A rail unloading vehicle and a long rail unloading and take-up system, and operating method.
By using a rail unloading vehicle and a long rail unloading system, and utilizing the rail guide wheel sets of the rail unloading vehicle body and auxiliary operation trolley, the problems of complex structure and insufficient safety in the existing technology are solved, realizing efficient and safe long rail unloading operations, and adapting to narrow spaces and small curve radii.
Patent Information
- Application Number
- CN202611474779.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-21
- Publication Date
- 2026-11-17
AI Technical Summary
Existing long rail unloading devices require bridge devices to be installed on long rail transport vehicles, which are complex in structure and cannot guarantee operational safety. They are also unable to adapt to the narrow space and small curve radius of tunnels, and cannot achieve off-site rail unloading.
The system employs a rail unloading vehicle and a long rail unloading and collection system. The rail unloading vehicle has rail conveying stations on both sides. The auxiliary operation trolleys are equipped with rail guide wheel sets, which can travel on the rail and fix the rail, realizing longitudinal conveying and lateral adjustment. The auxiliary operation trolleys are connected to each other to carry out rail unloading or rail collection operations.
It improves construction efficiency, enhances safety, can adapt to small radius curves, prevents rail overturning, enables single- or double-sided rail loading and unloading, and reduces labor intensity and safety risks.
Smart Images

Figure CN123109016A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of track maintenance technology, specifically to a rail unloading vehicle and a long rail unloading and collection system and operation method. Background Technology
[0002] Currently, some railway lines are constructed by welding short rails into long rails in the factory, and then transporting them directly to the site by long rail transport trains for construction. This saves a lot of construction time, and the welding quality is better when the short rails are welded in the factory.
[0003] Existing long rail handling and unloading methods can be broadly categorized into two types. One type uses longitudinally mounted long rail transport vehicles equipped with mobile rail-changing devices featuring robotic arms. These vehicles can handle long rail transport and unloading operations within tunnels and on small-radius curves, with minimal impact from construction and track conditions, and can perform unidirectional, off-site rail handling. However, due to structural limitations, the construction organization for this type of vehicle is relatively simple. The rail-changing device moves within the long rail transport vehicle, requiring tracks on the vehicle for its operation, and bridges are needed between adjacent vehicles for the device to pass through. However, the smoothness of the bridge connection with the preceding and following vehicles is poor on small curves, and the operation of the rail-changing device within the long rail transport vehicle poses safety hazards.
[0004] Another type is the long rail transport vehicle that uses lateral unloading rails on the same side. This type of long rail transport vehicle is formed by connecting multiple flatbed trucks equipped with rail hoisting devices and rail bearing devices. These long rail transport vehicles can be coupled together using hoisting devices, allowing for simultaneous lifting and lateral movement of rails from both sides of the train to achieve the unloading and loading of long rails. However, this type of long rail transport vehicle can only achieve the unloading and loading of long rails on the same side and cannot perform off-site unloading. Furthermore, this type of long rail transport vehicle is greatly affected by the construction environment and track conditions, and cannot adapt well to the narrow spaces of tunnels and small curve radii. If the line requiring rail replacement is a subway line, this type of rail transport vehicle group is difficult to operate.
[0005] The information disclosed in the background section is only intended to enhance the understanding of the background of this application, and therefore may contain information that is not part of the prior art known to those skilled in the art. Summary of the Invention
[0006] This application provides a rail unloading vehicle and a long rail unloading and collection system and operation method to solve the problems of existing long rail unloading and collection using mechanical arms and other devices, requiring the installation of bridge devices on long rail transport vehicles, complex structures, and inability to guarantee operational safety.
[0007] To achieve the above objectives, this application provides the following technical solution: A rail unloading vehicle, comprising: The rail unloading vehicle body is capable of traveling on the track; rail conveying stations are provided on both sides of the rail unloading vehicle body for longitudinal conveying of the rails to be worked. Several auxiliary operation trolleys are included, which can be housed within the rail unloading vehicle body. Each of the auxiliary operation trolleys includes an auxiliary operation trolley frame and two sets of rail guide wheel sets. The auxiliary operation trolley frame is arranged laterally along the track and can travel on the track. Each of the rail guide wheel sets is slidably connected to and fixed on the auxiliary operation trolley frame, used to support and guide the rail to be operated, so as to adjust the lateral position of the rail to be operated relative to the track. The auxiliary operation trolleys are connected to each other, and the rail unloading car body is connected to the train of auxiliary operation trolleys for rail unloading or rail collection operations.
[0008] Compared with the prior art, the rail unloading vehicle and long rail unloading system and operation method provided in the embodiments of this application have the following technical advantages: In this application, the rail unloading vehicle has two workstations, which can perform longitudinal transport operations on the rails on both sides of the lateral direction respectively; the auxiliary operation trolley has a frame and two sets of rail guide wheel sets, which slide on the frame of the auxiliary operation trolley and can be fixed to achieve lateral rail shifting, and can unload rails on one or both sides as needed, thereby improving construction efficiency; moreover, the auxiliary operation trolley is small and flexible, with a low center of gravity, which prevents the rails from tipping over during unloading, and can better adapt to unloading rails on small radius curves, thereby improving safety. Attached Figure Description
[0009] The accompanying drawings, which are included to provide a further understanding of this application and form part of this application, illustrate exemplary embodiments and are used to explain this application, but do not constitute an undue limitation of this application. In the drawings: Figure 1 This is a schematic diagram of the long rail receiving and unloading system according to an embodiment of this application; Figure 2 This is a schematic diagram of the rail-collecting operation of the rail-unloading vehicle according to an embodiment of this application; Figure 3 Figure 2 A top-view structural diagram; Figure 4 This is a schematic diagram of the structure of the rail unloading vehicle provided in the embodiments of this application; Figure 5 for Figure 4 A top-view structural diagram; Figure 6 This is a schematic diagram of the rail unloading operation of the rail unloading vehicle provided in the embodiments of this application; Figure 7This is a schematic diagram of the auxiliary operation trolley provided in the embodiments of this application, with the trolley positioned vertically at a high position. Figure 8 A schematic diagram of the auxiliary operation trolley provided in this application embodiment with its vertical position at a low level; Figure 9 This is a schematic diagram of the front view of the auxiliary work vehicle according to an embodiment of this application; Figure 10 This is a top view of the auxiliary work trolley provided in an embodiment of this application; Figure 11 This is an axonometric structural diagram of the auxiliary work trolley provided in the embodiments of this application; Figure 12 This is a schematic diagram of the isometric structure of the rail guide wheel assembly provided in an embodiment of this application; Figure 13 for Figure 12 A schematic diagram of the main structure.
[0010] Figure label: 100 auxiliary operation trolleys, 300 rail welding vehicles, 400 rail unloading vehicles, 500 rail transport vehicles, and 600 tractor vehicles; Auxiliary operation trolley frame 11, rail guide wheel assembly 12, auxiliary operation trolley traveling device 13, limit clamp assembly 14, counterweight groove 15, frame body 111, transverse sliding groove 112, transverse fixing hole 113, upper traveling roller 131, traveling side roller 132, lower guide roller 121, guide side roller 122, rail guide wheel assembly transverse sliding seat 123, transverse fixing groove 1231, rail guide wheel assembly frame 124, upper guide side roller 1221, lower guide side roller 1222, base pulley 125; 41. Rail unloading vehicle body; 42. Rail feeding device; 43. Rail shifting device; 44. Auxiliary rail feeding device; 45. Winch device; 46. Connecting rod; 47. Weld treatment device. Detailed Implementation
[0011] This invention discloses a rail unloading vehicle and a long rail unloading and collection system and operation method to solve the problems of existing long rail unloading and collection methods, such as the use of robotic arms and other devices, the need to install bridge devices on long rail transport vehicles, complex structures, and inability to guarantee operational safety.
[0012] To make the technical solutions and advantages of the embodiments of this application clearer, the exemplary embodiments of this application will be described in further detail below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not an exhaustive list of all embodiments. It should be noted that, unless otherwise specified, the embodiments and features in the embodiments of this application can be combined with each other.
[0013] Please see Figure 1-13In one specific embodiment, the rail unloading vehicle provided in this application includes a rail unloading vehicle body 41 and several auxiliary operation trolleys 100. The rail unloading vehicle body 41 can travel on the track. Rail conveying stations are provided on both sides of the rail unloading vehicle body 41 for longitudinal conveying of the rails to be unloaded. The rail unloading vehicle body 41 has a self-propelled or track-traveling special vehicle chassis and can be towed by a rail welding vehicle or railcar. Rail conveying stations are provided on both sides, each including roller sets and clamping devices. It can independently complete the longitudinal conveying, pushing, or retrieval of a single rail. Simultaneous processing of left and right rails to be unloaded or retrieved through the rail conveying stations on both sides improves operational efficiency. At the same time, the rail unloading vehicle body 41 serves as the main power platform for the auxiliary operation trolleys 100, providing them with traction and control.
[0014] Several auxiliary operation trolleys 100 can be housed within the rail unloading car body 41; each auxiliary operation trolley 100 includes an auxiliary operation trolley 100 frame and two sets of rail guide wheel sets. The auxiliary operation trolley 100 frame is arranged laterally along the track and can travel on the track; each set of rail guide wheels is slidably connected to the auxiliary operation trolley 100 frame and can be fixed to support and guide the rail to be operated, so as to adjust the lateral position of the rail to be operated relative to the track; the auxiliary operation trolleys 100 are connected to each other, and the rail unloading car body 41 is connected to the train of auxiliary operation trolleys 100 for rail unloading or rail collection operations.
[0015] The auxiliary work trolley 100 can travel on the track. The frame of the auxiliary work trolley 100 is arranged perpendicular to the track direction and straddles two steel rails, facilitating work on one or both sides of the rails. Preferably, running wheels are installed at the bottom, allowing it to roll forward on the existing track. The rail guide wheel assembly 12 supports the rail to be worked on and guides its longitudinal movement, preventing it from swaying or jamming. The rail guide wheel assembly 12 is slidably connected to the frame 11 of the auxiliary work trolley 100, allowing for lateral sliding and locking, enabling precise lateral movement of the rails. Positioning prevents lateral deviation of the rail to be worked. Before operation, the lateral position of the rail guide wheel group 12 on the frame 11 of the auxiliary operation trolley 100 can be adjusted and locked according to the rail replacement position of the rail to be worked. This enables the rail to be moved, such as moving the rail from the rail unloading car body 41 to one side of the track. The fixing structure can ensure that the rail does not move during operation through pins, clamping bolts, etc., improving construction accuracy. At the same time, the guiding function reduces the drag resistance of the rail, prevents twisting deformation, and ensures the geometric position of the rail.
[0016] like Figure 6As shown, during the rail unloading operation, the auxiliary operation trolleys 100 are connected to each other, such as by steel cables. The rail unloading car body 41 is connected to the train of auxiliary operation trolleys 100. The rail conveying station on the rail unloading car body 41 conveys the rail to be operated to the rail guide wheel group of the first group of auxiliary operation trolleys 100, and the auxiliary operation trolleys 100 are used for transition. The rail is then adjusted laterally by the rail guide wheel groups of the subsequent groups of auxiliary operation trolleys 100, and the rail to be operated is adjusted from the middle of the track to one side of the track, and unloaded as needed.
[0017] like Figure 2-3 As shown, during the rail collection operation, each auxiliary operation trolley 100 is rigidly connected, such as by a connecting rod 46. The auxiliary operation trolley 100 and the rail unloading car body 41 are also rigidly connected by a connecting rod 46. The rail guide wheel set of the auxiliary operation trolley 100 at the front end adjusts its position on the frame of the auxiliary operation trolley 100 according to the position of the rail to be worked. The position of the rail guide wheel set of the auxiliary operation trolley 100 at the rear end corresponds to the two sets of rail conveying positions of the rail unloading car body 41, so that the rail can be collected into the rail unloading car body 41. The unloading car body 41 drives the auxiliary operation trolleys 100 to move to the track to be worked. The unloading car body 41 pushes each auxiliary operation trolley 100 to move. Due to the rigid connection, each auxiliary operation trolley 100 moves forward under the push of the unloading car body 41 at the end. The rail can be manually guided into the rail guide wheel group of the auxiliary operation trolley 100 at the first end, and passes through each auxiliary operation trolley 100 in sequence. Under the push of the unloading car body 41, the auxiliary operation trolleys 100 shovel the rail until the rail enters the unloading car body 41.
[0018] When not in operation, the auxiliary work trolley 100 can be folded or embedded inside the vehicle body to save transportation space, avoid extra grouping, and improve relocation efficiency.
[0019] In one embodiment, any rail conveying station includes several auxiliary rail feeding devices 44, rail feeding devices 42, rail shifting devices 43, and weld treatment devices 47; wherein, the rail feeding devices 42 and the rail shifting devices 43 are arranged opposite each other in the longitudinal direction, the rail feeding devices 42 are located at one end of the longitudinal direction of the rail unloading car body 41, and are used to transport the rails to be worked; the rail shifting devices 43 are used to adjust the lateral position of the rails to be worked; several auxiliary rail feeding devices 44 are arranged between the rail feeding devices 42 and the rail shifting devices 43, and each auxiliary rail feeding device 44 is arranged at intervals in the longitudinal direction.
[0020] The rail feeding device 42 is located at one longitudinal end of the rail unloading car body 41, preferably near the rail welding car end; it actively pushes or pulls the rail to be worked, realizing the longitudinal movement of the rail; the rail feeding device 42 can be configured as a clamping push trolley, an active drive roller group, etc.; the rail shifting device 43 is arranged opposite to the rail feeding device 42 in the longitudinal direction, and the rail shifting device 43 can be set in the middle of the longitudinal direction of the rail unloading car body 41, and pushes the rail to move laterally through the lateral movement mechanism to realize the lateral fine adjustment of its relative to the center line of the track; each auxiliary rail feeding device 44 is arranged between the rail feeding device 42 and the rail shifting device 43, and is distributed at intervals in the longitudinal direction, providing intermediate support during the process of the rail being pushed by the rail feeding device 42 to prevent the middle part from deflecting due to its own weight; and guiding to avoid the rail from snaking or wobbling during long-distance transportation, the auxiliary rail feeding device 44 can be configured as a passive roller. In another embodiment, any rail conveying station also includes a winch device 45, which is located at the top of both longitudinal ends of the rail unloading vehicle body 41 to assist the rail in longitudinal movement and can be set as needed.
[0021] In another embodiment, the auxiliary operation trolleys 100 are arranged longitudinally on the track, and adjacent auxiliary operation trolleys 100 are rigidly connected. The rail unloading car body 41 is rigidly connected to the row of auxiliary operation trolleys 100 to push each auxiliary operation trolley 100 to shovel the rail. The rail after shoveling is guided by the rail guide wheel group of the auxiliary operation trolley 100 to the rail unloading car body 41 for rail collection.
[0022] Each trolley is arranged at a certain distance along the track direction (the direction of track extension). The distance is set according to factors such as rail length, work cycle, and structural interference, such as 3-10 meters. Adjacent trolleys are connected by rigid connecting rods 46, pins, trusses, or fixed beams to improve thrust transmission efficiency and prevent trolleys from stacking or disengaging during the track pushing process. The unloading car body 41 serves as the power source and is connected to the auxiliary operation trolley 100 via a rigid traction rod. The old rail is inserted into the rail guide wheel set of the auxiliary operation trolley 100. Under the push of the car body, the old rail is lifted and moved laterally out of the rail bearing groove. The shoveled old rail is supported and guided by the rail guide wheel sets on each auxiliary operation trolley 100. The guide wheel set not only supports the rail, but also gradually aligns the rail with the rail collection entrance on the unloading car body 41 through its adjustable lateral position. Finally, the rail is transported to the unloading car body 41 for recycling and storage. This method replaces the traditional manual pry bar and roller method, significantly reducing labor intensity and safety risks. The rigid car train ensures multi-point synchronous rail shoveling, avoiding local jamming or breakage of the old rail. The rigid connection prevents the trolley from being compressed or deflected under thrust, ensuring consistent rail shoveling action. The guide wheel set not only bears the weight, but also automatically aligns the old rail with the entrance of the unloading car body 41 through its lateral adjustment function, preventing the rail from deviating from or colliding with the car body structure during transportation.
[0023] Furthermore, the rail guide wheel assembly can be vertically adjusted relative to the auxiliary operation trolley 100; the height of the rail guide wheel assembly of the auxiliary operation trolley 100 near the rail unloading car body 41 is lower than the height of the rail conveying station, and higher than the height of the rail guide wheel assembly of the adjacent auxiliary operation trolley 100.
[0024] To ensure smooth transport of the rails from the track to the unloading car body 41, the rail guide wheel sets on each auxiliary trolley 100 can be vertically adjusted using hydraulic cylinders, screw mechanisms, or pin hole positioning. During the rail-shoveling stage, the height is lowered to facilitate insertion into the rail base; during the transport stage, the height is raised to match the height of adjacent trolleys or the car body entrance. Assuming the auxiliary trolleys 100 are arranged from closest to farthest from the unloading car body 41 as follows: trolley A (closest), trolley B, and trolley C (farthest), then: the guide wheel set height of trolley A is lower than the height of the rail transport station on the unloading car body 41, but higher than the guide wheel set height of its adjacent trolley (i.e., trolley B), forming a sloping transport channel that gradually rises towards the car body.
[0025] The specific working process is as follows: each trolley guide wheel group is adjusted to a low position suitable for shoveling the rail (especially the far end trolley is close to the rail surface); the old rail is inserted into the rail guide wheel group of the front end trolley; the unloading car body 41 pushes the trolley train forward, and the old rail is gradually lifted; at the same time, each trolley can lift the rail guide wheel group synchronously or step by step, so that the rail rises along the preset slope.
[0026] Because trolley A, located closer to the car body, is at a higher position, the rails naturally form an upward slope towards the car body during transport. This helps prevent rail slippage using the component of gravity and allows for a smooth transition to the transport station at a higher position on the car body. The guide wheel assembly of trolley A is slightly lower than the transport station on the car body, creating a minor drop or smooth connection. The rails smoothly enter the car body and are pulled into the storage area by the rail feeding device 42. This achieves a smooth lifting and transport of the rails from a low starting point to a high ending point, reducing drag resistance and protecting the rail base and rail head surfaces. It also prevents rail slippage and improves the reliability of rail collection. Furthermore, the rail unloading can be reversed to a low slope for easier rail placement.
[0027] like Figure 8-13 As shown, in one embodiment, the rail guide wheel assembly 12 includes a lower guide roller 121 and a pair of guide side rollers 122 arranged opposite to each other along the length direction of the auxiliary operation trolley frame 11. The lower guide roller 121 is used to support the bottom of the rail to be operated, and the rotation axis of the pair of guide side rollers 122 is arranged vertically for rolling connection with the rail to be operated for guidance.
[0028] The guide roller 121 supports the bottom of the rail to be worked, bears the main gravity load of the rail, prevents the rail from sagging, and can rotate around the horizontal axis to achieve rolling support and reduce longitudinal drag resistance. There are two guide rollers, which are set opposite each other along the length of the auxiliary working trolley frame 11. The rotation axis of the guide roller is set in the vertical direction, that is, the circumferential surface of the roller is a horizontal plane, which contacts the side of the rail head or the side of the rail web, restricting the lateral (horizontal) displacement of the rail, while allowing it to move freely in the longitudinal direction.
[0029] The lateral position of the rail guide roller group 12 is adjusted as needed. When the rail to be worked on (new or old rail) is placed on the rail guide roller group 12: the lower guide roller 121 supports the rail bottom from below and bears the vertical load; the two left and right guide side rollers 122 lightly press the rail web or rail head side from both sides; when the auxiliary working trolley 100 moves longitudinally along the track: the rail slides longitudinally relative to the rail guide roller group 12; because the axis of the guide side roller 122 is vertical, its circumferential surface forms a rolling friction pair with the side of the rail, allowing longitudinal movement; at the same time, the guide side roller 122 prevents the rail from shifting laterally, ensuring that it moves along the predetermined trajectory; through rolling friction, the drag resistance is reduced, and the rail bottom and rail web are prevented from being scratched or indented, ensuring the geometric accuracy of the new rail.
[0030] Furthermore, the guide wheel assembly also includes a rail guide wheel assembly transverse shift seat 123, and a pair of oppositely arranged rail guide wheel assembly frames 124 are provided along the length direction, which are spaced apart to form a rail limiting space; each rail guide wheel assembly frame 124 is provided with a guide side roller 122; the guide lower roller 121 is located between the pair of rail guide wheel assembly frames 124 and is fixed to the rail guide wheel assembly transverse shift seat 123.
[0031] Two rail guide wheel frame groups 124 are arranged opposite each other along the length of the rail guide wheel set transverse shift seat 123, with a certain distance between them. The gap between them forms a rail limiting space to accommodate the rail to be worked. Each rail guide wheel frame group 124 is equipped with a guide side roller 122. The rail guide wheel frame group 124 serves to position, support, and protect the side rollers. The rail guide wheel set transverse shift seat 123 can be slidably connected to the auxiliary working trolley frame 11 as a whole for lateral position adjustment as needed. The guide lower roller 121 is located in the lower area between the two rail guide wheel frame groups 124, directly facing the bottom of the rail. It is directly fixed to the transverse shift seat body to ensure that the guide lower roller 121 is always located directly below the rail, providing stable vertical support. Integrating the lower roller and the side roller into the same transverse shift seat avoids misalignment caused by separate adjustment. The relative positions of the three rollers remain constant during transverse movement, ensuring consistent guidance. The rigid frame structure resists the lateral force of the rail and prevents deformation. The side frames not only install rollers, but also act as physical baffles to prevent the rails from accidentally coming off the guide wheel assembly when being dragged, vibrating, or passing through curves; especially under high-speed traction or steep gradient conditions, they significantly reduce safety risks.
[0032] Furthermore, any guide roller 122 includes: an upper guide roller 1221 and a lower guide roller 1222 arranged vertically in sequence, both of which are arranged horizontally; the upper guide roller 1221 is used for rolling contact with the rail head; the rim of the lower guide roller 1222 protrudes from the rim of the upper guide roller 1221 and is used for rolling contact with the rail web.
[0033] Each guide roller 122 consists of two stacked rollers, arranged vertically in sequence as an upper guide roller 1221 and a lower guide roller 1222. The roller axes are all vertical, meaning the rollers rotate around a vertical axis, and their circumferential surfaces are horizontal, allowing for rolling contact with the rail side. The upper guide roller 1221 contacts the rail head side, providing upper lateral restraint to prevent the rail from tipping over or tilting. The lower guide roller 1222 contacts the rail neck, providing lower lateral restraint and the main guiding force. The flange of the lower guide roller 1222 protrudes further outward in the horizontal direction than the upper guide roller 1221, ensuring that the lower guide roller 1222 preferentially contacts or more closely adheres to the rail neck, forming a stable support base. When the rail to be worked is placed in the guide roller assembly: the upper guide roller 1221 is close to the side of the rail head, restricting the lateral sway of the top of the rail and preventing it from "nodding" or tipping over during movement; the lower guide roller 1222, due to its more convex flange, first contacts and adheres tightly to the rail neck (upper part of the rail web), bearing the main lateral guiding force; since the axes of both rollers are vertical, the rail can roll smoothly through during longitudinal dragging with low frictional resistance; the upper and lower double-point contact forms a "clamping" effect, realizing multi-point, layered lateral constraint of the rail, significantly improving guiding stability.
[0034] In another embodiment, the guide wheel assembly further includes base pulleys 125, located on both sides of the transverse shift seat 123 below the rail guide wheel assembly; the base pulleys 125 are located below the transverse shift seat 123 of the rail guide wheel assembly and on both sides of the transverse shift, i.e., arranged symmetrically from left to right; serving as support and rolling elements for the overall transverse movement of the guide wheel assembly; typically small-diameter rollers with bearings, with their axes set along the longitudinal direction (track direction), allowing them to roll laterally in the transverse shift groove 112. The auxiliary operation trolley frame 11 includes a frame body 111, which has a transverse shift groove 112 extending along its length, and the base pulleys 125 are located within the transverse shift groove 112 and can slide along the transverse shift groove 112. The base pulley 125 is embedded in the transverse sliding groove 112; when it is necessary to adjust the transverse position of the rail, the entire rail guide wheel assembly transverse sliding seat 123 slides laterally in the transverse sliding groove 112 through the base pulley 125; after sliding, the transverse sliding seat can be fixed to the frame by a locking mechanism (such as a pin or hydraulic clamp).
[0035] Before unloading or retrieving rails, operators need to fine-tune the lateral position of the rail to be worked on (such as aligning it with the rail support groove); after unlocking the transverse shift seat, apply lateral force (manual or hydraulic drive), and the base pulley 125 rolls in the transverse shift groove 112, driving the entire guide wheel assembly (including the upper and lower side rollers and the lower roller) to move smoothly laterally; after it is in place, the locking mechanism fixes the transverse shift seat to ensure that the rail does not move laterally during subsequent traction or dredging; due to the use of rolling friction, the required adjustment force is small and the operation is easy.
[0036] Furthermore, in order to fix the rail guide wheel assembly 12, the rail guide wheel assembly 12 also includes several transverse fixing grooves 1231, which are arranged along the length direction at the bottom of the transverse seat 123 of the rail guide wheel assembly; the frame body 111 is provided with several transverse fixing holes 113 in the length direction of the frame body 111, which are arranged in the length direction of the frame body 111 and correspond to the transverse fixing grooves 1231. The rail guide wheel assembly 12 and the frame body 111 are detachably fixedly connected by threaded fasteners, transverse fixing holes 113, and transverse fixing grooves 1231.
[0037] The transverse movement fixing groove 1231 is located at the bottom of the transverse movement seat 123 of the rail guide wheel set; it is arranged along the length direction of the transverse movement seat 123 of the rail guide wheel set (i.e., the transverse direction of the rail); there are several grooves, usually 4-10, spaced apart; they can be through grooves, countersunk grooves, or T-grooves, used to accommodate the head of threaded fasteners or to engage locking blocks. The transverse movement fixing hole 113 is located on the body of the auxiliary operation trolley frame 11; it is also arranged along the length direction of the frame; its position corresponds one-to-one with the transverse movement fixing groove 1231. When the transverse movement seat slides to any preset position, the fixing hole aligns with the fixing groove; it is usually a smooth hole or a threaded hole, used to pass through bolts or mounting screws. Threaded fasteners (such as bolts + nuts, hex socket head cap screws, etc.) are used; the fasteners pass through the transverse movement fixing hole 113 and the transverse movement fixing groove 1231 in sequence; after tightening, the transverse movement seat 123 of the rail guide wheel set is firmly locked on the frame body 111 to prevent lateral movement during operation. By combining multiple fixing holes and fixing slots, it supports multiple preset lateral positions, such as adapting to different line center distances or track gauges; the positioning is more reliable and the repeatability is higher.
[0038] In one embodiment, the auxiliary work trolley 100 further includes an auxiliary work trolley traveling device 13. The auxiliary work trolley traveling device 13 includes an auxiliary work trolley 100 traveling assembly, which is located on both sides opposite to each other below the auxiliary work trolley frame 11. Each auxiliary work trolley 100 traveling assembly includes an upper traveling roller 131 and a pair of traveling side rollers 132 arranged opposite each other along the length direction of the auxiliary work trolley frame 11. The upper traveling roller 131 is used to sit on the top of the track, and the traveling side rollers 132 are used for lateral limiting.
[0039] The auxiliary operation trolley frame 11 is arranged laterally, straddling two steel rails. A set of auxiliary operation trolley 100 traveling components is installed below each of the left and right ends of the auxiliary operation trolley frame 11. Each set of auxiliary operation trolley 100 traveling components includes an upper traveling roller 131 and a set of side traveling rollers 132. The upper traveling roller 131 sits on the top surface of the existing rail, bearing the main vertical load of the auxiliary operation trolley 100 and the rail it carries. It rotates around a transverse axis and rolls longitudinally along the rail with the trolley. The side traveling rollers 132 are arranged opposite each other along the length of the auxiliary operation trolley frame 11, with the two side rollers located on the inner and outer sides of the rail respectively, clamping the rail head. The side of the rail head makes rolling contact, providing lateral restraint and preventing the trolley from derailing or veering during operation. The lateral clamping of the side rollers forms a mechanical anti-derailment constraint, significantly improving operational safety.
[0040] To further prevent derailment, the auxiliary operation trolley 100 also includes a limiting clamp assembly 14, which is located at both ends of the auxiliary operation trolley frame 11 along its length. The limiting clamp assembly 14 includes a set of limiting clamps arranged opposite each other, forming a limiting cavity for clamping the head of the track, thereby limiting the upward movement of the auxiliary operation trolley 100.
[0041] A set of limiting clamp assemblies 14 is set at each of the left and right ends of the auxiliary operation trolley frame 11 to achieve synchronous limiting of the two rails. Each set of limiting clamp assemblies 14 contains two limiting clamps, which are arranged opposite each other and form a U-shaped cavity or C-shaped cavity with the opening facing downward. The shape of the limiting cavity matches the contour of the rail head (rail head) and can wrap around the rail head from above or from the side. The limiting clamps snap together from the upper sides of the rail head to form an "inverted U-shaped" limiting cavity, which "holds" the rail head and restricts the upward movement of the trolley. When the trolley attempts to lift, the inner wall of the limiting clamps presses against the lower jaw or side of the rail head to prevent it from leaving the track. This effectively prevents the auxiliary operation trolley 100 from jumping off the track and greatly improves the safety of operation.
[0042] Furthermore, the auxiliary work trolley 100 also includes a counterweight slot 15 located on the auxiliary work trolley frame 11 for detachable fixed connection with the auxiliary work trolley frame 11.
[0043] The counterweight groove 15 can be configured as a groove, tray, bracket or platform with mounting holes. It mainly supports the detachable counterweight block. It has mounting holes that can be matched with the transverse moving fixing holes 113 of the auxiliary operation trolley frame 11 and fixed by bolts, pins or other means to realize the flexibility of adding or removing counterweight as needed; and prevent the auxiliary operation trolley 100 from overturning due to uneven load when the rail guide wheel group 12 is located on one side of the auxiliary operation trolley frame 11.
[0044] In one optional embodiment, the auxiliary work trolley frame 11 is also provided with traction lugs at both ends, and a handle is provided at the bottom middle of the auxiliary work trolley frame 11. The traction lugs and / or the handle are connected to the traction trolley winch 22 via a flexible connector.
[0045] The auxiliary work trolley frame 11 is connected to the traction trolley 200 through the traction lugs at both ends. The traction lugs are lugs, eyelets or pin seats with through holes, which serve as the main force connection points to transmit traction force. Because they are located at both ends of the frame, they can achieve multi-point balanced force and avoid frame twisting.
[0046] In another embodiment, a handle can be provided at the bottom middle of the auxiliary work trolley frame 11 to assist in connecting the traction rope, making it convenient for on-site personnel to lift, position, or flip the trolley; the flexible connector can be connected to the traction lug, the handle, or both at the same time, and connected to the traction trolley winch 22 (such as a drum or winch) to form a complete traction circuit.
[0047] In one specific embodiment, the auxiliary operation trolleys of the track replacement system provided in this application are all standardized units with the same structure and uniform specifications of core components. The number of trolleys can be flexibly increased or decreased according to the number of rails to be replaced and the limitations of the construction site. There is no need to design separate equipment for different working conditions, which greatly reduces the complexity of construction organization and is suitable for track replacement needs of various lines such as main lines, branch lines, and stations. Multi-scenario position adaptation: The rail guide wheel set can slide and adjust left and right along the frame of the auxiliary operation trolley, so that the placement position of the new rail and the old rail can be flexibly selected (single side outside the track, both sides outside the track, etc.), without being restricted by a fixed operation path. It can easily cope with complex track environments such as curves and near turnouts, solving the problem of the single operation scenario of traditional equipment.
[0048] Each auxiliary operation trolley uses a single crossbeam as its frame, making it smaller than existing equipment. The rail lifting height is low, minimizing the impact of rail shifting and making it more adaptable to confined construction spaces in urban rail and subway systems. The traction trolley replaces the railcar to provide traction for rail replacement; after operation, the traction trolley can be retracted into the rail replacement train, shortening the train length and adapting to more stations. The auxiliary operation trolley is lightweight, making loading and unloading from transport vehicles more convenient.
[0049] This application also provides a long rail receiving and unloading system, including a traction vehicle 600, a rail transport vehicle 500, a rail welding vehicle 300 and an unloading vehicle 400 of any of the above embodiments connected in sequence. The rail welding vehicle includes a rail welding vehicle body, with rail conveying stations on both sides of the rail welding vehicle body for longitudinal conveying of the rails to be worked on; a welding device, a crane and a weld treatment device are provided at one longitudinal end of the rail welding vehicle body.
[0050] The aforementioned long rail unloading and collection system is used for rail unloading operations. The vehicle formation of the long rail unloading and collection system consists of a rail unloading car, a rail welding car, a rail transport car (4 in total), and a rail traction car. The rail unloading car is used for rail unloading and collection operations, the rail welding car can weld the rails, the rail transport car stores and transports the rails, and the traction car provides traction power.
[0051] Based on the long rail receiving and unloading system described in the above embodiments, this application also provides an operating method, which includes: S11: The tractor unit drives the train set along the track to the work area, and the rail unloading vehicle unloads each auxiliary work trolley to the work position on the track; The long rail transport vehicle is towed to the work area. The auxiliary working trolley is released manually or by towing, and then moved to the work position. The tail end of the rail unloading vehicle is connected to the auxiliary working trolley, and the auxiliary working trolleys are connected to each other. The winch on the rail welding vehicle is connected to the rail to be unloaded. S12: Adjust the lateral and vertical positions of the rail guide wheel sets of each auxiliary operation trolley on the auxiliary operation trolley frame according to the same-side or opposite-side rail unloading method; The rail guide wheel assembly selectively moves the rail from one side to the other, or from both sides to the outside, or does not move the rail at all; S13: The rail conveying station of the rail welding car and the rail unloading car sequentially conveys the first rail to be worked along the longitudinal direction, so that the first rail to be worked enters the rail guide wheel group of each of the auxiliary working trolleys in sequence, and continues to convey so that one end of the first rail to be worked falls to the ground and is fixed in a preset position. Power is provided by the hoisting device and rail feeding device of the rail welding car and rail unloading car, and the rail is moved longitudinally through the rail conveying station; the rail is moved longitudinally through the rail conveying station so that the first rail enters the rail guide wheel group of each auxiliary operation trolley in sequence. S14: The tractor drives the train set to move forward longitudinally to the end of the first rail to be worked and arrive at the welding station of the rail welding vehicle. The rail conveying station of the rail welding vehicle conveys the second rail to be worked to the welding station and welds the first rail and the second rail to be worked. The conveying steps for the second rail to be worked can refer to the conveying steps for the first rail to be worked. S15: The tractor continues to drive the train set forward longitudinally, and the rail feeding device of the rail welding car and the rail unloading car is opened until the first rail to be worked is detached from the auxiliary operation trolley train; the long rail receiving and unloading system has multiple rails, and the above steps S12-S15 can be repeated until all the transported rails are unloaded.
[0052] In another embodiment, after the tractor drives the train set along the track to the work area, and the unloading vehicle unloads the auxiliary trolleys to the work positions on the track, the method further includes: Adjust the lateral and vertical positions of the rail guide wheel sets of each auxiliary operation trolley on the frame of the auxiliary operation trolley according to the same or opposite side rail winding method; The tractor pushes the train set with the rail unloading car as the lead car, pushing the auxiliary operation trolley at the front end to the end of the rail to be worked, and guiding the rail to be worked into the rail guide wheel set of the auxiliary operation trolley at the front end; The driving tractor pushes the train set to move longitudinally, so that the rails to be worked enter the guide wheel set of the auxiliary operation trolley at the rear end in sequence, and then enter the rail unloading car, rail welding car and rail transport car in sequence; so that the first rail passes through the conveying channels on both sides of the rail unloading car and rail welding car until the rails to be recovered are completely returned to the rail transport train set; the auxiliary operation trolley is recovered, the rails are fixed, and the vehicle drives out of the construction area.
[0053] Although preferred embodiments of this application have been described, those skilled in the art, upon learning the basic inventive concept, can make other changes and modifications to these embodiments. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments as well as all changes and modifications falling within the scope of this application.
[0054] Obviously, those skilled in the art can make various modifications and variations to this application without departing from the spirit and scope of this application. Therefore, if such modifications and variations fall within the scope of the claims of this application and their equivalents, this application also intends to include such modifications and variations.
Claims
1. A rail unloading vehicle, characterized in that, include: The rail unloading vehicle body is capable of traveling on the track; rail conveying stations are provided on both sides of the rail unloading vehicle body for longitudinal conveying of the rails to be worked on. Several auxiliary operation trolleys are included, which can be housed within the rail unloading vehicle body. Each of the auxiliary operation trolleys includes an auxiliary operation trolley frame and two sets of rail guide wheel sets. The auxiliary operation trolley frame is arranged laterally along the track and can travel on the track. Each of the rail guide wheel sets is slidably connected to and fixed on the auxiliary operation trolley frame, used to support and guide the rail to be operated, so as to adjust the lateral position of the rail to be operated relative to the track. The auxiliary operation trolleys are connected to form a train, and the rail unloading car body is connected to the train of auxiliary operation trolleys for rail unloading or rail collection operations.
2. The rail unloading vehicle according to claim 1, characterized in that, Any of the aforementioned rail conveying stations includes: A rail feeding device and a rail shifting device are arranged along the longitudinal direction of the rail unloading car body. The rail feeding device is located at one end of the longitudinal direction of the rail unloading car body and is used to transport the rail to be operated. The rail shifting device is used to adjust the lateral position of the rail to be operated. A plurality of auxiliary rail feeding devices are provided between the rail feeding device and the rail shifting device, and each of the auxiliary rail feeding devices is arranged at intervals along the longitudinal direction.
3. The rail unloading vehicle according to claim 1, characterized in that, The auxiliary operation trolleys are arranged longitudinally on the track, and adjacent auxiliary operation trolleys are rigidly connected. The rail unloading car body is rigidly connected to the auxiliary operation trolleys and is used to push each auxiliary operation trolley to shovel the rail. The rail after shoveling is guided by the rail guide wheel group of the auxiliary operation trolley to the rail unloading car body for rail collection.
4. The rail unloading vehicle according to claim 3, characterized in that, The position of the rail guide wheel assembly relative to the auxiliary working trolley is adjustable in the vertical direction; The height of the rail guide wheel assembly of the auxiliary operation trolley near the rail unloading vehicle body is lower than the height of the rail conveying station, but higher than the height of the rail guide wheel assembly of the adjacent auxiliary operation trolley.
5. The rail unloading vehicle according to claim 1, characterized in that, The rail guide wheel assembly includes a lower guide roller and a pair of guide side rollers arranged opposite each other along the length of the auxiliary working trolley frame. The lower guide roller is used to support the bottom of the rail to be worked, and the rotation axis of the pair of guide side rollers is arranged vertically for rolling connection with the rail to be worked for guidance.
6. The rail unloading vehicle according to claim 5, characterized in that, The guide wheel assembly also includes: The rail guide wheel assembly transverse shifting seat has a pair of oppositely arranged rail guide wheel assembly frames along the length direction, which are spaced apart to form a rail limiting space; each of the rail guide wheel assembly frames is provided with a guide side roller; The guide roller is located between the pair of rail guide wheel frames and is fixed to the rail guide wheel transverse shift seat.
7. The rail unloading vehicle according to claim 6, characterized in that, Any of the guide rollers includes: The upper guide roller and the lower guide roller are arranged vertically in sequence, and both the upper guide roller and the lower guide roller are arranged horizontally. The upper guide roller is used for rolling contact with the rail head; the rim of the lower guide roller protrudes from the rim of the upper guide roller and is used for rolling contact with the rail web.
8. A long steel rail unloading system, characterized in that, It includes a tractor, a rail transport vehicle, a rail welding vehicle, and a rail unloading vehicle as described in any one of claims 1-7, connected in sequence. The rail welding vehicle includes a rail welding vehicle body, with rail conveying stations on both sides of the rail welding vehicle body for longitudinal conveying of the rails to be worked on; a welding device, a crane and a weld treatment device are provided at one longitudinal end of the rail welding vehicle body.
9. A method for operating a long rail receiving and unloading system based on claim 8, characterized in that, The method includes: The tractor unit drives the train set along the track to the work area, and the rail unloading vehicle unloads the auxiliary work trolleys to the work positions on the track. Adjust the lateral and vertical positions of the rail guide wheel sets of each auxiliary operation trolley on the auxiliary operation trolley frame according to the same-side or opposite-side rail unloading method; The rail conveying station of the rail welding car and the rail unloading car sequentially conveys the first rail to be worked along the longitudinal direction, so that the first rail to be worked enters the rail guide wheel group of each of the auxiliary working trolleys in sequence, and continues to convey so that one end of the first rail to be worked falls to the ground and is fixed in a preset position. The tractor drives the train set to move longitudinally forward to the end of the first rail to be worked and arrive at the welding station of the rail welding vehicle. The rail conveying station of the rail welding vehicle conveys the second rail to be worked to the welding station, and the first rail and the second rail to be worked are welded together. The tractor continues to move the train forward longitudinally until the first rail to be worked on detaches from the auxiliary work trolley train.
10. The operating method according to claim 9, characterized in that, The method further includes: the tractor-trailer drives the train set along the track to the work area, and after the rail unloading vehicle unloads the auxiliary work trolleys to the work positions on the track, the method also includes: Adjust the lateral and vertical positions of the rail guide wheel sets of each auxiliary operation trolley on the auxiliary operation trolley frame according to the same-side or opposite-side rail winding method; The tractor pushes the train set with the rail unloading car as the lead car, pushing the auxiliary operation trolley at the front end to the end of the rail to be worked, and guiding the rail to be worked into the rail guide wheel set of the auxiliary operation trolley at the front end; The driving tractor pushes the train set to move longitudinally, so that the rails to be worked enter the guide wheel set of the auxiliary working trolley at the rear in sequence, and then enter the rail unloading car, rail welding car and rail transport car in sequence.