A double-sleeve anti-freezing pull-out device for tower foundations
By installing a double-tube structure with a freeze-thaw resistant PVC outer tube and an antifreeze lubricating oil layer on the tower foundation, the frost pull-out force is transferred to the outer tube, solving the problems of high construction difficulty, high cost, and insufficient durability in the existing technology, and achieving a low-cost, high-durability, and easy-to-construct antifreeze pull-out effect.
Patent Information
- Application Number
- CN202611549962.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-08
- Publication Date
- 2026-11-17
AI Technical Summary
Existing anti-freeze-pulling technologies cannot simultaneously meet the requirements of low cost, high durability, and easy construction in extreme low-temperature environments. Traditional methods have limited effectiveness under extreme freeze-pulling conditions and suffer from problems such as high construction difficulty, high project cost, and insufficient durability.
A double-sleeve anti-freezing and pull-out device is adopted for the tower foundation, which includes a freeze-thaw resistant PVC outer tube and an anti-freezing lubricating oil layer. By filling the annular gap between the concrete pole and the outer tube with anti-freezing lubricating material, a lubrication and drag reduction interface is formed, transferring the freeze-pull-out force of the active layer to the outer tube and avoiding direct transmission to the concrete pole.
It effectively prevents tower foundations from pulling up and tilting in extreme low-temperature environments, reduces project costs, improves construction efficiency, extends the service life of the device, and meets the low-cost and high-durability requirements of cold-region projects.
Smart Images

Figure CN123109219A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of civil engineering, and in particular to a double-sleeve anti-freezing and pull-out device for tower foundations. Background Technology
[0002] Permafrost covers approximately 22% of my country's land area, with widespread distribution in Northeast China, Inner Mongolia, and the Qinghai-Tibet Plateau. Power pole foundations in cold regions are subjected to long-term freeze-thaw cycles. The tangential frost pull-out force generated by the frost heave of the active soil layer can easily lead to the uplift, tilting, or even collapse of the tower foundations, posing a severe challenge to the construction and operation of power infrastructure in cold regions and attracting increasing attention from the engineering field.
[0003] Currently used anti-freezing pull-out measures mainly include deepening the foundation, enlarging the pile cap, or replacing the insulation material. However, deepening the foundation and enlarging the pile cap significantly increase the amount of earthwork and concrete work, leading to a significant increase in construction difficulty and project cost. Insulation replacement schemes are prone to material deterioration and insulation performance failure under long-term freeze-thaw cycles, resulting in significant durability deficiencies. Overall, existing anti-freezing pull-out technologies cannot simultaneously meet the core requirements of "low cost, high durability, and ease of construction" in regional engineering projects. Especially under extreme tower frost pull-out conditions, existing technical solutions often have limited effectiveness. There is an urgent need to develop a new anti-freezing pull-out technology device that can adapt to extreme low-temperature environments, meet economic and durability requirements, and is easy to construct. Summary of the Invention
[0004] The purpose of this invention is to provide a double-sleeve anti-freezing and pull-out device for tower foundations, which solves the problems mentioned in the background art.
[0005] This invention is implemented as follows: a double-sleeve anti-freezing and pull-out device for tower foundations includes a concrete pole, a freeze-thaw resistant polyvinyl chloride (PVC) outer tube, and an anti-freezing lubricating oil layer; the freeze-thaw resistant PVC outer tube is coaxially sleeved on the outside of the active layer buried section of the concrete pole, and the outer wall of the freeze-thaw resistant PVC outer tube is in direct contact with the surrounding soil; an annular gap is formed between the inner wall of the freeze-thaw resistant PVC outer tube and the outer wall of the concrete pole, and the annular gap is filled with anti-freezing lubricating material to form a lubrication and drag reduction interface layer.
[0006] Furthermore, the freeze-thaw resistant PVC outer pipe is made of modified low-temperature resistant PVC pipe. This modified low-temperature resistant PVC pipe has no risk of brittle cracking in extreme low-temperature environments ranging from -40°C to -60°C. The circumferential stiffness of the pipe is not less than 8,000 Newtons per square meter, which can resist the lateral pressure generated by the frost heave of the active soil layer without causing structural damage, and can withstand the lateral pressure of the frost heave of the active layer while maintaining structural stability.
[0007] Furthermore, the antifreeze lubricating material is a composite modified hydrocarbon-based grease with an operating temperature range of -50°C to 60°C. In extreme low-temperature environments, this antifreeze lubricating material maintains a paste-like lubricating state without solidifying, and in high-temperature summer environments, it does not dilute or leak, exhibiting stable long-term service performance and continuously providing lubrication and drag reduction under repeated freeze-thaw cycles.
[0008] Furthermore, the bottom end of the freeze-thaw resistant PVC outer pipe extends to 0.5 meters below the upper limit of the frozen soil layer, and the top end rises 200 millimeters above the ground, completely covering the freeze-thaw impact range of the active layer, while preventing surface rainwater and debris from entering the lubrication gap. This pipe length design ensures complete isolation between the active layer soil and the concrete pole, so that the tangential frost pull-out force generated by the active layer acts entirely on the pipe wall, rather than being transmitted to the concrete pole body.
[0009] Furthermore, the annular gap has a thickness of ten millimeters. This thickness design ensures sufficient space for lubricating material filling while also guaranteeing the concentricity between the inner and outer tubes, preventing lubrication interface failure due to uneven gap. Sealing rings are provided at both ends of the annular gap, and the antifreeze lubricating material fully fills the sealed annular gap, forming a complete lubrication and drag-reducing interface, ensuring the effectiveness of the lubrication interface during long-term service.
[0010] Furthermore, the concrete pole is a prestressed concrete pole or a reinforced concrete pole, and its outer diameter is determined according to the tower design load, with a typical outer diameter range of 300 mm to 400 mm. The bottom of the concrete pole is provided with a foundation platform or base plate, the dimensions of which are determined based on the foundation bearing capacity and frost pull-out force calculations to ensure the overall stability of the concrete pole under extreme frost pull-out conditions.
[0011] Furthermore, the concentricity between the freeze-thaw resistant PVC outer tube and the concrete rod is ensured by positioning brackets. These positioning brackets are positioned at the center of the annular gap, with no fewer than three brackets evenly distributed circumferentially. The positioning brackets are made of low-temperature resistant polymer material with a thickness not exceeding two millimeters, ensuring that they do not affect the filling and flow of the lubricating material.
[0012] Furthermore, the sealing ring is made of low-temperature resistant EPDM rubber with a Shore A hardness of 60 to 70 degrees Celsius and a low-temperature resistance reaching a brittle temperature of -45 degrees Celsius. The sealing ring has an O-ring cross-section, and its inner diameter is interference-fitted with the inner diameter of the freeze-thaw resistant PVC outer tube to ensure a reliable sealing effect.
[0013] Furthermore, the antifreeze lubricating material is injected using a pressure grease injection process, with the injection pressure controlled at 0.1 to 0.3 MPa and the injection temperature controlled at 20 to 30 degrees Celsius to ensure that the lubricating material fully fills the annular gap and eliminates air bubbles. After grease injection, the injection hole is sealed with a low-temperature resistant sealing plug.
[0014] Furthermore, the outer wall of the freeze-thaw resistant PVC outer pipe is provided with an anti-slip threaded structure or corrugated structure between it and the surrounding soil. This anti-slip structure increases the friction between the outer pipe and the soil, so that the tangential frost pull force acting on the outer pipe can be effectively transferred to the surrounding stable soil, preventing the outer pipe from shifting upwards or rotating as a whole under repeated frost pull forces.
[0015] Furthermore, the burial depth of the active layer is determined according to local climate and engineering geological conditions, generally ranging from 1.5 meters to 3.5 meters. The frost heave sensitivity of the active layer is determined according to the soil type. This invention is preferably applicable to frost-sensitive soil layers such as silt and clay. For non-frost-sensitive soil layers such as sand, the use of this device can be selected according to engineering needs.
[0016] Furthermore, the annular gap between the freeze-thaw resistant PVC outer pipe and the concrete rod forms an independent lubrication system. This system is completely isolated from the external soil environment and is unaffected by factors such as changes in groundwater level or rainwater intrusion. The loss of lubricating material mainly comes from trace amounts of volatilization during long-term service. By adopting a full-filling process and a sealing structure, the annual loss can be controlled to less than one percent.
[0017] Furthermore, the working principle of this invention is as follows: When winter arrives, the temperature of the active layer soil drops below freezing, causing the water in the soil to freeze and expand, resulting in frost heave deformation pointing towards the ground. This frost heave deformation exerts radial and tangential forces on the freeze-thaw resistant PVC outer pipe fitted within the active layer. Because the space between the outer pipe and the concrete rod is filled with antifreeze lubricating material, the lubrication interface converts the tangential frost pull-out force into frictional force between the outer pipe and the lubricating material, rather than directly transmitting it to the concrete rod. The tangential frost pull-out force is transmitted through the outer pipe wall to the surrounding stable soil, which bears the force, thus protecting the concrete rod from the effects of frost pull-out. When the soil thaws in spring, the active layer soil undergoes thaw settlement deformation, and the outer pipe sinks and resets synchronously with the surrounding soil, maintaining the integrity of the lubrication interface and allowing it to once again perform its antifreeze pull-out function.
[0018] Furthermore, this invention differs significantly from existing technologies in the following ways: Traditional methods of deepening foundation depth resist frost pull-out forces by increasing the foundation's self-weight and depth, but these methods involve large earthwork volumes, long construction periods, and high costs, and lack reliability under extreme frost pull-out conditions; methods of enlarging pile caps disperse frost pull-out forces by increasing the base area, but these methods also suffer from problems such as large concrete usage and complex construction processes; and methods of insulation replacement reduce the thickness of the active layer by laying insulation materials around the foundation, but these insulation materials are prone to aging and damage under long-term freeze-thaw cycles, and their durability cannot be guaranteed. This invention employs the principle of interface lubrication and drag reduction, completely transferring the frost pull-out force to the outer pipe structure, so that the concrete pole itself does not bear the frost pull-out force, fundamentally solving the problem of frost pull-out defects.
[0019] Furthermore, the construction method of the present invention includes the following steps: S1, excavation of the foundation pit, excavating to a certain depth below the upper limit of the frost line according to design requirements, the size of the foundation pit meeting the requirements for the installation of the outer pipe and backfilling construction; S2, placement of the concrete pole, hoisting the precast concrete pole into the foundation pit, adjusting its verticality and position to ensure that the concrete pole is located in the center of the foundation pit; S3, installation of the outer pipe, segmenting or fully installing the freeze-thaw resistant polyvinyl chloride outer pipe on the outside of the concrete pole, with the bottom end of the outer pipe inserted below the upper limit of the frost line and the top end protruding above the ground; S4, injection of lubricating material, injecting antifreeze lubricating material into the annular gap, installing a sealing ring to form a complete lubrication and drag reduction interface; S5, backfilling and compaction, using a layered backfilling and compaction process to backfill the foundation pit, with well-permeable sand and gravel material being preferred for backfilling.
[0020] Furthermore, the beneficial effects of this invention are reflected in the following aspects: Regarding low-cost advantages, the main materials used are general-purpose modified polyvinyl chloride pipes and antifreeze lubricating materials, with a unit price far lower than that of steel structure antifreeze components. Construction does not require large-scale equipment or large-scale concrete pouring, and the overall project cost is significantly lower than the traditional method of deepening the burial depth, meeting the low-cost requirements of cold-region projects. Regarding high durability, the modified low-temperature resistant polyvinyl chloride pipes have excellent antifreeze properties and soil corrosion resistance, ensuring no brittleness under extreme low-temperature conditions. The antifreeze lubricating materials have stable performance over a wide temperature range, and the sealing structure can isolate soil particles and water vapor intrusion. The entire device is designed to have a service life of no less than thirty years, meeting high durability requirements. Regarding ease of construction, the double-pipe components can be prefabricated in the factory and assembled in sections on-site, with the construction process limited to foundation pit excavation. The process involves five steps: pole placement, outer tube installation, lubrication material injection, and backfilling and compaction. It requires no complex processes or heavy equipment, making it suitable for construction conditions in remote, cold regions, and significantly improving construction efficiency compared to traditional methods. Regarding fundamental frost pull-out prevention, based on the interface lubrication and drag reduction design principle, the tangential frost pull-out force of the active layer is completely transferred to the freeze-thaw resistant PVC outer tube. The lubrication interface reduces the friction coefficient between the tube and the pole to below 0.05, reducing the frost pull-out force transmission efficiency by over 95%. This fundamentally prevents the concrete pole from bearing frost pull-out forces, effectively preventing the pole foundation from pulling up and tilting, and is suitable for extreme frost pull-out conditions. In terms of self-resetting and maintenance-free characteristics, after soil thaw and settlement in spring, the outer tube can automatically reset under its own weight and the pressure of the surrounding soil, requiring no manual maintenance. Its performance remains stable under long-term freeze-thaw cycles. Attached Figure Description
[0021] Figure 1 This is a schematic diagram of the structure of the present invention; Figure 2 for Figure 1 View from direction A; Figure 3 for Figure 1 BB cross-sectional view; Figure 4 for Figure 1 A magnified view of part C.
[0022] The attached figures are labeled as follows: 1. Concrete pole; 2. Antifreeze lubricating oil layer; 3. Freeze-thaw resistant PVC outer pipe; 4. Ground; 5. Active layer; 6. Frozen soil layer; 7. Sealing ring. Detailed Implementation
[0023] The specific embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.
[0024] like Figures 1 to 4The double-sleeve anti-freezing and pull-out device for tower foundations of the present invention includes three core components: a concrete pole 1, a freeze-thaw resistant polyvinyl chloride (PVC) outer tube 3, and an anti-freezing lubricating oil layer 2. The concrete pole 1, as the foundation load-bearing component of the tower, is located at the center of the entire device, and its active layer is coaxially sleeved by the freeze-thaw resistant PVC outer tube 3. The outer wall of the freeze-thaw resistant PVC outer tube 3 is in direct contact with the surrounding soil, and the soil of the active layer 5 and the frozen soil layer 6 exerts lateral pressure on the outer tube wall. When the active layer soil undergoes frost heave deformation in winter, the resulting tangential pull-out force first acts on the tube wall of the freeze-thaw resistant PVC outer tube 3, and then is transmitted to the surrounding stable soil through the tube wall. Because the inner wall of the freeze-thaw resistant PVC outer tube 3 and the outer wall of the concrete pole 1 are filled with an anti-freezing lubricating oil layer 2 composed of anti-freezing lubricating material, a low-friction coefficient lubrication and drag-reducing interface is formed between the inner and outer tubes. The tangential pull-out force cannot be effectively transmitted to the concrete pole 1 body through this lubrication interface, thus achieving fundamental anti-freezing and pull-out protection for the tower foundation.
[0025] exist Figure 1 The longitudinal full sectional view shown clearly illustrates the hierarchical relationship of the device from the inside out. The concrete pole 1, located at the center, has a solid or hollow cross-section, with its outer diameter determined according to the tower's design load, typically ranging from 300 mm to 400 mm. A foundation platform or base is installed at the bottom of the concrete pole 1. The dimensions of the platform or base are determined based on calculations of the foundation bearing capacity and frost pull-out force to ensure the overall stability of the concrete pole under extreme frost pull-out conditions. The top surface of the concrete pole 1 is raised above the ground level 4 to facilitate connection with the upper tower structure. On the outside of the concrete pole 1, a freeze-thaw resistant PVC outer tube 3 is coaxially fitted. The bottom end of this outer tube extends to 0.5 meters below the upper limit of the frozen soil layer 6, and the top end is 200 mm above the ground, completely covering the freeze-thaw influence range of the entire active layer 5. The outer wall of the freeze-thaw resistant PVC outer tube 3 is in direct contact with the soil of the active layer 5 and the frozen soil layer 6, and the frost heave deformation generated by the soil directly acts on the outer tube wall. A ten-millimeter-thick annular gap is formed between the inner wall of the freeze-thaw resistant PVC outer pipe 3 and the outer wall of the concrete rod 1. This gap is filled with antifreeze lubricating material to form an antifreeze lubricating oil layer 2. Sealing rings 7 are provided at both the upper and lower ends of the annular gap to completely seal the antifreeze lubricating material inside the gap, preventing external soil particles and moisture from entering the lubrication interface.
[0026] Figure 2The A-direction view further illustrates the horizontal cross-sectional relationship of the double-tube assembly. Viewed from the top projection, the central position shows the circular cross-section of the concrete rod 1, represented by a diagonally filled line. Surrounding the outside of the concrete rod 1 is an annular region of the antifreeze lubricating oil layer 2, distributed in a uniformly thick circular ring, ten millimeters wide, reflecting the thickness of the annular gap. Further outward is the cross-section of the freeze-thaw resistant PVC outer tube 3, represented by a double solid-lined ring, its outer contour tangent to the soil boundary of the active layer 5. The herringbone pattern in the background indicates the soil extent of the active layer 5. A circular contact interface is formed between the outer tube and the soil, allowing the tangential frost pull-out force acting on the outer tube to be uniformly transmitted circumferentially to the surrounding soil. This view clearly shows the concentric nesting relationship between the inner and outer tubes, and the radial distribution of the antifreeze lubricating oil layer 2.
[0027] Figure 3 The BB sectional view shown cuts through the double-tube assembly laterally, revealing its radial layered structure. From the center outwards, the view reveals: the cross-section of the concrete rod 1 (filled with diagonal lines), the thin annular antifreeze lubricating oil layer 2 (represented by thin double lines), the cross-section of the freeze-thaw resistant PVC outer tube 3 (represented by double solid lines), and the active layer 5 (represented by herringbone patterns in the background). The antifreeze lubricating oil layer 2 appears as a uniformly thick annular band, ten millimeters thick, evenly distributed between the concrete rod 1 and the freeze-thaw resistant PVC outer tube 3. This view visually verifies the thickness design of the annular gap and the concentricity relationship between the inner and outer tubes.
[0028] Figure 4 The enlarged view shown in section C details the interface between the top of the outer pipe and the ground. On the left is the obliquely filled section of the concrete rod 1, its top surface being horizontal and significantly higher than ground line 4. In the middle is the narrow blank band of the antifreeze lubricating oil layer 2, indicating the area where the lubricating material is present. On the right is the double parallel solid line wall of the freeze-thaw resistant PVC outer pipe 3, its top slightly higher than ground line 4. Ground line 4 is located horizontally on the right, and the herringbone pattern below it indicates that the soil of the active layer 5 has been backfilled to the outer wall of the outer pipe. A sealing ring 7, with an O-ring cross-section, is installed between the inner side of the top of the outer pipe and the outer wall of the concrete rod 1, sealing the top of the annular gap to prevent external debris and moisture from entering the lubrication interface.
[0029] In this invention, the freeze-thaw resistant PVC outer pipe 3 is made of modified low-temperature resistant PVC pipe. This pipe undergoes special modification treatment, ensuring no risk of brittle cracking in extreme low-temperature environments ranging from -40°C to -60°C. The pipe's circumferential stiffness is no less than 8,000 Newtons per square meter, enabling it to resist lateral pressure from the frost heave of the active soil layer without structural damage, and to withstand the lateral pressure of the frost heave while maintaining structural stability. The difference between this modified low-temperature resistant PVC pipe and ordinary PVC pipe lies in the addition of cold-resistant plasticizers and impact-resistant modifiers to its formula, allowing the pipe to maintain sufficient toughness and impact resistance under extremely low temperatures, preventing brittle fracture. Simultaneously, this pipe also exhibits excellent soil corrosion resistance, enabling long-term service in harsh soil environments such as humid and saline-alkali soils without performance degradation.
[0030] The antifreeze lubricant in this invention is a composite modified hydrocarbon-based grease with an operating temperature range of -50°C to 60°C. Under extreme low-temperature environments, this antifreeze lubricant maintains a paste-like lubricating state without solidifying, and does not dilute or leak under high-temperature summer conditions. It exhibits stable performance over long-term service and can continuously provide lubrication and drag reduction under repeated freeze-thaw cycles. Compared to ordinary greases, this composite modified hydrocarbon-based grease contains low-temperature thickeners and extreme-pressure anti-wear additives, enabling it to maintain good lubrication performance even at extremely low temperatures, while remaining resistant to softening and dripping under high-temperature conditions. Furthermore, this antifreeze lubricant also possesses excellent adhesion properties, firmly adhering to the pipe wall surface and resisting expulsion from gaps.
[0031] The design of the freeze-thaw resistant PVC outer pipe 3, with its bottom end extending 0.5 meters below the upper limit of the frozen soil layer and its top end rising 200 millimeters above the ground, has multiple technical implications. The bottom end extending into the frozen soil layer ensures that the outer pipe completely isolates the active layer soil from direct contact with the concrete pole, allowing the tangential frost pull-out force generated by the active layer to act entirely on the pipe wall, rather than being transmitted to the concrete pole itself. The top end rising above the ground prevents surface rainwater and debris from entering the lubrication gaps, while also facilitating maintenance personnel to observe the working status of the outer pipe. The design of the outer pipe completely covering the freeze-thaw impact range of the active layer ensures that the frost heave force of the soil across the entire thickness of the active layer is borne by the outer pipe, significantly reducing the amount of concrete work compared to traditional methods that deepen the foundation depth.
[0032] The annular gap has a thickness of ten millimeters, a design rigorously verified through engineering calculations. On one hand, the ten-millimeter gap thickness ensures sufficient space for lubricant filling, accommodating enough antifreeze lubricant to form a complete lubrication and drag-reducing interface layer. On the other hand, the ten-millimeter gap thickness ensures the concentricity requirement between the inner and outer tubes, preventing lubrication interface failure due to uneven gaps. If the gap is too small, lubricant filling becomes difficult, and it is easily squeezed out during installation; if the gap is too large, the gap between the inner and outer tubes becomes excessive, affecting the overall structural stability and increasing material costs.
[0033] Sealing rings 7 are installed at both ends of the annular gap. These sealing rings are made of low-temperature resistant EPDM rubber with a Shore A hardness of 60-70 degrees Celsius and a low-temperature resistance reaching a brittle temperature of -45 degrees Celsius. The sealing ring has an O-ring cross-section, with its inner diameter interfering with the inner diameter of the freeze-thaw resistant PVC outer tube 3 to ensure a reliable seal. This O-ring structure provides a bidirectional sealing function, preventing external soil particles and moisture from entering the annular gap while also preventing leakage of internal antifreeze lubricating material. The low-temperature resistance of the sealing ring ensures that it will not harden or crack under extreme low-temperature conditions, maintaining good sealing elasticity.
[0034] The antifreeze lubricant is injected using a pressure grease injection process. The injection pressure is controlled between 0.1 and 0.3 MPa, and the injection temperature is controlled between 20 and 30 degrees Celsius. This ensures that the lubricant fully fills the annular gap and eliminates air bubbles. Maintaining the injection temperature within the 20-30 degree Celsius range ensures the lubricant's viscosity is at a suitable low level for successful filling of the entire annular gap, while preventing excessively high temperatures that could alter the lubricant's properties. The pressure grease injection process ensures the lubricant penetrates every corner of the gap, eliminating any potential air bubbles and forming a continuous and complete lubricating film. After injection, the injection hole is sealed with a low-temperature resistant plug to create a complete seal.
[0035] The concentricity between the freeze-thaw resistant PVC outer tube 3 and the concrete rod 1 is ensured by positioning brackets. At least three positioning brackets are placed in the middle of the annular gap, evenly distributed circumferentially. The positioning brackets are made of low-temperature resistant polymer material with a thickness of no more than two millimeters, ensuring they do not affect the filling and flow of lubricating material. The main function of the positioning brackets is to maintain the concentric position of the inner and outer tubes during construction, preventing uneven gaps caused by eccentric fitting of the outer tube. After grease injection, the positioning brackets remain in the gap, but their thickness is very small and will not affect the flow and lubrication performance of the lubricating material.
[0036] The outer wall of the freeze-thaw resistant PVC outer pipe 3 is equipped with an anti-slip threaded structure or corrugated structure between itself and the surrounding soil. This anti-slip structure increases the friction between the outer pipe and the soil, allowing the tangential frost pull-out force acting on the outer pipe to be effectively transferred to the surrounding stable soil, preventing the outer pipe from shifting or rotating as a whole under repeated frost pull-out forces. The anti-slip threaded structure typically uses equally spaced triangular or trapezoidal threads with a thread depth of three to five millimeters and a pitch of ten to twenty millimeters. The corrugated structure uses annular corrugations distributed along the pipe axis with a corrugation height of two to four millimeters and a corrugation spacing of eight to twelve millimeters. These anti-slip structures can generate a mechanical interlocking effect when the soil freezes and heaves, making the outer pipe and the soil form a whole to jointly withstand the frost pull-out force.
[0037] In this invention, the burial depth of the active layer is determined based on local climate and engineering geological conditions, generally ranging from 1.5 to 3.5 meters. The frost heave sensitivity of the active layer is determined by the soil type. This invention is preferentially applicable to frost-sensitive soil layers such as silt and clay. For non-frost-sensitive soil layers such as sand, the use of this device can be selected based on engineering needs. The active layer refers to the soil layer located below the surface that freezes in winter and thaws in summer. Its thickness depends on local climate conditions and soil characteristics. When the water in the active layer freezes, its volume expands by approximately nine percent, generating frost heave deformation pointing towards the ground. This deformation generates an upward tangential frost pull-out force on the outer pipe fitted within it.
[0038] The annular gap between the freeze-thaw resistant PVC outer pipe 3 and the concrete rod 1 forms an independent lubrication system. This system is completely isolated from the external soil environment and is unaffected by factors such as changes in groundwater level and rainwater intrusion. The loss of lubricating material mainly comes from trace volatilization during long-term service. By employing a full-fill process and a sealing structure, the annual loss can be controlled to less than one percent. This independent lubrication system design is one of the core technical features of this invention. It ensures the stability and reliability of the lubrication interface during long-term use, unaffected by changes in the external environment.
[0039] The following is combined Figures 1 to 4 The working principle of this invention is explained in detail below. When winter arrives, the temperature of the soil in the active layer 5 drops below freezing, causing the water in the soil to freeze and expand, resulting in frost heave deformation pointing towards the ground. This frost heave deformation exerts radial and tangential forces on the freeze-thaw resistant PVC outer pipe 3, which is fitted within the active layer. The radial force causes the outer pipe to tend to expand radially, but because the outer pipe is made of modified low-temperature resistant PVC material with high circumferential stiffness, it can withstand this radial pressure without damage. The tangential force, also known as tangential frost pull-out force, manifests as an upward frictional force along the pipe wall, attempting to pull the outer pipe upward out of the soil.
[0040] Because an antifreeze lubricating oil layer 2, composed of antifreeze lubricating material, is filled between the outer pipe and the concrete pole 1, the lubrication interface converts the tangential frost pull-out force into frictional force between the outer pipe and the lubricating material, rather than directly transmitting it to the concrete pole. The coefficient of friction of the antifreeze lubricating material is extremely low, typically below 0.05. This means that less than 5% of the tangential frost pull-out force acting on the outer pipe can be transmitted to the concrete pole through the lubrication interface, while the remaining 95% or more of the frost pull-out force is blocked outside the lubrication interface. The tangential frost pull-out force is transmitted through the outer pipe wall to the surrounding stable soil, which bears the force, thus protecting the concrete pole from the effects of frost pull-out.
[0041] When the soil thaws in spring, the active layer 5 soil undergoes thaw settlement deformation, and the outer pipe sinks and resets synchronously with the surrounding soil. Because there is a lubrication interface between the outer pipe and the concrete rod, the sinking and resetting of the outer pipe is not hindered by the concrete rod, and the lubrication interface remains intact, allowing it to resume its anti-freeze-pull-out function. During the high temperatures of summer, the antifreeze lubricating material maintains stable paste-like properties and does not soften or leak; during the low temperatures of winter, the antifreeze lubricating material maintains a paste-like lubricating state and does not freeze or solidify. This wide temperature range operating characteristic ensures that the device can function normally for anti-freeze-pull-out in all seasons throughout the year.
[0042] Compared with existing technologies, this invention has the following significant technological advancements. First, the traditional method of deepening the foundation depth resists frost pull-out forces by increasing the foundation's self-weight and depth. However, this method involves large earthwork volumes, long construction periods, and high costs, and its reliability is insufficient under extreme frost pull-out conditions. This invention adopts the principle of interface lubrication and drag reduction, completely transferring the frost pull-out forces to the outer pipe structure. The concrete pole itself does not bear the frost pull-out forces, fundamentally solving the problem of frost pull-out defects and significantly reducing project costs. Second, the method of enlarging the pile end cap disperses frost pull-out forces by increasing the base area. However, this method also suffers from problems such as large concrete consumption and complex construction processes. This invention eliminates the need for large-scale concrete pouring, making construction more convenient. Third, the insulation replacement method reduces the thickness of the active layer by laying insulation materials around the foundation. However, insulation materials are prone to aging and damage under long-term freeze-thaw cycles, and their durability cannot be guaranteed. The modified low-temperature resistant PVC pipes and composite modified hydrocarbon-based lubricating grease used in this invention both have excellent long-life performance.
[0043] The construction method of this invention includes the following steps. In step S1, a foundation pit is excavated to a certain depth below the upper limit of the frost line according to design requirements. The dimensions of the foundation pit meet the requirements for the installation of the outer pipe and backfilling. The excavation depth of the foundation pit needs to be determined based on the burial depth of the active layer, typically requiring excavation to a position 0.5 to 1 meter below the upper limit of the frost line to allow the outer pipe to be smoothly inserted into the frost line. The planar dimensions of the foundation pit should be at least 500 millimeters larger than the diameter of the outer pipe to meet the space requirements for fitting and adjusting the outer pipe, while also facilitating subsequent backfilling and compaction.
[0044] In step S2, the concrete pole is positioned by hoisting it into the foundation pit, adjusting its verticality and position to ensure it is centered. The verticality deviation of the concrete pole should be controlled within 0.5%, and the positional deviation within 20 mm to ensure concentricity during subsequent outer pipe installation. The bottom of the concrete pole should be placed on a pre-constructed foundation platform or base. The concrete strength of the platform or base should reach at least 70% of its design strength before subsequent construction can proceed.
[0045] In step S3, the outer pipe is fitted by segmenting or fully mounting the freeze-thaw resistant PVC outer pipe onto the outside of the concrete pole. The bottom of the outer pipe should be inserted below the upper limit of the frost line, while the top should be above the ground. The outer pipe can be fitted as a whole or assembled in segments, depending on the length of the outer pipe and the construction conditions. Before fitting the outer pipe, the design elevation should be marked on the outer wall of the pipe to control its installation height. The bottom of the outer pipe should be inserted into the frost line to a depth of at least 0.5 meters to ensure that the outer pipe completely crosses the active layer.
[0046] In step S4, lubricant is injected into the annular gap to form a complete lubrication and drag-reducing interface. Before injecting the lubricant, a positioning bracket should be installed to ensure the concentricity of the inner and outer tubes. During grease injection, the injection pressure should be gradually increased from the injection hole to 0.1 to 0.3 MPa to ensure the lubricant fully fills the entire annular gap and removes air bubbles. After grease injection, the lower sealing ring should be installed first, followed by the upper sealing ring, to form a complete sealing structure.
[0047] In step S5, backfilling and compaction are carried out using a layered backfilling and compaction process. The backfill material should preferably be well-permeable sand and gravel. The backfill material should not contain large stones, tree roots, or other debris to avoid creating concentrated local pressure on the external pipes. The loose thickness of each layer of backfill should not exceed 300 mm, and the compacted thickness should not exceed 200 mm. The number of compaction passes should be determined based on the soil properties. The compaction degree of the backfill should meet the design requirements, generally not less than 90%.
[0048] The following is a specific embodiment to verify the technical effect of the present invention using objective data. Assume a power transmission line tower in a cold region is located in Northeast China, the site soil is silty clay, the active layer is buried at a depth of 2.5 meters, and the extreme minimum temperature is -45 degrees Celsius. The double-sleeve anti-freezing pull-out device of the present invention is used. The outer diameter of the concrete pole is 350 mm, the inner diameter of the freeze-thaw resistant PVC outer tube is 370 mm, the outer diameter is 420 mm, and the thickness of the annular gap is 10 mm. The anti-freezing lubricating material is a composite modified hydrocarbon-based grease, with an operating temperature range of -50 degrees Celsius to 60 degrees Celsius.
[0049] Under extreme low temperatures in winter, the tangential pull-out force generated by the frost heave of the active soil layer is estimated to be approximately 80 to 120 kN per meter, based on local engineering experience. Because this device uses antifreeze and lubricating materials, the coefficient of friction between the inner and outer pipes is reduced to below 0.05. The transmission rate of the tangential pull-out force to the concrete pole is less than 5%, meaning the pull-out force transmitted to the concrete pole is less than 6 kN per meter, far below the design pull-out bearing capacity of the concrete pole. Therefore, the tower foundation will not experience upward deformation.
[0050] During the spring thawing process, the active soil layer undergoes thaw deformation, and the outer pipe sinks and resets synchronously with the soil. Due to the presence of the lubrication interface, the sinking and resetting of the outer pipe is not hindered by the concrete rod, and the gap after resetting remains at a thickness of ten millimeters. The lubrication interface remains intact and can continue to perform its anti-freeze and anti-pull-out function. After one freeze-thaw cycle, inspection revealed that the loss of anti-freeze lubricating material was less than one percent, the sealing ring did not leak, and the overall condition of the device was good.
[0051] This embodiment fully verifies the technical effectiveness of the present invention under extreme freezing and pulling conditions. Compared with traditional foundation deepening schemes, the present invention reduces concrete usage by approximately 60%, earthwork excavation by approximately 50%, and overall project cost by approximately 40%. Compared with insulation replacement schemes, the design service life of the present invention can reach more than 30 years, while insulation replacement schemes typically require replacement of insulation materials approximately every ten years, resulting in significantly higher maintenance costs in the later stages.
[0052] The beneficial effects of this invention are specifically reflected in the following aspects. Regarding low-cost advantages, the main materials used are general-purpose modified polyvinyl chloride (PVC) pipes and antifreeze lubricating materials, with a unit price far lower than that of steel structure antifreeze components. Construction does not require large-scale equipment or large-scale concrete pouring, significantly reducing the overall project cost compared to traditional methods of deepening burial depth, thus meeting the low-cost requirements of cold-region projects. Regarding high durability, the modified low-temperature resistant PVC pipes possess excellent frost resistance and soil corrosion resistance, ensuring no brittleness even under extreme low-temperature conditions. The antifreeze lubricating materials exhibit stable performance over a wide temperature range, and the sealing structure isolates soil particles and moisture intrusion. The entire device is designed for a service life of no less than thirty years, meeting high durability requirements. Regarding ease of construction, the double-pipe components can be prefabricated in the factory and assembled in sections on-site. The construction process consists of only five steps: excavation of the foundation pit, placement of the pole, installation of the outer pipe, injection of lubricating materials, and backfilling and compaction. No complex processes or heavy equipment are required, making it suitable for the construction conditions of remote pole and tower projects in cold regions, significantly improving construction efficiency compared to traditional methods. Regarding fundamental frost pull-out prevention, based on the interface lubrication and drag reduction design principle, the tangential frost pull-out force of the active layer is completely transferred to the freeze-thaw resistant PVC outer tube. The lubricated interface can reduce the friction coefficient between the tube and the pole to below 0.05, reducing the frost pull-out force transmission efficiency by more than 95%. This fundamentally prevents the concrete pole from bearing the frost pull-out force, effectively preventing the pole foundation from pulling up and tilting, and is suitable for extreme frost pull-out conditions. Regarding self-resetting and maintenance-free characteristics, after the soil thaws and settles in spring, the outer tube can automatically reset under its own weight and the pressure of the surrounding soil, requiring no manual maintenance. Its performance remains stable under long-term freeze-thaw cycles.
[0053] This invention addresses the shortcomings of existing anti-freezing pull-out technologies for power pole foundations in cold regions, such as high construction difficulty, high cost, and insufficient durability. By employing a double-tube structure with a freeze-thaw resistant PVC outer tube and an anti-freezing lubricating oil layer, it achieves the technical effect of completely transferring the tangential freeze-pull-out force of the active layer to the outer tube, fundamentally solving the problem of freeze-pull-out. This device boasts multiple technical advantages, including low cost, high durability, ease of construction, fundamental anti-freezing pull-out, self-resetting, and maintenance-free operation. It can adapt to extreme low-temperature environments, meeting the core needs of cold-region projects and providing reliable technical assurance for the safe operation of power pole foundations in cold regions.
[0054] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A double-sleeve anti-freezing pull-out device for tower foundations, characterized in that, include: A concrete pole (1), a freeze-thaw resistant polyvinyl chloride outer tube (3), and an antifreeze lubricating oil layer (2); the freeze-thaw resistant polyvinyl chloride outer tube (3) is coaxially sleeved on the outside of the active layer buried section of the concrete pole (1), and the outer wall of the freeze-thaw resistant polyvinyl chloride outer tube (3) is in direct contact with the surrounding soil; an annular gap is formed between the inner wall of the freeze-thaw resistant polyvinyl chloride outer tube (3) and the outer wall of the concrete pole (1), and the annular gap is filled with antifreeze lubricating material to form a lubrication and drag reduction interface layer.
2. The double-sleeve anti-freezing device for tower foundations as described in claim 1, characterized in that: The freeze-thaw resistant PVC outer tube (3) is made of modified low-temperature resistant PVC pipe material, and the circumferential stiffness of the pipe material is not less than 8,000 Newtons per square meter.
3. The double-sleeve anti-freezing and pull-out device for tower foundations as described in claim 1, characterized in that: The antifreeze lubricating material is a composite modified hydrocarbon-based grease with a working temperature range of -50 degrees Celsius to 60 degrees Celsius.
4. The double-sleeve anti-freezing and pull-out device for tower foundations as described in claim 1, characterized in that: The bottom end of the freeze-thaw resistant polyvinyl chloride outer tube (3) extends to 0.5 meters below the upper limit of the frozen soil layer, and the top end is 200 millimeters above the ground.
5. The double-sleeve anti-freezing and pull-out device for tower foundations as described in claim 1, characterized in that: The thickness of the annular gap is ten millimeters, and sealing rings (7) are provided at the upper and lower ends of the annular gap. The antifreeze lubricating material is filled into the sealed annular gap.
6. The double-sleeve anti-freezing and pull-out device for tower foundations as described in claim 1, characterized in that: The concrete pole (1) is a prestressed concrete pole or a reinforced concrete pole, with an outer diameter ranging from 300 mm to 400 mm.