A tunnel drilling device

By designing a tunnel drilling equipment that includes stepping, drilling, crushing, and slag removal components, the problem of low construction efficiency caused by manual core sampling in existing technologies has been solved, achieving automation and high efficiency in drilling operations.

CN123109693APending Publication Date: 2026-11-17GUIZHOU BRIDGE CONSTR GROUP +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611600961.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-16
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing tunnel drilling equipment requires manual removal of rock cores after drilling, resulting in low construction efficiency and cumbersome operation, especially when the rock core is stuck, which affects the construction process.

Method used

A tunnel drilling device was designed, comprising a stepping component, a drilling component, a crushing component, and a slag removal component. It synchronously drills and crushes rock cores through a hydraulically driven drill barrel, and achieves multi-stage crushing and slag removal integrated operation by utilizing the expansion and crushing sections.

Benefits of technology

It has automated drilling, core crushing and slag removal, simplified the construction process, improved drilling efficiency, avoided the problem of rock blockage, and improved the quality of secondary utilization of crushed stone.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109693A_ABST
    Figure CN123109693A_ABST
Patent Text Reader

Abstract

This invention relates to the field of tunnel drilling technology and discloses a tunnel construction drilling device, including a frame and a stepping assembly mounted thereon. The stepping assembly is connected to a drilling assembly, which includes a drill barrel and a drive component for rotating the drill barrel. The drill barrel contains a crushing assembly for crushing the rock core entering the drill barrel; it also includes a slag removal assembly for discharging the crushed rock from the drill barrel. The crushing assembly creates a primary crushing structure in the expansion section. Through the alternating cooperation of the first and second top blocks, multi-level gradient expansion and fracturing is achieved from the inside of the rock core outwards, orderly crushing the complete columnar rock core into sheet-like rock blocks. Combined with the slag removal assembly, the crushed rock is continuously discharged, thus realizing integrated drilling, core crushing, and slag removal operations. This eliminates the need for manual core sampling and crushing processes, simplifies the construction process, and improves drilling efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of tunnel drilling technology, and more specifically to a tunnel construction drilling device. Background Technology

[0002] Non-explosive water-jetting drilling is commonly used in hard rock tunnel excavation. This technique results in low vibration and minimal disturbance to the surrounding rock, making it suitable for the confined working space of tunnels. It is widely used in conventional tunnel excavation. Currently, most tunnel drilling operations use water-jetting drilling equipment. During construction, the equipment is positioned and installed on the tunnel work platform. The drill barrel is driven by a motor to rotate at high speed and grind the rock wall. Holes are drilled sequentially along the tunnel outline and working face, continuously drilling to form columnar rock cores. By drilling multiple points continuously, a free face of the rock mass is formed, thus completing the segmented drilling excavation of the tunnel rock mass. This is a conventional construction method for static tunnel excavation.

[0003] Chinese patent CN221742606U discloses a water-cooled drilling device for tunnel excavation. Technical problem: Existing water-cooled drilling rigs for tunnels suffer from time-consuming and labor-intensive problems due to reliance on manual labor for drill bit feed control. Technical solution: A water-cooled drilling device for tunnel excavation includes a drilling motor, a drill bit, a first feed component, a base, a second feed component, a water supply component, and a handle. The drill bit is located at the lower end of the drilling motor; the feed component is located behind the drilling motor; the base is located at the lower end of the feed component; the feed component is located at the upper end of the base; and the water supply component is located at the upper end of the feed component. The feed component provides a stable, powerful, and controllable feed processing function for the drilling motor and drill bit, thus solving the problem of insufficient accuracy in tunnel drilling depth control and time-consuming and labor-intensive manual feeding in existing water-cooled drilling rigs.

[0004] However, the existing technology has the following problems: When drilling with existing equipment, after a single hole is drilled and the drill barrel is removed, workers still need to manually extract the rock core. Manual core extraction is labor-intensive and time-consuming. When the rock core gets stuck in the drill barrel and is difficult to remove, it will delay the overall construction process. Furthermore, the overall transportation and crushing of the rock core is cumbersome, which affects the efficiency of tunnel drilling. Summary of the Invention

[0005] The purpose of this invention is to provide a tunnel drilling device to solve the above-mentioned problems, thereby overcoming the problem that existing drilling devices require manual core sampling during operation, which affects construction efficiency, as detailed below.

[0006] To achieve the above objectives, the present invention provides the following technical solution: The present invention provides a tunnel construction drilling device, including a frame and a stepping component mounted thereon, the stepping component being connected to a drilling component, the drilling component including a drill barrel and a driving component for driving the drill barrel to rotate, the drill barrel being provided with a crushing component for crushing the rock core entering the drill barrel; and also including a slag discharge component for discharging the crushed stone inside the drill barrel.

[0007] Preferably, the stepping assembly includes a slide mounted on a frame and a hydraulic cylinder mounted on the frame. The output end of the hydraulic cylinder is connected to the slide, and a fixed shaft is fixedly mounted on the slide. The drill barrel is rotatably sleeved on the fixed shaft.

[0008] Preferably, the driving component includes a motor and a driving gear connected to its output end. The motor is mounted on a slide, and a driven gear that meshes with the driving gear is connected to the outer wall of the drill barrel.

[0009] Preferably, the crushing assembly includes a drill rod, the fixed shaft extends into the drill barrel, the drill rod is rotatably sleeved on the outer wall of the fixed shaft, and a plurality of fixed rods are connected between the outer wall of the drill rod and the inner wall of the drill barrel.

[0010] Preferably, the section of the drill rod near the drilling end of the drill barrel is designated as a drilling section, the drilling section is provided with a spiral blade, and the drilling section is provided with a drill bit protruding from the drilling end of the drill barrel.

[0011] Preferably, the middle section of the drill pipe is designated as a fracture section, which includes two sets of first top blocks and two sets of second top blocks that are alternately distributed along the axial direction of the drill pipe. The first top blocks are provided with radial cutting edges, and the second top blocks are provided with axial cutting edges. The first and second top blocks are slidably embedded in the fracture section along the radial direction of the drill pipe. The fixed shaft is provided with four annular grooves corresponding to the inner positions of the two sets of first and second top blocks. Arc-shaped blocks are connected to the four annular grooves respectively. When the first and second top blocks rotate, they protrude outward from the fracture section by contacting the arc-shaped blocks.

[0012] Preferably, the radial protrusion height of the arc-shaped blocks in the four annular grooves increases progressively away from the drilling section.

[0013] Preferably, the section of the drill rod away from the drilling section is designated as a crushing section. The crushing section is a truncated cone-shaped variable diameter structure with an increasing outer radial diameter away from the drilling section. Multiple grinding rods are rotatably mounted in a circumferential array on the outer wall of the crushing section. Multiple reverse teeth are connected to the grinding rods. A protrusion is provided at the rotation fulcrum of the grinding rod near the interior of the crushing section. Multiple convex balls are connected to the outer wall of the fixed shaft. When the grinding rod rotates with the drill rod, the convex balls squeeze the protrusion and cause it to tilt outward from the crushing section.

[0014] Preferably, the slag discharge assembly includes an inner cylinder, a slag discharge pipe, and a slag discharge hopper. The inner cylinder is rotatably connected to the inner wall of the drill barrel and fixedly connected to a fixed shaft. A first opening is provided at the bottom of the inner cylinder, and at least one second opening is provided on the drill barrel. The second opening coincides with the first opening during rotation. The slag discharge pipe is installed on a sliding seat, and the slag discharge hopper is installed on a frame. The slag discharge pipe is located directly below the first opening and above the slag discharge hopper.

[0015] Preferably, the inner wall of the drill barrel is rotatably connected to a grinding bushing and the grinding bushing is fixedly connected to the inner barrel. The grinding bushing is located outside the crushing section. The grinding bushing is a throat-type variable diameter structure with the inner radial direction decreasing away from the drilling section. The inner wall of the grinding bushing is provided with multiple oblique convex ridges in a circumferential array.

[0016] The beneficial effects are: 1. This tunnel drilling equipment, through the setting of the crushing component, allows the drilling part to follow the drilling operation of the drill barrel and drill into the rock core synchronously. Utilizing the expansion and fracturing part, a primary crushing structure is formed. Through the alternating cooperation of the first and second top blocks, multi-level gradient expansion and fracturing is achieved from the inside of the rock core outward, orderly crushing the complete columnar rock core into sheet-like rock blocks. With the help of the slag removal component, the crushed stone is continuously discharged, thereby realizing the integrated operation of drilling, core crushing, and slag removal. This eliminates the need for manual core sampling and core crushing procedures, simplifies the construction process, and improves the efficiency of drilling operations.

[0017] 2. The tunnel drilling equipment, through the cooperation of the crushing section, grinding rod and grinding bushing, forms a two-stage crushing structure with a primary crushing structure. It squeezes and grinds the flaky rock blocks after they have expanded and cracked, further reducing the particle size of the crushed stone, avoiding the problem of large rock fragments blocking the hole and causing slag accumulation, ensuring smooth slag discharge, and at the same time, regularizing the particle size of the crushed stone and improving the quality of secondary utilization of the crushed stone. Attached Figure Description

[0018] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0019] Figure 1 This is a schematic diagram of the overall structure of the present invention; Figure 2 This is a schematic diagram of the slag discharge assembly structure of the present invention; Figure 3 This is a schematic diagram of the drilling assembly structure of the present invention; Figure 4 This is a schematic diagram of the inner cylinder structure of the present invention; Figure 5 This is a schematic diagram of the drill barrel structure of the present invention; Figure 6 This is a schematic diagram of the drill pipe structure of the present invention; Figure 7 This is a schematic diagram of the drilling section structure of the present invention; Figure 8 This is a schematic diagram of the fixed shaft structure of the present invention; Figure 9 This is a schematic diagram of the expansion and cracking structure of the present invention; Figure 10 This is a schematic diagram of the arc-shaped block structure of the present invention; Figure 11 This is a schematic diagram showing the positional relationship between the first top block and the second top block of the present invention; Figure 12 This is a schematic diagram of the crushing section structure of the present invention; Figure 13 This is a schematic diagram of the grinding rod structure of the present invention.

[0020] The annotations in the attached figures are explained as follows: 1. Frame; 2. Stepping assembly; 21. Slide; 22. Hydraulic cylinder; 3. Drilling assembly; 31. Fixed shaft; 32. Drill barrel; 33. Driven gear; 34. Motor; 35. Drive gear; 4. Crushing assembly; 41. Drill rod; 411. Drilling section; 412. Expansion section; 413. Crushing section; 42. Fixed rod; 43. First top block; 44. Second top block; 45. Arc block; 46. Convex ball; 47. Grinding rod; 48. Reverse gear; 49. Grinding bushing; 5. Slag discharge assembly; 51. Inner cylinder; 52. Slag discharge pipe; 53. Slag discharge hopper. Detailed Implementation

[0021] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of this invention will be described in detail below. Obviously, the described embodiments are merely some embodiments of this invention, and not all embodiments. Based on the embodiments of this invention, all other implementation methods obtained by those skilled in the art without creative effort are within the scope of protection of this invention.

[0022] It should be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this application.

[0023] In the description of this application, "multiple" means two or more, unless otherwise expressly and specifically defined.

[0024] To address the problems of existing water-cooled drilling methods in tunnel construction, where each borehole requires manual removal of the rock core before proceeding to the next, which is cumbersome, and the heavy rock cores require crushing during transport, resulting in a complex and inefficient drilling process, this application proposes the following first embodiment: Please see Figure 1 - Figure 11 A tunnel drilling device includes a frame 1 and a stepping component 2 mounted on it. The stepping component 2 is connected to a drilling component 3. The stepping component 2 includes a slide 21 slidably mounted on the frame 1 and a hydraulic cylinder 22 mounted on the frame 1. The output end of the hydraulic cylinder 22 is connected to the slide 21. The frame 1 is mounted on a tunnel-specific arc-shaped work platform frame. The arc-shaped work platform frame can be flexibly adjusted to fit the contour of the tunnel's arc-shaped inner wall, enabling the frame 1 to move precisely laterally and longitudinally along the tunnel edge, achieving continuous alignment operations at different drilling points in the tunnel. The stepping component 2 is the core feed drive structure of the drilling component 3. The hydraulic cylinder 22, through its own extension and retraction, precisely pushes and pulls the slide 21 at its output end, causing the slide 21 to slide smoothly in a straight line on the frame 1, thereby driving the drilling component 3 to synchronously complete forward drilling and backward drilling reset actions after drilling is completed.

[0025] Furthermore, the drilling assembly 3 includes a drill barrel 32 and a drive component for rotating the drill barrel 32. A fixed shaft 31 is fixedly installed on the slide 21. The drill barrel 32 is rotatably sleeved on the fixed shaft 31. The fixed shaft 31 is a stationary fixed reference shaft and will not rotate or displace relative to the slide 21, providing stable axial support for the operation of the drill barrel 32 and the crushing assembly 4 inside. The drill barrel 32 can rotate around the fixed shaft 31. The drilling end of the drill barrel 32 is provided with drill teeth. The drill teeth are hard cutting structures that can directly fit into the tunnel rock wall and achieve drilling by rotating and cutting the rock wall, so that the columnar rock core inside the rock wall can continuously and completely enter the drill barrel 32. The drill barrel 32 is provided with a crushing assembly 4, which is used to crush the rock core that enters the drill barrel 32. During the synchronous drilling operation, the crushing assembly 4 crushes the complete columnar rock core that enters the drill barrel 32, eliminating the need to wait for the single hole drilling to be completed before taking the core and crushing it separately, fundamentally simplifying the operation steps.

[0026] The drive component includes a motor 34 and a drive gear 35 connected to its output end. The motor 34 is mounted on the slide 21. The outer wall of the drill barrel 32 is connected to a driven gear 33 that meshes with the drive gear 35. The motor 34 moves synchronously with the slide 21. During operation, the motor 34 starts running and drives the drive gear 35 to rotate. The drive gear 35 drives the driven gear 33 to rotate synchronously. The driven gear 33 then drives the drill barrel 32 to rotate stably around the fixed shaft 31, providing continuous and stable rotational power for the rock wall cutting and drilling of the drill barrel 32 and the operation of the internal crushing components 4.

[0027] Specifically, the crushing assembly 4 includes a drill rod 41, a fixed shaft 31 extending into the drill barrel 32, and the drill rod 41 rotatably sleeved on the outer wall of the fixed shaft 31. Multiple fixed rods 42 are connected between the outer wall of the drill rod 41 and the inner wall of the drill barrel 32, arranged in a uniform array to achieve a rigid connection between the drill rod 41 and the inner wall of the drill barrel 32, allowing the drill rod 41 to rotate synchronously with the drill barrel 32. A section of the drill rod 41 near the drilling end of the drill barrel 32 is designated as a drilling section 411, which is equipped with a screw... The drilling section 411 is equipped with a drill bit protruding from the drilling end of the drill barrel 32. The drill bit protrudes from the drilling end face of the drill barrel 32. At the start of the drilling operation, the drill bit prioritizes positioning, breaking the rock and guiding the hole opening of the tunnel rock wall to improve the drilling alignment accuracy. The spiral blades of the drilling section 411 cooperate with the drilling feed action to enable the drilling section 411 to smoothly drill into the rock core and play a role in removing slag. When the drilling section 411 drills into the rock core, the cross-section of the rock core is similar to that of a CD, and the whole is a circle with a hole in the center.

[0028] Furthermore, the middle section of the drill pipe 41 is designated as a fracture section 412. The fracture section 412 includes two sets of first top blocks 43 and two sets of second top blocks 44, which are alternately distributed along the axial direction of the drill pipe 41. The first top blocks 43 are provided with radial cutting edges, and the second top blocks 44 are provided with axial cutting edges. The first top blocks 43 and the second top blocks 44 are both slidably embedded in the fracture section 412 along the radial direction of the drill pipe 41. The fixed shaft 31 is provided with four annular grooves corresponding to the inner positions of the two sets of first top blocks 43 and second top blocks 44. Arc-shaped blocks are connected to the four annular grooves respectively. 45. When rotating, the first top block 43 and the second top block 44 protrude outwards from the expansion joint 412 by contacting the arc-shaped block 45. Both the first top block 43 and the second top block 44 have arc-shaped protrusions on their inner sides. Since the fixed shaft 31 remains stationary relative to the drill barrel 32 and the drill rod 41, the arc-shaped block 45 on the fixed shaft 31 maintains relative movement with the first top block 43 and the second top block 44 on the expansion joint 412 of the drill rod 41. Taking the first top block 43 as an example, when the first top block 43 is not in contact with the arc-shaped block 45, the first top block 43 is embedded in the expansion joint. The outer wall of 412 does not protrude from the surface of the expansion crack 412. When the first top block 43 rotates with the expansion crack 412 past the arc-shaped block 45, the arc-shaped protrusion contacts the arc-shaped block 45 and is driven by the reaction force of the arc-shaped block 45 to slide the first top block 43 outward from the expansion crack 412. Thus, the first top block 43 protrudes outward from the expansion crack 412. Furthermore, the sliding connection between the first top block 43 and the second top block 44 and the expansion crack 412 is provided with an elastic reset member (not shown in the figure). Therefore, when the arc-shaped block 45 disengages from the arc-shaped block 412, the elastic reset member is provided at the sliding connection between the first top block 43 and the second top block 44 and the expansion crack 412. After the protrusion is formed, the first top block 43 can be reset by the elastic retraction of the elastic reset member and re-embed into the outer wall of the expansion and fracture section 412. The second top block 44 is the same as the first top block 43. Therefore, when the expansion and fracture section 412 continues to rotate, the two sets of first top blocks 43 and second top blocks 44 will repeatedly perform the action of protruding outward and then retracting. As the drilling part 411 drills into the rock core, the expansion and fracture section 412 will also drill into the rock core. By using the protruding action of the first top block 43 and the second top block 44, the expansion and fracture effect is achieved, thereby breaking the rock core into small rock fragments.

[0029] It is worth mentioning that the two sets of first top blocks 43 and the two sets of second top blocks 44 are arranged alternately along the axis of the drill pipe 41. After the core enters the drill barrel 32, as the core continuously enters the drill barrel 32 during drilling, the end of the core will successively contact the first set of first top blocks 43, the first set of second top blocks 44, the second set of first top blocks 43, and the second set of second top blocks 44, thereby completing alternating multi-stage expansion and fracturing in sequence. Among them, the radial cutting edge of the first top block 43 can apply radial thrust from the inside of the columnar core outward, performing circumferential expansion and fracturing on the end of the intact core, so that the end of the core first forms a disc-shaped rock fragment. The rock fragments are broken and separated from the core. As the core continues to push into the drill barrel 32, the broken rock fragments are pushed further, making them contact the second top block 44. The axial cutting edge of the second top block 44 applies an axial pushing force to the inner wall of the broken disc-shaped rock fragments, further axially compressing and expanding the entire disc-shaped rock fragments, causing them to break into smaller pieces. Similarly, as the rock fragments are pushed by the core end and the newly generated disc-shaped rock fragments, they continue to be compressed and expanded by the second set of first top blocks 43 and the second set of second top blocks 44, causing them to break into even smaller sheet-like rock blocks, achieving the breaking effect.

[0030] It is worth noting that the radial protrusion height of the arc-shaped blocks 45 in the four annular grooves increases gradually in the direction away from the drilling section 411. The structural design of the arc-shaped blocks 45 increasing radial protrusion height gradually increases the radial outward stroke and pushing force of the second group of first top blocks 43 and the second group of second top blocks 44 away from the drilling section 411. Therefore, as the rock core gradually penetrates into the drill barrel 32 during the drilling process, the expansion and fracturing force it receives gradually increases, achieving a gradient fracturing effect and causing the rock core to gradually break into small rock fragments.

[0031] In this embodiment, the first top block 43 and the second top block 44 can be adopted as follows: Figure 10 The arrangement shown has two first top blocks 43 in each group, arranged symmetrically, with the radial top edges of the two first top blocks 43 facing upward and downward respectively, which can simultaneously apply outward expansion force to the upper and lower radial positions of the columnar rock core. Similarly, there are two second top blocks 44 in each group, with the axial top edges of the two second top blocks 44 facing forward and backward respectively, which can simultaneously apply axial tearing force to the front and rear axial positions of the rock fragment, and the crushing force is evenly distributed.

[0032] In addition, the first top block 43 and the second top block 44 in this embodiment can also be adopted as follows: Figure 11The staggered arrangement structure shown in the diagram still has two sets of first top blocks 43 and two sets of second top blocks 44. The top edge of one set of first top blocks 43 faces the upper and lower sides and is responsible for radial expansion and fracturing of the rock core. The top edge of the other set of first top blocks 43 faces the front and back sides and is responsible for radial expansion and fracturing of the rock core. In the two sets of second top blocks 44, the top edge of one set of second top blocks 44 faces the front and back sides and the top edge of the other set of second top blocks 44 faces the upper and lower sides. Together, they complete the axial expansion and fracturing operation. This arrangement method realizes multi-angle expansion and fracturing in both radial and axial directions, and the expansion and fracturing effect is more uniform.

[0033] Similarly, the first top block 43 and the second top block 44 can also be arranged in other ways or in different combinations of quantities to meet different operational needs.

[0034] In addition, it includes a slag discharge assembly 5 for discharging the crushed stone inside the drill barrel 32. The slag discharge assembly 5 includes an inner cylinder 51, a slag discharge pipe 52, and a slag discharge hopper 53. The inner cylinder 51 is rotatably connected to the inner wall of the drill barrel 32 and fixedly connected to the fixed shaft 31. A first opening is provided at the bottom of the inner cylinder 51, and at least one second opening is provided on the drill barrel 32. The second opening coincides with the first opening during rotation. The slag discharge pipe 52 is installed on the slide 21, and the slag discharge hopper 53 is installed on the frame 1. The slag discharge pipe 52 is located directly below the first opening and above the slag discharge hopper 53. The inner cylinder 51 is fixedly connected to the fixed shaft 31 and remains stationary relative to the drill barrel 32, not rotating with the drill barrel 32. During the continuous rotation of the drill barrel 32, the second opening on its side wall makes a circular motion, following the rotation of the drill barrel 32. As the core material continues to enter the drill barrel 32, the crushed stone formed by the crushing component 4 is continuously pushed into the inner cylinder 51 for temporary storage. When the second opening rotates to coincide with the first opening at the bottom of the inner cylinder 51, the crushed stone inside the drill barrel 32 can fall smoothly into the lower slag discharge pipe 52 through the coinciding connecting opening. The slag discharge pipe 52 moves synchronously with the slide 21, always aligning with the material drop position of the first opening. The crushed stone falls directly into the slag discharge hopper 53 fixed in the frame 1 through the slag discharge pipe 52. During construction, small transportation equipment can be placed under the slag discharge hopper 53 to receive and transport the crushed stone in real time. The crushed stone can be reused as filler or aggregate for tunnel construction or other construction projects, effectively reducing the cost of construction materials and construction waste removal.

[0035] In this embodiment, the setting of the crushing component 4 allows the drilling part 411 to follow the drilling operation of the drill barrel 32 and drill into the rock core synchronously. The expansion and fracturing part 412 forms a primary crushing structure. Through the alternating cooperation of the first top block 43 and the second top block 44, multi-level gradient expansion and fracturing is achieved from the inside of the rock core outward, and the complete columnar rock core is orderly crushed into flaky rock blocks. With the help of the slag removal component 5, the crushed stone is continuously discharged, thereby realizing the integrated operation of drilling, core crushing and slag removal, eliminating the need for manual core sampling and core crushing processes, greatly simplifying the construction process and improving the efficiency of drilling operations.

[0036] The rock fragments after being broken by the expansion and fracture section 412 are mostly flaky in structure, with a small number of large flaky rock fragments. These large rock fragments are prone to getting stuck at the second opening of the drill pipe 32, preventing them from smoothly entering the slag removal assembly 5 for slag removal. Long-term jamming will cause slag accumulation or blockage inside the drill pipe 32, affecting the continuity of drilling operations. Therefore, based on the first embodiment, the following second embodiment is proposed, which adds a two-stage crushing structure to finely crush the flaky rock fragments: Please see Figure 5 , Figure 12 , Figure 13 The section of drill rod 41 furthest from the drilling section 411 is designated as a crushing section 413. The crushing section 413 is a truncated cone-shaped variable-diameter structure with an increasing outer radial diameter away from the drilling section 411. Multiple grinding rods 47 are rotatably mounted in a circumferential array on the outer wall of the crushing section 413. Multiple reverse teeth 48 are connected to the grinding rods 47. A protrusion is provided at the rotation fulcrum of the grinding rods 47 near the interior of the crushing section 413. Multiple convex balls 46 are connected to the outer wall of the fixed shaft 31. When the grinding rods 47 rotate with the drill rod 41, the convex balls 46 squeeze the protrusion and cause them to tilt outward from the crushing section 413. The flaky rock fragments, after being crushed by the expansion and fracturing section 412, will automatically move deeper into the drill barrel 32 under the continuous pushing action of the rock core entering the drill barrel 32, and finally enter the crushing section 413 area at the tail of the drill rod 41 to complete the secondary crushing operation. The crushing section 413 adopts a truncated cone-shaped variable-diameter structure with an increasing outer radial diameter. The space for rock movement can be gradually compressed to achieve step-by-step crushing. The grinding rod 47 is initially embedded and stored on the outer wall of the crushing part 413 to avoid obstructing the rock feeding. When the grinding rod 47 rotates synchronously with the drill rod 41, the protrusion at the fulcrum of the grinding rod 47 repeatedly contacts and squeezes the convex ball 46 on the outer wall of the fixed shaft 31, forcing the grinding rod 47 to tilt outward. The rotation fulcrum of the grinding rod 47 is also provided with an elastic reset element (not shown in the figure). When the protrusion is not in contact with the convex ball 46, the grinding rod 47 retracts and resets using the elastic force of the elastic reset element. Therefore, when multiple grinding rods 47 rotate with the crushing part 413, they can also repeatedly perform the tilting action. The tilted grinding rod 47, in conjunction with the reverse teeth 48 on the surface, strongly squeezes and tears large-volume flaky rock blocks, effectively breaking up large-volume rock blocks, reducing the overall particle size of the rock blocks, and thus avoiding the problem of rock block blockage affecting slag discharge.

[0037] A grinding bushing 49 is rotatably connected to the inner wall of the drill barrel 32, and the grinding bushing 49 is fixedly connected to the inner cylinder 51. The grinding bushing 49 is located outside the crushing section 413. The grinding bushing 49 is a throat-type variable diameter structure with an inner radial diameter decreasing away from the drill section 411. The inner wall of the grinding bushing 49 has multiple oblique protrusions arranged in a circumferential array. The grinding bushing 49 is fixedly connected to the inner cylinder 51 and remains stationary throughout the process. It forms a dynamic and static crushing structure with the rotating crushing section 413 and the multiple grinding rods 47 above it. The grinding bushing 49 adopts a progressively smaller inner radial diameter. The throat-type variable diameter structure, together with the outward expansion cone structure of the crushing section 413, forms a closed crushing channel with gradually decreasing gaps. During the movement of the rock blocks in the channel, they are continuously squeezed and ground. The oblique convex ridges arrayed on the inner wall of the grinding bushing 49 can greatly increase the friction and impact force with the rock blocks. Combined with the grinding rod 47 with reverse teeth 48, a two-way three-dimensional grinding effect is formed, which thoroughly grinds the flaky rock blocks into small pieces of gravel. The refined gravel is smoothly pushed into the inner cylinder 51 by the new rock blocks and rock cores for temporary storage, waiting for the first and second openings to overlap before the slag is discharged.

[0038] In this embodiment, the crushing section 413, the grinding rod 47, and the grinding bushing 49 work together to form a two-stage crushing structure with a primary crushing structure. This structure compresses and grinds the flaky rock blocks after they have expanded and cracked, further reducing the particle size of the crushed stone. This avoids the problem of large rock fragments blocking the holes and causing slag accumulation, ensuring smooth slag discharge. At the same time, it regulates the particle size of the crushed stone and improves the quality of secondary utilization of the crushed stone.

[0039] When the tunnel drilling equipment is in operation, the frame 1 is first mounted on a tunnel-specific arc-shaped work platform. The platform is then flexibly adjusted to conform to the tunnel's arc shape, allowing the frame 1 to achieve precise lateral and longitudinal displacement, aligning with different drilling points within the tunnel. After operation begins, the stepping component 2 mounted on the frame 1 starts working. The hydraulic cylinder 22 extends and retracts, pushing and pulling the slide 21 smoothly across the frame 1, driving the drilling component 3 forward for feeding. Simultaneously, the motor 34 on the slide 21 starts, driving the... The rotating gear 35 drives the driven gear 33 on the outer wall of the drill barrel 32 to rotate through gear meshing, causing the drill barrel 32 to rotate around the stationary fixed shaft 31 fixed on the slide block 21. The drill teeth at the drilling end of the drill barrel 32 cut the tunnel rock wall to complete the drilling operation. The protruding drill bit realizes the opening positioning and guidance. The spiral blade of the drilling part 411 guides the columnar rock core formed by the rock wall to continuously enter the internal cavity of the drill barrel 32. The drill rod 41 is rigidly connected to the inner wall of the drill barrel 32 through the uniformly arrayed fixed rods 42 and rotates synchronously with the drill barrel 32.

[0040] During drilling, the rock core entering the drill barrel 32 first contacts the expansion and fracture section 412 in the middle section of the drill rod 41. During rotation, the inner arc-shaped protrusions of the first top block 43 and the second top block 44 embedded in the expansion and fracture section 412 continuously contact the arc-shaped block 45 in the annular groove of the fixed shaft 31. Under the pushing action, it protrudes radially outward and achieves reciprocating extension and resetting during rotation through the elastic reset component. The two sets of first top blocks 43 and second top blocks 44 are arranged alternately along the axial direction. With the radial protrusion height of the arc-shaped block 45 increasing from front to back, the rock core is successively subjected to multi-level gradient primary crushing of radial circumferential expansion and axial tearing, breaking the complete columnar rock core into sheet-like rock blocks.

[0041] As new rock cores are continuously drilled and pushed forward, flaky rock blocks are transferred to the crushing section 413 at the tail of drill rod 41. The convex ball 46 on the outer wall of the fixed shaft 31 continuously squeezes the protrusion of the grinding rod 47, causing the embedded grinding rod 47 to tilt outward. Utilizing the reverse teeth 48 on the rod body, in conjunction with the grinding bushing 49 fixed to the inner cylinder 51 and its inner wall's oblique convex ridges, the flaky rock blocks undergo secondary fine crushing through compression and grinding within the gradually changing crushing channel formed by the outward expansion cone structure of the crushing section 413 and the contraction throat structure of the grinding bushing 49. This refines large rock fragments into uniform small gravel. The refined gravel is then continuously pushed into the inner cylinder 51. 1. Internal temporary storage: During the rotation of the drill barrel 32, the second opening on its side wall continuously makes circular motion. When the second opening coincides with the first opening at the bottom of the inner cylinder 51, the crushed stone inside the inner cylinder 51 automatically falls down. After being precisely guided by the slag discharge pipe 52 on the slide 21, it falls into the slag discharge hopper 53 assembled on the frame 1. It can be transported out in real time by small transportation equipment to complete the automated slag discharge operation. After the single hole drilling, crushing and slag discharge are completed, the hydraulic cylinder 22 drives the slide 21 and the drilling assembly 3 to move back and reset. The frame 1, in conjunction with the arc-shaped worktable frame, moves and aligns with the next drilling point. Without the need for manual core taking and core breaking, continuous cyclic drilling operations can be carried out.

[0042] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in the present invention should be included within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.

Claims

1. A tunnel drilling device, comprising a frame (1) and a stepping assembly (2) mounted thereon, wherein the stepping assembly (2) is connected to a drilling assembly (3), characterized in that: The drilling assembly (3) includes a drill barrel (32) and a driving component for rotating the drill barrel (32). The drill barrel (32) is provided with a crushing assembly (4) for crushing the rock core entering the drill barrel (32). It also includes a slag discharge assembly (5) for discharging slag from the drill barrel (32).

2. The tunnel drilling equipment according to claim 1, characterized in that: The stepping assembly (2) includes a slide (21) slidably mounted on the frame (1) and a hydraulic cylinder (22) mounted on the frame (1). The output end of the hydraulic cylinder (22) is connected to the slide (21). A fixed shaft (31) is fixedly mounted on the slide (21). The drill barrel (32) is rotatably sleeved on the fixed shaft (31).

3. The tunnel drilling equipment according to claim 2, characterized in that: The driving component includes a motor (34) and a drive gear (35) connected to its output end. The motor (34) is mounted on a slide (21), and the outer wall of the drill barrel (32) is connected to a driven gear (33) that meshes with the drive gear (35).

4. The tunnel drilling equipment according to claim 2, characterized in that: The crushing assembly (4) includes a drill rod (41), the fixed shaft (31) extends into the drill barrel (32), the drill rod (41) is rotatably sleeved on the outer wall of the fixed shaft (31), and a plurality of fixed rods (42) are connected between the outer wall of the drill rod (41) and the inner wall of the drill barrel (32).

5. The tunnel drilling equipment according to claim 4, characterized in that: The section of the drill rod (41) near the drilling end of the drill barrel (32) is designated as the drilling section (411), the drilling section (411) is provided with a spiral blade, and the drilling section (411) is provided with a drill bit protruding from the drilling end of the drill barrel (32).

6. The tunnel drilling equipment according to claim 5, characterized in that: The middle section of the drill rod (41) is designated as the expansion fracture section (412). The expansion fracture section (412) includes two sets of first top blocks (43) and two sets of second top blocks (44) that are alternately distributed along the axial direction of the drill rod (41). The first top blocks (43) are provided with radial top edges, and the second top blocks (44) are provided with axial top edges. The first top blocks (43) and the second top blocks (44) are both slidably embedded in the expansion fracture section (412) along the radial direction of the drill rod (41). The fixed shaft (31) is provided with four annular grooves corresponding to the inner positions of the two sets of first top blocks (43) and second top blocks (44). Arc-shaped blocks (45) are connected in the four annular grooves respectively. When the first top blocks (43) and the second top blocks (44) rotate, they protrude outward from the expansion fracture section (412) by contacting the arc-shaped blocks (45).

7. The tunnel drilling equipment according to claim 6, characterized in that: The radial protrusion height of the arc-shaped blocks (45) in the four annular grooves increases progressively in the direction away from the drilling section (411).

8. The tunnel drilling equipment according to claim 6, characterized in that: The section of the drill rod (41) away from the drilling section (411) is designated as a crushing section (413). The crushing section (413) is a tapered variable diameter structure with an increasing outer radial direction away from the drilling section (411). Multiple grinding rods (47) are rotatably mounted in a circular array on the outer wall of the crushing section (413). Multiple reverse teeth (48) are connected to the grinding rods (47). A protrusion is provided at the rotation fulcrum of the grinding rod (47) near the interior of the crushing section (413). Multiple convex balls (46) are connected to the outer wall of the fixed shaft (31). When the grinding rod (47) rotates with the drill rod (41), the convex balls (46) squeeze the protrusion and cause it to tilt outward from the crushing section (413).

9. The tunnel drilling equipment according to claim 8, characterized in that: The slag discharge assembly (5) includes an inner cylinder (51), a slag discharge pipe (52), and a slag discharge hopper (53). The inner cylinder (51) is rotatably connected to the inner wall of the drill barrel (32) and fixedly connected to the fixed shaft (31). A first opening is provided at the bottom of the inner cylinder (51), and at least one second opening is provided on the drill barrel (32). The second opening coincides with the first opening during rotation. The slag discharge pipe (52) is installed on the slide (21), and the slag discharge hopper (53) is installed on the frame (1). The slag discharge pipe (52) is located directly below the first opening and above the slag discharge hopper (53).

10. The tunnel drilling equipment according to claim 9, characterized in that: The inner wall of the drill barrel (32) is rotatably connected to a grinding bushing (49), and the grinding bushing (49) is fixedly connected to the inner cylinder (51). The grinding bushing (49) is located outside the crushing part (413). The grinding bushing (49) is a throat-type variable diameter structure with an inner radial direction decreasing away from the drilling part (411). The inner wall of the grinding bushing (49) is provided with multiple oblique convex ridges in a circumferential array.