A ductile connection structure for prefabricated vertical components
By setting a first steel anchorage section and a first ductile deformation section inside the steel rebar connection sleeve, and combining the injection of high and low strength grout, the shear failure problem of the connection node of precast components was solved, realizing multiple energy dissipation modes of vertical precast components, and improving the safety and durability of the connection structure.
Patent Information
- Application Number
- CN202611163951.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-03
- Publication Date
- 2026-11-17
AI Technical Summary
In existing prefabricated buildings, the connection nodes between precast components and cast-in-place concrete are prone to shear failure at the grouting joint, which can cause the anchoring steel bars to break inside the sleeve, weakening the bond and anchoring performance, and leading to slippage and pull-out failure, thus affecting the structural safety and durability.
A first rebar anchorage section and a first ductile deformation section are set inside the rebar connection sleeve, and high and low strength grouts are injected. Multiple energy dissipation paths are formed through the bending and shear deformation of the second ductile deformation section, which reduces the squeezing effect on the high strength grout and enhances the ductility of the connection structure.
It significantly improves the connection performance of vertical precast components, avoids slippage and pull-out of anchor bars, enhances the safety and durability of the structure, and improves the reliability and seismic performance of the connection.
Smart Images

Figure CN123109341A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of building engineering technology, and in particular to an ductile connection structure for prefabricated vertical components. Background Technology
[0002] Precast concrete construction (also known as prefabricated assembled construction) is a type of building that primarily uses factory-produced reinforced concrete precast components. These components are then assembled on-site through methods such as cast-in-place concrete pouring and grouting to form a modular, assembled structure. This type of construction offers numerous advantages, including rapid construction, suitability for winter construction, high production efficiency, good product quality, and high labor productivity, leading to its widespread application in modern construction engineering. However, existing experimental research and engineering practice show that most failures at the connection points between precast components and cast-in-place concrete occur on the precast component side, specifically in the concrete and rebar anchorage area around the grouting sleeve connection opening embedded within the precast component. The cast-in-place concrete section rarely fails before the precast side.
[0003] The aforementioned damage manifests as follows: When the connection structure between the cast-in-place concrete zone and the precast component experiences shear failure at the grouting joint (joint grouting layer), the horizontal reciprocating force originally transmitted by the joint grouting layer (such as horizontal shear force caused by seismic action or wind load) is instead borne by the anchoring steel bars inserted into the steel bar connecting sleeve. At this time, the anchoring steel bars directly exert a reciprocating squeezing effect on the anchoring grouting layer inside the sleeve. Since the thickness of the anchoring grouting layer surrounding the anchoring steel bars inside the steel bar connecting sleeve is usually relatively thin, its own deformation capacity is extremely limited, and it is very easy to undergo crushing and fragmentation failure between the steel bars and the steel sleeve under repeated loading. Under the combined action of bending moment, shear force, and repeated loading, the stress concentration phenomenon in this area is further aggravated, resulting in the maximum plastic hinge range and the maximum crack width both occurring within a range of approximately 50–100 mm above the steel bar connecting sleeve of the precast component. Once cracks continue to extend into the interior of precast components, they will significantly weaken the bond and anchorage performance of the reinforcing bars, thereby inducing slippage and pull-out failure of the anchored reinforcing bars, seriously affecting the safety and durability of the structure. Summary of the Invention
[0004] The main objective of this invention is to propose a ductile connection structure for prefabricated vertical components, which aims to solve the technical problem that existing connection structures between cast-in-place concrete areas and prefabricated components are prone to further weakening the bond and anchorage performance of reinforcing bars after damage occurs on the prefabricated component side, thus inducing slippage and pull-out failure of the anchoring reinforcing bars.
[0005] To achieve the above objectives, the present invention proposes a ductile connection structure for prefabricated vertical components, comprising vertical precast components spliced together and a cast-in-place concrete layer. Coaxial longitudinal reinforcing bars and a reinforcing bar connecting sleeve are pre-embedded within the vertical precast components. The inner end of the reinforcing bar connecting sleeve is connected to the inner end of the longitudinal reinforcing bar of the same vertical precast component, and the outer end is inserted into the outwardly extending outer end of the longitudinal reinforcing bar of another vertical precast component. The outer end of the reinforcing bar connecting sleeve includes a first reinforcing bar anchorage section and a first ductile deformation section distributed from the inside out. The final section of the outer end of the longitudinal reinforcing bar is a second reinforcing bar anchorage section, and the middle section is a second ductile deformation section. The second reinforcing bar anchorage section is located within the first reinforcing bar anchorage section, and the second ductile deformation section is located within the first ductile deformation section. High-strength grout is injected into the first reinforcing bar anchorage section, and low-strength grout is injected into the first ductile deformation section.
[0006] Optionally, an isolation layer is provided between the first steel reinforcement anchorage section and the first ductile deformation section.
[0007] Optionally, the isolation layer is a talc powder layer with a thickness of 1.5 mm to 4 mm.
[0008] Optionally, the first ductile deformation section is provided with a first grouting hole, and the top and bottom of the first steel reinforcement anchorage section are each provided with a second grouting hole, and the isolation layer is located between the first grouting hole and the second grouting hole at the bottom of the first steel reinforcement anchorage section.
[0009] Optionally, the low-strength grout is first injected into the first ductile deformation section through the first grouting hole; after the low-strength grout solidifies to form a supporting capacity, the material of the isolation layer is injected into the first steel reinforcement anchorage section through the second grouting hole at the bottom of the first steel reinforcement anchorage section to form an isolation layer; finally, the high-strength grout is injected into the first steel reinforcement anchorage section through the second grouting holes at the top and / or bottom of the first steel reinforcement anchorage section.
[0010] Optionally, when the nominal diameter of the longitudinal reinforcing bar is 12mm to 25mm, the minimum inner diameter of the first anchorage section and the first ductile deformation section of the reinforcing bar is 15mm to 20mm larger than the nominal diameter of the longitudinal reinforcing bar. When the nominal diameter of the longitudinal reinforcing bar is 28mm to 40mm, the minimum inner diameter of the first anchorage section and the first ductile deformation section of the reinforcing bar is 20mm to 25mm larger than the nominal diameter of the longitudinal reinforcing bar.
[0011] Optionally, the minimum inner diameter of the sleeve opening at the outer end of the reinforcing bar connecting sleeve is 6mm to 15mm larger than the nominal diameter of the longitudinal reinforcing bar.
[0012] Optionally, the length of the second reinforcing bar anchorage section is greater than 10d, where d is the nominal diameter of the longitudinal reinforcing bar.
[0013] Optionally, the length of the second ductile deformation section is 5d to 10d, where d is the nominal diameter of the longitudinal reinforcing bar.
[0014] Optionally, the length of the second ductile deformation segment is determined by deformation energy consumption calculation and takes a value in the range of 5d to 10d; The deformation energy dissipation calculation is based on the seismic grade of the ductile connection structure, the expected inter-story drift angle, the yield strength and ultimate strength of the steel reinforcement, the bond degradation under repeated loading, the enlarged gap size of the sleeve orifice, and the residual friction after the grout is locally crushed.
[0015] The technical solution of this invention has the following beneficial effects: 1. The present invention moderately increases the inner diameter of the first steel bar anchorage section and increases the thickness of the high-strength grout surrounding the second steel bar anchorage section, thereby directly enhancing the ductility of the first steel bar anchorage section and the second steel bar anchorage section.
[0016] 2. A second ductile deformation section is set up. When the joint grouting layer is subjected to horizontal reciprocating shear force, the reciprocating bending and shear deformation of the second ductile deformation section can add a horizontal energy dissipation path for the ductile connection structure, avoid the second steel reinforcement anchoring section directly squeezing the high-strength grout, and significantly alleviate the squeezing effect on the high-strength grout.
[0017] 3. Low-strength grout is used around the second ductile deformation section. The deformation of the second ductile deformation section compresses the low-strength grout, forming a second horizontal energy dissipation path, which further reduces the squeezing effect of the second steel reinforcement anchorage section on the high-strength grout.
[0018] 4. The inner diameter of the sleeve orifice was appropriately reduced to limit the ultimate deformation range of the second ductile deformation section, reduce the peak extrusion pressure of the second steel reinforcement anchorage section on the high-strength grout, avoid excessive deformation of the second ductile deformation section causing damage to the high-strength grout, and prevent damage cracks from continuously extending into the interior of the vertical precast component, thus avoiding the induction of slippage and pull-out damage at the outer end of the longitudinal stressed steel reinforcement, which would affect the safety and durability of the structure.
[0019] 5. By setting up a first ductile deformation section, a first rebar anchorage section, a second ductile deformation section, a second rebar anchorage section, and an isolation layer, and reducing the inner diameter of the sleeve orifice, the original single stress and single energy dissipation mode of the anchor rebar squeezing the rebar connection sleeve's anchorage grout layer is transformed into a multiple stress and multiple energy dissipation mode of the longitudinally stressed rebar squeezing low-strength grout, the sleeve orifice, and high-strength grout. Moreover, the bending energy dissipation of the second ductile deformation section is the main energy dissipation mode, thereby comprehensively improving the connection performance of the vertical precast components and significantly enhancing the safety of the vertical precast component connection. Attached Figure Description
[0020] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on the structures shown in these drawings without creative effort.
[0021] Figure 1 This is a schematic diagram of the overall structure of an ductile connection structure for a prefabricated vertical component according to the present invention. Figure 2 This is a schematic diagram of the steel bar connecting sleeve in the ductile connection structure of a prefabricated vertical component according to the present invention; Figure 3 for Figure 2 A schematic diagram of the local structure at position A in the middle.
[0022] Explanation of reference numerals in the attached drawings: 1. Upper vertical member; 11. Upper reinforcing bar; 12. Reinforcing bar connecting sleeve; 121. Threaded connection section; 122. First reinforcing bar anchorage section; 123. First ductile deformation section; 124. Sleeve orifice; 125. First grouting hole; 126. Second grouting hole; 127. Isolation layer; 2. Joint grouting layer; 3. Middle cast-in-place concrete zone; 4. Lower vertical member; 41. Lower reinforcing bar.
[0023] The realization of the objective, functional features and advantages of the present invention will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation
[0024] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.
[0025] It should be noted that all directional indications (such as up, down, left, right, front, back, etc.) in the embodiments of the present invention are only used to explain the relative positional relationship and movement of each component in a certain specific posture (as shown in the figure). If the specific posture changes, the directional indication will also change accordingly.
[0026] Furthermore, the technical solutions of the various embodiments can be combined with each other, but only if they are feasible for those skilled in the art. If the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such combination of technical solutions does not exist and is not within the scope of protection claimed by this invention.
[0027] This invention proposes an ductile connection structure for assembled vertical components.
[0028] like Figures 1 to 3 As shown in Embodiment 1 of the present invention, the ductile connection structure of the prefabricated vertical component includes vertical precast components spliced together with a cast-in-place concrete layer. Coaxial longitudinal reinforcing bars and a reinforcing bar connecting sleeve 12 are pre-embedded within the vertical precast components. The inner end of the reinforcing bar connecting sleeve 12 is connected to the inner end of the longitudinal reinforcing bar of the same vertical precast component, and the outer end is inserted into the outwardly extending outer end of the longitudinal reinforcing bar of another vertical precast component. Specifically, the outer end of the reinforcing bar connecting sleeve 12 includes a first reinforcing bar anchorage section 122 and a first ductile deformation section 123 distributed from the inside out. The final section of the outer end of the longitudinal reinforcing bar is the second reinforcing bar anchorage section, and the middle section is the second ductile deformation section. The second reinforcing bar anchorage section is located within the first reinforcing bar anchorage section 122, and the second ductile deformation section is located within the first ductile deformation section 123. High-strength grout is injected into the first reinforcing bar anchorage section 122, and low-strength grout is injected into the first ductile deformation section 123. Furthermore, the high-strength grout can specifically be standard high-strength grout or UHPC-based grout, and the low-strength grout can be low-strength flexible mortar or polymer-modified mortar. Since the application of high-strength and low-strength grouts in building engineering technology is very mature, they will not be described in detail in this embodiment.
[0029] like Figures 1 to 3As shown, in this embodiment, the vertical precast component includes an upper vertical component 1 and a lower precast component, and the cast-in-place concrete layer is the middle cast-in-place concrete zone 3. Furthermore, the longitudinal reinforcing bars embedded in the upper vertical component 1 are upper reinforcing bars 11, and the longitudinal reinforcing bars embedded in the lower vertical component 4 are lower reinforcing bars 41. Specifically, the upper vertical component 1, the middle cast-in-place concrete zone 3, and the lower vertical component 4 are sequentially spliced from bottom to top, and a joint grouting layer 2 is provided between the end face of the outer end of the reinforcing bar connecting sleeve 12 and the middle cast-in-place concrete zone 3. Furthermore, the inner end of the rebar connecting sleeve 12 that connects to the longitudinal reinforcing bar (hereinafter referred to as the upper reinforcing bar 11) of the same vertical precast component (hereinafter referred to as the upper vertical component 1) is a threaded connection section 121, and the inner end of the longitudinal reinforcing bar (upper reinforcing bar 11) is threadedly connected to the threaded connection section 121; at the same time, the outer end of the longitudinal reinforcing bar (hereinafter referred to as the lower reinforcing bar 41) of another vertical precast component (hereinafter referred to as the lower vertical component 4) extending outward is inserted into the rebar connecting sleeve 12, and the end of the outer end of the lower reinforcing bar 41 is located in the first reinforcing bar anchorage section 122, and the middle section is located in the first ductile deformation section 123. In other embodiments, the vertical precast components and the cast-in-place concrete layer can be spliced in other ways, such as pre-embedding a steel bar connecting sleeve 12 at the top of the lower vertical component 4, so that the lower end of the upper steel bar 11 of the upper vertical component 1 extends downward, passes through the middle cast-in-place concrete area 3 and is inserted into the steel bar connecting sleeve 12, so that the end of the upper steel bar 11 is located in the first steel bar anchorage section 122 and the middle section is located in the first ductile deformation section 123.
[0030] This invention improves the controllability, safety, and reliability of prefabricated concrete buildings by incorporating a first ductile deformation section 123, a low-strength grout, and a second ductile deformation section. Firstly, the second ductile deformation section undergoes reciprocating bending-shear deformation when the joint grout layer 2 is subjected to horizontal reciprocating shear force. This adds a new horizontal energy dissipation path to the ductile connection structure of the prefabricated vertical component, mitigating the squeezing effect of the second steel reinforcement anchorage section on the high-strength grout of the first steel reinforcement anchorage section 122. Secondly, the first ductile deformation section 123 and the low-strength grout create a second horizontal energy dissipation path through the squeezing effect of the second ductile deformation section on the low-strength grout, further reducing the squeezing effect of the second steel reinforcement anchorage section on the high-strength grout. This transforms the original brittle failure mode of reciprocating squeezing of the anchoring steel reinforcement on the anchoring grout layer into a ductile failure mode of bending-shear deformation of the second ductile deformation section under reciprocating load and its moderate squeezing effect on the low-strength grout. This comprehensively improves the connection performance of the upper vertical component 1 and effectively enhances its connection safety and seismic reliability.
[0031] Preferably, an isolation layer 127 is provided between the first reinforcing bar anchorage section 122 and the first ductile deformation section 123 to prevent the extension of damage cracks caused by the compression of low-strength grout into the high-strength grout. In this embodiment, the isolation layer 127 is a talc powder layer with a thickness of 1.5 to 4 mm. Further, a talc powder layer thickness of 2 mm, 2.5 mm, or 3 mm is most effective.
[0032] Preferably, a first grouting hole 125 is provided in the first ductile deformation section 123, and a second grouting hole 126 is provided at the top and bottom of the first steel bar anchoring section 122. The isolation layer 127 is located between the first grouting hole 125 and the second grouting hole 126 at the bottom of the first steel bar anchoring section 122 to ensure smooth construction and grouting quality.
[0033] During construction, the reinforcing bar connecting sleeve 12 is inserted into the lower reinforcing bar 41 and then fixed with grout. Specifically, firstly, low-strength grout is injected into the first ductile deformation section 123 through the first grouting hole 125 until the first ductile deformation section 123 is filled; secondly, after the low-strength grout has solidified and formed supporting capacity, the material of the isolation layer 127 (such as talc powder) is injected into the first reinforcing bar anchorage section 122 through the second grouting hole 126 at the bottom of the first reinforcing bar anchorage section 122 to form the isolation layer 127; finally, high-strength grout is injected into the first reinforcing bar anchorage section 122 through the second grouting holes 126 at the top and / or bottom of the first reinforcing bar anchorage section 122 until the first reinforcing bar anchorage section 122 is filled to a dense state. In this embodiment, the low-strength grout is injected first, which can serve as a supporting structure for the upper isolation layer 127 and the high-strength grout. In the embodiment where the steel bar connecting sleeve 12 is installed on the lower vertical member 4, high-strength grout can be injected first as a supporting structure between the isolation layer 127 and the low-strength grout.
[0034] Preferably, when the nominal diameter of the lower reinforcing bar 41 is 12mm to 25mm, the minimum inner diameter of the first reinforcing bar anchorage section 122 and the first ductile deformation section 123 is 15mm to 20mm larger than the nominal diameter of the lower reinforcing bar 41. When the nominal diameter of the lower reinforcing bar 41 is 28mm to 40mm, the minimum inner diameter of the first reinforcing bar anchorage section 122 and the first ductile deformation section 123 is 20mm to 25mm larger than the nominal diameter of the lower reinforcing bar 41. This design can increase the thickness of the low-strength grout, the isolation layer 127, and the high-strength grout surrounding the lower reinforcing bar 41, thereby providing better deformation capacity for the second ductile deformation section and the second reinforcing bar anchorage section of the lower reinforcing bar 41.
[0035] Preferably, the minimum inner diameter of the sleeve opening 124 at the outer end of the reinforcing bar connecting sleeve 12 is 6mm to 15mm larger than the nominal diameter of the lower reinforcing bar 41. Specifically, in this embodiment, the amount of plastic deformation of the lower reinforcing bar 41 in the first ductile deformation section 123 is adjusted by setting the size of the sleeve opening 124, thereby setting the maximum compression and energy consumption of the lower reinforcing bar 41 on the high-strength grout.
[0036] Preferably, the length of the second rebar anchorage segment is greater than 10d (the same as the length of the first rebar anchorage segment 122), where d is the nominal diameter of the lower rebar 41. Specifically, 10d is a minimum structural limit, representing a safety reserve based on engineering experience, to avoid insufficient anchorage due to a calculated value being too small. In actual engineering, a longer length can be determined through anchorage bearing capacity calculations. In this embodiment, the final length of the second rebar anchorage segment can be determined by anchorage bearing capacity calculations, i.e., based on parameters such as the tensile strength of the rebar, the compressive strength of the grout, the rib height and rib spacing of the rebar, the shear key structure of the inner wall of the sleeve, and the bond-slip constitutive relationship between the rebar and the grout, the minimum anchorage length required to "ensure no pull-out under the ultimate tensile force of the lower rebar 41" is calculated.
[0037] Preferably, the length of the second ductile deformation section is 5d to 10d (the same as the length of the first ductile deformation section 123), where d is the nominal diameter of the lower reinforcing bar 41. Specifically, 5d to 10d is a commonly used structural value range in engineering: because if the length is too short, it cannot provide sufficient plastic deformation space and will not achieve the energy dissipation effect; if the length is too long, it will significantly reduce the overall stiffness of the joint and affect the normal service performance of the structure. Therefore, this length range allows the lower reinforcing bar 41 to yield, slip, and slightly bend in the second ductile deformation section, forming a "plastic hinge inside the reinforcing bar connecting sleeve 12".
[0038] Furthermore, the length of the second ductile deformation section is determined by deformation energy dissipation calculation within the range of 5d to 10d. This deformation energy dissipation calculation is based on parameters such as the seismic grade of the ductile connection structure, the expected inter-story drift angle, the yield strength and ultimate strength of the steel reinforcement, bond degradation under repeated loading, the enlarged gap size of the sleeve orifice 124, and the residual friction after local crushing of the grout. These parameters are used to inversely calculate the amount of plastic deformation and total energy dissipation capacity required by the lower steel reinforcement 41, and then calculate the required minimum deformation section length.
[0039] It is worth noting that the stress and energy dissipation process of the second ductile deformation section is as follows: a) When the ductile connection structure is subjected to a high-intensity earthquake, the joint grouting layer 2 undergoes shear failure and relative displacement, thereby transferring the horizontal force to the lower reinforcing bar 41. b) The second ductile deformation section enters a reciprocating bending-shear stress state and generates corresponding deformation, while simultaneously creating a squeezing effect on the surrounding low-strength grout. c) Under the reciprocating bending-shear stress mechanism, the second reinforcing bar anchorage section exerts a reciprocating squeezing effect on the high-strength grout. d) As the earthquake intensity further increases, the deformation of the lower reinforcing bar 41 increases accordingly. When the deformation develops to the sleeve opening 124, it is constrained by the reinforcing bar sleeve, and the concrete inside and around the sleeve opening 124 begins to bear the load. At this stage, the horizontal force and energy dissipation are distributed in three areas: firstly, the sleeve opening 124 and its surrounding concrete; secondly, the second ductile deformation section and its surrounding low-strength grout; and thirdly, the high-strength grout around the anchorage area of the second reinforcing bar anchorage section.
[0040] Furthermore, the stress and energy dissipation principle of the first ductile deformation section 123 is as follows: 1. The low-strength grout filling the area around the first ductile deformation section 123 is easily broken and deformed, creating conditions for the spatial bending and shear deformation of the lower reinforcing bar 41 in this area. Under these conditions, the stress deformation of the second ductile deformation section and its squeezing effect on the low-strength grout can effectively dissipate seismic energy, significantly reducing the squeezing effect of the reinforcing bar on the surrounding high-strength grout in the second reinforcing bar anchorage section. 2. After the seismic action is further enhanced, the lower reinforcing bar 41 will be constrained by the steel sleeve at the sleeve opening 124, thereby limiting the maximum force of the second reinforcing bar anchorage section and preventing the high-strength grout around the second reinforcing bar anchorage section from being damaged by squeezing. Further analysis shows that by setting the ratio of the inner diameter of the sleeve opening 124 to the length of the second ductile deformation section, a scheme that can prevent damage to the high-strength grout around the second reinforcing bar anchorage section can be designed.
[0041] The above description is merely a preferred embodiment of the present invention and does not limit the patent scope of the present invention. Any equivalent structural transformations made using the contents of the present invention's specification and drawings under the inventive concept of the present invention, or direct / indirect applications in other related technical fields, are included within the patent protection scope of the present invention.
Claims
1. A ductile connection structure for prefabricated vertical components, comprising prefabricated vertical components spliced together and a cast-in-place concrete layer, wherein coaxial longitudinal reinforcing bars and reinforcing bar connecting sleeves are pre-embedded within the prefabricated vertical components, the inner end of the reinforcing bar connecting sleeve is connected to the inner end of the longitudinal reinforcing bar of the same prefabricated vertical component, and the outer end is inserted into the outwardly extending outer end of the longitudinal reinforcing bar of another prefabricated vertical component; characterized in that, The outer end of the steel bar connecting sleeve includes a first steel bar anchorage section and a first ductile deformation section distributed from the inside to the outside. The last section of the outer end of the longitudinal stressed steel bar is the second steel bar anchorage section, and the middle section is the second ductile deformation section. The second steel bar anchorage section is located within the first steel bar anchorage section, and the second ductile deformation section is located within the first ductile deformation section. High-strength grout is injected into the first steel bar anchorage section, and low-strength grout is injected into the first ductile deformation section.
2. The ductile connection structure of the prefabricated vertical component according to claim 1, characterized in that, An isolation layer is provided between the first steel reinforcement anchorage section and the first ductile deformation section.
3. The ductile connection structure of the prefabricated vertical component according to claim 2, characterized in that, The isolation layer is a talc powder layer with a thickness of 1.5mm to 4mm.
4. The ductile connection structure of the prefabricated vertical component according to claim 2, characterized in that, The first ductile deformation section is provided with a first grouting hole, and the top and bottom of the first steel bar anchoring section are each provided with a second grouting hole. The isolation layer is located between the first grouting hole and the second grouting hole at the bottom of the first steel bar anchoring section.
5. The ductile connection structure of the prefabricated vertical component according to claim 4, characterized in that, The low-strength grout is first injected into the first ductile deformation section through the first grouting hole; after the low-strength grout solidifies to form a supporting capacity, the material of the isolation layer is injected into the first steel reinforcement anchorage section through the second grouting hole at the bottom of the first steel reinforcement anchorage section to form an isolation layer; finally, the high-strength grout is injected into the first steel reinforcement anchorage section through the second grouting holes at the top and / or bottom of the first steel reinforcement anchorage section.
6. The ductile connection structure of the prefabricated vertical component according to claim 1, characterized in that, When the nominal diameter of the longitudinal reinforcing bar is 12mm to 25mm, the minimum inner diameter of the first anchorage section and the first ductile deformation section of the reinforcing bar is 15mm to 20mm larger than the nominal diameter of the longitudinal reinforcing bar. When the nominal diameter of the longitudinal reinforcing bar is 28mm to 40mm, the minimum inner diameter of the first anchorage section and the first ductile deformation section of the reinforcing bar is 20mm to 25mm larger than the nominal diameter of the longitudinal reinforcing bar.
7. The ductile connection structure of the prefabricated vertical component according to claim 1, characterized in that, The minimum inner diameter of the sleeve opening at the outer end of the steel bar connecting sleeve is 6mm to 15mm larger than the nominal diameter of the longitudinal reinforcing steel bar.
8. The ductile connection structure of the prefabricated vertical component according to claim 1, characterized in that, The length of the second reinforcing bar anchorage section is greater than 10d, where d is the nominal diameter of the longitudinal reinforcing bar.
9. The ductile connection structure of the prefabricated vertical component according to claim 1, characterized in that, The length of the second ductile deformation section is 5d to 10d, where d is the nominal diameter of the longitudinal reinforcing bar.
10. The ductile connection structure of the prefabricated vertical component according to claim 9, characterized in that, The length of the second ductile deformation section is determined by the deformation energy consumption calculation and is within the range of 5d to 10d. The deformation energy dissipation calculation is based on the seismic grade of the ductile connection structure, the expected inter-story drift angle, the yield strength and ultimate strength of the steel reinforcement, the bond degradation under repeated loading, the enlarged gap size of the sleeve orifice, and the residual friction after the grout is locally crushed.
