An emergency system and method for water leakage in an underwater data container
By detecting and identifying breaches in the seabed data container, temporarily sealing them, and draining water from the inside for repair, the problem of not being able to directly repair leaks in the seabed data container was solved, achieving efficient and low-cost emergency treatment.
Patent Information
- Application Number
- CN202611611810.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-19
- Publication Date
- 2026-11-17
AI Technical Summary
In existing technologies, when a submarine data container leaks, it cannot be effectively drained and repaired directly on the seabed, leading to server damage and high costs.
An emergency leak response method was adopted, which involves detecting and identifying the location of the leak, temporarily sealing it, draining water from the inside, and using internal tools to perform preliminary repairs to ensure that seawater does not spread to other compartments and reduce the probability of server damage.
This technology enables direct drainage and repair of leaks on the seabed, reducing manpower and material costs, minimizing server damage, and improving emergency response efficiency.
Smart Images

Figure CN123109226A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of emergency repair technology for seabed data containers, specifically to a water leakage emergency system and method for seabed data containers. Background Technology
[0002] The subsea data container is the core equipment of a subsea data center. It is a tank-like structure permanently placed on the seabed, housing multiple servers. The heat generated by the servers during operation is cooled by seawater, achieving green and efficient heat dissipation. The subsea data container is connected to the shore via a corridor. After installation, personnel can access the container from the shore to perform server setup, maintenance, and other tasks. Because the subsea data container is located on the seabed, it needs sufficient pressure and corrosion resistance to protect the servers inside. However, due to the complex underwater environment, breaches may still develop in some areas of the container over prolonged use, allowing seawater to seep in and potentially damage all the servers inside. In subsequent maintenance and repair processes, the data container often has to be disassembled and hoisted back to shore for drainage and repair. This is because adding a drainage structure to the data container not only increases structural complexity and cost, but also poses a risk of seawater backflow due to excessive water pressure. Furthermore, drainage requires overcoming external water pressure and dealing with continuous leakage from the breach. These factors make it impossible to directly place the submerged data container on the seabed for leak repair using existing technology. Hoisting the container back to shore for drainage and repair not only increases manpower and material costs significantly, but also causes the servers to be completely damaged by prolonged immersion in water, resulting in substantial property losses. Summary of the Invention
[0003] In order to overcome the shortcomings of the existing technology, the purpose of this invention is to provide an emergency method for water leakage of the underwater data container, which can drain and repair the container placed on the seabed in a timely and direct manner, greatly reducing manpower and material costs, and reducing the probability and number of server damages.
[0004] To solve the above problems, the technical solution adopted by the present invention is as follows: an emergency method for water leakage in a subsea data container, comprising the following steps: Step S100: Detect and identify the compartment with the breach and the location of the breach within the corresponding compartment, wherein the compartment with the breach is the target compartment; Step S200: Based on the location information of the target compartment, control the watertight doors on both sides of the target compartment to close; Step S300: Based on the location information of the target compartment and the breach, temporarily seal the breach from the outside of the target compartment; Step S400: Initially drain water from the inside of the container into the target compartment until the breach is exposed; Step S500: Insert or place a tool from the top inside the target compartment or from the top of an adjacent compartment to perform preliminary repairs on the breach in the target compartment. Step S600: After the initial repairs are completed, the target compartment is drained a second time from inside the container. After step S700, the secondary drainage is completed, the interior of the target compartment is entered to perform final repairs on the breach and inspect it for compliance.
[0005] Compared with the prior art, the present invention has at least the following beneficial effects: 1. When water leakage occurs in the container, this method can promptly close the watertight doors on both sides of the target compartment, isolating seawater within the target compartment. Subsequent drainage and repair work can prevent seawater from spreading to other compartments, thereby reducing the number of damaged internal servers and minimizing losses. 2. Before draining the target compartment, this method first temporarily seals the breach from the outside of the target compartment, and then performs preliminary drainage of the target compartment. This can prevent seawater from continuing to seep in during the drainage process and affecting the drainage process. Moreover, after the preliminary drainage reaches the position where the breach is exposed, the drainage is stopped and preliminary repairs are carried out. This can prevent the situation where the pressure difference between the inside and outside is large after the seawater is drained all at once, which may cause the temporary seal to break and leak again. 3. After initial drainage, this method involves inserting tools from the top of the target compartment or from the top of an adjacent compartment to perform initial repairs on the breach inside the target compartment. This eliminates the need for maintenance personnel to enter the target compartment, thus avoiding the danger to maintenance personnel caused by accidental damage to the externally temporarily sealed area and subsequent leakage. At the same time, if the externally temporarily sealed area is accidentally damaged and leaks again, the area opened during the initial repair can be closed in time to prevent further seawater spread. 4. After the initial repair is completed, the target compartment is drained a second time. At this time, the breach has sufficient strength after the external temporary sealing and internal initial repair. After the second drainage, even if the pressure difference between the inside and outside is large, the breach is not likely to break again in a short period of time. Draining the seawater allows maintenance personnel to enter the target compartment for careful final repair to ensure the quality of the repair. At the same time, it also allows for timely emergency repair of the server to prevent it from being completely damaged due to prolonged immersion in water, thus reducing the probability of server damage and further reducing losses. 5. When draining the target compartment, this method drains the water from inside the container, that is, the seawater in the target compartment is discharged to other spaces such as temporary storage compartments for temporary storage, and then the seawater is transported out of the container by external equipment before being discharged. Alternatively, the seawater can be directly pumped out by pumping equipment and then transported out of the container by external equipment before being discharged. On the one hand, it does not require setting up a complex drainage structure connecting to the outside of the container, avoiding the risk of seawater backflow caused by the failure of the drainage structure to resist external water pressure. On the other hand, it also effectively solves the problem of not being able to drain water on the seabed due to insufficient power.
[0006] The above five points demonstrate that this method eliminates the need to hoist the container back to shore, enabling timely drainage and repair of leaking target compartments. Furthermore, it reduces drainage difficulty and repair risks, ensuring the smooth completion of drainage and repair work directly on the seabed. This significantly reduces manpower and material costs, as well as the probability and number of server failures.
[0007] The above-mentioned emergency method for water leakage in the seabed data container includes the following steps in step S200: Step S210: When a staff member is detected in the target compartment, the inner watertight door of the inner compartment and the outer watertight door of the outer compartment of the target compartment are closed according to the location information of the target compartment. Step S220: After the staff leaves the target compartment, close the watertight doors on both sides of the target compartment.
[0008] In the above-mentioned emergency method for water leakage in the underwater data container, if personnel are detected in a compartment closer to the inside of the container than the target compartment before step S400, the target compartment will be initially drained after the personnel have escaped through the escape passage.
[0009] The above-mentioned emergency method for water leakage in the seabed data container includes a temporary storage compartment at the bottom of the container. If staff are trapped in a compartment that is closer to the inside of the container than the target compartment, the temporary storage compartment will serve as an escape route. Staff will enter the temporary storage compartment from the inner compartment and escape through the outer exit of the temporary storage compartment. After the staff escapes the temporary storage compartment and closes the outer exit of the temporary storage compartment, the seawater in the target compartment will be discharged into the temporary storage compartment.
[0010] In the above-mentioned emergency method for water leakage of the seabed data container, in steps S400 and S600, external pumping equipment is used to extract seawater from the temporary storage compartment, and a transport vehicle is used to transport and discharge the extracted seawater away.
[0011] The above-mentioned emergency method for water leakage in the seabed data container, after step S700, also includes the following steps: Step S800: Clean, disinfect and prevent corrosion of the target compartment, its adjacent compartments and the temporary storage compartment.
[0012] The above-mentioned emergency method for water leakage in the seabed data container, when the breach is located below 1 / 2 the height of the target compartment, includes the following steps in step S400: Step 410: From inside the container, perform the first preliminary drainage of the target compartment. When the drainage is about to expose the breach, perform pre-repair of the breach. Step S420: From inside the container, perform a second preliminary drainage of the target compartment until the breach is fully exposed.
[0013] The above-mentioned emergency method for water leakage in the subsea data container includes the following steps in step S600: Step S610: After the initial repairs are completed, reseal the target compartment; Step S620: Drain the target compartment from the inside of the container a second time until the seawater in the target compartment is emptied. Step S630: Continuously detect and identify water leakage in the target compartment. After a period of time, if there is no water leakage, proceed to step S700. If water leakage is detected, strengthen the temporary external sealing and return to step S400.
[0014] The present invention also provides a water leakage emergency system for a seabed data container, including a container body, a water leakage detection component, a control component, an external temporary plugging component, and an internal drainage component; The cabin includes multiple compartments distributed along its length. Each compartment has watertight doors on both sides. Each compartment is equipped with a leakage detection component. The leakage detection component is used to detect and identify leakage information in the corresponding compartment and send the location information of the detected target compartment and the location information of the breach to the external temporary plugging component and the control component. The control component can control the closing of the watertight doors on both sides of the target compartment; The external temporary plugging component can temporarily seal the breach from outside the target compartment; The internal drainage system is capable of draining water from inside the container to the target compartment.
[0015] This leak emergency system is equipped with leak detection components, control components, external temporary plugging components, and internal drainage components. The leak detection components can promptly detect leaks in target compartments, and the control components can promptly close the watertight doors on both sides of the target compartment, isolating seawater within the compartment and preventing it from spreading to other compartments. This reduces the number of damaged internal servers and minimizes losses. The external temporary plugging components can also temporarily seal breaches in the target compartment, and the internal drainage components drain water from inside the container to facilitate subsequent maintenance. This reduces drainage difficulty and maintenance risks, ensuring that drainage and maintenance work carried out directly on the seabed can be completed smoothly, significantly reducing manpower and material costs and decreasing the probability and number of server damages.
[0016] The aforementioned emergency system for water leakage in the seabed data container includes a container floor that divides the interior of the container into an upper working compartment and a lower temporary storage compartment. The temporary storage compartment has an outer exit that connects to the outer end of the container or a connecting corridor. The compartments are located within the working cabin, and multiple compartments are connected to the temporary storage cabin, so that staff can enter the temporary storage cabin from the compartments and seawater in the target compartments can be discharged into the temporary storage cabin.
[0017] The aforementioned emergency system for water leakage in the underwater data container includes a temporary door at the top of the watertight door.
[0018] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments. Attached Figure Description
[0019] Figure 1 This is a flowchart of the emergency method for water leakage of the seabed data container according to Embodiment 1 of the present invention; Figure 2 This is a partial structural diagram of the underwater data container and connecting corridor according to an embodiment of the present invention; Figure 3 This is a partial structural diagram of the emergency water leakage system of the seabed data container according to an embodiment of the present invention.
[0020] The diagram numbers are as follows: 100 hull, 110 container floor, 120 working compartment, 121 compartment, 122 target compartment, 1221 breach, 130 temporary storage compartment, 140 watertight door, 141 temporary door, 150 escape door, 160 escape ladder, 170 roof, 171 top opening, 200 leak detection component, 300 control component, 400 external temporary plugging component, 500 internal drainage component, 510 temporary water tank, 520 drainage pipe, 530 connecting pipe, 600 main control room, 700 connecting corridor, 800 server. Detailed Implementation
[0021] The embodiments of the present invention are described in detail below: Example 1 Reference Figure 2 and Figure 3 ,in, Figure 2 The diagram shows a partial structural schematic of the seabed data container and the connecting corridor 700. In reality, after extending from the shore to the seabed, the connecting corridor 700 extends a considerable distance underwater, allowing multiple seabed data containers to be arranged sequentially along both sides of its extension direction. Figure 2 The image only shows a section of the 700-meter connecting corridor and two underwater data cabins. Figure 3 The diagram shows a partial structural schematic of the emergency water leakage system of the subsea data container. The diagram only exemplarily shows a few compartments 121 and three sets of servers 800 within one compartment 121, and does not represent the actual number of compartments 121 and servers 800 inside the container. (Refer to...) Figure 2 The seabed data container includes a container 100, which is placed on the seabed. Its side connects to a connecting corridor 700 extending from the shore to the seabed, allowing personnel to enter the data container from the shore via the corridor 700. (See reference...) Figure 3 The interior of the cabin 100 includes multiple compartments 121 distributed along its length, each compartment 121 having watertight doors 140 on both sides. Because the cabin is placed on the seabed, and the seabed environment is complex, with seawater corrosion, biological attachment, and erosion from hard objects, the cabin is highly susceptible to water leakage emergencies during prolonged operation. The cabin houses numerous servers 800, and personnel frequently enter and exit it. In the event of a leakage emergency, due to the depth and high water pressure of the seabed, seawater will seep into the cabin in a short time, causing the servers 800 inside to be submerged and damaged, and seriously threatening the personal safety of the personnel. Therefore, an emergency response plan for water leakage in seabed data cabins is urgently needed.
[0022] Reference Figure 1 Embodiment 1 of the present invention provides an emergency method for water leakage of a subsea data container, comprising the following steps: Step S100: Detect and identify the compartment 121 with the breach 1221 and the location of the breach 1221 within the corresponding compartment 121, wherein the compartment 121 with the breach 1221 is named the target compartment 122. Specifically, inside the shelter, a leak detection component 200 and a control component 300 are installed. The leak detection component 200 is used to detect and identify leak information, that is, to detect and identify the compartment 121 with the breach 1221 and the location of the breach 1221 within the corresponding compartment 121, and sends the detected leak information to the control component 300, which then controls the watertight doors 140 on both sides of the target compartment 122 to close. (Refer to...) Figure 3 In order to demonstrate the connection or control relationship of components such as the leakage detection component 200, the control component 300, the external temporary plugging component 400, and the internal drainage component 500, Figure 3 The leakage detection component 200, control component 300, and internal drainage component 500 are illustrated in a block diagram. The block diagrams of the control component 300 and internal drainage component 500 are placed outside the hull 100. In reality, the control component 300 and internal drainage component 500 are located inside the hull 100 or within the connecting corridor 700. Figure 3 The diagram illustrates the placement of the external temporary blocking assembly 400 and the main control room 600 above the sea surface. The signal or electrical connections between these components and the main control room 600 are shown using dashed lines. Furthermore, in... Figure 3 The image shows a breach 1221 in the third compartment from left to right of the hull 100, which is the target compartment 122.
[0023] Furthermore, the leak detection component 200 employs a three-dimensional sound source localization method to detect and identify leak information. This is because in the seabed environment, due to the significant pressure difference between the inside and outside of the shelter, once a breach 1221 occurs, seawater seeps in through the breach, accompanied by a relatively high decibel noise. The source of this noise, i.e., the location of the sound source, is the location of the breach 1221 to be detected. The leak detection component 200 includes at least three microphones arranged in a three-dimensional array. By using the orientation and distance of the array microphones, the location of the breach 1221 is detected and identified. Of course, the three-dimensional sound source localization method is a relatively mature existing detection technology, and its detection principle will not be elaborated here. Understandably, during the detection process, a threshold needs to be preset. When the detected noise decibel level exceeds this threshold, the control component 300 will control the watertight door 140 to close, to avoid false triggering due to the detection of ordinary noise. This threshold can be tested and adjusted according to the actual seabed depth, and is generally greater than 100 dB.
[0024] Step S200: Based on the location information of the target compartment 122, control the watertight doors 140 on both sides of the target compartment 122 to close; When the leakage detection component 200 detects and identifies leakage information, it will send information to the control component 300. After receiving the leakage information, the control component 300 will close the watertight doors 140 on both sides of the target compartment 122 where the leakage occurred. The target compartment 122 will be isolated into an independent sealed space. After seawater seeps into the target compartment 122 and fills it, it will not continue to seep in, thus preventing seawater from spreading to other compartments 121, thereby reducing the number of damaged internal servers 800 and reducing losses.
[0025] Step S300: Based on the location information of the target compartment 122 and the breach 1221, temporarily seal the breach 1221 from the outside of the target compartment 122; Upon receiving leakage information, the control component 300 immediately closes the watertight doors 140 on both sides of the target compartment 122 and sends a leakage alarm to the main control room 600 on shore, notifying relevant personnel to take immediate emergency measures. Based on the leakage information received by the control component 300, relevant personnel promptly arrange for maintenance personnel to carry out repairs. After the leakage occurs, since the seawater is already contained within the target compartment 122, the safety of other compartments 121 inside the hull 100 is guaranteed, so there is no need to rush to drain the water. Before proceeding with drainage, the breach 1221 is temporarily sealed to prevent continued seawater leakage during subsequent drainage processes, which could affect the drainage progress. When temporarily sealing breach 1221, nail guns can be used in conjunction with a plugging plate. Professional underwater personnel can be deployed to the seabed to the outside of target compartment 122 based on the received location information of target compartment 122 and breach 1221, and temporarily seal the breach 1221. Of course, to improve the safety of the operation, an underwater robot can also be deployed to assist in the operation. When temporarily sealing the outside of breach 1221, the relevant person in charge should observe the position and operation of the underwater personnel or underwater robot in the main control room at all times to better coordinate the operation and prepare for emergency rescue.
[0026] Step S400: Initially drain water from the inside of the container into the target compartment 122 until the breach 1221 is exposed. Due to the great depth and high water pressure at the seabed, it is extremely difficult to construct a drainage structure connecting the container to the seabed, which could easily lead to the risk of seawater backflow and also make it difficult to provide sufficient drainage power. Therefore, this method adopts an internal drainage approach, that is, the seawater in the target compartment 122 is discharged to other spaces, such as the temporary storage compartment 130, for temporary storage, and then the seawater is transported out of the container by external equipment before being discharged. Alternatively, the seawater can be directly pumped out by pumping equipment and then transported out of the container by external equipment before being discharged. On the one hand, this method avoids the need for a complex drainage structure connecting to the outside of the container, thus avoiding the risk of seawater backflow due to the drainage structure failing to withstand external water pressure. On the other hand, it also effectively solves the problem of insufficient power to drain water at the seabed. During the initial drainage, the seawater in the target compartment 122 is discharged until the breach 1221 is exposed, and then drainage is stopped. This prevents the large pressure difference between the inside and outside from causing the temporary external seal to break and leak again after the seawater is emptied all at once.
[0027] Step S500: Insert or place a tool from the top inside the target compartment 122 or from the top of the adjacent compartment 121 to perform preliminary repairs on the tear 1221 inside the target compartment 122. like Figure 2 and Figure 3 As shown, the overall shape of the container is approximately a cylindrical tank. To facilitate the placement of the server 800 and the arrangement of internal heat dissipation pipes and other structures, a container floor 110 is installed at the bottom of the container, and a top plate 170 is installed at the top of the container. Therefore, for the compartment 121 inside the container, there is a certain amount of space between its bottom and the bottom wall of the container, and there is also a certain amount of space between its top and the top wall of the container. Therefore, after completing the initial drainage and preparing for initial repairs, the space between the top of the target compartment 122 and the top wall of the container can be utilized. Maintenance personnel can enter the target compartment 122 from above through this space, open the pre-set top opening 171, and insert tools for initial welding. If the breach 1221 is located at a lower position within the target compartment 122, making repairs difficult for personnel, an underwater welding robot can be deployed for initial welding without requiring personnel to enter the target compartment 122. This avoids the danger to maintenance personnel caused by accidental damage to the external temporary sealing point leading to renewed leakage. Furthermore, if the external temporary sealing point accidentally breaks and leaks again, the opening made during initial repairs can be closed promptly to prevent further seawater spread. Additionally, if... Figure 3As shown, a temporary door 141 can also be set above the watertight door 140. When the position of the breach 1221 is lower than the position of the temporary door 141, after the initial drainage is completed, the temporary door 141 can be opened and seawater cannot seep out. At this time, maintenance personnel can insert or put tools into the temporary door 141 to perform preliminary repairs on the breach 1221 in the target compartment 122 without having to enter from above the target compartment 122, which facilitates operation.
[0028] Step S600: After the initial repairs are completed, the target compartment 122 is drained a second time from inside the container. After initial welding is completed, the top opening 171 or temporary door 141 of the target compartment 122 is closed. After a period of time, secondary drainage is carried out on the target compartment 122 from the inside of the container. During the drainage process, the liquid level is monitored in real time to see if it continues to drop. At the same time, the leakage detection component 200 also monitors in real time whether the breach 1221 is damaged again. During the secondary drainage, the breach 1221 has sufficient strength after being temporarily sealed externally and initially repaired internally. After the secondary drainage, even if the pressure difference between the inside and outside is large, the breach 1221 is not likely to be damaged again in a short period of time.
[0029] After step S700 and secondary drainage are completed, enter the interior of the target compartment 122, perform final repair on the breach 1221, and inspect it to ensure it passes inspection.
[0030] After the secondary drainage is completed, a period of time is waited for the leak detection component 200 to monitor the location of the breach 1221 in real time. Once no continuous leakage is detected, the temporary door 141 is opened. After the air pressure equalizes and remains stable for a period without any abnormalities, the watertight door 140 is opened, and maintenance personnel enter the target compartment 122 to perform a thorough final repair to ensure repair quality. The repair of breach 1221 is inspected, and once it passes inspection, the final repair is complete. During the repair process, other maintenance personnel can simultaneously perform emergency repairs on server 800 to prevent it from being completely damaged by prolonged immersion in water, reducing the probability of server 800 damage and further minimizing losses. External pumping equipment can also simultaneously pump water from the temporary storage tank 130. Multiple tasks can be carried out concurrently without interference, improving emergency response efficiency.
[0031] This method allows for timely drainage and repair of the leaking target compartment 122 without having to hoist the container back to shore. At the same time, it reduces the difficulty and risk of drainage and repair, ensuring that drainage and repair work carried out directly on the seabed can be completed smoothly. This greatly reduces manpower and material costs, and reduces the probability and number of server 800 failures.
[0032] Example 2 Embodiment 2 of the present invention provides an emergency method for water leakage of a subsea data container, comprising the following steps: Step S100: Detect and identify the compartment 121 with the breach 1221 and the location of the breach 1221 within the corresponding compartment 121, wherein the compartment 121 with the breach 1221 is named the target compartment 122. Inside the shelter, a leak detection component 200 and a control component 300 are installed. The leak detection component 200 is used to detect and identify leak information, that is, to detect and identify the compartment 121 with the breach 1221 and the location of the breach 1221 within the corresponding compartment 121, and sends the detected leak information to the control component 300, which then controls the watertight doors 140 on both sides of the target compartment 122 to close. (Refer to...) Figure 3 In order to demonstrate the connection or control relationship of components such as the leakage detection component 200, the control component 300, the external temporary plugging component 400, and the internal drainage component 500, Figure 3 The leakage detection component 200, control component 300, and internal drainage component 500 are illustrated in a block diagram. The block diagrams of the control component 300 and internal drainage component 500 are placed outside the hull 100; in reality, the control component 300 and internal drainage component 500 are located inside the hull 100 or the connecting corridor 700. Figure 3 The diagram illustrates the placement of the external temporary blocking assembly 400 and the main control room 600 above the sea surface. The signal or electrical connections between these components and the main control room 600 are shown using dashed lines. Furthermore, in... Figure 3 The image shows a breach 1221 in the third compartment 121 from left to right of the cabin 100. This compartment 121 is the target compartment 122.
[0033] Furthermore, the leak detection component 200 employs a three-dimensional sound source localization method to detect and identify leak information. This is because in the seabed environment, due to the significant pressure difference between the inside and outside of the shelter, once a breach 1221 occurs, seawater seeps in through the breach, accompanied by a relatively high decibel noise. The source of this noise, i.e., the location of the sound source, is the location of the breach 1221 to be detected. The leak detection component 200 includes at least three microphones arranged in a three-dimensional array. By using the orientation and distance of the array microphones, the location of the breach 1221 is detected and identified. Of course, the three-dimensional sound source localization method is a relatively mature existing detection technology, and its detection principle will not be elaborated here. Understandably, during the detection process, a threshold needs to be preset. When the detected noise decibel level exceeds this threshold, the control component 300 will control the watertight door 140 to close, to avoid false triggering due to the detection of ordinary noise. This threshold can be tested and adjusted according to the actual seabed depth, and is generally greater than 100 dB.
[0034] Step S200: Based on the location information of the target compartment 122, control the watertight doors 140 on both sides of the target compartment 122 to close; When the leakage detection component 200 detects and identifies leakage information, it will send information to the control component 300. After receiving the leakage information, the control component 300 will close the watertight doors 140 on both sides of the target compartment 122 where the leakage occurred. The target compartment 122 will be isolated into an independent sealed space. After seawater seeps into the target compartment 122 and fills it, it will not continue to seep in, thus preventing seawater from spreading to other compartments 121, thereby reducing the number of damaged internal servers 800 and reducing losses.
[0035] Further, step S200 includes the following steps: Step S210: When a staff member is detected in the target compartment 122, the inner watertight door 140 of the inner compartment 121 of the target compartment 122 and the outer watertight door 140 of the outer compartment 121 of the target compartment 122 are controlled to close according to the location information of the target compartment 122. Step S220: After the staff leaves the target compartment 122, close the watertight doors 140 on both sides of the target compartment 122.
[0036] When a leak occurs in a compartment 121, there may be staff performing routine maintenance inside that compartment. If the control component 300 closes the watertight doors 140 on both sides of the target compartment 122 at this time, the staff may be trapped inside the target compartment 122. Seawater will seep in rapidly under high pressure, posing a great threat to the personal safety of the staff. Therefore, in this embodiment, a human detection radar is arranged in compartment 121 to detect whether there are staff members in the target compartment 122. When no staff members are detected in the target compartment 122, the control component 300 directly controls the watertight doors 140 on both sides of the target compartment 122 to close. When staff members are detected in the target compartment 122, the inner watertight door 140 of the inner compartment 121 and the outer watertight door 140 of the outer compartment 121 of the target compartment 122 are closed first. After the staff members hear the alarm, they quickly enter the adjacent compartment 121 that is closer to them. After the human detection radar detects and identifies that the staff members have left the target compartment 122, it controls the watertight doors 140 on both sides of the target compartment 122 to close to prevent seawater from continuing to spread to the adjacent compartment 121. During the process of staff entering the adjacent compartment 121, some seawater may overflow into the adjacent compartment 121. Therefore, if the watertight door 140 of the adjacent compartment 121 is opened at this time, the seawater in the compartment 121 may continue to seep into the next compartment 121. Therefore, it is necessary to keep the watertight door 140 of the adjacent compartment 121 of the target compartment 122 closed, while the staff can escape through the temporary door 141 above the watertight door 140. Since the seawater is now isolated inside the target compartment 122, the staff have enough time to open the temporary door 141 above the watertight door 140, close the temporary door 141 again, and then escape.
[0037] Step S300: Based on the location information of the target compartment 122 and the breach 1221, temporarily seal the breach 1221 from the outside of the target compartment 122; Upon receiving leakage information, the control component 300 immediately closes the watertight doors 140 on both sides of the target compartment 122 and sends a leakage alarm to the main control room 600 on shore, notifying relevant personnel to take immediate emergency measures. Based on the leakage information received by the control component 300, relevant personnel promptly arrange for maintenance personnel to carry out repairs. After the leakage occurs, since the seawater is already contained within the target compartment 122, the safety of other compartments 121 inside the hull 100 is guaranteed, so there is no need to rush to drain the water. Before proceeding with drainage, the breach 1221 is temporarily sealed to prevent continued seawater leakage during subsequent drainage processes, which could affect the drainage progress. When temporarily sealing breach 1221, nail guns can be used in conjunction with a plugging plate. Professional underwater personnel can be deployed to the seabed to the outside of target compartment 122 based on the received location information of target compartment 122 and breach 1221, and temporarily seal the breach 1221. Of course, to improve the safety of the operation, an underwater robot can also be deployed to assist in the operation. When temporarily sealing the outside of breach 1221, the relevant person in charge should observe the position and operation of the underwater personnel or underwater robot in the main control room at all times to better coordinate the operation and prepare for emergency rescue.
[0038] Step S400: Initially drain water from the inside of the container into the target compartment 122 until the breach 1221 is exposed. Due to the great depth and high water pressure at the seabed, it is extremely difficult to construct a drainage structure connecting the container to the seabed, which could easily lead to the risk of seawater backflow and also make it difficult to provide sufficient drainage power. Therefore, this method adopts an internal drainage approach, that is, the seawater in the target compartment 122 is discharged to other spaces, such as the temporary storage compartment 130, for temporary storage, and then the seawater is transported out of the container by external equipment before being discharged. Alternatively, the seawater can be directly pumped out by pumping equipment and then transported out of the container by external equipment before being discharged. On the one hand, this method avoids the need for a complex drainage structure connecting to the outside of the container, thus avoiding the risk of seawater backflow due to the drainage structure failing to withstand external water pressure. On the other hand, it also effectively solves the problem of insufficient power to drain water at the seabed. During the initial drainage, the seawater in the target compartment 122 is discharged until the breach 1221 is exposed, and then drainage is stopped. This prevents the large pressure difference between the inside and outside from causing the temporary external seal to break and leak again after the seawater is emptied all at once.
[0039] Furthermore, when the leakage detection component 200 detects a leak in the target compartment 122 and there are no personnel present, the control component 300 will promptly close the watertight doors 140 on both sides of the target compartment 122. However, at this time, personnel may still be present in other compartments 121 closer to the inner end of the cabin than the target compartment 122. Alternatively, personnel escaping the target compartment 122 may be closer to an adjacent compartment 121 at the inner end of the cabin and thus also escape to that adjacent compartment 121. After the watertight doors 140 on both sides of the target compartment 122 are closed, the personnel will be trapped inside the cabin, and prolonged confinement within the cabin poses a safety hazard. Therefore, in this embodiment, if personnel are detected in a compartment 121 closer to the inner side of the cabin than the target compartment 122, the target compartment 122 will be initially drained only after the personnel have escaped through the escape route.
[0040] Furthermore, as mentioned above, a cabin floor 110 is provided in the lower part of the cabin. Therefore, there is actually a certain space between the bottom of compartment 121 and the bottom wall of the cabin. This space can serve as a temporary storage compartment 130. If personnel are trapped in compartment 121, which is closer to the inside of the cabin than the target compartment 122, the temporary storage compartment 130 will first serve as an escape route. Personnel will enter the temporary storage compartment 130 from the inner compartment 121 and escape through the outer exit of the temporary storage compartment 130. After personnel escape from the temporary storage compartment 130 and close the outer exit of the temporary storage compartment 130, the seawater in the target compartment 122 will be discharged into the temporary storage compartment 130. After the seawater is discharged, external pumping equipment will be used to extract the seawater from the temporary storage compartment 130, and a transport vehicle, such as a transport vehicle, will be used to transport the extracted seawater away and discharge it. This discharge method converts the drainage into first discharging into the temporary storage tank 130 below the target compartment 122. Simply opening the discharge port allows for drainage entirely through gravity. When using external pumping equipment, only ordinary pumping motors are needed, effectively solving the problem of insufficient underwater pumping power. Discharging seawater first into the temporary storage tank 130 below the target compartment 122 utilizes gravity, eliminating the need for additional installation or docking. After temporary external sealing, drainage can proceed immediately without reserving space for pumping equipment. This provides maintenance personnel with sufficient time and space to prepare for repairs. Furthermore, external pumping equipment can be directly connected to the temporary storage tank 130, while transport vehicles can wait in the connecting corridor 700. The pumping equipment can directly pump seawater into the transport vehicle, and once full, the vehicle can be transported away.
[0041] Furthermore, temporary water tanks 510 can be installed within the temporary storage compartment 130. Each compartment 121 has a temporary water tank 510 connected to its bottom via a drain pipe 520, and all temporary water tanks 510 are sequentially connected via connecting pipes 530. During drainage, the control component 300 opens the valve at the drain pipe 520, allowing seawater in compartment 121 to drain into the temporary water tank 510 through the drain pipe 520, instead of being directly discharged into the temporary storage compartment 130. This facilitates subsequent processing and prevents seawater corrosion of the container's interior. During subsequent pumping, since the temporary water tanks 510 are interconnected, the pumping equipment can be connected to the outermost temporary water tank 510 for pumping. Furthermore, although the space of temporary water tank 510 is smaller than that of compartment 121, multiple temporary water tanks 510 are interconnected. Therefore, during drainage, the seawater is actually temporarily stored in multiple temporary water tanks 510, which can still meet the space requirements for initial drainage. In the subsequent secondary drainage process, a pumping device is connected to the outermost temporary water tank 510 for pumping water, so the storage capacity of temporary water tank 510 is sufficient to meet the needs. Of course, even with temporary water tanks 510 in place, initial drainage should be carried out only after the trapped personnel have escaped, to avoid any accidents that could endanger the safety of the trapped personnel during the initial drainage process.
[0042] Furthermore, in this embodiment, a height reference value is set based on the actual height of the target compartment 122, which is half the height of the target compartment 122. When the leakage detection component 200 detects and identifies the location of the breach 1221, it compares the height of the breach 1221 location with the preset height reference value. When the location of the breach 1221 is below half the height of the target compartment 122, step S400 includes the following steps: Step 410: From inside the container, perform the first preliminary drainage of the target compartment 122. When the drainage is about to expose the breach 1221, perform pre-repair of the breach 1221. Step S420: Perform a second preliminary drainage of the target compartment 122 from inside the container until the breach 1221 is fully exposed.
[0043] In this embodiment, if the breach 1221 is located below half the height of the target compartment 122, and the seawater in the target compartment 122 is initially discharged to the point where the breach 1221 is completely exposed, the inside of the breach 1221 is air and the outside is seawater, which will be subjected to huge pressure, which will have an adverse effect on the external temporary plugging structure at the location of the breach 1221. Therefore, the first preliminary drainage of the target compartment 122 was carried out from the inside of the container. The target compartment 122 is equipped with a liquid level sensor, which monitors the seawater level in the target compartment 122 in real time. When the breach 1221 is about to be exposed, that is, when the liquid level sensor detects that the seawater level in the target compartment 122 is a certain distance above the breach 1221, for example, 3cm to 5cm, the drainage component stops draining. The maintenance personnel first pre-repair the breach 1221. After the pre-repair is completed, the target compartment 122 is drained a second time until the breach 1221 is completely exposed. At this time, the outside of the breach 1221 is temporarily sealed and the inside has also been pre-repaired, which has high strength and is conducive to subsequent preliminary repairs.
[0044] Step S500: Insert or place a tool from the top inside the target compartment 122 or from the top of the adjacent compartment 121 to perform preliminary repairs on the tear 1221 inside the target compartment 122. like Figure 2 and Figure 3 As shown, the overall shape of the container is approximately a cylindrical tank. To facilitate the placement of the server 800 and the arrangement of internal heat dissipation pipes and other structures, a container floor 110 is installed at the bottom of the container, and a top plate 170 is installed at the top of the container. Therefore, for the compartment 121 inside the container, there is a certain amount of space between its bottom and the bottom wall of the container, and there is also a certain amount of space between its top and the top wall of the container. Therefore, after completing the initial drainage and preparing for initial repairs, the space between the top of the target compartment 122 and the top wall of the container can be utilized. Maintenance personnel can enter the target compartment 122 from above through this space, open the pre-set top opening 171, and insert tools for initial welding. If the breach 1221 is located at a lower position within the target compartment 122, making repairs difficult for personnel, an underwater welding robot can be deployed for initial welding without requiring personnel to enter the target compartment 122. This avoids the danger to maintenance personnel caused by accidental damage to the external temporary sealing point leading to renewed leakage. Furthermore, if the external temporary sealing point accidentally breaks and leaks again, the opening made during initial repairs can be closed promptly to prevent further seawater spread. Additionally, if... Figure 3As shown, a temporary door 141 can also be set above the watertight door 140. When the position of the breach 1221 is lower than the position of the temporary door 141, after the initial drainage is completed, the temporary door 141 can be opened and seawater cannot seep out. At this time, maintenance personnel can insert or put tools into the temporary door 141 to perform preliminary repairs on the breach 1221 in the target compartment 122 without having to enter from above the target compartment 122, which facilitates operation.
[0045] Step S600: After the initial repairs are completed, the target compartment 122 is drained a second time from inside the container. After initial welding is completed, the top opening 171 or temporary door 141 of the target compartment 122 is closed. After a period of time, secondary drainage is carried out on the target compartment 122 from the inside of the container. During the drainage process, the liquid level is monitored in real time to see if it continues to drop. At the same time, the leakage detection component 200 also monitors in real time whether the breach 1221 is damaged again. During the secondary drainage, the breach 1221 has sufficient strength after being temporarily sealed externally and initially repaired internally. After the secondary drainage, even if the pressure difference between the inside and outside is large, the breach 1221 is not likely to be damaged again in a short period of time.
[0046] Further, step S600 includes the following steps: Step S610: After the initial repairs are completed, reseal the target compartment 122. Step S620: Drain the target compartment 122 from the inside of the container until the seawater in the target compartment 122 is emptied. Step S630: Continuously detect and identify water leakage in the target compartment 122. After a period of time, if there is no water leakage, proceed to step S700. If water leakage is detected, strengthen the temporary external sealing and return to step S400.
[0047] In this embodiment, after the initial repair, the target compartment 122 is resealed and then drained a second time. During the drainage process, the leakage situation in the target compartment 122 is continuously detected and identified. Even if the external temporary seal or the internal pre-repair is damaged and leaks again during the secondary drainage process, the target compartment 122 has been resealed, so there will be no seawater overflow. If the leakage situation is still detected, the external temporary seal is strengthened first, and then the process returns to step S400 to continue the initial drainage, initial repair and secondary drainage of the target compartment 122.
[0048] After step S700 and secondary drainage are completed, enter the interior of the target compartment 122, perform final repair on the breach 1221, and inspect it to ensure it passes inspection.
[0049] After the secondary drainage is completed, wait for a period of time. The leak detection component 200 monitors the location of the breach 1221 in real time. Once there is no continuous leakage, open the temporary door 141. After waiting for the air pressure to equalize and remain normal for a period of time, open the watertight door 140. Maintenance personnel enter the target compartment 122 to perform careful final repairs to ensure repair quality and inspect the repair of breach 1221. Once it passes inspection, the final repair is complete. During the repair process, other maintenance personnel can simultaneously perform emergency repairs on server 800 to prevent server 800 from being completely damaged due to prolonged immersion in water, thus reducing the probability of server 800 damage and further minimizing losses.
[0050] Step S800: Clean, disinfect and prevent corrosion of the target compartment 122, its adjacent compartment 121, and the temporary storage compartment 130. After the treatment is completed, the staff rearranges the server 800 and checks the working condition.
[0051] Example 3 Reference Figure 3 Embodiment 3 of the present invention provides a water leakage emergency system for a seabed data container, used to implement the above-mentioned water leakage emergency method, including a container 100, a water leakage detection component 200, a control component 300, an external temporary plugging component 400, and an internal drainage component 500.
[0052] The hull 100 is placed on the seabed and connected to the shore via a connecting corridor 700. The hull 100 includes multiple compartments 121 distributed along its length. Each compartment 121 is equipped with watertight doors 140 on both sides. Each compartment 121 is equipped with a leakage detection component 200. The leakage detection component 200 is used to detect and identify leakage information in the corresponding compartment 121, and sends the location information of the detected target compartment 122 and the location information of the breach 1221 to the external temporary blocking component 400 and the control component 300. The control component 300 can control the watertight doors 140 on both sides of the target compartment 122 to close. The external temporary blocking component 400 can temporarily block the breach 1221 from the outside of the target compartment 122. The internal drainage component 500 can drain water from the inside of the hull to the target compartment 122. It is understandable that the structure of the watertight door 140 and its connection with the structure that needs to maintain watertight performance are existing technologies, such as watertight doors commonly used in ships, and will not be elaborated here.
[0053] Reference Figure 3 The document shows a sectional view of part of the structure of the modular shelter 100, illustrating the connection and control relationships of components such as the leakage detection component 200, control component 300, external temporary plugging component 400, and internal drainage component 500. Figure 3The leakage detection component 200, control component 300, and internal drainage component 500 are illustrated in a block diagram. The block diagrams of the control component 300 and internal drainage component 500 are placed outside the hull 100; in reality, the control component 300 and internal drainage component 500 are located inside the hull 100 or the connecting corridor 700. Figure 3 The diagram illustrates the placement of the external temporary blocking assembly 400 and the main control room 600 above the sea surface. The signal or electrical connections between these components and the main control room 600 are shown using dashed lines. Furthermore, in... Figure 3 The image shows a breach 1221 in the third compartment from left to right of the hull 100, which is the target compartment 122.
[0054] This water leakage emergency system is equipped with a water leakage detection component 200, a control component 300, an external temporary plugging component 400, and an internal drainage component 500. The water leakage detection component 200 can detect the target compartment 122 where a water leak has occurred in a timely manner, and the control component 300 can control the watertight doors 140 on both sides of the target compartment 122 to close the watertight doors 140 on both sides of the target compartment 122 in a timely manner, thus isolating the seawater within the target compartment 122 and preventing the seawater from spreading to other compartments 121, thereby reducing the number of damaged internal servers 800 and reducing losses. This water leakage emergency system can also temporarily seal the breach 1221 of the target compartment 122 from the outside through the external temporary plugging component 400, and drain the water from the inside of the container into the target compartment 122 through the internal drainage component 500 to facilitate subsequent maintenance and treatment. It can reduce the difficulty of drainage and maintenance risks, and ensure that drainage and maintenance work carried out directly on the seabed by the container can be completed smoothly, which greatly reduces manpower and material costs and reduces the probability and number of damaged servers 800.
[0055] Furthermore, the leak detection component 200 employs a three-dimensional sound source localization method to detect and identify leak information. This is because in the seabed environment, due to the significant pressure difference between the inside and outside of the shelter, once a breach 1221 occurs, seawater seeps in through the breach, accompanied by a relatively high decibel noise. The source of this noise, i.e., the location of the sound source, is the location of the breach 1221 to be detected. The leak detection component 200 includes at least three microphones arranged in a three-dimensional array. By using the orientation and distance of the array microphones, the location of the breach 1221 is detected and identified. Of course, the three-dimensional sound source localization method is a relatively mature existing detection technology, and its detection principle will not be elaborated here. Understandably, during the detection process, a threshold needs to be preset. When the detected noise decibel level exceeds this threshold, the control component 300 will control the watertight door 140 to close, to avoid false triggering due to the detection of ordinary noise. This threshold can be tested and adjusted according to the actual seabed depth, and is generally greater than 100 dB.
[0056] Furthermore, the cabin 100 is equipped with a container floor 110 to divide the interior of the cabin 100 into an upper working cabin 120 and a lower temporary storage cabin 130. The temporary storage cabin 130 has an outer exit connecting to the outer end of the cabin 100 or the connecting corridor 700. Compartments 121 are located inside the working cabin 120, and multiple compartments 121 are connected to the temporary storage cabin 130, so that personnel can enter the temporary storage cabin 130 from the compartments 121 and seawater in the target compartment 122 can be discharged into the temporary storage cabin 130. In the event of a leak, if personnel are trapped inside the container, the temporary storage cabin 130 can serve as a temporary escape route, allowing personnel to enter the temporary storage cabin 130 to escape from the container. Furthermore, an escape door 150 is installed at the bottom of the innermost compartment 121, and an escape ladder 160 is installed below the escape door 150. After entering the innermost compartment 121, staff can open the escape door 150 at the bottom and climb down the escape ladder 160 to the temporary storage chamber 130. During drainage, the temporary storage chamber 130 serves as a temporary seawater storage structure to store seawater.
[0057] Furthermore, a temporary water tank 510 can be installed in the temporary storage compartment 130. The bottom of each compartment 121 is connected to a temporary water tank 510 through a drain pipe 520, and the temporary water tanks 510 are connected in sequence through a connecting pipe 530. When draining, the seawater in the compartment 121 is discharged into the temporary water tank 510 through the drain pipe 520 instead of being directly discharged into the temporary storage compartment 130. This facilitates subsequent processing and also avoids corrosion of the container interior by seawater. When pumping water, since the temporary water tanks 510 are interconnected, the pumping equipment can be connected to the outermost temporary water tank 510 for pumping. Furthermore, although the space of temporary water tank 510 is smaller than that of compartment 121, multiple temporary water tanks 510 are interconnected. Therefore, during drainage, the seawater is actually temporarily stored in multiple temporary water tanks 510, which can still meet the space requirements for initial drainage. In the subsequent secondary drainage process, a pumping device is connected to the outermost temporary water tank 510 for pumping water, so the storage capacity of temporary water tank 510 is sufficient to meet the needs. Of course, even with temporary water tanks 510 in place, initial drainage should be carried out only after the trapped personnel have escaped, to avoid any accidents that could endanger the safety of the trapped personnel during the initial drainage process.
[0058] Furthermore, a temporary door 141 is provided above the watertight door 140. The temporary door 141 is a door within a door, which is connected to the watertight door 140 by a lifting and sliding mechanism. Under normal circumstances, the temporary door 141 is in a raised state and is sealed to the watertight door 140. For example... Figure 3 As shown in the two watertight doors 140 on the left side, the temporary door 141 can be lowered during subsequent initial repairs, for example... Figure 3As shown in the third watertight door 140 from left to right, maintenance personnel can use the window opened by the temporary door 141 to reach in tools or deploy an underwater welding robot for initial repairs. If the breach 1221 breaks again and causes leakage, the control component 300 can quickly raise the temporary door 141 and seal it with the watertight door 140, completely resealing the target compartment 122.
[0059] It should be noted that in the description of this invention, any descriptions of orientation, such as up, down, front, back, left, right, etc., indicating orientation or positional relationships, are based on the orientation or positional relationships shown in the accompanying drawings. They are only for the purpose of facilitating the description of this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed or operated in a specific orientation, and should not be construed as a limitation of this invention.
[0060] In the description of this invention, "several" means one or more, "more than" means two or more, "greater than," "less than," "exceeding," etc. are understood to exclude the stated number, while "above," "below," "within," etc. are understood to include the stated number. If "first" or "second" is mentioned, it is only for the purpose of distinguishing technical features and should not be construed as indicating or implying relative importance, or implicitly indicating the number of indicated technical features, or implicitly indicating the order of the indicated technical features.
[0061] In the description of this invention, unless otherwise explicitly defined, terms such as "set up," "install," and "connect" should be interpreted broadly, and those skilled in the art can reasonably determine the specific meaning of the above terms in this invention in conjunction with the specific content of the technical solution.
[0062] The above embodiments are merely preferred embodiments of the present invention and should not be construed as limiting the scope of protection of the present invention. Any non-substantial changes and substitutions made by those skilled in the art based on the present invention shall fall within the scope of protection claimed by the present invention.
Claims
1. An emergency method for water leakage in an underwater data container, characterized in that, Includes the following steps: Step S100: Detect and identify the compartment (121) with the break (1221) and the location of the break (1221) in the corresponding compartment (121), wherein the compartment (121) with the break (1221) is the target compartment (122). Step S200: Based on the location information of the target compartment (122), control the watertight doors (140) on both sides of the target compartment (122) to close; Step S300: Based on the location information of the target compartment (122) and the breach (1221), temporarily seal the breach (1221) from the outside of the target compartment (122); Step S400: Initially drain the target compartment (122) from inside the container until the breach (1221) is exposed; Step S500: Insert or place a tool from the inner top of the target compartment (122) or from the upper part of the adjacent compartment (121) to perform preliminary repair on the tear (1221) in the target compartment (122); Step S600: After the initial repair is completed, the target compartment (122) is drained a second time from inside the container. After step S700 and secondary drainage are completed, enter the interior of the target compartment (122), perform final repair on the breach (1221), and inspect for compliance.
2. The emergency method for water leakage of the seabed data container according to claim 1, characterized in that, Step S200 includes the following steps: Step S210: When it is detected that there are staff members in the target compartment (122), according to the location information of the target compartment (122), control the inner watertight door (140) of the inner compartment (121) of the target compartment (122) and the outer watertight door (140) of the outer compartment (121) of the target compartment (122) to close. Step S220: After the staff leaves the target compartment (122), close the watertight doors (140) on both sides of the target compartment (122).
3. The emergency method for water leakage of the seabed data container according to claim 1, characterized in that, Before step S400, if it is detected that there are staff members in a compartment (121) that is closer to the inside of the cabin than the target compartment (122), the target compartment (122) will be initially drained after the staff members have escaped through the escape passage.
4. The emergency method for water leakage of the seabed data container according to claim 3, characterized in that, The bottom of the container is equipped with a temporary storage compartment (130). If staff are trapped in a compartment (121) that is closer to the inside of the container than the target compartment (122), the temporary storage compartment (130) will first serve as an escape route. Staff will enter the temporary storage compartment (130) from the inner compartment (121) and escape from the outer exit of the temporary storage compartment (130). After the staff escapes from the temporary storage compartment (130) and closes the outer exit of the temporary storage compartment (130), the seawater in the target compartment (122) will be discharged into the temporary storage compartment (130).
5. The emergency method for water leakage of the subsea data container according to claim 4, characterized in that, In steps S400 and S600, an external pumping device is used to extract seawater from the temporary storage tank (130), and a transport vehicle is used to transport and discharge the extracted seawater.
6. The emergency method for water leakage of the seabed data container according to claim 4, characterized in that, Following step S700, the following steps are also included: Step S800: Clean, disinfect and prevent corrosion of the target compartment (122) and its adjacent compartment (121), as well as the temporary storage compartment (130).
7. The emergency method for water leakage of the subsea data container according to claim 1, characterized in that, When the breach (1221) is located below half the height of the target compartment (122), step S400 includes the following steps: Step 410: From inside the container, perform the first preliminary drainage of the target compartment (122). When the drainage is about to expose the breach (1221), perform pre-repair of the breach (1221). Step S420: From inside the container, perform a second preliminary drainage of the target compartment (122) until the breach (1221) is fully exposed.
8. The emergency method for water leakage of the seabed data container according to claim 1, characterized in that, Step S600 includes the following steps: Step S610: After the initial repair is completed, reseal the target compartment (122). Step S620: Drain the target compartment (122) from the inside of the container until the seawater in the target compartment (122) is emptied. Step S630: Continuously detect and identify water leakage in the target compartment (122). After a period of time, if there is no water leakage, proceed to step S700. If water leakage is detected, strengthen the temporary external sealing and return to step S400.
9. A water leakage emergency system for an underwater data container, characterized in that, It includes a hull (100), a leak detection assembly (200), a control assembly (300), an external temporary plugging assembly (400), and an internal drainage assembly (500). The cabin (100) includes multiple compartments (121) distributed along its length. Each compartment (121) is provided with a watertight door (140) on both sides. Each compartment (121) is provided with a leakage detection component (200). The leakage detection component (200) is used to detect and identify leakage information in the corresponding compartment (121) and send the location information of the detected target compartment (122) and the location information of the breach (1221) to the external temporary plugging component (400) and the control component (300). The control component (300) is capable of controlling the closing of the watertight doors (140) on both sides of the target compartment (122); The external temporary plugging assembly (400) can temporarily plug the breach (1221) from the outside of the target compartment (122); The internal drainage assembly (500) is capable of draining water from inside the container into the target compartment (122).
10. The emergency water leakage system for the subsea data container according to claim 9, characterized in that, The cabin (100) is provided with a container floor (110) to divide the interior of the cabin (100) into an upper working cabin (120) and a lower temporary storage cabin (130), the temporary storage cabin (130) having an outer end outlet that connects to the outer end of the cabin (100) or a connecting corridor (700). The compartment (121) is located inside the work cabin (120), and multiple compartments (121) are connected to the temporary storage cabin (130) so that staff can enter the temporary storage cabin (130) from the compartment (121) and seawater in the target compartment (122) can be discharged into the temporary storage cabin (130).
11. The emergency water leakage system for the subsea data container according to claim 9, characterized in that, A temporary door (141) is provided on the upper part of the watertight door (140).