A solid anchorage structure for lattice columns penetrating the base slab and its construction method

By pre-filling the section of the lattice column penetrating the bottom slab with filling material to form a solid anchorage section and connecting it with the bottom slab reinforcement, the problem of the lattice column and the bottom slab not being able to cooperate in bearing the load is solved, achieving the effect of good integrity, high load-bearing capacity and excellent waterproof performance.

CN123109205APending Publication Date: 2026-11-17CHINA RAILWAY MAJOR BRIDGE RECONNAISSANCE & DESIGN INSTITUTE CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611368900.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-04
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing technologies, lattice columns and base plates cannot work together to bear the load, resulting in poor overall joint integrity, complex processes, material waste, and poor waterproofing performance.

Method used

By pre-filling the section of the lattice column penetrating the bottom slab with a filling material that has fluidity and curing properties to form a solid anchoring section, and setting anchoring connectors to fix it to the bottom slab reinforcement, the lattice column and the bottom slab form an integral and coordinated force-bearing structure.

Benefits of technology

This design achieves integrated and coordinated load-bearing between the lattice columns and the base slab, simplifies construction procedures, improves load-bearing capacity and waterproofing performance, reduces material waste, and shortens the construction period.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109205A_ABST
    Figure CN123109205A_ABST
Patent Text Reader

Abstract

This invention relates to the field of underground engineering construction technology and discloses a solid anchorage structure for a lattice column penetrating a base slab, comprising: a lattice column body and anchorage connectors; the section of the lattice column body penetrating the base slab is a solid anchorage section formed by filling the cavity of the lattice column with a filling material having fluidity and curing properties, the range of the penetrating section being from a predetermined anchorage depth below the bottom surface of the base slab to the height of the top surface of the base slab; the anchorage connectors are disposed on the outer surface of the solid anchorage section, and the anchorage connectors are located within the thickness range of the base slab. This invention, by pre-filling the lattice column penetrating the base slab section with a filling material having fluidity and curing properties to form a solid anchorage section, and setting anchorage connectors to fix it to the base slab reinforcement, enables the lattice column penetrating the base slab section and the base slab to form an integral and collaborative force-bearing structure, transforming the lattice column segment that is passively filled into the base slab in the traditional approach into a permanent structure that actively participates in the force-bearing of the base slab, solving the problems of poor joint integrity, complex procedures, material waste, and poor waterproofing performance in traditional methods.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of underground engineering construction technology, specifically to a connection node structure between a lattice column and the underground structure base plate in deep foundation pit engineering and its construction method. Background Technology

[0002] With the continuous expansion of urban underground space development, deep foundation pit projects are becoming increasingly common. Currently, deep foundation pit projects mainly employ two construction methods: reverse construction and forward construction. In reverse construction, the top slab and upper floor slabs are constructed first, followed by layer-by-layer excavation and construction of the main structure from top to bottom. The lattice columns, acting as temporary vertical support components, must penetrate from the ground level through each structural slab to the bottom slab to bear the vertical load of the constructed upper structure. In forward construction, the excavation is first carried out to the bottom of the pit, followed by pouring the main structure from bottom to top. The lattice columns, acting as vertical support components of the retaining structure, also need to penetrate the bottom slab section. Regardless of whether the reverse or forward construction method is used, the lattice columns must be removed and recycled from the bottom slab location after construction is completed.

[0003] Currently, the conventional practice for lattice columns penetrating the base slab is to insert the entire lattice column through the base slab during construction. After the base slab concrete is poured and reaches its design strength, the portion of the lattice column above the design elevation of the base slab is then cut and removed. While this construction method is simple to operate, it has the following prominent problems: (1) The lattice column and the base plate cannot work together to bear the load. Since the lattice column is a hollow section, the reinforcement of the base plate is difficult to pass through the lattice column effectively. It is necessary to open holes in the gusset plate or cut off part of the gusset plate, which weakens the integrity and bearing capacity of the base plate and results in poor joint stress performance.

[0004] (2) Although the lattice columns that are above the design elevation of the base plate can be cut and recycled, the lattice columns and the base plate cannot work together to bear the load. The cutting position is close to the top surface of the base plate, and the cutting accuracy is required. It is easy to damage the concrete of the base plate. If the section penetrating the base plate needs to be removed, a post-pouring strip needs to be reserved around the lattice columns. After the concrete of the base plate reaches the design strength, it is necessary to excavate to the bottom surface of the base plate for overall cutting. The construction process is complicated and the cycle is long.

[0005] (3) If the lattice column in the section penetrating the bottom slab is ultimately left inside the bottom slab, since the inside of the lattice column is still a cavity, it is passively wrapped in the bottom slab concrete as a filler and cannot form an integral force-bearing structure with the bottom slab, which essentially results in a permanent waste of steel. If it is completely removed, a second excavation and post-pouring process will be required, which will significantly increase the construction period and cost.

[0006] In response to the above problems, several improvement solutions have been proposed in recent years. For example, one solution is to create a channel by setting up a partition around the lattice column, so that the lattice column is not stuck to the floor slab, making it easier to remove later; another solution is to connect the tool section to the lattice column with a flange or detachable bolts, so that the lattice column can be removed by simply disassembling the connector.

[0007] Furthermore, as disclosed in patent CN207829012U, there is another method in the industry for post-casting treatment of lattice columns penetrating the base slab. This method involves setting up a concrete interception net around the lattice column to form a trough-shaped post-casting area for the base slab, and installing water-stop steel plates and water-swellable water-stop strips. The procedure is as follows: during the construction of the base slab, a post-casting area is reserved at the location where the lattice column penetrates. The base slab concrete is poured as a whole first. When it is necessary to remove the lattice column, the reserved area is partially excavated to below the bottom surface of the base slab, and the lattice column segment within the base slab area is cut and removed. Then, the post-casting area is waterproofed and sealed with a second pour of concrete. Although this solution improves the construction conditions of the traditional cutting method to some extent, it still does not fundamentally deviate from the technical concept of "pour first, cut later." It still requires partial excavation, cutting, and secondary pouring, making the process complex. Moreover, the part of the lattice column penetrating the base slab is completely removed and fails to participate in the load-bearing of the base slab as part of the permanent structure. Similarly, some solutions involve setting pads on the bottom formwork to separate the lattice column from the concrete component before cutting and removing it, but the fundamental nature of the section penetrating the bottom slab being completely removed remains unchanged.

[0008] In addition, some schemes use precast concrete slabs and wooden wedges to achieve a rigid connection between the lattice column and the floor slab; others strengthen the connection between the lattice column and the base slab by welding anchor bars or connecting steel plates to the angle steel of the lattice column, setting column caps, and encasing it in reinforced concrete. Although these schemes achieve a connection between the lattice column and the base slab to a certain extent, they essentially treat the lattice column as a temporary supporting component. The section penetrating the base slab is not actively solidified during the pouring of the base slab, and the interior of this section is not effectively filled. The concrete cannot be compacted and form an effective bond, and the base slab reinforcement cannot effectively penetrate the lattice column. After construction, the lattice column still needs to be cut and removed from the base slab. In these schemes, although the section of the lattice column penetrating the base slab is wrapped in the base slab concrete, its interior is not effectively filled and cannot form an integral force-bearing structure with the base slab.

[0009] The aforementioned existing technical solutions, whether for reverse construction or forward construction, fail to solve the fundamental problem that the hollow section of the lattice column penetrating the bottom slab cannot effectively cooperate with the bottom slab in bearing the load.

[0010] In summary, the core idea of ​​existing technical solutions is to treat the lattice columns penetrating the base slab as temporary structural members. The only difference lies in the removal method—some solutions employ a "separation" approach for easy removal or cutting, while others, although using connectors to attempt to strengthen the connection, fail to achieve the same level of integrated load-bearing with the base slab. Therefore, regardless of the method used, the lattice columns penetrating the base slab ultimately cannot participate in load-bearing as part of the permanent structure, leading to problems such as large cutting workload, long construction period, material waste, and poor overall joint integrity. Summary of the Invention

[0011] This invention discloses a solid anchorage structure for lattice columns penetrating the base slab. By pre-filling the section of the lattice column penetrating the base slab with concrete to form a solid anchorage section, and setting anchorage connectors to fix it to the reinforcement of the base slab, the lattice column penetrating the base slab section and the base slab form an integral and coordinated force-bearing structure. This transforms the lattice column segment, which is passively filled into the base slab in the traditional method, into a permanent structure that actively participates in the force-bearing of the base slab. It solves the problems of poor joint integrity, complex process, material waste, and poor waterproof performance in the traditional method.

[0012] The technical solution adopted in this invention is as follows: A solid anchoring structure for a lattice column penetrating a base plate includes: a lattice column body and anchoring connectors; The section of the lattice column body that penetrates the bottom plate is a solid anchoring section formed by filling the cavity of the lattice column with a filling material that has fluidity and curing properties. The range of the section that penetrates the bottom plate is from the preset anchoring depth below the bottom surface of the bottom plate to the height of the top surface of the bottom plate. The anchoring connector is disposed on the outer surface of the solid anchoring section, and the anchoring connector is located within the thickness range of the base plate.

[0013] The preferred technical solution for the above structure is that the section of the lattice column body that penetrates the bottom plate is a solid anchoring section formed by pouring concrete into the cavity of the lattice column.

[0014] A further preferred technical solution is that, in use, the top surface of the solid anchoring section on the lattice column body is not higher than the design elevation of the top surface of the upper decorative layer of the base plate; or, in use, the top surface of the solid anchoring section on the lattice column body is not higher than the design elevation of the top surface of the base plate.

[0015] A further preferred technical solution is that the lattice column body is a lattice steel column welded from angle steel and gusset plates; the solid anchoring section is a structure in which the filling material is bonded together with the angle steel and the gusset plates.

[0016] A further preferred technical solution is that the anchoring connector includes: a stud or stiffening rib welded to the outside of the angle steel in the solid anchoring section, or a stud and stiffening rib welded to the outside of the angle steel in the solid anchoring section.

[0017] A further preferred technical solution is that the anchoring connector further includes a steel bar connector welded to the outside of the solid anchoring section.

[0018] Since the anchoring connector is located on the outer surface of the solid anchoring section, the anchoring connector is also located within the thickness range of the base plate; the rebar connector is used to screw and fix it to the rebar of the base plate, and the studs and stiffening ribs are embedded in the concrete of the base plate to form a shear-resistant connection and mechanical interlock with the concrete, so that the solid anchoring section and the base plate form an integral load-bearing structure.

[0019] This invention also provides a construction method for a solid anchorage structure with lattice columns penetrating a base slab, comprising the following steps: S1. Solid anchorage structure fabrication stage of lattice column penetrating the base plate: When fabricating lattice columns in the factory or on site, determine the range of the lattice column penetrating the base plate section, and weld anchorage connectors to the outer surface of the penetrating base plate section; pre-fill the cavity inside the lattice column in the penetrating base plate section with a filling material that has fluidity and curing properties to form a solid anchorage section. S2. Lattice column installation stage: The lattice column through the solid anchor structure of the bottom plate is hoisted into place, and the lower end of the lattice column through the solid anchor structure of the bottom plate is anchored in the cast-in-place pile; S3: Bottom slab reinforcement binding stage: Bind the bottom slab reinforcement and fix the bottom slab reinforcement to the anchorage connectors; S4. Base Slab Concrete Pouring Stage: Pouring the base slab concrete to integrate the solid anchoring section with the base slab, ensuring full adhesion between the outer surface of the solid anchoring section and the base slab concrete. S5. Lattice column removal stage: After the base slab concrete reaches the design strength, the hollow section of the lattice column body is cut off and removed for recycling.

[0020] The preferred construction method is that, in the lattice column installation stage of step S2, when the lattice column is hoisted into place through the solid anchorage structure of the base plate, the top surface of the solid anchorage section is not higher than the design elevation of the top surface of the base plate. In step S5, the dismantling stage of the lattice column, after the concrete of the base slab reaches the design strength, the hollow section of the lattice column body is cut off and removed for recycling at a position above the top surface of the base slab, not exceeding the design elevation of the top surface of the finishing layer on the base slab.

[0021] Another preferred construction method is that, in the lattice column installation stage of step S2, when the lattice column is hoisted into place through the solid anchoring structure of the base plate, the top surface of the solid anchoring section is not higher than the design elevation of the top surface of the finishing layer on the base plate. In step S5, the dismantling stage of the lattice column, after the concrete of the base slab reaches the design strength, the hollow section of the lattice column body is cut off and removed for recycling at the top surface of the decoration layer.

[0022] Compared with the prior art, the advantages of the present invention are as follows: The present invention discloses a solid anchorage structure for lattice columns penetrating the base slab. This structure forms a solid anchorage section by pre-filling the lattice column penetrating the base slab with a filler material that has fluidity and curing properties. Anchorage connectors are then provided for fixed connection with the base slab reinforcement. This allows the lattice column penetrating the base slab to form an integral and collaborative force-bearing structure with the base slab. This transforms the lattice column segment, which is passively filled into the base slab in the traditional approach, into a permanent structure that actively participates in the load-bearing of the base slab. This solves the problems of poor joint integrity, complex procedures, material waste, and poor waterproof performance in the traditional approach. This invention also provides a construction method for the solid anchorage structure of the lattice column penetrating the base slab. During the lattice column fabrication stage, the internal cavity of the lattice column penetrating the base slab is pre-filled with a material possessing fluidity and curing properties to form a solid anchorage section bonded integrally with the lattice column body. This transforms the hollow section into a solid section before integrally casting it with the base slab concrete. This achieves coordinated load-bearing between the lattice column penetrating the base slab and the base slab, transforming the penetrating section from a traditional passive filler into a permanent structure actively participating in the base slab's load-bearing capacity. The portion of the lattice column above the base slab can still be dismantled and recycled using conventional methods, solving the problem in existing technologies where cutting and recycling lattice columns exceeding the design elevation of the base slab can easily damage the base slab concrete due to the inability of the lattice column and base slab to coordinate load-bearing. The beneficial effects of this invention also include: (1) Achieve “one-time casting” and greatly simplify the process. This invention does not require reserving a post-casting area, secondary excavation, or secondary casting. The base plate is cast in one go, eliminating the many complex processes such as reservation, excavation, waterproofing, and secondary casting in the traditional post-casting process, and greatly shortening the construction period.

[0023] (2) Good structural integrity and high bearing capacity. The solid anchorage section is effectively connected to the bottom plate reinforcement through studs, stiffening ribs and steel bar connectors, so that the lattice column penetrating the bottom plate section and the bottom plate form an integral and coordinated force-bearing structure. In contrast, in the traditional method, the lattice column penetrating the bottom plate section is only passively filled in the bottom plate and does not form an effective connection with the bottom plate. In comparison, the bearing capacity of the solid anchorage section node is significantly improved.

[0024] (3) High material utilization and good economy. Unlike the traditional method where the section penetrating the bottom plate is completely cut off or passively left in the bottom plate and cannot be used, the present invention pre-solidifies the section penetrating the bottom plate and uses it as a permanent structure to participate in the load-bearing of the bottom plate, thus realizing the effective use of the material in this section and avoiding the waste of steel in the traditional method.

[0025] (4) Good waterproof performance. In the traditional method, after cutting, the top of the lattice column forms a hollow section (cavity), which needs to be sealed and waterproofed. The interface between the old and new concrete is a weak point in waterproofing. In this invention, the section through the bottom plate is pre-filled as solid, and no secondary sealing treatment is required after cutting, thus avoiding the risk of leakage at this weak point.

[0026] This invention solves the problems of poor joint integrity, complex procedures, material waste, and poor waterproofing performance when traditional lattice columns penetrate the base slab. It has the advantages of high construction efficiency, structural safety and reliability, good waterproofing performance, and excellent economy. It can be widely used in the construction of lattice columns penetrating the base slab in deep foundation pit projects using both reverse and forward construction methods. It is applicable to both reverse and forward construction methods and is not limited to any one of the construction methods. Attached Figure Description

[0027] To more clearly illustrate the technical solutions in the embodiments of this application, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0028] Figure 1 This is a schematic diagram of the overall structure of the lattice column through-base solid anchorage structure according to an embodiment of the present invention; Figure 2 for Figure 1 A partially enlarged schematic diagram of the solid anchorage section in the structure shown; Figure 3 This is a cross-sectional view (1-1). Figure 4 This is a cross-sectional view (2-2).

[0029] The components are: 1. Lattice column body; 11. Angle steel; 12. Draping plate; 2. Solid anchorage section; 21. Concrete; 31. Stud; 32. Stiffening rib; 33. Rebar connector; 4. Base plate; 41. Base plate reinforcement; 5. Cast-in-place pile. Detailed Implementation

[0030] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0031] The embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.

[0032] like Figure 1 , Figure 2As shown in the figure, this embodiment provides a solid anchoring structure for a lattice column penetrating a base plate, comprising: a lattice column body 1 and anchoring connectors. The section penetrating the base plate on the lattice column body 1 is a solid anchoring section 2 formed by filling the cavity of the lattice column with a filling material having fluidity and curing properties. The range of the section penetrating the base plate is from a predetermined anchoring depth below the bottom surface of the base plate to the height of the top surface of the base plate. The anchoring connectors are disposed on the outer surface of the solid anchoring section, and the anchoring connectors are located within the thickness range of the base plate 4.

[0033] For the filler material, a preferred embodiment is to use concrete 21 as the filler material. In addition to concrete, filler materials with fluidity and curing properties, such as cement mortar, grouting material, and polymer grouting material, may also be included.

[0034] In this embodiment, when in use, the top surface of the solid anchoring section 2 on the lattice column body 1 is not higher than the design elevation of the top surface of the finishing layer on the base plate, or is not higher than the design elevation of the top surface of the base plate.

[0035] For the structure of the lattice column body 1, in a preferred embodiment, the lattice column body 1 is a lattice steel column formed by welding angle steel 11 and connecting plates 12. In this case, the solid anchoring section 2 is a structure in which filling material is bonded to the angle steel 11 and connecting plates 12 as a whole.

[0036] For the anchoring connection, a preferred embodiment includes: a stud 31 or a stiffening rib 32 welded to the outside of the angle steel 11, or a combination structure of a stud 31 and a stiffening rib 32 welded to the outside of the angle steel 11; the stud 31 and the stiffening rib 32 are used to be embedded in the concrete 21 of the base slab. It also includes: a steel bar connector 33 welded to the outside of the lattice column body 1, the steel bar connector 33 being used to screw and fix to the steel bar 41 of the base slab. Figure 3 and Figure 4 These are cross-sectional schematic diagrams at different cross-sectional positions, used to illustrate the structure of the shear stud 31 and the rebar connector. In actual implementation, the shear stud 31, stiffening rib 32, and rebar connector 33 can be simultaneously combined and installed on the outer surface of the solid anchorage section 2 as needed; the three are not mutually exclusive.

[0037] This embodiment also discloses a construction method for a lattice column through-base solid anchorage structure, which includes the following steps: S1. Solid anchorage structure fabrication stage of lattice column penetrating the base plate: When fabricating lattice columns in the factory or on site, determine the range of the lattice column penetrating the base plate section. First, weld anchorage connectors on the outer surface of the penetrating base plate section. After welding, fill the cavity inside the lattice column in the penetrating base plate section with a filling material that has fluidity and curing properties to form a solid anchorage section 2. S2. Installation stage: The solid anchorage structure for the lattice column through the bottom plate is hoisted into place, and the lower end of the solid anchorage structure for the lattice column through the bottom plate is anchored in the cast-in-place pile 5. S3. Bottom slab reinforcement binding stage: Bind the bottom slab reinforcement 41 and fix the bottom slab reinforcement 41 to the anchorage connector; when the combination of studs 31, stiffening ribs 32 and reinforcement connectors 33 is used as the anchorage connector, screw the bottom slab reinforcement 41 into the reinforcement connectors 33 to complete the connection; studs 31 and stiffening ribs 32 have been prefabricated on the outside of angle steel 11, and will form a shear connection and mechanical interlock with the concrete when the bottom slab concrete is poured later; S4. Base Slab Concrete Pouring Stage: Pouring concrete for base slab 4 to integrate solid anchor section 2 with base slab 4, ensuring full adhesion between the outer surface of solid anchor section 2 and base slab concrete. S5. Demolition stage of lattice column: After the concrete of the base slab reaches the design strength, the hollow section of the lattice column body 1 is cut off and taken out for recycling.

[0038] The preferred embodiment of the above construction method is as follows: In step S2, the lattice column installation stage, when the lattice column is hoisted into place through the solid anchoring structure of the base plate, the top surface of the solid anchoring section 2 is not higher than the design elevation of the top surface of the finishing layer on the base plate; In step S5, the lattice column removal stage, after the base plate concrete reaches the design strength, the hollow section of the lattice column body 1 is cut off and removed for recycling at the top surface of the finishing layer.

[0039] Another preferred embodiment of the above construction method is that, in step S2, during the installation of the lattice column, when the lattice column is hoisted into place through the solid anchoring structure of the base plate, the top surface of the solid anchoring section 2 is not higher than the design elevation of the top surface of the base plate; in step S5, during the removal of the lattice column, after the concrete of the base plate reaches the design strength, the hollow section of the lattice column body 1 is cut and removed for recycling at a point above the top surface of the base plate, not exceeding the design elevation of the top surface of the finishing layer on the base plate.

[0040] Those skilled in the art will readily understand that the above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

[0041] In the description of this application, it should be noted that the terms "upper," "lower," etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this application. Unless otherwise expressly specified and limited, the terms "installed," "connected," and "linked" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication between two elements. For those skilled in the art, the specific meaning of the above terms in this application can be understood according to the specific circumstances.

[0042] It should be noted that in this application, relational terms such as "first" and "second" are used merely to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0043] The above description is merely a specific embodiment of this application, enabling those skilled in the art to understand or implement this application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of this application. Therefore, this application is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features claimed herein.

Claims

1. A lattice column through-floor solid anchoring structure, characterized by, include: Lattice column body (1), anchoring connectors; The section of the lattice column body (1) that penetrates the bottom plate is a solid anchoring section (2) formed by filling the cavity of the lattice column with a filling material that has fluidity and curing properties. The range of the section that penetrates the bottom plate is from the preset anchoring depth below the bottom surface of the bottom plate (4) to the height of the top surface of the bottom plate (4). The anchoring connector is disposed on the outer surface of the solid anchoring section (2) and is located within the thickness range of the base plate (4).

2. The lattice column through-floor solid anchoring structure according to claim 1, wherein The section of the lattice column body (1) that penetrates the bottom plate is a solid anchorage section (2) formed by pouring concrete (21) into the cavity of the lattice column.

3. The lattice column through-floor solid anchoring structure according to claim 2, wherein When in use, the top surface of the solid anchoring section (2) on the lattice column body (1) is not higher than the design elevation of the top surface of the upper decoration layer of the base plate (4); or, when in use, the top surface of the solid anchoring section (2) on the lattice column body (1) is not higher than the design elevation of the top surface of the base plate (4).

4. The lattice column through-floor solid anchoring structure according to claim 3, wherein The lattice column body (1) is a lattice steel column welded from angle steel (11) and gusset plate (12); the solid anchoring section (2) is a structure in which the filling material is bonded together with the angle steel (11) and the gusset plate (12).

5. The lattice column through-floor solid anchoring structure according to claim 4, wherein The anchoring connector includes: a stud (31) or stiffening rib (32) welded to the outside of the angle steel (11) in the solid anchoring section (2), or a stud (31) and stiffening rib (32) welded to the outside of the angle steel (11) in the solid anchoring section (2).

6. The lattice column through-floor solid anchoring structure according to claim 5, wherein The anchoring connector also includes a steel bar connector (33) welded to the outside of the solid anchoring section (2).

7. A method of constructing a lattice column through-floor solid anchoring structure according to any one of claims 1 to 6, characterized in that, It includes the following steps: S1. Solid anchorage structure fabrication stage of lattice column through base plate: When fabricating lattice column in the factory or on site, determine the range of the lattice column through base plate section, and first weld anchorage connectors on the outer surface of the through base plate section; after welding, fill the cavity inside the lattice column in the through base plate section with fluidity and curing properties to form a solid anchorage section (2). S2. Installation stage: The lattice column through the solid anchor structure of the bottom plate is hoisted into place, and the lower end of the lattice column through the solid anchor structure of the bottom plate is anchored in the cast-in-place pile (5); S3: Bottom slab reinforcement binding stage: Bind the bottom slab reinforcement (41) and fix the bottom slab reinforcement (41) to the anchorage connector; S4. Base plate concrete pouring stage: Pour concrete for the base plate (4) so ​​that the solid anchor section (2) and the base plate (4) are poured together and the outer surface of the solid anchor section (2) is fully bonded to the base plate concrete. S5. Demolition stage of lattice column: After the concrete of the base plate reaches the design strength, the hollow section of the lattice column body (1) is cut off and taken out for recycling.

8. The lattice column through-floor solid anchoring structure construction method according to claim 7, wherein During the S2 lattice column installation stage, when the lattice column is hoisted into place through the solid anchorage structure of the base plate, the top surface of the solid anchorage section (2) shall not be higher than the design elevation of the top surface of the base plate (4); In step S5, during the dismantling of the lattice column, after the concrete of the base plate reaches the design strength, the hollow section of the lattice column body (1) is cut off and taken out for recycling at a position above the top surface of the base plate (4) and not exceeding the design elevation of the top surface of the finishing layer on the base plate.

9. The construction method of the lattice column through-base solid anchorage structure as described in claim 7, characterized in that, In the S2 lattice column installation stage, when the lattice column is hoisted into place through the solid anchoring structure of the base plate, the top surface of the solid anchoring section (2) shall not be higher than the design elevation of the top surface of the decoration layer on the base plate (4); In step S5, during the dismantling of the lattice column, after the concrete of the base slab reaches the design strength, the hollow section of the lattice column body (1) is cut off and removed for recycling at the top surface of the decoration layer.