A closed-loop control method for multi-component micro-liquid preparation in grinding aid production

By generating a three-phase pre-adjustment scheme and real-time monitoring, the problems of flow regulation lag and viscosity change in grinding aid production were solved, achieving efficient closed-loop control and improving the accuracy and safety of the grinding aid preparation process.

CN123113722APending Publication Date: 2026-11-17MOZHIDAO (SHANDONG) MEASUREMENT & CONTROL EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611224774.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-13
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In the existing grinding aid production process, the flow rate adjustment response is slow, making it difficult to capture the flow drift risk caused by dynamic changes in material viscosity. The proportioning accuracy is seriously deviated, and there is a lack of adaptive control strategies, which cannot effectively guarantee product quality and flow safety.

Method used

By collecting real-time status data of each pipeline in the grinding aid mixing tank, a three-phase pre-adjustment scheme is generated, the hazard factor of high pressure flow and the safety factor of component mixing are evaluated, the optimal pipeline distribution scheme is screened, and the torque and conductivity of the stirring paddle are monitored in real time during the mixing process to make micro-mixing adjustments and form a closed-loop control.

Benefits of technology

It improves the accuracy of identifying the viscosity characteristics of flowing materials and the accuracy of pipeline distribution planning in the grinding aid preparation process, ensures safe component mixing, prevents high pressure hazards during flow, achieves efficient and accurate liquid preparation resource allocation, and improves product quality and flow safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123113722A_ABST
    Figure CN123113722A_ABST
Patent Text Reader

Abstract

This invention discloses a closed-loop control method for multi-component micro-liquid preparation in the production of grinding aids, relating to the field of closed-loop control technology. This invention improves the accuracy of viscosity characteristic identification of flowing materials and the accuracy of pipeline distribution scheme planning during the grinding aid preparation process. It achieves efficient and accurate evaluation of the rationality of preparation schemes and dynamic construction of pipeline distribution strategies, significantly improving the accuracy of three-phase pre-adjustment scheme screening and the rationality of preparation resource allocation during the grinding aid preparation process. It effectively prevents insufficient response of fixed preparation control strategies to actual viscosity changes and dynamic proportioning requirements, avoids pipeline safety hazards and equipment malfunctions caused by excessive high-pressure flow, and effectively improves the pertinence and implementation effect of the final synergistic flow safety and proportioning accuracy optimization scheme, ensuring a high degree of fit between the preparation control strategy and the actual dynamic viscosity changes of the materials.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of closed-loop control technology, specifically to a closed-loop control method for multi-component micro-liquid preparation in the production of grinding aids. Background Technology

[0002] Multi-component micro-liquid preparation of grinding aids is a core technology link in the production process of cement grinding aids, which is to control the proportioning accuracy and ensure the stability of product quality. Under the conditions of multi-pipe collaborative feeding and dynamic changes in the viscosity of component materials, it is necessary to make scientific decisions to maximize the accuracy of liquid preparation, ensure the flow safety, and correct the proportioning deviation in real time. Therefore, it is essential to build a closed-loop control system for multi-component micro-liquid preparation of grinding aids based on real-time analysis of the viscosity of flowing materials and multi-objective optimization of pipeline distribution schemes.

[0003] In existing technologies, the grinding aid preparation process relies on a fixed ratio setpoint combined with a timed flow control strategy to manage the addition and ratio control of each component raw material. When there are large changes in pipeline temperature and pressure or significant differences in the viscosity of the components, the flow regulation response speed is significantly lagging, the ratio accuracy deviation is serious, and it is difficult to capture the flow drift risk distribution caused by dynamic changes in material viscosity and the evolution of the feeding rate caused by pipeline tilt angle deviation. Although existing technologies introduce control methods such as flow feedback to improve ratio stability, they fail to distinguish the respective contributions of pipeline temperature and pressure changes and valve opening adjustment to flow control capability. The system lacks judgment on the source of abnormal ratio deviation and does not consider the coupling relationship between the order of component addition and the energy impact sensitivity of the mixture. It is difficult to accurately assess the hazard coefficient of high-pressure flow, the estimated viscosity abnormality area, and the consumption of preparation and adjustment resources. When faced with the multi-factor coupling effect caused by abnormal pipeline flow or sudden changes in material viscosity, problems such as adjustment failure, ratio accuracy deviation, and decline in grinding aid product quality or waste of adjustment resources are likely to occur.

[0004] Furthermore, existing technologies lack a matching mechanism for the energy efficiency differences of different pipeline liquid preparation schemes and the spatial distribution of component mixing states in the dynamic optimization process of liquid preparation strategies. They cannot effectively realize the generation of adaptive pipeline distribution schemes and the formulation of differentiated three-phase pre-adjustment parameters based on the current viscosity characteristics of the flowing material. In addition, they have defects such as lag in response to viscosity anomalies, weak ability to identify the source of ratio deviation, lack of joint optimization of flow safety and mixing uniformity, insufficient analysis of component addition sequence matching, and unreasonable allocation of adjustment resources. As a result, the grinding aid liquid preparation system cannot effectively support the guarantee of product ratio accuracy and pipeline flow safety. At the same time, it lacks an adaptive liquid preparation control strategy for high uncertainty viscosity changes under different raw materials, and cannot adaptively generate differentiated liquid preparation parameter optimization schemes based on the current material viscosity distribution state, component mixing state evolution and other dynamic changes. Summary of the Invention

[0005] The purpose of this invention is to provide a closed-loop control method for multi-component micro-liquid preparation in the production of grinding aids, which solves the problems existing in the background art.

[0006] To solve the above technical problems, the present invention adopts the following technical solution: The present invention provides a closed-loop control method for multi-component micro-liquid preparation in the production of grinding aids. Step 1. When the grinding aid preparation task is issued, real-time status data of each pipeline belonging to the grinding aid preparation tank are collected, thereby analyzing the viscosity value of the flowing material of each component raw material in each pipeline and generating each three-phase pre-adjustment scheme of each component raw material. Step 2. Based on the viscosity values ​​of the flowing materials of each component raw material in each pipeline and each three-phase preconditioning scheme, evaluate the high-pressure hazard factor and component mixing safety factor of each three-phase preconditioning scheme, and select the optimal pipeline distribution scheme and pipeline preconditioning scheme for the grinding aid liquid preparation tank accordingly. Step 3. Send the optimal pipeline allocation scheme and pipeline pre-adjustment scheme of the grinding aid liquid preparation tank to the liquid preparation control terminal for execution. During the liquid preparation process, collect the real-time stirring paddle torque value, real-time conductivity value and material temperature of each internal area of ​​the grinding aid liquid preparation tank at each liquid preparation time point when each component raw material is added, so as to estimate the estimated viscosity of the grinding aid in each internal area of ​​the grinding aid liquid preparation tank after the addition of each component raw material is completed. Step 4. Based on the estimated viscosity of the grinding aid in each internal area of ​​the grinding aid mixing tank after the addition of each component raw material, determine whether the grinding aid mixing tank needs to be adjusted by micro-liquid mixing after the addition of each component raw material. If so, proceed to step 5. If not, complete the grinding aid mixing task. Step 5. Analyze the additional amount of grinding aid solution added, pipeline direction, valve opening, pipeline inclination angle and feeding rate after the addition of each component raw material in the mixing tank, and execute the corresponding operations to form a closed-loop control.

[0007] The beneficial effects of this invention are as follows: This invention improves the accuracy of identifying the viscosity characteristics of flowing materials and the accuracy of pipeline distribution scheme planning in the grinding aid preparation process. It can accurately distinguish the viscosity differences caused by pipeline temperature and pressure changes and the influencing factors of valve opening and pipeline tilt adjustment through three-phase pre-adjustment scheme traversal analysis and flow high-pressure hazard factor assessment. This enables efficient and accurate evaluation of the rationality of the preparation scheme and dynamic construction of pipeline distribution strategies, significantly improving the screening accuracy of three-phase pre-adjustment schemes and the rationality of preparation resource allocation in the grinding aid preparation process. Furthermore, it can dynamically determine the component mixing safety factor assessment requirements based on the actual flowing material viscosity distribution characteristics of each component raw material and the preparation execution status. The goal is to effectively prevent fixed liquid mixing control strategies from failing to respond adequately to actual viscosity changes and dynamic proportioning requirements, avoid pipeline safety hazards and equipment malfunctions caused by excessive high-pressure flow, achieve accurate assessment of pipeline allocation based on the total energy value entering the tank and the energy impact hazard intensity coefficient, and formulate differentiated adaptive viscosity anomaly early warning strategies. This will effectively improve the pertinence and implementation effect of the final collaborative flow safety and proportioning accuracy optimization scheme, accurately identify the predicted viscosity anomaly areas that threaten the quality of grinding aid products and the main factors and optimal micro-adjustment matching schemes for the corresponding proportioning deviations, and ensure a high degree of fit between the liquid mixing control strategy and the actual dynamic viscosity changes of the material. Attached Figure Description

[0008] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0009] Figure 1 This is a schematic diagram of the method flow of the present invention. Detailed Implementation

[0010] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0011] Reference Figure 1 As shown, the present invention provides a closed-loop control method for multi-component micro-liquid preparation in the production of grinding aids, including: Step 1. When the grinding aid preparation task is issued, real-time status data of each pipeline belonging to the grinding aid preparation tank are collected, thereby analyzing the viscosity values ​​of the flowing materials of each component raw material in each pipeline, and generating each three-phase pre-adjustment scheme of each component raw material.

[0012] In one specific embodiment, real-time status data of each pipeline belonging to the grinding aid mixing tank is collected. The specific method is as follows: the pipeline temperature value of each pipeline is collected by a temperature sensor, and the pipeline pressure value of each pipeline is collected by a pressure transmitter. The temperature sensor is installed at the inlet flange of each component raw material pipeline, and the pressure transmitter is installed at the outlet end of each pipeline.

[0013] It should be noted that each component raw material refers to the various raw material components that make up the grinding aid product. Grinding aids are usually composed of multiple components such as triethanolamine, ethylene glycol, and organic acid salts in a specific ratio. Different component raw materials have different physicochemical properties, such as viscosity, density, and surface tension. The ratio and order of addition of each component raw material directly affect the final performance of the grinding aid. The specific types and ratios of each component raw material can be determined according to the grinding aid product standard and production formula.

[0014] In a specific embodiment of the present invention, the viscosity values ​​of the flowing materials of each component raw material in each pipeline are analyzed. The specific method is as follows: based on the real-time status data of each pipeline belonging to the grinding aid mixing tank, the pipeline temperature value and pipeline pressure value of each pipeline belonging to the grinding aid mixing tank are extracted, and the material viscosity values ​​of each component raw material under each pipeline temperature value range and each pipeline pressure value range are obtained from the local database, thereby mapping the viscosity values ​​of the flowing materials of each component raw material in each pipeline.

[0015] It should be noted that the viscosity values ​​of each component raw material in each pipeline temperature range and each pipeline pressure range refer to the viscosity characteristic parameters of different component raw materials under different temperature and pressure conditions. This correspondence reflects the rheological characteristics of each component raw material. Generally, an increase in temperature leads to a decrease in material viscosity, while an increase in pressure leads to an increase in material viscosity. This correspondence can be determined by conducting rheological tests on each component raw material, that is, measuring the viscosity value of each component raw material using a rotational viscometer under different temperature and pressure conditions. After statistical analysis of the data, a three-dimensional mapping relationship table of temperature-pressure-viscosity is established. For example, the material viscosity value of triethanolamine in the temperature range of 20 degrees Celsius to 30 degrees Celsius and the pressure range of 0.1 MPa to 0.2 MPa is 550 mPa·s.

[0016] In a specific embodiment of the present invention, the three-phase pre-adjustment schemes for each component raw material are generated. The specific method is as follows: the target addition amount, allowable liquid addition time, maximum feeding rate, maximum pipe tilt angle and maximum valve opening of each component raw material are obtained from the local database. Based on the target addition amount and allowable liquid addition time of each component raw material, the minimum feeding rate of each component raw material is calculated and combined with the maximum feeding rate of each pipe to form the feeding rate range of each component raw material in each pipe. The range is divided according to the preset feeding rate step value to obtain the feeding rate of each component raw material in each pipe.

[0017] It should be noted that the target addition amount of each component raw material refers to the mass value of each component raw material that should be added in the current batch of solution preparation, as determined by the grinding aid product formula. The allowable solution preparation and addition time refers to the maximum time limit for the addition of the component raw material according to the production plan requirements. The maximum feeding rate of each pipeline refers to the maximum material conveying rate allowed by each pipeline under the condition of safe equipment operation. The maximum pipeline tilt angle refers to the maximum angle value that the adjustable tilting mechanism of each pipeline can adjust. The maximum valve opening refers to the opening value corresponding to the fully open state of the metering valve of each pipeline. The above parameters can be obtained from the equipment technical manual and production process documents of the solution preparation system. For example, the target addition amount of triethanolamine is 100 kg, the allowable solution preparation and addition time is 30 minutes, the corresponding maximum feeding rate of the pipeline is 5 kg per minute, the maximum pipeline tilt angle is 45 degrees, and the maximum valve opening is fully open.

[0018] It should also be noted that the preset feeding rate step value can be divided according to a fixed ratio. Based on the feeding rate range, it is fixedly divided into 10 values, and the difference between two adjacent values ​​is the preset feeding rate step value.

[0019] In one specific embodiment, the minimum feeding rate of each component raw material is calculated by dividing the target addition amount of each component raw material by the corresponding allowable addition time to obtain the minimum feeding rate of each component raw material. The minimum feeding rate represents the lower limit of the feeding rate required to just complete the target addition amount within the allowable addition time.

[0020] Based on the maximum pipe inclination angle and maximum valve opening of each pipe, the pipes are divided according to the preset valve step value and preset pipe inclination angle step value to obtain the valve opening value and pipe inclination angle of each pipe. These values ​​are then combined with the feeding rates of each component raw material in each pipe to obtain the valve opening value, pipe inclination angle and feeding rate of each component raw material in each preset combination in each pipe. These values ​​are then used as the three-phase pre-adjustment schemes for each component raw material.

[0021] It should be noted that the preset valve step value refers to the incremental value of the step adjustment of the opening of the pipeline metering valve when generating each three-phase pre-adjustment scheme, and the preset pipeline tilt angle step value refers to the incremental value of the angle of the step adjustment of the pipeline tilt angle. The setting of the step value needs to strike a balance between ensuring the diversity of schemes and the computational efficiency. If the step value is too small, it will result in too many generated schemes and increase the computational burden. If the step value is too large, the optimal adjustment scheme may be missed. The preset valve step value can be set to five percent of the maximum valve opening, and the preset pipeline tilt angle step value can be set to ten percent of the maximum pipeline tilt angle.

[0022] Step 2. Based on the viscosity values ​​of the raw materials flowing in each pipeline and each three-phase preconditioning scheme, evaluate the high-pressure hazard factor and component mixing safety factor of each three-phase preconditioning scheme, and select the optimal pipeline distribution scheme and pipeline preconditioning scheme for the grinding aid mixing tank accordingly.

[0023] In a specific embodiment of the present invention, the flow high pressure hazard factor and component mixing safety factor of each three-phase pre-adjustment scheme are evaluated by the following method: based on the pipe inclination angle and feeding rate of each component raw material in each preset combination of each pipe, and combined with the viscosity value of the flowing material of each component raw material in each pipe, the estimated flow velocity value of each component raw material in each preset combination of each pipe is evaluated, and combined with the valve opening value of each component raw material in each preset combination of each pipe, the valve port flow rate value and valve port pressure value of each component raw material in each preset combination of each pipe are calculated, thereby analyzing the flow high pressure hazard factor of each component raw material in each preset combination of each pipe.

[0024] In one specific embodiment, the estimated flow rate of each component raw material in each preset combination of each pipeline is evaluated by means of the following method: based on the feeding rate and pipeline inclination angle of each component raw material in each preset combination of each pipeline, combined with the viscosity value of the flowing material in each pipeline, the pipeline flow rate value corresponding to each feeding rate range, each pipeline inclination angle range, and each material viscosity value range is obtained from the local database, and the estimated flow rate value of each component raw material in each preset combination of each pipeline is mapped to obtain the estimated flow rate value of each component raw material in each preset combination of each pipeline. This flow rate value represents the actual flow velocity of the material in the pipeline. For example, when the feeding rate is 3 kg per minute, the pipeline inclination angle is 30 degrees, and the viscosity value of the flowing material is 50 mPa·s, the corresponding pipeline flow rate value is 0.5 m / s. The relationship between the pipeline flow rate values ​​corresponding to each feeding rate range, each pipeline inclination angle range, and each material viscosity value range can be obtained by researchers through all combinations and then stored in the local database.

[0025] In one specific embodiment, the flow rate and pressure values ​​at the valve ports of each component raw material in each preset combination of each pipeline are calculated to analyze the high-pressure hazard coefficient of each component raw material in each preset combination of each pipeline. The specific method is as follows: Based on the feeding rate and valve opening value of each component raw material in each preset combination of each pipeline, the feeding rate is divided by the product of the valve opening value and the pipeline cross-sectional area to obtain the valve port flow rate value. Based on the estimated flow velocity value and the viscosity value of the flowing material in each preset combination of each component raw material in each pipeline, the square of the estimated flow velocity value is multiplied by the viscosity value of the flowing material and then divided by the pipeline diameter to obtain the valve port pressure value. The maximum allowable working pressure of the pipeline is obtained from the local database. This pressure value refers to the maximum pressure limit that the pipeline can withstand under safe operating conditions, which can be obtained from the pipeline equipment technical manual. In this invention, the maximum allowable working pressure of the pipeline is set to 1 MPa. The valve port pressure value is divided by the maximum allowable working pressure of the pipeline to obtain the high-pressure hazard coefficient.

[0026] The system retrieves the liquid preparation order of each component raw material and the height of each pipeline relative to the bottom of the grinding aid liquid preparation tank from the local database. Combined with the valve port flow rate and valve port pressure values ​​of each component raw material in each preset combination of each pipeline, the system analyzes the component mixing safety factor of each component raw material in each preset combination of each pipeline.

[0027] The above data are used to obtain the high-pressure hazard factor and component mixing safety factor for each three-phase pre-adjustment scheme.

[0028] In a specific embodiment of the present invention, the component mixing safety factor of each component raw material in each preset combination of each pipeline is analyzed. The specific method is as follows: based on the liquid preparation order of each component raw material and the height value of each pipeline relative to the bottom of the grinding aid liquid preparation tank, the gravitational potential energy value of each component raw material in each preset combination of each pipeline when the grinding aid liquid preparation tank is added is calculated.

[0029] In one specific embodiment, the gravitational potential energy value of each component raw material in each preset combination of each pipeline when added to the grinding aid mixing tank is calculated as follows: based on the feeding rate of each component raw material in each preset combination of each pipeline, and combined with the target addition amount of each component raw material, the added mass of each component raw material per unit time is calculated. Based on the height value of each pipeline relative to the bottom of the grinding aid mixing tank, the added mass of each component raw material per unit time is multiplied by the corresponding height value and then multiplied by the gravitational acceleration to obtain the gravitational potential energy value of each component raw material in each preset combination of each pipeline.

[0030] Based on the flow rate and pressure values ​​at the valve ports of each component raw material in each preset combination of each pipeline, and combined with the height of each pipeline relative to the bottom of the grinding aid mixing tank, the kinetic energy value of each component raw material entering the tank in each preset combination of each pipeline when added to the grinding aid mixing tank is calculated.

[0031] In one specific embodiment, the kinetic energy value of each component raw material in each preset combination of each pipeline when added to the grinding aid mixing tank is calculated as follows: based on the mixing order of each component raw material and the target addition amount of each component raw material, the horizontal height of the existing grinding aid mixture in the mixing tank when each component raw material is added is calculated. The actual falling height of each component raw material is obtained by subtracting the horizontal height of the existing grinding aid mixture in the mixing tank from the height of each pipeline relative to the bottom of the grinding aid mixing tank. The estimated flow velocity value of each component raw material in each preset combination of each pipeline is used as the initial flow velocity. The square of the initial velocity is obtained by adding the square of the velocity increment corresponding to the actual falling height and taking the square root. The kinetic energy value of each component raw material added per unit time is multiplied by the square of the instantaneous flow velocity in the tank to obtain the kinetic energy value of the material entering the tank.

[0032] Based on the gravitational potential energy and kinetic energy of each component raw material in each preset combination of each pipeline, the total energy value of each component raw material in each preset combination of each pipeline is obtained by superimposing them. Combined with the liquid preparation order of each component raw material, the composition of the grinding aid mixture before the addition of each component raw material is screened, thereby assessing the energy impact hazard intensity coefficient of each component raw material in each preset combination of each pipeline to the already added grinding aid mixture. The reciprocal of this coefficient is used to obtain the component mixing safety factor of each component raw material in each preset combination of each pipeline.

[0033] In one specific embodiment, the components of the grinding aid mixture before the addition of each component raw material are screened to assess the energy shock hazard intensity coefficient of each component raw material in each preset combination of each pipeline to the added grinding aid mixture. The specific method is as follows: based on the liquid preparation order of each component raw material, each component raw material added before the current component raw material is screened and regarded as the component of the grinding aid mixture before the addition of the current component raw material. The energy shock sensitivity coefficient corresponding to each component combination is obtained from the local database. This sensitivity coefficient represents the sensitivity of different components to energy shock. Different components have different sensitivities to energy shock. Mixtures containing volatile or easily decomposed components are more sensitive to energy shock. For example, the energy shock sensitivity coefficient of a mixture containing only water is 0.2, that of a mixture containing water and triethanolamine is 0.5, and that of a mixture containing water, triethanolamine, and ethylene glycol is 0.8. This value can be obtained by researchers through actual experiments. The total energy value of each component raw material entering the tank in each preset combination of each pipeline is multiplied by the corresponding energy shock sensitivity coefficient to obtain the energy shock hazard intensity coefficient.

[0034] In a specific embodiment of the present invention, the optimal pipeline allocation scheme and pipeline pre-adjustment scheme for screening the grinding aid liquid preparation tank are specifically implemented by: screening each flow safety preset combination of each component raw material in each pipeline based on the high pressure hazard coefficient of each component raw material in each preset combination of each pipeline.

[0035] In one specific embodiment, the method for screening each component raw material in each pipeline for each flow safety preset combination is as follows: The safety threshold of the flow high pressure hazard coefficient is obtained from a local database. This safety threshold represents the upper limit of the high pressure hazard coefficient that the pipeline flow system can withstand. It can be determined based on the pipeline material strength and safety factor. The setting of this threshold needs to consider the pipeline's pressure-bearing capacity and long-term operational safety. An excessively high flow high pressure hazard coefficient will lead to increased pipeline fatigue damage and leakage risk. In this invention, the safety threshold of the flow high pressure hazard coefficient is set to 0.8. Based on the flow high pressure hazard coefficient of each component raw material in each pipeline for each preset combination, if the flow high pressure hazard coefficient of a preset combination is less than the safety threshold, then the preset combination is marked as a flow safety preset combination, thereby screening each component raw material in each pipeline for each flow safety preset combination.

[0036] Based on the component mixing safety factor of each component raw material in each preset combination in each pipeline, each component raw material in each pipeline is screened for each mixing safety preset combination, and the intersection of each flow safety preset combination is taken to obtain each initial screening preset combination of each component raw material in each pipeline.

[0037] In one specific embodiment, the method for screening the safe preset combinations of each component raw material in each pipeline is as follows: The safety threshold of the component mixing safety factor is obtained from a local database. This safety threshold represents the lower limit of the component mixing safety factor corresponding to the energy shock that the grinding aid mixture can safely withstand. It can be determined according to the chemical stability and mixing uniformity requirements of each component of the grinding aid. The setting of this threshold needs to consider the impact of energy shock on the stability of the grinding aid mixture. If the component mixing safety factor is too low, it indicates that the intensity of the energy shock hazard is too high, which may lead to the decomposition or precipitation of the grinding aid components, affecting product quality. In this invention, the safety threshold of the component mixing safety factor is set to 1.2. Based on the component mixing safety factor of each component raw material in each preset combination in each pipeline, if the component mixing safety factor of a preset combination is greater than the safety threshold, then the preset combination is marked as a safe mixing preset combination, thereby screening the safe mixing preset combinations of each component raw material in each pipeline.

[0038] Based on the high-pressure hazard coefficient and component mixing safety factor of each component raw material in each pipeline and the viscosity value of the flowing material in each pipeline, the appropriate allocation score of each component raw material in each pipeline is evaluated. The target scheme is screened through the conditional allocation method. The pipelines and corresponding primary screening preset combinations of each component raw material in the target scheme are respectively taken as the optimal pipeline allocation scheme and the pipeline pre-adjustment scheme.

[0039] In one specific embodiment, the appropriate allocation score of each component raw material in each pre-screened combination in each pipeline is evaluated. The specific method is as follows: Based on the high-pressure hazard coefficient and the component mixing safety coefficient of each component raw material in each pre-screened combination in each pipeline, the component mixing safety coefficient is divided by the sum of the high-pressure hazard coefficient and the component mixing safety coefficient to obtain the basic score. Based on the viscosity value of each component raw material in each pipeline, the viscosity suitability coefficient corresponding to each viscosity value range is obtained from the local database. This coefficient represents the suitability of different viscosity values ​​for the liquid preparation effect. Too high viscosity will lead to mixing difficulties and increased flow resistance, while too low viscosity will lead to uneven component dispersion. For example, the viscosity suitability coefficient corresponding to the viscosity value of the flowing material in the range of 400 mPa·s to 600 mPa·s is 1, and the viscosity suitability coefficient corresponding to the viscosity value of the flowing material in the range of 200 mPa·s to 400 mPa·s is 0.8. The basic score is multiplied by the viscosity suitability coefficient to obtain the appropriate allocation score of each component raw material in each pre-screened combination in each pipeline.

[0040] In a specific embodiment of the present invention, a target scheme is selected by a conditional allocation method. The specific method is as follows: each component raw material is allocated to only one pipeline, and only one preliminary screening preset combination is used in one pipeline as a constraint condition. The raw materials of each component are allocated as much as possible, thereby obtaining the pipeline and the corresponding preliminary screening preset combination of each component raw material in each allocation scheme. The suitable allocation score value of each component raw material in the corresponding pipeline and the corresponding preliminary screening preset combination in each allocation scheme is extracted, and the sum is used to obtain the comprehensive suitable allocation score value of each allocation scheme. The allocation scheme with the largest comprehensive suitable allocation score value is selected as the target scheme.

[0041] In one specific embodiment, the pipelines corresponding to each component raw material and the corresponding preliminary screening preset combinations are obtained in each allocation scheme. The specific method is as follows: based on the constraint condition that each component raw material is only allocated to one pipeline and only one preliminary screening preset combination is used in one pipeline, the components raw material and each pipeline are traversed and combined. For each combination scheme, it is checked whether the constraint condition is met. If a component raw material is allocated to multiple pipelines in the scheme or a pipeline is allocated to multiple preliminary screening preset combinations, the scheme does not meet the constraint condition and is excluded. All combinations that meet the constraint condition are taken as each allocation scheme, and the pipelines corresponding to each component raw material and the corresponding preliminary screening preset combinations are extracted in each allocation scheme.

[0042] Step 3. Send the optimal pipeline allocation scheme and pipeline pre-adjustment scheme of the grinding aid mixing tank to the mixing control terminal for execution. During the mixing process, collect the real-time stirring paddle torque value, real-time conductivity value and material temperature of each internal area of ​​the grinding aid mixing tank at each mixing time point when each component raw material is added, so as to estimate the estimated viscosity of the grinding aid in each internal area of ​​the grinding aid mixing tank after the addition of each component raw material is completed.

[0043] In one specific embodiment, the real-time stirring paddle torque value, real-time electrical conductivity value, and material temperature of each internal region are collected at each mixing time point when each component raw material is added to the grinding aid mixing tank. The specific method is as follows: the real-time stirring paddle torque value is collected by a torque sensor installed on the stirring motor shaft; the real-time electrical conductivity value of each internal region is collected by a conductivity probe distributed at different heights and radial positions in the mixing tank; and the material temperature of each internal region is collected by a resistance temperature sensor.

[0044] It should be noted that each internal region refers to the spatial division of the internal space of the grinding aid mixing tank according to the tank wall. The internal space of the mixing tank is evenly divided into multiple tank wall regions, which can be 10 to 20, as determined by the researchers. The tank wall regions are connected to the central axis of the internal space of the grinding aid mixing tank, thus forming multiple independent internal regions. The division of each internal region can be determined according to the geometric dimensions of the mixing tank, the distribution of the agitator, and the installation position of the sensors. By monitoring each internal region separately, the concentration distribution and temperature distribution of the grinding aid mixture in the mixing tank can be more accurately grasped.

[0045] In a specific embodiment of the present invention, the estimated viscosity of the grinding aid in each internal region of the grinding aid mixing tank after the addition of each component raw material is estimated is determined by: analyzing the concentration value of the grinding aid mixture in each internal region of the grinding aid mixing tank at each mixing time point of each component raw material addition based on the real-time conductivity value of each internal region of each mixing time point of each mixing time point of each component raw material addition.

[0046] In one specific embodiment, the concentration values ​​of the grinding aid mixture in each internal region at each mixing time point of each component raw material addition are analyzed. The specific method is as follows: the conductivity and concentration calibration relationship of the grinding aid mixture under each component raw material combination is obtained from the local database. This calibration relationship is established by conducting conductivity tests on grinding aid mixtures of different component raw material combinations at different concentrations, reflecting the correspondence between conductivity values ​​and grinding aid mixture concentrations. For example, if triethanolamine is currently added, the grinding aid mixture concentration is 10% when the conductivity is 5 mS / cm and 20% when the conductivity is 10 mS / cm. Based on the real-time conductivity values ​​of each internal region of the grinding aid mixing tank at each mixing time point of each component raw material addition, the values ​​are mapped in the conductivity-concentration calibration relationship to obtain the grinding aid mixture concentration values ​​of each internal region at each mixing time point of each component raw material addition.

[0047] Based on the real-time stirring paddle torque values ​​at each mixing time point when each component raw material is added, the stirring paddle torque fluctuation coefficient at each mixing time point when each component raw material is added is calculated.

[0048] In one specific embodiment, the method for calculating the stirring paddle torque fluctuation coefficient at each solution preparation time point when each component raw material is added is as follows: based on the real-time stirring paddle torque value at each solution preparation time point when each component raw material is added, the stirring paddle torque change between each adjacent solution preparation time point is calculated. The absolute value of the stirring paddle torque change between each adjacent solution preparation time point is divided by the real-time stirring paddle torque value of the previous solution preparation time point to obtain the torque fluctuation rate between each adjacent solution preparation time point. All torque fluctuation rates are added together and divided by the total number of solution preparation time points minus one to obtain the stirring paddle torque fluctuation coefficient at each solution preparation time point when each component raw material is added.

[0049] Based on the material temperature and grinding aid mixture concentration of each internal region at each mixing time point of each component raw material addition, and combined with the stirring paddle torque fluctuation coefficient at each mixing time point of each component raw material addition, the estimated viscosity of the grinding aid in each internal region after the addition of each component raw material is completed is calculated.

[0050] In one specific embodiment, the estimated viscosity of the grinding aid in each internal region after the addition of each component raw material is calculated. The specific method is as follows: Based on the concentration value of the grinding aid mixture in each internal region after the addition of each component raw material, the trend of the change value of the grinding aid mixture in each internal region during the addition of each component raw material is extracted, the standard deviation of the concentration value in each internal region is calculated, and the standard deviation is used as the concentration fluctuation amplitude. Based on the material temperature in each internal region after the addition of each component raw material, a standard temperature of 25 degrees Celsius is set, and the temperature deviation value is obtained by subtracting the standard temperature from the material temperature in each internal region. Based on the concentration value of the grinding aid mixture in each internal region after the addition of each component raw material, the concentration value is multiplied by the temperature deviation value and the exponent is taken to obtain the temperature viscosity influence factor. Based on the stirring paddle torque fluctuation coefficient, the concentration fluctuation amplitude is multiplied by the stirring paddle torque fluctuation coefficient to obtain the mixing uneven viscosity correction value. The concentration value is multiplied by the temperature viscosity influence factor and then added to the mixing uneven viscosity correction value to obtain the estimated viscosity of the grinding aid in each internal region after the addition of each component raw material.

[0051] Step 4. Based on the estimated viscosity of the grinding aid in each internal area of ​​the grinding aid mixing tank after the addition of each component raw material, determine whether the grinding aid mixing tank needs to be adjusted by a small amount of mixing after the addition of each component raw material. If so, proceed to step 5. If not, the grinding aid mixing task is completed.

[0052] In one specific embodiment, the method for determining whether a micro-adjustment of the grinding aid mixing tank is required after the addition of each component raw material is as follows: the target viscosity value and allowable viscosity deviation range of the grinding aid mixture after the addition of each component raw material are obtained from the local database; based on the estimated viscosity of the grinding aid in each internal region of the grinding aid mixing tank after the addition of each component raw material, the target viscosity value of the grinding aid mixture is subtracted from the estimated viscosity of the grinding aid in each internal region to obtain the viscosity deviation value of each internal region; if the viscosity deviation value of any internal region exceeds the allowable viscosity deviation range, it is determined that a micro-adjustment of the mixing tank is required; otherwise, it is determined that no adjustment is required.

[0053] Step 5. Analyze the additional amount of grinding aid solution added, pipeline direction, valve opening, pipeline inclination angle and feeding rate after the addition of each component raw material in the mixing tank, and execute the corresponding operations to form a closed-loop control.

[0054] In a specific embodiment of the present invention, the additional amount of grinding aid added, pipeline direction, valve opening, pipeline tilt angle, and feeding rate after the addition of each component raw material in the grinding aid mixing tank are analyzed. The specific method is as follows: the target viscosity value and allowable viscosity deviation range of the grinding aid mixture after the addition of each component raw material are obtained from the local database. Based on the estimated viscosity of the grinding aid in each internal region of the grinding aid mixing tank after the addition of each component raw material, the viscosity deviation value between the estimated viscosity of the grinding aid in each internal region and the target viscosity value of the grinding aid mixture is calculated. Each internal region whose viscosity deviation value exceeds the allowable viscosity deviation range is selected as a viscosity abnormality region.

[0055] It should be noted that the target viscosity value of the grinding aid mixture after the addition of each component raw material refers to the target viscosity value that the grinding aid mixture should achieve, determined according to the grinding aid product standard and the requirements of different component ratios. Different combinations of raw materials correspond to different target viscosity values. The target viscosity value directly affects the dispersion effect and grinding performance of the grinding aid in the cement grinding process. The allowable viscosity deviation range refers to the range of fluctuation that the actual viscosity value is allowed to fluctuate relative to the target viscosity value. This range can be determined according to the quality standard of the grinding aid product and the stability requirements of the production process. For example, when the ratio of water to triethanolamine is 3:1, the target viscosity value of the grinding aid mixture is 500 mPa·s, and the allowable viscosity deviation range is ±50 mPa·s, that is, the actual viscosity value should be between 450 mPa·s and 550 mPa·s.

[0056] Based on the viscosity deviation values ​​of each viscosity abnormality region, the direction of viscosity deviation in each viscosity abnormality region is determined. If the viscosity deviation value is positive, it indicates that the viscosity of the region is too high. If the viscosity deviation value is negative, it indicates that the viscosity of the region is too low. Based on the direction of viscosity deviation, the component raw materials corresponding to each viscosity abnormality region are identified from each component raw material. Based on the viscosity deviation values ​​of each viscosity abnormality region, the additional amount of solution to be added for each viscosity abnormality region is calculated.

[0057] In one specific embodiment, the raw material to be compensated for each viscosity abnormality region is identified by the following method: based on the viscosity deviation value and viscosity deviation direction of each viscosity abnormality region, if the viscosity deviation value is positive, it indicates that the viscosity of the region is too high, and water is used as the raw material to be compensated. The viscosity is reduced by adding water to decrease the concentration of the grinding aid mixture. If the viscosity deviation value is negative, it indicates that the viscosity of the region is too low, and the last added raw material is used as the raw material to be compensated.

[0058] Based on the spatial location of each viscosity anomaly region within the grinding aid mixing tank, and combined with the pipeline inlet corresponding to the raw material of the component to be compensated in the optimal pipeline distribution scheme, the direction corresponding to the center point of each viscosity anomaly region is taken as the pipeline direction of each viscosity anomaly region.

[0059] Based on the additional amount of liquid added to each viscosity abnormality region and the viscosity value of the corresponding raw material to be compensated in the corresponding pipeline, the three-phase pre-adjustment scheme generation method in step 1 is re-executed to evaluate the valve opening, pipeline tilt angle and feeding rate corresponding to each viscosity abnormality region.

[0060] In a specific embodiment of the present invention, the method for calculating the additional amount of liquid to be added for each viscosity abnormality region is as follows: based on the spatial division of each internal region of the grinding aid mixing tank, the liquid volume corresponding to each viscosity abnormality region is extracted.

[0061] Based on the concentration values ​​of the grinding aid mixture after the addition of each component raw material in each viscosity anomaly region, combined with the viscosity deviation values ​​and viscosity deviation directions of each viscosity anomaly region, the unit volume compensation concentration of the component raw material to be compensated for each viscosity anomaly region is evaluated.

[0062] In one specific embodiment, the unit volume compensation concentration of the raw material to be compensated for each viscosity anomaly region is evaluated and obtained. The specific method is as follows: Based on the concentration value of the grinding aid mixture after the addition of each raw material in each viscosity anomaly region, combined with the viscosity deviation value and viscosity deviation direction of each viscosity anomaly region, if the viscosity deviation value is positive, it indicates that the viscosity needs to be reduced. Then, based on the ratio of the absolute value of the viscosity deviation value to the target viscosity value of the grinding aid mixture, the viscosity reduction ratio is calculated. This viscosity ratio is multiplied by the concentration value of the grinding aid mixture after the addition of each raw material in each viscosity anomaly region to obtain the concentration value to be diluted and reduced. This is used as the unit volume compensation concentration of the raw material to be compensated for each viscosity anomaly region. If the viscosity deviation value is negative, it indicates that the viscosity needs to be increased. Then, based on the ratio of the absolute value of the viscosity deviation value to the target viscosity value of the grinding aid mixture, the viscosity increase ratio is calculated. This viscosity ratio is multiplied by the concentration value of the grinding aid mixture after the addition of each raw material in each viscosity anomaly region to obtain the concentration value to be added. This is used as the unit volume compensation concentration of the raw material to be compensated for each viscosity anomaly region.

[0063] Based on the liquid volume corresponding to each viscosity anomaly region, and combined with the unit volume compensation concentration of the raw materials to be compensated for each viscosity anomaly region, the absolute addition mass of the raw materials to be compensated for each viscosity anomaly region is calculated. Combined with the viscosity value of the flowing material of each raw material to be compensated in the corresponding pipeline, the additional amount of liquid to be added for each viscosity anomaly region is evaluated.

[0064] In one specific embodiment, the absolute addition mass of the raw material to be compensated for each viscosity anomaly region is calculated, and combined with the viscosity value of the flowing material of each raw material to be compensated in the corresponding pipeline, the additional amount of liquid to be added for each viscosity anomaly region is evaluated. The specific method is as follows: based on the liquid volume corresponding to each viscosity anomaly region, combined with the unit volume compensation concentration of the raw material to be compensated for each viscosity anomaly region, the liquid volume is multiplied by the absolute value of the unit volume compensation concentration to obtain the total compensation concentration mass of the raw material to be compensated for each viscosity anomaly region; based on the viscosity value of the flowing material of each raw material to be compensated in the corresponding pipeline, the viscosity value of the flowing material is compared with the standard viscosity reference value to obtain the viscosity correction coefficient; the total compensation concentration mass is multiplied by the viscosity correction coefficient to obtain the absolute addition mass of the raw material to be compensated for each viscosity anomaly region; based on the pipeline temperature value of each raw material to be compensated in the corresponding pipeline, the material density value of each raw material to be compensated at the current temperature is mapped; the absolute addition mass is divided by the material density value to obtain the additional amount of liquid to be added for each viscosity anomaly region.

[0065] It should be noted that the standard viscosity reference value refers to the viscosity value of the raw material to be compensated under standard temperature and pressure conditions, which can be obtained from the physical property data table of each raw material. The viscosity correction coefficient reflects the degree of deviation of the viscosity of the raw material to be compensated under actual flow conditions from the standard viscosity. This coefficient is used to correct the differences in material properties caused by temperature and pressure changes. The material density value can be obtained simultaneously from the material viscosity values ​​corresponding to each raw material in each pipeline temperature range and each pipeline pressure range. This data is measured simultaneously when rheological tests are conducted on each raw material.

[0066] All formulas in this manual are dimensionless and calculated numerically. The formulas are derived from software simulations based on a large amount of collected data to obtain the most recent real-world results. The preset parameters and thresholds in the formulas are set by those skilled in the art according to the actual situation.

[0067] The above content is merely an example and illustration of the concept of the present invention. Those skilled in the art can make various modifications or additions to the specific embodiments described, or use similar methods to replace them, as long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, and all such modifications or additions should fall within the protection scope of the present invention.

Claims

1. A closed-loop control method for multi-component micro-liquid preparation in the production of grinding aids, characterized in that, include: Step 1. When the grinding aid liquid preparation task is issued, collect the real-time status data of each pipeline belonging to the grinding aid liquid preparation tank, thereby analyzing the viscosity value of each component raw material flowing in each pipeline, and generating each three-phase pre-adjustment scheme of each component raw material. Step 2. Based on the viscosity values ​​of the flowing materials of each component raw material in each pipeline and each three-phase preconditioning scheme, evaluate the high-pressure hazard factor and component mixing safety factor of each three-phase preconditioning scheme, and select the optimal pipeline distribution scheme and pipeline preconditioning scheme for the grinding aid liquid preparation tank accordingly. Step 3. Send the optimal pipeline allocation scheme and pipeline pre-adjustment scheme of the grinding aid liquid preparation tank to the liquid preparation control terminal for execution. During the liquid preparation process, collect the real-time stirring paddle torque value, real-time conductivity value and material temperature of each internal area of ​​the grinding aid liquid preparation tank at each liquid preparation time point when each component raw material is added, so as to estimate the estimated viscosity of the grinding aid in each internal area of ​​the grinding aid liquid preparation tank after the addition of each component raw material is completed. Step 4. Based on the estimated viscosity of the grinding aid in each internal area of ​​the grinding aid mixing tank after the addition of each component raw material, determine whether the grinding aid mixing tank needs to be adjusted by micro-liquid mixing after the addition of each component raw material. If so, proceed to step 5. If not, complete the grinding aid mixing task. Step 5. Analyze the additional amount of grinding aid solution added, pipeline direction, valve opening, pipeline inclination angle and feeding rate after the addition of each component raw material in the mixing tank, and execute the corresponding operations to form a closed-loop control.

2. The closed-loop control method for multi-component micro-liquid preparation in the production of grinding aids according to claim 1, characterized in that, The specific method for analyzing the viscosity values ​​of the flowing materials of each component raw material in each pipeline is as follows: Based on the real-time status data of each pipeline belonging to the grinding aid mixing tank, the pipeline temperature and pressure values ​​of each pipeline belonging to the grinding aid mixing tank are extracted, and the material viscosity values ​​of each component raw material under each pipeline temperature and pressure range are obtained from the local database, thereby mapping the flow material viscosity values ​​of each component raw material in each pipeline.

3. The closed-loop control method for multi-component micro-liquid preparation in the production of grinding aids according to claim 2, characterized in that, The specific method for generating each three-phase pre-adjustment scheme of the raw materials is as follows: The target addition amount, allowable liquid addition time, maximum feeding rate, maximum pipe inclination angle and maximum valve opening of each component raw material are obtained from the local database. Based on the target addition amount and allowable liquid addition time of each component raw material, the minimum feeding rate of each component raw material is calculated and combined with the maximum feeding rate of each pipe to form the feeding rate range of each component raw material in each pipe. This range is then divided according to the preset feeding rate step value to obtain the feeding rate of each component raw material in each pipe. Based on the maximum pipe inclination angle and maximum valve opening of each pipe, the pipes are divided according to the preset valve step value and preset pipe inclination angle step value to obtain the valve opening value and pipe inclination angle of each pipe. These values ​​are then combined with the feeding rates of each component raw material in each pipe to obtain the valve opening value, pipe inclination angle and feeding rate of each component raw material in each preset combination in each pipe. These values ​​are then used as the three-phase pre-adjustment schemes for each component raw material.

4. The closed-loop control method for multi-component micro-liquid preparation in the production of grinding aids according to claim 3, characterized in that, The specific method for evaluating the high-pressure hazard factor and component mixing safety factor of each three-phase pre-adjustment scheme is as follows: Based on the pipe inclination angle and feeding rate of each component raw material in each preset combination of pipes, and combined with the viscosity value of the flowing material of each component raw material in each pipe, the estimated flow rate value of each component raw material in each preset combination of pipes is evaluated. Combined with the valve opening value of each component raw material in each preset combination of pipes, the valve port flow rate value and valve port pressure value of each component raw material in each preset combination of pipes are calculated, thereby analyzing the high pressure hazard factor of each component raw material in each preset combination of pipes. The system retrieves the liquid preparation order of each component raw material and the height of each pipeline relative to the bottom of the grinding aid liquid preparation tank from the local database. Combined with the valve port flow rate and valve port pressure values ​​of each component raw material in each preset combination of each pipeline, the system analyzes the component mixing safety factor of each component raw material in each preset combination of each pipeline. The above data are used to obtain the high-pressure hazard factor and component mixing safety factor for each three-phase pre-adjustment scheme.

5. The closed-loop control method for multi-component micro-liquid preparation in the production of grinding aids according to claim 4, characterized in that, The specific method for analyzing the component mixing safety factor of each component raw material in each preset combination of each pipeline is as follows: Based on the order of the raw materials and the height of each pipeline relative to the bottom of the grinding aid mixing tank, calculate the gravitational potential energy of each raw material in each pipeline in each preset combination when the grinding aid mixing tank is added. Based on the flow rate and pressure values ​​at the valve ports of each component raw material in each preset combination of each pipeline, and combined with the height of each pipeline relative to the bottom of the grinding aid mixing tank, the kinetic energy value of each component raw material entering the tank in each preset combination of each pipeline when adding the grinding aid mixing tank is calculated. Based on the gravitational potential energy and kinetic energy of each component raw material in each preset combination of each pipeline, the total energy value of each component raw material in each preset combination of each pipeline is obtained by superimposing them. Combined with the liquid preparation order of each component raw material, the composition of the grinding aid mixture before the addition of each component raw material is screened, thereby assessing the energy impact hazard intensity coefficient of each component raw material in each preset combination of each pipeline to the already added grinding aid mixture. The reciprocal of this coefficient is used to obtain the component mixing safety factor of each component raw material in each preset combination of each pipeline.

6. The closed-loop control method for multi-component micro-liquid preparation in the production of grinding aids according to claim 4, characterized in that, The specific methods for the optimal pipeline distribution scheme and pipeline pre-adjustment scheme of the screening grinding aid preparation tank are as follows: Based on the high pressure hazard coefficient of each component material in each pipeline in each preset combination, select each safe preset combination of each component material in each pipeline. Based on the component mixing safety factor of each component raw material in each preset combination in each pipeline, each component raw material in each pipeline is screened for each mixing safety preset combination in each pipeline, and the intersection of each flow safety preset combination is taken to obtain each initial screening preset combination of each component raw material in each pipeline. Based on the high-pressure hazard coefficient and component mixing safety factor of each component raw material in each pipeline and the viscosity value of the flowing material in each pipeline, the appropriate allocation score of each component raw material in each pipeline is evaluated. The target scheme is screened through the conditional allocation method. The pipelines and corresponding primary screening preset combinations of each component raw material in the target scheme are respectively taken as the optimal pipeline allocation scheme and the pipeline pre-adjustment scheme.

7. The closed-loop control method for multi-component micro-liquid preparation in the production of grinding aids according to claim 6, characterized in that, The method for selecting target solutions through conditional allocation is as follows: With the constraint that each component raw material is allocated to only one pipeline and only one preset screening combination is used in one pipeline, the raw materials of each component are allocated as much as possible. This results in the pipeline and the preset screening combination corresponding to each component raw material in each allocation scheme. The appropriate allocation score value of each component raw material in the corresponding pipeline and the preset screening combination in each allocation scheme is extracted. The scores are added together to obtain the comprehensive appropriate allocation score value of each allocation scheme. The allocation scheme with the largest comprehensive appropriate allocation score value is selected as the target scheme.

8. The closed-loop control method for multi-component micro-liquid preparation in the production of grinding aids according to claim 1, characterized in that, The method for estimating the viscosity of the grinding aid in each internal region of the grinding aid mixing tank after the addition of each component raw material is as follows: Based on the real-time conductivity values ​​of each internal region of the grinding aid mixing tank at each mixing time point when each component raw material is added, the concentration values ​​of the grinding aid mixture in each internal region at each mixing time point when each component raw material is added are analyzed. Based on the real-time stirring paddle torque values ​​at each time point when each component raw material is added, the stirring paddle torque fluctuation coefficient at each time point when each component raw material is added is calculated. Based on the material temperature and grinding aid mixture concentration of each internal region at each mixing time point of each component raw material addition, and combined with the stirring paddle torque fluctuation coefficient at each mixing time point of each component raw material addition, the estimated viscosity of the grinding aid in each internal region after the addition of each component raw material is completed is calculated.

9. The closed-loop control method for multi-component micro-liquid preparation in the production of grinding aids according to claim 8, characterized in that, The specific methods for determining the additional amount of grinding aid solution added, pipeline direction, valve opening, pipeline inclination angle, and feeding rate after the addition of each component raw material in the analytical grinding aid solution mixing tank are as follows: The target viscosity value and allowable viscosity deviation range of the grinding aid mixture after the addition of each component raw material are obtained from the local database. Based on the estimated viscosity of the grinding aid in each internal area of ​​the grinding aid mixing tank after the addition of each component raw material, the viscosity deviation value between the estimated viscosity of the grinding aid in each internal area and the target viscosity value of the grinding aid mixture is calculated. Each internal area with a viscosity deviation value exceeding the allowable viscosity deviation range is selected as a viscosity abnormality area. Based on the viscosity deviation values ​​of each viscosity abnormality region, the direction of viscosity deviation in each viscosity abnormality region is determined. If the viscosity deviation value is positive, it indicates that the viscosity of the region is too high. If the viscosity deviation value is negative, it indicates that the viscosity of the region is too low. Based on the direction of viscosity deviation, the component raw materials corresponding to each viscosity abnormality region are identified from each component raw material. Based on the viscosity deviation values ​​of each viscosity abnormality region, the additional amount of liquid to be added for each viscosity abnormality region is calculated. Based on the spatial location of each viscosity abnormality region in the grinding aid mixing tank, and combined with the pipeline inlet corresponding to the raw material of the component to be compensated in the optimal pipeline distribution scheme, the direction corresponding to the center point of each viscosity abnormality region is taken as the pipeline direction of each viscosity abnormality region. Based on the additional amount of liquid added to each viscosity abnormality region and the viscosity value of the corresponding raw material to be compensated in the corresponding pipeline, the three-phase pre-adjustment scheme generation method in step 1 is re-executed to evaluate the valve opening, pipeline tilt angle and feeding rate corresponding to each viscosity abnormality region.

10. The closed-loop control method for multi-component micro-liquid preparation in the production of grinding aids according to claim 9, characterized in that, The specific method for calculating the additional amount of solution needed for each viscosity anomaly region is as follows: Based on the spatial division of each internal area of ​​the grinding aid mixing tank, the liquid volume corresponding to each viscosity abnormality area is extracted. Based on the concentration values ​​of the grinding aid mixture after the addition of each component raw material in each viscosity abnormality region, combined with the viscosity deviation value and viscosity deviation direction of each viscosity abnormality region, the unit volume compensation concentration of the component raw material to be compensated in each viscosity abnormality region is evaluated. Based on the liquid volume corresponding to each viscosity anomaly region, and combined with the unit volume compensation concentration of the raw materials to be compensated for each viscosity anomaly region, the absolute addition mass of the raw materials to be compensated for each viscosity anomaly region is calculated. Combined with the viscosity value of the flowing material of each raw material to be compensated in the corresponding pipeline, the additional amount of liquid to be added for each viscosity anomaly region is evaluated.