A square steel barrel wharf structure suitable for soft soil foundation and its construction method
By adopting a square steel barrel structure and a continuous quay wall construction method, the problems of equipment load-bearing capacity and construction efficiency of wharf structures on deep-water soft soil foundations were solved, achieving efficient and safe wharf construction.
Patent Information
- Application Number
- CN202611146067.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-30
- Publication Date
- 2026-11-17
AI Technical Summary
Existing technologies make it difficult to construct efficient, fast, and safe wharf structures on deep-water soft soil foundations. Traditional circular steel cylinder structures cannot meet the load-bearing requirements of equipment, and modular combination results in poor performance, low construction efficiency, and poor environmental friendliness.
The structure adopts a square steel barrel structure, including a rectangular steel cylinder, vertical stiffening ribs, annular reinforcing plates, and straight connecting components. It is prefabricated in the factory, positioned at sea, and installed by vibration sinking to form a continuous integral shoreline. Combined with vertical pile foundations and backfill reinforcement, it achieves rapid connection and water stoppage.
It improved the load-bearing capacity and construction efficiency of the wharf structure, reduced underwater operations, shortened the construction period, reduced project costs, enhanced the stability and safety of the structure, and met the construction needs of deep-water soft soil foundations.
Smart Images

Figure CN123109093A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of port terminal technology, and in particular to a square steel barrel terminal structure suitable for soft soil foundations and its construction method. Background Technology
[0002] During the construction of deep-water offshore ports, coastlines and artificial islands, the construction sites are often covered with thick layers of silt, silty soil and other soft soil layers. These soils generally have engineering characteristics such as low foundation bearing capacity, high compressibility, long consolidation settlement period and poor overall stability. At the same time, the offshore operation area has high water flow velocity, frequent wave loads and harsh marine construction environment, which puts forward stringent technical requirements on the overall structural stability of the wharf structure, the adaptability of soft soil foundation and construction efficiency.
[0003] Currently, the mainstream wharf structures suitable for deep-water soft soil foundations are traditional gravity block wharves, caisson wharves, and high-pile beam-slab wharves. Among them, gravity block wharves and caisson wharves require large-scale trench dredging, riprap foundation leveling, and layered masonry and pouring operations during construction. The underwater construction procedures are complicated, the overall construction period is long, the construction process causes significant silt disturbance, has poor ecological and environmental protection, and is difficult to adapt to the complex working conditions of ultra-thick soft soil foundations. High-pile beam-slab wharves have extremely high requirements for the precision control of pile foundation construction, and the construction process requires the construction of permanent embankments to assist in the operation. Not only is the construction period lengthy, but the overall project cost is also relatively high.
[0004] In addition to the methods mentioned above, large-diameter steel cylindrical structures, which are prefabricated in factories, immersed in the sea as a whole, and have good structural integrity, are widely used in the construction of offshore marine engineering embankments. This effectively improves the problems of low construction efficiency and poor adaptability to soft soil foundations in traditional embankment construction techniques. However, engineering practice has verified that this type of circular steel cylindrical structure still has obvious technical shortcomings and cannot meet the needs of modern deep-water wharf construction: First, the top surface of the circular cylinder is an arc-shaped curved surface structure, which concentrates the force and has poor uniformity, making it unable to meet the long-term and stable load-bearing requirements of the wharf's vertical crane equipment, resulting in insufficient equipment compatibility and structural safety; Second, when the circular cylinders are modularly combined and arranged, the fit between the cylinders is poor, the regularity of the formed quay wall is insufficient, and the compatibility with the upper wharf paving, tracks, equipment foundations, and other structures is weak, making it difficult to achieve standardized and modular rapid assembly construction, which restricts the improvement of the overall construction efficiency of the wharf.
[0005] Therefore, there is an urgent need for a square steel barrel wharf structure and construction method suitable for deep-water soft soil foundations, which features regular structure, good equipment stress performance, convenient assembly, strong adaptability to soft soil foundations, and efficient and rapid construction. Summary of the Invention
[0006] The purpose of this invention is to provide a square steel barrel wharf structure and construction method suitable for deep-water soft soil foundations that solves the above-mentioned problems.
[0007] To achieve the above objectives, the present invention adopts the following technical solution:
[0008] A square steel barrel wharf structure suitable for soft soil foundations includes:
[0009] Multiple sets of square steel tubular structures of equal specifications, straight connecting components, and vertical pile foundations are provided. The square steel tubular structures are rectangular steel cylinder structures that run vertically through the ground. Vertical stiffening ribs and annular reinforcing plates are arranged on the side walls. A pre-installed platform is provided on the top of the square steel tubular structures. The vertical pile foundations are located inside the square steel tubular structures, with their lower ends inserted into the soft soil foundation and their upper ends connected to the concrete breast wall. The straight connecting components are set between the side walls of adjacent square steel tubular structures.
[0010] Preferably, the rectangular cross-section of the square steel tub has a side length of 14m-28m.
[0011] Preferably, the square steel tub is provided with internal supports, which are rectangular structures composed of four internal support plates / beams. The two ends of each internal support plate / beam are fixedly connected to the adjacent inner walls of the square steel tub.
[0012] Preferably, the vertical pile foundation, the square steel tube, and the concrete breast wall are cast and connected as a whole to form a combined force-bearing system.
[0013] Preferably, the straight connection assembly includes multiple sheet piles of the same specifications. Each sheet pile has two locking slots. The adjacent side walls of the square steel tube are provided with locking slot grooves that are compatible with the locking slots. The sheet piles are vertically inserted into the locking slot grooves of the square steel tubes on both sides through the locking slots.
[0014] Preferably, a construction method for a square steel barrel wharf structure suitable for soft soil foundation includes:
[0015] S1. Factory modular prefabrication: Prefabricate square steel barrels in batches according to design dimensions, complete barrel stiffening rib welding, overall flaw detection, anti-corrosion treatment and top platform pre-installation;
[0016] S2. Marine Transportation and Positioning: The square steel barrels are transported to the construction site by transport ships. The GPS-RTK dynamic positioning system is used in conjunction with the crane ship for precise positioning, and the mud surface of the construction sea area is simply leveled.
[0017] S3. Vibratory sinking installation: The square steel barrel is hoisted to the design position and relies on its own weight to complete the initial sinking. The verticality and plane position of the barrel are adjusted, and a combination of vibratory hammers is used to carry out overall vibration sinking until the design depth and elevation are reached.
[0018] S4. Quick connection water stop: After the adjacent square steel barrels are placed in place, install the straight connection components, fix them by welding on the water and cooperate with the sealing structure to complete the joint water stop, forming a continuous integral bank structure.
[0019] S5. Sand is pumped into the square steel barrel in layers using water-based filling equipment, and drainage boards are installed and dewatering measures are taken to reinforce and consolidate the filling material and the bottom soft soil.
[0020] S6. Construction of vertical pile foundation: The piles are formed in the square steel tube using the cast-in-place pile process. The pile tip passes through the bottom of the square steel tube and is anchored into the soft soil bearing layer. An anchorage section is reserved at the top of the pile.
[0021] S7. Lay two stone cushion layers to level the base, and cast the top reinforced concrete base in place to realize the integrated casting and forming of the square steel barrel and the vertical pile foundation, thus completing the overall stress reinforcement.
[0022] S8. Construction of the superstructure: After the foundation concrete reaches the required strength, the breast wall, track beam and wharf surface are poured in sections, and auxiliary facilities such as fenders and mooring bollards are installed to complete the overall wharf construction.
[0023] Compared with the prior art, the beneficial effects of the present invention are:
[0024] 1. This invention uses square steel tubing to replace the traditional circular steel cylinder. The top of the tubing is a flat planar structure, which ensures uniform stress distribution and eliminates stress concentration issues. It can stably bear the long-term operating loads of large vertical cranes and loading and unloading equipment at the wharf, completely solving the technical problem that the curved top surface of the traditional circular cylinder cannot adapt to the stress of the wharf equipment. At the same time, the square steel tubing is arranged linearly and neatly, and the formed quay wall is flat and continuous, which effectively improves the overall construction quality and forming effect of the wharf, while significantly improving the operational safety and durability of the wharf structure.
[0025] 2. This invention uses square modular components of equal specifications, which are prefabricated in batches in the factory and sunk as a whole at sea. The adjacent barrels fit together flat and are easy to align, eliminating the need for complex arc-shaped sub-grid components. This greatly simplifies the connection and water-stopping construction procedures and reduces the amount of underwater work. At the same time, there is no need to build permanent embankments to assist in construction. Compared with traditional wharf structures and circular steel cylinder structures, it can significantly shorten the construction period at sea and meet the needs of rapid construction of deep-water soft foundation wharves.
[0026] 3. The present invention uses a square steel barrel as an integral gravity foundation, which can be directly adapted to deep-water, thick-layered soft soil foundation conditions. It does not require large-scale trench dredging and complex foundation treatment. Only a very small amount of mud and sand disturbance is generated when the barrel is inserted, reducing the impact on the marine ecology. In addition, the components are highly standardized, the prefabrication cost is low, and the construction process is simplified, which effectively reduces the overall project cost. At the same time, the retaining structure composed of square steel barrels also has the advantages of high overall rigidity, anti-slip and anti-overturning performance, which can effectively resist complex loads such as high current velocity and large waves in the open sea.
[0027] 4. This invention can quickly form a fence structure to meet the needs of subsequent land reclamation construction and significantly shorten the project implementation cycle. Attached Figure Description
[0028] Figure 1 This is a schematic cross-sectional view of a square steel barrel wharf structure suitable for soft soil foundations.
[0029] Figure 2 This is a schematic cross-sectional view of the connection of multiple square steel tubs in an embodiment of the present invention;
[0030] Figure 3 This is a schematic cross-sectional view of the steel sheet pile in an embodiment of the present invention.
[0031] 1. Square steel tubular structure; 10. Pre-assembled platform; 11. Internal bracing; 2. Straight connection assembly; 20. Steel sheet pile; 200. Locking joint; 3. Vertical pile foundation; Detailed Implementation
[0032] Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. However, it should be understood that these descriptions are merely exemplary and not intended to limit the scope of the invention. In the following detailed description, many specific details are set forth for ease of explanation to provide a full understanding of the embodiments of the present invention. However, it is obvious that one or more embodiments may be implemented without these specific details. Furthermore, in the following description, descriptions of well-known structures and techniques are omitted to avoid unnecessarily obscuring the concept of the present invention.
[0033] The terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the invention. The terms “comprising”, “including”, etc., as used herein indicate the presence of features, steps, operations and / or components, but do not exclude the presence or addition of one or more other features, steps, operations or components.
[0034] All terms used herein (including technical and scientific terms) have the meanings commonly understood by those skilled in the art, unless otherwise defined. It should be noted that the terms used herein should be interpreted in a manner consistent with the context of this specification and should not be interpreted in an idealized or overly rigid manner.
[0035] Please see the appendix Figure 1-2
[0036] A square steel barrel wharf structure suitable for soft soil foundations and its construction method, comprising:
[0037] Multiple sets of equal-sized square steel tubular cylinders 1, straight connecting components 2, and vertical pile foundations 3 are provided. The square steel tubular cylinder 1 is a rectangular steel cylinder structure that runs vertically through the body. Its side walls are provided with vertical stiffening ribs and annular reinforcing plates. The top of the square steel tubular cylinder 1 is provided with a pre-installed platform 10. The vertical pile foundation 3 is located inside the square steel tubular cylinder 1. Its lower end is inserted into the soft soil foundation to the required bearing capacity depth, and its upper end is connected to the concrete breast wall. The straight connecting components 2 are set between the side walls of adjacent square steel tubular cylinders 1.
[0038] The square steel cylinder is a rectangular steel cylinder structure that runs vertically through the interior and exterior. It is prefabricated in the factory as a whole. The side walls of the cylinder are equipped with vertical stiffening ribs and circumferential reinforcing plates to greatly improve the overall rigidity and deformation resistance of the cylinder. Depending on the working conditions, an appropriate number of vertical piles 3 are evenly arranged inside the square steel cylinder 1 to jointly bear the concentrated vertical load and effectively meet the vertical bearing requirements of large equipment at the wharf front. It should be noted that in some cases, the vertical bearing capacity of the square steel cylinder 1 itself is sufficient for the construction requirements, and there is no need to arrange additional vertical piles 3.
[0039] The top surface of the square steel tub 1 is a flat, planar structure with uniform stress distribution and no stress concentration, resulting in excellent vertical bearing capacity. Furthermore, the top of the square steel tub 1 is equipped with a flat, enclosed prefabricated steel roof platform 10, forming a complete load-bearing base surface that provides uniform support for the superstructure and loading / unloading equipment. The square steel tubs 1 are arranged closely along the wharf shoreline, with the side walls of adjacent square steel tubs 1 fitting together flatly. Reliable fixing and watertight connection are achieved through flat connecting components 2, replacing the traditional arc-shaped sub-grid structure. This allows for the rapid formation of a continuous, regular, and highly integrated shoreline enclosure system. In addition, the interior of the square steel tub 1 is filled with sand to construct a backfill reinforcement system. Simultaneously, plastic drainage boards are installed in the soil within the square steel tub 1, along with corresponding dewatering equipment. The combination of self-weight and dewatering pressurization achieves rapid consolidation and reinforcement of the soft soil. The reinforcement process is simple, economical, and highly efficient.
[0040] The entire structure relies on the self-weight of the square steel barrel 1 and the combined self-weight of the backfill inside the barrel, along with the post-grouting reinforced strata and the vertical pile foundation 3 to jointly bear the force, effectively resisting external pressure, wave loads and ship berthing forces.
[0041] Specifically, the rectangular cross-section of the square steel tub 1 has a side length of 14m-28m. The side length of the square steel tub 1 is usually 14m-28m, and the depth is prefabricated according to the actual situation. There are no rigid requirements. The selection of the side length of the square steel tub 1 is determined by factors such as the ship's lifting capacity and the foundation. The side length of the square steel tub 1 increases with the increase of the depth of the soft stratum.
[0042] Please see the appendix Figure 2
[0043] Specifically, the square steel tub 1 is provided with an internal support 11, which is a rectangular structure composed of four internal support plates / beams. The two ends of each internal support plate / beam are fixedly connected to the adjacent inner walls of the square steel tub 1.
[0044] In order to further enhance the structural rigidity and deformation resistance of the square steel tub 1 during sinking and use, and to prevent the tub wall of the square steel tub 1 from buckling and becoming unstable under external pressure, inner supports 11 are arranged on the tub wall to provide radial support. It should be noted that the number of inner supports 11 and the distance between adjacent inner supports 11 are arranged according to the actual situation.
[0045] Specifically, the vertical pile foundation 3, the square steel tube 1, and the concrete breast wall are cast and connected as a whole to form a combined force-bearing system;
[0046] Specifically, the straight connection component 2 includes multiple sheet piles 20 of equal specifications. Each sheet pile 20 has two locking slots 200. The adjacent side walls of the square steel tubular barrel 1 are provided with locking slot grooves that are adapted to the locking slots 200. The sheet piles 20 are vertically inserted into the locking slot grooves of the square steel tubular barrels 1 on both sides through the locking slots 200. The adjacent square steel tubular barrels 1 are connected by the sheet piles 20, thereby achieving reliable fixation to the water-stop connection and quickly forming a continuous, regular, and highly integrated bank wall protection system.
[0047] Specifically, a construction method for a square steel barrel wharf structure suitable for soft soil foundations includes:
[0048] S1. Factory modular prefabrication: The square steel barrel 1 is prefabricated in batches according to the design dimensions, and the barrel body stiffening rib welding, overall flaw detection, anti-corrosion treatment and top platform pre-installation are completed.
[0049] S2. Marine Transportation and Positioning: The square steel barrel 1 is transported to the construction site by a transport ship. The GPS-RTK dynamic positioning system is used in conjunction with the crane ship for precise positioning, and the mud surface of the construction sea area is simply leveled.
[0050] S3. Vibration sinking installation: The square steel barrel 1 is hoisted to the design position and relies on its own weight to complete the initial self-sinking. The verticality and plane position of the barrel are adjusted, and the combined vibratory hammer group is used to carry out the overall vibration sinking until the design soil depth and elevation are reached.
[0051] S4. Quick connection water stop: After the adjacent square steel barrels are placed in place, the straight connection component 2 is installed. The joint is fixed by welding on the water and sealed with a sealing structure to complete the water stop and form a continuous integral bank structure.
[0052] S5. Sand is blown into the square steel barrel 1 in layers using a water-based filling equipment, and drainage boards are installed and dewatering measures are taken to reinforce and consolidate the filling material and the bottom soft soil.
[0053] S6. Construction of vertical pile foundation 3: The pile is formed in the square steel tube 1 using the cast-in-place pile process. The pile end passes through the bottom of the square steel tube 1 and is anchored into the soft soil bearing layer. An anchorage section is reserved at the top of the pile.
[0054] S7. Lay two stone cushion layers to level the base, and cast the top reinforced concrete base in place to realize the integrated casting and forming of square steel barrel 1 and vertical pile foundation 3, and complete the overall stress reinforcement.
[0055] S8. Construction of the superstructure: After the foundation concrete reaches the required strength, the breast wall, track beam and wharf surface are poured in sections, and auxiliary facilities such as fenders and mooring bollards are installed to complete the overall wharf construction.
[0056] The main components used in the construction of this invention, such as the square steel tub 1, the straight connecting component 2, and the internal support 11, are prefabricated. Compared with traditional processes, this eliminates the need for large-scale dredging, riprap bed leveling, and sealing layer masonry and pouring operations, effectively reducing on-site work and shortening the on-site construction period. It has the advantages of high degree of assembly and fast construction efficiency. At the same time, the prefabrication of the main components also ensures the excellent structural performance of the components and strong equipment adaptability, making it more suitable for the construction of wharves on soft soil foundations.
[0057] The above description is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any equivalent substitutions or modifications made by those skilled in the art within the scope of the technology disclosed in the present invention, based on the technical solution and inventive concept of the present invention, should be covered within the scope of protection of the present invention.
Claims
1. A square steel barrel wharf structure suitable for soft soil foundations, characterized in that, include: Multiple sets of square steel tubular tubes (1), straight connecting components (2), and vertical pile foundations (3) of equal specifications. The square steel tubular tube (1) is a rectangular steel cylinder structure that runs vertically through the top and bottom. Its side walls are provided with vertical stiffening ribs and annular reinforcing plates. The top of the square steel tubular tube (1) is provided with a pre-installed platform (10). The vertical pile foundation (3) is located inside the square steel tubular tube (1). Its lower end is inserted into the soft soil foundation to the depth required for bearing capacity, and its upper end is connected to the concrete breast wall. The straight connecting components (2) are set between the side walls of adjacent square steel tubular tubes (1).
2. A square steel barrel wharf structure suitable for soft soil foundations according to claim 1, characterized in that: The rectangular steel barrel (1) has a rectangular cross-section with a side length of 14m-28m.
3. A square steel barrel wharf structure suitable for soft soil foundations according to claim 1, characterized in that: The square steel tub (1) is provided with an inner support (11), which is a rectangular structure composed of four inner support plates / beams. The two ends of each inner support plate / beam are fixedly connected to the adjacent inner walls of the square steel tub (1).
4. A square steel barrel wharf structure suitable for soft soil foundations according to claim 1, characterized in that: The vertical pile foundation (3), the square steel tube (1), and the concrete breast wall are connected as a whole to form a combined force system.
5. A square steel barrel wharf structure suitable for soft soil foundations according to claim 1, characterized in that: The straight connection component (2) includes multiple sheet piles (20) of the same specifications. The sheet piles (20) are provided with two locking slots (200). The adjacent side walls of the square steel tube (1) are provided with locking slot grooves that are compatible with the locking slots (200). The sheet piles (20) are vertically inserted into the locking slot grooves of the square steel tubes (1) on both sides through the locking slots (200).
6. A construction method for a square steel barrel wharf structure suitable for soft soil foundation according to any one of claims 1-5, characterized in that, include: S1. Factory modular prefabrication: The square steel tubs (1) are prefabricated in batches according to the design dimensions. The stiffening ribs of the tubs are welded, the overall flaw detection is carried out, the anti-corrosion treatment is carried out, the sacrificial anti-corrosion components are reserved, and the top platform is pre-installed. S2. Marine transportation and positioning: The square steel tubs (1) are transported to the construction site by a transport ship. The GPS-RTK dynamic positioning system is used in conjunction with the crane ship for precise positioning. The mud surface of the construction sea area is simply leveled. S3. Vibration sinking installation: The square steel tubs (1) are hoisted to the design position. The tubs are initially self-sinked by their own weight. The verticality and plane position of the tubs are adjusted. The overall vibration sinking is carried out by a combination of vibrating hammers until the design depth and elevation are reached. S4. Quick connection water stop: After the adjacent square steel tubs are sunk into place, the straight connection components (2) are installed and fixed by welding on the water. And cooperate with the sealing structure to complete the joint water stop, forming a continuous overall shore wall structure; S5, use the water-based filling equipment to fill the square steel barrel (1) in layers with sand, install drainage boards and take dewatering measures to complete the reinforcement and consolidation of the filling material and the bottom soft soil; S6, construct the vertical pile foundation (3): use the grouting pile process to form piles in the square steel barrel (1), the pile end passes through the bottom of the square steel barrel (1) and anchors into the soft soil foundation bearing layer, and the pile top is reserved for anchoring section; S7, lay two stone cushion layers to level the base, cast the top reinforced concrete base, realize the integrated casting and forming of the square steel barrel (1) and the vertical pile foundation (3), and complete the overall stress reinforcement; S8, superstructure construction: after the foundation concrete strength reaches the standard, cast the breast wall, track beam and wharf surface layer in sections, install the fenders, mooring bollards and other auxiliary facilities, and complete the overall wharf construction.