A device for precise placement of gabions in waterway dam construction and its usage method

By using a precise gabion deployment device for dam construction, and by controlling the sinking speed and position of the gabions with adjusting and locking components, the problem of poor gabion deployment accuracy was solved, achieving precise deployment and efficient construction.

CN123109174APending Publication Date: 2026-11-17HUNAN AVIATION ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611618138.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-20
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing technologies, the accuracy of gabions is affected by the water flow speed and sinking speed during deployment, resulting in poor deployment accuracy and difficulty in accurately reaching the predetermined position.

Method used

A precise gabion deployment device for dam construction was adopted, which includes a fixed deployment mechanism and a movable deployment mechanism. By adjusting and locking components, the sinking speed and position of the gabions were controlled to ensure precise deployment.

Benefits of technology

It improves the accuracy of gabion placement, avoids bottoming out and rebounding due to excessive sinking speed, expands the scope of application, and improves construction efficiency and convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109174A_ABST
    Figure CN123109174A_ABST
Patent Text Reader

Abstract

This application provides a precise gabion deployment and dam construction device for waterways, comprising a fixed deployment mechanism and a movable deployment mechanism. The fixed deployment mechanism is installed on the hull. The movable deployment mechanism includes a first deployment frame, two first rotating plates, two reset components, two first adjusting components, two first baffles, a locking component, two second adjusting components, two second baffles, and two third baffles. This application also provides a method for using the precise gabion deployment and dam construction device for waterways, comprising at least the following steps: Step S1: parameter adjustment; Step S2: net laying; Step S3: material loading; Step S4: deployment. The precise gabion deployment and dam construction device for waterways provided by this application, under the action of the movable deployment mechanism, can actively reduce the sinking speed of the gabion when it approaches the target position, avoiding the situation where the gabion bounces off the bottom due to excessive sinking speed, thus helping to improve deployment accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of gabion deployment technology, and in particular to a device and method for precise deployment of gabions for dam construction in waterways. Background Technology

[0002] A cofferdam is a temporary retaining structure built in hydraulic engineering projects to construct permanent hydraulic facilities. Its function is to prevent water and soil from entering the construction site, facilitating drainage, excavation of the foundation pit, and construction of the structure within the cofferdam. During construction, lifting equipment is typically installed on a ship to lower gabions into the water. After sinking to the bottom, the gabions form a base layer, facilitating cofferdam construction. However, during deployment, the gabions are susceptible to deviation from their intended placement due to the influence of water flow velocity and sinking speed, increasing the difficulty of deployment. Summary of the Invention

[0003] The purpose of this application is to provide a device and method for precise deployment of gabions in waterway dam construction, in order to solve the technical problem in the prior art where the deployment accuracy of gabions is affected by the water flow velocity and sinking velocity.

[0004] To achieve the above objectives, the technical solution adopted in this application is: to provide a device for precise placement of gabions in waterway dam construction, comprising: A fixed deployment mechanism, installed on the hull; The active delivery mechanism includes a first delivery frame, two first rotating plates, two reset components, two first adjusting components, two first baffles, a locking component, two second adjusting components, two second baffles, and two third baffles. The first delivery frame is installed on an external lifting device and is through-connected. Both first rotating plates are hinged to the ends of the first delivery frame. Both reset components are installed in the first delivery frame and configured to drive the two first rotating plates to rotate in opposite directions around a first direction to cover the first delivery frame. Both first adjusting components are installed inside the first delivery frame and spaced apart along the first direction. The arrangement includes two first baffles installed between two first adjusting components, which move towards each other or away from each other along a second direction under the influence of the two first adjusting components. The locking component is installed on the first delivery frame and configured to lock one of the first adjusting components. Two second adjusting components are respectively installed on the two first baffles. The two second baffles are each installed on one of the second adjusting components and are movable along a first direction. The two third baffles are each installed on the other second adjusting component and are movable along a first direction. The second baffles and the third baffles are arranged alternately along the first direction.

[0005] Optionally, the reset assembly includes two driven members, a stop bar, and an active member. The two driven members are both mounted on the first delivery frame, the stop bar is mounted between the two driven members, and the active member is mounted between the two driven members and configured to drive the stop bar to move in a second direction via the two driven members when moving in a third direction.

[0006] Optionally, the driven member includes a horizontal bar, a vertical bar, a horizontal slider, a vertical slider, and a hinge rod. The horizontal bar and the vertical bar are both installed on the first delivery frame. The horizontal slider is sleeved on the horizontal bar and can move in a second direction. The vertical slider is sleeved on the vertical bar and can move in a third direction. The hinge rod is hinged between the horizontal slider and the vertical slider.

[0007] Optionally, the active component includes two connecting rods, multiple counterweights, a hanging lug, and a first pull rope. The two connecting rods are sleeved between the two vertical rods and are respectively located at both ends of the vertical slider along a third direction. The multiple counterweights are installed on the two connecting rods. The hanging lug is installed on the two connecting rods, and the first pull rope is installed on the hanging lug.

[0008] Optionally, the first adjustment assembly includes a plurality of first guide rods, two adjustment sliders, an internal gear, a first rack, and a second rack. The plurality of first guide rods are all installed inside the first delivery frame. The two adjustment sliders are all sleeved on the plurality of first guide rods and respectively installed at the ends of the two first baffles. The internal gear is installed inside the first delivery frame and located between the two adjustment sliders, and is rotatable about a first direction. The first rack is installed on one of the adjustment sliders and meshes with the internal gear. The second rack is installed on the other adjustment slider and meshes with the internal gear.

[0009] Optionally, the first adjustment component further includes an external gear, which is mounted outside the first delivery frame and connected to the internal gear via a rotating shaft; The locking assembly includes a locking rack and a pin. One end of the locking rack is hinged to the outside of the first delivery frame and can engage with the external gear. The pin is inserted into the other end of the locking rack and can fix the locking rack to the outside of the first delivery frame.

[0010] Optionally, the first adjustment component further includes a first limiting block and a second limiting block. The first limiting block is installed at the end of the first rack away from the adjusting slider and is sleeved on the first guide rod. The second limiting block is installed at the end of the second rack away from the adjusting slider and is sleeved on the first guide rod.

[0011] Optionally, the second adjustment assembly includes a plurality of second guide rods, a screw, and two threaded sleeves. The plurality of second guide rods and the screw are all installed between the two ends of the second baffle or the third baffle. The two threaded sleeves are all screwed to the screw. The two second baffles or the two third baffles are all located between the two threaded sleeves.

[0012] Optionally, the fixed delivery mechanism includes a second delivery frame, two second rotating plates, two first rotating wheels, multiple second rotating wheels, and two second pull ropes. The second delivery frame is installed on the hull and is through-connected. The two second rotating plates are hinged to the ends of the second delivery frame. The two first rotating wheels are installed on the second delivery frame and are spaced apart along a second direction. The two ends of the second rotating plates along the second direction are each equipped with a second rotating wheel. The two second pull ropes are respectively located at the two ends of the second delivery frame along the second direction. The second pull rope is installed on one of the second rotating wheels and is sequentially wound around the other second rotating wheel and the first rotating wheel.

[0013] This application also provides a method for using a precise gabion deployment device for dam construction in waterways, comprising at least the following steps: Parameter adjustment: Adjust the positions of the first baffle, the second baffle, and the third baffle according to the specifications of the gabion using the first adjustment component and the second adjustment component; Lay the net flat within the space formed by the first baffle, the second baffle, and the third baffle; Loading: The stones are loaded into the gabion basket to form a gabion. The first deployment frame is deployed into the river channel by opening the fixed deployment mechanism. When the first deployment frame approaches the target position, the sinking speed of the first deployment frame is reduced by the lifting equipment. After the sinking speed of the first deployment frame decreases, the first deployment frame is opened by the two reset components to allow the gabion to be deployed to the target position.

[0014] The beneficial effects of the precise deployment device for dam construction using gabions in waterways provided in this application are as follows: This application provides a precise gabion deployment device for dam construction in waterways. Under the action of the movable deployment mechanism and with the aid of lifting equipment, the device actively reduces the sinking speed of the gabion as it approaches the target position, preventing the gabion from bouncing back due to excessive sinking speed and thus improving deployment accuracy. The two first and two second adjustment components allow for fine-tuning of the gabion's position within the first deployment frame according to the water flow velocity, ensuring precise deployment to the target location and further enhancing accuracy. Furthermore, the two first and two second adjustment components allow for adjustment of the positions of the first, second, and third baffles, enabling the fabrication of gabions of different sizes within the first deployment frame, thus broadening its applicability. The locking component limits the first adjustment components, stabilizing the two first baffles and facilitating gabion formation. The two reset components not only limit the movement of the two first rotating plates but also automatically reset them after the gabion is removed from the first deployment frame, improving ease of use. Attached Figure Description

[0015] To more clearly illustrate the technical solutions in the embodiments of this application, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0016] Figure 1 A three-dimensional diagram of a fixed deployment mechanism for a precise deployment dam-building device for waterway gabions provided in this application; Figure 2 A three-dimensional view of the overall structure of a channel gabion precision deployment dam construction device provided in this application; Figure 3 A first-person perspective perspective view of the active deployment mechanism of a precise deployment device for dam construction of gabions in waterways, provided in this application; Figure 4 A second-view perspective stereoscopic image of the movable deployment mechanism of a precise gabion deployment and dam-building construction device for waterways provided in this application; Figure 5 A three-dimensional diagram of the internal structure of the movable deployment mechanism of a precise gabion deployment and dam-building construction device for waterways provided in this application; Figure 6 for Figure 5 A magnified view of a section at point A in the middle; Figure 7 for Figure 3 A magnified view of a section at point B in the middle; Figure 8 for Figure 5A magnified view of a section at point C.

[0017] The following are the labeling elements in the figure: 1. Fixed dispensing mechanism; 11. Second dispensing frame; 12. Second rotating plate; 13. First rotating wheel; 14. Second rotating wheel; 15. Second pull rope; 2. Activity delivery mechanism; 21. First delivery frame; 22. First rotating plate; 23. Reset assembly; 231. Driven component; 2311. Horizontal bar; 2312. Vertical bar; 2313. Horizontal slider; 2314. Vertical slider; 2315. Hinge rod; 232. Stop bar; 233. Driven component; 2331. Connecting rod; 2332. Counterweight; 2333. Hanging lug; 2334. First pull rope; 24. First adjustment assembly; 241 242. First guide rod; 243. Adjusting slider; 244. Internal gear; 245. First rack; 246. Second rack; 247. External gear; 248. First limiting block; 249. Second limiting block; 200. First baffle; 201. Locking assembly; 202. Locking rack; 202. Pin; 203. Second adjusting assembly; 204. Second guide rod; 205. Screw; 206. Screw sleeve; 207. Second baffle; 208. Third baffle. Detailed Implementation

[0018] To make the technical problems, technical solutions, and beneficial effects to be solved by this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and are not intended to limit the scope of this application.

[0019] It should be noted that when a component is referred to as being "mounted to," "fixed to," or "set on" another component, it can be directly on or indirectly on that other component. When a component is referred to as being "connected to" another component, it can be directly connected to or indirectly connected to that other component.

[0020] It should be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this application.

[0021] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this application, "multiple" means two or more, unless otherwise explicitly specified.

[0022] like Figures 1 to 8 As shown, this application provides a precise deployment device for dam construction using gabions in waterways, including a fixed deployment mechanism 1 and a movable deployment mechanism 2. The fixed deployment mechanism 1 is installed on the hull of a ship. The movable deployment mechanism 2 includes a first deployment frame 21, two first rotating plates 22, two reset components 23, two first adjusting components 24, two first baffles 25, a locking component 26, two second adjusting components 27, two second baffles 28, and two third baffles 29. The first deployment frame 21 is installed on an external lifting device and is through-connected. The two first rotating plates 22 are hinged to the ends of the first deployment frame 21. The two reset components 23 are installed in the first deployment frame 21 and are configured to drive the two first rotating plates 22 to rotate in opposite directions around a first direction to cover the first deployment frame 21. The two first adjusting components 24 are installed inside the first deployment frame 21 and move along the first... The first baffles 25 are installed between the two first adjusting components 24 and move towards each other or away from each other along the second direction under the drive of the two first adjusting components 24. The locking component 26 is installed on the first delivery frame 21 and is configured to lock one of the first adjusting components 24. The two second adjusting components 27 are respectively installed on the two first baffles 25. The two second baffles 28 are each installed on one of the second adjusting components 27 and can move along the first direction. The two third baffles 29 are each installed on the other second adjusting component 27 and can move along the first direction. The second baffles 28 and the third baffles 29 are arranged alternately along the first direction.

[0023] It should be noted that the "first direction" above and below refers to the bidirectional direction of the shortest line connecting the two second rotating plates 12, as detailed below. Figure 2 The X-axis is shown in the diagram. The second direction, above and below, refers to the bidirectional direction of the shortest line connecting the two first rotating plates 22, as specifically shown in the diagram. Figure 2 The Y-axis is shown in the diagram. The third direction below refers to the vertical direction, i.e., the downward direction, as shown below. Figure 2 The Z-axis is shown in the figure.

[0024] It should also be noted that in the existing technology, when the gabions are deployed, the gabions may sink too quickly, causing them to bounce back after hitting the bottom. This results in the gabions not being deployed accurately to the target location, leading to poor deployment precision.

[0025] This application provides a precise gabion deployment device for dam construction in waterways. Under the action of the movable deployment mechanism 2, a lifting device can actively reduce the sinking speed of the gabion as it approaches the target position, preventing the gabion from bouncing back due to excessive sinking speed and thus improving deployment accuracy. The two first adjustment components 24 and two second adjustment components 27 can fine-tune the position of the gabion within the first deployment frame 21 according to the water flow velocity, again ensuring precise deployment to the target position and further improving accuracy. Furthermore, the two first adjustment components 24 and two second adjustment components 27 can adjust the positions of the first baffle 25, the second baffle 28, and the third baffle 29, allowing for the fabrication of gabions of different sizes within the first deployment frame 21, thus broadening its applicability. The locking component 26 limits the movement of the first adjustment components 24, stabilizing the two first baffles 25 and facilitating gabion formation. Under the action of the two reset components 23, not only can the two first rotating plates 22 be limited, but the two first rotating plates 22 can also be automatically reset after the gabion is moved out of the first delivery frame 21, which helps to improve the convenience of use. The second baffle 28 and the third baffle 29 are arranged alternately along the first direction. When adjusting the distance between the two first baffles 25, the second baffle 28 and the third baffle 29 can avoid interference with the movement of the two first baffles 25, and can also shield the gabion along the first direction, which facilitates the formation of the gabion.

[0026] In one embodiment of this application, please refer to Figures 1 to 8 The reset assembly 23 includes two driven members 231, a stop bar 232, and an active member 233. The two driven members 231 are both installed in the first delivery frame 21, the stop bar 232 is installed between the two driven members 231, and the active member 233 is installed between the two driven members 231 and is configured to drive the stop bar 232 to move in the second direction through the two driven members 231 when moving in the third direction.

[0027] With this configuration, under the action of the driving member 233, the two driven members 231 can drive the stop rod 232 to move along the second direction. When the two stop rods 232 move towards each other in the second direction, they can drive the two first rotating plates 22 to rotate towards each other, thereby closing the first delivery frame 21. When the two stop rods 232 move away from each other in the second direction, the two second rotating plates 22 rotate away from each other, thereby opening the first delivery frame 21. Under the action of the two stop rods 232, the first delivery frame 21 can be opened and closed without the need for workers to go into the water, greatly improving construction efficiency.

[0028] In one embodiment of this application, please refer to the following: Figures 1 to 8The driven member 231 includes a horizontal bar 2311, a vertical bar 2312, a horizontal slider 2313, a vertical slider 2314, and a hinge rod 2315. The horizontal bar 2311 and the vertical bar 2312 are both installed on the first delivery frame 21. The horizontal slider 2313 is sleeved on the horizontal bar 2311 and can move along the second direction. The vertical slider 2314 is sleeved on the vertical bar 2312 and can move along the third direction. The hinge rod 2315 is hinged between the horizontal slider 2313 and the vertical slider 2314.

[0029] With this configuration, when the vertical slider 2314 moves along a third direction, it can drive the stop bar 232 to move along a second direction via the hinge rod 2315 and the horizontal slider 2313, enabling the first delivery frame 21 to open and close, resulting in a compact structure. The horizontal rod 2311 improves the movement stability of the horizontal slider 2313, thereby contributing to improved movement stability of the stop bar 232 in the second direction. The vertical rod 2312 improves the movement stability of the vertical slider 2314, further enhancing the movement stability of the horizontal slider 2313.

[0030] In one embodiment of this application, see [reference] Figures 1 to 8 The active component 233 includes two connecting rods 2331, multiple counterweights 2332, a hanging lug 2333, and a first pull rope 2334. The two connecting rods 2331 are both sleeved between the two vertical rods 2312 and are respectively located at both ends of the vertical slider 2314 along the third direction. The multiple counterweights 2332 are all installed on the two connecting rods 2331. The hanging lug 2333 is installed on the two connecting rods 2331, and the first pull rope 2334 is installed on the hanging lug 2333.

[0031] With this configuration, the first pull rope 2334, via the lug 2333 and two connecting rods 2331, can drive the vertical slider 2314 to move away from the horizontal bar 2311 along a third direction. This, in turn, can drive the stop rod 232 to move towards the vertical bar 2312 along a second direction, thus releasing the stop rod 232 from limiting the first rotating plate 22. Under the action of the counterweight 2332, the two connecting rods 2331 can drive the vertical slider 2314 to move towards the horizontal bar 2311 along a third direction. This, in turn, can drive the stop rod 232 to move away from the vertical bar 2312 along a second direction, allowing the stop rod 232 to reset the first rotating plate 22. In summary, the opening and closing of the first rotating plate 22 does not require personnel to enter the water, making operation convenient and the structure compact.

[0032] In one embodiment of this application, please refer to Figures 1 to 8The first adjustment component 24 includes multiple first guide rods 241, two adjustment sliders 242, an internal gear 243, a first rack 244, and a second rack 245. The multiple first guide rods 241 are all installed inside the first delivery frame 21. The two adjustment sliders 242 are all sleeved on the multiple first guide rods 241 and are respectively installed at the ends of the two first baffles 25. The internal gear 243 is installed inside the first delivery frame 21 and is located between the two adjustment sliders 242, and can rotate around a first direction. The first rack 244 is installed on one of the adjustment sliders 242 and meshes with the internal gear 243. The second rack 245 is installed on the other adjustment slider 242 and meshes with the internal gear 243.

[0033] With this configuration, under the action of the internal gear 243, the first rack 244 and the second rack 245 can move towards each other or away from each other in the second direction. This allows the two first baffles 25 to also move towards each other or away from each other in the second direction, adjusting the distance between them and enabling the molding of gabions of different sizes. The multiple first guide rods 241 can limit the movement of the adjusting slider 242, improving its stability in the second direction, which in turn improves the stability of the first baffles 25 in the second direction.

[0034] In one embodiment of this application, please refer to the following: Figures 1 to 8 The first adjusting component 24 also includes an external gear 246, which is mounted outside the first delivery frame 21 and connected to the internal gear 243 via a rotating shaft. The locking component 26 includes a locking rack 261 and a pin 262. One end of the locking rack 261 is hinged to the outside of the first delivery frame 21 and can mesh with the external gear 246. The pin 262 is inserted into the other end of the locking rack 261 and can fix the locking rack 261 to the outside of the first delivery frame 21.

[0035] With this configuration, the locking rack 261 can be fixed to the first delivery frame 21 by the action of the pin 262, and the locking rack 261 can mesh with the external gear 246, preventing the external gear 246 from rotating. This prevents the two first baffles 25 from moving relative to each other after adjustment, facilitating gabion forming. When the locking rack 261 and the external gear 246 are separated, the distance between the two first baffles 25 can be adjusted. In summary, the locking assembly 26 has a simple structure, is easy to use, and has a good fixing effect.

[0036] In one embodiment of this application, see [reference] Figures 1 to 8The first adjustment component 24 also includes a first limiting block 247 and a second limiting block 248. The first limiting block 247 is installed on the end of the first rack 244 away from the adjusting slider 242 and is sleeved on the first guide rod 241. The second limiting block 248 is installed on the end of the second rack 245 away from the adjusting slider 242 and is sleeved on the first guide rod 241.

[0037] This configuration, under the action of the first limiting block 247, limits the end of the first rack 244 away from the adjusting slider 242, which helps improve the movement stability of the first rack 244 in the second direction, thereby helping to improve the movement stability of one of the first baffles 25. Under the action of the second limiting block 248, the end of the second rack 245 away from the adjusting slider 242 is limited, which helps improve the movement stability of the second rack 245 in the second direction, thereby helping to improve the movement stability of the other first baffle 25.

[0038] In one embodiment of this application, please refer to Figures 1 to 8 The second adjustment component 27 includes multiple second guide rods 271, screws 272 and two screw sleeves 273. The multiple second guide rods 271 and screws 272 are all installed between the two ends of the second baffle 28 or the third baffle 29. The two screw sleeves 273 are all screwed to the screws 272. The two second baffles 28 or the two third baffles 29 are all located between the two screw sleeves 273.

[0039] This configuration, under the action of the screw 272 and the two screw sleeves 273, can limit the movement of the second baffle 28 or the third baffle 29 between the two screw sleeves 273, preventing the two second baffles 28 or the two third baffles 29 from moving in opposite directions. It can be used to form gabions of different sizes and can also adjust the position of the gabions, offering a wide range of applications and precise placement. The multiple second guide rods 271 help improve the stability of the movement of the two second baffles 28 or the two third baffles 29 in the first direction.

[0040] In one embodiment of this application, please refer to Figures 1 to 8 The fixed delivery mechanism 1 includes a second delivery frame 11, two second rotating plates 12, two first rotating wheels 13, multiple second rotating wheels 14, and two second pull ropes 15. The second delivery frame 11 is installed on the hull and is through-connected. The two second rotating plates 12 are hinged to the ends of the second delivery frame 11. The two first rotating wheels 13 are installed on the second delivery frame 11 and are spaced apart along a second direction. The two ends of the second rotating plates 12 along the second direction are each equipped with a second rotating wheel 14. The two second pull ropes 15 are respectively located at the two ends of the second delivery frame 11 along the second direction. The second pull ropes 15 are installed on one of the second rotating wheels 14 and are wound around the other second rotating wheel 14 and the first rotating wheel 13 in sequence.

[0041] With this configuration, by extending and retracting the second pull rope 15, the two second rotating plates 12 can rotate in opposite directions or in opposite directions around the second direction under the combined action of the first rotating wheel 13 and the second rotating wheel 14. The second delivery frame 11 can thus be opened or closed. The structure is simple and will not affect the delivery of the active delivery mechanism 2, making it convenient to use.

[0042] The working principle of the precise deployment device for dam construction using gabions in waterways provided in this application is as follows: During construction, the positioning vessel is first moved to the designated dumping area, and four boundary control points are set up using the positioning system. Water buoys are deployed to define the dumping range. The stone-dumping vessel is positioned using the water buoys as a reference, and anchored by tightening the anchor cables with a hydraulic winch. The transport vessel is moored at the side of the stone-dumping vessel, using it as a reference, and secured with cables. In summary, this three-vessel collaborative mode allows for precise definition of the dumping range and also helps improve the accuracy of the dumping. First, based on the specifications and dimensions of the gabion, the distance between the two first baffles 25 is adjusted using two first adjusting components 24, and the distance between the two second baffles 28 and the distance between the two third baffles 29 are adjusted using two second adjusting components 27. When adjusting the distance between the two first baffles 25, the worker first pulls out the pin 262 and rotates the locking rack 261 to separate the locking rack 261 from the external gear 246. After the locking rack 261 and the external gear 246 are separated, the worker pulls one of the first baffles 25. When one of the first baffles 25 moves toward the other, the first rack 244 and the second rack 245 can move toward each other via the internal gear 243. This allows the two first baffles 25 to move toward each other along the second direction, thus reducing the distance between them; conversely, moving them apart increases the distance. When adjusting the distance between the two second baffles 28, the worker directly moves the two second baffles 28 so that the distance between them is approximately the same as the distance of the gabion in the first direction. Then, the worker rotates the threaded sleeve 273 to move it along the first direction until the threaded sleeve 273 contacts the second baffle 28. When adjusting the distance between the two third baffles 29, it is only necessary to ensure that the third baffle 29 is in contact with the second baffle 28. Finally, the threaded sleeve 273 is rotated to bring it into contact with the third baffle 29. After adjustment, the worker lays the gabion net within the space formed by the two first baffles 25, the two second baffles 28, and the two third baffles 29. After the laying is completed, the stones are loaded into the gabion basket. After loading, the gabion basket is tightened using a special winch. The first external winch loosens the second rope 15, and the two second rotating plates 12 rotate in opposite directions around the second direction under their own weight, thereby opening the bottom of the second delivery frame 11. The lifting equipment lowers the movable delivery mechanism 2. The movable delivery mechanism 2 sinks under its own weight until it approaches the target position, at which point the lifting equipment tightens the rope to reduce the sinking speed of the movable delivery mechanism 2. After the sinking speed of the movable delivery mechanism 2 decreases, the workers tighten the first rope 2334 using the second external winch. Under the action of the first rope 2334, the vertical slider 2314 moves towards the fixed delivery mechanism 1 along the third direction. Under the action of the hinge rod 2315, the two horizontal sliders 2313 move in opposite directions along the second direction, and the two stop rods 232 also move in opposite directions along the second direction.Under the influence of the gabion's gravity and its own weight, the two first rotating plates 22 rotate in opposite directions, opening the bottom of the first delivery frame 21. The gabion moves out of the first delivery frame 21 and continues to sink to the target position under its own weight. During the delivery process, an underwater camera drone captures real-time images of the gabion's landing posture, whether it is damaged, and whether any stones are lost. If a deviation exceeding 0.3m is detected, the stone-throwing vessel is immediately adjusted to change the delivery position, enabling visualization of the delivery process. A single-beam measuring unmanned surface vessel cruises along the cross-section of the filling area, collecting underwater topographic data and generating a construction cross-section diagram. The combined effect of the underwater camera drone and the single-beam measuring unmanned surface vessel greatly improves the accuracy of the delivery. After the gabion moves out of the first delivery frame 21, the vertical slider 2314 moves along a third direction away from the fixed delivery mechanism 1 under the action of the counterweight 2332. Under the action of the hinge rod 2315, the two transverse sliders 2313 move towards each other in the second direction, and the two stop rods 232 also move towards each other in the second direction. The two stop rods 232 can drive the two first rotating plates 22 to rotate towards each other, thereby covering the bottom of the first delivery frame 21. The lifting equipment tightens the rope and pulls the movable delivery mechanism 2 back into the second delivery frame 11. The first external winch tightens the second pull rope 15. The second pull rope 15 drives the two second rotating plates 12 to rotate towards each other through the first rotating wheel 13 and the second rotating wheel 14, so as to cover the bottom of the second delivery frame 11.

[0043] like Figures 1 to 7 As shown, this application also provides a method for using a precise gabion placement device for dam construction in waterways, comprising at least the following steps: Step S1: Adjust parameters. Adjust the positions of the first baffle 25, the second baffle 28 and the third baffle 29 according to the specifications of the gabion using the first adjustment component 24 and the second adjustment component 27. Step S2: Lay the net, and lay the gabion net flat in the space formed by the first baffle 25, the second baffle 28 and the third baffle 29; Step S3: Loading the stone into the gabion basket to form a gabion. Step S4: Deployment. Open the fixed deployment mechanism 1 to deploy the first deployment frame 21 into the river channel. When the first deployment frame 21 approaches the target position, reduce the sinking speed of the first deployment frame 21 by using the lifting equipment. After the sinking speed of the first deployment frame 21 decreases, open the first deployment frame 21 by using the two reset components 23 to deploy the gabion to the target position.

[0044] The present application provides a method for using a precise gabion deployment device for dam construction in waterways. This device can slow down the sinking speed of the gabion as it approaches the target position, preventing the gabion from rebounding after hitting the bottom and causing it to shift, thus helping to improve deployment accuracy.

[0045] One or more embodiments in this application are intended to cover all such substitutions, modifications, and variations that fall within the broad scope of this application. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of one or more embodiments in this application should be included within the protection scope of this application.

Claims

1. A device for precise placement of gabions in waterway dam construction, characterized in that, include: A fixed deployment mechanism, installed on the hull; The active delivery mechanism includes a first delivery frame, two first rotating plates, two reset components, two first adjusting components, two first baffles, a locking component, two second adjusting components, two second baffles, and two third baffles. The first delivery frame is installed on an external lifting device and is through-connected. The two first rotating plates are hinged to the ends of the first delivery frame. The two reset components are installed in the first delivery frame and configured to drive the two first rotating plates to rotate in opposite directions around a first direction to cover the first delivery frame. The two first adjusting components are installed inside the first delivery frame. The two first baffles are installed between the two first adjusting components and move in opposite directions or backwards along a second direction under the drive of the two first adjusting components. The locking components are installed in the first delivery frame and configured to lock one of the first adjusting components. The two second adjusting components are respectively installed on the two first baffles. The two second baffles are each installed on one of the second adjusting components and are movable along the first direction. The two third baffles are each installed on the other second adjusting component and are movable along the first direction.

2. The precise deployment device for dam construction using gabions in waterways as described in claim 1, characterized in that, The reset assembly includes two driven members, a stop bar, and an active member. The two driven members are both mounted on the first delivery frame, the stop bar is mounted between the two driven members, and the active member is mounted between the two driven members and configured to drive the stop bar to move in a second direction via the two driven members when moving in a third direction.

3. The precise deployment device for dam construction using gabions in waterways as described in claim 2, characterized in that, The driven member includes a horizontal bar, a vertical bar, a horizontal slider, a vertical slider, and a hinge rod. The horizontal bar and the vertical bar are both installed on the first delivery frame. The horizontal slider is sleeved on the horizontal bar and can move in a second direction. The vertical slider is sleeved on the vertical bar and can move in a third direction. The hinge rod is hinged between the horizontal slider and the vertical slider.

4. The precise deployment device for dam construction using gabions in waterways as described in claim 3, characterized in that, The active component includes two connecting rods, multiple counterweights, a hanging lug, and a first pull rope. The two connecting rods are sleeved between the two vertical rods and are respectively located at both ends of the vertical slider along a third direction. The multiple counterweights are installed on the two connecting rods. The hanging lug is installed on the two connecting rods, and the first pull rope is installed on the hanging lug.

5. The precise deployment device for dam construction using gabions in waterways as described in claim 1, characterized in that, The first adjustment assembly includes multiple first guide rods, two adjustment sliders, an internal gear, a first rack, and a second rack. The multiple first guide rods are all installed inside the first delivery frame. The two adjustment sliders are all sleeved on the multiple first guide rods and respectively installed at the ends of the two first baffles. The internal gear is installed inside the first delivery frame and located between the two adjustment sliders, and is rotatable about a first direction. The first rack is installed on one of the adjustment sliders and meshes with the internal gear. The second rack is installed on the other adjustment slider and meshes with the internal gear.

6. The precise deployment device for dam construction using gabions in waterways as described in claim 5, characterized in that, The first adjustment component also includes an external gear, which is mounted outside the first delivery frame and connected to the internal gear via a rotating shaft; The locking assembly includes a locking rack and a pin. One end of the locking rack is hinged to the outside of the first delivery frame and can engage with the external gear. The pin is inserted into the other end of the locking rack and can fix the locking rack to the outside of the first delivery frame.

7. The precise deployment device for dam construction using gabions in waterways as described in claim 5, characterized in that, The first adjustment component further includes a first limiting block and a second limiting block. The first limiting block is installed at the end of the first rack away from the adjusting slider and is sleeved on the first guide rod. The second limiting block is installed at the end of the second rack away from the adjusting slider and is sleeved on the first guide rod.

8. The precise deployment device for dam construction using gabions in waterways as described in claim 1, characterized in that, The second adjustment assembly includes a plurality of second guide rods, a screw, and two screw sleeves. The plurality of second guide rods and the screw are all installed between the two ends of the second baffle or the third baffle. The two screw sleeves are all screwed to the screw. The two second baffles or the two third baffles are all located between the two screw sleeves.

9. The precise deployment device for dam construction using gabions in waterways as described in claim 1, characterized in that, The fixed delivery mechanism includes a second delivery frame, two second rotating plates, two first rotating wheels, multiple second rotating wheels, and two second pull ropes. The second delivery frame is installed on the hull and is through-connected. The two second rotating plates are hinged to the ends of the second delivery frame. The two first rotating wheels are installed on the second delivery frame and are spaced apart along a second direction. The two ends of the second rotating plates along the second direction are each equipped with a second rotating wheel. The two second pull ropes are located at the two ends of the second delivery frame along the second direction. The second pull rope is installed on one of the second rotating wheels and is wound around the other second rotating wheel and the first rotating wheel in sequence.

10. A method of using the precise placement device for dam construction of waterway gabions as described in claim 1, characterized in that, At least the following steps are included: Parameter adjustment: Adjust the positions of the first baffle, the second baffle, and the third baffle according to the specifications of the gabion using the first adjustment component and the second adjustment component; Lay the net flat within the space formed by the first baffle, the second baffle, and the third baffle; Loading: The stones are loaded into the gabion basket to form a gabion. The first deployment frame is deployed into the river channel by opening the fixed deployment mechanism. When the first deployment frame approaches the target position, the sinking speed of the first deployment frame is reduced by the lifting equipment. After the sinking speed of the first deployment frame decreases, the first deployment frame is opened by the two reset components to allow the gabion to be deployed to the target position.