A scaffolding system for ultra-thick concrete slabs used in dry quenching foundations and its erection method.

The design of the ultra-thick concrete slab scaffolding for dry quenching foundation solved the construction challenges of large-span and heavy-weight concrete projects, achieving safe, stable, and efficient construction results while reducing construction costs.

CN123109377APending Publication Date: 2026-11-17MCC5 GROUP SHANGHAI CORPORATION LIMITED
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611498496.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-24
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies using full-span coupler scaffolding are unsuitable for construction of dry-quenched concrete projects with large spans and heavy self-weight, as they suffer from problems such as narrow spacing between scaffolds, limited work space, inconsistent modular layout between upper and lower layers, localized haunches at the connection between slabs and walls, and irregular structures.

Method used

The dry quenching coke foundation uses an ultra-thick concrete slab disc-locked frame, which includes main beams, secondary beams, uprights, longitudinal and transverse bars, adjustable top supports, bases, and vertical diagonal braces. It is divided into a top layer and a foundation layer disc-locked frame structure. The uprights are kept in the same vertical line. The stability of the haunch area is enhanced by fastener diagonal bracing and fastener frames in the back-top area. The upright spacing and diagonal bracing are adjusted according to construction requirements.

Benefits of technology

It enabled safe and efficient construction of large-span, ultra-thick concrete slabs, improved the stability of the scaffolding and construction efficiency, and reduced labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109377A_ABST
    Figure CN123109377A_ABST
Patent Text Reader

Abstract

This invention discloses a disc-lock scaffold for ultra-thick concrete slabs used in dry quenching foundations and its erection method. The scaffold includes main beams, secondary beams, uprights, longitudinal and transverse braces, adjustable top supports, a base, and vertical diagonal braces. The scaffold is divided into a top-level disc-lock scaffold structure and a foundation-level disc-lock scaffold structure. The uprights of the top-level and foundation-level disc-lock scaffold structures are aligned vertically. The uprights, longitudinal and transverse braces, and vertical diagonal braces constitute the main body of the scaffold. Above the uprights, from bottom to top, are sequentially arranged disc-lock scaffold tubes, adjustable top supports, main beams, secondary beams, and formwork. The uprights of the top-level disc-lock scaffold are set on the already poured concrete above the foundation-level disc-lock scaffold. The entire scaffold structure is safe and stable. Local treatment of the haunch area, backfill area, and groove area improves the stability of the scaffold; local treatment of the central hole area improves the economic efficiency of the scaffold. Compared with coupler-type scaffolding, it has higher construction efficiency, shorter construction period, and saves labor costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of dry quenching coke concrete construction, specifically relating to a scaffolding system for ultra-thick concrete slabs in dry quenching coke foundations and its erection method. Background Technology

[0002] Currently, the largest dry quenching coke plant in China has a coke processing capacity of 260 tons / hour, an 18.8-meter span, and 3.05-meter-thick slabs, making it extremely heavy. Conventional methods involve erecting a full-span scaffolding system with couplers underneath for support. As the scale of dry quenching coke production gradually expands, its structure is also increasingly characterized by large spans and heavy weights. Simultaneously, construction faces technical challenges such as narrow scaffold spacing, limited work space, consistent modular layout between upper and lower layers, localized haunches at the connection between slabs and walls, and irregular structural features. Summary of the Invention

[0003] The technical problem to be solved by the present invention is to provide a scaffolding system for ultra-thick concrete slabs for dry quenching foundations and its erection method, which solves the problem that the existing full-span scaffolding system is not suitable for construction of dry quenching concrete projects with large spans, heavy weight, haunches, and irregular structures.

[0004] To solve the above-mentioned technical problems, the present invention adopts the following technical solution:

[0005] A type of disc-lock scaffolding for ultra-thick concrete slabs used in dry quenching coke foundations includes main beams, secondary beams, uprights, longitudinal and transverse braces, adjustable top supports, a base, and vertical diagonal braces. The disc-lock scaffolding as a whole is divided into a top-level disc-lock scaffolding structure and a foundation-level disc-lock scaffolding structure. The uprights of the top-level disc-lock scaffolding structure and the uprights of the foundation-level disc-lock scaffolding structure are aligned vertically. The uprights, longitudinal and transverse braces, and vertical diagonal braces constitute the main body of the disc-lock scaffolding. Above the uprights, from bottom to top, are arranged disc-lock scaffolding tubes, adjustable top supports, main beams, secondary beams, and formwork. The uprights of the top-level disc-lock scaffolding are set on the poured concrete above the formwork of the foundation-level disc-lock scaffolding.

[0006] The top-level disc buckle frame structure is equipped with fastener diagonal bracing at the haunch section, with one end abutting against the main beam. The fastener diagonal bracing increases the contact area of ​​the secondary beam at the haunch section by welding angle steel.

[0007] Top-level disc buckle frame structure is equipped with return-top area fastener frames at all four ends;

[0008] The bottom groove of the basic layer disc buckle frame structure is equipped with brick supports built on both sides of the longitudinal end of the groove, and sweeping rods are installed at the bottom and upper support surfaces of the groove.

[0009] The diagonal shear bracing is set according to the specific construction requirements; the spacing of the uprights and longitudinal and transverse bars in the hollowed-out parts of the top-level disc buckle frame structure is adjusted according to the specific hollowed-out size.

[0010] The fastener diagonal brace is a steel pipe, set perpendicular to the 45° haunch slope.

[0011] The fastener frame in the top return area is a steel pipe frame.

[0012] The secondary beams of the top-level disc-lock frame are steel pipe structures; the secondary beams of the base-level disc-lock frame are timber structures.

[0013] The main beam is made of No. 12 I-beam, and the formwork is made of plywood.

[0014] The method for erecting a disc-lock scaffold for an ultra-thick concrete slab foundation in dry quenching coke ovens involves first erecting the foundation layer disc-lock scaffold structure. After the concrete layer is poured, the top layer disc-lock scaffold structure is erected on top of the poured concrete. The specific steps include the following:

[0015] Step 1: At the bottom groove, build brick supports on both sides of the longitudinal end of the groove to support the lower part of the pole. Set up sweeping rods at the bottom and upper support surfaces of the groove.

[0016] Step 2: Set up the bottom uprights, horizontal bars, and vertical diagonal bars;

[0017] Step 3: Install the disc-lock scaffolding pipe, adjustable top support, main beam, and secondary beam in sequence above the bottom uprights, and lay the bottom formwork above the secondary beams;

[0018] Step 4: Above the poured foundation concrete, install the top upright corresponding to the position of the bottom upright, so that the top upright and the bottom upright are on the same vertical line;

[0019] Step 5: Install the disc-lock scaffolding pipe, adjustable top support, main beam, and secondary beam in sequence above the top uprights, and lay the top formwork above the secondary beams;

[0020] Step 6: At the top armhole, install a fastener diagonal brace perpendicular to the 45° armhole slope;

[0021] Step 7: Erect a top-mounted fastener frame around the four ends of the top-level disc buckle frame.

[0022] If the top-level disc buckle frame structure has a corresponding hollowed-out part in the concrete slab, the spacing between the uprights corresponding to the hollowed-out part is greater than the spacing between the uprights in the non-hollowed-out part.

[0023] If the spacing between the uprights in the hollow section is 600mm, then a vertical diagonal brace is installed every other span; if the spacing between the uprights is 1200mm, then a vertical diagonal brace is installed every other three spans. Vertical diagonal braces are installed at the ends and middle of the non-hollow section and the haunch section, and vertical diagonal braces are installed every other span in the remaining positions. Horizontal scissor braces are installed throughout the entire layer at the preset height.

[0024] In step 6, the specific process for setting up the fastener diagonal brace is as follows:

[0025] First, the angle steel is spot-welded to the main beam, making contact with the secondary beam. Then, the steel pipe fasteners are used to support the main beam.

[0026] Compared with the prior art, the present invention has the following beneficial effects:

[0027] 1. The upper and lower uprights are on the same vertical line to ensure that the lower structure is not affected by the construction of the upper structure, and to provide reinforcement and support for the lower structure. The entire frame structure is safe and stable.

[0028] 2. Using disc-lock scaffolding as standard components and steel profiles as main beams makes construction quality and safety easy to control.

[0029] 3. Local treatment of the armhole area, top area, and groove area improves the stability of the disc buckle frame; local treatment of the middle hole area improves the economy of the disc buckle frame.

[0030] 4. Compared with coupler-type scaffolding, it has higher construction efficiency, shorter cycle, and saves labor costs. Attached Figure Description

[0031] Figure 1 This is a schematic diagram of the main structure of the disc-lock scaffolding of the present invention.

[0032] Figure 2 This is a partial longitudinal cross-sectional view of the bottom groove portion of the disc-lock scaffolding of the present invention.

[0033] Figure 3 This is a partial schematic diagram of the armhole of the disc-lock scaffolding of the present invention.

[0034] Figure 4 This is a schematic diagram of the basic layer of the disc-lock scaffolding of the present invention.

[0035] Figure 5 This is a longitudinal cross-sectional view of the basic layer disc-lock scaffolding of the present invention.

[0036] Figure 6 This is a cross-sectional view of the basic layer of the disc-lock scaffolding of the present invention.

[0037] Figure 7 This is a schematic diagram of the top layer of the disc-lock scaffolding of the present invention.

[0038] Figure 8 for Figure 7 Schematic diagram of cross section along the AA direction.

[0039] Figure 9 for Figure 7 Schematic diagram of cross-section along the CC direction.

[0040] Figure 10 for Figure 7 Schematic diagram of cross-section along the BB direction.

[0041] The markings in the diagram are as follows: 1-Disc-lock scaffolding pipe; 2-Adjustable top support; 3-Main beam; 4-Secondary beam; 5-Formwork; 6-Brick support pier; 7-Sweeping rod; 8-Fastening brace; 9-Angle steel. Detailed Implementation

[0042] The structure and working process of the present invention will be further described below with reference to the accompanying drawings.

[0043] A type of disc-lock scaffolding for ultra-thick concrete slabs used in dry quenching coke foundations includes main beams, secondary beams, uprights, longitudinal and transverse braces, adjustable top supports, a base, and vertical diagonal braces. The disc-lock scaffolding as a whole is divided into a top-level disc-lock scaffolding structure and a foundation-level disc-lock scaffolding structure. The uprights of the top-level disc-lock scaffolding structure and the uprights of the foundation-level disc-lock scaffolding structure are aligned vertically. The uprights, longitudinal and transverse braces, and vertical diagonal braces constitute the main body of the disc-lock scaffolding. Above the uprights, from bottom to top, are arranged disc-lock scaffolding tubes, adjustable top supports, main beams, secondary beams, and formwork. The uprights of the top-level disc-lock scaffolding are set on the already poured concrete slab above the uprights of the foundation-level disc-lock scaffolding.

[0044] The top-level disc buckle frame structure is equipped with a fastener diagonal brace at the haunch section, with one end abutting against the main beam. The fastener diagonal brace increases the contact area of ​​the secondary beam at the haunch section by welding angle steel. In this embodiment, the fastener diagonal brace is a steel pipe, which is set perpendicular to the 45° haunch slope.

[0045] Top-level disc buckle frame structure is equipped with return-top area fastener frames at all four ends;

[0046] The bottom groove of the basic layer disc buckle frame structure is equipped with brick supports built on both sides of the longitudinal end of the groove, and sweeping rods are installed at the bottom and upper support surfaces of the groove.

[0047] Specific embodiments, such as Figures 1 to 10 As shown:

[0048] A type of scaffolding for ultra-thick concrete slabs in dry quenching coke foundations includes a main beam 3, secondary beams 4, uprights, longitudinal and transverse bars, adjustable top supports 2, a base, and vertical diagonal braces. The scaffolding is divided into a top-level scaffolding structure and a foundation-level scaffolding structure. The uprights of the top-level scaffolding structure and the foundation-level scaffolding structure are aligned vertically. The uprights, longitudinal and transverse bars, and vertical diagonal braces constitute the main body of the scaffolding. Above the uprights, from bottom to top, are arranged scaffolding tubes 1, adjustable top supports 2, main beams 3, secondary beams 4, and formwork 5. The uprights of the top-level scaffolding are set on the poured concrete above the foundation-level scaffolding.

[0049] The top-level disc buckle frame structure is equipped with a fastener diagonal brace 8 at the haunch section, with one end abutting against the main beam 3. The fastener diagonal brace increases the contact area of ​​the secondary beam at the haunch section by welding angle steel 9. In this embodiment, the fastener diagonal brace is a steel pipe, which is set perpendicular to the 45° haunch slope.

[0050] The top-level disc buckle frame structure is equipped with a top-return area fastener frame at all four ends; the top-return area fastener frame described in this embodiment is a steel pipe frame.

[0051] In the bottom recessed section of the base layer disc-lock frame structure, brick supports 6 are installed along both sides of the longitudinal end of the recess, and sweeping rods 7 are installed at the bottom and upper support surfaces of the recess. The vertical diagonal braces are set according to specific construction requirements; in the top layer disc-lock frame structure, the spacing of the uprights, longitudinal and transverse bars in the hollowed-out parts is adjusted according to the specific hollowed-out dimensions.

[0052] In this embodiment, the secondary beams of the top-level disc-lock frame are steel pipe structures; the secondary beams of the foundation-level disc-lock frame are timber structures. The main beams are made of No. 12 I-beams, and the formwork is made of plywood.

[0053] To further illustrate the effectiveness of this disc-type fastener application, a dry quenching project will be used as an example to provide a detailed explanation of its specific construction and application:

[0054] The specific construction parameters for this project are as follows:

[0055] The dry quenching coke foundation is approximately 19m long, 19.8m wide, and has a top elevation of 10.030m. It is a pile foundation, raft foundation, and frame-shear wall structure. The upper part of the foundation is a steel structure with a height of 80m. The top elevation of the large raft foundation is -4.64m (the elevation inside the groove is -5.14m, and the groove is 13m long × 11.4m wide). The raft foundation is 3m thick, with a 100mm cushion layer underneath. The bottom elevation of the excavated trench is -7.74m. The dry quenching coke foundation has a top elevation of 10.030 meters and consists of two structural layers. The floor slab elevations for each layer are ▽0.255m and ▽10.030m, respectively. The layer from ▽-4.64m (elevation within the groove: -5.14m) to ▽0.255m has a height of 5.395m and a formwork height of 4.495m. The layer from ▽0.255m to ▽10.030m has a height of 9.775m and a formwork height of 6.725m. The haunch area is located at the bottom of the 10.030m floor slab, and the other 10.030m floor slab has an 11.7m × 11.7m opening in the middle.

[0056] The foundation concrete project for the dry quenching coke body has a 0.255-meter layer of concrete slabs with a thickness of 0.9 meters and a 10.030-meter layer of concrete slabs with a thickness of 3.05 meters. The span is 18.8 meters × 18 meters. The construction method mainly adopts the disc-lock scaffolding method to promote and apply the safe and efficient construction technology for large-span and ultra-thick concrete slabs.

[0057] The dry quenching coke body structure foundation consists of a 0.255-meter-high concrete slab with a thickness of 900mm. The formwork support height is 5.395m, with a longitudinal length of 18.8m and a transverse length of 18m. The uprights and horizontal bars of the disc-lock scaffold are made of Φ48.3×3.2mm Q355 steel, with a longitudinal and transverse spacing of 600mm and a step distance of 1500mm. The height of the ground-level bar is less than 550mm, and the top step distance is 1000mm. The distance from the adjustable support point of the scaffold to the center line of the top horizontal bar is 450mm. The secondary beams are made of 50×70mm square timber with a spacing of 150mm and a maximum cantilever length of 300mm. The main beams are made of No. 12 I-beams with a maximum cantilever length of 400mm. The formwork is made of 12mm thick plywood.

[0058] The dry quenching coke oven structure foundation consists of a 10.030-meter-long concrete slab with a thickness of 3050mm. The formwork support height is 9.775m, with a longitudinal length of 18.8m and a transverse length of 18m. The uprights and horizontal bars of the disc-lock scaffold are made of Φ48.3×3.2mm Q355 steel. The longitudinal spacing of the uprights is 600mm (plus 300mm in the armhole area, and 1200mm or 600mm at the opening in the middle of the top slab), and the transverse spacing of the uprights is 600mm (plus 300mm in the armhole area). The opening in the middle of the top slab is 1200mm or 600mm, the step distance is 1500mm, the height of the sweeping rod is 410mm, the top step distance is 1000mm, the distance from the adjustable top support point of the bracket to the center line of the top horizontal bar is 450mm, the secondary beams are made of steel pipe Φ48×2.7mm, the spacing between secondary beams is 130mm, the maximum cantilever length of the secondary beams is 100mm, the main beams are made of No. 12 I-beams, the maximum cantilever length of the main beams is 150mm, and the formwork is made of 12mm thick plywood.

[0059] Due to the large span of the formwork and the extra-thickness of the concrete slab, the erection of the disc-lock scaffolding must meet the requirements of quality and safety, as well as ensure the construction period and cost.

[0060] The key installation techniques are as follows:

[0061] 1. The uprights of the top layer (10.030 meters) and the foundation layer (0.255 meters) should be on the same vertical line.

[0062] 2. Layout of 0.255-meter layered scaffolding for the dry quenching coke body foundation:

[0063] (1) Arrangement of formwork, main beams, secondary beams and uprights

[0064] The calculated thickness of the newly poured concrete floor slab is 900mm. The formwork support height is 5.395m, the longitudinal length of the formwork support is 18.8m, and the transverse length of the formwork support is 18m. The uprights and horizontal bars of the disc-lock scaffold are made of Φ48.3×3.2mm Q355 steel, with a longitudinal spacing of 600mm and a transverse spacing of 600mm. The step distance is 1500mm, the height of the ground-level bar is less than 550mm, the top step distance is 1000mm, the distance from the adjustable top support point of the scaffold to the center line of the top horizontal bar is 450mm, the secondary beams are made of 50×70mm square timber, the secondary beam spacing is 150mm, the maximum cantilever length of the secondary beam is 300mm, the main beams are made of No. 12 I-beams, the maximum cantilever length of the main beam is 400mm, and the formwork is made of 12mm thick plywood.

[0065] The adjustable top support is used to lay the I-beam main beam parallel to the 18m direction and perpendicular to the 18.8m direction. The secondary beam timber is laid on top of the main beam perpendicular to the main beam direction, and the formwork is laid on the timber.

[0066] (2) Vertical diagonal bracing and horizontal scissor bracing

[0067] Vertical diagonal bracing is installed every 3 spans along the longitudinal direction, and vertical diagonal bracing is installed every 3 spans along the transverse direction in the middle two spans. Horizontal scissor bracing is installed throughout the entire layer at heights of 910mm and 3910mm.

[0068] (3) Localized installation of disc-lock scaffolding in the recessed area of ​​the base plate

[0069] The bottom sweeping rod of the groove is arranged at a height of 410mm, and the top support surface of the groove is arranged at a height of 500mm. Brick supports of 240mm wide and 500mm high are built on both sides of the longitudinal end of the groove to support the lower part of the uprights.

[0070] 3. Arrangement of the 10.030-meter layered frame for the dry quenching coke body foundation:

[0071] (1) Arrangement of formwork, main beams, secondary beams and uprights

[0072] The calculated thickness of the newly poured concrete floor slab is 3050mm. The formwork support height is 9.775m, the longitudinal length of the formwork support is 18.8m, and the transverse length of the formwork support is 18m. The uprights and horizontal bars of the disc-lock scaffold are made of Φ48.3×3.2mm Q355 material. The longitudinal spacing of the uprights is 600mm (plus 300mm in the haunch area, and 1200mm or 600mm at the opening in the middle of the top slab). The transverse spacing of the uprights is 600mm (plus 300mm in the haunch area, and 1200mm or 600mm at the opening in the middle of the top slab). The dimensions are as follows: 1200mm or 600mm (partial spacing), 1500mm step distance, 410mm sweeping bar height, 1000mm top-level step distance, 450mm distance from the adjustable support point to the center line of the top-level horizontal bar, Φ48×2.7mm steel pipe for secondary beams, 130mm spacing between secondary beams, 100mm maximum cantilever length for secondary beams, 12# I-beams for main beams, 150mm maximum cantilever length for main beams, and 12mm thick plywood formwork. The opening refers to the hollowed-out portion after the concrete slab is poured.

[0073] The adjustable top support is used to lay the I-beam main beam parallel to the 18m direction and perpendicular to the 18.8m direction. The secondary beam timber is laid on top of the main beam perpendicular to the main beam direction, and the formwork is laid on the timber.

[0074] (2) Vertical diagonal bracing and horizontal scissor bracing

[0075] In the central opening area of ​​the roof slab, the spacing between the longitudinal and transverse uprights is 600mm, with vertical diagonal braces installed every other span. In the central opening area of ​​the roof slab, the spacing between the longitudinal and transverse uprights is 1200mm, with vertical diagonal braces installed every other three spans. In the haunch area and the non-opening area of ​​the roof slab, vertical diagonal braces are installed in all three spans at the end of the haunch area, in all four middle spans, and in every other span in other areas. Horizontal scissor braces are installed throughout the entire floor at heights of 410mm, 3410mm, and 5910mm.

[0076] (3) Erection of partial disc buckle scaffolding at the top and armpit area

[0077] At the haunch, a fastener diagonal brace is installed perpendicular to the 45° haunch slope. Angle steel is spot-welded to the main beam. The upper part of the secondary beam is the formwork, and the lower part is supported by the main beam and angle steel. The fastener steel pipe diagonal brace is supported on the main beam. The secondary beam at the haunch is made of steel pipe.

[0078] (4) Local scaffolding erection at the opening in the middle of the roof slab

[0079] There is no concrete above the openings in the top slab. In order to ensure the integrity of the frame, the longitudinal and transverse spacing of the risers at the openings in the middle of the top slab is less than or equal to 1200mm.

[0080] (5) Erection of fastener scaffolding in the top section

[0081] Steel pipe scaffolding with Φ48×2.7mm steel pipes is erected at the four ends of the disc-lock scaffolding to ensure that the cantilever length of the main beam at the 10.030-meter level is 150mm.

[0082] The above-mentioned frame structure achieves the integration of upper and lower levels with overlapping uprights, resulting in a safe and stable overall structure that saves construction time and is economical.

[0083] It should be noted that the terms "comprising" and "having" and any variations thereof in the specification, claims and accompanying drawings of this application are intended to cover non-exclusive inclusion. For example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are explicitly listed, but may include other steps or units that are not explicitly listed or that are inherent to such process, method, product or device.

[0084] In this application, the terms "upper," "lower," "left," "right," "front," "rear," "top," "bottom," "inner," "outer," "middle," "vertical," "horizontal," "lateral," and "longitudinal" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. These terms are primarily for the purpose of better describing this application and its embodiments, and are not intended to limit the indicated device, element, or component to having a specific orientation, or to be constructed and operated in a specific orientation.

[0085] Furthermore, in addition to indicating location or positional relationship, some of the aforementioned terms may also have other meanings. For example, the term "above" may also be used in some cases to indicate a certain dependency or connection relationship. Those skilled in the art can understand the specific meaning of these terms in this application based on the specific circumstances.

[0086] Furthermore, the terms "installation," "setup," "equipped with," "connection," "linking," and "socketing" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral structure; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium, or an internal connection between two devices, components, or parts. Those skilled in the art can understand the specific meaning of these terms in this application based on the specific circumstances.

[0087] This solution is not limited to the specific embodiments described above. Devices and structures not described in detail herein should be understood as being implemented in a manner common to the art. Any person skilled in the art can make many possible variations and modifications to this solution, or modify it into equivalent embodiments, without departing from the scope of this solution, using the methods and techniques disclosed above. This does not affect the substantive content of this solution. Therefore, any simple modifications, equivalent changes, and alterations made to the above embodiments based on the technical essence of this solution, without departing from its scope, still fall within the protection scope of this solution.

Claims

1. A dry quenching foundation super thick concrete slab tray fastening frame, characterized in that: The scaffolding system comprises main beams, secondary beams, uprights, longitudinal and transverse braces, adjustable top supports, bases, and vertical diagonal braces. The overall structure consists of a top-level scaffolding structure and a foundation-level scaffolding structure. The uprights, longitudinal and transverse braces, and vertical diagonal braces form the main body of the scaffolding. Above the uprights, from bottom to top, are arranged scaffolding tubes, adjustable top supports, main beams, secondary beams, and formwork. The uprights of the top-level scaffolding are set on the poured concrete slab above the uprights of the foundation-level scaffolding. The modules of the top-level and foundation-level scaffolding are equal, and the uprights of the upper and lower levels are on the same vertical straight line. The top-level disc buckle frame structure is equipped with fastener diagonal bracing at the haunch section, with one end abutting against the main beam. The fastener diagonal bracing increases the contact area of ​​the secondary beam at the haunch section by welding angle steel. Top-level disc buckle frame structure is equipped with return-top area fastener frames at all four ends; The bottom groove of the basic layer disc buckle frame structure is equipped with brick supports built on both sides of the longitudinal end of the groove, and sweeping rods are installed at the bottom and upper support surfaces of the groove.

2. The dry quenching foundation super thick concrete slab tray rack according to claim 1, characterized in that: The vertical diagonal braces are set according to specific construction requirements; the spacing of the uprights, longitudinal and transverse braces in the hollowed-out parts of the top-level disc buckle frame structure is adjusted according to the specific hollowed-out dimensions.

3. The dry quenching foundation ultra-thick concrete slab tray clip of claim 1, wherein: The fastener diagonal brace is a steel pipe, set perpendicular to the 45° haunch slope.

4. The dry quenching foundation ultra-thick concrete slab tray clip of claim 1, wherein: The fastener frame in the top return area is a steel pipe frame.

5. The dry quenching foundation ultra-thick concrete slab tray clip of claim 1, wherein: The secondary beams of the top-level disc-lock frame are steel pipe structures; the secondary beams of the base-level disc-lock frame are timber structures.

6. The dry quenching coke foundation ultra-thick concrete slab disc buckle frame according to claim 1, characterized in that: The main beam is made of No. 12 I-beam, and the formwork is made of plywood.

7. The method for erecting the ultra-thick concrete slab scaffolding for dry quenching foundation as described in any one of claims 1 to 6, characterized in that: First, the foundation layer scaffolding structure is erected. After the concrete for this layer is poured, the top layer scaffolding structure is erected on top of the poured concrete. The specific steps include the following: Step 1: At the bottom groove, build brick supports on both sides of the longitudinal end of the groove to support the lower part of the pole. Set up sweeping rods at the bottom and upper support surfaces of the groove. Step 2: Set up the bottom uprights, horizontal bars, and vertical diagonal bars; Step 3: Install the disc-lock scaffolding pipe, adjustable top support, main beam, and secondary beam in sequence above the bottom uprights, and lay the bottom formwork above the secondary beams; Step 4: Above the poured foundation concrete, install the top upright corresponding to the position of the bottom upright, so that the top upright and the bottom upright are on the same vertical line; Step 5: Install the disc-lock scaffolding pipe, adjustable top support, main beam, and secondary beam in sequence above the top uprights, and lay the top formwork above the secondary beams; Step 6: At the top armhole, install a fastener diagonal brace perpendicular to the 45° armhole slope; Step 7: Erect a top-mounted fastener frame around the four ends of the top-level disc buckle frame.

8. The method for erecting an ultra-thick concrete slab scaffolding for dry quenching foundations according to claim 7, characterized in that: If the top-level disc buckle frame structure has a corresponding hollowed-out part in the concrete slab, the spacing between the uprights corresponding to the hollowed-out part is greater than the spacing between the uprights in the non-hollowed-out part.

9. The method for erecting an ultra-thick concrete slab scaffolding for dry quenching foundations according to claim 8, characterized in that: If the spacing between the uprights in the hollow section is 600mm, then a vertical diagonal brace is installed every other span; if the spacing between the uprights is 1200mm, then a vertical diagonal brace is installed every other three spans. Vertical diagonal braces are installed at the ends and middle of the non-hollow section, the haunch section, and the remaining positions are installed every other span. Horizontal scissor braces are installed throughout the entire layer at the preset height.

10. The method for erecting an ultra-thick concrete slab scaffolding for dry quenching foundations according to claim 8, characterized in that: In step 6, the specific process for setting up the fastener diagonal brace is as follows: First, the angle steel is spot-welded to the main beam, making contact with the secondary beam. Then, the steel pipe fasteners are used to support the main beam.