A smart ventilation and reverse slope drainage linkage control system for the entire tunnel construction process

The tunnel construction system, which utilizes multi-dimensional sensing, process identification, and linkage control, solves the problems of power grid load competition and harmful gas delay caused by the independent operation of ventilation and drainage systems, thus achieving safe and efficient tunnel construction control.

CN123109749APending Publication Date: 2026-11-17中铁二十局集团第三工程有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611220729.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-12
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In the reverse slope construction of long tunnels in water-rich and associated harmful gas strata, the independent operation of ventilation and drainage systems leads to the risk of power grid load competition and tripping, the delayed release of harmful gases threatens the safety of construction operations, and the lack of staggered operation of system processes results in high energy consumption.

Method used

Multi-dimensional sensing units are used to collect real-time data on tunnel environment, hydrology, and power grid. The process identification unit identifies the status of construction processes, and the linkage control unit generates collaborative control commands. The terminal execution unit executes the actions of variable frequency ventilation fans and variable frequency water pump sets, realizing feedforward early warning ventilation and dynamic load game strategy, optimizing power grid load distribution and construction process coordination.

Benefits of technology

This effectively avoids the risks of power grid overload tripping and excessive concentration of harmful gases, reduces the overall power consumption and peak load demand of transformers during tunnel construction, and ensures construction safety and energy consumption optimization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109749A_ABST
    Figure CN123109749A_ABST
Patent Text Reader

Abstract

This invention relates to the field of intelligent control technology for tunnel and underground engineering construction safety, specifically to an intelligent ventilation and reverse slope drainage linkage control system for the entire tunnel construction process, comprising: a multi-dimensional sensing unit; a process identification unit; a linkage control unit; and a terminal execution unit. This invention employs a load dynamic game strategy to prioritize a stepped reduction in ventilation load in non-core areas under conditions of limited total power supply and extreme water inrush, thereby releasing available grid capacity and effectively avoiding overload tripping and well flooding accidents caused by simultaneous full-load operation. Simultaneously, through a feedforward early warning ventilation mechanism based on water level change rate, it intervenes and increases fan speed before the water pump physically starts and agitates the water, eliminating the time lag of traditional passive sensor responses and effectively preventing the risk of excessive concentrations caused by the instantaneous release of harmful gases from the water-air interface.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of intelligent control technology for safety in tunnel and underground engineering construction, specifically to an intelligent ventilation and reverse slope drainage linkage control system for the entire tunnel construction process. Background Technology

[0002] In the construction of long tunnels, especially in water-rich strata with associated harmful gases, ventilation and smoke extraction, as well as drainage, are the two core physical systems for maintaining safe operation at the tunnel face. In existing technologies, both the ventilation and drainage systems employ independent closed-loop control architectures. This independent operation mode exposes the following core technical problems in complex physical engineering environments: First, there is the risk of grid load preemption and cascading tripping. The transformer capacity of the substation at the tunnel entrance has a physical limit. In the event of a sudden water inrush, the drainage system needs to urgently activate multiple high-power backup pumps for forced drainage; if the tunnel is in the post-blast smoke exhaust period at this time, the main fan and jet fan of the ventilation system are also operating at full load and high frequency. The simultaneous demand for maximum rated power from the power grid by these two independent systems can easily exceed the power threshold of the substation's low-voltage main bus, causing the power supply system to overload and trip. This tripping will directly lead to a complete power outage and shutdown of all pumps, resulting in a serious well flooding accident.

[0003] Secondly, there are shortcomings in the delayed and passive response to harmful gas release. In the sump pits during reverse slope construction, stagnant water that has remained for a long time easily dissolves harmful gases such as hydrogen sulfide and methane. When multi-stage pumps start to perform drainage operations, the high-speed rotation of the pump impellers and the physical agitation of the water flow in the pipelines disrupt the water-gas balance interface, causing a large amount of dissolved harmful gases to desorb and release in a very short time. However, the existing ventilation system relies entirely on environmental sensors to obtain gas concentration data and then passively increases the fan operating frequency. There is a significant time lag between the control command and physical execution, resulting in toxic gas concentrations exceeding the standard at the working face and surrounding working environment before the air volume is increased, directly threatening the lives of construction workers.

[0004] Third, the lack of staggered operation of the system leads to extremely high energy consumption. Tunnel construction has a strict sequential process (such as drilling, blasting, and muck removal). Existing technology cannot identify the status of the underlying construction process, causing the ventilation system to maintain unnecessary high-frequency operation during the muck removal period when the release of harmful substances is low. This not only results in serious energy waste but also leads to excessive redundancy in the planned configuration of electrical equipment in the early stages of tunnel construction. Summary of the Invention

[0005] To achieve the above objectives, the present invention provides the following technical solution: This invention provides an intelligent ventilation and reverse slope drainage linkage control system for the entire tunnel construction process, including: a multi-dimensional sensing unit for real-time collection of gaseous environment data of the tunnel face and return air passage, hydrological data of the reverse slope sump, and power grid energy consumption data of the tunnel substation; The process identification unit is used to acquire and output the current construction standard process status of the tunnel; The linkage control unit is communicatively connected to the multi-dimensional sensing unit and the process identification unit, and has a built-in linkage coordination strategy for generating linkage control commands based on the gaseous environment data, hydrological data, power grid energy consumption data and the status of the construction standard process. The terminal execution unit is communicatively connected to the linkage control unit, including a variable frequency ventilation unit and a multi-stage variable frequency water pump unit, and is used to execute corresponding actions according to the linkage control command. The linkage and coordination strategy includes: Feedforward early warning ventilation strategy: When the hydrological data reaches the pumping threshold, the linkage control unit generates a feedforward pre-adjustment command to forcibly increase the operating frequency of the variable frequency ventilation unit before or during the start-up of the multi-stage variable frequency water pump group. Load dynamic game strategy: When it is necessary to start standby equipment and the overall power grid energy consumption data is predicted to exceed the upper limit of the available power grid, the linkage control unit prioritizes to reduce the operating frequency of the variable frequency ventilation unit in the non-core work area to release the power grid capacity. When the released power grid capacity meets the demand of the new water pump load, the multi-stage variable frequency water pump group at the corresponding level is allowed to start.

[0006] Furthermore, the multi-dimensional sensing unit includes a gaseous environment monitoring node, which is deployed at a safe distance from the tunnel face and at the return air passage behind the trolley. The specific gaseous environment data includes: ambient dust concentration, carbon monoxide concentration, hydrogen sulfide concentration, methane concentration, and longitudinal wind speed in the tunnel; the gaseous environment monitoring node adopts an intrinsically safe explosion-proof design; The multi-dimensional sensing unit is equipped with a water artifact joint detection array; The water quality monitoring array is installed in the sinking water collection pits at each level. It consists of an ultrasonic level gauge, a pipeline flow meter and a water turbidity sensor. It is used to output the absolute water level elevation of the water collection pit, the water flow rate per unit time and the sediment content of the pumped water in real time.

[0007] Furthermore, the hardware link for the multi-dimensional sensing unit to collect the power grid energy consumption data is as follows: By connecting intelligent power transmitters in parallel to the low-voltage side busbar of the main substation at the tunnel entrance and to the various distribution boxes inside the tunnel, the total load current, active power, reactive power and the current power margin of the transformer are extracted in real time, and the above parameters are packaged into the power grid energy consumption data. The multi-dimensional sensing unit also integrates an edge computing gateway. Before the underlying sensor data collected by the multi-dimensional sensing unit is uploaded to the linkage control unit, the edge computing gateway performs the following pre-processing logic: The gaseous environment data and the hydrological data are subjected to sliding window filtering to remove transient spike signals caused by construction blasting or mechanical vibration, and the filtered effective data is converted into standard industrial Ethernet protocol messages for uplink transmission.

[0008] Furthermore, the process identification unit includes a positioning subsystem and an airborne data acquisition module; The positioning subsystem is used to obtain the real-time location trajectory of construction personnel and special vehicles with electronic identification tags by using ultra-wideband UWB base stations deployed on the tunnel sidewalls. The airborne data acquisition module is used to communicate with the programmable logic controller (PLC) bus of the rock drilling rig and the wet spraying robot to obtain the operation start-stop characteristics of the core construction equipment. The process identification unit automatically determines and outputs the status of the standard construction process based on the logical combination of the spatial distribution characteristics of the real-time location trajectory and the operation start-stop characteristics.

[0009] Furthermore, the construction standard procedure is divided into at least the following stages in terms of time sequence: drilling and charging period, blasting and smoke removal period, slag removal period, and support period; The process identification unit is pre-set with a process state machine model. When the positioning subsystem identifies that all personnel have evacuated to outside the preset safe distance boundary, and the process identification unit receives the closure authorization signal of the detonation network, the process state machine model automatically switches the current state to the blasting smoke exhaust period and immediately outputs a high-priority state flag to the linkage control unit.

[0010] Furthermore, the process identification unit also includes an intrinsically safe human-machine interface terminal, which is deployed in the safety trolley or safety zone behind the working face. Before performing the cross-stage switching of the construction standard procedure status, the process identification unit issues an audible and visual warning through the intrinsically safe human-machine interface terminal. Only after receiving a physical button confirmation signal from authorized personnel on site within a set time window does it generate the final construction standard procedure status output command, which serves as the final trigger condition for the linkage control unit to perform feedforward pre-adjustment.

[0011] Furthermore, the linkage control unit is pre-configured with a load allocation priority matrix, and the specific execution steps of the load dynamic game strategy are as follows: Step S11: Obtain the total load of the entire tunnel in real time Calculate the current transformer power margin. ; Step S12: When encountering extreme water inrush conditions and needing to start a backup high-power water pump, calculate the required additional rated power. ; If the judgment If so, the power underload protection will be triggered; Step S13: The linkage control unit sends a frequency reduction control command to the terminal execution unit, and in a step-by-step manner, reduces the operating frequency of the variable frequency ventilation units on non-core working faces proportionally until the released grid capacity is reached. ; Step S14: The linkage control unit issues an unlocking command, allowing the multi-stage variable frequency water pump group at the corresponding level to start.

[0012] The feedforward early warning ventilation strategy adopts a time-difference-based feedforward prediction triggering mechanism, specifically: The linkage control unit calculates the rate of water level rise in the hydrological data in real time. When the rate of change of the water level rises When the set threshold is exceeded continuously and the sump reaches the pumping threshold, the linkage control unit, based on the preset gas-water co-existing dynamics empirical model, inverts and predicts the envelope of the release rate of harmful gases that will be released due to water agitation. Based on the release rate envelope, the linkage control unit calculates the target air volume required for dilution to a safe concentration and sets a time window before the multi-stage variable frequency water pump set is physically started. Within the specified time window, a frequency increase command is issued to the variable frequency ventilation unit in advance. The value ranges from 10 seconds to 30 seconds.

[0013] Furthermore, the linkage and coordination strategy also includes a spatiotemporal peak-shaving energy-saving strategy bound to the status of the standard construction procedures, the control logic of which is as follows: When the output of the process identification unit is the blasting smoke exhaust period, the linkage control unit establishes a one-way control matrix with the goal of maximizing smoke exhaust efficiency, locks the variable frequency ventilation unit to full-load full-frequency operation, and if the hydrological data does not trigger the red water level warning line, the start of the standby water pump is forcibly suspended and limited to the highest operating frequency of the water pump. When the process identification unit outputs "slag discharge period" or "empty period", the linkage control unit will switch the variable frequency ventilation unit back to a low frequency state, and at the same time, utilize the idle capacity of the power grid to start the multi-stage variable frequency water pump group at full power to perform emptying and pumping operations on each back slope water collection pit.

[0014] Furthermore, the multi-stage variable frequency water pump group in the terminal execution unit adopts a graded series relay drainage topology, including submersible sewage pumps installed in each level of reverse slope sump and drainage pipelines connecting each level of sump. The drainage pipeline is equipped with an electrically controlled check valve that is communicatively connected to the linkage control unit. The variable frequency ventilation unit includes a counter-rotating axial flow main ventilation fan installed at the tunnel entrance, and several sets of variable frequency jet fans suspended along the tunnel axis on the arch.

[0015] Furthermore, the terminal execution unit also includes a centralized frequency converter drive cabinet array and a frequency converter feedback loop; The output terminals of each inverter in the inverter drive cabinet array are respectively connected to the motor input terminals of the corresponding inverter ventilation unit and multi-stage inverter water pump unit; the inverter feedback loop is used to collect the output frequency, output current and motor winding temperature of each inverter in real time, and feed them back to the linkage control unit as operating status monitoring data, so as to dynamically correct the action threshold of the feedforward early warning ventilation strategy and the load dynamic game strategy through the linkage control unit. The terminal execution unit has a built-in hardware emergency interlock switching module; When the linkage control unit determines that a certain multi-stage variable frequency water pump group in operation has an overload power failure based on the operation status monitoring data, the hardware emergency interlock switching module forcibly switches the electrically controlled check valve of the adjacent water sump that is on the same series pipeline as the faulty water pump to the bypass conduction state. At the same time, the variable frequency drive cabinet array automatically increases the output frequency of the water pump in the upper-level water sump.

[0016] Beneficial effects This invention employs a load dynamic game strategy to prioritize a stepped reduction in ventilation load in non-core areas under conditions of limited total power supply and extreme water inrush, thereby releasing available grid capacity. This effectively avoids overload tripping and well flooding accidents caused by simultaneous full-load operation. Simultaneously, through a feedforward early warning ventilation mechanism based on water level change rate, it intervenes in advance and increases fan speed before the water pump physically starts and agitates the water body. This eliminates the time lag of passive response from traditional sensors and effectively prevents the risk of concentration exceeding standards caused by the instantaneous release of harmful gases from the water-air interface. This invention relies on the accurate identification of the construction process status of the underlying entity to achieve unidirectional matrix locking and staggered operation of ventilation and drainage operations in the spatiotemporal dimension. Under the premise of ensuring absolute safety of the project, it significantly reduces the comprehensive power consumption and transformer peak load demand throughout the entire process of tunnel construction. Attached Figure Description

[0017] Figure 1 This is a block diagram of the overall system architecture of the present invention; Figure 2 This is a flowchart of the load dynamic game and priority water supply logic of the present invention. Detailed Implementation

[0018] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.

[0019] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this invention are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of the invention described herein can be implemented in orders other than those illustrated or described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover a non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but includes other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.

[0020] The present invention will now be described in further detail with reference to the accompanying drawings: Example: like Figures 1-2 As shown, a smart ventilation and reverse slope drainage linkage control system for the entire tunnel construction process includes: The multi-dimensional sensing unit is used to collect real-time gaseous environment data of the tunnel face and return air passage, hydrological data of the reverse slope sump, and power grid energy consumption data of the tunnel substation. The process identification unit is used to acquire and output the current construction standard process status of the tunnel; The linkage control unit communicates with the multi-dimensional sensing unit and the process identification unit, and has a built-in linkage coordination strategy to generate linkage control commands based on gaseous environment data, hydrological data, power grid energy consumption data and construction standard process status. The terminal execution unit is connected to the linkage control unit and includes a variable frequency ventilation unit and a multi-stage variable frequency water pump unit. It is used to execute corresponding actions according to the linkage control command. Collaborative strategies include: Feedforward early warning ventilation strategy: When the hydrological data reaches the pumping threshold, the linkage control unit generates a feedforward pre-adjustment command to forcibly increase the operating frequency of the variable frequency ventilation unit before or during the start-up of the multi-stage variable frequency water pump group. Load dynamic game strategy: When it is necessary to start standby equipment and the overall power grid energy consumption data is predicted to exceed the upper limit of the available power grid, the linkage control unit prioritizes to reduce the operating frequency of the variable frequency ventilation unit in non-core work areas to release the power grid capacity. When the released power grid capacity meets the demand of the new water pump load, the corresponding level of multi-stage variable frequency water pump group is allowed to start.

[0021] Furthermore, the specific operation process of the multi-dimensional sensing unit is as follows: Deployment and implementation of gaseous environment monitoring nodes: The multi-dimensional sensing unit is equipped with gaseous environment monitoring nodes. These monitoring nodes are divided into an array at the front of the tunnel face and a return air array at the rear of the tunnel trolley, based on the characteristics of the airflow field at the tunnel face. The array at the front of the tunnel face is anchored to the sidewall 10 to 15 meters away from the tunnel excavation face, while the return air array at the rear of the tunnel trolley is located at the center of the arch 50 meters behind the secondary lining trolley.

[0022] The gaseous environment monitoring node integrates a non-dispersive infrared (NDIR) gas sensor, an electrochemical carbon monoxide sensor, an electrochemical hydrogen sulfide sensor, a laser scattering dust sensor, and a pitot tube anemometer in parallel. All these sensors are encapsulated within a metal housing with an ExdIIBT4 explosion-proof rating. A microprocessor controls the sampling frequency of each sensor, set to 10Hz. The pitot tube anemometer probe is vertically inserted into the longitudinal airflow axis of the tunnel, continuously outputting the longitudinal wind speed. Each gas sensor uses a miniature pump to continuously draw external gas into a darkroom for concentration signal conversion, generating raw electrical signals for environmental dust concentration, carbon monoxide concentration, hydrogen sulfide concentration, and gas concentration.

[0023] Deployment and implementation of the joint detection array for aquatic artifacts: To address the drainage requirements of the reverse slope, a multi-dimensional sensing unit is synchronously configured with a water level and sediment monitoring array. This array is deployed via a sunken method within the various sump pits excavated during the tunnel's reverse slope construction phase. The specific arrangement is as follows: expansion bolts are vertically driven into the sidewalls of the sump pits and stainless steel guide rails are anchored. The ultrasonic level gauge probe is adjusted step-by-step along these guide rails and finally secured 0.5 meters above the designed highest water level line of the sump pit. The ultrasonic level gauge continuously emits sound wave pulses towards the water surface and receives the reflected echoes. By calculating the round-trip time of the sound waves and combining this with the pre-calibrated absolute elevation data of the probe, the absolute water level elevation within the sump pit is calculated in real time.

[0024] An electromagnetic flow meter is embedded in series at the flange of the main pipe connecting to the outlet of the submersible sewage pump to extract the flow rate per unit time across the pipe cross-section. Simultaneously, an optical scattering turbidity sensor is fixedly installed 50 cm outside the suction port of the submersible sewage pump. The probe is submerged underwater, continuously emitting infrared beams into the water and receiving the scattered light from suspended particles, converting this into a parameter for the sediment content in the pumped mixed fluid.

[0025] Access and implementation of power grid energy consumption monitoring links: The multi-dimensional sensing unit is directly connected to the tunnel's physical power supply network via a hard-wired link. A three-phase intelligent power transmitter is connected in parallel to the low-voltage side main busbar of the main substation at the tunnel entrance, and intelligent power transmitters of the same specification are simultaneously connected in parallel to the incoming lines of the distribution boxes at each level of excavation steps inside the tunnel.

[0026] The specific electrical connection method is as follows: The intelligent power transmitter obtains the three-phase load current through a current transformer (CT) and connects to the phase voltage through a voltage transformer (PT). The microprocessor controls the sampling period to be constant at 20 milliseconds. By performing AC sampling and RMS integration on the current and voltage waveforms, the active power and reactive power are extracted in real time. The rated power constant of the corresponding substation transformer is pre-written into the read-only memory of the intelligent power transmitter. The calculation unit subtracts the real-time active power from the rated power constant to output the current power margin of the transformer, and packages the three-phase load current, active power, reactive power, and power margin into complete grid energy consumption data.

[0027] Data preprocessing implementation of edge computing gateway: Before being fed into the main control communication bus, the gaseous environment data, hydrological data, and power grid energy consumption data output from the bottom of the sensor are first sent to the edge computing gateway integrated inside the multi-dimensional sensing unit for preprocessing. The microprocessor chip inside the edge computing gateway has a sliding window filtering algorithm programmed into it.

[0028] The specific steps of preprocessing are as follows: The data time window width is set to 500 milliseconds, and the window sliding step size is 100 milliseconds. The microprocessor chip captures 50 consecutive sampling points within a single time window, calculates the standard deviation of these 50 sampling points, and directly removes extreme points whose absolute values ​​exceed three times the standard deviation of the arithmetic mean. These removed extreme points typically correspond to transient glitch electrical signals caused by shock wave disturbances during tunnel blasting or vibrations from the boom of heavy construction machinery.

[0029] After removing extreme points, the microprocessor chip takes the arithmetic mean of the remaining valid sampling points and uses it as the true output value for the current time window. After filtering and preprocessing, the network protocol stack in the edge computing gateway repackages the true output value with a message header and cyclic redundancy check code according to the Modbus-TCP standard industrial Ethernet protocol, generates a standard data frame, and sends it to the uplink network.

[0030] Furthermore, the specific operation procedure of the process identification unit is as follows: Deployment and integration of the positioning subsystem and the airborne data acquisition module: The process identification unit deploys a positioning subsystem and an airborne data acquisition module. The positioning subsystem has UWB base stations anchored alternately at 50-meter intervals along both sides of the tunnel sidewalls. Identification electronic tags are embedded inside the safety helmets of construction workers entering the tunnel construction area and on the control panels of special vehicles. These electronic tags transmit radio frequency pulses carrying unique device identification codes to the UWB base stations at a fixed frequency of 2Hz. The positioning server within the positioning subsystem uses a Time Difference of Arrival (TDOA) algorithm to continuously analyze the flight time of the radio frequency pulses between different UWB base stations, calculates the absolute three-dimensional spatial coordinates of construction workers and special vehicles, and fits the discrete coordinate points to output a real-time position trajectory.

[0031] The airborne data acquisition module is equipped with an industrial-grade serial communication gateway. This gateway is physically connected via a CAN bus to the main control communication port of the drilling rig and the extended communication interface of the programmable logic controller (PLC) of the wet spraying robot. The airborne data acquisition module continuously reads the level transitions and numerical changes of specific M and D data registers within the PLCs of both the drilling rig and the wet spraying robot at a fixed polling cycle of 500 milliseconds. This allows it to extract the boom extension / retraction displacement of the drilling rig, the drilling rig rotation frequency, and the pumping pressure value of the wet spraying robot. These parameters collectively constitute the operation and start-up / shutdown characteristics of the core construction equipment.

[0032] Cross-stage decision logic of the process state machine model: The process identification unit has a built-in microcontroller, which contains a process state machine model. The microcontroller sets a timing control benchmark, strictly dividing the standard tunnel construction process into four discrete state nodes in the time domain: drilling and charging period, blasting and smoke removal period, muck removal period, and support period. The process state machine model receives in parallel the real-time location trajectory spatial distribution characteristics output by the positioning server and the operation start and stop characteristics output by the airborne data acquisition module. The microcontroller sends the aforementioned two types of characteristics to the logic judgment array: when the logic judgment array reads that the drilling rig's rotation frequency is greater than zero and the spatial three-dimensional coordinates of the identification electronic tags are densely distributed in the range of 0 to 20 meters from the working face, the output of the process state machine model is set to the drilling and charging period.

[0033] For the transition logic between the drilling and charging phase and the blasting and smoke extraction phase, the microcontroller enforces a multi-condition intersection verification. First, the microcontroller calls the positioning server's database to verify the current absolute spatial 3D coordinates of all personnel identification tags, calculating whether all personnel coordinates have crossed the pre-defined 500-meter safety distance boundary line on the digital electronic map. After confirming the personnel coordinates are correct, the microcontroller monitors the detonator network nodes, waiting to receive the electrical pulse authorization signal generated by the physical closed loop of the detonation network. Only when personnel have evacuated beyond the safety distance boundary line and the microcontroller pins capture the electrical pulse authorization signal of the physical closed loop of the detonation network, the microcontroller's internal process state machine model immediately executes a state transition instruction, updates the output register variable to the blasting and smoke extraction phase, and immediately pushes a process state data packet with a high-priority interrupt flag to the uplink data bus of the linkage control unit.

[0034] Security redundancy verification for intrinsically safe human-computer interaction terminals: To avoid misjudgments of processes caused by the failure of a single sensor, the process identification unit is hardwired to an intrinsically safe human-machine interface terminal in the control cabin of the emergency escape trolley, 500 meters away from the working face. The main control board of the intrinsically safe human-machine interface terminal integrates physical mechanical buttons and an audible and visual alarm array.

[0035] Before the microcontroller executes a cross-stage state transition command between any adjacent construction standard procedure states, the microcontroller first sends a high-level warning signal to the control pin of the intrinsically safe human-machine interface terminal. Upon receiving the high-level warning signal, the intrinsically safe human-machine interface terminal drives the audible and visual alarm array to continuously emit buzzing and high-frequency flashing signals. Simultaneously, the microcontroller starts its internal hardware timer, setting the countdown window width to 60 seconds. Within the set 60-second countdown window, if a physical mechanical button on the intrinsically safe human-machine interface terminal panel is manually pressed, the rear contact of the physical mechanical button closes, generating a dry contact conduction signal, which is then transmitted back to the microcontroller. After capturing the dry contact conduction signal, the microcontroller releases the state transition lock program and formally generates the final construction standard procedure state output command. This final construction standard procedure state output command then serves as the sole triggering condition for the linkage control unit to execute feedforward pre-adjustment actions and load game theory. If the microcontroller fails to capture the dry contact conduction signal when its internal hardware timer overflows and is cleared, the microcontroller resets the procedure state machine model, cancels the current cross-stage state transition action, and generates a timeout fault log.

[0036] Furthermore, the specific operating procedure of the linkage control unit is as follows: Load allocation priority matrix and dynamic game calculation process: The core control motherboard of the linkage control unit has an independent high-speed cache area for constructing a load allocation priority matrix. The aforementioned load allocation priority matrix arranges all power terminals along the entire tunnel in descending order according to their absolute distance from the tunnel face and assigns weight coefficients accordingly. The ventilation units and main drainage pumps in the core area of ​​the tunnel face are assigned the highest weight, while the auxiliary fan units in the return air duct at the far end of the tunnel entrance are assigned the lowest weight.

[0037] The microprocessor executes a dynamic game calculation process within each 50-millisecond interrupt cycle: first, it reads the maximum rated power limit parameter of the tunnel transformer stored in the read-only memory and marks it as... ;Simultaneously read the real-time total load measurement value of the entire tunnel via fieldbus and mark it as The microprocessor's built-in arithmetic logic unit executes a subtraction instruction to determine the current transformer power margin. The calculation formula is set as follows: .

[0038] When the microprocessor receives an extreme high-level water inrush signal reported by the water conservancy joint detection array, it retrieves the rated nameplate power parameters of the backup high-power water pump, extracts the required additional rated power value, and marks it as... The arithmetic logic unit compares the two values. If it determines that the power margin cannot meet the demand of the new load, then... The microprocessor immediately broadcasts a power underload protection command to the bus. Simultaneously, the microprocessor accesses the load allocation priority matrix and, starting with the lowest-weighted remote return air unit, issues the frequency reduction percentage values ​​to the corresponding inverter registers in batches, gradually reducing their input power in steps of 5Hz reduction per batch. The arithmetic logic unit synchronously accumulates the grid capacity value released due to the aforementioned frequency reduction action and marks it as... The microprocessor continues to execute the comparison loop until it detects that the accumulated release capacity satisfies the inequality. Once the condition is met, the microprocessor exits the loop and sends a physical dry contact closure / unlock signal to the corresponding standby water pump multi-speed terminal to complete the water supply and drainage operation.

[0039] Setting and implementation of control parameters for the feedforward early warning time window of gas-water coexistence: Unlike matrix game logic, the feedforward early warning ventilation strategy employs a time-difference-based digital calculus feedforward triggering mechanism. The high-speed counter module of the linkage control unit continuously reads the absolute water level elevation time series fed back by the ultrasonic level gauge in the reverse slope sump. The arithmetic logic unit performs a difference operation between two adjacent discrete sampling points to obtain the current water level rise rate parameter, which is then labeled as... .

[0040] The microcontroller checks two physical trigger boundaries in parallel: the first boundary is the forced pumping action line when the water level in the sump reaches the preset level; the second boundary is the water level rise rate parameter. The set inrush rate threshold was exceeded for three consecutive sampling cycles. When both physical boundaries closed simultaneously, the microprocessor blocked the real-time feedback channel of the gaseous environment monitoring node and forcibly invoked the gas-water co-existing dynamics empirical model pre-installed in the flash memory chip. The aforementioned empirical model uses water volume and expected stirring speed as input variables, and predicts the envelope matrix of the toxic gas release rate in space through polynomial fitting and inversion.

[0041] Based on the concentration peak parameters in the aforementioned release rate envelope matrix, the microprocessor calculates the target airflow required to dilute the predicted gas and maps it to a specific target rotational speed using the fan characteristic curve table. Before executing the pump start relay activation action, the microprocessor starts a hardware timer and writes the time window constant parameters. The aforementioned parameters Linear interpolation tuning is performed based on a distance coefficient within a range of 10 to 30 seconds. At the instant the hardware timer starts, the microprocessor sends an electrical message to the face-mounted variable frequency ventilation unit to increase the frequency to the target speed; during this period, the start message of the multi-stage variable frequency water pump unit is stored in a pending queue by the microprocessor. The microprocessor releases the water pump start message from the pending queue only when the hardware timer countdown reaches zero and generates an interrupt request, thereby achieving premature dilution of harmful gases through physical time difference.

[0042] Bimodal unidirectional matrix locking mapping based on process state machine: To address energy consumption coordination throughout the entire lifecycle, the linkage control unit employs a dual-modal unidirectional locking logic to implement a spatiotemporal peak-shaving mechanism. The linkage control unit establishes a register mapping table in memory, using the process status pushed by the process identification unit as the unique index pointer of the register mapping table.

[0043] When the index pointer points to the level code for the blasting smoke exhaust period, the microprocessor activates the smoke exhaust efficiency maximization control mode. At this time, the microcontroller forcibly writes the hexadecimal code of the highest operating frequency to the communication address of the frequency converter controlling the exhaust, locking the fan in a full-load constant frequency output state; simultaneously, it freezes the start-up enable bit of the standby water pump group. If a frequency increase request is received at the frequency regulation port of the main water pump at this time, the comparator inside the microprocessor compares the requested value with the set maximum operating frequency limit threshold, forcibly clipping the peak output to ensure that the ventilation power exclusively utilizes the total grid capacity.

[0044] When the index pointer switches to the slag discharge period or idle period level code, the microprocessor flips the operating mode to the emptying and pumping control mode. The microprocessor actively writes a decreasing hexadecimal frequency code to the ventilation inverter communication address in a loop, reducing the wind speed to the minimum reference speed required to maintain safe breathing. At this time, the microprocessor reads the idle power parameters fed back by the power grid energy consumption monitoring module, converts all the idle power parameters into the upper limit of the number of pump groups to be started, and fully activates the multi-stage variable frequency pump group control relays to perform high-frequency emptying and pumping operations on the stagnant water in the back slope sump, realizing energy consumption cutting and load balancing of heavy equipment on the time axis.

[0045] Furthermore, the specific operation procedure of the terminal execution unit is as follows: The terminal execution unit, as the physical endpoint of the linkage control center, is responsible for converting the digital level signals and control messages output by the microprocessor into physical driving mechanical actions targeting the tunnel's airflow and hydrodynamic fields. The following details the physical topology deployment structure, electrical drive links, and hardware interlock switching procedures under sudden failure conditions of the terminal execution unit.

[0046] The multi-stage variable frequency water pump set in the terminal execution unit adopts a graded series relay drainage topology for construction layout. On the tunnel reverse slope excavation axis, the first-stage water collection pit to the Nth-stage water collection pit are excavated sequentially from low to high terrain.

[0047] High-power submersible sewage pumps are horizontally anchored to the concrete base at the bottom of each sump. The drainage outlets of these pumps are directly connected to steel drainage pipelines via high-pressure flanges. These drainage pipelines extend upwards along the tunnel sidewall against the slope, with their outlets directly leading into the collection channel of the next sump, thus forming a series relay loop of multiple pump stations. On the transverse section of the main outlet pipe of each submersible sewage pump, a manual maintenance butterfly valve and an electrically controlled check valve are installed in series against the direction of water flow. The valve stem of the electrically controlled check valve is connected to a three-phase electric actuator, and the control input of the electric actuator is hardwired to the digital output module of the linkage control unit via a shielded control cable.

[0048] Meanwhile, variable frequency ventilation units are deployed in a three-dimensional, tiered manner within the tunnel interior. Two sets of high-power counter-rotating axial flow main ventilation fans are symmetrically anchored on the hardened ground outside the tunnel entrance excavation line. The air outlets of these fans connect directly to the core excavation area of ​​the tunnel face via flame-retardant, anti-static zipper-type air ducts. On both sides of the tunnel arch centerline, several sets of variable frequency jet fans are installed along the tunnel axis at equal intervals of 150 to 200 meters, suspended by a matrix of expansion bolts. The nozzle axes of these variable frequency jet fans are parallel to the longitudinal airflow axis of the tunnel, used to directionally and rapidly expel return air and harmful gases from the middle and rear sections of the tunnel.

[0049] The terminal execution unit performs power distribution at the electrical level using a centralized frequency converter drive cabinet array. This array of frequency converter drive cabinets is installed in rows within a mobile substation cabin inside the tunnel, and integrates independent heavy-duty frequency converters for the main ventilation fan, jet fan, and various levels of submersible sewage pumps. The three-phase AC input terminals of each set of frequency converters are connected to the low-voltage power distribution bus, while the three-phase AC output terminals are physically connected directly to the stator winding terminals of the corresponding fan motor or pump motor via high-voltage armored power cables.

[0050] Each inverter's integrated microcontroller unit reads the inverter module's output frequency command value and measured effective output current value in real time via an internal bus. To construct a closed-loop feedback circuit, Pt100 platinum resistance temperature sensors are pre-embedded in the stator windings of the main ventilator, jet fan, and submersible sewage pump motors. The leads of these Pt100 platinum resistance temperature sensors are connected to an analog input module inside the inverter cabinet via shielded signal lines. The analog input module linearly converts the resistance change value into a digital parameter of the motor winding temperature.

[0051] The communication chip inside the inverter encapsulates the aforementioned digital parameters of output frequency, output current, and motor winding temperature into standard industrial bus protocol data frames, which are cyclically sent to the bus receiving port of the linkage control unit at a period of 100 milliseconds. The aforementioned parameters together constitute complete operating status monitoring data, which allows the linkage control unit to correct the upper limit of the control frequency of the feedforward ventilation strategy and the load game strategy in real time.

[0052] The terminal execution unit is independently configured with a hardware emergency interlock switching module. The aforementioned module is composed of multiple sets of auxiliary contacts of low-voltage circuit breakers, hard-wired links of intermediate relays, and an emergency logic controller in the frequency converter drive cabinet.

[0053] When the linkage control unit determines the first based on the aforementioned operating status monitoring data... If the temperature of the motor windings of the submersible sewage pump in the sump exceeds the upper limit of 105 degrees Celsius, or if the output current exceeds 1.5 times the rated current for 3 consecutive seconds, the pump is deemed to have experienced an overload fault. The circuit breaker actuator inside the frequency converter drive cabinet will instantly trip, cutting off the power supply to the overloaded pump.

[0054] At the instant the aforementioned circuit breaker trip contact operates, the intermediate relay coil of the hardware emergency interlock switching module is de-energized, its normally open contact physically opens, and its normally closed contact closes. This contact level reversal directly triggers the hardware emergency interlock switching control program. First, the emergency logic controller sends a forced closure command to the electric actuator of the electrically controlled check valve at the faulty pipeline to prevent water in the high-level pipeline from flowing back into the sump. Simultaneously, the emergency logic controller bypasses the serial communication bus of the linkage control unit via hardwiring and directly closes the adjacent high-level... The submersible sewage pump in the sump pumping submersible pumping system pulls the frequency setting terminal of the strain gauge up to 50Hz for full-frequency operation, and simultaneously sends a command to unlock the first... The contactor of the backup submersible sewage pump in the sump pit closes, thereby increasing the pumping throughput of the high-level pump station and absorbing the water volume accumulated due to the shutdown of the low-level pump station. At the execution terminal level, it completes the disaster relief self-healing closed loop in a purely hardware response manner.

[0055] The above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit it. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions will not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A smart ventilation and reverse slope drainage linkage control system for the entire tunnel construction process, characterized in that, include: The multi-dimensional sensing unit is used to collect real-time gaseous environment data of the tunnel face and return air passage, hydrological data of the reverse slope sump, and power grid energy consumption data of the tunnel substation. The process identification unit is used to acquire and output the current construction standard process status of the tunnel; The linkage control unit is communicatively connected to the multi-dimensional sensing unit and the process identification unit, and has a built-in linkage coordination strategy for generating linkage control commands based on the gaseous environment data, hydrological data, power grid energy consumption data and the status of the construction standard process. The terminal execution unit is communicatively connected to the linkage control unit, including a variable frequency ventilation unit and a multi-stage variable frequency water pump unit, and is used to execute corresponding actions according to the linkage control command. The linkage and coordination strategy includes: Feedforward early warning ventilation strategy: When the hydrological data reaches the pumping threshold, the linkage control unit generates a feedforward pre-adjustment command to forcibly increase the operating frequency of the variable frequency ventilation unit before or during the start-up of the multi-stage variable frequency water pump group. Load dynamic game strategy: When it is necessary to start standby equipment and the overall power grid energy consumption data is predicted to exceed the upper limit of the available power grid, the linkage control unit prioritizes to reduce the operating frequency of the variable frequency ventilation unit in the non-core work area to release the power grid capacity. When the released power grid capacity meets the demand of the new water pump load, the corresponding level of the multi-stage variable frequency water pump group is allowed to start.

2. The intelligent ventilation and reverse slope drainage linkage control system for the entire tunnel construction process according to claim 1, characterized in that, The multi-dimensional sensing unit includes a gaseous environment monitoring node, which is deployed at a safe distance from the tunnel face and at the return air passage behind the trolley. The specific gaseous environment data includes: ambient dust concentration, carbon monoxide concentration, hydrogen sulfide concentration, methane concentration, and longitudinal wind speed in the tunnel; the gaseous environment monitoring node adopts an intrinsically safe explosion-proof design; The multi-dimensional sensing unit is equipped with a water artifact joint detection array; The water quality monitoring array is installed in the sinking water collection pits at each level. It consists of an ultrasonic level gauge, a pipeline flow meter and a water turbidity sensor. It is used to output the absolute water level elevation of the water collection pit, the water flow rate per unit time and the sediment content of the pumped water in real time.

3. The intelligent ventilation and reverse slope drainage linkage control system for the entire tunnel construction process according to claim 2, characterized in that, The hardware link for the multi-dimensional sensing unit to collect the power grid energy consumption data is as follows: By connecting intelligent power transmitters in parallel to the low-voltage side busbar of the main substation at the tunnel entrance and to the various distribution boxes inside the tunnel, the total load current, active power, reactive power and the current power margin of the transformer are extracted in real time, and the above parameters are packaged into the power grid energy consumption data. The multi-dimensional sensing unit also integrates an edge computing gateway. Before the underlying sensor data collected by the multi-dimensional sensing unit is uploaded to the linkage control unit, the edge computing gateway performs the following pre-processing logic: The gaseous environment data and the hydrological data are subjected to sliding window filtering to remove transient spike signals caused by construction blasting or mechanical vibration, and the filtered effective data is converted into standard industrial Ethernet protocol messages for uplink transmission.

4. The intelligent ventilation and reverse slope drainage linkage control system for the entire tunnel construction process according to claim 3, characterized in that, The process identification unit includes a positioning subsystem and an airborne data acquisition module; The positioning subsystem is used to obtain the real-time location trajectory of construction personnel and special vehicles with electronic identification tags by using ultra-wideband UWB base stations deployed on the tunnel sidewalls. The airborne data acquisition module is used to communicate with the programmable logic controller (PLC) bus of the rock drilling rig and the wet spraying robot to obtain the operation start-stop characteristics of the core construction equipment. The process identification unit automatically determines and outputs the status of the standard construction process based on the logical combination of the spatial distribution characteristics of the real-time location trajectory and the operation start-stop characteristics.

5. The intelligent ventilation and reverse slope drainage linkage control system for the entire tunnel construction process according to claim 4, characterized in that, The construction standard process is divided into at least the following stages in terms of time sequence: drilling and charging period, blasting and smoke removal period, slag removal period, and support period. The process identification unit is pre-set with a process state machine model. When the positioning subsystem identifies that all personnel have evacuated to outside the preset safe distance boundary, and the process identification unit receives the closure authorization signal of the detonation network, the process state machine model automatically switches the current state to the blasting smoke exhaust period and immediately outputs a high-priority state flag to the linkage control unit.

6. The intelligent ventilation and reverse slope drainage linkage control system for the entire tunnel construction process according to claim 5, characterized in that, The process identification unit also includes an intrinsically safe human-machine interaction terminal, which is deployed in the safety trolley or safety zone behind the working face. Before performing the cross-stage switching of the construction standard procedure status, the process identification unit issues an audible and visual warning through the intrinsically safe human-machine interface terminal. Only after receiving a physical button confirmation signal from authorized personnel on site within a set time window does it generate the final construction standard procedure status output command, which serves as the final trigger condition for the linkage control unit to perform feedforward pre-adjustment.

7. The intelligent ventilation and reverse slope drainage linkage control system for the entire tunnel construction process according to claim 6, characterized in that, The linkage control unit has a pre-set load allocation priority matrix, and the specific execution steps of the load dynamic game strategy are as follows: Step S11: Obtain the total load of the entire tunnel in real time Calculate the current transformer power margin. ; Step S12: When encountering extreme water inrush conditions and needing to start a backup high-power water pump, calculate the required additional rated power. ; If the judgment If so, the power underload protection will be triggered; Step S13: The linkage control unit sends a frequency reduction control command to the terminal execution unit, and in a step-by-step manner, reduces the operating frequency of the variable frequency ventilation units on non-core working faces proportionally until the released grid capacity is reached. ; Step S14: The linkage control unit issues an unlocking command, allowing the multi-stage variable frequency water pump group at the corresponding level to start; The feedforward early warning ventilation strategy adopts a time-difference-based feedforward prediction triggering mechanism, specifically: The linkage control unit calculates the rate of water level rise in the hydrological data in real time. When the rate of change of the water level rises When the set threshold is exceeded continuously and the sump reaches the pumping threshold, the linkage control unit, based on the preset gas-water co-existing dynamics empirical model, inverts and predicts the envelope of the release rate of harmful gases that will be released due to water agitation. Based on the release rate envelope, the linkage control unit calculates the target air volume required to dilute to a safe concentration and sets a time window before the multi-stage variable frequency water pump set is physically started. Within the specified time window, a frequency increase command is issued to the variable frequency ventilation unit in advance. The value ranges from 10 seconds to 30 seconds.

8. The intelligent ventilation and reverse slope drainage linkage control system for the entire tunnel construction process according to claim 7, characterized in that, The linkage and coordination strategy also includes a spatiotemporal peak-shaving energy-saving strategy that is bound to the status of the construction standard procedures, and its control logic is as follows: When the output of the process identification unit is the blasting smoke exhaust period, the linkage control unit establishes a one-way control matrix with the goal of maximizing smoke exhaust efficiency, locks the variable frequency ventilation unit to full-load full-frequency operation, and if the hydrological data does not trigger the red water level warning line, the start of the standby water pump is forcibly suspended and limited to the highest operating frequency of the water pump. When the process identification unit outputs "slag discharge period" or "empty period", the linkage control unit will switch the variable frequency ventilation unit back to a low frequency state, and at the same time, utilize the idle capacity of the power grid to start the multi-stage variable frequency water pump group at full power to perform emptying and pumping operations on each back slope water collection pit.

9. The intelligent ventilation and reverse slope drainage linkage control system for the entire tunnel construction process according to claim 8, characterized in that, The multi-stage variable frequency water pump group in the terminal execution unit adopts a graded series relay drainage topology, including submersible sewage pumps installed in each level of reverse slope water collection pit and drainage pipelines connecting each level of water collection pit. The drainage pipeline is equipped with an electrically controlled check valve that is communicatively connected to the linkage control unit. The variable frequency ventilation unit includes a counter-rotating axial flow main ventilation fan installed at the tunnel entrance, and several sets of variable frequency jet fans suspended along the tunnel axis on the arch.

10. The intelligent ventilation and reverse slope drainage linkage control system for the entire tunnel construction process according to claim 9, characterized in that, The terminal execution unit also includes a centralized frequency converter drive cabinet array and a frequency converter feedback loop; The output terminals of each inverter in the inverter drive cabinet array are respectively connected to the motor input terminals of the corresponding inverter ventilation unit and multi-stage inverter water pump unit; the inverter feedback loop is used to collect the output frequency, output current and motor winding temperature of each inverter in real time, and feed them back to the linkage control unit as operating status monitoring data, so as to dynamically correct the action threshold of the feedforward early warning ventilation strategy and the load dynamic game strategy through the linkage control unit. The terminal execution unit has a built-in hardware emergency interlock switching module; When the linkage control unit determines that a certain multi-stage variable frequency water pump group in operation has an overload power failure based on the operation status monitoring data, the hardware emergency interlock switching module forcibly switches the electrically controlled check valve of the adjacent water sump that is on the same series pipeline as the faulty water pump to the bypass conduction state. At the same time, the variable frequency drive cabinet array automatically increases the output frequency of the water pump in the upper-level water sump.