Analog device

By combining a support and gravity loading mechanism with a lifting mechanism, the simulation device solves the problem of inaccurate simulation of the stress scenario of curved pipe sections in the existing technology, and realizes efficient detector accuracy verification and calibration, which is suitable for the detection of curved pipe sections in industrial long-distance pipelines.

CN123111168APending Publication Date: 2026-11-17PIPECHINA SOUTH CHINA CO +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611205316.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-10
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing technologies, devices used to simulate curved sections of industrial long-distance pipelines have poor flexibility and cannot accurately simulate the stress scenarios of curved sections with different curvatures, resulting in low verification efficiency of the detector.

Method used

A simulation device is provided, including a support mechanism, a gravity loading mechanism, and a lifting mechanism. The lifting mechanism enables stepless adjustment of the pressure exerted on the pipeline. By combining the adjustable weight of the gravity loading component and the lifting action of the lifting mechanism, the stress scenarios of pipe sections with different curvatures are simulated.

Benefits of technology

It improves the efficiency of detector accuracy verification, can accurately verify and calibrate the accuracy of ACSM and IMU detectors, adapts to the stress simulation of curved pipe sections with different curvatures, and is simple to operate and low in cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123111168A_ABST
    Figure CN123111168A_ABST
Patent Text Reader

Abstract

The application discloses a simulation device, relates to the technical field of pipeline detection, and aims to solve the problem of how to accurately simulate the stress scene of a curved pipe section with different curvatures efficiently. The simulation device is used for simulating the downward pressure borne by a pipeline, and comprises a supporting mechanism, a gravity loading mechanism and a lifting mechanism. The supporting mechanism is used for supporting the pipeline so as to separate the pipeline from the ground. The gravity loading mechanism is adapted to be borne on the pipeline to apply the downward pressure to the pipeline. The gravity loading mechanism is also borne on the lifting mechanism, and the lifting mechanism can be lowered to adjust the downward pressure applied to the pipeline by the gravity loading mechanism.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of pipeline inspection technology, and in particular to a simulation device. Background Technology

[0002] Industrial long-distance pipelines have complex laying paths and a large number of curved pipe sections with different curvatures. The structural stability of these curved pipe sections directly affects the overall safety of the pipeline. Accurately identifying and quantitatively analyzing such curved pipe sections is the core prerequisite for safe operation and maintenance of pipelines.

[0003] Currently, the main industrial applications are Automated CurvStrain Monitoring (ACSM) and Inertial Measurement Units (IMUs) for identifying and quantitatively detecting curved sections in long-distance pipelines.

[0004] However, the measurement accuracy of ACSM and IMU detectors is greatly affected by the equipment parameter settings, requiring verification and analysis through standardized experimental simulations. Among related technologies, bending stress simulation devices have poor flexibility and cannot simulate the stress scenarios of pipe sections with different curvatures, resulting in low detector verification efficiency. Summary of the Invention

[0005] The purpose of this application is to provide a simulation device that aims to solve the problem of how to efficiently and accurately simulate the stress scenarios of pipe sections with different curvatures.

[0006] To achieve the above objectives, this application adopts the following technical solution: This application provides a simulation device for simulating the downward pressure borne by a pipeline. The simulation device includes a support mechanism, a gravity loading mechanism, and a lifting mechanism. The support mechanism is used to support the pipeline to separate the pipeline from the ground. The gravity loading mechanism is adapted to be carried on the pipeline to apply downward pressure to the pipeline. The gravity loading mechanism is also carried on the lifting mechanism, which can be raised and lowered to adjust the downward pressure applied to the pipeline by the gravity loading mechanism.

[0007] The simulation device provided in this application adjusts the magnitude of the downward pressure on the pipeline by adjusting the lifting mechanism. When the downward pressure on the pipeline is different, the strain or bending curvature of the pipeline will change. By comparing the measured parameters such as the bending displacement, curvature and strain of the pipeline under different downward pressure conditions with the parameters detected by the ACSM and IMU detectors, the accuracy of the ACSM and IMU detectors can be verified and the ACSM and IMU detectors can be calibrated and adjusted.

[0008] In this way, the simulation device can steplessly adjust the downward pressure applied to the pipeline by simply adjusting the lifting mechanism, so as to simulate pipe sections with different curvatures. The operation is simple and helps to improve the verification efficiency of the detector accuracy.

[0009] In some embodiments, the gravity loading mechanism includes a gravity frame and a gravity loading member, wherein the gravity frame is connected to a lifting mechanism; the gravity loading member is connected to the gravity frame, and the weight of the gravity loading member is adjustable.

[0010] In some embodiments, the gravity frame includes a support base and a plurality of limiting members disposed on the support base, the plurality of limiting members surrounding to form at least one receiving space; the gravity loading member includes a plurality of weights, and the receiving space can selectively accommodate one or more of the plurality of weights to adjust the weight of the gravity loading member.

[0011] In some embodiments, the gravity frame is provided with a connecting portion; the gravity loading mechanism further includes a connector connected to the connecting portion, and at least a portion of the connector is located above the pipe, the connector being adapted to convert the gravity load of the gravity frame into a downward pressure applied to the pipe.

[0012] In some embodiments, there are multiple connectors, which are arranged at intervals along the axial direction of the pipe.

[0013] In some embodiments, the number of connectors is at least one, and the connectors may be selectively connected to at least one of a plurality of connectors.

[0014] In some embodiments, the connection includes a first lifting part and a second lifting part arranged radially at intervals along the pipe, and the two ends of the connector are respectively connected to the first lifting part and the second lifting part.

[0015] In some embodiments, the lifting mechanism includes a jack.

[0016] In some embodiments, the lifting mechanism includes a first lifting mechanism and a second lifting mechanism, which are arranged radially at intervals on both sides of the pipe.

[0017] In some embodiments, the number of lifting mechanisms is multiple, and the multiple lifting mechanisms are arranged at intervals along the axial direction of the pipe.

[0018] In some embodiments, the support mechanism includes a first pipe support and a second pipe support, which are arranged at intervals along the axial direction of the pipe, and a gravity loading mechanism and a lifting mechanism are located between the first pipe support and the second pipe support.

[0019] In some embodiments, the simulation apparatus further includes a detection mechanism adapted to be located in the pressure section of the pipeline to detect the bending parameters of the pipeline. Attached Figure Description

[0020] Figure 1 An application effect diagram of a simulation device provided in an embodiment of this application; Figure 2 for Figure 1 A partial schematic diagram of a simulation device is shown; Figure 3 for Figure 1 The image shows a front view of a simulation device.

[0021] Figure descriptions: 100, simulation device; 200, pipeline; 1. Support mechanism; 11. First pipe support; 12. Second pipe support; 2. Gravity loading mechanism; 21. Gravity frame; 211. Support base; 212. Limiting component; 2121. Pin hole; 213. Connecting frame; 214. Connecting part; 2141. First hoisting part; 2142. Second hoisting part; 22. Gravity loading component; 23. Connecting component; 3. Lifting mechanism; 41. Strain gauge; 42. Meter ruler; 43. Digital display instrument; 5. Support pier. Detailed Implementation

[0022] In the description of this application, it should be understood that the terms "upper," "lower," "left," "right," "front," "rear," "inner," and "outer," etc., indicate the orientation or positional relationship based on the orientation or relative positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this application and for simplification, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this application. Unless otherwise specified, the above-mentioned orientational descriptions can be flexibly set in practical applications, provided that the relative positional relationships shown in the accompanying drawings are satisfied.

[0023] The terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this application, unless otherwise stated, "a plurality of" means two or more.

[0024] In the description of this application, it should be noted that, unless otherwise expressly specified and limited, the terms "installation," "connection," "linking," and "communication" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection. They can refer to a direct connection or an indirect connection through an intermediate medium, or a connection within two components. Those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances.

[0025] In embodiments of this application, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, article, or apparatus that includes that element.

[0026] In the embodiments of this application, the terms "exemplary" or "for example" are used to indicate that something is an example, illustration, or description. Any embodiment or design that is described as "exemplary" or "for example" in the embodiments of this application should not be construed as being more preferred or advantageous than other embodiments or design. Specifically, the use of the terms "exemplary" or "for example" is intended to present the relevant concepts in a specific manner.

[0027] In the field of industrial long-distance pipeline engineering and safe operation and maintenance, long-distance pipelines have a large number of curved pipe sections with different curvatures due to their complex laying paths. The structural stability of these curved pipe sections directly affects the overall safety of the pipeline. Accurately identifying and quantitatively analyzing such curved pipe sections is the core prerequisite for safe operation and maintenance of pipelines.

[0028] In related technologies, ACSM stress detection technology and IMU inertial navigation measurement technology can be used in industry to identify and quantitatively detect the curved pipe sections of long-distance pipelines. The measurement accuracy of the two technologies directly determines the accuracy of the curved pipe section identification and the reliability of the quantitative analysis.

[0029] However, the measurements of ACSM and IMU detectors are significantly affected by factors such as sensor sensitivity, installation angle error, and the parameter settings of equipment like gyroscopes, accelerometers, and sensor bias. Their measurement accuracy cannot be directly determined and requires verification and analysis through standardized experimental simulations. Furthermore, adjusting the detector parameters based on experimental data feedback can ensure their detection accuracy in practical engineering applications.

[0030] To achieve parameter calibration and measurement accuracy verification of ACSM and IMU detectors, it is necessary to construct an experimental device that can simulate the actual bending stress state of industrial long-distance pipelines. Controllable and stable bending stress is configured on the pipeline to simulate the working conditions of bending pipe sections with different curvatures. Data is collected in conjunction with ACSM and IMU detectors. By comparing and analyzing the experimental configuration data with the detector detection data, the accuracy of the detector measurement values ​​is verified. Based on the verification results, the detector parameters are adjusted to ensure the measurement accuracy of the detectors.

[0031] Existing simulation devices in related technologies mostly focus on realizing pipe bending loading, using a single jack for gravity loading or a fixed gravity loading module. However, a single jack is difficult to apply a stable downward pressure of no less than 6 tons to the pipe, while a fixed gravity loading module cannot flexibly adjust the pressure according to the test requirements. Therefore, the simulation devices in related technologies have poor adaptability to pipe sections with different curvatures, and the gravity loading module needs to be replaced to realize the stress simulation of pipe sections with different curvatures. The verification efficiency of the detector is also low.

[0032] Based on this, please refer to Figures 1-3 , Figure 1 This is an application effect diagram of a simulation device 100 provided in an embodiment of this application. Figure 2 for Figure 1 A partial schematic diagram of a simulation device 100 is shown. Figure 3 for Figure 1 The image shows a front view of a simulation device 100. This application provides a simulation device 100 for simulating downward pressure on a pipe 200.

[0033] The simulation device 100 includes a support mechanism 1, a gravity loading mechanism 2, and a lifting mechanism 3. The support mechanism 1 supports the pipe 200 to separate the pipe 200 from the ground. The gravity loading mechanism 2 is adapted to bear on the pipe 200 to apply downward pressure to the pipe 200; the gravity loading mechanism 2 is also supported by the lifting mechanism 3, which can be raised and lowered to adjust the downward pressure applied to the pipe 200 by the gravity loading mechanism 2.

[0034] By supporting the pipe 200 with the support mechanism 1 to separate the pipe 200 from the ground, the downward pressure applied to the pipe 200 by the gravity loading mechanism 2 can cause the pipe 200 to bend and deform, thereby verifying the bending performance of the pipe 200.

[0035] The gravity loading mechanism 2 is supported by the pipe 200 and the lifting mechanism 3. The gravity load of the gravity loading mechanism 2 can be applied to the pipe 200 and / or the lifting mechanism 3. When the lifting mechanism 3 descends, a portion of the gravity load of the gravity loading mechanism 2 can be transferred from the lifting mechanism 3 to the pipe 200, thereby increasing the downward pressure applied to the pipe 200 by the gravity loading mechanism 2. When the lifting mechanism 3 rises, a portion of the gravity load of the gravity loading mechanism 2 can also be transferred from the pipe 200 to the lifting mechanism 3, thereby decreasing the downward pressure applied to the pipe 200 by the gravity loading mechanism 2.

[0036] With this configuration, the simulation device 100 provided in this application embodiment can adjust the magnitude of the downward pressure borne by the pipeline 200 by adjusting the lifting mechanism 3. When the downward pressure borne by the pipeline 200 is different, the strain or bending curvature of the pipeline 200 will change. By comparing the measured parameters such as the bending displacement, curvature and strain of the pipeline 200 under different downward pressure conditions with the parameters detected by the ACSM and IMU detectors, the accuracy of the ACSM and IMU detectors can be verified, and the ACSM and IMU detectors can be calibrated and adjusted.

[0037] Thus, the simulation device 100 only needs to adjust the lifting mechanism 3 to achieve stepless adjustment of the downward pressure applied to the pipeline 200, and can simulate pipe sections with different curvatures. The operation is simple and conducive to improving the verification efficiency of detector accuracy.

[0038] Furthermore, in this embodiment, the downward pressure on the pipe 200 is provided by the weight of the gravity loading mechanism 2, so that the magnitude of the downward pressure applied to the pipe 200 is not limited by the output capacity of the lifting mechanism 3.

[0039] When the required downward pressure on pipe 200 is relatively large, for example, when the required downward pressure is greater than or equal to 6 tons, the lifting mechanism 3, due to its own power and transmission structure limitations, cannot output the required downward pressure to pipe 200 by relying solely on the lifting mechanism 3. This application can configure a gravity loading mechanism 2 with a load greater than or equal to 6 tons. As the lifting mechanism 3 descends, the gravity load of the gravity loading mechanism 2 can be transferred entirely or partially to pipe 200, thereby subjecting pipe 200 to a downward pressure greater than or equal to 6 tons.

[0040] This solves the problem of limited adjustment range of loading force in existing technologies, thereby simulating the stress conditions of pipe sections with different curvatures and improving the adaptability of the simulation device 100.

[0041] In some embodiments of this application, the initial state after the simulation device 100 and the pipe 200 are assembled can be a state where the gravity loading mechanism 2 is just in contact with the pipe 200 and no downward pressure is applied to the pipe 200. In this way, as the lifting mechanism 3 descends, downward pressure can be gradually applied to the pipe 200, and the magnitude of the downward pressure applied to the pipe 200 can be determined based on the amount of lifting displacement or height change of the lifting mechanism 3.

[0042] This setup ensures accurate and reliable data acquisition under different downforce simulation conditions, which helps improve the accuracy of detector verification.

[0043] In other embodiments, the initial state after the simulation device 100 and the pipe 200 are assembled can be such that the pipe 200 and the lifting mechanism 3 simultaneously bear the gravity load of the gravity loading mechanism 2. With this configuration, the lifting mechanism 3 can lift the gravity loading mechanism 2 upwards, reducing the downward pressure applied to the pipe 200; conversely, the lifting mechanism 3 can lower the gravity loading mechanism 2 downwards, increasing the downward pressure applied to the pipe 200. In this case, the maximum load on the lifting mechanism 3 can be less than the load applied by the gravity loading mechanism 2, saving costs; this application does not further limit this aspect.

[0044] Please refer to Figure 2 and Figure 3 In some embodiments, the gravity loading mechanism 2 may include a gravity frame 21 and a gravity loading element 22. The gravity frame 21 is connected to the lifting mechanism 3; the gravity loading element 22 is connected to the gravity frame 21, and the weight of the gravity loading element 22 is adjustable.

[0045] The gravity frame 21 serves as a load-bearing component of the gravity loading mechanism 2 and is connected to the lifting mechanism 3, enabling the transfer of the gravity load of the gravity loading mechanism 2 to the lifting mechanism 3. The gravity loading element 22 is connected to the gravity frame 21 and can simultaneously form the gravity load of the gravity loading mechanism 2 with the gravity frame 21. By adjusting the weight of the gravity loading element 22, the downward pressure applied by the gravity loading mechanism 2 to the pipe 200 can be adjusted.

[0046] Thus, the gravity loading element 22 and the lifting mechanism 3 can achieve two-stage adjustment of the downward pressure. Firstly, the downward pressure can be coarsely adjusted by increasing or decreasing the weight of the gravity loading element 22 itself, allowing for initial adjustment of the total gravitational load. Secondly, the weight of the gravity loading element 22 can be adjusted according to the maximum expected downward pressure in the experiment.

[0047] Secondly, during the experiment, by adjusting the descent action of the lifting mechanism 3, the gravity load of the gravity loading mechanism 2 can be transferred between the lifting mechanism 3 and the pipe 200, thereby achieving fine adjustment of the actual pressure borne by the pipe 200.

[0048] Thus, the downward pressure F2 applied to pipe 200 is the force F applied by gravity loading element 22 minus the force F1 borne by lifting mechanism 3. F can be calculated using weights, and F1 can be obtained from the pressure gauge connected to lifting mechanism 3.

[0049] Please refer to Figure 2 and Figure 3 In some embodiments, the gravity frame 21 includes a support base 211 and a plurality of limiting members 212 disposed on the support base 211, the plurality of limiting members 212 surrounding to form at least one receiving space. The receiving space can be used to receive the gravity loading member 22.

[0050] The support base 211 can serve as the load-bearing base for the gravity loading component 22. The support base can be connected to the lifting mechanism 3 to accurately transfer the load of the gravity loading module to the lifting mechanism 3, thereby preventing the gravity loading mechanism 2 from shifting during the application of force.

[0051] Multiple limiting members 212 can enclose and form a receiving space to accommodate the gravity loading member 22. The limiting members 212 can constrain and limit the gravity loading member 22, preventing the gravity loading member 22 from shifting laterally relative to the support base 211 during the lifting and lowering process of the gravity loading mechanism 2 or when it interacts with the pipeline 200. This reduces the bending deformation of the pipeline 200 and the interference with stress acquisition, ensuring the stability of the loading force output direction and the accuracy of stress acquisition.

[0052] Reference Figure 2 and Figure 3 In some embodiments, the gravity loading member 22 may include a plurality of weights, and the accommodating space may selectively accommodate one or more of the plurality of weights to adjust the weight of the gravity loading member 22.

[0053] The gravity loading component 22 is configured with multiple weights, which can select and place different numbers of weights into the accommodating space according to the target downward pressure requirements. By increasing or decreasing the number of weights, the total weight of the gravity loading mechanism 2 can be changed, thereby achieving the initial adjustment of the gravity load.

[0054] In addition, the gravity loading element 22 is set as a weight. Since the weight of the weight is usually a standard value, the weight of the gravity loading element 22 can be quickly obtained according to the number of weights. The operation is simple and convenient, and the adjustment is flexible.

[0055] For example, standard cast iron weights can be used, and the number of weights can be greater than or equal to 24 and less than or equal to 32. Each weight has a specification of 250 kg. They can be selected individually or combined according to testing requirements, allowing for flexible adjustment of the total load weight of the gravity loading component 22. For example, with 24 weights and a jack, a downward pressure output of no less than 6 tons can be achieved, thereby simulating the load strength of different curved sections of an industrial long-distance pipeline 200.

[0056] In some embodiments, the number of accommodating spaces can be set to correspond to the number of weights. For example, each accommodating space can contain one, two, or three weights, etc.

[0057] The number of holding spaces may not correspond to the number of weights. For example, the number of holding spaces may be 10, and the number of weights may be 8. The weights can be placed in 8 different holding spaces, or some holding spaces may contain 3 weights and some holding spaces may contain 1 weight. This application does not limit this.

[0058] In some embodiments, the gravity loading element 22 can also be configured as an integral structure, such as a steel block, and the weight of the gravity loading element 22 can be adjusted by replacing steel blocks of different weights.

[0059] In other embodiments, the gravity loading element 22 can also be made of sand, gravel, iron blocks, etc., and the weight of the gravity loading element 22 can be adjusted by filling the accommodating space with sand, gravel, iron blocks of different weights. Making the gravity loading element 22 into sand, gravel, iron blocks allows for more precise weight adjustment of the gravity loading element 22. For example, the mass of the gravity loading element 22 can be greater than or equal to 1 ton and less than or equal to 8 tons.

[0060] Using sand, gravel, and iron blocks as gravity loading components 22 can also reduce the operating cost of the simulation device 100.

[0061] In some embodiments, the support base 211 and the limiting member 212 can both be formed by splicing multiple high-strength steel sections. For example, the steel sections can be welded or bolted together so that the gravity frame 21 as a whole presents a frame structure. In this way, the weight of the gravity frame 21 can be reduced, and the operation difficulty can be reduced when assembling the gravity frame 21 with the pipe 200.

[0062] In other embodiments, the support base 211 and the limiting member 212 can also be made of steel plates, which can prevent smaller gravity loading members 22 from falling. For example, steel plates can be used when the weight is small or when the gravity loading member 22 is sand or gravel.

[0063] In some embodiments, the limiting member 212 is detachably connected to the support base 211. For example, the limiting member 212 may be provided with an adjustment buckle, and the support base 211 may have multiple slots that cooperate with the adjustment buckle. This configuration allows for flexible adjustment of the position of the limiting member 212 according to the size of the gravity loading member 22, improving the adaptability and installation stability of the gravity loading member 22.

[0064] In some embodiments, the surface of the support base 211 facing the limiting member 212 may be provided with anti-slip protrusions. For example, the anti-slip protrusions may be anti-slip strips or anti-slip paint with anti-slip particles may be applied to the surface of the support base 211. In this way, on the one hand, the possibility of the gravity loading member 22 shifting can be further reduced, and on the other hand, when the worker stands on the gravity frame 21 to perform assembly work, the anti-slip protrusions can prevent the worker from slipping or falling.

[0065] like Figure 2 and Figure 3As shown, in some embodiments, the upper edge of the limiting member 212 is provided with a pin hole 2121, which can be used to realize the hoisting of the gravity loading mechanism 2. Alternatively, the pin holes 2121 of multiple limiting members 212 can be connected by components such as ropes, connecting rods or cover plates to fix and limit the gravity loading member 22.

[0066] In some embodiments, along the radial direction of the pipe 200, the gravity loading members 22 can be distributed on opposite sides of the pipe 200, thereby enabling the downward pressure applied to the pipe 200 to be evenly distributed, reducing lateral forces, and ensuring the accuracy of the bending curvature and strain of the pipe 200.

[0067] Since the gravity loading members 22 are distributed on opposite sides of the pipe 200, the limiting members 212 can also be located on opposite sides of the support base 211 along the radial direction of the pipe 200. For example, the structure of the gravity frame 21 can be a portal frame structure or an inverted portal frame structure.

[0068] In some other embodiments, the gravity loading mechanism 2 may also be configured as a planar structure, that is, the gravity loading member 22 is evenly arranged on the surface of the support base 211 so that the surface of the gravity loading mechanism 2 facing the pipe 200 is a plane. This application does not limit this.

[0069] like Figure 2 and Figure 3 As shown, in some embodiments, the gravity frame 21 may further include a connecting frame 213, which includes a base plate, a top plate, and a support beam connecting the base plate and the top plate. The support beam may be inclined to offset the top plate from the base plate. The base plate is fixedly connected to the support base 211, and the top plate is higher than the top of the support base 211, with the lifting mechanism 3 fixedly connected to the lower surface of the top plate.

[0070] With this configuration, when the lifting mechanism 3 does not need to lift the gravity loading mechanism 2, the support base 211 can be lowered to the ground. The height difference between the top plate and the ground is used to accommodate the lifting mechanism 3, thereby allowing the gravity frame 21 and the lifting mechanism 3 to be disassembled. The operation is simple and convenient.

[0071] like Figure 3 As shown, in some embodiments, the gravity frame 21 is provided with a connecting portion 214. Exemplarily, the connecting portion can be a lifting ring or a locking bolt. The gravity loading mechanism 2 also includes a connector 23, which, exemplary, can be a strap. The connector 23 is connected to the connecting portion 214, and at least a portion of the connector 23 is located above the pipe 200. The connector 23 is adapted to convert the gravity load of the gravity frame 21 into a downward pressure applied to the pipe 200.

[0072] After the lifting mechanism 3 raises the gravity frame 21 to the target position, the connecting piece 23 is fastened to the connecting part 214 around the top of the pipe 200. The gravity frame 21 is assembled and connected to the connecting piece 23 through the connecting part 214. Since the connecting piece 23 is located above the pipe 200, it can transmit the gravity load formed by the combination of the gravity frame 21 and the gravity loading member 22 downward, converting it into downward pressure acting on the outer wall of the pipe 200.

[0073] In this way, downward pressure can be applied to the pipe 200 without hoisting the gravity frame 21 and the gravity loading mechanism 2 above the pipe 200, reducing the difficulty of operation. At the same time, by using the connector 23 for the transition, direct contact between the gravity frame 21 and the pipe 200 can be avoided, which would cause local stress concentration and reduce the risk of the pipe 200 being scratched or damaged by pressure.

[0074] For example, the strap can be tied to the lifting ring to secure it. Alternatively, the end of the strap can be equipped with a hook that can be hung inside the lifting ring to connect to the gravity frame 21. In some examples, one end of the strap can be equipped with a winding mechanism. For example, the winding mechanism can be made of stainless steel. The winding mechanism allows the length of the strap connection at the connection part 214 to be adjusted between 0.5mm and 2mm, specifically adjusting the strap tightness according to the different diameters of the industrial long-distance pipeline 200. The winding mechanism can tighten the strap to a state that fits snugly against the pipeline 200, ensuring a firm fixation and preventing the pipeline 200 from shifting during bending loading.

[0075] In some embodiments, the connector 23 may include a first lifting portion 2141 and a second lifting portion 2142 arranged radially at intervals along the pipe 200, with the two ends of the connector 23 respectively connected to the first lifting portion 2141 and the second lifting portion 2142.

[0076] Through the first lifting part 2141 and the second lifting part 2142, the loads of the gravity frame 21 and the gravity loading member 22 can be bidirectionally transmitted to the upper surface of the pipe 200 through the connection of the two lifting parts and the connecting member 23, reducing the load on a single lifting part and avoiding stress concentration or fatigue damage.

[0077] Furthermore, by arranging the first lifting part 2141 and the second lifting part 2142 at radial intervals along the pipe 200, the stability of the gravity loading mechanism 2 can be improved, and offset, tilting or torsion can be reduced.

[0078] In some embodiments, the first lifting part 2141 and the second lifting part 2142 may be disposed on the surface of the support base 211 facing the pipe 200.

[0079] In some embodiments, the first lifting part 2141 and the second lifting part 2142 may also be provided on the upper edge of the limiting member 212. For example, the pin hole 2121 on the upper edge of the limiting member 212 can be used as a lifting part.

[0080] This configuration improves the adaptability of the gravity loading mechanism 2 to pipes 200 of different diameters.

[0081] For example, when the diameter of the pipe 200 is small, it can be accommodated between the gravity loading members 22 on both sides. In this case, the strap can be fixedly connected to the locking bolt or lifting ring on the surface of the support base 211 facing the pipe 200. When the diameter of the pipe 200 is large, the pipe 200 cannot enter between the gravity loading members 22 on both sides, and the strap cannot be connected to the locking bolt or lifting ring on the surface of the support base 211 through the small gap between the pipe 200 and the limiting member 212. In this case, the strap can be fixedly connected to the pin hole 2121 on the surface of the limiting member 212.

[0082] It is understandable that the first lifting part 2141 and the second lifting part 2142 provided on the surface of the support base 211 can also be used as lifting lugs for lifting the gravity loading mechanism 2.

[0083] This design eliminates the need for additional lifting lugs, simplifying the design of the simulation device 100, reducing manufacturing costs, and adapting to the transportation and deployment needs of laboratory and field calibration scenarios, thereby enhancing the practicality and convenience of the simulation device 100.

[0084] In some embodiments, the surface of the support base 211 facing the pipe 200 is provided with an anti-slip pad to increase the friction with the surface of the pipe 200, prevent slippage during loading, avoid damage to the surface of the pipe 200, and ensure the integrity of the experimental pipe 200.

[0085] In some embodiments, the strap may be made of high-strength nylon with a width greater than or equal to 50 mm and less than or equal to 80 mm, a thickness greater than or equal to 5 mm and less than or equal to 8 mm, and a tensile strength greater than or equal to 10 tons. This enables the strap to withstand a gravity load of not less than 6 tons and convert the gravity load into a downward pressure applied to the pipe 200.

[0086] Furthermore, the straps have good wear resistance and toughness, which can prevent scratches on the surface of the pipe 200 and are compatible with the material characteristics of the industrial long-distance pipeline 200.

[0087] The hooks at the ends of the straps can be made of high-strength stainless steel with a tensile strength of not less than 10 tons. They fit tightly with the first lifting part 2141 and the second lifting part 2142 to ensure a firm fixation and prevent the hooks from shifting during loading, thus avoiding pressure distribution deviation. This ensures the accuracy of the experimental simulation and provides precise working condition support for the parameter calibration of the ACSM and IMU detectors.

[0088] In some embodiments, the hook and the strap can be configured as separate structures. During the assembly process, the hook and the connecting part 214 can be connected and fixed first, and then the strap can be installed to connect the strap and the hook.

[0089] In some embodiments, there are multiple connecting portions 214, and the multiple connecting portions 214 are arranged at intervals along the axial direction of the pipe 200.

[0090] Thus, the connector 23 can be selectively connected to different connectors 214, thereby changing the distribution of the downward pressure applied to the pipeline 200 to simulate the load distribution of different curved sections of the industrial long-distance pipeline 200.

[0091] For example, the number of connections 214 along the axial direction of the pipe 200 can be 10, 16, 25 or 30, etc., and this application does not limit this.

[0092] Along the axial direction of the pipe 200, the distance between two adjacent connecting parts 214 can be 0.1m, and the position of the connecting part 214 can be used to precisely limit the layout position of the connector 23.

[0093] In some embodiments, the number of connectors 23 is at least one, and the connectors 23 may be selectively connected to at least one of a plurality of connectors 214.

[0094] For example, the number of connectors 23 can be 1, 2, 4, 7 or 10, etc., and this application does not limit this.

[0095] In this way, multiple connectors 23 are fixedly connected to different positions of the gravity frame 21 and can be distributed at intervals along the axial direction of the pipe 200 on the upper surface of the pipe 200, so as to flexibly adjust the distribution distance of the downward pressure along the pipe 200.

[0096] For example, the adjustable range of the distribution distance of the multiple connectors 23 on the surface of the pipe 200 can be greater than or equal to 0.3m and less than or equal to 3m, and the adjustment accuracy can be less than or equal to 0.1m. Specifically, it can be precisely controlled according to the spacing between the connectors 214.

[0097] In some embodiments, the side of the strap facing the pipe 200 is provided with a rubber pad. The rubber pad has a thickness of 10 mm or more and 15 mm or less. This can buffer the impact force during the loading process, protect the surface of the pipe 200, and at the same time enhance the fit between the strap and the pipe 200, ensuring a firm fixation and preventing the pipe 200 from shifting during bending loading.

[0098] In some embodiments, the lifting mechanism 3 may include a jack.

[0099] For example, the jack is a hydraulic jack with a rated load of not less than 8 tons and a stable pressure output capability. The pressure adjustment range of the jack is greater than or equal to 1 ton and less than or equal to 8 tons. It can work in conjunction with the gravity loading mechanism 2 to achieve precise adjustment of the downward pressure and adapt to the stress simulation requirements of 200-degree curved pipe sections of long-distance pipelines with different curvatures.

[0100] For example, the jack can also be set as an electric jack, which is suitable for calibration scenarios that require remote control and frequent pressure adjustment, improving the ease of operation and adapting to batch calibration needs.

[0101] In other embodiments, the lifting mechanism 3 may also be configured as a screw lifting platform, hydraulic push rod, motor reducer, pneumatic cylinder or scissor lift, etc., and this application does not limit it in this regard.

[0102] In some embodiments, the lifting mechanism 3 is fixedly connected to the lower surface of the gravity frame 21 by bolts to ensure that the jack and the gravity frame 21 are subjected to force synchronously, and to prevent the jack from shifting during the loading process.

[0103] In some embodiments, the lower surface of the jack can be fixed to the ground by pre-installed bolts to further prevent the jack from shifting.

[0104] In some embodiments, the jack is equipped with a precision pressure gauge that can display the output pressure value in real time, with an adjustment accuracy of less than or equal to 0.1 tons, which makes it easy for operators to set and control the downward pressure according to experimental requirements, and to simulate the stress intensity of different curved pipe sections.

[0105] In some embodiments, the lifting mechanism 3 includes a first lifting mechanism 3 and a second lifting mechanism 3, which are arranged radially at intervals on both sides of the pipe 200.

[0106] This configuration not only improves the stability of the gravity loading mechanism 2 during the lifting process and prevents it from shaking or shifting, but also evenly distributes the gravity load of the gravity loading mechanism 2 to the first lifting mechanism 3 and the second lifting mechanism 3, reducing the load-bearing pressure of a single lifting mechanism 3, allowing the selection of a lifting mechanism 3 with a lower load-bearing capacity and reducing costs.

[0107] In some embodiments, there are multiple lifting mechanisms 3, which are arranged at intervals along the axial direction of the pipe 200.

[0108] Similarly, this configuration can improve the stability of the gravity loading mechanism 2 during the lifting process, reduce the load-bearing pressure of a single lifting mechanism 3, reduce costs, and reduce stress concentration.

[0109] In addition, multiple lifting mechanisms 3 are arranged at intervals along the axial direction of the pipe 200, which can extend the testing range of the curved pipe section and improve the adaptability of the simulation device 100.

[0110] In some embodiments of this application, if higher precision pressure and displacement control is required, a PLC control module can be added to the gravity loading mechanism 2 or the lifting mechanism 3 to realize automatic adjustment and closed-loop control of the downward pressure and pressure distribution distance, reduce human operation errors, and improve the accuracy of experimental data.

[0111] In some embodiments, the support mechanism 1 includes a first pipe support 11 and a second pipe support 12, the first pipe support 11 and the second pipe support 12 are arranged at intervals along the axial direction of the pipe 200, and the gravity loading mechanism 2 and the lifting mechanism 3 are located between the first pipe support 11 and the second pipe support 12.

[0112] This setup allows the pipeline 200 to be suspended in the air, so that the downward pressure of the gravity loading mechanism 2 can cause the pipeline 200 to bend downward, simulating the actual bending stress state of the curved section of the industrial long-distance pipeline 200.

[0113] In some embodiments, the first pipe support 11 and the second pipe support 12 can be configured as U-shaped pipe supports. The radius of the U-shaped groove of the U-shaped pipe support can be replaced according to the diameter of the pipe 200 to ensure that the U-shaped pipe support fits tightly with the surface of the pipe 200 and adapts to the different specifications of the industrial long-distance pipeline 200.

[0114] For example, the diameter of the U-shaped groove can be greater than or equal to 50 mm and less than or equal to 500 mm.

[0115] For example, the material of the U-shaped tube support can be set as high-strength aluminum alloy.

[0116] In some embodiments, the U-shaped pipe support can be configured as an adjustable U-shaped pipe support, that is, the opening diameter of the U-shaped groove is adjustable, which can adapt to industrial long-distance pipelines 200 of different diameters without changing the groove opening. At the same time, it can optimize the overhead effect of the pipeline 200, better simulate the stress state of different curved pipe sections, and improve versatility.

[0117] In some embodiments, a rubber pad is provided on the top of the U-shaped pipe support. The rubber pad can reduce the friction between the pipe 200 and the U-shaped pipe support, prevent wear on the surface of the pipe 200, and enhance the support stability.

[0118] In some embodiments, the bottom of the U-shaped pipe support is connected to the ground by expansion bolts. The distance between the first pipe support 11 and the second pipe support 12 can be flexibly adjusted within the range of 1m to 5m to adapt to the bending stress simulation requirements of pipes 200 of different lengths. It can simulate the bending pipe sections of industrial long-distance pipelines 200 with different spans, ensure that the pipe 200 is subjected to uniform stress during bending loading, avoid local stress concentration that could damage the pipe 200, and ensure the smooth progress of the experiment.

[0119] In other embodiments, to enhance the stability of the simulation device 100, a reinforcing pad can be added at the connection between the bottom of the U-shaped tube support and the ground. The reinforcing pad is then fixed to the ground by expansion bolts, so that the reinforcing pad can withstand a load of no less than 10 tons without deformation, thus ensuring the safety of the experimental process.

[0120] In some embodiments, the ground is set as a cement ground or asphalt ground, etc. The ground needs to be leveled in advance to ensure that the device is level after installation.

[0121] In some embodiments, the simulation device 100 further includes a detection mechanism adapted to be located in the pressure-bearing section of the pipe 200 to detect the bending parameters of the pipe 200. The bending parameters may include bending displacement, curvature, strain, and inertial measurement data, etc.

[0122] For example, the testing mechanism may include strain gauge 41, meter ruler 42, and digital display instrument 43, which can monitor key parameters in real time during the loading process and provide comparative data for the verification of measurement accuracy and parameter adjustment of ACSM and IMU detectors.

[0123] In some embodiments, the detection mechanism includes a measuring tape 42, which can be vertically mounted on the ground or set independently of other components in the simulation device 100, for measuring the downward displacement of the pipe 200.

[0124] For example, the measuring range of the 42 meter ruler is 0mm to 500mm, and the measuring accuracy is less than or equal to ±1mm. It can directly read the bending displacement of the pipe 200 and intuitively reflect the degree of bending of the pipe 200.

[0125] In other embodiments, the detection mechanism may also include a high-precision laser rangefinder to measure the downward displacement of the pipe 200. The high-precision laser rangefinder can improve the displacement measurement accuracy to less than or equal to ±0.1 mm, providing more accurate theoretical reference data for verifying the accuracy of the detector measurement.

[0126] In some embodiments, the detection mechanism includes strain gauges 41, which are attached to different clock positions of the target cross-section of the pipe 200, such as key positions like 1 o'clock, 3 o'clock, 6 o'clock, and 9 o'clock, to measure the strain level of the target cross-section at different clock positions after the pipe 200 is pressed down.

[0127] For example, the measurement accuracy of strain gauge 41 is less than or equal to ±0.001 mm / mm, which can accurately capture the strain difference at different locations of pipe 200, providing detailed data for pipe 200 bending performance analysis and detector calibration.

[0128] In some embodiments, the testing mechanism includes a digital display instrument 43 connected to the strain gauge 41, which visually displays the strain values ​​at each clock position and supports peak hold and real-time recording functions. The digital display instrument 43 can export test data via a USB interface, facilitating comparison and analysis with data acquired by the ACSM and IMU detectors, verifying the accuracy of detector measurements, and adjusting detector parameters based on the comparison results.

[0129] Meanwhile, the simulation device 100 can reserve interfaces for ACSM and IMU detectors, which can be directly connected to the detectors to realize the synchronous acquisition and transmission of bending strain, stress and inertial measurement data, thereby improving the efficiency of parameter calibration.

[0130] In some embodiments, the testing mechanism may also include a temperature sensor to monitor the test environment temperature in real time, thereby reducing the impact of temperature on the measurement of strain gauge 41, experimental data, and the measurement accuracy of the detector.

[0131] In some embodiments, the simulation device 100 may also be configured with a data comparison and analysis module to automatically compare theoretical data with detector measurement data, generate a deviation report, and improve the efficiency of parameter calibration.

[0132] In some embodiments, the testing organization may add a wireless data transmission function to enable remote monitoring and storage of experimental data, adapting to unattended calibration scenarios.

[0133] In some embodiments, support piers 5 may be provided on the outer sides of the first pipe support 11 and the second pipe support 12. For example, a first support pier 5 is provided on the side of the first pipe support 11 opposite to the second pipe support 12, and a second support pier 5 is provided on the side of the second pipe support 12 opposite to the first pipe support 11. The support piers 5 may be formed by concrete casting and are used to further support the pipe 200, ensuring the stability of the long pipe 200 during testing.

[0134] According to the above-mentioned simulation device 100, the operation steps for calibrating the parameters of the ACSM and IMU detectors are as follows: First, the simulation device 100 is set up and positioned.

[0135] Place each component on the leveled cement floor to ensure that the simulation device is level as a whole.

[0136] The hook is installed on the connecting part 214 of the gravity frame 21, and the fixing reliability and adjustment flexibility of the hook are tested.

[0137] For example, when the hook and strap are separate components, the hook and connecting part 214 can be installed and fixed first. When the hook and strap are integrated, the hook at one end of the strap can be fixedly installed on the connecting part 214 on one side of the gravity frame 21, and the adjustment flexibility of the winding mechanism can be tested.

[0138] Connect the top of the jack to the gravity frame 21 bolts, and connect the bottom of the jack to the cement floor bolts, and connect the jack and the pressure gauge.

[0139] It should be noted that connecting the bottom of the jack to the concrete floor enhances its stability and prevents it from detaching from the ground or tilting during lifting. When the jack has sufficient power to maintain stability, it can also be placed directly on the ground without bolts.

[0140] A limiting member 212 is installed on the surface of the support base 211. The installation position of the limiting member 212 can be flexibly adjusted according to the weight and size of the gravity loading member 22.

[0141] Assemble support mechanism 1. Based on the diameter of the industrial long-distance pipeline 200 to be simulated, select a U-shaped pipe support with a groove opening that matches the pipeline 200, for example, a U-shaped pipe support with a diameter of 200mm. Adjust the distance between the two U-shaped pipe supports, for example, to 2m, so that the pipeline 200 can be stably suspended in the air to simulate the actual stress state of the curved section of the long-distance pipeline 200, and to meet the experimental simulation requirements. Fix the U-shaped pipe support to the cement ground using expansion bolts.

[0142] Install the testing mechanism. Attach strain gauges 41 to different clock positions on the target cross-section of pipe 200. Install a measuring tape 42 and connect a digital display instrument 43 to the strain gauges 41 and the measuring tape 42 to display the bending dimensions and strain of pipe 200. Calibrate the strain gauges 41, the measuring tape 42, and the digital display instrument 43 to ensure accurate theoretical data acquisition. Simultaneously connect the ACSM and IMU detectors, ensuring all components are securely connected and the wiring is unobstructed.

[0143] Next, the parameters of the simulation device 100 are set and adjusted.

[0144] Based on the experimental requirements, and considering the curvature, load strength, and distribution of the actual curved pipe section of the industrial long-distance pipeline, the target pressure and pressure distribution distance are set. The pressure distribution distance is determined by the distance between multiple straps.

[0145] Based on the target pressure distribution distance, adjust the position of the straps and hooks on the gravity frame 21 to simulate the load distribution of the target curved pipe section.

[0146] According to the target downward pressure, place the corresponding number of 250kg weights on the gravity frame 21. For example, 24 weights are needed for a downward pressure of 6 tons. The weights are fixed firmly by connecting the adjusting buckle of the limiting member 212 to the slot of the support base 211.

[0147] By adjusting the jack's adjustment knob, the jack pressure is initially adjusted. Combined with the pressure gauge and digital display instrument 43, the downward pressure is adjusted to the preset value to ensure pressure stability and simulate the stress intensity of the target bent pipe section. Simultaneously, the ACSM and IMU detector parameters are initialized, and the detection mode is set to prepare for measurement accuracy verification.

[0148] In some embodiments, before the formal start of the experimental test, pre-adjustment can be performed by placing four 250kg weights on top of the gravity frame 21, with a total weight of 1 ton, to test the stability of the device. The tightness of the connector 23 and the connection part 214 is checked to ensure that there is no looseness or abnormality in each component, thus preparing for experimental simulation and parameter calibration.

[0149] Further, install and secure the 200mm pipe.

[0150] Based on the simulated industrial long-distance pipeline 200, the pipeline to be tested 200 is selected. The pipeline to be tested 200 is placed on two U-shaped pipe supports. The pipeline 200 is suspended in the air by the U-shaped pipe supports to simulate the actual stress state of the bending section of the industrial long-distance pipeline 200. The position of the pipeline 200 is adjusted so that the bending test part of the pipeline 200 is aligned with the bottom of the jack to ensure the accuracy of the bending simulation.

[0151] When installing pipe 200 into the U-shaped pipe support, pipe 200 is hoisted into the U-shaped groove of the U-shaped pipe support. In some embodiments, pipe 200 can be hoisted into the U-shaped groove as a whole. In other embodiments, pipe 200 can be hoisted in sections sequentially. After pipe 200 is hoisted, the later hoisted pipe 200 is welded to the earlier hoisted pipe 200, and multiple pipe sections 200 are connected to form a long pipe 200 for further testing.

[0152] Wrap the strap around the pipe 200, adjust the tightness of the strap, and lock the strap and fix the pipe 200 using the winding mechanism to ensure that the pipe 200 does not shift during loading. Check the fit between the pipe 200 and the U-shaped pipe support and gravity loading mechanism 2 to ensure that the rubber pad is in close contact with the surface of the pipe 200, avoid damage to the surface of the pipe 200, and ensure the integrity of the experimental pipe 200.

[0153] Next, bending loading, data collection, and accuracy verification were performed.

[0154] Start the testing mechanism and calibrate strain gauge 41, meter ruler 42 and display instrument to ensure the accuracy of theoretical reference data.

[0155] Slowly adjust the pressure adjustment knob of the jack to gradually apply downward pressure. In conjunction with the gravity loading mechanism 2, the downward pressure reaches the preset value and remains stable, simulating the actual stress state of the 200-degree curved pipe section of the industrial long-distance pipeline.

[0156] Simultaneously, the ACSM and IMU detectors are activated to collect key data such as bending strain, stress, and inertial measurement of pipe 200. The operator reads the downward displacement of pipe 200 in real time through the ruler 42 and reads the strain level of the target section of pipe 200 at different clock positions through the digital display instrument 43, and records the experimental data synchronously.

[0157] In some embodiments, displacement measurement and strain detection need to be continuously acquired for 30 minutes, and all experimental data need to be recorded in real time.

[0158] During the experiment, theoretical data such as displacement and strain collected by the detection agency were compared and analyzed with the measurement data from the ACSM and IMU detectors to verify the accuracy of the detector measurements and mark parameters with large measurement deviations. For example, when the deviation between the measurement data of the ACSM and IMU detectors and the theoretical data exceeds 5%, the measurement data of the ACSM and IMU detectors can be considered to have large deviations.

[0159] Finally, the detector parameters were adjusted and a second verification was performed.

[0160] Based on the comparative analysis results above, for parameters with large measurement deviations, feedback adjustments are made to the relevant parameters of the ACSM and IMU detectors, such as the strain acquisition sensitivity of the ACSM and the inertial navigation measurement accuracy of the IMU. For example, the strain acquisition sensitivity of the ACSM is increased by one level.

[0161] After the parameters are adjusted, keep the simulation device 100 under load and restart the ACSM and IMU detectors to collect data. Compare the data with the theoretical data from the testing institution to verify the effect of the parameter adjustment. For example, the measurement deviation of the ACSM and IMU detectors can be adjusted to less than or equal to 3%.

[0162] If the measurement deviation still does not meet the preset requirements, repeat the above parameter adjustment and verification steps until the accuracy of the detector's measurement value meets the detection requirements of the 200 bend section of the industrial long-distance pipeline.

[0163] After the test is completed, slowly release the pressure from the jack. Once the pressure drops to 0, remove the weights from the gravity frame 21 and store them separately. Loosen the straps, disconnect the pipe 200 from the straps and strain gauge 41, and remove the pipe 200 from the U-shaped pipe support.

[0164] Shut down the detection facility and the ACSM and IMU detectors, and export all experimental data for subsequent analysis and archiving. Experimental data includes theoretical reference data, detector measurement data, and parameter adjustment records.

[0165] If calibration experiments are required for curved sections of long-distance pipelines 200 with different curvatures, repeat the above steps: install and fix the pipeline 200, perform bending loading, data acquisition and accuracy verification, adjust the detector parameters, and perform secondary verification. Adjust parameters such as the downward pressure by adding or removing weights and the pressure distribution distance by adjusting the fixed position of connector 23.

[0166] After the experiment, the connecting part 214 was used as a lifting lug, and the simulation device 100 was moved to the storage area with the help of hoisting equipment. Each detachable component was then disassembled for easy transportation and storage.

[0167] Clean the dust and impurities from the surface of the simulation device 100, and check each component for wear, looseness, etc.: check for damage to the straps and wear on the rubber gaskets; replace them promptly if necessary. Check the sealing performance of the jack; add hydraulic oil if insufficient. Check the connection lines of the strain gauge 41, meter stick 42, and digital display instrument 43 to ensure unobstructed wiring. Clean the surface of the meter stick 42 to ensure accurate measurements.

[0168] Check the fit between connector 23 and connecting part 214. If there is any looseness, tighten it promptly. Check the integrity and tightness of connecting part 214. Clean the surface of the bolts and apply anti-rust lubricant to ensure that it can both stably lock the straps and function normally as a lifting lug. Check the connection between the U-shaped pipe support and the ground to ensure that it is firmly fixed.

[0169] The simulation device 100 provided in this embodiment adopts a technical solution of gravity frame 21, straps and jacks working together to apply a downward pressure of not less than 6 tons. The downward pressure can be flexibly adjusted by adjusting the number of weights and the output pressure of the jack. Combined with the adjustable position of the connector 23, the pressure distribution can be adjusted. It effectively simulates the stress state of the bent pipe section of the industrial long-distance pipeline 200 under different curvatures and different load intensities, and provides diverse calibration conditions for ACSM and IMU detectors.

[0170] Regarding simulation accuracy, the downward pressure distribution distance along the pipeline 200 of the simulation device 100 provided in this application can be flexibly adjusted within the range of 0.3-3m, accurately reproducing the actual load distribution of different curved sections of the industrial long-distance pipeline 200, making the experimental simulation scenario highly consistent with actual engineering conditions. The built-in detection mechanism of the simulation device 100 can provide accurate theoretical reference data, and by comparing it with the measured data of the ACSM and IMU detectors, the accuracy of the detector measurements can be effectively verified.

[0171] In addition, the device has dedicated interfaces for ACSM and IMU detectors, which can realize the linkage feedback between experimental data and detector parameters. Based on the comparison results, the detector parameters can be quickly adjusted until the detection accuracy requirements are met, thus solving the pain point that existing technologies cannot efficiently complete detector calibration.

[0172] In terms of versatility and deployment efficiency, the simulation device 100 provided in this application adopts a modular structure design, which supports adaptation to industrial long-distance pipelines 200 of different diameters and lengths. The support mechanism 1 can be flexibly replaced to optimize the overhead effect, and the device can be disassembled and decomposed, making on-site installation and debugging simple and deployment time no more than 15 minutes. It can be quickly deployed in laboratory and on-site calibration scenarios.

[0173] In terms of ease of operation and safety, the simulation device 100 provided in this application does not require operation by professional technicians. Loading tests, data acquisition, and parameter calibration can be completed through intuitive instrument displays and convenient testing mechanisms. The device is equipped with multiple fixing and protection structures to ensure that the weights and pipes 200 are firmly fixed and the loading process is controllable. In particular, the simulation device 100 uses a connecting part 214 that combines fixing and hoisting functions, replacing the additional lifting lugs in traditional designs, eliminating the safety hazards caused by additional lifting lugs, and ensuring the safety of the experimental process and the transportation and deployment of the device.

[0174] In terms of economy and practicality, the components of this simulation device 100 are common and easy to procure, resulting in low manufacturing costs. By simplifying the structure and reducing manufacturing costs and maintenance difficulty, this device can be widely used in scenarios such as identifying curved pipe sections in industrial long-distance pipelines 200, calibrating detector parameters, analyzing pipeline performance, and conducting safety assessments. It balances experimental efficiency and quality, facilitates mass production, and provides strong technical support for the safe operation and maintenance of industrial long-distance pipelines 200.

[0175] In the description of this specification, specific features, structures, materials, or characteristics may be combined in any suitable manner in one or more embodiments or examples.

[0176] The above are merely specific embodiments of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.

Claims

1. A simulation device, characterized by, The simulation device, used to simulate the downward pressure borne by the pipeline (200), includes: A support mechanism (1) is provided for supporting the pipe (200) to separate the pipe (200) from the ground. Gravity loading mechanism (2), the gravity loading mechanism (2) being adapted to be carried on the pipe (200) to apply downward pressure to the pipe (200); The lifting mechanism (3) is also supported by the gravity loading mechanism (2), which is capable of lifting and lowering to adjust the downward pressure applied to the pipe (200) by the gravity loading mechanism (2).

2. The simulation device of claim 1, wherein, The gravity loading mechanism (2) includes: Gravity frame (21), which is connected to the lifting mechanism (3); Gravity loading element (22) is connected to the gravity frame (21), and the weight of the gravity loading element (22) is adjustable.

3. The simulation device of claim 2, wherein, The gravity frame (21) includes a support base (211) and a plurality of limiting members (212) disposed on the support base (211), the plurality of limiting members (212) enclosing to form at least one receiving space; The gravity loading element (22) includes a plurality of weights, and the accommodating space can selectively accommodate one or more of the plurality of weights to adjust the weight of the gravity loading element (22).

4. The simulation device of claim 2, wherein, The gravity frame (21) is provided with a connecting part (214); The gravity loading mechanism (2) further includes a connector (23) connected to the connection (214), and at least a portion of the connector (23) is located above the pipe (200). The connector (23) is adapted to convert the gravity load of the gravity frame (21) into a downward pressure applied to the pipe (200).

5. The simulation device of claim 4, wherein, The number of the connecting parts (214) is multiple, and the multiple connecting parts (214) are arranged at intervals along the axial direction of the pipe (200).

6. The simulation device of claim 5, wherein, The number of the connectors (23) is at least one, and the connectors (23) can be selectively connected to at least one of the plurality of connectors (214).

7. The simulation device of claim 5, wherein, The connecting part (214) includes a first lifting part (2141) and a second lifting part (2142) arranged radially at intervals along the pipe (200), and the two ends of the connector (23) are respectively connected to the first lifting part (2141) and the second lifting part (2142).

8. The simulation device of claim 1, wherein, The lifting mechanism (3) includes a jack; And / or, the lifting mechanism (3) includes a first lifting mechanism (3) and a second lifting mechanism (3), the first lifting mechanism (3) and the second lifting mechanism (3) being arranged at radial intervals on both sides of the pipe (200); And / or, the number of the lifting mechanisms (3) is multiple, and the multiple lifting mechanisms (3) are arranged at intervals along the axial direction of the pipe (200).

9. The simulation device of claim 1, wherein, The support mechanism (1) comprises a first pipe support (11) and a second pipe support (12), the first pipe support (11) and the second pipe support (12) are arranged along the axial direction of the pipeline (200), and the gravity loading mechanism (2) and the lifting mechanism (3) are located between the first pipe support (11) and the second pipe support (12).

10. The simulation device of claim 1, wherein, Further comprising: a detection mechanism, the detection mechanism is suitable to be arranged at the pressure section of the pipeline (200) to detect the bending parameter of the pipeline (200).