A lightweight drilling method adapted to permafrost in high-altitude areas

By using small excavators and double-cone single-spiral drills combined with laser benchmark verification in permafrost regions of the plateau, the problems of low construction efficiency, heavy equipment, and ecological damage in permafrost areas have been solved, achieving efficient and low-disturbance integrated drilling operations.

CN123109536APending Publication Date: 2026-11-17QINGHAI ELECTRIC POWER DESIGN INST +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611285094.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-24
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing power transmission and transformation projects in permafrost regions face problems such as low drilling efficiency, insufficient adaptability to low temperatures, large thermal disturbances, significant damage to the ecological environment, and complex procedures. In particular, in plateau permafrost areas, heavy equipment is required, verticality control is difficult, and the efficiency of multi-equipment collaboration is low.

Method used

Using a small excavator, hydraulic power adapter, segmented drill rod, and a complete set of double-cone single-spiral drilling tools adapted to frozen soil, combined with dual-point reflective marking and laser reference, the drilling, slag removal, and hole cleaning operations are integrated. The small equipment adapts to complex terrain, and the laser reference is used to check the verticality of the drill rod. The drilling, slag removal, and hole bottom cleaning processes are integrated, eliminating the need for traditional multi-equipment separate operations.

Benefits of technology

It enables efficient, low-disturbance, and green construction in plateau permafrost regions, reduces the ecological damage caused by equipment, improves construction efficiency and verticality control accuracy, and reduces equipment costs and thermal disturbance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109536A_ABST
    Figure CN123109536A_ABST
Patent Text Reader

Abstract

This invention discloses a lightweight borehole drilling method adapted to high-altitude permafrost, belonging to the technical field of permafrost power transmission and transformation foundation construction. This invention utilizes a small excavator equipped with a hydraulic power adapter to support existing drilling tools; a vertical benchmark is established using a total station and laser line projector, and the verticality of the drill rod is simultaneously calibrated using two reflective marks on the upper and lower sections; existing drilling tools are selected based on the differences in permafrost soil properties for layered drilling and slag removal; after drilling to the designed depth, a bottom cleaning and sand-removing bucket is replaced to clean the residue at the bottom of the hole, and the excavator can be directly transferred to the site for continuous construction. This application selects corresponding existing drilling tools based on the water and sand content characteristics of permafrost, integrating the entire process of drilling, slag removal, and bottom cleaning, eliminating the traditional multi-equipment, separate operation process, reducing the frequency of repeated drilling and cleaning, and significantly improving the overall borehole drilling efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of permafrost foundation construction, specifically to a lightweight hole-forming construction method adapted to high-altitude permafrost. Background Technology

[0002] Permafrost in high-altitude areas is characterized by low temperatures, low air pressure, uneven ice content in the soil, and fragile ecosystems. Currently, drilling for power transmission tower foundations in permafrost typically employs heavy-duty rotary drilling rigs with corresponding drilling tools, presenting several challenges: First, the heavy equipment causes significant ecological disturbance. Existing auger drilling requires large rotary drilling rigs, necessitating the widening and construction of access roads before site access, resulting in extensive damage to high-altitude vegetation. The equipment also faces harsh operating conditions, being impassable in mountainous terrain and poorly adaptable to undulating terrain, thus limiting operational flexibility. Second, verticality control is inaccurate. Traditional construction lacks standardized verticality calibration methods, relying on manual visual observation of drill rod verticality. As drilling depth increases in permafrost, inclination cannot be monitored in real time, and substandard verticality of the tower foundation directly impacts the overall load-bearing safety. Third, traditional construction processes are fragmented, and the coordination of multiple equipment is costly and inefficient. Traditional construction is divided into three independent processes: drilling and breaking, sand dredging and soil extraction, and bottom cleaning. Typically, a spiral drill is used for drilling and breaking, followed by a sand dredging bucket for soil extraction, and finally, a cleaning device is used to clean the bottom of the hole. These three processes require frequent changes of drilling rigs, sand dredging buckets, and cleaning equipment. In remote high-altitude areas, equipment relocation and scheduling are costly, and manual operation can easily lead to borehole wall collapse. Because permafrost is a high-strength composite of soil particles and underground ice, it has high hardness and extremely high cutting resistance. Existing single-cone cutting teeth can only achieve localized breaking and cannot cut the permafrost into loose soil samples that can be directly collected in one go. Therefore, drilling and soil extraction cannot be completed simultaneously; drilling and breaking must be done first, followed by separate soil extraction. Because conventional double-bottom sand dredging buckets lack a spiral pushing structure and rely solely on the scraping of the bucket teeth for soil extraction, simultaneous drilling and soil extraction is not possible. Furthermore, there is no supporting coordination process for selecting drilling tools based on the differences in permafrost drawings, and for cuttings removal and bottom cleaning. Summary of the Invention

[0003] This invention addresses the prominent problems of low drilling efficiency, insufficient low-temperature adaptability, large thermal disturbance during drilling, significant damage to the fragile surface ecological environment, and complex excavation and soil extraction procedures in existing power transmission and transformation engineering foundation construction in permafrost areas. It proposes a lightweight drilling construction method adapted to plateau permafrost, realizing efficient, low-disturbance, green, and lightweight integrated drilling operations in permafrost areas.

[0004] To achieve the above objectives, this application adopts the following technical solution: A lightweight drilling method adapted to permafrost in high-altitude areas is implemented using a small excavator, a hydraulic power adapter, segmented drill rods, and a double-cone single-spiral drilling tool set adapted to permafrost, comprising the following steps: S1. Equipment Assembly: Utilizing a mini excavator as a lightweight carrier, and equipped with a hydraulic power adapter for collaborative operation, the hydraulic power adapter is rigidly fixed to the end of the mini excavator's boom. The hydraulic power adapter is connected to the excavator's hydraulic lines and its forward / reverse rotation and torque adjustment functions are tested. The lower end of the power adapter connects to the drill rod, and a standardized quick-change connector is installed at the bottom of the drill rod. Different drilling tools can be installed at the lower end of the quick-change connector depending on the permafrost conditions. The entire system does not require a separate drilling power station or the widening and construction of heavy-duty access roads. The mini excavator is adaptable to complex high-altitude terrain, significantly reducing the area damaged by surface operations.

[0005] S2. Pile location marking and laser reference layout: The center point of the pile location is marked by a total station and a mark is set on the ground. The laser line projector is used to place it at a distance of 2-3m from the pile location to complete the leveling operation. After leveling, a vertical laser beam is emitted and aligned with the center point of the pile location to form a vertical reference surface covering the borehole area. S3. Drill rod verticality calibration: Set two reflective cross marks at intervals on the drill rod body. Lower the drill rod to above the pile position and align the drill rod tip with the center point of the pile position. Determine the verticality of the drill rod based on the position of the two cross marks and the laser line. Drilling can only be carried out if the drill rod is vertical. S4. Differentiated layered drilling: Select the corresponding drill bit according to the frozen soil geology to be drilled and assemble it with the quick-change connector. Start the power adapter to rotate forward and drive the drill bit to cut the frozen soil in layers. Check the verticality of the drill rod once for each drilling. S5. Segmented Slag Removal and Bottom Hole Cleaning: After drilling to the effective length of the drill bit in a single operation, the drill bit is raised to the surface slag removal area; when using a double-cone single-spiral drill bit with cutting teeth, the drill bit is reversed to remove slag by centrifugal force; when using a straight-cylinder spiral double-bottom sand scooping bucket with bucket teeth, the bucket bit is raised to the upper limit fixing device to trigger the bucket bit with bucket teeth straight-cylinder spiral double-bottom sand scooping bucket with its own press-type unlocking mechanism to automatically unload soil; after drilling to the designed depth, the drill bit is replaced with a bottom cleaning sand scooping bucket and lowered to the bottom of the hole, rotating in the forward direction to collect the residue at the bottom of the hole to complete the hole cleaning; S6. Drill rod extension and cyclic drilling: When the total length of the drill rod is insufficient for the designed hole depth, a segmented drill rod is inserted inside the borehole to extend the length of the drill rod. This is done directly inside the borehole without having to remove the entire drill rod. After drilling a single hole, the drilling tools are disassembled and the site is moved to the next pile location. Steps S2 to S5 are repeated to complete the continuous drilling operation.

[0006] Furthermore, in step S1, the drilling tools include a double-cone single-spiral cutting tool, a straight-cylinder spiral double-bottom sand-retrieving bucket, and a bottom-cleaning sand-retrieving bucket. Each type of drilling tool is equipped with a standard quick-change interface that matches the quick-change connector at its upper end.

[0007] Furthermore, in step S1, the hydraulic power adapter can adjust the output torque and speed by relying on the excavator's own hydraulic system, and the maximum output torque can meet the cutting requirements of plateau permafrost.

[0008] Furthermore, in step S3, if the two reflective cross marks coincide with the laser cross line, the drill rod is determined to be vertical; if the two reflective cross marks are both biased towards the same side of the laser line, the drill rod is determined to be tilted as a whole, and the boom and slewing mechanism of the excavator are finely adjusted until both marks are aligned with the laser line; if only one reflective cross mark deviates from the laser line, the drill rod itself is determined to be bent and the drill rod needs to be replaced.

[0009] Furthermore, the reflective cross mark mentioned in step S3 is a reflective cross sticker, with the upper reflective cross mark set on the drill rod 10cm below the excavator's power head, and the lower reflective cross mark set 1.5-2 meters away from the upper reflective cross mark.

[0010] Furthermore, before drilling in step S4, a steel casing or concrete interlocking wall is pre-installed at the borehole opening.

[0011] Furthermore, in step S4, during the drilling process, an auxiliary worker monitors the alignment of the reflective cross mark with the laser beam throughout the process and provides feedback on the drill rod tilt deviation. If the deviation exceeds 5mm, the machine is stopped immediately for correction. During correction, the excavator boom is adjusted in the opposite direction to whichever direction the reflective cross mark is biased, until the two marks are aligned with the laser line again.

[0012] Furthermore, in step S5, the bottom cleaning and sand scooping bucket rotates forward to collect the slag into its own semi-enclosed slag storage box, and after being lifted to the ground, the side door of the cylinder is opened to unload the slag.

[0013] Furthermore, the drill rod is a segmented quick-connect drill rod, and in step S6, adjacent drill rods are quickly connected by a plug-in flange.

[0014] Furthermore, when selecting drilling tools in step S4, a double-cone single-spiral cutting tool is used for the bottom layer of soft, clayey frozen soil with high water content, and a bucket-tooth straight-cylinder spiral double-bottom sand-scooping bucket is used for the top layer of loose sandy frozen soil.

[0015] Furthermore, the outer side of the barrel of the double-cone single-spiral drill bit is surrounded by a large-lead single-spiral blade, and the bottom end of the barrel is provided with two layers of tungsten-cobalt cemented carbide conical cutting teeth arranged in a staggered spiral pattern; a vertical baffle is provided on the outer side of the single-spiral blade.

[0016] Compared with the prior art, this application has the following beneficial effects. 1. This application abandons heavy rotary drilling rigs and uses small excavators for construction, eliminating the need to build and widen construction access roads, and significantly reducing the area of ​​native vegetation destruction; the overall weight is small, the equipment heat dissipation is low, and with the low-speed layered drilling process, the frictional heat generation of frozen soil is significantly reduced, effectively controlling the depth of thermal disturbance of frozen soil. 2. This application uses dual-point reflective markings in conjunction with a cross laser reference to synchronously verify the verticality of the drill rod. The drilling process is repeated in sections, and minor tilts can be corrected in real time to avoid exceeding the verticality standard of the tower foundation and ensure the long-term load-bearing stability of the foundation. 3. Based on the water and sand content characteristics of frozen soil, this application selects the corresponding existing drilling tools and integrates the entire process of drilling, slag removal, and bottom cleaning, eliminating the traditional multi-equipment separate operation process, reducing the frequency of repeated drilling and cleaning, and significantly improving the overall hole formation efficiency.

[0017] 4. Utilizing the existing sand hopper with its built-in automatic pressing and unloading structure, the hopper opening is prevented from being blocked by melting cohesive frozen soil. The large-lead spiral blades simultaneously transport the slag and reduce the amount of drill cuttings stuck in the gap between the drill bit and the borehole wall, significantly improving the continuity of construction. Attached Figure Description

[0018] Figure 1 This is a flowchart of the construction method of the present invention; Figure 2 This is a schematic diagram of the double-cone single-spiral drill bit structure used in this invention; Figure 3 This is a schematic diagram of the straight cylindrical spiral double-bottom sand scooping bucket structure used in this invention; Figure 4 This is a cross-sectional view of the straight cylindrical spiral double-bottom sand scooping bucket used in this invention. Figure 5 This is a schematic diagram of the bottom cleaning and sand scooping bucket structure used in this invention; Figure 6 This is a schematic diagram of the vertical calibration of the present invention; Figure 7 This is a schematic diagram of the slag discharge operation of the straight cylindrical spiral double-bottom sand scoop bucket of the present invention; In the diagram, 1-connecting rod; 11-spiral blade one; 12-baffle; 13-conical cutting tooth; 2-cylinder; 21-spiral blade two; 22-press-type unlock trigger assembly; 23-press-type unlock button; 24-drilling unit; 3-cylinder two; 31-center rod 31; 32-partition plate; 33-scraper; 34-slag discharge side door. Detailed Implementation

[0019] To enable those skilled in the art to better understand the technical solutions of this application, the technical solutions in the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. All other embodiments obtained by those skilled in the art based on the embodiments of this application without creative effort are within the scope of protection of this application.

[0020] This application proposes a lightweight drilling method adapted to permafrost in high-altitude areas. The method employs a small excavator, segmented drill rods, and a double-cone single-spiral drilling tool set suitable for permafrost. The double-cone single-spiral drilling tool set includes a cutting tooth double-cone single-spiral drilling tool, a bucket tooth straight-cylinder spiral double-bottom sand-retrieving bucket, and a bottom-cleaning sand-retrieving bucket. A hydraulic power adapter is used in conjunction to complete the drilling operation, which includes the following steps: S1, Lightweight Equipment Assembly Using a mini excavator as a lightweight carrier, the hydraulic power adapter is rigidly fixed to the end of the mini excavator arm. The hydraulic power adapter is connected to the excavator's hydraulic pipeline and its forward and reverse rotation and torque adjustment functions are tested. The lower end of the power adapter is connected to the drill rod through a high-strength flange. The bottom end of the drill rod is equipped with a uniform standard quick-change connector, which can complete the replacement of two drill tools in a short time.

[0021] The hydraulic power adapter is driven entirely by the excavator's built-in hydraulic system, achieving power transmission and precise control through the excavator's hydraulic lines. The operator can independently control the adapter's forward, reverse, and torsional movements from the cab. Maximum output torque and speed can be adjusted in real-time according to the hardness of the frozen soil, meeting the drilling needs of high-altitude frozen soil. The entire system eliminates the need for a dedicated drilling rig power station and tracked chassis, directly reusing existing excavators on-site, reducing equipment investment costs by over 60% and significantly improving the flexibility of site relocation.

[0022] S2, Pile location marking and laser reference layout Use a total station to determine the center point of the pile location and mark it on the ground. You can either nail a small wooden stake or draw a clear cross mark on the ground. Set up the laser line projector 2-3m away from the pile location (do not place it within the excavator's operating radius), turn on the automatic leveling function to complete the leveling operation, and after leveling, emit a vertical laser beam aimed at the center point of the pile location to form a vertical reference plane covering the drilling area. Use weights or steel rods to fix the tripod to the ground to prevent displacement during construction.

[0023] S3, Drill pipe verticality calibration Reflective cross markings: Two reflective cross markings are set at intervals on the drill rod body. The reflective cross markings used in this application are reflective cross stickers. The upper reflective cross marking is set on the drill rod 10cm below the excavator's power head, and the lower reflective cross marking is set 1.5-2 meters away from the upper reflective cross marking. It is done once and used permanently.

[0024] Verticality Correction: After marking, lower the drill rod above the pile position, aligning the drill rod tip with the center point of the pile position, and let the drill rod hang naturally. At this time, observe the position of the cross mark on the drill rod and the laser line to determine the verticality of the drill rod. Drilling can only proceed if the drill rod is vertical. If both reflective cross marks coincide with the laser cross line, it means the drill rod is completely vertical and drilling can begin. If both reflective cross marks are biased towards the same side of the laser line, it means the drill rod is tilted overall. Fine-tune the excavator's boom and slewing mechanism until both marks are aligned with the laser line. If only one reflective cross mark deviates from the laser line, it means the drill rod itself is bent and needs to be replaced and recalibrated.

[0025] S4, Differentiated Layered Drilling Drilling tool selection: Select the appropriate drilling tool according to the frozen soil geology to be constructed and assemble it with the quick-change coupling. In order to improve drilling and slag removal efficiency, use a double-cone single-spiral cutting tool for soft and sticky frozen soil with high water content, and use a bucket tooth straight cylinder spiral double-bottom sand scooping bucket for loose sandy frozen soil.

[0026] Main drilling: Before drilling, steel casing or concrete interlocking wall is pre-installed at the borehole opening according to the characteristics of the rock and soil. The power adapter is started to rotate forward, and the excavator arm is controlled to slowly press down, driving the drill bit to rotate and drill, completing pre-crushing and heavy cutting. During the drilling process, an auxiliary worker monitors the alignment of the reflective crosshair and the laser beam throughout the process, and provides feedback on the drill rod tilt deviation. The verticality of the drill rod is checked after each drilling operation. If the deviation exceeds 5mm, the machine is stopped immediately for correction.

[0027] Correction method: If the marked point is off-center, slightly adjust the excavator boom in the opposite direction until the two marks are aligned with the laser line again. After the drill rod is extended, there is no need to recalibrate the laser reference; simply continue monitoring the marks on the newly extended drill rod using the method described above.

[0028] S5. Segmented slag removal and bottom hole cleaning After drilling to the effective length of the drill bit, the drill bit is raised to the surface slag removal area.

[0029] When using a double-cone single-spiral drill bit with cutting teeth, the power head and drill bit are reversed in the slag discharge area, and the slag on the spiral drill bit is removed by centrifugal force. When using a straight-cylinder spiral double-bottom sand scooping bucket with bucket teeth, a limit fixing device is set above the slag discharge area. When the drill bit is raised to the upper limit fixing device, the push-type unlocking mechanism of the straight-cylinder spiral double-bottom sand scooping bucket with bucket teeth is triggered to make it contact the limit fixing device. The upper limit fixing plate triggers the push-type unlocking mechanism to open the sand scooping bucket and automatically unload the soil.

[0030] After drilling to the designed depth, the drill bit is replaced with a bottom cleaning and sand scooping bucket and lowered to the bottom of the hole. The bottom cleaning and sand scooping bucket rotates in the forward direction to collect the excavated soil into its own semi-enclosed excavated soil storage box. After being lifted to the ground, the side door of the cylinder is opened to unload the excavated soil.

[0031] S6. Drill pipe extension and circulating hole forming After a single hole is drilled, the drilling tools are disassembled and the site is moved to the next pile location. Steps S2 to S5 are repeated to complete the continuous drilling operation.

[0032] The drill rod used in this application is a segmented quick-connect drill rod, with adjacent drill rods connected by a snap-fit ​​flange. When the total length of the drill rod is insufficient for the designed hole depth, the length of the drill rod can be extended by increasing the number of segmented drill rods. When the length of the excavator boom is less than the length of the drill rod, the drilling operation can be completed inside the borehole without having to pull the entire drill rod out.

[0033] The drilling tools selected in this invention mainly include three types: a straight-cylinder spiral double-bottom sand-retrieving bucket, a double-cone single-spiral cutting bucket, and a bottom-cleaning sand-retrieving bucket. These three types of drilling tools use a unified standard interface and can be quickly switched via drill rod and power adapter. They respectively undertake the functions of drilling and breaking up the main body of frozen soil and fine cleaning of the bottom of the hole, forming an integrated operation chain. Among them: 1. Cutting tooth double cone single spiral drill bit The double-layer cutting tooth array adopts a large-lead single-helical blade design, including a cylindrical connecting rod 1, with a large-lead single-helical blade 11 arranged around the outside of the connecting rod 1, a vertical baffle 12 arranged on the outside of the helical blade, and a tungsten cobalt hard alloy conical cutting tooth 13 arranged in two layers of staggered helical arrangement at the bottom of the connecting rod 1.

[0034] Applications: Utilizing a double-layer conical cutting tooth arrangement, the upper layer of conical teeth is used for initial froth breaking and drilling guidance, while also dispersing concentrated impact forces during drilling and protecting the lower layer of teeth. The lower layer of conical teeth undertakes the main heavy-duty cutting of the froth, significantly improving rock-breaking efficiency by increasing the cutting area. The cone apexes of the two layers of teeth are arranged in a spiral staggered pattern, eliminating overlapping cutting zones and further dispersing the overall stress on the drill bit, preventing tooth breakage and drill rod deformation caused by localized stress concentration. All cutting teeth are made of tungsten-cobalt cemented carbide, undergoing precision sintering and surface strengthening treatment, resulting in rock-breaking hardness and wear resistance more than three times that of ordinary cutting teeth, making them suitable for complex hard formations such as those containing ice gravel and permafrost. The large-lead single-helix blade optimizes the slag removal path after froth cutting, reducing the accumulation resistance of drill cuttings between the borehole wall and the drill bit, and improving continuous drilling capability.

[0035] 2. Straight-cylinder spiral double-bottom sand scoop bucket The system includes an upper sand-collecting bucket and a lower drilling unit. The upper sand-collecting bucket unit comprises a cylindrical body 2, with large-lead spiral blades 21 fixedly arranged around its outer side. Inside the body is a push-button unlocking trigger assembly 22, with a push-button unlocking button 23 located at the top of the body. The lower end of the body houses the drilling unit 24, which is identical to the double-cone single-spiral structure of the cutting teeth, except that the bottom drill teeth are bucket teeth. It possesses the same cutting and breaking capabilities for frozen soil, and can simultaneously handle the remaining hard frozen soil blocks and consolidated drill cuttings at the bottom of the hole during the hole cleaning process, avoiding secondary drilling.

[0036] It adopts a double-bottom sand scoop structure with opening and closing. During operation, the bottom of the sand scoop can efficiently collect loose drilling cuttings, mud, sand and gravel from the bottom of the hole. After being lifted to the ground, pressing it again will automatically open the bottom to discharge the cuttings. The operation is simple and efficient.

[0037] 3. Clean the bottom and remove sand from the bucket. The whole is cylindrical, including a cylindrical body 3. A central rod 31 is vertically arranged in the center of the cylindrical body 3. Two vertical partitions 32 are symmetrically arranged between the central rod 31 and the cylindrical body 3. The inner cavity of the cylindrical body 3 is divided by the partitions 32 to form a slag storage box. A scraper 33 is provided at the bottom of the cylindrical body 3 for cleaning the soil. A slag unloading side door 34 is opened on the side wall of the cylindrical body 3.

[0038] Example 1: Construction of foundation drilling for iron towers in permafrost areas of high-altitude regions The construction site is at an altitude of 3750m, and the stratum is permafrost with a 28% ice content. The designed drilling depth is 8m and the borehole diameter is 600mm. The maximum ground slope in the construction area is 22°.

[0039] 1. Equipment assembly: A 20-ton mini excavator was selected, and the hydraulic power adapter flange was rigidly fixed to the hydraulic output end of the excavator boom. The hydraulic pipeline was connected and the forward and reverse rotation and torque adjustment were tested. Four 2m long pluggable segmented drill rods were assembled, and standard quick-change couplings were installed at the bottom of the drill rods. The stratum was soft clay frozen soil with high water content. Existing double-cone single-spiral drill bit with cutting teeth was selected to complete the assembly.

[0040] 2. Benchmarking: The total station marks the center point of the tower foundation piles; the laser line projector is placed on a flat ground 3m east of the pile position, the tripod is weighed down and fixed, and after the equipment is automatically leveled, the cross laser beam is vertically aligned with the center of the pile on the ground to establish a permanent vertical benchmark.

[0041] 3. Verticality Marker Placement: Affix a reflective cross mark 10cm below the drill rod power head and affix a lower reflective cross mark 1.8m below it; lower the drill rod to align with the pile center, adjust the excavator boom, and start drilling after the upper and lower marks coincide with the laser line; check the verticality after each drilling operation, and correct it immediately if the deviation is greater than 5mm.

[0042] 4. Layered drilling: A 0.8m steel casing is installed at the borehole opening. The excavator drives the drill bit at low speed to cut the frozen soil in layers. After drilling to a depth of 2m in a single operation, the drill bit is lifted to the slag removal area. The drill bit is reversed for 30 seconds, and the frozen soil and slag on the spiral blades are removed by centrifugal force.

[0043] 5. Hole cleaning operation: After drilling to the designed depth of 8m, disassemble the double cone single spiral drill bit, replace it with the existing bottom cleaning and sand scooping bucket and lower it to the bottom of the hole. Rotate it back and forth to collect the sediment at the bottom of the hole. After lifting it to the ground, open the side door of the cylinder to remove the residue.

[0044] 6. Site transfer: After the single hole is completed, the drilling tools are dismantled, and the excavator is driven to the next foundation pile position 300m away to repeat the entire process of benchmark setting, calibration, drilling, and hole cleaning.

[0045] Construction Results: This embodiment requires no construction access road, and the area of ​​surface vegetation damage is reduced by 72% compared to traditional rotary drilling. There are no cutting tooth jamming or drill bit sticking faults throughout the process, and the single hole drilling time is shortened by 53% compared to heavy rotary drilling. The verticality deviation of the drilling is controlled within 3mm, which meets the requirements of the construction specifications for power transmission and transformation tower foundations.

[0046] Example 2: Hole Formation Construction in Loose Sandy Frozen Soil The construction stratum is loose sandy frozen soil with an ice content of 12%. The designed hole depth is 6m and the slope is 18°. The existing straight-cylinder spiral double-bottom sand scooping bucket is selected and assembled to the drill rod. After drilling to an effective length of 2m, it is lifted to the upper limit fixing device. The press-type unlocking mechanism automatically opens the bottom of the bucket to unload the soil. After unloading the slag, the bottom of the sand scooping bucket automatically closes. After drilling to a depth of 6m, the bottom cleaning sand scooping bucket is replaced to clean the sand and gravel residue at the bottom of the hole. The remaining construction steps are the same as in Example 1.

[0047] Construction results: There was no blockage in the sand hopper opening and closing of the sandy soil, and no need for manual cleaning of the soil inside the hopper, which significantly improved the continuity of construction.

Claims

1. A lightweight drilling method adapted to permafrost in high-altitude areas, characterized in that, Includes the following steps: S1. Equipment Assembly: Using a mini excavator as a lightweight carrier, a hydraulic power conversion joint is used in conjunction with the mini excavator. The hydraulic power conversion joint is rigidly fixed to the end of the mini excavator arm. The hydraulic power conversion joint is connected to the excavator's hydraulic pipeline. The lower end of the power conversion joint is connected to the drill rod. A standardized quick-change connector is installed at the bottom of the drill rod. Multiple drilling tools can be quickly assembled at the lower end of the quick-change connector. S2. Pile location marking and laser reference layout: The center point of the pile location is marked by a total station and a mark is set on the ground. The laser line projector is used to place it at a distance of 2-3m from the pile location to complete the leveling operation. After leveling, a vertical laser beam is emitted and aligned with the center point of the pile location to form a vertical reference surface covering the borehole area. S3. Drill rod verticality calibration: Set two reflective cross marks at intervals on the drill rod body. Lower the drill rod to above the pile position and align the drill rod tip with the center point of the pile position. Determine the verticality of the drill rod based on the position of the two cross marks and the laser line. Drilling can only be carried out if the drill rod is vertical. S4. Differentiated layered drilling: Select the corresponding drill bit according to the frozen soil geology to be drilled and assemble it with the quick-change connector. Start the power adapter to rotate forward and drive the drill bit to cut the frozen soil in layers. Check the verticality of the drill rod once for each drilling. S5. Segmented slag removal and bottom hole cleaning: After drilling to the effective length of the drill bit in a single operation, the drill bit is raised to the slag removal area on the ground; when using a double-cone single-spiral drill bit with cutting teeth, the drill bit is reversed to remove slag by centrifugal force; when using a straight-cylinder spiral double-bottom sand scooping bucket with bucket teeth, the bucket bit is raised to the upper limit fixing device to trigger the bucket bit straight-cylinder spiral double-bottom sand scooping bucket with bucket teeth and a built-in press-type unlocking mechanism to automatically unload soil; after drilling to the designed depth, the drill bit is replaced with a bottom cleaning sand scooping bucket and lowered to the bottom of the hole, rotating in the forward direction to collect the residue at the bottom of the hole to complete the hole cleaning; S6. Drill rod extension and cyclic drilling: When the total length of the drill rod is insufficient for the designed hole depth, insert segmented drill rods inside the borehole to extend the length of the drill rod; after the single hole is completed, disassemble the drilling tools and move to the next pile location to repeat steps S2 to S5 to complete the continuous drilling operation.

2. The lightweight drilling method adapted to high-altitude permafrost as described in claim 1, characterized in that: In step S1, the drilling tools include a double-cone single-spiral cutting tool, a straight-cylinder spiral double-bottom sand-retrieving bucket, and a bottom-cleaning sand-retrieving bucket. Each type of drilling tool is equipped with a standard quick-change interface that matches the quick-change connector at its upper end.

3. The lightweight drilling method adapted to plateau permafrost as described in claim 1, characterized in that: In step S3, if the two reflective cross marks coincide with the laser cross line, the drill rod is determined to be vertical; if both reflective cross marks are biased to the same side of the laser line, the drill rod is determined to be tilted as a whole, and the boom and slewing mechanism of the excavator are finely adjusted until both marks are aligned with the laser line; if only one reflective cross mark deviates from the laser line, the drill rod itself is determined to be bent and the drill rod needs to be replaced.

4. The lightweight drilling construction method adapted to plateau permafrost as described in claim 1, characterized in that: The reflective cross mark mentioned in step S3 is a reflective cross sticker. The upper reflective cross mark is set on the drill rod 10cm below the excavator's power head, and the lower reflective cross mark is set 1.5-2 meters away from the upper reflective cross mark.

5. The lightweight drilling construction method adapted to plateau permafrost as described in claim 1, characterized in that: Before drilling in step S4, a steel casing or concrete interlocking wall is pre-installed at the borehole opening.

6. The lightweight borehole construction method adapted to plateau permafrost as described in claim 1, characterized in that: In step S4, during the drilling process, an assistant worker monitors the alignment of the reflective cross mark with the laser beam throughout the process. If the offset exceeds 5mm, the machine is stopped immediately for correction.

7. The lightweight drilling construction method adapted to plateau permafrost as described in claim 1, characterized in that: In step S5, the bottom cleaning and sand scooping bucket rotates forward to collect the slag into its own semi-enclosed slag storage box, and after being lifted to the ground, the side door of the cylinder is opened to unload the slag.

8. The lightweight hole-forming construction method adapted to plateau permafrost as described in claim 1, characterized in that: The drill pipe is a segmented quick-connect drill pipe. In step S6, adjacent drill pipes are quickly connected by a plug-in flange.

9. The lightweight drilling method adapted to plateau permafrost as described in claim 2, characterized in that: When selecting drilling tools in step S4, a double-cone single-spiral cutting tool is used for the bottom layer of soft, clayey frozen soil with high water content, and a bucket-tooth straight-cylinder spiral double-bottom sand-scooping bucket is used for the top layer of loose sandy frozen soil.

10. The lightweight hole-forming construction method adapted to plateau permafrost as described in claim 6, characterized in that: The correction method is to adjust the excavator boom in the opposite direction of whichever direction the reflective cross mark is biased, until the two marks are aligned with the laser line again.