A layered sewage-separating deep infiltration and drainage system and method for urban roads
By using a layered, segregated deep infiltration drainage system for urban roads, and utilizing initial rainwater interception chambers and drainage permitting mechanisms, the system achieves separation of initial rainwater from subsequent rainwater and controls deep infiltration drainage. This solves the problem of initial rainwater pollutants entering deep infiltration wells and reduces the risk of longitudinal seepage in deep infiltration wells.
Patent Information
- Application Number
- CN202611485064.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-22
- Publication Date
- 2026-11-17
AI Technical Summary
Existing urban road deep infiltration drainage systems are difficult to effectively isolate pollutants carried by initial rainwater. Furthermore, the underground sealing structure of deep infiltration drainage wells is prone to the formation of longitudinal hydraulic channels due to construction defects or settlement, making it impossible to promptly block the migration of shallow water to deeper layers.
A layered sewage-isolation deep infiltration and drainage system for urban roads is adopted, including an initial rainwater interception chamber, floating components, a flow exchange assembly, and an infiltration and drainage permitting mechanism. The flow exchange assembly is driven to switch between interception, isolation, and infiltration and drainage positions by changes in liquid level. Combined with upper and lower sealing sections and a sewage isolation monitoring chamber, the system achieves separation of initial rainwater from subsequent rainwater and deep infiltration and drainage control.
This effectively reduces the amount of mud, sand, and pollutants carried by initial rainwater into deep drainage wells, lowers the risk of longitudinal seepage channels at the construction interface of deep drainage wells, ensures timely cessation of deep drainage wells when the sealing status changes, and maintains the road's rainwater drainage capacity.
Smart Images

Figure CN123109259A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of rainwater infiltration and drainage, specifically to a layered, segregated deep infiltration and drainage system and method for urban roads. Background Technology
[0002] As the paved area of urban roads continues to increase, surface runoff from rainfall is less likely to infiltrate naturally through the road base and shallow soil. Under conditions of short-duration heavy rainfall, large amounts of rainwater concentrate in the urban stormwater drainage network, easily leading to increased network load and road flooding. To improve the on-site absorption capacity of road rainwater, existing technologies are increasingly adopting infiltration wells, recharge wells, or deep infiltration and drainage facilities to transport collected rainwater from roads through vertical wells to permeable underground strata, thereby shortening the rainwater infiltration path and increasing the effective infiltration area.
[0003] However, initial rainwater runoff from roads typically carries a significant amount of mud, sand, and particulate pollutants after washing the road surface. If rainwater from different rainfall stages is directly and continuously introduced into deep drainage wells, the initial rainwater can easily penetrate deeper strata during the infiltration process. Furthermore, existing deep drainage wells usually need to pass through road base layers, fill layers, cohesive soil layers, or other shallow strata to reach deeper permeable strata, creating a construction interface extending along the well depth between the well casing and the borehole wall. Even with clay sealing or other water-stopping structures, if the sealing area develops a water flow channel due to construction defects, long-term settlement, or localized leakage, shallow water may still migrate downwards along the well perimeter, causing the deep drainage well to form a longitudinal hydraulic channel between different underground strata.
[0004] Furthermore, existing initial rainwater interception structures and the underground sealing structures of deep infiltration wells typically function independently. After initial rainwater interception is completed, subsequent rainwater is allowed to enter the deep infiltration channels, and changes in the underground sealing status do not directly affect the opening and closing control of the deep infiltration channels. When the well-circumferential sealing fails or undesigned water migration occurs between different underground layers, the deep infiltration process may still continue, making it difficult to promptly stop shallow water from migrating along the well perimeter to deeper layers. Therefore, how to respond to the underground layered isolation status of deep infiltration wells while completing the initial rainwater isolation of roads, and how to promptly stop deep infiltration when the sealing status changes, are technical problems that urban road deep rainwater absorption facilities need to further address. Summary of the Invention
[0005] To address the shortcomings of existing technologies, this invention provides a layered, pollution-separated deep infiltration and drainage system and method for urban roads, thereby solving the technical problems existing in the prior art.
[0006] The above-mentioned technical objective of the present invention is achieved through the following technical solution: A layered sewage-separated deep infiltration and drainage system for urban roads includes a road rainwater collection section, a layered sewage-separated well chamber, a deep infiltration and drainage well, and an infiltration and drainage permitting agency; The road rainwater collection section is connected to the layered sewage isolation chamber. The layered sewage isolation chamber is equipped with an initial rainwater interception chamber and a flow exchange component. The flow exchange component has a sewage interception position, an intermediate isolation position, and an infiltration position. At the sewage interception position, the road rainwater collection section is connected to the initial rainwater interception chamber and isolated from the deep infiltration well. At the intermediate isolation position, both the initial rainwater interception chamber and the deep infiltration well are isolated from the road rainwater collection section. At the infiltration position, the initial rainwater interception chamber is isolated from the road rainwater collection section, and the deep infiltration well is connected to the road rainwater collection section. The deep drainage well includes a solid-walled water delivery pipe that penetrates the shallow strata downwards and a filter pipe that is connected to the solid-walled water delivery pipe and is set up in the target permeable strata. The outer perimeter of the solid-walled water delivery pipe is provided with an upper sealing section and a lower sealing section at intervals along the depth direction, and a pollution monitoring chamber is formed between the upper sealing section and the lower sealing section. The seepage discharge permitting mechanism includes a floating component installed in the fouling isolation monitoring chamber, a traction component connected to the floating component, and a locking component connected to the traction component. The locking component has a release position that avoids the movement path of the converter component and a locking position that enters the movement path of the converter component. When the floating component moves as the liquid level in the fouling isolation monitoring chamber rises, the traction component moves the locking component from the release position to the locking position. In the locking position, the locking component pushes the converter component in the seepage discharge position back to the intermediate isolation position and restricts the converter component from returning from the intermediate isolation position to the seepage discharge position.
[0007] Preferably, the flow exchange assembly includes a flow guide tube fixedly installed in the layered sewage isolation chamber and a flow exchange sleeve slidably installed along the axial direction of the flow guide tube. The upper end of the flow guide tube is connected to the road rainwater collection part. The side wall of the flow guide tube is provided with intercepting openings and seepage openings at intervals along the moving direction of the flow exchange sleeve. The intercepting opening is connected to the initial rain intercepting chamber, and the seepage opening is connected to the solid wall water conveying pipe. The converter sleeve is equipped with a converter window. When the converter sleeve is in the interception position, the converter window is connected to the interception opening and the converter sleeve blocks the seepage opening. When the converter sleeve is in the intermediate isolation position, it blocks both the interception opening and the seepage opening. When the converter sleeve is in the seepage position, it blocks the interception opening and the converter window is connected to the seepage opening.
[0008] Preferably, the initial rain interception chamber is equipped with an initial rain floating component that moves vertically, and the initial rain floating component is connected to the converter sleeve via a transmission. When the initial rain floating component is in the lower position, the exchange sleeve remains in the interception position. When the liquid level in the initial rain interception chamber rises, causing the initial rain floating component to move upward, the initial rain floating component drives the exchange sleeve to pass through the intermediate isolation position in sequence and move towards the seepage position.
[0009] Preferably, the intercepting opening and the seepage opening are staggered along the moving direction of the converter sleeve. During the process of the converter window moving from the intercepting opening to the seepage opening, the converter sleeve first completely blocks the intercepting opening, and then the converter window connects with the seepage opening. The lower part of the initial rain interception chamber forms a sedimentation zone. The initial rain interception chamber is also connected to a sewage discharge channel. The sewage discharge channel is equipped with a throttling part, so that the water in the initial rain interception chamber is discharged through the sewage discharge channel after the rainfall weakens or stops. The initial rain floating component drives the exchange sleeve to reset to the interception position as the liquid level drops.
[0010] Preferably, a filter screen is provided around the outer periphery of the filter pipe, and a reverse filter layer is provided around the filter pipe. A sedimentation pipe is connected to the lower end of the filter pipe, and the bottom end of the sedimentation pipe is closed. The rainwater transported by the solid wall water pipe seeps into the target permeable stratum through the filter pipe, filter screen and reverse filter layer, and the solid particles that sink with the water enter the sedimentation pipe.
[0011] Preferably, the upper and lower sealing sections are formed by annular water-stopping packing layers surrounding the outer wall of the solid-wall water conveying pipe. The contamination monitoring chamber is located between the outer wall of the solid-wall water conveying pipe and the borehole wall. The upper end of the contamination monitoring chamber is closed by the upper sealing section and the lower end is closed by the lower sealing section. The lower sealing section is located above the filter pipe, so that water that passes through the upper sealing section and migrates downward along the outer periphery of the solid-wall water conveying pipe enters the contamination monitoring chamber and is blocked by the lower sealing section.
[0012] Preferably, the floating component is annular and sleeved around the solid wall water supply pipe, and the dirt-proof monitoring chamber is provided with a guide component extending along the axial direction of the solid wall water supply pipe, with the floating component and the guide component slidingly engaged; The locking element is slidably installed in the stratified sewage well chamber. The end of the locking element facing the converter sleeve is provided with a pushing slope and a stop surface that connects with the pushing slope. The converter sleeve is provided with a force-bearing part that cooperates with the pushing slope and the stop surface. When the floating element moves upward and drives the locking element into the moving path of the converter sleeve through the traction element, the pushing slope pushes the force-bearing part to make the converter sleeve retreat from the seepage position to the intermediate isolation position. Then the stop surface forms a stop on the force-bearing part.
[0013] Preferably, the layered sewage chamber is also equipped with an overflow channel connected to the road rainwater collection section. The outlet of the overflow channel is connected to the urban road rainwater pipe network, and the inlet of the overflow channel is located upstream of the converter component. When the locking element is in the locked position and the converter component is in the intermediate isolation position, the rainwater entering the stratified sewage chamber enters the urban road rainwater pipe network through the overflow channel after the water level reaches the inlet of the overflow channel.
[0014] A layered, pollution-separated deep infiltration and drainage method for urban roads includes: S1: Collects road rainwater through the road rainwater collection unit, keeps the converter component in the interception position, directs the initial rainwater entering the stratified sewage isolation chamber into the initial rain interception chamber, and blocks the connection between the road rainwater collection unit and the deep infiltration well. S2: As the liquid level in the initial rain interception chamber rises, the converter component moves from the interception position to the infiltration position. During the movement, it first enters the intermediate isolation position to isolate the initial rain interception chamber. Then, when the floating part in the interception monitoring chamber is in the lower position and the locking part is in the released position, the converter component enters the infiltration position to guide the subsequent rainwater into the deep infiltration well. S3: The rainwater introduced into the deep drainage well is transported downwards along the solid wall water conveyance pipe to the filter pipe installed in the corresponding target permeable stratum, and then seeps out into the target permeable stratum through the filter pipe; S4: The pollution monitoring chamber set between the upper and lower septum sections intercepts water that passes through the upper septum section and migrates downward along the outer periphery of the solid wall water pipe. When the liquid level in the pollution monitoring chamber rises and causes the floating component to move, the traction component drives the locking component to enter the movement path of the converter component. The locking component pushes the converter component from the seepage position to the intermediate isolation position and restricts its return to the seepage position, so as to stop the road rainwater from entering the deep seepage well.
[0015] Preferably, after the converter component is kept in the intermediate isolation position due to the rise in the liquid level in the pollution monitoring chamber, the rainwater that subsequently enters the stratified pollution isolation chamber enters the urban road rainwater pipe network through the overflow channel when the water level reaches the inlet of the overflow channel. After the rainfall weakens or stops, the water in the initial rain interception chamber is discharged through the sewage discharge channel, and the converter component is reset to the interception position after the liquid level in the initial rain interception chamber drops.
[0016] In summary, the present invention has the following main beneficial effects: By installing an initial rainwater interception chamber, an initial rainwater floating component, and a flow exchange assembly inside the stratified sewage isolation well, road rainwater is first introduced into the initial rainwater interception chamber upon entering the system. The flow exchange assembly, driven by changes in liquid level, sequentially passes through the interception point, intermediate isolation point, and infiltration point, isolating the initial rainwater from the subsequent rainwater entering the deep infiltration well along its flow path. This reduces the direct entry of mud, sand, and pollutants carried by the initial road rainwater into the deep infiltration well. Simultaneously, the intermediate isolation point closes the interception channel first, followed by the opening of the deep infiltration channel, minimizing the re-disturbance of the intercepted initial rainwater and sediment by subsequent rainwater.
[0017] By having a solid-walled water delivery pipe pass through shallow strata and a filter pipe installed at the corresponding location in the target permeable stratum, and by sequentially installing an upper sealing section, a contamination monitoring chamber, and a lower sealing section around the solid-walled water delivery pipe, rainwater entering the deep drainage well is kept in a closed-loop transport within the shallow strata and then seeps out after reaching the target permeable stratum. When the water crosses the sealing boundary and migrates longitudinally along the well perimeter, it is first intercepted by the contamination monitoring chamber, and then the lower sealing section restricts its continued migration towards the target permeable stratum. This achieves the effect of balancing the deep absorption of road rainwater with hydraulic isolation between different underground strata, reducing the risk of forming a longitudinal seepage channel at the construction interface of the deep drainage well.
[0018] By mechanically linking the floating monitoring component in the pollution isolation monitoring chamber with the traction component and the locking component, when the liquid level rises in the monitoring chamber due to a change in the isolation state, the locking component is driven to retract the flow exchange component from the infiltration position to the intermediate isolation position and prevent it from re-entering the infiltration position. This achieves the effect of directly converting the underground isolation state into a deep infiltration permitting condition. At the same time, the holding component maintains the locking state, and after the deep infiltration stops, the subsequent rainwater enters the urban road rainwater pipe network through the overflow channel. This achieves the effect of automatically stopping the deep infiltration when the isolation state is abnormal, while still maintaining the road rainwater discharge capacity. Attached Figure Description
[0019] Figure 1 This is a schematic diagram of the overall structure of the present invention.
[0020] Figure 2 This is a schematic diagram of the state of the converter component of the present invention at the interception position, intermediate isolation position and seepage discharge position.
[0021] Figure 3 This is a schematic diagram of the structure of the upper sealing section, the contamination monitoring chamber, the lower sealing section, and the monitoring floating component of the present invention.
[0022] Figure 4 This is a structural schematic diagram of the transmission relationship between the monitoring floating component, traction component, traction guide tube and locking component of the present invention.
[0023] Figure 5 This is a flowchart of the method of the present invention. Detailed Implementation
[0024] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0025] refer to Figure 1-5 A layered, pollution-isolated urban road deep infiltration drainage system and method is used for the initial interception of polluted rainwater and the deep infiltration drainage of subsequent rainwater on urban roads, and to stop the continued delivery of road rainwater to the deep target permeable strata when the well perimeter sealing state of the deep infiltration drainage well changes.
[0026] The layered pollution isolation described in this embodiment includes the initial rainwater diversion during the entry of surface rainwater and the hydraulic isolation between different underground layers. Specifically, road rainwater with a higher initial pollution level first enters the initial rainwater interception chamber, while subsequent rainwater, after meeting the exchange conditions, enters the deep infiltration well. The deep infiltration well crosses shallow strata via a solid-walled water conveyance pipe, and only seeps into the surrounding strata through filter pipes installed in the corresponding target permeable strata. An upper sealing section, a pollution isolation monitoring chamber, and a lower sealing section are installed around the solid-walled water conveyance pipe. When water flows along the well perimeter, crosses the sealing section, and enters the pollution isolation monitoring chamber, a monitoring float within the monitoring chamber directly triggers the infiltration permission mechanism, causing the deep infiltration channel to exit the connected state.
[0027] In this embodiment, the shallow stratum refers to the stratum below the road structure layer and above the target permeable stratum, but not considered as the permeable layer in the system design. The target permeable stratum refers to the underground layer with rainwater reception conditions determined based on the project's geotechnical engineering investigation, hydrogeological data, and on-site permeability tests. The specific burial depth, thickness, and permeability of the target permeable stratum are determined according to the engineering site and are not considered a necessary condition for this invention.
[0028] The road rainwater collection unit is located at the lowest point of the road or on the side edge of the road. In this embodiment, a flat grate-type rainwater inlet is installed corresponding to the road drainage slope. A rainwater grate is installed on the upper part of the road rainwater collection unit to allow road runoff to enter the system while blocking larger solid debris.
[0029] A layered sewer system is installed below the road's rainwater collection system. An inspection port is provided at the top of the layered sewer system, and a load-bearing manhole cover is installed according to the road's design load.
[0030] The layered sewage well is equipped with a primary rainwater interception chamber, a primary rainwater floating component, and a converter assembly.
[0031] The flow exchange assembly includes a flow guide cylinder fixedly installed in the stratified sewage well chamber and a flow exchange sleeve slidably sleeved around the flow guide cylinder. The flow guide cylinder is arranged vertically, and its upper end is connected to the road rainwater collection section, so that rainwater entering from the road rainwater collection section first enters the flow guide cylinder.
[0032] The sidewall of the guide tube is provided with a sewage interception opening and a seepage discharge opening along the moving direction of the converter sleeve. The sewage interception opening is connected to the initial rainwater interception chamber, and the seepage discharge opening is connected to the solid-wall water conveyance pipe of the deep seepage discharge well.
[0033] A converter window is set on the converter sleeve.
[0034] As the converter sleeve moves along the guide tube, it sequentially has a sewage interception position, an intermediate isolation position, and a seepage discharge position.
[0035] When the converter sleeve is in the interception position, the converter window corresponds to the interception opening. The road rainwater entering the guide tube enters the initial rain interception chamber through the interception opening. At this time, the seepage opening is covered by the solid wall of the converter sleeve, and the road rainwater cannot enter the solid wall water pipe.
[0036] After the converter sleeve moves upward from the intercepting position, the converter window first separates from the intercepting opening. Before the converter window reaches the seepage opening, the converter sleeve simultaneously blocks both the intercepting opening and the seepage opening, forming an intermediate isolation position.
[0037] After the converter sleeve continues to move upward to the infiltration position, the converter window corresponds to the infiltration opening, and the sewage interception opening remains blocked by the converter sleeve, thereby connecting the road rainwater collection section to the solid wall water delivery pipe through the guide tube.
[0038] A gap is maintained between the intercepting opening and the infiltration opening along the direction of movement of the exchange sleeve. This gap is greater than the length of the exchange window in the same direction. This ensures that when the exchange window moves from the intercepting opening to the infiltration opening, there is a travel segment in which both the intercepting opening and the infiltration opening close simultaneously, preventing the initial rainwater intercepting chamber and the deep infiltration well from being simultaneously connected to the road rainwater collection section.
[0039] The specific height and dimensions of the intercepting opening, seepage opening, and converter window are determined based on the design flow rate. The principle for this determination is to ensure that the road's rainwater flow capacity meets design rainfall conditions while maintaining complete shielding boundaries in all three working positions of the converter sleeve. During actual manufacturing, the minimum spacing between the two openings is determined by considering the fit clearance between the converter sleeve and the guide tube, machining errors, and the effective sealing width of the sliding seal.
[0040] A sliding seal is installed between the converter sleeve and the guide tube to reduce the bypass flow of rainwater when the converter sleeve is in the interception position or intermediate isolation position.
[0041] The initial rainwater interception chamber is located inside the stratified sewage well chamber, and its water inlet is connected to the sewage interception opening.
[0042] The lower part of the initial rainwater interception chamber is lower than the interception opening, which allows road rainwater entering the chamber to settle, and the mud and sand carried by the road flow can be deposited to the bottom of the chamber under the action of gravity.
[0043] The initial rainwater floating component is disposed within the initial rainwater interception chamber. In this embodiment, the initial rainwater floating component is sleeved around the guide tube and can move along the axial direction of the guide tube.
[0044] The initial rain floating component is connected to the converter sleeve via a connecting frame, so that the lifting and lowering of the initial rain floating component can directly drive the movement of the converter sleeve.
[0045] When the initial rain interception chamber is at a low liquid level, the initial rain floating component is in the lower position, and the converter sleeve remains in the interception position.
[0046] After rainfall begins, the initial road runoff entering the system flows into the initial rainwater interception chamber through the interception opening. When the inflow into the initial rainwater interception chamber consistently exceeds its outflow, the liquid level rises and gradually supports the initial rainwater floating component.
[0047] After the initial rainwater floating component moves upward, it drives the converter sleeve to move upward from the interception position via the connecting frame. The converter sleeve first enters the intermediate isolation position, separating the water that has entered the initial rainwater interception chamber from the road rainwater that subsequently enters the system; if the infiltration permitting mechanism does not lock, the initial rainwater floating component continues to rise and drives the converter sleeve into the infiltration position.
[0048] The effective volume of the initial rainwater interception chamber is determined based on the actual catchment area of the corresponding road rainwater collection section, and a fixed volume is not used as a uniform value for all engineering conditions.
[0049] When the initial rainfall thickness is used as the design basis, the design control volume is determined by the following formula: ; In the formula, V0 is the initial rainwater volume that the initial rainwater interception chamber needs to control, in cubic meters; ψ is the runoff coefficient of the catchment area; A is the effective catchment area corresponding to the road rainwater collection section, in square meters; and h0 is the initial rainwater control rainfall thickness determined by the project, in millimeters.
[0050] The effective catchment area is determined based on the road's longitudinal and transverse slopes, curb layout, and the service area of the storm drains; the runoff coefficient is determined based on the road paving type and the drainage design basis adopted by the project; and the initial stormwater control rainfall thickness is determined based on the stormwater runoff pollution control requirements of the project site, the sponge city design requirements, or the stormwater quality monitoring results at the project site.
[0051] Therefore, the liquid level at which the initial rain floating component starts driving the converter sleeve to switch is determined by the initial rain control volume and the actual geometric dimensions of the initial rain interception chamber, rather than an arbitrarily set fixed liquid level.
[0052] The lower part of the initial rain interception chamber is equipped with a sewage discharge channel, which has a throttling orifice.
[0053] The size of the throttling orifice is determined based on the effective volume of the initial rainwater interception chamber and the required drainage time. Its design ensures that rainwater entering the initial rainwater interception chamber at the beginning of rainfall can cause a rise in the water level, while the rainwater can be gradually discharged from the chamber after the rainfall weakens or stops.
[0054] In other words, the design drainage capacity of the throttling orifice is less than the inlet capacity of the initial rain interception stage, and it can restore the initial rain interception chamber to a low liquid level between two adjacent rainfall processes that require independent execution of initial rain interception.
[0055] After the rainfall ends, the rainwater in the initial rain interception chamber is discharged through the throttling orifice. The initial rain floating component descends with the liquid level and, through the connecting frame, drives the exchange sleeve from the seepage position through the intermediate isolation position back to the interception position.
[0056] Deep drainage wells include solid-walled water conveyance pipes, filter pipes, and sedimentation pipes.
[0057] The solid-walled water conveyance pipe extends downward from the layered septic chamber and passes through the shallow strata, with its upper end connected to the seepage opening on the guide tube.
[0058] The solid-walled water pipe keeps the pipe wall closed for shallow strata and does not have a permeable structure for drainage into shallow strata. This allows rainwater entering through the drainage opening to be transported downwards along the pipe, rather than entering the road base, fill layer, or non-target permeable strata.
[0059] The filter pipe is connected below the solid wall water supply pipe and is set up to correspond to the target permeable stratum.
[0060] The installation depth of the filter pipe is determined based on the borehole survey data of the engineering site. When the geological data cannot fully determine the location and continuity of the target permeable stratum, the location of the target permeable stratum is determined by supplementary drilling, particle size distribution analysis, and on-site permeability tests.
[0061] Therefore, the boundary between the solid-wall water pipe and the filter pipe is not fixed at a certain uniform depth, but is set at the position corresponding to the target permeable stratum, so that the rainwater from the road remains in a closed transport before reaching the target permeable stratum.
[0062] The filter pipe is covered with a filter screen, and a reverse filter layer is set around the filter screen.
[0063] The filter screen is used to restrict larger particles from entering the filter pipe opening. The reverse filter layer is used to restrict the migration of fine particles in the target permeable stratum towards the filter pipe while ensuring that water can pass through.
[0064] The particle size of the filter material is determined based on the particle composition of the target permeable stratum. Before construction, the particle composition of the target stratum is determined through stratum sampling and particle size distribution analysis. Then, the gradation of the filter material is determined according to the filter design principles, without using a fixed particle size range as a necessary requirement for all stratum conditions.
[0065] The permeable opening area of the filter pipe is determined by the design drainage capacity and the structural strength of the pipe body, so that the effective permeable area can meet the design drainage volume and maintain the structural stability of the filter pipe during installation and operation.
[0066] The lower end of the filter pipe is connected to the sedimentation pipe. The sedimentation pipe is a solid-walled pipe with a closed bottom. The inner cavity of the sedimentation pipe is connected to the inner cavity of the filter pipe and extends downwards to the main water-permeable part of the filter pipe.
[0067] After entering the deep drainage well, a small amount of solid particles carried by the water can continue to deposit downwards into the sedimentation pipe, thereby reducing the probability of solid particles continuously accumulating in the permeable area of the filter pipe.
[0068] The length of the sedimentation pipe is determined based on the expected amount of solid deposits and maintenance cycle, and a fixed length that is detached from the actual road pollution load is not used as a necessary condition.
[0069] Deep drainage wells are installed inside vertical boreholes.
[0070] Between the outer perimeter of the solid-wall water delivery pipe above the filter pipe and the wall of the vertical perforation hole, an upper sealing section, a dirt monitoring chamber, and a lower sealing section are sequentially arranged along the depth direction.
[0071] Both the upper and lower sealing sections are arranged around the solid-wall water supply pipe, so that the annular space between the outer wall of the solid-wall water supply pipe and the wall of the vertical hole forms hydraulic isolation at two different depth positions.
[0072] The upper sealing section is used to restrict the shallow water above it from continuing to migrate downwards along the perimeter of the solid-walled water conveyance pipe; the lower sealing section is used to separate the pollution monitoring chamber from the target permeable stratum where the filter pipe is located.
[0073] The upper and lower sealing sections are formed using sealing materials with low permeability. The specific materials are determined based on the well size, groundwater conditions, construction method, and design head difference.
[0074] The length of the sealing section is not a fixed value, but is determined based on the permeability of the sealing material, the outer diameter of the solid-wall water pipe, the diameter of the vertical hole, and the design head difference that may be formed on both sides of the sealing section.
[0075] After construction is completed, a water-stopping inspection should be conducted on the sealed area. Specifically, a check water head can be formed on one side of the sealed section to observe whether there is a continuous change in liquid level or continuous water outflow on the other side; if no continuous water flow is formed, then the sealed section is considered a sealed structure that meets the design requirements.
[0076] A contamination monitoring chamber is retained between the upper and lower septum sections.
[0077] The contamination monitoring chamber is formed between the outer wall of the solid water pipe and the wall of the vertically formed hole. Its upper end is restricted by the upper sealing section and its lower end is restricted by the lower sealing section.
[0078] The contamination monitoring chamber is not connected to the normal water supply channel inside the solid-wall water supply pipe, nor is it directly connected to the reverse filter layer outside the filter pipe.
[0079] Under normal conditions, there is no water accumulation in the dirt-proof monitoring chamber sufficient to cause the monitoring floating component to lock.
[0080] When a seepage channel is formed between the upper sealing section itself, the joint between the upper sealing section and the solid wall water pipe, or between the upper sealing section and the vertical borehole wall, the water that migrates downwards along the well perimeter from above first enters the contamination monitoring chamber.
[0081] The water entering the pollution monitoring chamber is blocked by the lower sealing section and cannot continue to directly enter the target permeable formation corresponding to the filter pipe along the same well perimeter channel.
[0082] Therefore, the upper barrier section forms the first isolation, the lower barrier section forms the second barrier, and the pollution monitoring chamber located between the two is used to intercept water that crosses the barrier boundary and convert the barrier status into a liquid level change that can be identified by the seepage permitting agency.
[0083] The permitting body for seepage discharge includes the monitoring of floating components, traction components, and locking components.
[0084] The monitoring floating element is installed inside the contamination monitoring chamber.
[0085] In this embodiment, the monitoring floating element is ring-shaped and sleeved around the solid-wall water pipe.
[0086] The monitoring chamber is equipped with a guide that extends axially along the solid wall water pipe. The floating monitoring component slides with the guide, so that the floating monitoring component moves mainly vertically during water level changes, reducing tilting or jamming caused by unilateral water inflow.
[0087] The monitoring of floating components does not require action based on pollutant concentration, nor does it use a specific water quality parameter as a threshold.
[0088] The trigger position of the monitoring floating component is determined based on the movement stroke required for the drainage permitting agency to complete the mechanical locking.
[0089] Specifically, the installation height and initial position of the monitoring floating component are determined based on the stroke required for the locking component to move from the release position to the locking position, the transmission path of the traction component, and the effective lift of the monitoring floating component.
[0090] Once the liquid level in the contamination monitoring chamber reaches this position and continues to rise, the buoyancy generated by the monitoring floating component can overcome the transmission resistance of the traction component, the sliding resistance of the locking component, and the resistance required to push the converter sleeve back to the intermediate isolation position, thereby completing the locking action.
[0091] The trigger liquid level was verified through a physical water filling test after the structural design was completed. During the test, water was gradually injected into the sludge monitoring chamber to check whether the entire process of the floating component moving from the start to the locking component locking was continuous, and the drainage volume of the floating component, the stroke of the traction component, and the stroke of the locking component were verified accordingly.
[0092] Monitor the connection between the floating component and the traction component.
[0093] A traction guide pipe is installed around the solid-walled water pipe, and the traction component is installed inside the traction guide pipe.
[0094] The traction guide tube passes through the upper sealing section and is sealed to the upper sealing section to prevent the formation of a new longitudinal seepage channel between the outer wall of the traction guide tube and the sealing material.
[0095] A sealing guide is installed at one end of the traction guide pipe near the stratified sewage chamber. The traction component can move relative to the sealing guide, while restricting the water body from forming a free flow path along the traction guide pipe.
[0096] The upper end of the traction component is connected to the locking component.
[0097] The locking element is slidably installed in the stratified septic tank chamber and has a release position and a locking position.
[0098] When the locking element is in the released position, it avoids the movement path of the converter sleeve, and the initial rain floating element can drive the converter sleeve to move between the interception position, the intermediate isolation position and the seepage position.
[0099] The locking element has a pushing slope and a stop surface that connects with the pushing slope at the end facing the converter sleeve.
[0100] The outer wall of the converter sleeve is equipped with a stress-bearing section.
[0101] When the water level in the pollution isolation monitoring chamber rises, causing the monitoring floating component to move upward, the monitoring floating component, through the traction component, drives the locking component to move from the released position to the locked position.
[0102] When the converter sleeve is in the drainage position, the pushing slope of the locking element first contacts the force-bearing part on the converter sleeve. As the locking element continues to move, the force-bearing part moves along the pushing slope, converting the lateral movement of the locking element into the downward movement of the converter sleeve along the guide tube.
[0103] After the converter sleeve moves from the infiltration position to the intermediate isolation position, the converter window and the infiltration opening are completely separated. The infiltration opening is blocked by the solid wall of the converter sleeve, and rainwater from the road stops entering the solid wall water pipe.
[0104] At this point, the stop surface of the locking component enters the path of the force-bearing part moving back to the drainage position, preventing the converter sleeve from re-entering the drainage position.
[0105] If the fouling monitoring chamber has already reached the trigger level while the converter sleeve is still in the fouling interception position or the intermediate isolation position, the locking element will be locked in advance. When the initial rain floating element subsequently moves the converter sleeve upward, the converter sleeve will be restricted by the locking element after reaching the intermediate isolation position and will not be able to continue to the seepage discharge position.
[0106] Therefore, the seepage permitting agency can both close the deep seepage channels that have already been opened and prevent the opening of deep seepage channels when the sealing status no longer meets the requirements.
[0107] The locking element is provided with a retaining groove, and the layered sewage well is provided with a retaining element that cooperates with the retaining groove.
[0108] When the locking element moves to the locking position, the retaining groove moves to the corresponding position of the retaining element, and the retaining element enters the retaining groove, thus restricting the position of the locking element.
[0109] Subsequently, even if the liquid level in the contamination monitoring chamber drops, the floating monitoring component falls back, or the force of the traction component decreases, the locking component remains in the locked position.
[0110] Therefore, when water enters the sludge monitoring chamber, a fault-maintaining state is formed, preventing the system from automatically resuming deep drainage due to a drop in liquid level before the sludge is checked.
[0111] A reset component is installed at the inspection port of the layered sewage isolation chamber, and the reset component is connected to the retaining component through a transmission connection.
[0112] After draining the water from the pollution monitoring chamber and inspecting the upper and lower sealing sections, maintenance personnel use a reset device to remove the retaining element from the retaining groove.
[0113] After the retaining element exits the retaining slot, the locking element can return to the released position.
[0114] Therefore, the locking condition is released by actively disengaging the mechanical fit between the retaining element and the retaining groove, rather than simply by the decrease in the liquid level in the dirt-proof monitoring chamber.
[0115] The layered sewage-separated well chambers are equipped with overflow channels.
[0116] The overflow channel inlet is located upstream of the converter component and is connected to the water passage space after the road rainwater collection section enters the stratified sewage well chamber; the overflow channel outlet is connected to the urban road rainwater pipe network.
[0117] The elevation of the overflow channel inlet is determined by a combination of factors, including the allowable water depth of the road, the normal operating water level of the stratified sewage isolation chambers, and the access elevation of the urban road stormwater pipe network.
[0118] The setting principle is as follows: when the initial rainwater interception and deep infiltration are performed normally, the upstream water level is lower than the overflow channel inlet; when the converter component is kept in the middle isolation position and rainwater continues to enter the road, the upstream water level reaches the overflow channel inlet before reaching the road's allowable water accumulation control elevation.
[0119] Under normal infiltration and drainage conditions, rainwater from roads is absorbed locally through deep infiltration wells.
[0120] When the pollution control monitoring chamber triggers the seepage discharge permitting mechanism, causing the converter sleeve to retract to and remain in the intermediate isolation position, the pollution interception opening and the seepage discharge opening close simultaneously.
[0121] As more rainwater from the roads enters the system, the upstream water level rises. Once it reaches the overflow channel inlet, it enters the city's road rainwater pipe network through the overflow channel.
[0122] Therefore, while stopping deep infiltration, the road's rainwater drainage path is preserved.
[0123] Before the rainfall begins, the initial rain interception chamber is at a low liquid level, the initial rain floating component is in the lower position, and the converter sleeve is in the interception position.
[0124] No trigger water accumulation occurred in the contamination monitoring chamber, the floating monitoring component was in the initial position, and the locking component was in the released position.
[0125] After rainfall begins, rainwater from the road enters the guide tube through the road rainwater collection section, and then enters the initial rainwater interception chamber through the exchange window and the interception opening.
[0126] The mud and sand entering the initial rainwater interception chamber are deposited downwards, and some water is slowly discharged through the sewage discharge channel.
[0127] As rainfall continues, when the inflow of water into the sewage interception chamber exceeds the outflow, the liquid level inside the chamber rises.
[0128] Once the liquid level reaches the working position determined by the initial rain design control volume, the initial rain floating component begins to rise and drives the converter sleeve to move through the connecting frame.
[0129] The converter sleeve first moves from the interception position to the intermediate isolation position, so that the interception opening and the seepage opening are closed at the same time.
[0130] If the locking device in the pollution isolation monitoring chamber is not triggered, the initial rain floating device continues to rise, causing the converter sleeve to move from the intermediate isolation position to the seepage and discharge position.
[0131] The rainwater that then enters the road stormwater collection section enters the solid-walled water pipe through the infiltration opening and crosses the shallow strata along the solid-walled water pipe.
[0132] After rainwater reaches the target permeable stratum, it enters the filter pipe and diffuses into the target permeable stratum through the filter pipe, filter screen and reverse filter layer.
[0133] A small amount of solid particles that enter the well with the water flow downwards into the sedimentation pipe.
[0134] After the rainfall weakens or stops, the rainwater in the initial rain interception chamber continues to be discharged through the sewage channel.
[0135] When the locking element is not in the locked position, the initial rain floating element drops with the liquid level and drives the converter sleeve back to the interception position.
[0136] During system operation, if a seepage path is formed between the upper sealing section itself, between the upper sealing section and the outer wall of the solid wall water conveyance pipe, or between the upper sealing section and the wall of the vertical perforation, the upper water body may migrate downwards along the outer perimeter of the solid wall water conveyance pipe.
[0137] After passing the upper sealing section, the water first enters the pollution monitoring chamber.
[0138] A lower sealing section is set below the contamination monitoring chamber, so the water entering the contamination monitoring chamber cannot continue to directly enter the target permeable formation along the same well perimeter channel.
[0139] As the amount of water in the contamination monitoring chamber increases, the liquid level gradually rises.
[0140] When the liquid level reaches the trigger position of the monitoring float, the monitoring float moves upward along the guide and drives the locking element to move to the locking position through the traction element.
[0141] If the converter sleeve is in the drainage position at this time, the pushing slope of the locking element pushes the force-bearing part on the converter sleeve, causing the converter sleeve to retract to the intermediate isolation position.
[0142] After the converter sleeve reaches the intermediate isolation position, the seepage opening is completely closed, stopping the continued input of road rainwater into the solid wall water pipe.
[0143] Subsequently, the stop surface forms a barrier to the force-bearing part, and the retaining element enters the retaining groove, preventing the converter sleeve from re-entering the drainage position.
[0144] As rainwater continues to enter the stratified sewer chambers, the upstream water level rises and reaches the overflow channel inlet, before flowing into the city's road rainwater pipe network.
[0145] If the monitoring chamber for the fouling barrier reaches the trigger level before the converter sleeve enters the seepage discharge position, the locking element will enter the locking position in advance, so that the converter sleeve can only move from the fouling interception position to the intermediate isolation position and cannot continue to enter the seepage discharge position.
[0146] Therefore, deep infiltration is constrained by both the initial rainfall state and the underground sealing state.
[0147] When the initial rain stage is not yet complete, the converter sleeve remains in the interception position; when the initial rain stage is complete and the pollution isolation monitoring chamber has been triggered to lock, the converter sleeve cannot enter the seepage position; the converter sleeve only enters the seepage position when the initial rain stage is complete and the pollution isolation monitoring chamber has not formed the locking condition.
[0148] The lower sealing section is used to separate the pollution monitoring chamber from the target permeable stratum.
[0149] If the lower sealing section forms a local seepage path, allowing water from the target permeable stratum to enter the contaminant monitoring chamber, it will also cause the liquid level in the contaminant monitoring chamber to rise.
[0150] This system does not require water quality parameters or flow direction sensors to determine whether the water entering the sludge monitoring chamber comes from the upper or lower sludge section.
[0151] Once water accumulates in the pollution isolation monitoring chamber to the point where the monitoring floating element reaches its mechanical trigger stroke, it indicates that the original design of the underground layer isolation state has changed, and the seepage permitting agency enters a locked state.
[0152] Therefore, there is no need to set pollution concentration thresholds, pressure difference thresholds, or water quality category thresholds, which avoids unclear judgment boundaries due to insufficient sources of such parameters.
[0153] Before construction, the location and effective catchment area of the road rainwater collection section are determined based on the road drainage slope and the existing rainwater inlet layout, and the location of the deep infiltration well is determined based on the underground pipeline data.
[0154] The distribution of strata in each area is determined based on existing geotechnical engineering survey data at the engineering site.
[0155] When existing data is insufficient to determine the target permeable stratum, the top burial depth, thickness, and permeability of the target permeable stratum are determined by supplementing exploration boreholes, particle size distribution analysis, and field permeability tests.
[0156] The depth of deep drainage wells is determined by the burial depth of the target permeable stratum, the effective length of the filter pipe, and the installation space of the sedimentation pipe, and a uniform fixed well depth is not adopted.
[0157] The location and length of the filter pipe are determined based on the location and thickness of the target permeable stratum.
[0158] The gradation of the filter material is determined based on the particle composition of the target permeable stratum.
[0159] The locations of the upper and lower sealing sections are determined based on the shallow strata, the target permeable strata, and the strata that need to be hydraulically isolated between them.
[0160] The lengths of the upper and lower sealing sections are determined based on the properties of the sealing material, the vertical hole size, the outer diameter of the solid-wall water delivery pipe, and the design head difference, and are verified through on-site water-stopping inspection.
[0161] The volume of the initial rainwater interception chamber is determined based on the effective catchment area of the road, the runoff coefficient, and the initial rainwater volume controlled according to engineering requirements.
[0162] The working position of the initial rain floating component is determined based on the actual liquid level corresponding to the design control volume of the initial rain interception chamber.
[0163] The interception position, intermediate isolation position, and seepage position of the converter sleeve are all determined by the actual geometric positional relationship between the interception opening, the seepage opening, and the converter window, without using positional thresholds without structural basis.
[0164] The trigger position of the monitoring floating element in the pollution isolation monitoring chamber is determined based on the mechanical stroke required for the locking element to complete locking, and is verified through a physical water filling test.
[0165] The elevation of the overflow channel inlet is determined based on the road's allowable water accumulation depth, the normal operating water level of the stratified sewage isolation chambers, and the access elevation of the urban road stormwater pipe network.
[0166] The flow size of the throttling orifice in the sewage discharge channel is determined based on the effective volume of the initial rain interception chamber and the designed recovery time. The initial rain floating component can be effectively raised when the initial rainwater enters and reset after the rainfall ends, as confirmed by on-site water injection and drainage tests.
[0167] After the system is installed, the following checks are performed: commutation operation check, initial rainwater interception chamber water filling check, sewage isolation monitoring chamber trigger check, lock-in and retention check, and reset check.
[0168] The flow exchange operation check is used to confirm that the flow exchange sleeve passes through the interception position, intermediate isolation position and seepage discharge position in sequence, and to confirm that there is no state where the interception opening and the seepage discharge opening are open at the same time.
[0169] The initial rain interception chamber water filling check is used to confirm that the actual liquid level corresponding to the design control volume can drive the initial rain floating component and the converter sleeve to complete the switching.
[0170] The fouling isolation monitoring chamber trigger check is performed by slowly injecting water into the fouling isolation monitoring chamber to confirm that the monitoring floating component can drive the locking component to move from the released position to the locked position.
[0171] When the converter sleeve is in the drainage position, it should also be confirmed that the locking element can actually push the converter sleeve back to the intermediate isolation position by pushing against the inclined surface, and completely close the drainage opening.
[0172] The locking and holding check is used to confirm that after the liquid level in the contamination monitoring chamber drops, the retaining element can still prevent the locking element from automatically returning to the release position through the retaining groove.
[0173] The reset check is used to confirm that after the retaining member and retaining groove are released, the locking member can return to the released position, and the switching sleeve can complete the normal switching between the interception position, intermediate isolation position and seepage position again.
[0174] When using the above system for deep drainage of urban roads, the following steps are included.
[0175] S1 collects rainwater from the road through the road rainwater collection unit, keeps the converter component in the interception position, directs the initial rainwater entering the stratified sewage interception chamber into the initial rain interception chamber, and cuts off the connection between the road rainwater collection unit and the deep infiltration well.
[0176] S2, as the liquid level in the initial rain interception chamber rises, the initial rain floating component moves upward and drives the converter component from the interception position to the intermediate isolation position, so that the road rainwater collection section is isolated from the initial rain interception chamber and the deep infiltration well; when the locking component is in the release position, the converter component continues to move to the infiltration position, so that the road rainwater collection section is connected to the deep infiltration well.
[0177] S3 allows rainwater entering the deep drainage well to be transported downwards along the solid-walled water pipe, maintaining its flow within the pipe while passing through shallow strata, and then seeping out into the target permeable strata through a filter pipe, filter screen, and reverse filter layer after reaching the target permeable strata.
[0178] S4 restricts the longitudinal migration of water around the well along the perimeter of the solid-walled water delivery pipe through the upper and lower sealing sections. When water crosses the sealing boundary and enters the fouling monitoring chamber, causing the liquid level in the fouling monitoring chamber to reach the trigger position of the monitoring float, the monitoring float is driven by the traction component to enter the movement path of the converter assembly through the locking component.
[0179] S5, when the converter component is already in the infiltration position, the locking element pushes the converter component back to the intermediate isolation position and closes the deep infiltration channel; when the converter component has not yet entered the infiltration position, the locking element prevents the converter component from continuing to enter the infiltration position from the intermediate isolation position. After the locking element enters the locking position, the retaining element holds this state, and the road rainwater continuing to enter the stratified sewage chamber enters the urban road rainwater pipe network through the overflow channel after the water level reaches the overflow channel inlet.
[0180] After completing the drainage of the sludge monitoring chamber and the inspection of the upper and lower sealing sections, release the engagement between the retaining element and the retaining groove, allowing the locking element to return to the release position.
[0181] After the rainfall ends, the water in the initial rain interception chamber is gradually discharged through the sewage discharge channel. The initial rain floating component drops with the liquid level and drives the converter component back to the interception position, thus restoring the initial state before the next rainfall.
[0182] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A layered, pollution-separating deep infiltration and drainage system for urban roads, characterized in that, This includes road stormwater collection systems, stratified sewer chambers, deep drainage wells, and drainage permitting agencies; The road rainwater collection section is connected to the layered sewage isolation chamber. The layered sewage isolation chamber is equipped with an initial rainwater interception chamber and a flow exchange component. The flow exchange component has a sewage interception position, an intermediate isolation position, and an infiltration position. At the sewage interception position, the road rainwater collection section is connected to the initial rainwater interception chamber and isolated from the deep infiltration well. At the intermediate isolation position, both the initial rainwater interception chamber and the deep infiltration well are isolated from the road rainwater collection section. At the infiltration position, the initial rainwater interception chamber is isolated from the road rainwater collection section, and the deep infiltration well is connected to the road rainwater collection section. The deep drainage well includes a solid-walled water delivery pipe that penetrates the shallow strata downwards and a filter pipe that is connected to the solid-walled water delivery pipe and is set up in the target permeable strata. The outer perimeter of the solid-walled water delivery pipe is provided with an upper sealing section and a lower sealing section at intervals along the depth direction, and a pollution monitoring chamber is formed between the upper sealing section and the lower sealing section. The seepage discharge permitting mechanism includes a floating component installed in the fouling isolation monitoring chamber, a traction component connected to the floating component, and a locking component connected to the traction component. The locking component has a release position that avoids the movement path of the converter component and a locking position that enters the movement path of the converter component. When the floating component moves as the liquid level in the fouling isolation monitoring chamber rises, the traction component moves the locking component from the release position to the locking position. In the locking position, the locking component pushes the converter component in the seepage discharge position back to the intermediate isolation position and restricts the converter component from returning from the intermediate isolation position to the seepage discharge position.
2. The layered sewage-separating deep infiltration and drainage system for urban roads according to claim 1, characterized in that, The converter assembly includes a guide tube fixedly installed in the layered sewage isolation chamber and a converter sleeve slidably installed along the axial direction of the guide tube. The upper end of the guide tube is connected to the road rainwater collection part. The side wall of the guide tube is provided with interception openings and seepage openings at intervals along the moving direction of the converter sleeve. The interception opening is connected to the initial rain interception chamber, and the seepage opening is connected to the solid wall water conveyance pipe. The converter sleeve is equipped with a converter window. When the converter sleeve is in the interception position, the converter window is connected to the interception opening and the converter sleeve blocks the seepage opening. When the converter sleeve is in the intermediate isolation position, it blocks both the interception opening and the seepage opening. When the converter sleeve is in the seepage position, it blocks the interception opening and the converter window is connected to the seepage opening.
3. A layered sewage-separating deep infiltration and drainage system for urban roads according to claim 2, characterized in that, The initial rain interception chamber is equipped with a vertically movable initial rain floating component, which is connected to the converter sleeve via a transmission. When the initial rain floating component is in the lower position, the exchange sleeve remains in the interception position. When the liquid level in the initial rain interception chamber rises, causing the initial rain floating component to move upward, the initial rain floating component drives the exchange sleeve to pass through the intermediate isolation position in sequence and move towards the seepage position.
4. A layered sewage-separating deep infiltration and drainage system for urban roads according to claim 3, characterized in that, The intercepting opening and the seepage opening are staggered along the moving direction of the converter sleeve. As the converter window moves from the intercepting opening to the seepage opening, the converter sleeve first completely blocks the intercepting opening, and then the converter window connects with the seepage opening. The lower part of the initial rain interception chamber forms a sedimentation zone. The initial rain interception chamber is also connected to a sewage discharge channel. The sewage discharge channel is equipped with a throttling part, so that the water in the initial rain interception chamber is discharged through the sewage discharge channel after the rainfall weakens or stops. The initial rain floating component drives the exchange sleeve to reset to the interception position as the liquid level drops.
5. A layered sewage-separating deep infiltration and drainage system for urban roads according to claim 4, characterized in that, The filter pipe is equipped with a filter screen on its outer periphery, and a reverse filter layer surrounds the filter pipe around the filter screen. The lower end of the filter pipe is connected to a sedimentation pipe, and the bottom end of the sedimentation pipe is sealed. The rainwater transported by the solid wall water pipe seeps into the target permeable stratum through the filter pipe, filter screen and reverse filter layer, and the solid particles that sink with the water enter the sedimentation pipe.
6. A layered, pollution-separated, deep-drainage system for urban roads according to claim 5, characterized in that, The upper and lower sealing sections are formed by annular water-stopping packing layers surrounding the outer wall of the solid-wall water conveying pipe. The contamination monitoring chamber is located between the outer wall of the solid-wall water conveying pipe and the borehole wall. The upper end of the contamination monitoring chamber is closed by the upper sealing section and the lower end is closed by the lower sealing section. The lower sealing section is located above the filter pipe, so that the water that passes through the upper sealing section and migrates downward along the outer periphery of the solid-wall water conveying pipe enters the contamination monitoring chamber and is blocked by the lower sealing section.
7. A layered sewage-separating deep infiltration and drainage system for urban roads according to claim 6, characterized in that, The floating component is ring-shaped and sleeved around the solid wall water supply pipe. The dirt-proof monitoring chamber is equipped with a guide component that extends along the axial direction of the solid wall water supply pipe. The floating component and the guide component are in sliding fit. The locking element is slidably installed in the stratified sewage well chamber. The end of the locking element facing the converter sleeve is provided with a pushing slope and a stop surface that connects with the pushing slope. The converter sleeve is provided with a force-bearing part that cooperates with the pushing slope and the stop surface. When the floating element moves upward and drives the locking element into the moving path of the converter sleeve through the traction element, the pushing slope pushes the force-bearing part to make the converter sleeve retreat from the seepage position to the intermediate isolation position. Then the stop surface forms a stop on the force-bearing part.
8. A layered sewage-separating deep infiltration and drainage system for urban roads according to claim 7, characterized in that, The layered sewage chamber is also equipped with an overflow channel connected to the road rainwater collection section. The outlet of the overflow channel is connected to the urban road rainwater pipe network, and the inlet of the overflow channel is located upstream of the converter component. When the locking element is in the locked position and the converter component is in the intermediate isolation position, the rainwater entering the stratified sewage chamber enters the urban road rainwater pipe network through the overflow channel after the water level reaches the inlet of the overflow channel.
9. A layered pollution-separating deep infiltration and drainage method for urban roads, applicable to the layered pollution-separating deep infiltration and drainage system for urban roads as described in any one of claims 1-8, characterized in that, include: S1: Collects road rainwater through the road rainwater collection unit, keeps the converter component in the interception position, directs the initial rainwater entering the stratified sewage isolation chamber into the initial rain interception chamber, and blocks the connection between the road rainwater collection unit and the deep infiltration well. S2: As the liquid level in the initial rain interception chamber rises, the converter component moves from the interception position to the infiltration position. During the movement, it first enters the intermediate isolation position to isolate the initial rain interception chamber. Then, when the floating part in the interception monitoring chamber is in the lower position and the locking part is in the released position, the converter component enters the infiltration position to guide the subsequent rainwater into the deep infiltration well. S3: The rainwater introduced into the deep drainage well is transported downwards along the solid wall water conveyance pipe to the filter pipe installed in the corresponding target permeable stratum, and then seeps out into the target permeable stratum through the filter pipe; S4: The pollution monitoring chamber set between the upper and lower septum sections intercepts water that passes through the upper septum section and migrates downward along the outer periphery of the solid wall water pipe. When the liquid level in the pollution monitoring chamber rises and causes the floating component to move, the traction component drives the locking component to enter the movement path of the converter component. The locking component pushes the converter component from the seepage position to the intermediate isolation position and restricts its return to the seepage position, so as to stop the road rainwater from entering the deep seepage well.
10. A layered, pollution-separated deep infiltration and drainage method for urban roads according to claim 9, characterized in that, After the converter component is kept in the middle isolation position due to the rise of the liquid level in the pollution monitoring chamber, the rainwater that subsequently enters the stratified pollution control chamber will enter the urban road rainwater pipe network through the overflow channel when the water level reaches the inlet of the overflow channel. After the rainfall weakens or stops, the water in the initial rain interception chamber is discharged through the sewage discharge channel, and the converter component is reset to the interception position after the liquid level in the initial rain interception chamber drops.