During normal operation, the automatic effluent valve 46 is in the state that allows the treated wastewater to be discharged, and the assembled aeration grit chamber 10 maintains the normal operating level.

[0056] When scum removal is required, the effluent control system can close the automatic effluent valve 46. As water continues to flow into the prefabricated aerated grit chamber 10, the operating liquid level within it rises. Because the aerated grit chamber A and the scum chamber B are interconnected below the width separation structure 22, the operating liquid levels in both areas rise together.

[0057] When the operating liquid level rises from the normal operating level to the discharge level above the top of the discharge weir 44, the scum accumulated on the surface of the scum zone B rises with the liquid level and passes over the discharge weir 44 into the scum trough 42, thus achieving scum discharge. After the scum discharge is completed, the automatic effluent valve 46 can be controlled to reopen, allowing the treated wastewater to be discharged again through the effluent trough 41, and the operating liquid level in the prefabricated aeration grit chamber 10 will correspondingly return to the normal operating state.

[0058] Thus, the upper partition and lower connection formed by the width partition structure 22, together with the effluent weir plate 43, the slag discharge weir plate 44, the level gauge 45, the automatic effluent valve 46 and the effluent control system, enable the assembled aeration grit removal body 10 to discharge scum by changing its own operating liquid level, thereby reducing the reliance on independent mechanical scraping equipment.

[0059] A bottom sand guiding structure 23 is provided at the lower part of the aerated grit settling zone A. The bottom sand guiding structure 23 forms the bottom of the aerated grit settling zone A, and the lower space of the aerated grit settling zone A and the bottom sand guiding structure 23 together form the settling chamber D. The sand and gravel separated by the aeration settling action settle into the settling chamber D.

[0060] The bottom sand guiding structure 23 has a bottom surface that slopes towards a lower position, and a spiral conveying trough 231 extending along the length of the assembled aerated sand settling body 10 is formed at this lower position. The sand and gravel settling on the bottom sand guiding structure 23 can collect along the inclined bottom surface towards the spiral conveying trough 231 under the action of gravity.

[0061] In the illustrated embodiment, the spiral conveyor trough 231 is located in the middle region of the bottom of the aerated grit settling zone A, and is offset from the center of the width of the aerated grit settling zone A towards the first sidewall 13, that is, relatively offset towards the side where the aeration device 30 is located. Combined with Figure 3 The cross-sectional structure shown has a bottom sand guiding structure 23 with a transverse sand guiding bottom surface that slopes downward toward the spiral conveying trough 231 from both sides of the width direction of the aerated sand settling zone A, so that the sand and gravel settling at different positions at the bottom of the aerated sand settling zone A can be concentrated along the transverse sand guiding bottom surface toward the spiral conveying trough 231.

[0062] A spiral sand conveyor 51 is installed inside the spiral conveyor 231, and the spiral sand conveyor 51 extends along the length of the assembled aerated sand settling body 10. The sand and gravel collected in the spiral conveyor 231 are conveyed by the spiral sand conveyor 51 to the sand conveying end near the first end wall 11.

[0063] In one specific embodiment, the cross-section of the spiral conveying trough 231 is U-shaped, and the spiral sand conveyor 51 is a shaftless spiral sand conveyor. The U-shaped spiral conveying trough 231 constitutes both a sand and gravel collection area and a sand conveying space adapted to the shaftless spiral sand conveyor, allowing the sand and gravel collected in the trough to directly enter the conveying area of ​​the shaftless spiral sand conveyor.

[0064] The shaftless spiral sand conveyor eliminates the central shaft, allowing for a more continuous conveying space for sand and gravel within the spiral conveying trough 231. The U-shaped spiral conveying trough 231, when used in conjunction with the shaftless spiral sand conveyor, helps reduce the possibility of sand and gravel getting trapped between the spiral blades and the spiral conveying trough 231, thus affecting sand conveying.

[0065] Since the sand and gravel will be in continuous contact with the spiral conveying trough 231 and the spiral blades during the collection and transportation process, in one specific embodiment, the inner wall of the spiral conveying trough 231 and the spiral blades of the shaftless spiral sand conveyor are provided with a wear-resistant nylon layer to reduce the structural wear caused by long-term friction of the sand and gravel.

[0066] The shaftless spiral sand conveyor can operate intermittently. During periods when the conveyor is not in operation, settled sand and gravel continue to collect along the bottom guide structure 23 into the spiral conveying trough 231. When the conveyor is running, it transports the sand and gravel already collected in the spiral conveying trough 231 to the end of the conveying line near the first end wall 11. The specific operating interval and single operating time can be set according to the actual sand content of the influent and the equipment's processing capacity.

[0067] The sand conveying end of the spiral sand conveyor 51 is provided with a sand discharge channel, which extends downward from the sand conveying end. The sand storage and distribution device 60 is vertically installed in the equipment room below the prefabricated aerated sand settling body 10, and is located on the side close to the first end wall 11 in the length direction of the prefabricated aerated sand settling body 10, and is also located below the sand conveying end of the spiral sand conveyor 51.

[0068] The inlet of the sand storage and distributor 60 is located at its upper part and is connected to the sand discharge channel. Therefore, after the screw conveyor 51 transports the sand and gravel to the first end side, the sand and gravel can enter the sand storage and distributor 60 located below through the downwardly extending sand discharge channel.

[0069] With the above arrangement, the gravel collection structure at the bottom of the prefabricated aerated grit settling body 10, the spiral sand conveyor 51, and the sand storage and distribution device 60 in the equipment room are continuously connected in the same prefabricated aerated grit settling body. The gravel first settles downward in the aerated grit settling zone A, then collects along the bottom sand guiding structure 23 to the spiral conveying trough 231, and is then transported by the spiral sand conveyor 51 along the length of the prefabricated aerated grit settling body 10 to the first end side, and then enters the sand storage and distribution device 60 downward through the sand discharge channel. As a result, the transfer path between the bottom grit settling and the subsequent sand storage and distribution equipment can be shortened, and the configuration of additional lifting and external transfer equipment can be reduced.

[0070] The sand storage and separator 60 is used to receive the sand-water mixture sent by the screw conveyor 51 and to separate the sand and water and store the sand and gravel by utilizing the density difference between the sand and gravel and the sewage.

[0071] In one specific embodiment, the sand storage and separator 60 has a cylindrical section 61 at the top and a conical section 62 connected below the cylindrical section 61. The inlet of the sand storage and separator 60 is located at the top, and the discharge port is located at the bottom of the conical section 62. In the sand-water mixture entering the sand storage and separator 60, the denser sand and gravel gradually settle downwards and accumulate within the sand storage and separator 60. The conical section 62 further collects the settled sand and gravel towards the bottom discharge port.

[0072] In a further embodiment, the cone bottom angle of the conical section 62 can be greater than 55°, so that the gravel settling into the conical section 62 can move more smoothly along the inner wall of the conical section 62 toward the bottom sand discharge port.

[0073] A level detector 63 is installed on the sand storage and separator 60 to detect the storage height of sand and gravel inside the sand storage and separator 60. An automatic inlet valve 64 is installed at the inlet of the sand storage and separator 60. An air pressure balancing port with an air pressure balancing valve 65 is installed at the top of the sand storage and separator 60. An automatic sand discharge valve 66 is installed at the sand discharge port at the bottom of the sand storage and separator 60. The sand discharge control system is connected to the level detector 63, the automatic inlet valve 64, the air pressure balancing valve 65, and the automatic sand discharge valve 66, respectively.

[0074] Under normal sand receiving and storage conditions, the inlet automatic valve 64 is in the open state, and the sand discharge automatic valve 66 is in the closed state. The sand-water mixture conveyed by the spiral sand conveyor 51 can enter the sand storage and distribution device 60 through the sand discharge channel and the inlet of the sand storage and distribution device 60. The sand and gravel gradually settle and are stored in the sand storage and distribution device 60.

[0075] The level detector 63 continuously or periodically monitors the sand and gravel storage height in the sand storage and distribution device 60. When the level detector 63 detects that the sand and gravel have reached the preset upper limit position, it outputs a corresponding level signal to the sand discharge control system, which then starts the sand discharge procedure accordingly.

[0076] After the sand discharge procedure is started, the sand discharge control system first controls the inlet automatic valve 64 to close, so as to cut off the channel for the assembled aerated sand settling body 10 to continue to deliver the sand-water mixture to the sand storage and separator 60, thus isolating the sand storage and separator 60 from the upper sand and water input.

[0077] Subsequently, the sand discharge control system controls the air pressure balance valve 65 to open, so that the sand storage and distribution device 60 can achieve internal air pressure balance through the air pressure balance port at the top, providing the corresponding pressure conditions for the sand and gravel stored therein to be discharged by gravity.

[0078] Afterwards, the sand discharge control system controls the automatic sand discharge valve 66 to open, and the sand and gravel that have settled and gathered at the bottom of the conical section 62 in the sand storage and distribution device 60 are discharged through the sand discharge port under the action of gravity.

[0079] By controlling the imported automatic valve 64, the air pressure balance valve 65 and the sand discharge automatic valve 66 in the above sequence, the sand storage and sand separator 60 can be isolated from the upper sand and water input channel before sand discharge, and the internal air pressure balance can be completed before opening the sand discharge port. This helps to reduce the continued entry of sand and water mixture during the sand discharge process and the impact of the internal air pressure state on gravity sand discharge.

[0080] After sand discharge is completed, the sand discharge control system can sequentially control the automatic sand discharge valve 66 to close, the air pressure balance valve 65 to close, and the inlet automatic valve 64 to open, so that the sand storage and separator 60 returns from the sand discharge state isolated from the prefabricated aerated sand settling body 10 to the sand storage state connected to the sand discharge channel, and resumes receiving sand and gravel conveyed by the screw conveyor 51. Thus, the sand storage and separator 60 can cycle between sand receiving, sand storage, and sand discharge states.

[0081] The sand storage and separator 60 is also provided with an air purging port connected to a compressed air source. The air purging port is located at the lower part of the sand storage and separator 60 and can introduce compressed air into the deposited sand and gravel in the conical section 62.

[0082] When the sand and gravel have high viscosity, low moisture content, or accumulate near the conical section 62 and the sand discharge port, causing poor sand discharge, compressed air can be blown into the deposited sand and gravel through the air purging port to loosen the deposited sand and gravel and move it towards the sand discharge port, thereby reducing the possibility of blockage at the sand discharge port.

[0083] In terms of equipment space layout, the prefabricated main support frame 70 supports the prefabricated aerated grit settling body 10 while forming an equipment room using the space below the prefabricated aerated grit settling body 10. Therefore, the equipment room is not an external equipment space that is independently set up from the prefabricated aerated grit settling body 10, but rather a component of the whole machine formed by the prefabricated main support frame 70.

[0084] In one specific embodiment, the equipment room includes a sand storage room and a blower room that are separated from each other. The sand storage separator 60 is installed in the sand storage room, and the aeration blower of the aeration device 30 and the electrical control cabinet are installed in the blower room. The sand storage room can also be used to arrange pipelines and valves that cooperate with the sand storage separator 60, as well as sand carts for receiving discharged sand and gravel, and can also hold containers for collecting scum.

[0085] The sand storage room is prone to a relatively humid environment during sand discharge and scum collection, while the aeration blower and electrical control cabinet are best placed in a relatively dry space. By separating the sand storage room from the blower room, the corresponding equipment can be arranged in separate zones, allowing the lower space formed by the prefabricated main support frame 70 to simultaneously meet the arrangement needs of sand storage and separation equipment, aeration equipment, and electrical control equipment.

[0086] Thus, the prefabricated main support frame 70 serves to support the prefabricated aerated grit settling body 10 on the one hand, and forms an equipment room for integrating corresponding auxiliary equipment on the other hand, so that equipment such as sand storage separator 60, aeration blower and electrical control cabinet can be directly installed under the prefabricated aerated grit settling body 10, instead of being scattered around the prefabricated aerated grit settling body 10.

[0087] In one specific embodiment, both the prefabricated aerated grit chamber 10 and the prefabricated main support frame 70 are structures assembled from steel components. Specifically, the steel components constituting the prefabricated aerated grit chamber 10 are assembled to form an elongated tank for containing and treating wastewater, while the steel components constituting the prefabricated main support frame 70 are assembled to form a support structure for supporting the prefabricated aerated grit chamber 10 and forming an inter-equipment support structure.

[0088] The aforementioned steel components can be prefabricated and assembled on-site to form an independently operating prefabricated aerated grit chamber. The specific dimensions of the prefabricated aerated grit chamber body 10 and the prefabricated body support frame 70 can be determined according to the design processing capacity and site layout conditions; the number and spacing of the aeration devices 30, the length of the spiral sand conveyor 51, and the volume of the sand storage and distribution device 60 can also be set according to the corresponding processing scale.

[0089] In this embodiment, the prefabricated aerated grit chamber 10 and the prefabricated main support frame 70 together constitute the overall structure of the prefabricated aerated grit chamber. The prefabricated aerated grit chamber 10 mainly undertakes water treatment functions such as aerated grit chambering, scum treatment, effluent slag discharge, and bottom sand collection and conveying. While supporting the prefabricated aerated grit chamber 10, the prefabricated main support frame 70 forms an equipment room below it for arranging equipment such as the sand storage and separator 60, aeration blower, and electrical control cabinet. Thus, the main treatment space and auxiliary equipment space required for aerated grit chambering can be directly integrated into the same equipment. Compared with the method of arranging multiple auxiliary equipment around the on-site civil engineering tank, it can reduce the installation space required for the dispersed arrangement of different equipment and the corresponding connection, conveying, and equipment connection relationships, which is conducive to forming a structurally complete prefabricated aerated grit chamber unit.

[0090] Both the prefabricated aerated grit settling body 10 and the prefabricated main support frame 70 can be assembled from steel components. These components can be fabricated in locations with relatively stable processing conditions and assembled on-site. Compared to methods that primarily rely on on-site reinforced concrete construction to form the tank body, this structure reduces on-site wet work and tank construction-related procedures, allowing the installation of the main structure and equipment of the aerated grit settling facility to be largely transformed into component fabrication and on-site assembly. This improves the standardization of the equipment and shortens the on-site construction and installation cycle.

[0091] In terms of gravel treatment, the bottom sand guiding structure 23 first uses its inclined bottom surface to allow the settled gravel to collect into the spiral conveyor trough 231 under gravity. The spiral sand conveyor 51 only needs to transport the gravel already collected in the spiral conveyor trough 231 along its length to the first end. The sand storage and separator 60 is directly located below the sand conveying end of the spiral sand conveyor 51, allowing the gravel to enter the sand storage and separator 60 downwards through the sand discharge channel, where it continues to complete sand-water separation, sand storage, and bottom sand discharge. Thus, a continuous internal processing path is formed between the sedimentation, collection, and transportation of gravel from the bottom of the pool to the sand storage and separator, which can reduce the need for auxiliary conveying equipment to lift the gravel from the bottom of the pool to the independent sand-water separation equipment far away from the prefabricated aerated grit settling body 10. At the same time, the spiral sand conveyor 51 can be an intermittent shaftless spiral sand conveyor, which allows the number of core moving equipment and the continuous operating time to be controlled, which helps to reduce the burden of equipment operation and maintenance.

[0092] In terms of scum treatment, the aerated grit chamber A and the scum chamber B are hydraulically connected at the bottom by a width-separated structure 22, allowing the scum to detach from the strongly aerated water surface of the aerated grit chamber A and gather in the scum chamber B, while maintaining a common operating liquid level in both areas. Through the coordination of the level gauge 45, the automatic effluent valve 46, and the effluent control system, the scum can be allowed to pass over the discharge weir plate 44 and enter the scum trough 42 by the rise in the operating liquid level of the prefabricated aerated grit chamber 10 itself. Therefore, scum discharge can be mainly achieved through water level regulation, which helps reduce the need for independent mechanical scraping or skimming mechanisms, further integrating the scum treatment function into the prefabricated aerated grit chamber 10 itself.

[0093] In terms of sand discharge control, the sand storage and separator 60 combines sand-water separation and sand storage functions, and the actual sand storage status is detected by the level detector 63. When the sand reaches the preset upper limit, the sand discharge control system sequentially controls the inlet automatic valve 64 to close, the air pressure balance valve 65 to open, and the sand discharge automatic valve 66 to open. This isolates the sand storage and separator 60 from the upper sand-water input channel, completes internal air pressure balance, and finally discharges the sand using its own gravity. Compared to simply discharging sand according to a preset time, this allows the sand discharge operation to correspond to the actual sand storage status within the sand storage and separator 60. For sand with high viscosity, low moisture content, or localized accumulation, it can also be purged through the air purging port to improve the sand discharge status and reduce the possibility of blockage.

[0094] Furthermore, the equipment room formed by the prefabricated main support frame 70 can be further divided into a sand storage room and a blower room. The sand storage and separator 60, as well as equipment related to sand discharge and scum collection, are located in the sand storage room, while the aeration blower and electrical control cabinet are located in the blower room, thus separating the relatively humid and polluted sand and slag treatment environment from the space more suitable for the arrangement of electromechanical equipment. This utilizes the space under the prefabricated aeration and sand settling main body 10 while also accommodating the installation environment requirements of different equipment, which is conducive to improving the utilization rate of the internal space of the whole machine and improving subsequent operation and maintenance conditions.

[0095] As can be seen, this embodiment does not simply change the traditional aerated grit chamber body to an assemblable structure, but rather uses the prefabricated aerated grit chamber body 10 and the prefabricated body support frame 70 to form a complete machine frame, and integrates aerated grit chamber, scum treatment, grit collection and transportation, sand-water separation, sand storage and discharge, and related auxiliary equipment into this complete machine frame. This allows multiple treatment links that were originally scattered in and around the tank body to be continuously connected within a single prefabricated aerated grit chamber, thus taking into account equipment construction, functional integration, space utilization, and equipment simplification.

[0096] In this embodiment, the prefabricated aerated grit chamber 10 adopts an elongated trough structure extending along its length. This elongated trough structure not only forms the main treatment space for containing wastewater but also adapts to the aerated grit chamber process. The second end wall 12 is located at the inlet end, and the first end wall 11 is located at the outlet and sludge discharge end, separating the inlet and outlet positions along the length of the prefabricated aerated grit chamber 10. After entering from the side where the second end wall 12 is located, the wastewater needs to flow along the main treatment area towards the side where the first end wall 11 is located, thereby forming an effective treatment path extending along the length between the inlet and outlet ends. Compared to an arrangement where the inlet and outlet positions are adjacent to each other, the above structure helps to reduce short-flow caused by wastewater rapidly reaching the outlet position after entering, allowing the wastewater to undergo a more thorough aeration and grit chamber process within the main treatment area.

[0097] Aeration device 30 is located on the side of the aerated grit chamber A near the first sidewall 13 and is arranged along the length of the assembled aerated grit chamber body 10. The rising air bubbles generated by the aeration device 30 can cause the water in the cross-section of the aerated grit chamber A to circulate, while the wastewater to be treated flows from the inlet to the outlet along the length of the assembled aerated grit chamber body 10. This creates a flow state where the longitudinal main flow and the cross-sectional circulating flow are superimposed, causing the wastewater to rotate or spiral as it is transported forward along its length. Compared to simply passing through the tank quickly in a straight line, this flow state increases the actual movement path of the wastewater in the aerated grit chamber A and provides the necessary space and time for particles of different densities to gradually separate during the flow.

[0098] In the circulating water flow formed by the aforementioned aeration, less dense organic particles can remain suspended for a longer period and continue to move towards the outlet with the main water flow, while denser inorganic particles such as sand and debris gradually detach from the water flow under their own gravity and settle towards the grit chamber D. Therefore, the prefabricated aeration grit chamber 10 adopts a long trough structure, which allows the particle separation process to continue along the length of the main treatment area, rather than being concentrated in a short local area. The long trough thus provides continuous treatment space for aeration, swirling, particle separation, and sand and gravel settling, which is beneficial to improving the stability of the aeration grit chamber process.

[0099] Meanwhile, the elongated tank structure facilitates the continuous or intermittent arrangement of aeration devices 30 along the length, ensuring aeration at different lengths within the main treatment zone and reducing the possibility of weakened downstream treatment due to aeration only in localized areas. The specific number, spacing, and aeration intensity of the aeration devices 30 can be determined based on the length of the prefabricated aerated grit chamber 10, the design flow rate, and the sand content of the influent, to match the aeration effect with the wastewater treatment process along its length.

[0100] The prefabricated aerated grit settling body 10 adopts a long trough structure, which is also coordinated with the bottom gravel collection and conveying method. The gravel settling to the bottom of the aerated grit settling zone A first collects along the width direction of the bottom sand guiding structure 23 into the spiral conveying trough 231. The spiral conveying trough 231 then extends along the length direction of the prefabricated aerated grit settling body 10, and the spiral sand conveyor 51 conveys the collected gravel along the length direction to the sand conveying end near the first end wall 11. Therefore, a large area of ​​bottom grit can first be transformed into a linear sand flow concentrated in the spiral conveying trough 231 by the transverse sand guiding bottom surface, and then sent to the designated end through a single longitudinal spiral conveying path, which helps to simplify the bottom grit collection and conveying structure.

[0101] Therefore, the prefabricated aerated grit chamber 10 simultaneously performs two different but complementary functions along its length: on the one hand, it forms the main treatment direction for wastewater from the inlet to the outlet; on the other hand, it forms the direction for the concentrated transport of grit from the spiral grit conveyor 51 to the grit conveying end. Although the wastewater and grit are at different heights and move along different structures, they both utilize the longitudinal dimension of the same elongated main body to complete their respective treatments. This allows the elongated tank structure to simultaneously serve both the water treatment process and the mechanical transport of grit, which is beneficial for improving the utilization efficiency of the main body space.

[0102] The first end wall 11 is located at the effluent and sludge discharge end of the prefabricated aerated grit chamber 10, and its significance extends beyond simply defining an effluent interface. The length separation structure 21 is positioned close to the first end wall 11, allowing wastewater passing through the main treatment zone to enter the end functional area as it approaches the first end wall 11, and further enter the effluent zone C, passing over the effluent weir 43 and entering the effluent trough 41. Thus, the main aerated grit chamber process and the final effluent process are seamlessly connected along the length, making the end functional area the collection and output area for treated water after the main treatment zone.

[0103] Setting the effluent zone C in the end functional area near the first end wall 11 also allows the level gauge 45 to avoid the strong bubble disturbance in the aeration and grit settling zone A. In the aeration and grit settling zone A, due to the continuous operation of the aeration device 30, the local water surface is easily affected by rising bubbles and circulating water flow. However, the effluent zone C, located after the main treatment zone, does not directly bear the strong local effects of the aeration device 30, and its water surface is generally relatively stable. Therefore, setting the level gauge 45 in the effluent zone C is beneficial for obtaining a detection signal that better reflects the overall operating water level of the prefabricated aeration and grit settling main body 10, providing a more stable detection basis for subsequent adjustment of the overall water level via the automatic effluent valve 46.

[0104] On the side where the first end wall 11 is located, a scum trough 42 and a scum discharge weir 44 are simultaneously installed, allowing scum treatment to be concentrated in the end functional area along with normal effluent. The scum zone B extends along the length of the main treatment area. During wastewater treatment, the scum gradually transfers from the strongly aerated water surface of the aerated grit chamber A and accumulates in the scum zone B. When the effluent control system closes the automatic effluent valve 46, causing the operating liquid level to rise, the scum reaches the end functional area along the scum zone B and can then cross the scum discharge weir 44 into the scum trough 42. Thus, the scum accumulation area and the final scum discharge location are spatially continuous, allowing scum discharge to be completed using the hydraulic conditions of the main body itself, which helps reduce the need for specialized mechanical scraping or skimming mechanisms.

[0105] The spiral sand conveyor 51 also transports sand and gravel to the sand conveying end near the first end wall 11, thus the first end side actually becomes the main functional output end of the prefabricated aerated grit chamber. In this end area, treated wastewater is discharged through the effluent trough 41, scum is discharged through the scum trough 42, and sand and gravel are transported by the spiral sand conveyor 51 to the sand conveying end, then enter the sand storage and distribution device 60 downwards through the sand discharge channel. The three types of materials are treated and discharged along independent channels, but their end treatment positions are all concentrated on the side near the first end wall 11. This reduces the situation where different output interfaces are scattered around the prefabricated aerated grit chamber 10, making the effluent, scum discharge, sand discharge, and corresponding maintenance operations more centralized in the overall layout.

[0106] Especially for gravel, the sand storage and separator 60 is positioned below the end of the screw conveyor 51, allowing the gravel to directly enter the sand storage and separator 60 through the downward-extending discharge channel after the screw conveyor 51 completes its centralized transport along its length. The gravel thus undergoes a continuous motion process of "downward settling—lateral collection—longitudinal transport—downward entry into the sand storage and separator 60," with the downward movement and lateral collection primarily utilizing gravity, and mechanical transport mainly concentrated in the necessary longitudinal transport stages. Compared to lifting the gravel from the bottom of the pool and transporting it to a separate sand-water separation device located on the periphery of the pool, this structure helps shorten the gravel transfer path and reduces the need for additional lifting and transport equipment.

[0107] In the width direction, the aerated grit settling zone A and the scum settling zone B are arranged side by side in the same elongated tank, each serving a corresponding function. Aerated grit settling zone A requires strong aeration and circulating water flow to separate grit from lighter particles; scum settling zone B needs to form a relatively suitable water surface area for scum accumulation. The width separation structure 22 separates the upper water surface space of the two zones, thereby reducing the disturbance of the scum already in scum settling zone B caused by the direct aeration of aerated grit settling zone A. Simultaneously, the lower edge of the width separation structure 22 is higher than the bottom of the prefabricated aerated grit settling body 10, ensuring hydraulic communication between the two zones below and providing a common operating liquid level. In this way, both the strong aeration grit settling and the relatively stable scum accumulation requirements can be met within the same elongated tank, eliminating the need for a separate scum treatment tank.

[0108] From the perspective of the overall structure, the elongated trough structure of the prefabricated aerated grit settling body 10 also forms a cooperative relationship with the prefabricated main support frame 70. The elongated trough provides upper treatment space for the continuous arrangement of aerated grit settling, scum separation, bottom sand collection, and end effluent slag discharge structures along its length; the prefabricated main support frame 70, while providing overall support for the elongated trough, forms an equipment room below it for arranging equipment such as the sand storage and separator 60, aeration blowers, and electrical control cabinets. In this way, some auxiliary equipment that might have previously needed to be arranged around the perimeter of the tank can be arranged using the height space below the elongated trough, making the main treatment body in the horizontal direction and the auxiliary equipment space in the vertical direction an integrated combination, which helps to reduce the floor space occupied by the entire aerated grit settling facility.

[0109] Furthermore, both the prefabricated aerated grit settling body 10 and the prefabricated main support frame 70 adopt a structure assembled from steel components, enabling the aforementioned elongated treatment body, lower support structure, and equipment space to be constructed as a single equipment system. The main treatment area, end functional area, aerated grit settling area A, scum area B, grit settling chamber D, and spiral conveyor trough 231 within the elongated tank are all formed based on the prefabricated aerated grit settling body 10, while the lower equipment room is formed based on the prefabricated main support frame 70. Therefore, this embodiment does not simply replace the traditional concrete tank with a steel tank, but rather reorganizes the functions of aerated grit settling, scum treatment, sand and gravel collection and conveying, sand-water separation, sand storage, and sand discharge around an assemblable overall frame.

[0110] In summary, the prefabricated aerated grit chamber 10 adopts a long trough structure. On the one hand, this facilitates the formation of a long and continuous aerated grit treatment path between the inlet and outlet ends, allowing the longitudinal main water flow and the transverse circulating water flow generated by aeration to cooperate, providing treatment space for the gradual separation and sedimentation of sand and gravel. On the other hand, it also facilitates the arrangement of the spiral conveyor 231 and the spiral sand conveyor 51 along the same length direction, achieving centralized transportation of sand and gravel from the bottom of the pool. The outlet, scum discharge, and sand and gravel transportation ends are further centrally located on the side where the first end wall 11 is located, allowing different treatment products to enter their respective end treatment paths after completing the main treatment. The combination of the long trough, centralized end functions, width-direction zoning, and integrated upper and lower equipment enables the prefabricated aerated grit chamber to not only create suitable hydraulic and sedimentation conditions for aerated grit, but also to organize multiple previously dispersed treatment functions into a single, compact prefabricated device.

[0111] The overall working process of this embodiment will be further explained below. During operation, the wastewater to be treated enters the assembled aerated grit chamber 10 from the inlet end near the second end wall 12 and enters the main treatment area. The aeration device 30 introduces air into the aerated grit chamber A, so that the wastewater forms the water flow state required for aerated grit settling. The denser sand and gravel gradually settle into the grit chamber D and collect along the bottom sand guiding structure 23 to the spiral conveyor trough 231; the scum collects in the scum chamber B, which is arranged parallel to the aerated grit chamber A; the wastewater after aerated grit settling further enters the end functional area near the first end wall 11 and is discharged through the effluent zone C, the effluent weir plate 43, and the effluent trough 41.

[0112] The sand and gravel collected in the spiral conveyor 231 are transported by the spiral sand conveyor 51 along the length of the assembled aerated sedimentation body 10 to the sand conveying end near the first end wall 11, and then enter the sand storage and separator 60 located in the equipment room through the downward-extending sand discharge channel. After the sand-water mixture enters the sand storage and separator 60, sand and water are separated and the settled sand and gravel are stored. After the sand and gravel reach the preset upper limit position, gravity sand discharge is carried out by sequential control of the inlet automatic valve 64, the air pressure balance valve 65 and the sand discharge automatic valve 66; when sand discharge is not smooth, the deposited sand and gravel can also be purged through the air purging port.

[0113] For scum, the operating liquid level of the assembled aeration grit chamber 10 can be detected by the level gauge 45, and the automatic effluent valve 46 can be closed by the effluent control system, so that the operating liquid level of both the aeration grit chamber A and the scum chamber B rises. When the operating liquid level rises above the top of the discharge weir plate 44, the scum accumulated in the scum chamber B crosses the discharge weir plate 44 and enters the scum trough 42, completing the scum discharge.

[0114] Thus, the prefabricated aerated grit chamber 10 integrates an aerated grit chamber A, a scum chamber B, a grit chamber D, a spiral conveyor trough 231, and an end-discharge slag removal structure 40. The prefabricated main support frame 70 not only supports the prefabricated aerated grit chamber 10 but also forms an equipment room below it for arranging the sand storage and separator 60, aeration blower, and electrical control cabinet. The sand conveying end of the spiral sand conveyor 51 is directly connected to the sand storage and separator 60 located below it through a downwardly extending sand removal channel. Through the above structure, the functions of aerated grit removal, scum treatment, sand and gravel collection and conveying, sand-water separation, sand storage, and sand removal can be concentrated in the same prefabricated aerated grit chamber, thus forming a complete set of equipment that can be assembled from components and independently complete the aerated grit removal process.

[0115] The foregoing has described the relevant content of the present invention. Those skilled in the art will be able to implement the present invention based on these descriptions. All other embodiments obtained by those skilled in the art based on the foregoing content of this specification without inventive effort should fall within the scope of the present invention.

Claims

1. A prefabricated aerated grit chamber, characterized in that, include: The assembled aerated grit chamber has an overall elongated trough structure extending along the length direction, and has a first end wall and a second end wall arranged opposite to each other in the length direction, and a first side wall and a second side wall arranged opposite to each other in the width direction. The first end wall is located at the water outlet and slag discharge end of the assembled aerated grit chamber, and the second end wall is located at the water inlet end of the assembled aerated grit chamber. A prefabricated main support frame is disposed below the prefabricated aerated grit settling body and supports the prefabricated aerated grit settling body. The prefabricated main support frame forms an equipment room below the prefabricated aerated grit settling body. The water treatment partition structure is set inside the prefabricated aerated grit chamber, including a length partition structure, a width partition structure and a bottom sand guiding structure; The length dividing structure is disposed close to the first end wall and extends along the width direction of the assembled aerated grit chamber, so as to form an end functional area between the length dividing structure and the first end wall, and to form a main processing area extending along the length direction of the assembled aerated grit chamber between the length dividing structure and the second end wall. The width partition structure is disposed within the main treatment area and extends along the length direction of the prefabricated aerated grit chamber. The width partition structure is spaced apart from the second sidewall in the width direction of the prefabricated aerated grit chamber to form an aerated grit chamber between the first sidewall and the width partition structure, and a scum chamber between the width partition structure and the second sidewall. The aerated grit chamber and the scum chamber are arranged side by side along the width direction of the prefabricated aerated grit chamber and both extend along the length direction of the prefabricated aerated grit chamber. The width partition structure extends downward from the upper part of the prefabricated aerated grit chamber into the prefabricated aerated grit chamber. The upper part of the width partition structure is higher than the normal operating liquid level, and the lower edge of the width partition structure is lower than the normal operating liquid level but higher than the bottom of the prefabricated aerated grit chamber, so that the aerated grit chamber and the scum chamber are interconnected below the width partition structure and have a common operating liquid level. The bottom sand guiding structure is disposed at the lower part of the aerated sand settling zone and forms the bottom of the aerated sand settling zone. The bottom sand guiding structure has a bottom surface that is inclined towards the lower position, and a spiral conveying trough extending along the length direction of the assembled aerated sand settling body is formed at the lower position. The spiral conveying trough is disposed biased towards the first side wall in the width direction of the assembled aerated sand settling body. The lower space of the aerated sand settling zone and the bottom sand guiding structure together form a sand settling chamber, so that the sand and gravel settling in the sand settling chamber collect along the bottom surface of the spiral conveying trough. An aeration device is provided on the side of the aerated grit chamber near the first sidewall and arranged along the length of the assembled aerated grit chamber body, for introducing air into the aerated grit chamber. An end-feed slag discharge structure, located in the end functional area, includes a water outlet area, a water outlet trough, a slag trough, a water outlet weir plate, a slag discharge weir plate, a level gauge, an automatic water outlet valve, and a water outlet control system. The water outlet area is connected to the main treatment area. The water outlet weir plate is located between the water outlet area and the water outlet trough. The slag trough is correspondingly located to the slag area. The slag discharge weir plate is located on the path from the slag area to the slag trough. The crest of the water outlet weir plate is lower than the normal operating liquid level. The top of the weir is higher than the normal operating liquid level; the level gauge is installed in the outlet area, the automatic outlet valve is installed on the outlet path of the outlet trough, and the outlet control system is connected to the level gauge and the automatic outlet valve respectively and can control the automatic outlet valve to close, so that the operating liquid level of the interconnected aeration grit removal area and the scum removal area is raised from the normal operating liquid level to the scum removal liquid level higher than the top of the scum removal weir plate, so that the scum in the scum removal area crosses the scum removal weir plate and enters the scum removal trough; The gravel output structure includes a spiral sand conveyor and a sand discharge channel. The spiral sand conveyor is disposed in the spiral conveying trough and extends along the length of the assembled aerated sand settling body. It is used to transport the gravel collected in the spiral conveying trough to the sand conveying end near the first end wall. The sand discharge channel is disposed at the sand conveying end and extends downward from the sand conveying end. And a sand storage and separator, which is vertically installed in the equipment room and located on the side close to the first end wall in the length direction of the assembled aerated sand settling body and below the sand conveying end of the spiral sand conveyor. The sand storage and separator has an inlet located at its upper part and a sand discharge port located at its bottom. The inlet of the sand storage and separator is connected to the sand discharge channel.

2. The assembled aerated grit chamber as described in claim 1, characterized in that: The spiral conveying trough is located in the middle area of ​​the bottom of the aerated grit settling zone and is offset from the first sidewall relative to the width center of the aerated grit settling zone. The bottom sand guiding structure has a transverse sand guiding bottom surface that slopes downward toward the spiral conveying trough from both sides of the width direction of the aerated grit settling zone, so that the sand and gravel settled at different positions at the bottom of the aerated grit settling zone will collect along the transverse sand guiding bottom surface toward the spiral conveying trough under the action of gravity.

3. The assembled aerated grit chamber as described in claim 2, characterized in that: The cross-section of the spiral conveying trough is U-shaped, and the spiral sand conveyor is a shaftless spiral sand conveyor installed in the spiral conveying trough, so that the U-shaped spiral conveying trough can form a sand conveying space adapted to the shaftless spiral sand conveyor while collecting sand and gravel; the inner wall of the spiral conveying trough and the spiral blades of the shaftless spiral sand conveyor are both provided with a wear-resistant nylon layer.

4. The assembled aerated grit chamber as described in claim 1, characterized in that: The equipment room includes a sand storage room and a blower room that are separated from each other. The sand storage and separator is located in the sand storage room, and the aeration blower and electrical control cabinet of the aeration device are located in the blower room.

5. The assembled aerated grit chamber as described in claim 1, characterized in that: The sand storage and separator has a cylindrical section at the top and a conical section connected below the cylindrical section. The inlet of the sand storage and separator is located at the top of the sand storage and separator, and the discharge port is located at the bottom of the conical section. The sand-water mixture entering the sand storage and separator through the discharge channel can be separated into sand and water within the sand storage and separator by utilizing the density difference between the sand and wastewater, and the settled sand and gravel can be stored. The conical section gathers the settled sand and gravel towards the discharge port, so that the sand and gravel after sand-water separation can be discharged from the bottom of the sand storage and separator.

6. The assembled aerated grit chamber as described in claim 5, characterized in that: The sand storage and separator is also equipped with a level detector, an inlet automatic valve, a pressure balancing valve, and a sand discharge automatic valve. The inlet automatic valve is located at the inlet of the sand storage and separator, the pressure balancing valve is located at the pressure balancing port at the top of the sand storage and separator, and the sand discharge automatic valve is located at the sand discharge port. The sand discharge control system is connected to the level detector, the inlet automatic valve, the pressure balancing valve, and the sand discharge automatic valve respectively. When the level detector detects that the sand and gravel in the sand storage and separator has reached a preset upper limit position, it sequentially controls the inlet automatic valve to close, the pressure balancing valve to open, and the sand discharge automatic valve to open. This first cuts off the channel for the assembled aerated sand settling body to continue supplying sand and water mixture to the sand storage and separator, then balances the internal pressure of the sand storage and separator, and allows the sand and gravel stored therein to be discharged from the sand discharge port by gravity.

7. The assembled aerated grit chamber as described in claim 6, characterized in that: The sand storage and separator is also provided with an air purging port connected to a compressed air source. The air purging port is located at the lower part of the sand storage and separator and can introduce compressed air into the deposited sand and gravel in the conical section to loosen the deposited sand and gravel and move it toward the sand discharge port.

8. The assembled aerated grit chamber as described in claim 6, characterized in that: The sand discharge control system can also sequentially control the automatic sand discharge valve to close, the air pressure balance valve to close, and the inlet automatic valve to open after the sand storage and distribution device completes the sand discharge, so that the sand storage and distribution device can be restored from the sand discharge state isolated from the prefabricated aeration and sedimentation body to the sand storage state connected to the sand discharge channel, and can receive the sand and gravel conveyed by the spiral sand conveyor again.

9. The assembled aerated grit chamber as described in claim 1, characterized in that: Both the prefabricated aerated sedimentation body and the prefabricated body support frame are structures assembled from steel components.

10. The assembled aerated grit chamber as described in claim 1, characterized in that: The first end wall, the second end wall, the first side wall, and the second side wall are connected end to end and together form the outer perimeter of the rectangular trough of the assembled aerated sedimentation body.