A design method for an advanced fully enclosed combined pre-support structure for tunnels traversing a water-rich, wide fault fracture zone.
By constructing a parameterized advanced fully enclosed combined pre-support structure design method, the problems of construction safety and large deformation control when tunnels pass through water-rich, wide fault fracture zones were solved, achieving quantitative constraints and mechanical synergy, and improving engineering safety.
Patent Information
- Application Number
- CN202611068295.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-17
- Publication Date
- 2026-11-17
AI Technical Summary
When tunnels traverse water-rich, wide fault fracture zones, existing technologies lack comprehensive quantitative design and mechanical verification, leading to uncertainties in construction safety and large deformation control under complex geological conditions.
An advanced, fully enclosed combined pre-support structure design method is adopted. By establishing parameterized and programmed design boundary conditions, a curtain grouting equivalent bearing arch model, a double-ring horizontal jet grouting continuous arch shell model, a pipe roof longitudinal continuous beam model, and a tunnel bottom grouting anti-uplift model are constructed to realize the quantitative design of the pre-support structure and the synergy of fully enclosed stress.
It improves the accuracy of load assessment under complex geological conditions, forms a fully enclosed mechanical structure system, and enhances the engineering safety of large deformation control and prevention of water and mud inrush.
Smart Images

Figure CN123116386A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of underground engineering and tunnel construction technology, and in particular to a design method for an advanced fully enclosed combined pre-support structure for tunnels traversing water-rich, wide fault fracture zones. Background Technology
[0002] During underground engineering and tunnel construction, routes often inevitably traverse areas with complex geological structures. Among these, wide, water-rich fault fracture zones present extremely challenging geological conditions for tunnel construction due to their fractured rock masses, abundant groundwater, and complex in-situ stress. Soft media such as fault gouge and mylonite are highly susceptible to instability under groundwater immersion and excavation disturbance, posing an objective risk of causing large deformations of the surrounding rock and engineering disasters such as water and mud inrushes.
[0003] To address the aforementioned complex geological conditions, the industry typically employs pre-support methods such as advanced grouting, advanced pipe roofing, or advanced small-diameter pipes. These technologies, by improving the mechanical properties of the surrounding rock ahead of the tunnel face or providing advanced support, ensure the progress of construction to a certain extent. In practice, engineers select and combine these conventional support measures based on geological survey reports and experience from similar past projects.
[0004] As transportation infrastructure construction extends into deeper and more complex mountainous areas, tunnels face increasingly severe challenges related to fault fracture zones and water pressure and flow conditions. In specific environments involving wide, active fault zones rich in water, relying solely on accumulated experience and qualitative judgments to combine support measures makes it difficult to accurately quantify the boundary of combined soil and water loads. Existing conventional support systems often lack comprehensive calculations of the stress mechanisms of fully enclosed spatial structures during parameter design, making it difficult to achieve deep mechanical synergy and quantitative constraint verification among various support components. This introduces uncertainties into the control of large deformations and construction safety in complex fault zones. Summary of the Invention
[0005] To address the shortcomings of existing technologies in tunneling through wide, water-rich fault fracture zones, which lack comprehensive quantitative design and mechanical collaborative verification, this invention provides a design method for an advanced, fully enclosed combined pre-support structure for tunnels traversing such zones. This method aims to establish parameterized and programmed design boundary conditions and constraint verification relationships for the advanced pre-support system, using the equivalent load-bearing structure theory as the basic mechanical framework. This enables quantitative design and fully enclosed stress coordination of the pre-support structure system, thereby improving the engineering safety of large deformation control and preventing water and mud inrushes.
[0006] This invention provides a design method for an advanced fully enclosed combined pre-support structure for tunnels traversing water-rich, wide fault fracture zones. The method includes the following steps in sequence:
[0007] Step A: Establish engineering geology and load model: Obtain the geological parameters and design groundwater pressure of the fault fracture zone ahead, and calculate the resultant force of the loose body load and the design groundwater pressure in combination with the softening and loosening height of the loose body, as the design load of the combined support system.
[0008] Step B: Determine the equivalent bearing arch parameters of the curtain grouting reinforcement zone: The grouting and solidification zone outside the excavation outline in front of the tunnel face is regarded as a continuous annular arch. Based on the outer arc ultimate compressive stress condition and the design load, the minimum effective grouting thickness that meets the bearing requirements is determined, and the design grouting thickness and hole layout range are set accordingly.
[0009] Step C: Determine the arch parameters of the horizontal jet grouting pile: Treat the interlocking body of the double-ring horizontal jet grouting pile as an integral arch shell. Based on the continuous arch shell axial force model and the design load, determine the minimum bearing thickness of the integral arch shell, and calculate the minimum pile diameter and circumferential spacing of the jet grouting pile accordingly.
[0010] Step D: Determine the specifications of the pipe shed: Treat a single pipe shed as a continuous beam model bearing a uniformly distributed longitudinal load, convert the design load to the single pipe shed, determine the minimum section modulus of the pipe shed according to the limit state and maximum bending moment control criteria of the beam, and determine the outer diameter and wall thickness of the pipe shed in conjunction with the deflection check conditions.
[0011] Step E: Determine tunnel bottom grouting parameters: Based on the thickness of the softened zone at the bottom of the tunnel in the fault fracture zone, determine the tunnel bottom grouting reinforcement depth and grouting hole layout parameters for suppressing bottom heave;
[0012] Step F: Construction and Feedback of the Combined System: Based on the parameters determined in Steps B to E, curtain grouting, double-ring horizontal jet grouting piles, pipe roof installation, excavation, and tunnel bottom grouting are carried out in sequence according to the established procedures to construct a fully enclosed pre-support structure.
[0013] Optionally, in step B:
[0014] When calculating the minimum effective grouting thickness, the input parameters include the tunnel excavation radius, the design load, and the equivalent uniaxial compressive strength of the grouting solidified body after reduction.
[0015] The designed grouting thickness is greater than or equal to 1.2 times the minimum effective grouting thickness, and the outermost boundary of the curtain grouting hole is determined by the designed grouting thickness;
[0016] The longitudinal grouting range of the curtain grouting is the sum of the designed excavation advance and the length of the grout-stopping rock bed.
[0017] Optionally, in step B:
[0018] The curtain grouting holes are arranged in a quincunx pattern, and the distance between the bottoms of adjacent holes is no more than twice the designed grout diffusion radius, in order to eliminate grout leakage blind spots in the reinforced area;
[0019] The curtain grouting adopts segmented and graded pressure control. The section near the working face uses low-pressure filling grouting, while the section far from the working face uses high-pressure splitting grouting with sleeve valve tube bundles.
[0020] Optionally, in step C:
[0021] The coverage angle of the integral arch shell in the tunnel arch is not less than 220°;
[0022] The minimum bearing thickness is determined based on the following: the axial stress of the integral arch shell under the design load does not exceed the design value of the unconfined compressive strength of the jet grouting pile consolidation body.
[0023] A front-end interlocking amount is provided between two adjacent jet grouting piles. The minimum pile diameter and the circumferential spacing must ensure that the equivalent cover thickness after the adjacent jet grouting piles interlock is not less than the minimum bearing thickness.
[0024] Optionally, in step C:
[0025] The double-ring horizontal jet grouting pile includes an outer ring jet grouting pile and an inner ring jet grouting pile;
[0026] The outer deflection angle of the outer ring jet grouting pile is calculated based on the distance from the end of the pile to the outer boundary of the design outline. The outer deflection angle of the inner ring jet grouting pile is smaller than that of the outer ring jet grouting pile.
[0027] Optionally, in step D:
[0028] The span of the continuous beam model is taken as the distance between the two end supports, that is, the net distance between two adjacent arch frames plus half the length of the jet grouting interlocking strip;
[0029] When performing the deflection check, the maximum deflection of the pipe shed is required to be no greater than one three-hundredth of the span.
[0030] Optionally, in step D:
[0031] The pipe roof is implanted inside the outer ring jet grouting pile along the original drilling channel, with the outer deflection angle of the entry hole consistent with that of the outer ring jet grouting pile.
[0032] The pipe body of the pipe shed is longitudinally provided with overflow holes, and a sealing section without overflow holes is reserved at the end;
[0033] The annular gap between the pipe roof and the jet grouting pile is filled with a dual-liquid grout, so that the pipe roof and the jet grouting body form a composite stress-bearing skeleton.
[0034] Optionally, in step E:
[0035] The depth of the tunnel bottom grouting reinforcement is 1.5 times the thickness of the softened zone below the tunnel bottom, and a minimum depth threshold is set.
[0036] The tunnel bottom grouting adopts the pre-embedded pipe post-construction grouting process, which is as follows: after the initial support of the invert arch is completed and the invert arch filling concrete is poured, grouting is carried out by drilling holes through the pre-embedded pipes and installing grouting pipes.
[0037] Optionally, the method further includes a system stability verification step between step E and step F, specifically:
[0038] The load-bearing contributions of the curtain grouting solidification zone, the jet grouting pile arch shell, and the pipe roof frame are superimposed to calculate the comprehensive load-bearing safety factor of the combined system. Only when the comprehensive load-bearing safety factor is greater than or equal to the preset safety threshold can the excavation and construction of step F be carried out.
[0039] Optionally, in step F, there is a mandatory construction sequence constraint, the specific sequence being as follows:
[0040] Advanced geological forecasting is conducted to confirm the degree of agreement between actual conditions and design loads;
[0041] Construct a grout-stopping wall and perform the curtain grouting; after the curtain grouting is completed, construct the outer ring horizontal jet grouting piles and the inner ring horizontal jet grouting piles in sequence;
[0042] The pipe roof is inserted into a hole formed inside the jet grouting pile and then filled.
[0043] After the pipe roof construction is completed and a safe time has been reached, excavation and initial support will be carried out; finally, the tunnel bottom grouting will be implemented.
[0044] The measured deformation rate is monitored in real time during the excavation process, and a supplementary grouting mechanism is triggered when the rate exceeds the warning value.
[0045] The present invention has achieved the following beneficial effects:
[0046] This invention provides a design method for an advanced, fully enclosed combined pre-support structure for tunnels traversing wide, water-rich fault zones. By establishing an engineering geological and load input model, the physical resultant force of loose mass load and design groundwater pressure is used as the benchmark design load, improving the accuracy of load assessment under complex soil and water geology. Based on this, the invention sequentially constructs a curtain grouting equivalent bearing arch model, a double-ring horizontal jet grouting continuous arch shell model, a pipe roof longitudinal continuous beam model, and a tunnel bottom grouting anti-heave model, and establishes corresponding parametric and procedural constraint verification relationships. This design process allows the curtain grouting solidification zone, jet grouting arch shell, and pipe roof skeleton to form a superposition and collaborative calculation in terms of mechanical bearing capacity, constructing a fully enclosed mechanical structure system that includes the top arch stress and the bottom plate anti-heave. This method changes the previous reliance on empirical qualitative judgment for support combination, providing a systematic quantitative constraint standard and implementation procedure basis for the initial support deformation control and anti-water and mud inrush prevention requirements in water-rich active fault zones.
[0047] Other features and advantages of the invention will be set forth in the following description, and will be apparent in part from the description, or may be learned by practicing the invention. The objects and other advantages of the invention may be realized and obtained by means of the structures particularly pointed out in the written description and the accompanying drawings.
[0048] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description
[0049] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used in conjunction with embodiments of the invention to explain the invention and do not constitute a limitation thereof. In the drawings:
[0050] Figure 1 This is a schematic diagram of the cross-sectional layout of the advanced fully enclosed combined pre-support system of the present invention;
[0051] Figure 2 A flowchart illustrating the overall logical execution steps of the advanced fully enclosed combined pre-supported structure design method provided in this embodiment of the invention;
[0052] Figure 3 Here is a simplified diagram of the mechanical calculation model of the present invention, wherein (a) is the stress model of the equivalent annular bearing arch for curtain grouting, and (b) is a simplified calculation diagram of the pipe roof beam type;
[0053] Figure 4 This is a flowchart illustrating the design and construction method of the advanced fully enclosed combined pre-support structure of the present invention.
[0054] Figure 5 This is a comparison chart of parameter configuration and stability verification results for a specific embodiment of the present invention. Detailed Implementation
[0055] The preferred embodiments of the present invention will be described below with reference to the accompanying drawings. It should be understood that the preferred embodiments described herein are for illustration and explanation only and are not intended to limit the present invention.
[0056] To address the challenges of controlling large deformations in the initial support and preventing water and mud inrushes when tunnels traverse wide, water-rich, and active fault fracture zones dominated by fault gouge and mylonite, this invention provides a design method for an advanced, fully enclosed, combined pre-support structure for tunnels traversing such zones. This design method is based on the equivalent load-bearing structure theory as its fundamental mechanical framework. It establishes parameterized and programmed boundary conditions and constraint verification relationships for the advanced pre-support system by sequentially constructing a curtain grouting equivalent load-bearing arch model, a double-ring horizontal jet grouting continuous arch shell model, a pipe roof longitudinal continuous beam model, and a tunnel bottom grouting anti-heave model. The cross-sectional layout of this advanced, fully enclosed, combined pre-support system and the spatial relationships of its components are as follows: Figure 1 As shown.
[0057] Specifically, the advanced fully enclosed combined pre-support structure design method for tunnels traversing water-rich, wide fault fracture zones in this embodiment, such as... Figure 2 As shown, the data flow and logical execution steps are as follows:
[0058] Step A: Establish the engineering geology and load input model. Obtain the basic geological parameters and design groundwater pressure parameters of the fault fracture zone in front of the tunnel face, and calculate the physical resultant force of the loosened mass load and the design groundwater pressure parameters in combination with the softening and loosening height of the loosened medium. Use this resultant force as the benchmark design load input value for the subsequent mechanical calculation of the combined support system.
[0059] Furthermore, the acquisition of engineering geological parameters includes setting up ground-penetrating radar scanning subroutines, TRT elastic wave reflection detection subroutines, transient electromagnetic water exploration subroutines, and advanced borehole coring equipment. Through the above-mentioned forecasting and detection methods, the lithological assemblage type and thickness range parameters of the core area of the fault fracture zone are extracted. The unit weight of loose mass for this specific lithology was determined through on-site core sampling and related laboratory geomechanical tests. In this embodiment, the bulk density is... The value range is 14 to 18 kN / m³.
[0060] The loosening range of the surrounding rock after stress release is determined based on the Terzaghi loosening earth pressure theory. The Terzaghi loosening height of the loosened body is calculated. The mathematical analytical model is configured as follows:
[0061] ;
[0062] In this formula, This parameter represents the excavation width of the tunnel, in meters (m). The cohesion parameter of the medium in the fault fracture zone is expressed in kPa. The internal friction angle parameter represents the medium in the fault fracture zone, in degrees. This indicates the lateral pressure coefficient at that formation depth; This parameter represents the vertical burial depth of the tunnel, in meters (m). This represents the surface overload parameter, in kPa. It is understandable that the integral solution of the above differential equations can quantitatively determine the ultimate loosening boundary of a granular structure that has lost its self-stabilizing ability under a gravitational field.
[0063] Based on the calculated Terzaghi loosening height Further calculations were performed on the loose mass load acting on the top of the support system. Loose body load The specific algebraic relation is:
[0064] ;
[0065] Simultaneously, based on the converted value of the maximum water head obtained from the advanced water exploration operation or the geological survey and assessment report, the design groundwater pressure is extracted. The unit is MPa. The obtained loose mass load... With design groundwater pressure Scalar superposition is performed to obtain the resultant force of loose mass load and water pressure. This serves as a unified load input parameter for the subsequent design of a fully enclosed combined support system architecture.
[0066] Step B: Determine the physical and geometric parameters of the equivalent load-bearing arch of the curtain grouting reinforcement zone. The grouting and solidification zone distributed in front of the tunnel face and outside the excavation outline is considered to have a thickness of... The equivalent uniaxial compressive strength is Continuous annular arch structures, such as Figure 3 As shown in (a), the inner diameter boundary of this continuous annular arch structure is taken as the radius of the equivalent circle of the tunnel excavation. .
[0067] Based on the ultimate compressive stress condition of the outer circular arc, an equilibrium criterion for the ultimate state of thin arches is established to determine the minimum effective grouting thickness required to meet the ultimate bearing capacity requirements. Minimum effective grouting thickness The calculation formula is:
[0068] ;
[0069] In this formula, The input value for the equivalent uniaxial compressive strength of the grouting solidified body is determined by multiplying the average value of the indoor mix proportion test results by a reduction factor of 0.5 to 0.6 to correct for the uneven attenuation caused by on-site grouting. The final design grouting thickness is set to determine the safety redundancy for system seepage prevention and load-bearing capacity. The logical constraints are:
[0070] ;
[0071] Based on the above-mentioned locked design grouting thickness Set the radial distance between the outer boundary of the curtain grouting and the tunnel excavation outline. Based on these geometric boundary conditions, the bottom outward angle and cross-sectional layout range of the outer curtain grouting holes are determined. The layout of the curtain grouting holes is specified as a staggered, quincunx arrangement, with the bottom spacing of adjacent grouting holes rigidly constrained to no more than [a certain value]. ,in The diffusion radius parameter of the grout in a specific fault gouge is designed to range from 1.0 to 1.5 m. The longitudinal grouting range of the curtain grouting is as follows. The value is taken as the design excavation advance. Length of the magma-stopping rock block The sum of these is expressed as:
[0072] ;
[0073] In the implementation parameters for conventional fault zones, the input constraints are as follows: m, and m, thus ensuring that a sufficiently thick natural water-stopping rock mass is left before the start of the next construction cycle.
[0074] The curtain grouting process employs a segmented and graded pressure control strategy. Low-pressure filling grouting is implemented in the section near the working face (0 to 10m away), with a grouting pressure of... The system control range is set to 0 to 6 MPa; for 10m to For deeper sections, high-pressure fracturing grouting is implemented using a matching sleeve valve tube bundle grouting hardware device, with a grouting pressure of [missing information]. The system control range is set to 6 to 12 MPa. The grouting material is a cement-water glass two-component grout, and its physicochemical proportions are set as follows: initial volume ratio... Cement grout water-cement ratio The water glass concentration was set to 35 Bé, the modulus range was strictly controlled between 2.8 and 3.1, and the gelation time was set to 42 to 60 seconds.
[0075] Step C: Determine the geometric and mechanical parameters of the horizontal jet grouting pile arch. The composite structure formed by the interlocking of the outer and inner ring horizontal jet grouting piles is considered as a monolithic arch shell. The geometric coverage angle of the monolithic arch shell in the tunnel arch region is set to be no less than 220°. The inner chord radius parameter of this monolithic arch shell is taken as the equivalent circle radius of the tunnel excavation. The effective pile diameter of a single jet grouting pile is marked as follows: The geometric interlocking amount at the front ends of two adjacent jet grouting piles is marked as And the following spatial interference constraints must be met:
[0076] ;
[0077] Based on the axial force calculation model of continuous arch shells, and using the comprehensive design load as the external input, the minimum bearing thickness of the double-ring arch shell to resist crushing is calculated. Its mathematical relationship model is as follows:
[0078] ;
[0079] In this formula, The system must input the design value of the 28-day unconfined compressive strength of the jet grouting pile consolidation body. MPa. Actual thickness of the overall arch shell. The calculation method is based on the equivalent cover thickness after deducting losses from the interlocking of two adjacent ring jet grouting piles. The calculation formula is as follows:
[0080] ;
[0081] By introducing decision constraints The system calculates the minimum required pile diameter for jet grouting piles. Meanwhile, to ensure no gaps are left in the circumference, the circumferential spacing of the jet grouting piles is... The following inequality formula must be satisfied:
[0082] ;
[0083] in, The minimum engagement parameter allowed for the system. Design pile length for jet grouting piles. The constraints for the value of are:
[0084] ;
[0085] In the process implementation sequence of horizontal jet grouting piles, the outer ring jet grouting piles are started after the curtain grouting process is completed and passes quality acceptance. The outer deflection angle parameter is based on the projection of the pile end to the outer boundary of the design outline. The spatial triangular geometric relationship at the location is calculated.
[0086] The specific extraction steps and corresponding relationships are as follows: Let the design pile length of the outer ring jet grouting pile be... The radial geometric extension distance outside the excavation outline set for curtain grouting is... Under ideal boundary conditions where the downward pressure of gravity on the borehole trajectory is not considered, the external deviation angle of the outer ring jet grouting pile (denoted as ) is... The logical condition for determining () is that it satisfies the relation:
[0087] ;
[0088] The control system, through this explicit geometric association, determines the input... and This allows for the unique reverse calculation of the output external deflection angle. The command parameters (usually constrained to the range of 5° to 10°) serve as the basis for setting the inclination angle of the drilling rig guide rail on site.
[0089] The inner ring jet grouting piles are initiated after the outer ring jet grouting pile construction command is completed, and their outer deflection angle is set to be smaller than that of the outer ring jet grouting piles. Regarding process hardware parameters, the horizontal jet grouting adopts a triple-pipe process, with the high-pressure injection pressure set to 35-40 MPa, the drilling rig retraction and extraction speed set to 15-30 cm / min, the drilling rig rotation speed set to 10-20 r / min, the cement usage per linear meter controlled to ≥300 kg / m, and the water-cement ratio of the cement slurry used kept constant at 1:1. After 28 days of consolidation, the system triggers a core drilling or in-hole video inspection subroutine.
[0090] Step D: Determine the specifications and stiffness distribution parameters of the pipe shed. Establish a continuous beam mechanical model of the pipe shed group, combined with... Figure 3 The simplified calculation diagram of the pipe roof beam shown in (b) treats a single advanced pipe roof as bearing a uniformly distributed external load in the longitudinal direction. Simply supported beams or beams on elastic foundations based on Winkler's assumptions. Uniformly distributed load. The value is obtained by converting the total loose mass load integral to the circumferential spacing of a single pipe roof, and the specific algebraic relationship is as follows:
[0091] ;
[0092] In this formula, The spacing parameter for the circumferential arrangement of the pipe roof in the arch is in meters.
[0093] The effective mechanical span of the pipe shed is marked as follows: Its value is the distance between the rigid or elastic supports at both ends, that is, the algebraic sum of the longitudinal net distance between two adjacent initial support steel arches and half the length of the jet grouting pile interlocking zone. Based on the control criterion of the maximum bending moment envelope of a simply supported beam, the minimum section modulus required for the pipe roof is determined. :
[0094] ;
[0095] In this formula, This represents the maximum theoretical bending moment that the continuous beam of the pipe roof can withstand under uniformly distributed load. This represents the yield strength parameter of the steel pipe material for the pipe roof, in MPa. The minimum section modulus is obtained through calculation. The outer diameter of the steel pipe for the pipe shed is determined by reverse calculation based on the mechanical cross-sectional properties of the material. With wall thickness Physical specification combination. Simultaneously, maximum deflection is applied to the longitudinal stiffness of the pipe roof structure. Upon verification, its control displacement equations satisfy:
[0096] ;
[0097] In this formula, This refers to the elastic modulus of the steel pipe material for the pipe shed, expressed in MPa. The moment of inertia of the steel pipe section of the pipe shed is expressed in cm. 4 .
[0098] During the physical installation phase of the pipe roof, it is implanted along the existing borehole guide channel inside the outer ring jet grouting pile, with the outer deflection angle of the pipe roof entry hole consistent with the design outer deflection angle of the outer ring jet grouting pile. The pipe roof components are made of hot-rolled seamless steel perforated pipes with an outer diameter of not less than 108mm and a wall thickness of not less than 6mm. Overflow holes with a diameter of 10mm are arranged longitudinally along the pipe body at fixed intervals of 15 to 20cm, with the last 3m section of the pipe body designated as an internal sealing section without overflow holes. The annular gap between the internal channel of the pipe roof and the outer wall of the pipe roof and the borehole wall of the outer ring jet grouting pile is filled with pressure grout using a cement-water glass dual-liquid grout. The volume ratio of the grouting material is configured as follows: The grouting pressure threshold is controlled between 0.5 and 4 MPa, and the system's constrained filling volume parameter is ≥110% of the theoretical borehole volume, thereby achieving microscopic interlocking and composite stress state between the steel frame of the pipe roof and the concrete jet grouting pile. It is stipulated that the control system can only release the excavation command after the grouting of the last pipe roof is completed and allowed to stand for 24 hours.
[0099] Step E: Determine the parameters for tunnel floor grouting anti-heave reinforcement. For the tunnel floor section in the fault fracture zone, install a post-construction grouting reinforcement mesh for the invert arch. Based on the thickness parameters of the softened zone at the tunnel floor in the fault fracture zone, which may experience stress release leading to floor heave or uplift deformation, obtained from advanced detection. Determine the effective grouting reinforcement depth at the tunnel bottom. Its computational logic is as follows:
[0100] ;
[0101] The system sets the minimum threshold control constraint for the tunnel bottom reinforcement depth as follows: m.
[0102] The grouting holes at the bottom of the tunnel are constructed using steel perforated pipes with a specification of Φ76×5mm, and are arranged in an array at a vertical angle or an inclination angle designed according to the slip line field below the foundation of the invert arch structure.
[0103] Specifically, the design inclination angle based on the slip line field has a clear quantitative implementation standard: in order to effectively cut off the potential shear failure surface of the softened zone at the tunnel floor, the grouting holes on both sides near the bottom of the tunnel sidewall need to be installed at an outward angle. Let the angle between this inclined grouting hole and the horizontal plane be... Its value depends on the input value of the internal friction angle of the medium in the fault softening zone. Specifically, it satisfies the geometric and physical constraint relationships:
[0104] ;
[0105] This clearly defined inclination configuration ensures that the grouting steel pipe skeleton can orthogonally pass through the logarithmic spiral slip surface of the fault mud bottom heap to the greatest extent possible, thus transforming the macroscopic slip line theory into drilling inclination command parameters that can be directly executed by the drilling rig on site. The planar layout of the grouting holes is set in a quincunx pattern, with a circumferential spacing of 1.5m and a longitudinal spacing of 1.5m. The grouting pump pressure parameter is set to 2.0MPa. Under groundwater conditions, a dual-component grout is used, which automatically switches to a single-component cement grout in the absence of water. The tunnel bottom grouting adopts a post-construction grouting process guided by pre-embedded Φ120 PVC pipes. After the initial support steel frame of the tunnel invert is closed and the invert filling concrete is poured and cured for 3 days, the foundation reinforcement grouting procedure is performed by drilling downwards through the pre-embedded pipes and installing the steel pipes.
[0106] Step F: Construction sequence constraints and feedback loop throughout the entire life cycle of the combined system. Based on all geometric scalars and mechanical parameters obtained from steps A to E, a hardware workflow for the construction cycle organization with mandatory unidirectional execution sequence constraints is established. Specific implementation steps and feedback loops are as follows: Figure 4 As shown. The specific hardware operation and process execution sequence configuration is as follows:
[0107] Initiate the advanced geological prediction program, extract the geological properties and water pressure data ahead and verify them with the system settings. If the actual conditions do not match the design load, return and re-execute step A for recalculation.
[0108] Construct the grout-stopping wall structure at the working face and precisely install the grouting conduit array;
[0109] Start the main program of the curtain grouting process, and implement it according to the hole position coordinates, pressure threshold and segment sequence determined in step B. Trigger the effect inspection operation 7 days after the grouting is completed and cured.
[0110] Start the construction machinery for the outer ring horizontal jet grouting piles. After completion, extract the pile continuity and radial quality data by sending a video probe into the hole or a core drilling equipment.
[0111] Initiate the construction of the inner ring horizontal jet grouting piles, and inspect the quality status of the double-ring interlocking and overlapping interface after completion;
[0112] The pipe roof entity is sent into the pre-reserved hole-forming channel of the outer ring jet grouting pile and the double liquid grout high-pressure filling process is carried out. The completion of the last pipe roof construction triggers a 24-hour system countdown. After the countdown ends, the excavation lock command is released and the door-breaking excavation operation is carried out.
[0113] The excavation process is forced to adopt the three-stage pre-reserved core soil method, and the initial support components are installed simultaneously to form a closed loop.
[0114] After the arch area closure is completed, the vertical grouting reinforcement operation at the tunnel bottom described in step E is performed.
[0115] Throughout the entire excavation and support process, a monitoring and measurement subsystem is run synchronously to capture the three-dimensional deformation rate data stream during excavation in real time. When the measured deformation rate triggers the preset physical warning value, the underlying hardware immediately executes the stop excavation command and starts the local supplementary grouting module.
[0116] Before the end of a single construction cycle and the start of the next, the system requires the execution of a stability verification process for the combined system. This verification process includes analytical verification, on-site physical verification, and closed-loop monitoring feedback. In analytical verification, the stiffness matrix of the equivalent bearing arch of the curtain grouting solidification zone, the double-ring arch shell of the jet grouting piles, and the reverse bearing contribution of the pipe roof skeleton is superimposed. To achieve rapid and quantitative procedural verification, this stiffness matrix superposition is simplified within the system to a resistance analytical equation based on the stiffness distribution weights of each support structure. The comprehensive bearing safety factor is then considered. The specific determination method is as follows:
[0117] ;
[0118] In the formula, the denominator The comprehensive benchmark design load determined in step A; the molecule represents the comprehensive reverse bearing capacity of the composite system, where , , These are the maximum radial support resistances that the curtain grouting equivalent bearing arch, the double-ring horizontal jet grouting arch shell, and the pipe roof skeleton can provide under independent ultimate states, respectively. , , These are the stiffness coordination coefficients for the corresponding support components, used to characterize the proportion of resistance exerted by each component when reaching the same radial displacement. Their values are positively correlated with the elastic modulus of each material. Through this analytical formula, the load-bearing capacity coordination of the three advanced support components on the same cross-section is quantified.
[0119] Output the overall load-bearing safety factor under the current system configuration. The security determination logic constraints are as follows:
[0120] ;
[0121] In the on-site physical verification, the continuity rate of the grouting core samples was verified to meet ≥90%, and their 28-day unconfined compressive strength was verified to meet the input design nominal value. The presence of a mud layer with a thickness greater than 20cm within the jet grouting pile was also verified. The measured filling volume of the pipe roof grouting was verified to reach ≥110% of the borehole volume standard. In the monitoring feedback, the time-series data on crown settlement, peripheral convergence, and surrounding rock pressure extracted by the convergence meter and multi-point displacement meter during excavation were used as feedback control variables to drive the adaptive correction of grouting thickness and jet grouting parameters for the next tunneling cycle.
[0122] In this step, the numerical adaptive correction operation is performed based on a pre-defined hard logic threshold mapping rule within the system. The specific definition is as follows:
[0123] Let the maximum measured deformation rate of a single cycle captured by the monitoring and measurement system be... The system's set warning rate threshold is (In this embodiment, based on the deformation specification for weak surrounding rock, the hard-coded value is taken as follows) The third-order adaptive correction logic built into the control system is as follows:
[0124] Degradation and optimization judgment: When If the system determines that the current support system has excessive safety redundancy, it will automatically drive the command correction for the next cycle, adjusting the curtain wall grouting thickness accordingly. Reduce by 10%, and decrease the circumferential spacing of the jet grouting piles. Relax the restrictions to the maximum permissible limit to conserve resources;
[0125] The determination of maintaining the status quo: when When the current stress state is deemed reasonable, the output of the predetermined design parameter set is maintained.
[0126] Enhanced early warning judgment: When When the physical warning mechanism is triggered, the hardware system immediately locks the excavation command. When generating the parameters for the next tunneling cycle, the system will forcibly execute the redundant reinforcement command, specifically by increasing the density of the main grouting holes by 15% to 20% and forcibly adding the core soil stabilization jet grouting reinforcement node configuration to the operation sequence.
[0127] Using the segmented threshold mapping table determined above, this method realizes the programmed and quantitative operation of closed-loop feedback.
[0128] Furthermore, to specifically and clearly illustrate the numerical calculation details and command execution process of this advanced fully enclosed combined pre-supported structure design method in engineering applications, a construction cycle of the left tunnel exit of a national highway crossing a major fault zone with a compressional-torsional fault fracture zone is used as a specific example. Data flow calculation analysis and verification are performed on the tenth cycle (covering a 17m engineering chainage range) and the twelfth cycle (covering a 17m engineering chainage range) recorded in the database. The design parameters of its key components and the stability verification indicators for on-site verification are as follows: Figure 5 As shown.
[0129] In step A of the tenth cycle, the results of advanced geological prediction and core sampling sensor data extraction indicate that the lithology of the preceding strata is a completely weathered fault gouge and mylonite structure. Laser ranging and 3D elevation mapping are used to output the tunnel depth. The length is 180m. Extract the tunnel excavation width from the design cross-section drawings. The equivalent area is 14.0m, and the equivalent circle radius is converted from the equivalent area. The length is 7.5m. Indoor triaxial shear mechanical test data characterize the cohesion of this loose mass. The probability distribution range is 10 to 20 kPa, and the internal friction angle is... The probability distribution range is 10° to 15°, and the bulk density is measured in situ. The data value is 16 kN / m³. The system is set to a constant for the side pressure coefficient. The value is 0.5. The absolute groundwater head height obtained from the borehole inflow hydrological model analysis is approximately 40m, which is converted to the static design groundwater pressure. It is 0.4 MPa (corresponding to an input parameter of 400 kPa).
[0130] Extract the most unfavorable mechanical parameters (set) kPa, Substituting the partial cross-sectional width into the simplified feature dimensions and then into the Terzaghi loosening height formula for floating-point calculation:
[0131] ;
[0132] Based on the above calculation of the loosening height Further calculations of gravity-dominated design loose loads :
[0133] ;
[0134] Loose load With groundwater pressure Numerical superposition yields the comprehensive baseline design load:
[0135] ;
[0136] In the parameter design stage of step B, considering the fault gouge degradation effect, the expected design value of the equivalent uniaxial compressive strength of the grouted solidified body after reduction is determined. The pressure is set at 2.0 MPa. Substituting the comprehensive load parameters into the analytical formula for calculating the minimum effective grouting thickness:
[0137] ;
[0138] Calculate based on the geometric balance formula:
[0139] ;
[0140] Considering the large deformation characteristics of the fault zone, the design grouting thickness is determined by rounding overfitting. The depth is 6.0m. The outer boundary of the curtain grouting is set at a geometric extension of 6.0m beyond the excavation outline. This is based on the grout diffusion radius obtained from the evaluation. m, determining that the spacing between adjacent hole bottoms in the quincunx-shaped hole layout topology mode is ≤2.0m. Based on the layout algorithm, the tenth cycle curtain grouting hole array contains 6 rings, with a total output of 132 holes (including 97 main holes), and the borehole diameter hardware configuration is set to 110mm. Total grouting length setting... The excavation depth is 30m, including a 10-12m design excavation section, a 5-7m safety retention length for the grout stop rock mass, and a pre-reinforced extension length for the exploration section. The grouting pump operation configuration is as follows: low-pressure filling at 0-6MPa for the 0-10m depth range, and high-pressure fracturing grouting at 6-12MPa for the 10-30m depth range. A two-component grout is used, with the initial volumetric flow rate valve position configured as follows: .
[0141] In the parameter design stage of step C, the control parameters for the unconfined compressive strength of the jet grouting pile consolidation body are set. The bearing capacity is 3.0 MPa. Substituting this into the minimum bearing thickness calculation formula:
[0142] ;
[0143] Hardware configuration using single pile diameter m-type rotary nozzle, front-end bite setting m, based on which the equivalent coverage thickness of the double ring is calculated. :
[0144] ;
[0145] The system logic comparison and judgment result satisfies Rigid safety constraint of (1.10 ≥ 0.73). Circumferential spacing calculation formula and logic threshold constraint:
[0146] ;
[0147] On-site implementation of circumferential spacing calibration parameters The setting is 0.35m, with tolerance. An outer and inner ring geometric array is configured within a 220° fan-shaped coverage area, generating a total of 122 jet grouting pile holes for the tenth cycle. A triple-pipe system is selected for construction, with servo drive parameters configured as follows: jet pump pressure 35-40MPa, drill rod retraction speed 15-30cm / min, rotary table speed 10-20r / min, and jet grouting pile length parameters. The drilling rig's entry hole angle is set to 20m, and the servo control is set to 5° to 7°. The grouting flow meter controls the amount of dry cement powder used per meter to be ≥300kg / m.
[0148] In the parameter design phase of step D, the nominal span parameters are extracted. m and circumferential spacing configuration parameters m. Calculate the linear uniformly distributed load assigned to a single pipe roof. :
[0149] ;
[0150] Calculate the maximum bending moment response of a continuous beam at its mechanical limit state. :
[0151] ;
[0152] The absolute requirement for the minimum rigid section modulus of the material to be provided. (Q235 steel) MPa):
[0153] ;
[0154] The jet grouting consolidation body constructed in the early stage was introduced as an elastic foundation for equivalent bending resistance calculation. The soil modulus of the medium was taken as 50 to 100 MPa, and the effective bending moment was reduced after composite constraint of the subgrade coefficient. The response calculation formula is:
[0155] A reduction factor for the reaction of the pipe roof foundation is introduced. Based on experience or calculation using the stiffness matrix of this system, the reduction factor is set to 0.4.
[0156] Specifically, the reduction factor for the foundation reaction of the pipe roof (denoted as...) The value is not an empirical constant, but is determined based on the ratio of the stiffness of the composite section formed by the pipe roof steel pipe and the surrounding jet grouting piles. In this embodiment, the annular gap between the pipe roof and the jet grouting piles has been filled with double-liquid grout, forming a composite beam structure that deforms together. Therefore, the effective bending moment reduction factor allocated to the pipe roof steel pipe itself... The calculation formula is as follows:
[0157] ;
[0158] In the formula, For the bending stiffness of the steel pipes in the pipe shed ( The elastic modulus of steel, (moment of inertia of the steel pipe section). The flexural stiffness of the peripheral equivalent jet grouting consolidation shared by a single pipe shed ( The elastic modulus of the jet nozzle. (This refers to the effective cross-sectional moment of inertia of the jet nozzle within the range of a single pipe roof). Under the parameter system of the tenth cycle in this embodiment, the theoretical calculation obtained by substituting the aforementioned known physical quantities... The value is approximately 0.4, thus clarifying the physical and mathematical boundaries of the reduction factor and eliminating the reliance on empirical assignment.
[0159] Calculate the adjusted effective minimum section modulus stiffness requirement. :
[0160] ;
[0161] The cross-section is selected and configured as the outer diameter. mm, inner diameter The section modulus of a hot-rolled seamless steel pipe with a wall thickness of 6 mm (i.e., 6 mm) is calculated based on the characteristics of a circular cross-section. :
[0162] ;
[0163] (Unit: mm³, i.e., 10⁵ cm³), after calculating the overall coordinated stiffness weighted coefficient of the pipe roof group, the combined structure's bearing safety factor was deemed to meet the standard. The tenth cycle drawings implemented a matrix laying of 49 pipe roofs, with the single pipe roof length set at 17m (the length variable was updated to 20m in the subsequent twelfth cycle), and the circumferential spacing array remained at 400mm. The guide pipe was inserted into the existing drilling channel of the outer ring jet grouting piles, and the external deflection angle of the drilling rig's entry guide rail was set at 9°. The internal channels and annular gaps of the pipe roof were filled with a secondary injection of dual-liquid grout, with the injection pump pressure set to 0.5 to 4MPa and the dual-liquid ratio flow rate set to... .
[0164] In step E, during the tunnel bottom anti-heave parameter configuration stage, radar detection data is used to read the thickness parameters of the fault gouge softening zone below the forward invert arch. The depth is 3m. The theoretical reinforcement thickness is calculated based on the proportional relationship between vertical reinforcement depth and other factors.
[0165] ;
[0166] The system applies effective grouting reinforcement depth The bottom-limit constraint rule for m will define the variable. The value was rounded down to 5.0m. The lower hardware uses Φ76×5mm thick-walled steel perforated pipes, employing a quincunx pattern of holes with a node spacing of 1.5×1.5m. The process involves pre-embedded Φ120 PVC pipes for post-construction high-pressure grouting after the invert arch structure is closed, with the hydraulic pump station maintaining a constant pressure of 2.0MPa. The drilling and cutting length of a single steel perforated pipe was calculated and determined, covering a range of 6.6 to 7.9m to accommodate the curvature of the invert arch base plate.
[0167] In the comprehensive verification phase of step F, the tenth cycle of construction organization sequence was strictly implemented according to the hardware assembly line. The combined system comprehensive bearing capacity safety factor variable was calculated and output from the analytical verification model. Reaching 1.9, the logic threshold judgment is met. The start-up conditions were as follows. Data logs recorded that the grouting reinforcement process lasted 59 days, and the excavation process lasted 12 days. The cumulative deformation data of the arch settlement continuously read by the monitoring and measurement system sensors remained within a steady-state tolerance range of ≤20mm, and the surrounding rock stress response curve of the pressure cell sensor was stable without any jumps. Based on the above closed-loop positive feedback data flow, when entering the twelfth cycle, the system configuration array continued to maintain the main curtain grouting thickness. Based on the layout of the m and the basic framework pipe roof, and with sufficient safety margin based on the measured boundary stress conditions, the core soil-stabilized jet grouting pile node configuration, which was an additional item in the previous cycle, was removed. The variable of the number of main grouting holes was updated to 97, and the variable of the total number of jet grouting piles in a single cycle was reduced to 114. This resulted in the output of a more optimized set of execution instructions, which guided the precise parameter calling and engineering execution of the subsequent deep-buried fractured zone construction sections.
[0168] Obviously, those skilled in the art can make various modifications and variations to this invention without departing from its spirit and scope. Therefore, if these modifications and variations fall within the scope of the claims of this invention and their equivalents, this invention also intends to include these modifications and variations.
Claims
1. A design method for an advanced fully enclosed combined pre-support structure for tunnels traversing water-rich, wide fault fracture zones, characterized in that, The method includes the following steps in sequence: Step A: Establish engineering geology and load model: Obtain the geological parameters and design groundwater pressure of the fault fracture zone ahead, and calculate the resultant force of the loose body load and the design groundwater pressure in combination with the softening and loosening height of the loose body, as the design load of the combined support system. Step B: Determine the equivalent bearing arch parameters of the curtain grouting reinforcement zone: The grouting and solidification zone outside the excavation outline in front of the tunnel face is regarded as a continuous annular arch. Based on the outer arc ultimate compressive stress condition and the design load, the minimum effective grouting thickness that meets the bearing requirements is determined, and the design grouting thickness and hole layout range are set accordingly. Step C: Determine the arch parameters of the horizontal jet grouting pile: Treat the interlocking body of the double-ring horizontal jet grouting pile as an integral arch shell. Based on the continuous arch shell axial force model and the design load, determine the minimum bearing thickness of the integral arch shell, and calculate the minimum pile diameter and circumferential spacing of the jet grouting pile accordingly. Step D: Determine the specifications of the pipe shed: Treat a single pipe shed as a continuous beam model bearing a uniformly distributed longitudinal load, convert the design load to the single pipe shed, determine the minimum section modulus of the pipe shed according to the limit state and maximum bending moment control criteria of the beam, and determine the outer diameter and wall thickness of the pipe shed in conjunction with the deflection check conditions. Step E: Determine tunnel bottom grouting parameters: Based on the thickness of the softened zone at the bottom of the tunnel in the fault fracture zone, determine the tunnel bottom grouting reinforcement depth and grouting hole layout parameters for suppressing bottom heave; Step F: Construction and Feedback of the Combined System: Based on the parameters determined in Steps B to E, curtain grouting, double-ring horizontal jet grouting piles, pipe roof installation, excavation, and tunnel bottom grouting are carried out in sequence according to the established procedures to construct a fully enclosed pre-support structure.
2. The design method for the advanced fully enclosed combined pre-support structure according to claim 1, characterized in that, In step B: When calculating the minimum effective grouting thickness, the input parameters include the tunnel excavation radius, the design load, and the equivalent uniaxial compressive strength of the grouting solidified body after reduction. The designed grouting thickness is greater than or equal to 1.2 times the minimum effective grouting thickness, and the outermost boundary of the curtain grouting hole is determined by the designed grouting thickness; The longitudinal grouting range of the curtain grouting is the sum of the designed excavation advance and the length of the grout-stopping rock bed.
3. The design method for advanced fully enclosed combined pre-supported structures according to claim 2, characterized in that, In step B: The curtain grouting holes are arranged in a quincunx pattern, and the distance between the bottoms of adjacent holes is no more than twice the designed grout diffusion radius, in order to eliminate grout leakage blind spots in the reinforced area; The curtain grouting adopts segmented and graded pressure control. The section near the working face uses low-pressure filling grouting, while the section far from the working face uses high-pressure splitting grouting with sleeve valve tube bundles.
4. The design method for advanced fully enclosed combined pre-supported structures according to claim 1, characterized in that, In step C: The coverage angle of the integral arch shell in the tunnel arch is not less than 220°; The minimum bearing thickness is determined based on the following: the axial stress of the integral arch shell under the design load does not exceed the design value of the unconfined compressive strength of the jet grouting pile consolidation body. A front-end interlocking amount is provided between two adjacent jet grouting piles. The minimum pile diameter and the circumferential spacing must ensure that the equivalent cover thickness after the adjacent jet grouting piles interlock is not less than the minimum bearing thickness.
5. The design method for an advanced fully enclosed combined pre-support structure according to claim 4, characterized in that, In step C: The double-ring horizontal jet grouting pile includes an outer ring jet grouting pile and an inner ring jet grouting pile; The outer deflection angle of the outer ring jet grouting pile is calculated based on the distance from the end of the pile to the outer boundary of the design outline. The outer deflection angle of the inner ring jet grouting pile is smaller than that of the outer ring jet grouting pile.
6. The design method for advanced fully enclosed combined pre-supported structures according to claim 1, characterized in that, In step D: The span of the continuous beam model is taken as the distance between the two end supports, that is, the net distance between two adjacent arch frames plus half the length of the jet grouting interlocking strip; When performing the deflection check, the maximum deflection of the pipe shed is required to be no greater than one three-hundredth of the span.
7. The design method for advanced fully enclosed combined pre-supported structures according to claim 6, characterized in that, In step D: The pipe roof is implanted inside the outer ring jet grouting pile along the original drilling channel, with the outer deflection angle of the entry hole consistent with that of the outer ring jet grouting pile. The pipe body of the pipe shed is longitudinally provided with overflow holes, and a sealing section without overflow holes is reserved at the end; The annular gap between the pipe roof and the jet grouting pile is filled with a dual-liquid grout, so that the pipe roof and the jet grouting body form a composite stress-bearing skeleton.
8. The design method for advanced fully enclosed combined pre-supported structures according to claim 1, characterized in that, In step E: The depth of the tunnel bottom grouting reinforcement is 1.5 times the thickness of the softened zone below the tunnel bottom, and a minimum depth threshold is set. The tunnel bottom grouting adopts the pre-embedded pipe post-construction grouting process, which is as follows: after the initial support of the invert arch is completed and the invert arch filling concrete is poured, grouting is carried out by drilling holes through the pre-embedded pipes and installing grouting pipes.
9. The design method for an advanced fully enclosed combined pre-support structure according to claim 1, characterized in that, The method further includes a system stability verification step between step E and step F, specifically: The load-bearing contributions of the curtain grouting solidification zone, the jet grouting pile arch shell, and the pipe roof frame are superimposed to calculate the comprehensive load-bearing safety factor of the combined system. Only when the comprehensive load-bearing safety factor is greater than or equal to the preset safety threshold can the excavation and construction of step F be carried out.
10. The design method for an advanced fully enclosed combined pre-support structure according to claim 1, characterized in that, In step F, there are mandatory construction sequence constraints, and the specific sequence is as follows: Advanced geological forecasting is conducted to confirm the degree of agreement between actual conditions and design loads; Construct a grout-stopping wall and perform the curtain grouting; after the curtain grouting is completed, construct the outer ring horizontal jet grouting piles and the inner ring horizontal jet grouting piles in sequence; The pipe roof is inserted into a hole formed inside the jet grouting pile and then filled. After the pipe roof construction is completed and a safe time has been reached, excavation and initial support will be carried out; finally, the tunnel bottom grouting will be implemented. The measured deformation rate is monitored in real time during the excavation process, and a supplementary grouting mechanism is triggered when the rate exceeds the warning value.