A novel drainage pressure limiting well structure and construction method

By combining prefabricated filtration devices with sand-free permeable concrete, the problems of geotextile overlap failure and mixed use of crushed stone are solved, achieving efficient and reliable filtration effect and construction quality, significantly improving construction efficiency and reducing costs.

CN123109136APending Publication Date: 2026-11-17SHANGHAI CONSTRUCTION FIRST CONSTRUCTION (GROUP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610878718.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-06-17
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing technologies, geotextiles are easily disturbed during active anti-buoyancy construction in basements, leading to overlap failure. Furthermore, two types of crushed stone of different particle sizes are easily mixed during on-site construction, resulting in poor filtration effects. Moreover, the construction process can easily damage the geotextiles, affecting the bearing capacity of the foundation.

Method used

Prefabricated water filtration devices are used, including water pipes and sand-free permeable concrete. The water pipes are equipped with water-stopping rings, flanges and spherical enlarged heads, and are wrapped with geotextile. They are directly hoisted into the foundation pit and backfilled with coarse sand, which simplifies the construction steps and avoids geotextile overlap failure and the mixing of crushed stone.

Benefits of technology

It improves the filtration reliability and construction quality of the filter layer, simplifies the process, reduces on-site construction difficulty, significantly shortens the construction period and reduces costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109136A_ABST
    Figure CN123109136A_ABST
Patent Text Reader

Abstract

This invention discloses a novel drainage pressure-limiting well structure and construction method, including a prefabricated water filter device and a drainage pressure-limiting valve. One end of the prefabricated water filter device is connected to the drainage pressure-limiting valve, and the other end passes through the basement floor slab and is buried in the foundation pit soil. A water guide pipe is arranged inside the prefabricated water filter device. The water guide pipe has a water-stopping wing ring in the middle, a flange at the top, and a spherical enlarged head at the bottom, with multiple water-permeable holes. This invention, through off-site prefabrication, can greatly improve the reliability of the construction quality of the filter layer in the pressure-limiting water collection well and the speed of on-site construction, avoiding the problems of traditional pressure-limiting water filter wells where the construction quality heavily relies on the management and construction skills of on-site workers, and the ease with which the geotextile fabric can be damaged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of active anti-buoyancy construction of basements, specifically a novel drainage pressure limiting well structure and construction method. Background Technology

[0002] Currently, active anti-buoyancy construction of basements generally adopts the drainage pressure limiting method. The main construction method is to lay small-diameter filter gravel on the outside of the drainage pressure limiting well and large-diameter filter gravel in the middle to filter groundwater in layers. The construction sequence is as follows: excavate the sump pit → lay geotextile → install and fix the water pipe → lay 7-15mm small-diameter gravel → lay 25-40mm large-diameter gravel → cover the surface with geotextile → pour concrete cushion layer → basement floor slab construction.

[0003] The current mainstream construction method of using geotextile-wrapped crushed stone as the filter layer for drainage pressure limiting wells has the following disadvantages:

[0004] After the foundation pit is excavated, geotextile is laid. During subsequent construction, the overlap of the geotextile is easily disturbed, causing the overlap to fail. When water from the basement collects in the sump, soil particles cannot be effectively filtered, which can easily lead to the loss of underground soil and a decrease in the bearing capacity of the foundation.

[0005] The site requires the use of two different particle sizes of crushed stone for drainage, and it must be laid in a strict order of smaller particle size on the outside and larger particle size on the inside. However, during construction, the two particle sizes are easily mixed during storage, stockpiling, and installation. This prevents the achievement of layered filtration and effectively filters soil particles. Furthermore, smaller particle size crushed stone can mix into the inner layer of the pressure-limiting well's crushed stone drainage layer and drain into the basement sump through the drainage pipes, causing particle loss.

[0006] When laying crushed stone, workers may scratch or damage the geotextile when using shovels to shovel and spread the crushed stone in the pit. Summary of the Invention

[0007] The purpose of this invention is to provide a novel drainage pressure limiting well structure, including a finished water filtration device and a drainage pressure limiting valve.

[0008] One end of the finished water filtration device is connected to the drainage pressure relief valve, and the other end passes through the basement floor slab and is buried in the foundation pit soil.

[0009] The finished product water filtration device has a water guide pipe inside.

[0010] The water guide pipe is provided with a water-stop wing ring in the middle, a flange at the top, and a spherical enlarged head at the bottom, with multiple water-permeable holes in the spherical enlarged head.

[0011] Furthermore, the finished water filtration device is a hollow structure made of sand-free permeable concrete. The structure of the finished water filtration device is compatible with the structure of the water guide pipe.

[0012] Furthermore, sand-free permeable concrete is prepared using cement and aggregate.

[0013] Furthermore, the aggregate size is 7 mm to 15 mm. The ratio of cement to aggregate is 1:3 to 1:6.

[0014] Furthermore, the outer wall of the finished water filtration device is also wrapped with geotextile.

[0015] The finished water filtration device is filled with coarse sand between itself and the foundation pit.

[0016] Furthermore, the water pipe is made of stainless steel.

[0017] Furthermore, the flange at the top of the water pipe is connected to the drain pressure relief valve.

[0018] Furthermore, the drainage pressure relief valve is used to regulate the operation of the finished product water filtration device.

[0019] A construction method for a novel drainage pressure-limiting well structure includes the following steps:

[0020] Step 1: Prepare the mold for the finished water filtration device, and embed the water pipe into the mold. After casting and curing, the finished water filtration device is obtained.

[0021] Step 2: Wrap geotextile around the outer wall of the finished water filtration device and fix it at the top to prevent it from falling off.

[0022] Step 3: Excavate the water collection well foundation pit according to the design dimensions and clean the loose soil and debris at the bottom of the pit.

[0023] Step 4: Hoist the finished filter device wrapped with geotextile into the soil of the foundation pit and adjust its position and elevation.

[0024] Step 5: Backfill the gap between the finished water filtration device and the foundation pit soil with coarse sand and compact it.

[0025] Step 6: Construct the concrete foundation, brick formwork, and basement floor slab in sequence.

[0026] Step 7: Install a drain pressure relief valve on the top flange of the water pipe.

[0027] Furthermore, molds for finished water filtration devices were prepared using sand-free permeable concrete.

[0028] This invention employs prefabricated off-site water filtration devices, primarily constructed using water pipes and sand-free permeable concrete to directly replace the gravel filter layer. After the sump pit is excavated, the prefabricated water filtration device is wrapped with geotextile and then directly lowered into the sump pit. Subsequently, coarse sand backfilling and basement floor slab construction are carried out.

[0029] This invention avoids the problem of disturbing the overlap of the geotextile after laying the entire geotextile in the foundation pit of the water collection well, causing the overlap to fail. It also avoids the problem of mixing large and small-sized crushed stone for backfilling on site.

[0030] This invention, through off-site prefabrication, can greatly improve the construction quality and reliability of the filter layer of the pressure-limiting water collection well, as well as the on-site construction speed. It avoids the problems of traditional pressure-limiting water collection wells, where the construction quality heavily depends on the management level and construction skills of on-site workers, and the geotextile products are easily damaged. Attached Figure Description

[0031] Figure 1 This refers to the excavation process of the water collection well foundation pit;

[0032] Figure 2 The process of laying coarse sand at the bottom;

[0033] Figure 3 This refers to the process of hoisting and placing prefabricated water filtration devices off-site.

[0034] Figure 4 The process of backfilling the sides and top with coarse sand;

[0035] Figure 5 This refers to the construction process of the subbase and brick formwork;

[0036] Figure 6 The construction process of the basement floor slab (sump);

[0037] Figure 7 For the installation of the drain pressure relief valve;

[0038] Figure 8 Schematic diagram of the cross-sectional structure of a drainage pressure-limiting water collection well;

[0039] Figure 9 This is a schematic diagram of the finished water filtration device;

[0040] Figure 10 It is a traditional drainage and pressure limiting structure. Detailed Implementation

[0041] The present invention will be further described below with reference to embodiments, but it should not be construed that the scope of the present invention is limited to the following embodiments. Various substitutions and modifications made based on ordinary technical knowledge and common practices in the art without departing from the above-described technical concept of the present invention should be included within the scope of protection of the present invention.

[0042] Example 1:

[0043] A novel drainage pressure limiting well structure includes a prefabricated water filtration device 3 and a drainage pressure limiting valve 2.

[0044] One end of the finished water filtration device 3 is connected to the drainage pressure relief valve 2, and the other end passes through the basement floor slab 1 and the concrete cushion layer 5, and is buried in the foundation pit soil 6. A brick formwork 4 is provided between the basement floor slab 1 and the foundation pit soil.

[0045] The finished product water filtration device 3 has a water guide pipe 10 arranged inside.

[0046] The water guide pipe 10 has a water-stop wing ring 11 in the middle, a flange 9 at the top, and a spherical enlarged head 12 at the bottom, with multiple water-permeable holes in the spherical enlarged head 12.

[0047] Example 2:

[0048] A novel drainage pressure-limiting well structure, with the same technical content as Embodiment 1, further wherein the finished water filtration device 3 is a hollow structure made of sand-free permeable concrete. The structure of the finished water filtration device 3 is adapted to the structure of the water guide pipe 10.

[0049] Example 3:

[0050] A novel drainage pressure limiting well structure, with the same technical content as any one of Embodiments 1-2, further wherein the sand-free permeable concrete is prepared using cement and gravel.

[0051] Example 4:

[0052] A novel drainage pressure-limiting well structure, with technical content identical to any one of embodiments 1-3, using gravel with a particle size of 7 mm to 15 mm. The ratio of cement to gravel is 1:3 to 1:6. In this embodiment, the ratio of cement to gravel is set to 1:6.

[0053] Example 5:

[0054] A novel drainage pressure limiting well structure, with the same technical content as any one of embodiments 1-4, wherein the outer wall of the finished water filter device 3 is also wrapped with geotextile 7.

[0055] The finished water filtration device 3 and the foundation pit soil 6 are filled with backfill coarse sand 8.

[0056] Example 6:

[0057] A novel drainage pressure limiting well structure, with the same technical content as any one of embodiments 1-5, wherein the water guide pipe 10 is made of stainless steel.

[0058] Example 7:

[0059] A novel drainage pressure limiting well structure, with the same technical content as any one of embodiments 1-6, wherein the flange 9 at the top of the water guide pipe 10 is connected to the drainage pressure limiting valve 2.

[0060] Example 8:

[0061] A novel drainage pressure limiting well structure, with the same technical content as any one of embodiments 1-7, wherein the drainage pressure limiting valve 2 is used to regulate the operation of the finished product water filtration device 3.

[0062] Example 9:

[0063] A construction method for a novel drainage pressure-limiting well structure includes the following steps:

[0064] Step 1: Prepare the mold for the finished water filtration device 3, and embed the water guide pipe 10 into the mold of the finished water filtration device 3. After casting and curing, the finished water filtration device 3 is obtained.

[0065] Step 2: Wrap geotextile 7 around the outer wall of the finished water filtration device 3 and fix it at the top to prevent it from falling off.

[0066] Step 3: Excavate the water collection well foundation pit according to the design dimensions and clean the loose soil and debris at the bottom of the pit.

[0067] Step 4: Hoist the finished filter device 3 wrapped with geotextile into the soil 6 of the foundation pit and adjust its position and elevation.

[0068] Step 5: Backfill the gap between the finished water filtration device 3 and the foundation pit soil 6 with coarse sand 8 and compact it.

[0069] Step 6: Construct the concrete foundation, brick formwork, and basement floor slab in sequence.

[0070] Step 7: Install a drain pressure relief valve on the top flange 9 of the water pipe 10.

[0071] Example 10:

[0072] A construction method for a novel drainage pressure limiting well structure, with the same technical content as in Example 9, further comprising using a mold for preparing the finished water filter device 3 using sand-free permeable concrete.

[0073] Example 11:

[0074] A construction method for a novel drainage pressure limiting well structure includes the following steps: excavation of the foundation pit → laying coarse sand at the bottom → hoisting and placing prefabricated filter devices off-site → pouring the foundation layer and building the brick formwork → construction of the basement floor slab (sump well) → installation of the drainage pressure limiting valve.

[0075] The specific steps include:

[0076] 1. Prefabrication of finished water filtration devices:

[0077] The permeable concrete mold is fabricated according to the designed diameter. Metal components such as the water guide pipe, flange, and water-stop ring 11 are made of stainless steel. The top of the water guide pipe is a flange, which will later connect to the drainage pressure relief valve. The water-stop ring 11 is welded to the middle of the water guide pipe and will be embedded in the middle of the basement floor slab. The bottom of the water guide pipe is a stainless steel spherical object with a drilled hole in the center. The welded water guide pipe is then embedded inside the permeable, sand-free concrete. After pouring and curing, the mold is removed, and the finished water filtration device is complete.

[0078] 2. The surface of the finished water filtration device is wrapped with geotextile:

[0079] The entire outer wall of the finished water filtration device is wrapped with geotextile, and the top is fixed with cable ties or thin wires to prevent the geotextile from falling off during subsequent construction, thus forming a stable filter layer.

[0080] 3. Excavation of the foundation pit

[0081] Excavate the drainage pressure-limiting water collection well foundation pit according to the design dimensions, clean the loose soil and debris at the bottom of the pit, and ensure that the flatness and verticality of the foundation pit meet the installation requirements.

[0082] 4. Overall hoisting and positioning

[0083] Using cranes and other lifting equipment, the finished filter device wrapped in geotextile was lifted and placed into the foundation pit as a whole, and its position and elevation were adjusted to ensure that the pipe was centered and vertical.

[0084] 5. Backfill with coarse sand

[0085] After the finished water filtration device is installed, the space between the foundation pit and the finished water filtration device is filled with coarse sand to make it dense and level.

[0086] 5. Base slab construction

[0087] After the coarse sand backfill is completed, the subsequent subbase and basement floor slab (sump) construction will proceed.

[0088] 6. Install a drain pressure relief valve

[0089] After the basement floor slab (sump) is completed, install the drainage pressure relief valve, and it can be used normally.

[0090] The effect of this construction method is:

[0091] 1. Improved filtration reliability

[0092] The finished filter device is completely wrapped with geotextile, eliminating the risk of geotextile failure due to overlap and completely preventing soil particles from seeping into the filter layer, achieving 100% filtration effectiveness.

[0093] 2. Simplified construction procedures

[0094] The two types of crushed stone with different particle sizes were eliminated from being laid in layers. Instead, only prefabricated off-site water filtration devices were used, reducing on-site construction procedures and significantly lowering the difficulty of on-site operations.

[0095] 3. Improved quality stability

[0096] The standardized production of finished water filtration devices in factories eliminates reliance on on-site construction management and personnel skill levels, thereby improving the pass rate of construction quality.

[0097] 4. Increased construction efficiency

[0098] The on-site use of prefabricated water filtration devices allows for immediate installation upon hoisting, reducing the construction period of a traditional single drainage pressure limiting water collection well from 1 day to 0.5 days, significantly shortening the construction period for basement anti-buoyancy construction.

[0099] 5. Cost reduction

[0100] Reduce the cost of purchasing, transporting, and screening crushed stone materials, and reduce labor input; the finished product filtration device can significantly reduce the amount of crushed stone and geotextile used, saving project costs.

[0101] Example 12:

[0102] The verification of a construction method for a novel drainage pressure-limiting well structure is as follows:

[0103] For a basement project, the design pressure-limiting water collection well has a side length of 1000*2000mm and a depth of 1200mm.

[0104] I. Material Parameters:

[0105] Finished water filtration device parameters:

[0106] 1. Spherical permeable concrete, 1000mm in diameter, no-fines concrete mix ratio: cement:aggregate = 1:6, aggregate size 7-15mm.

[0107] 2. The water guide pipe is made of stainless steel, with a diameter of 150mm. The bottom enlarged head is spherical with a diameter of 300mm, and the enlarged head is perforated at 10mm intervals with a 5mm diameter hole. The top is a flange, and the middle of the water guide pipe has a water-stopping wing ring.

[0108] Geotextile parameters:

[0109] 300g / m² geotextile is used.

[0110] II. Construction process:

[0111] After the foundation pit excavation is accepted, the sand-free concrete pipe wrapped with geotextile is hoisted into place, and the deviation is corrected to ≤5mm. The outer side is backfilled with coarse sand; the foundation layer and basement slab are then poured.

[0112] III. Effect Verification:

[0113] After six months of continuous operation, no sand particles were discharged from the water pipe, the surrounding soil did not settle, and the groundwater drainage effect remained stable.

[0114] like Figure 10 The traditional process shown requires purchasing two types of crushed stone, 7 mm to 15 mm and 25 mm to 40 mm, and laying them in layers. Two people can complete the construction of four wells in one day.

[0115] The process of this invention: prefabricated water filtration devices are installed directly after being wrapped with geotextile on site. Two people can construct 10 wells a day, which improves efficiency.

[0116] Example 13:

[0117] A novel drainage pressure-limiting well structure includes a prefabricated water filter device, geotextile, backfill coarse sand, a basement floor slab, and a drainage pressure-limiting valve. The prefabricated water filter device is integrally prefabricated from sand-free permeable concrete and an internal stainless steel water guide pipe. The water guide pipe has a water-stop wing ring in the middle, a flange at the top, and a spherical enlarged head with permeable holes at the bottom. The geotextile is entirely wrapped around the outer wall of the prefabricated water filter device, and coarse sand is used for backfilling between the prefabricated water filter device and the foundation pit.

[0118] The mix ratio of the sand-free permeable concrete is cement:gravel = 1:6, with a gravel particle size of 7 mm to 15 mm; the diameter of the water pipe is 150 mm, the diameter of the bottom spherical enlarged head is 300 mm, the diameter of the permeable holes is 5 mm, and the hole spacing is 10 mm; the specification of the geotextile is 300 g / m².

[0119] Example 14:

[0120] A novel drainage pressure-limiting well structure and construction method includes the following steps:

[0121] (1) Off-site prefabrication: make permeable concrete molds, embed stainless steel water pipes with welded flanges, water-stop rings and enlarged water pipe heads into sand-free permeable concrete, pour and cure to obtain finished water filter devices.

[0122] (2) Wrapping with geotextile: Wrap geotextile around the entire outer wall of the finished water filtration device and fix it at the top to prevent it from falling off;

[0123] (3) Excavation of the foundation pit: Excavate the foundation pit of the water collection well according to the design dimensions, and clean up the loose soil and debris at the bottom of the pit;

[0124] (4) Hoisting and positioning: The finished filter device wrapped with geotextile is hoisted and placed into the foundation pit as a whole, and the position and elevation are adjusted;

[0125] (5) Coarse sand backfilling: Backfill the gap between the finished filter device and the foundation pit with coarse sand and compact it;

[0126] (6) Foundation slab construction: Concrete cushion layer, brick formwork and basement foundation slab are constructed in sequence;

[0127] (7) Valve installation: After the basement floor slab is completed, a drainage pressure relief valve is installed on the top flange of the water pipe.

[0128] The finished water filtration device is prefabricated in the factory according to standardization, eliminating the need for on-site layering of two types of crushed stone.

[0129] Permeable concrete is used as the filter layer, and composite water guide pipes, flanges, water-stop rings, and enlarged water guide pipe heads are used.

Claims

1. A novel drainage pressure-limiting well structure, characterized in that: Includes a finished water filtration device (3) and a drain pressure relief valve (2); One end of the finished water filtration device (3) is connected to the drainage pressure relief valve (2), and the other end passes through the basement floor slab (1) and is buried in the foundation pit soil (6); The finished product water filtration device (3) has a water guide pipe (10) arranged inside. The water guide pipe (10) is provided with a water-stop wing ring (11) in the middle, a flange (9) at the top, and a spherical enlarged head (12) at the bottom, and the spherical enlarged head (12) is provided with multiple water-permeable holes.

2. The novel drainage pressure-limiting well structure according to claim 1, characterized in that: The finished water filtration device (3) is a hollow structure made of sand-free permeable concrete; the structure of the finished water filtration device (3) is compatible with the structure of the water pipe (10).

3. The novel drainage pressure-limiting well structure according to claim 2, characterized in that: No-fines permeable concrete is made from cement and aggregate.

4. The novel drainage pressure-limiting well structure according to claim 2, characterized in that: The aggregate size is 7 mm to 15 mm; the ratio of cement to aggregate is 1:3 to 1:

6.

5. The novel drainage pressure-limiting well structure according to claim 1, characterized in that: The outer wall of the finished water filtration device (3) is also wrapped with geotextile (7); The finished water filtration device (3) and the foundation pit soil (6) are filled with backfill coarse sand (8).

6. The novel drainage pressure-limiting well structure according to claim 1, characterized in that: The water pipe (10) is made of stainless steel.

7. The novel drainage pressure-limiting well structure according to claim 1, characterized in that: The flange (9) at the top of the water pipe (10) is connected to the drain pressure relief valve (2).

8. The novel drainage pressure-limiting well structure according to claim 1, characterized in that: The drainage pressure relief valve (2) is used to regulate the operation of the finished product water filtration device (3).

9. A construction method for a novel drainage pressure-limiting well structure, characterized in that, Includes the following steps: Step 1: Prepare the mold of the finished water filtration device (3), and embed the water pipe (10) into the mold of the finished water filtration device (3). After pouring and curing, the finished water filtration device (3) is obtained. Step 2: Wrap geotextile (7) around the outer wall of the finished water filtration device (3) and fix it at the top to prevent it from falling off; Step 3: Excavate the water collection well foundation pit according to the design dimensions, and clean the loose soil and debris at the bottom of the pit; Step 4: Hoist the finished filter device (3) wrapped with geotextile into the soil (6) of the foundation pit and adjust its position and elevation; Step 5: Backfill the gap between the finished water filtration device (3) and the foundation pit soil (6) with coarse sand (8) and compact it; Step 6: Construct the concrete foundation, brick formwork, and basement floor slab in sequence. Step 7: Install a drain pressure relief valve on the top flange (9) of the water pipe (10).

10. The construction method of a novel drainage pressure-limiting well structure according to claim 9, characterized in that, Molds for preparing finished water filtration devices (3) using sand-free permeable concrete.