A method for strong support in the collapse of surrounding rock in the goaf of a gas tunnel

By introducing adjustment and support components into the gas tunnel support device, the support plate can be quickly adjusted and the contact area expanded, solving the problems of inconvenient adjustment and insufficient support strength of existing devices in high gas environments, and providing a safe and efficient tunnel support solution.

CN123109726APending Publication Date: 2026-11-17SICHUAN ROAD & BRIDGE CONSTRUCTION GROUP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611276889.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-21
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing tunnel support devices are inconvenient to adjust in high-gas environments, difficult to adapt to tunnels with different inner diameters, have insufficient support strength, and lack the ability to respond quickly to the instability of surrounding rock in goaf areas.

Method used

The design incorporates adjustment and support components, including movable rods, fixed screws, and support plates, enabling rapid and precise adjustment of the support plates and expanding the contact area to enhance support strength. It is suitable for the special operating environment of gas tunnels.

Benefits of technology

The device has improved versatility and adaptability, enhanced support strength for tunnel sidewalls and roof, effectively resisted the risk of collapse due to unstable surrounding rock in the goaf, and is safe and reliable to operate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109726A_ABST
    Figure CN123109726A_ABST
Patent Text Reader

Abstract

This invention discloses a strong support device and method for rock instability and collapse in the goaf area of ​​a gas tunnel, relating to the technical field of tunnel engineering support equipment. The device includes multiple first support rods and multiple arc-shaped support plates. An adjustment assembly is slidably installed inside each first support rod. The adjustment assembly includes a movable rod and a fixing screw. Multiple inner holes are spaced apart on the movable rod, and outer holes are provided on the first support rod. The fixing screw is inserted into the inner holes at different positions to achieve rapid locking and adjustment of the support plate position, ensuring a tight fit between the arc-shaped support plate and the tunnel wall with different inner diameters. The support plates are connected as a whole by first and second fixing plates and are equipped with a support assembly. The support assembly includes a support plate, a limiting rod, and an adjustment screw. Rotating the adjustment screw allows the support plate to contact the tunnel wall under the guidance of the limiting rod, increasing the contact area. This invention adapts to tunnels with different cross-sections through the adjustment assembly and enhances support strength through the support assembly. It features a simple structure, safe operation, and is suitable for high-risk support situations involving rock instability and collapse in the goaf area of ​​gas tunnels.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of tunnel engineering support equipment technology, specifically to a strong support device and method for unstable collapse of surrounding rock in a gas tunnel goaf. Background Technology

[0002] Goaf areas in gas-filled tunnels are extremely complex and high-risk geological formations encountered during tunnel construction. Goaf areas refer to the cavities or spaces left underground after mineral extraction. These areas suffer from disrupted geological structures, unbalanced surrounding rock stress, and are prone to collapse and deformation. They also frequently become conduits for groundwater and gas accumulation. Gas (primarily methane CH4) is highly flammable and explosive; it can explode when its concentration in the air reaches 5%–16% and it encounters an ignition source, posing one of the most serious threats during tunnel construction. Therefore, timely and effective support of the surrounding rock after excavation is crucial when constructing tunnels in gas-filled goaf areas.

[0003] There are various tunnel support devices in the prior art. For example, Chinese patent CN114562306A discloses a tunnel anti-deformation emergency support device, which adjusts the position of the support plate by cooperating with the fixing screw and the clamp; CN114233356A discloses a fault fracture anti-collapse device for high gas tunnel support, which uses telescopic support rods in conjunction with arched frame plates for support. However, the above-mentioned prior art still has the following shortcomings: (1) The adjustment mechanism of some devices is complex and inconvenient to operate, and there are safety risks in the adjustment operation in a high gas environment; (2) The fit between the support plate and the inner wall of the tunnel depends on the adjustment accuracy, and it is difficult to maintain uniform contact when the inner diameter of the tunnel changes greatly; (3) There is a lack of targeted support for the tunnel sidewalls and top, and the overall support strength needs to be improved; (4) Most of the existing devices lack the ability to provide rapid and strong support for sudden instability of the surrounding rock in the goaf.

[0004] Therefore, there is an urgent need in this field for a simple, easy-to-adjust, and highly effective support device and method for the unstable collapse of surrounding rock in gas tunnel goaf areas, which can be quickly adapted to tunnels of different inner diameters and achieve high-strength support. Summary of the Invention

[0005] This invention provides a strong support device and method for preventing collapse due to rock instability in the goaf of a gas tunnel. One objective is to achieve rapid and precise adjustment of the support plate position by setting an adjustment component, enabling the arc-shaped support plate to fit tightly against tunnel walls of different inner diameters, thus improving the device's versatility and adaptability. A second objective is to expand the contact area between the support plate and the tunnel wall by setting a support component, enhancing the support strength for the tunnel sidewalls and roof, and effectively resisting the risk of collapse caused by rock instability in the goaf. A third objective is to provide a simple and safe support method suitable for the special operating environment of gas tunnels.

[0006] To achieve the above objectives, the technical solution adopted by the present invention is as follows: a strong support device for unstable collapse of surrounding rock in a gas tunnel goaf, comprising multiple first support rods (4) and multiple support plates (1) for supporting the tunnel. An adjustment component is slidably installed inside the first support rod (4). The first support rod (4) is connected to the support plate (1) through the adjustment component. The adjustment component is used to adjust the position of the support plate (1) relative to the first support rod (4) so ​​that the outer wall of the support plate (1) fits against the inner wall of the tunnel. The outer wall of the support plate (1) is provided with a plurality of first mounting holes and a plurality of second mounting holes. The plurality of support plates (1) located on the same side are mounted with the same first fixing plate (6) through the first mounting holes, and the plurality of support plates (1) are mounted with the same second fixing plate (7) through the second mounting holes. Support components are installed on both the first fixing plate (6) and the second fixing plate (7). The support components are used to expand the contact area between the support plate (1) and the inner wall of the tunnel.

[0007] Preferably, the outer wall of the support plate (1) is an arc shape adapted to the inner wall of the tunnel.

[0008] Preferably, the adjustment assembly includes a movable rod (14) and a fixed screw (13). The movable rod (14) is slidably installed inside the first support rod (4). The end of the first support rod (4) away from the ground is fixedly connected to the support plate (1) through the movable rod (14). The outer wall of the movable rod (14) is provided with a plurality of inner holes (11) spaced apart along its length. The outer wall of the first support rod (4) is provided with at least one outer hole (12). The fixed screw (13) is threadedly connected to the outer hole (12), and one end of the fixed screw (13) passes through the outer hole (12) and extends into one of the inner holes (11) to achieve relative locking and fixation between the movable rod (14) and the first support rod (4).

[0009] Preferably, a plurality of reinforcing rods (10) are fixedly connected to the outer wall of the movable rod (14), and one end of the reinforcing rod (10) away from the movable rod (14) is fixedly connected to the inner wall of the support plate (1) to enhance the connection strength between the movable rod (14) and the support plate (1).

[0010] Preferably, a second support rod (5) is fixedly connected to the outer wall of the first support rod (4), and the lower end of the second support rod (5) is supported on the ground to share the supporting pressure of the first support rod (4).

[0011] Preferably, the outer wall of the support plate (1) is provided with a plurality of mounting holes (2) for fixing the support plate (1) to the inner wall of the tunnel by means of fasteners.

[0012] Preferably, the support assembly includes multiple support plates (3), and multiple limiting rods (8) are inserted into the outer walls of the first fixing plate (6) and the second fixing plate (7). One end of the limiting rod (8) is fixedly connected to the support plate (3). The first fixing plate (6) and the second fixing plate (7) are both threadedly connected to adjusting screws (9). One end of the adjusting screw (9) is fixedly connected to the bottom outer wall of the support plate (3). When the adjusting screw (9) is rotated, the support plate (3) moves towards or away from the inner wall of the tunnel under the guidance of the limiting rod (8).

[0013] A method for strong support in the collapse of surrounding rock in a gas tunnel goaf, employing any of the strong support devices described above, includes the following steps: S1: According to the tunnel cross-section dimensions, fix multiple first support rods (4) at predetermined positions on the tunnel surface; S2: Pull the movable rod (14) to slide it relative to the first support rod (4) until the outer wall of the support plate (1) fixed to the end of the movable rod (14) is tightly fitted with the inner wall of the tunnel; S3: Pass the fixing screw (13) through the outer hole (12) on the first support rod (4) and screw it into the inner hole (11) at the corresponding position on the movable rod (14) to lock the relative position of the movable rod (14) and the first support rod (4); S4: Connect multiple support plates (1) located on the same side into one unit through the first fixing plate (6) and the second fixing plate (7); S5: Rotate the adjusting screw (9) and drive the support plate (3) to move closer to the inner wall of the tunnel under the guidance of the limiting rod (8) until the outer wall of the support plate (3) abuts against the inner wall of the tunnel, thus completing the installation of the support device; S6: During the excavation of the gas tunnel goaf, the support device is installed section by section as the tunnel face advances to form a continuous support system.

[0014] Compared with the prior art, the present invention has the following beneficial effects: This invention, by setting an adjustment assembly consisting of a movable rod and a fixed screw, allows the movable rod to slide inside the first support rod and to be locked and positioned by the fixed screw passing through the inner holes at different positions. This enables the position of the support plate to be adjusted quickly and accurately according to the actual inner diameter of the tunnel, so that the arc-shaped support plate fits tightly with the inner wall of tunnels of different sizes, significantly improving the versatility of the device and the efficiency of on-site adaptation.

[0015] This invention, by setting up a support assembly, utilizes the guiding effect of the limiting rod and the driving effect of the adjusting screw to enable the support plate to move towards the inner wall of the tunnel and make close contact, effectively expanding the contact area between the support plate and the inner wall of the tunnel, enhancing the support strength of the support device for the tunnel sidewalls and top, and effectively resisting the risk of collapse caused by the instability of the surrounding rock in the goaf.

[0016] This invention improves the stability and load-bearing capacity of the overall support structure by setting up a reinforcing rod and a second supporting rod. The reinforcing rod enhances the connection stiffness between the movable rod and the support plate, while the second supporting rod shares the support load of the first supporting rod. It is suitable for high-strength support requirements under complex geological conditions such as gas tunnels and goaf areas.

[0017] This invention has a simple structure and is easy to operate. The telescopic positioning of the adjustment component and the contact adjustment of the support component do not require complicated equipment. It is safe and reliable to operate in high gas environments. It can be installed section by section to form a continuous support system as the tunnel is excavated, and has good field applicability. Attached Figure Description

[0018] Figure 1 This is a schematic diagram of the overall structure of the strong support device of the present invention; Figure 2 This is a schematic diagram of the limiting rod structure of the strong support device of the present invention; Figure 3 This is a schematic diagram of the movable rod structure of the strong support device of the present invention.

[0019] In the attached diagram: 1. Support plate; 2. Mounting hole; 3. Support plate; 4. First support rod; 5. Second support rod; 6. First fixing plate; 7. Second fixing plate; 8. Limiting rod; 9. Adjusting screw; 10. Reinforcing rod; 11. Inner hole; 12. Outer hole; 13. Fixing screw; 14. Movable rod. Detailed Implementation

[0020] To make the technical means, creative features, objectives and effects of this invention easier to understand, the invention will be further described below in conjunction with specific embodiments.

[0021] like Figure 1 As shown, this invention provides a strong support device for rock instability and collapse in a gas tunnel goaf, comprising multiple first support rods 4 and multiple support plates 1 for tunnel support. The lower end of the first support rod 4 is fixed to the tunnel floor, and the upper end is connected to the support plate 1 via an adjustment assembly. The outer wall of the support plate 1 is arc-shaped to fit the inner wall of the tunnel, and the arc structure can effectively fit the inner wall of the tunnel, improving the support effect. Multiple mounting holes 2 are provided on the outer wall of the support plate 1, and the support plate 1 can be further fixed to the inner wall of the tunnel through the mounting holes 2 and fasteners.

[0022] An adjustment component is slidably installed inside the first support rod 4. The position of the support plate 1 can be adjusted by the adjustment component so that the outer wall of the support plate 1 can fit tightly against the inner wall of the tunnel with different inner diameters.

[0023] like Figure 3 As shown, the adjusting assembly includes a movable rod 14 and a fixing screw 13. The movable rod 14 is slidably installed inside the first support rod 4, and the end of the first support rod 4 away from the ground is fixedly connected to the support plate 1 via the movable rod 14. The outer wall of the movable rod 14 has a plurality of inner holes 11 spaced apart along its length, and the outer wall of the first support rod 4 has at least one outer hole 12. The fixing screw 13 is threadedly connected to the outer hole 12, and one end of the fixing screw 13 passes through the outer hole 12 and extends into one of the inner holes 11, thereby achieving relative locking and fixation between the movable rod 14 and the first support rod 4.

[0024] During adjustment, firstly, the fixed position of the first support rod 4 is determined according to the tunnel cross-sectional dimensions, and the first support rod 4 is fixed to the ground. Then, the movable rod 14 is pulled, causing it to slide relative to the first support rod 4, until the outer wall of the support plate 1 fixed to the end of the movable rod 14 is tightly fitted against the inner wall of the tunnel. Finally, the fixing screw 13 is screwed into the corresponding inner hole 11 through the outer hole 12 to complete the locking and fixing of the support plate 1. By inserting the fixing screw 13 into the inner hole 11 at different positions, the support plate 1 can be locked at different protruding positions, thereby adapting to tunnels with different inner diameters.

[0025] To improve the overall strength and stability of this device, multiple reinforcing rods 10 are fixedly connected to the outer wall of the movable rod 14. The end of each reinforcing rod 10 away from the movable rod 14 is fixedly connected to the inner wall of the support plate 1. The reinforcing rods 10 increase the connection strength between the movable rod 14 and the support plate 1, making them less prone to deformation under rock pressure. A second support rod 5 is fixedly connected to the outer wall of the first support rod 4. The lower end of the second support rod 5 rests on the ground, sharing the supporting pressure of the first support rod 4 and preventing it from deforming due to overload. This effectively improves the service life of the first support rod 4 and the load-bearing capacity of the overall support structure.

[0026] like Figure 2 As shown, to further enhance the support effect, multiple first mounting holes and multiple second mounting holes are provided on the outer wall of the support plate 1. Multiple support plates 1 located on the same side are mounted with the same first fixing plate 6 through the first mounting holes, and multiple support plates 1 are mounted with the same second fixing plate 7 through the second mounting holes. Support components are installed on both the first fixing plate 6 and the second fixing plate 7. These support components expand the contact area between the support plate 1 and the tunnel inner wall, enabling the device to provide a more comprehensive and effective support effect to the tunnel inner wall.

[0027] The support assembly includes multiple support plates 3. Multiple limiting rods 8 are inserted into the outer walls of the first fixed plate 6 and the second fixed plate 7, with one end of each limiting rod 8 fixedly connected to the support plate 3. Adjusting screws 9 are threaded onto both the first fixed plate 6 and the second fixed plate 7, with one end of each adjusting screw 9 fixedly connected to the bottom outer wall of the support plate 3. After the support plate 1 is installed and fixed, rotating the adjusting screw 9, guided by the limiting rods 8, moves the support plate 3 towards the inner wall of the tunnel until the outer wall of the support plate 3 is in close contact with the inner wall of the tunnel, thus providing good support for the sides and top of the inner wall of the tunnel and effectively improving the safety inside the tunnel. The limiting rods 8 serve two purposes: firstly, to guide the movement of the support plate 3 in a predetermined direction; and secondly, to limit the movement of the support plate 3 during adjustment.

[0028] When this invention is used in the goaf area of ​​a gas tunnel, all metal components are explosion-proof, and adjustments are made as manually as possible to reduce the use of electrical equipment, ensuring operational safety in a flammable and explosive environment. As the tunnel face advances, this support device is installed section by section to form a continuous, high-strength support system for the surrounding rock of the goaf area in the gas tunnel.

[0029] This invention also provides a method for strong support in the event of rock instability and collapse in a gas tunnel goaf, employing the aforementioned strong support device and comprising the following steps: S1: According to the tunnel cross-section dimensions, fix multiple first support rods 4 at predetermined positions on the tunnel surface.

[0030] S2: Pull the movable rod 14 to slide it relative to the first support rod 4 until the outer wall of the support plate 1 fixed to the end of the movable rod 14 is tightly fitted to the inner wall of the tunnel; in this step, by inserting the fixing screw 13 into the inner hole 11 at different positions on the movable rod 14, the support plate 1 is locked at different extension positions to adapt to tunnel cross sections with different inner diameters.

[0031] S3: Pass the fixing screw 13 through the outer hole 12 on the first support rod 4 and screw it into the inner hole 11 at the corresponding position on the movable rod 14 to lock and fix the relative position of the movable rod 14 and the first support rod 4.

[0032] S4: Multiple support plates 1 located on the same side are connected into one unit by the first fixing plate 6 and the second fixing plate 7.

[0033] S5: Rotate the adjusting screw 9, and under the guidance of the limiting rod 8, drive the support plate 3 to move towards the inner wall of the tunnel until the outer wall of the support plate 3 abuts against the inner wall of the tunnel, thus completing the installation of the support device; in this step, the limiting rod 8 plays a guiding and limiting role during the movement of the support plate 3, ensuring that the support plate 3 moves in the predetermined direction without deflection.

[0034] S6: During the excavation of the gas tunnel goaf, the support device is installed section by section as the tunnel face advances to form a continuous support system.

[0035] The foregoing has shown and described the basic principles, main features, and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of the invention. Various changes and modifications can be made to the invention without departing from its spirit and scope, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of protection of the present invention is defined by the appended claims and their equivalents.

Claims

1. A strong support device for rock instability and collapse in a gas tunnel goaf, comprising multiple first support rods (4) and multiple support plates (1) for tunnel support, characterized in that: An adjustment component is slidably installed inside the first support rod (4). The first support rod (4) is connected to the support plate (1) through the adjustment component. The adjustment component is used to adjust the position of the support plate (1) relative to the first support rod (4) so ​​that the outer wall of the support plate (1) fits against the inner wall of the tunnel. The outer wall of the support plate (1) is provided with a plurality of first mounting holes and a plurality of second mounting holes. The plurality of support plates (1) located on the same side are mounted with the same first fixing plate (6) through the first mounting holes, and the plurality of support plates (1) are mounted with the same second fixing plate (7) through the second mounting holes. Support components are installed on both the first fixing plate (6) and the second fixing plate (7). The support components are used to expand the contact area between the support plate (1) and the inner wall of the tunnel.

2. The strong support device for rock instability and collapse in a gas tunnel goaf area according to claim 1, characterized in that: The outer wall of the support plate (1) is an arc shape that matches the inner wall of the tunnel.

3. The strong support device for unstable collapse of surrounding rock in a gas tunnel goaf area according to claim 1, characterized in that: The adjustment assembly includes a movable rod (14) and a fixed screw (13). The movable rod (14) is slidably installed inside the first support rod (4). The end of the first support rod (4) away from the ground is fixedly connected to the support plate (1) through the movable rod (14). The outer wall of the movable rod (14) is provided with a plurality of inner holes (11) spaced apart along its length. The outer wall of the first support rod (4) is provided with at least one outer hole (12). The fixed screw (13) is threadedly connected to the outer hole (12), and one end of the fixed screw (13) passes through the outer hole (12) and extends into one of the inner holes (11) to achieve relative locking and fixation between the movable rod (14) and the first support rod (4).

4. A strong support device for unstable collapse of surrounding rock in a gas tunnel goaf area according to claim 3, characterized in that: Multiple reinforcing rods (10) are fixedly connected to the outer wall of the movable rod (14), and one end of the reinforcing rod (10) away from the movable rod (14) is fixedly connected to the inner wall of the support plate (1).

5. A strong support device for rock instability and collapse in a gas tunnel goaf area according to claim 1, characterized in that: The outer wall of the first support rod (4) is fixedly connected to a second support rod (5), and the lower end of the second support rod (5) is supported on the ground.

6. A strong support device for rock instability and collapse in a gas tunnel goaf area according to claim 1, characterized in that: The outer wall of the support plate (1) is provided with a plurality of mounting holes (2) for fixing the support plate (1) to the inner wall of the tunnel by means of fasteners.

7. A strong support device for unstable collapse of surrounding rock in a gas tunnel goaf area according to claim 1, characterized in that: The support assembly includes multiple support plates (3). Multiple limiting rods (8) are inserted into the outer walls of the first fixing plate (6) and the second fixing plate (7). One end of the limiting rod (8) is fixedly connected to the support plate (3). The first fixing plate (6) and the second fixing plate (7) are both threadedly connected to adjusting screws (9). One end of the adjusting screw (9) is fixedly connected to the bottom outer wall of the support plate (3). When the adjusting screw (9) is rotated, the support plate (3) moves towards or away from the inner wall of the tunnel under the guidance of the limiting rod (8).

8. A method for strong support in the collapse of surrounding rock in a gas tunnel goaf, characterized in that, The use of the strong support device as described in any one of claims 1 to 7 includes the following steps: S1: According to the tunnel cross-section dimensions, fix multiple first support rods (4) at predetermined positions on the tunnel surface; S2: Pull the movable rod (14) to slide it relative to the first support rod (4) until the outer wall of the support plate (1) fixed to the end of the movable rod (14) is tightly fitted with the inner wall of the tunnel; S3: Pass the fixing screw (13) through the outer hole (12) on the first support rod (4) and screw it into the inner hole (11) at the corresponding position on the movable rod (14) to lock the relative position of the movable rod (14) and the first support rod (4); S4: Connect multiple support plates (1) located on the same side into one unit through the first fixing plate (6) and the second fixing plate (7); S5: Rotate the adjusting screw (9) and drive the support plate (3) to move closer to the inner wall of the tunnel under the guidance of the limiting rod (8) until the outer wall of the support plate (3) abuts against the inner wall of the tunnel, thus completing the installation of the support device; S6: During the excavation of the gas tunnel in the goaf area, the support device is installed section by section as the tunnel face advances to form a continuous support system.

9. A method for strong support in the collapse of surrounding rock in a gas tunnel goaf area according to claim 8, characterized in that: In step S2, the support plate (1) is locked at different extension positions by inserting the fixed screw (13) into the inner hole (11) at different positions on the movable rod (14) to adapt to tunnel cross sections with different inner diameters.

10. A method for strong support in the event of rock instability and collapse in a gas tunnel goaf, as described in claim 8, characterized in that: In step S5, the limiting rod (8) plays a guiding and limiting role during the movement of the support plate (3), ensuring that the support plate (3) moves in the predetermined direction without deflection.

Citation Information

Patent Citations

  • Fault fracture anti-collapse device and method for high-gas tunnel support

    CN114233356A

  • Tunnel anti-deformation emergency supporting device

    CN114562306A