A multidimensional assessment method and system for soil pollution source intensity around an industrial park
By obtaining the discharge flow and concentration of pollution sources, and combining the hydraulic status of the pipeline network and soil evaluation units, the problem of inaccurate pollution source intensity evaluation when shared underground gravity sewage pipelines leak is solved, and a more accurate multi-dimensional assessment is achieved.
Patent Information
- Application Number
- CN202611333294.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-31
- Publication Date
- 2026-11-17
AI Technical Summary
Existing methods are insufficient to reflect the dynamic correspondence between the timing of pollution source emissions, the pipeline transmission process, and the actual soil entry process, resulting in inaccurate assessment of pollution source intensity. In particular, when leakage occurs in shared underground gravity sewage pipe networks, the contribution of pollutants is inconsistent with the actual pollution load entering the surrounding soil.
By obtaining the drainage flow and concentration of pollution sources to form a pollutant discharge load sequence, and combining the pipeline network topology and hydraulic parameters to determine the dynamic hydraulic state, the transmission and leakage of pollutants in the pipeline network are calculated, soil evaluation units are divided, the proportion of pollutant migration is determined, and finally a multi-dimensional assessment is achieved.
It improves the accuracy of pollution source intensity assessment, enabling the identification of situations where emissions are high but actual soil load is low or vice versa, and enhances the distinguishability of assessments in scenarios where multiple pollution sources share a pipeline network.
Smart Images

Figure CN123117541A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of soil pollution source assessment technology, specifically a multidimensional assessment method and system for soil pollution source intensity around a park. Background Technology
[0002] Assessing the intensity of soil pollution sources around the industrial park is crucial for identifying the contribution of different pollution sources to surrounding soil pollution. Existing methods typically estimate pollution source intensity based on pollution source emissions, pollutant concentrations, leakage coefficients, or soil monitoring results.
[0003] In scenarios where multiple pollution sources share an underground gravity sewage network with leakage defects, the time it takes for pollutants emitted from different sources to reach the leakage location varies, and the hydraulic conditions of the network continuously change over time. Therefore, the contribution of pollutants to the network does not correspond to the actual pollution load entering the surrounding soil. Existing methods struggle to reflect the dynamic correspondence between the timing of pollution source emissions, the network transmission process, and the actual soil entry process, easily leading to distorted assessments of the intensity of different pollution sources. Summary of the Invention
[0004] The purpose of this invention is to provide a multidimensional assessment method and system for the intensity of soil pollution sources around a park, in order to solve the problem that when a shared underground gravity sewage pipe network leaks, the pollution contribution of the pollution source in the pipe network is inconsistent with the actual pollution load entering the surrounding soil, resulting in inaccurate assessment of the intensity of the pollution source.
[0005] To achieve the above objectives, on the one hand, the present invention provides a multidimensional assessment method for the intensity of soil pollution sources around an industrial park, the method comprising: S1. Obtain the drainage flow, target pollutant concentration, and emission time of multiple pollution sources in the park during the evaluation period; form a pollutant emission load sequence for each pollution source based on the drainage flow, target pollutant concentration, and emission time.
[0006] S2. Determine the dynamic hydraulic state of the shared underground gravity sewage network based on the drainage flow of each pollution source, the topology of the shared underground gravity sewage network in the park, and the hydraulic parameters of the network. Based on the dynamic hydraulic state of the shared network and the pollutant transmission parameters, calculate the transmission of pollutant discharge load sequences of each pollution source in the network to obtain the source-attributed pollutant concentration contribution sequence of each pollution source in the target leakage pipe section connected to the surrounding soil of the park.
[0007] S3. Based on the dynamic hydraulic state of the shared pipe network of the target leakage pipe section, the hydraulic state of the soil surrounding the target leakage pipe section, and the leakage response parameters, determine the outward leakage period and the outward leakage flux for each outward leakage period; based on the source-attributed pollutant concentration contribution sequence and outward leakage flux within each outward leakage period, calculate the effective soil pollution load of each pollution source in each outward leakage period.
[0008] S4. Divide the soil around the park into multiple surrounding soil evaluation units. Determine the pollutant migration ratio based on the spatial relationship between the target leakage pipe section and each surrounding soil evaluation unit, pollutant migration parameters, and migration duration from each outward leakage period to the end of the evaluation period. Allocate each effective soil-entry pollution load to the corresponding surrounding soil evaluation unit according to the pollutant migration ratio to obtain the multi-dimensional assessment results of pollution source intensity under the dimensions of pollutants, outward leakage period, and surrounding soil evaluation unit.
[0009] Furthermore, the method for determining the dynamic hydraulic state of the shared underground gravity sewage network based on the drainage flow of each pollution source, the topology of the shared underground gravity sewage network in the industrial park, and the hydraulic parameters of the network includes: According to a unified time step, the drainage flow of each pollution source is mapped to the pollution source access node corresponding to the shared underground gravity sewage pipe network in the park, and the basic flow of the pipe network is included in the inflow boundary of the corresponding time step to obtain the inflow boundary sequence of each node.
[0010] Based on the topology and hydraulic parameters of the shared underground gravity sewage network in the park, continuous flow calculations of node flow and hydraulic calculations of pipe segments are performed on the inflow boundary sequence to obtain the flow rate, velocity and liquid level of each pipe segment at each time step.
[0011] By combining the flow rate, velocity, and liquid level of each pipe segment at each time step in chronological order, the dynamic hydraulic state of the shared pipe network can be obtained.
[0012] Furthermore, the method for calculating the pollutant emission load sequence of each pollution source based on the dynamic hydraulic state and pollutant transport parameters of the shared pipe network includes: Based on the topology of the shared underground gravity sewage network in the park, the pipeline transmission path from each pollution source access node to the target leakage pipe section is determined; the pollutant emission load sequence of each pollution source is set as the pollutant input boundary of the corresponding pollution source access node.
[0013] Based on the dynamic hydraulic state and pollutant transport parameters of the same shared pipe network, the target pollutant concentration contribution of each pollution source is calculated for each pipe segment along the transport path of each pipe network. The target pollutant concentration contribution at the outlet of the upstream pipe segment is used as the pollutant input boundary of the adjacent downstream pipe segment, thus obtaining the source-attributed pollutant concentration contribution sequence of each pollution source in the target leakage pipe segment.
[0014] Furthermore, the method for calculating the target pollutant concentration contribution of each pollution source segment by segment along each pipeline transmission path includes: Identify the confluence nodes in each pipeline transmission path; calculate the source-attributed pollutant mass flow rate of each pollution source entering the confluence node based on the flow rate of each upstream pipe segment entering the confluence node within the same time step and the source-attributed pollutant concentration contribution of each pollution source.
[0015] The total inflow to the confluence node is calculated based on the flow rates of each upstream pipe segment entering the confluence node and the inflow boundary flow rate at the corresponding time step of the confluence node; the source-attributed pollutant concentration contribution of each pollution source downstream of the confluence node is calculated based on the source-attributed pollutant mass flow rate of each pollution source and the total inflow to the confluence node.
[0016] Furthermore, the method for determining the outward leakage period and the outward leakage flux during each outward leakage period based on the dynamic hydraulic state of the shared pipe network of the target leakage pipe section, the hydraulic state of the soil surrounding the target leakage pipe section, and leakage response parameters includes: The equivalent opening parameters of the defect are determined based on the geometric characteristics of the defect in the target leakage pipe section; the equivalent permeability parameters are determined based on the permeability characteristics of the soil surrounding the target leakage pipe section; and the leakage response parameters are formed based on the equivalent opening parameters and the equivalent permeability parameters.
[0017] The hydraulic potential sequence inside the pipe is determined based on the dynamic hydraulic state of the shared pipe network of the target leaking pipe section; the hydraulic potential sequence of the soil is determined based on the hydraulic state of the soil surrounding the target leaking pipe section.
[0018] The difference between the hydraulic potential inside the pipe and the hydraulic potential of the soil at the same time step is calculated to obtain the hydraulic potential difference sequence inside and outside the pipe; the continuous time steps with positive hydraulic potential difference inside and outside the pipe are combined into the outward leakage period.
[0019] The outward leakage flux at each time step is calculated based on the hydraulic potential difference between the inside and outside of the pipe and the leakage response parameters during each outward leakage period, thus obtaining the outward leakage flux for each outward leakage period.
[0020] Furthermore, the method for calculating the effective soil pollution load of each pollution source during each outward leakage period based on the source-attributed pollutant concentration contribution sequence and outward leakage flux includes: According to the unified time step, the source-attributed pollutant concentration contribution sequence of each pollution source is correlated with the outward leakage flux over time to obtain the source-attributed pollutant concentration contribution and outward leakage flux at each time step.
[0021] The source-attributed soil load component is calculated based on the source-attributed pollutant concentration contribution, outward leakage flux, and time step length at each time step.
[0022] The effective soil ingress load of each pollution source during each outflow period is obtained by accumulating the soil ingress load component according to the pollution source and the outflow period.
[0023] Furthermore, the method for dividing the soil surrounding the park into multiple surrounding soil evaluation units includes: The leakage location of the target leakage pipe section is used as the spatial division benchmark; multiple horizontal distance intervals are set according to the horizontal distance from the spatial division benchmark, and multiple depth intervals are set according to the soil depth; the soil around the park is divided according to the spatial intersection relationship of the horizontal distance intervals and the depth intervals, resulting in multiple surrounding soil evaluation units.
[0024] Furthermore, the method for determining the pollutant migration ratio based on the spatial relationship between the target leakage pipe section and each surrounding soil evaluation unit, pollutant migration parameters, and the migration duration from each outward leakage period to the end of the evaluation cycle includes: Based on the leakage location of the target leakage pipe section and the spatial location of each surrounding soil evaluation unit, determine the horizontal and vertical migration distances from the target leakage pipe section to each surrounding soil evaluation unit.
[0025] The migration duration sequence is formed based on the time interval from each time step within each outward leakage period to the end of the evaluation period.
[0026] Based on the horizontal migration distance, vertical migration distance, migration duration sequence, and pollutant migration parameters, the proportion of unit pollution load that reaches each surrounding soil evaluation unit at each time step is calculated according to the horizontal and vertical convection diffusion relationship.
[0027] Based on the proportion of the source-attributed soil ingress load component to the effective soil ingress load during the corresponding outward leakage period at each time step, the unit load migration ratio is weighted to obtain the pollutant migration ratio of each pollution source to each surrounding soil assessment unit during each outward leakage period.
[0028] Based on the same inventive concept, this invention also provides a multi-dimensional assessment system for the intensity of soil pollution sources around a park, the system comprising: The emission load module is used to obtain the drainage flow, target pollutant concentration, and emission time of multiple pollution sources in the park during the evaluation period; and to form the pollutant emission load sequence of each pollution source based on the drainage flow, target pollutant concentration, and emission time.
[0029] The pipeline transmission module is used to determine the dynamic hydraulic state of the shared underground gravity sewage network based on the drainage flow of each pollution source, the topology of the shared underground gravity sewage network in the park, and the hydraulic parameters of the network. Based on the dynamic hydraulic state of the shared network and the pollutant transmission parameters, the pipeline transmission module is used to calculate the pollutant emission load sequence of each pollution source, and obtain the source-attributed pollutant concentration contribution sequence of each pollution source in the target leakage pipe section connected to the surrounding soil of the park.
[0030] The soil ingress load module is used to determine the outward leakage period and the outward leakage flux during each outward leakage period based on the dynamic hydraulic state of the shared pipe network of the target leakage pipe section, the hydraulic state of the soil surrounding the target leakage pipe section, and the leakage response parameters; and to calculate the effective soil ingress pollution load of each pollution source during each outward leakage period based on the source-attributed pollutant concentration contribution sequence and the outward leakage flux within each outward leakage period.
[0031] The multidimensional assessment module is used to divide the soil around the park into multiple surrounding soil assessment units. Based on the spatial relationship between the target seepage pipe section and each surrounding soil assessment unit, pollutant migration parameters, and the migration duration from each outward seepage period to the end of the assessment period, the pollutant migration ratio is determined. Based on the pollutant migration ratio, each effective soil-entry pollution load is allocated to the corresponding surrounding soil assessment unit, resulting in a multidimensional assessment of the pollution source intensity of each pollution source in the dimensions of pollutants, outward seepage period, and surrounding soil assessment unit.
[0032] Compared with the prior art, the beneficial effects of the present invention are: 1. Based on the emission information of multiple pollution sources and the operating status of the shared pipeline network, the temporal contribution of pollutants to the target leakage pipe section is determined. Combined with the outward leakage status at different time periods, the actual pollution load of each pollution source entering the surrounding soil is calculated. Then, combined with the spatial location of the soil and the migration process of pollutants, a multi-dimensional assessment result is formed. This transforms the pollution source intensity from simply reflecting the emission volume to reflecting the actual pollution load entering the surrounding soil across the pipe-soil interface. It can identify situations where the emission mass is large but the actual soil load is low, and the emission mass is small but the actual soil load is high, thereby improving the accuracy of the assessment of the soil pollution source intensity around the park.
[0033] 2. In the process of multiple pollution sources converging through a shared pipe network, the concentration contribution of each pollution source is determined according to the pollutant mass flow rate entering the confluence node and the total inflow after confluence. This ensures that the source correspondence is maintained after the pollutants undergo physical mixing, avoiding the source attribution bias caused by directly allocating pollutant contributions according to the proportion of drainage flow. This allows the pollutant contribution under conditions of simultaneous drainage from multiple pollution sources and confluence of multiple branches to continue to be transmitted along the pipe network and correspond to the actual soil pollution load, thereby improving the distinguishability of pollution source intensity assessment in scenarios where multiple pollution sources share a pipe network. Attached Figure Description
[0034] Figure 1 This is a flowchart of a multidimensional assessment method for soil pollution source intensity around a park, according to the present invention. Detailed Implementation
[0035] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0036] This invention is applicable to scenarios where multiple pollution sources in an industrial park are connected to a shared underground gravity sewage network, the shared underground gravity sewage network has a target leakage pipe section that is connected to the surrounding soil of the park, and it is necessary to distinguish the pollution load contribution of different pollution sources entering different surrounding soil evaluation units through the target leakage pipe section.
[0037] Example 1: As Figure 1 As shown, this embodiment provides a multi-dimensional assessment method for the intensity of soil pollution sources around an industrial park, taking a metal surface treatment industrial park as an example. A continuous backfill soil layer is distributed outside the park boundary. Electroplating workshops A, B, and C within the park are connected to the park's shared underground gravity sewage network. Existing monitoring results for the backfill soil layer outside the park boundary show a continuous enrichment of nickel content relative to the regional background value; therefore, nickel is used as the target pollutant in this embodiment. The target leakage section is located near the park boundary, with the leakage location denoted as coordinate origin O, and a depth of 2.00m below ground level. The evaluation period is 30 days.
[0038] Obtain the drainage flow, target pollutant concentration, and emission time of multiple pollution sources in the park during the evaluation period; and form a pollutant emission load sequence for each pollution source based on the drainage flow, target pollutant concentration, and emission time.
[0039] Electroplating workshop A generated a continuous wastewater discharge batch from 01:30 to 03:30 on the first day of the evaluation period, with an average discharge flow rate of 40 m³ / h. The target pollutant concentration was 125 mg / L, based on the test results of the mixed water sample from the corresponding discharge batch. Surface treatment workshop B generated a continuous wastewater discharge batch from 09:00 to 11:00 on the first day of the evaluation period, with an average discharge flow rate of 80 m³ / h and a target pollutant concentration of 31.25 mg / L. Electroplating workshop C generated a continuous wastewater discharge batch from 08:40 to 10:40 on the first day of the evaluation period, with an average discharge flow rate of 30 m³ / h and a target pollutant concentration of 40 mg / L. There was a 100-minute overlap in discharge time between surface treatment workshop B and electroplating workshop C. Discharge flow rates were recorded by electromagnetic flowmeters at the production wastewater discharge outlets before each pollution source connected to the shared underground gravity sewage network of the park. Discharge times were determined by the operation records of the drainage pumps and control valves. The target pollutant concentration was determined by the test results of the mixed water sample from the corresponding discharge batch. The pollutant discharge load sequence was arranged according to a uniform time step. Save the data; in this embodiment, 10 minutes is used, and the timestamp is taken as the start time of each uniform time step.
[0040] pollution source In the Target pollutant emission load at each time step ; Indicates pollution source In the Drainage flow rate over a time step; Indicates pollution source In the The target pollutant concentrations at the discharge outlets are calculated for each time step. Electroplating workshop A has an emission load of 5000 g / h, which corresponds to 10.0 kg of nickel after 2 hours; surface treatment workshop B has an emission load of 2500 g / h, which corresponds to 5.0 kg of nickel after 2 hours; and electroplating workshop C has an emission load of 1200 g / h, which corresponds to 2.4 kg of nickel after 2 hours.
[0041] According to a unified time step, the drainage flow of each pollution source is mapped to the pollution source access node corresponding to the shared underground gravity sewage pipe network in the park, and the basic flow of the pipe network is included in the inflow boundary of the corresponding time step to obtain the inflow boundary sequence of each node.
[0042] The park shares an underground gravity sewage network with confluence nodes M1 and M2 and discharge node NO. The basic flow rate of the network, 25 m³ / h, is directly used as the inflow boundary flow rate of M1. NA connects to M1 via pipe section P1, NB connects to M1 via pipe section P2, M1 connects to M2 via pipe section P3, NC connects to M2 via pipe section P4, and M2 connects to NO via pipe section P5. The target leakage section is located within P5, and the leakage location is mapped to a calculation location 120 m from M2 in the network transmission model. For each pollution source, the drainage flow rate corresponding to a unified time step when no drainage occurs is set to 0. When a drainage event crosses the unified time step boundary, the average drainage flow rate corresponding to the unified time step is calculated based on the actual duration.
[0043] Pipe segment P1 connects NA and M1, with a modeling length of 360m, an inner diameter of 0.35m, and a longitudinal slope of 0.0040; pipe segment P2 connects NB and M1, with a modeling length of 240m, an inner diameter of 0.40m, and a longitudinal slope of 0.0035; pipe segment P3 connects M1 and M2, with a modeling length of 280m, an inner diameter of 0.50m, and a longitudinal slope of 0.0030; pipe segment P4 connects NC and M2, with a modeling length of 180m, an inner diameter of 0.35m, and a longitudinal slope of 0.0040; pipe segment P5 connects M2 and NO, with a modeling length of 220m, an inner diameter of 0.60m, and a longitudinal slope of 0.0025; pipe segments P1 to P5 use the same type of gravity drainage pipe. Pipe endoscopic inspection did not find any obvious scaling or large-area inner wall damage affecting the flow cross-section, and the Manning roughness coefficient was taken as 0.013 for all segments.
[0044] The topology, pipe segment connections, inner diameter, longitudinal slope, and bottom elevation of the shared underground gravity sewage network in the industrial park were verified based on the park's underground network as-built data and the mileage of pipeline endoscopic inspections. The basic flow rate of the network was determined based on continuous flow records when electroplating workshops A, B, and C all ceased production and were discharging wastewater. The average flow rate across multiple non-production wastewater discharge time windows was 25.2 m³ / h, and 25 m³ / h was used as the inflow boundary flow rate for the network hydraulic calculations at M1. The hydraulic state of the shared network at the start of the evaluation period was based on the steady-state hydraulic calculation results with only the basic flow rate of the network as the initial state. The discharge node NO adopted a free outflow boundary, and the normal downstream water depth was determined based on the pipe diameter, longitudinal slope, and corresponding flow rate at the end of P5.
[0045] The actual lengths of pipe segments from the as-built data of the underground pipeline network in the park and the mileage records from pipeline endoscopic inspections are discretized in the model space to form the modeling lengths of the pipe segments. The modeling lengths of pipe segments P1 to P5 are 360m, 240m, 280m, 180m, and 220m, respectively. The pipeline transmission calculation adopts a spatial step size of 20m, and each pipe segment modeling length corresponds to an integer number of calculation units.
[0046] Based on the topology and hydraulic parameters of the shared underground gravity sewage network in the park, continuous flow calculations of node flow and hydraulic calculations of pipe segments are performed on the inflow boundary sequence to obtain the flow rate, velocity and liquid level of each pipe segment at each time step.
[0047] Continuous flow calculation at nodes employs the mass conservation relationship between node inflow, upstream pipe inflow, downstream pipe outflow, and changes in node water storage. Pipeline hydraulic calculations utilize one-dimensional unsteady flow continuity and momentum equations, while friction gradients are calculated using the Manning relation. Ordinary confluence nodes with negligible changes in node water storage satisfy... When there are changes in the water storage of the inspection well, it meets the following conditions. .
[0048] in, Indicates the first The sum of the flow of all upstream pipe segments entering the node at each time step; Indicates the first The sum of the flow rates of all downstream pipe segments at each time step outflow node; Represents a node In the Inflow boundary flow at a time step; Represents a node Changes in water storage within the hydraulic calculation time step.
[0049] Average flow velocity in pipe section ; This represents the flow rate of the pipe section, which should be converted to m³ / s during calculation. This represents the wetted flow cross-sectional area determined by the pipe diameter and liquid level, in m².
[0050] The bottom elevation of pipe P5, where the target leaking section is located, is taken as 12.00m at the leak location. In the representative time step, 01:20 only contains the basic flow of the pipe network; 02:30 includes drainage from electroplating workshop A; 09:10 includes drainage from electroplating workshop C; 09:50 includes drainage from the overlapping sections of surface treatment workshop B and electroplating workshop C; 11:10 mainly includes the tail end of drainage from surface treatment workshop B. No significant backflow was observed in P5 during the representative time step, and the flow rate, liquid level, and flow velocity simultaneously satisfied the cross-sectional continuity relationship, which was verified using the Manning relation.
[0051] At 01:20 and 12:00, the flow rate of P5 was 25 m³ / h, the liquid level at the leakage point was 0.062 m, and the average flow velocity was 0.446 m / s; at 02:30, the flow rate was 65 m³ / h, the liquid level at the leakage point was 0.0987 m, and the average flow velocity was 0.594 m / s; at 09:10, the flow rate was 55 m³ / h, the liquid level at the leakage point was 0.091 m, and the average flow velocity was 0.565 m / s; at 09:50, the flow rate was 135 m³ / h, the liquid level at the leakage point was 0.1416 m, and the average flow velocity was 0.736 m / s; at 11:10, the flow rate was 105 m³ / h, the liquid level at the leakage point was 0.1249 m, and the average flow velocity was 0.684 m / s.
[0052] By combining the flow rate, velocity, and liquid level of each pipe segment at each time step in chronological order, the dynamic hydraulic state of the shared pipe network can be obtained.
[0053] The dynamic hydraulic status of the shared pipeline network is stored using a time-step index, with flow rate, velocity, and liquid level stored simultaneously for P1 to P5 within a single time step. Subsequent calculations of pipeline transmission and external leakage are performed using the dynamic hydraulic status of the shared pipeline network under the same time index, without recalculating the pipeline network hydraulic conditions separately for different pollution sources.
[0054] Based on the topology of the shared underground gravity sewage network in the park, the pipeline transmission path from each pollution source access node to the target leakage pipe section is determined; the pollutant emission load sequence of each pollution source is set as the pollutant input boundary of the corresponding pollution source access node.
[0055] The pipeline transmission path for electroplating workshop A is P1-P3-P5, for surface treatment workshop B it is P2-P3-P5, and for electroplating workshop C it is P4-P5. Contaminant transmission parameters include the longitudinal dispersion coefficient. and first-order aqueous phase loss coefficient .
[0056] Longitudinal diffusion coefficient Based on the tracer test results of the shared underground gravity sewage pipe network in the park, the concentration breakthrough curves formed by the tracer substance at the upstream addition point and the downstream monitoring point were substituted into a one-dimensional convection dispersion model for parameter fitting. The fitting result was taken as 0.18 m² / s. First-stage water phase loss coefficient. The data was fitted based on the changes in mass flux of historical nickel emission batches at adjacent monitoring sections, and then... First-order aqueous phase loss coefficient This indicates the loss of the aqueous phase during the transmission of the target pollutant through the pipeline network due to adsorption on the pipe wall and carryover by settleable particles.
[0057] Pollution sources within ordinary pipe sections The formula for calculating the contribution of the target pollutant concentration is: .
[0058] in, Indicates pollution source At the pipe section location and calculation time The contribution of the target pollutant concentration, in mg / L; This indicates the distance along the axis of the pipe segment, in meters (m). This represents the pipeline transmission calculation time, in seconds. Indicates the position in the dynamic hydraulic state of the shared pipe network and calculation time The average flow velocity in the pipe section is expressed in m / s.
[0059] Under the same shared network dynamic hydraulic state, the longitudinal dispersion coefficient and the first-order water phase loss coefficient are determined. The convective dispersion relationship maintains a linear relationship with the contribution of the target pollutant concentration of different pollution sources. Therefore, the contribution of the target pollutant concentration of each pollution source can be calculated separately under the same shared network dynamic hydraulic state. The contribution of the target pollutant concentration of different pollution sources is calculated at the confluence node according to the pollutant mass conservation relationship.
[0060] The spatial step size is 20m, and a 60s internal calculation step size and a fully implicit difference scheme are used within a single unified time step. When using a 10m spatial step size and a 30s internal calculation step size for densification verification, the changes in the peak concentrations of the main pollutants in the target leakage pipe section are all less than 2%. In this embodiment, the 20m spatial step size and the 60s internal calculation step size are retained.
[0061] At the end of a single unified time step This serves as the initial state for the next unified time step. After the emission event ends, the corresponding pollutant input boundary is set to 0, and the existing pollutants within the pipe section... Continue to transmit dynamic hydraulic status along with the shared pipeline network.
[0062] The leaking section of the target pipe is located at the [number]th [location]. The source-attributed pollutant concentration contribution at each time step is denoted as .
[0063] The total inflow to the confluence node is calculated based on the flow rates of each upstream pipe segment entering the confluence node and the inflow boundary flow rate at the corresponding time step of the confluence node. The source-attributed pollutant concentration contribution of each pollution source downstream of the confluence node is calculated based on the source-attributed pollutant mass flow rate of each pollution source and the total inflow to the confluence node. The target pollutant concentration contribution at the outlet of the upstream pipe segment is used as the pollutant input boundary of the adjacent downstream pipe segment to obtain the source-attributed pollutant concentration contribution sequence of each pollution source in the target leakage pipe segment.
[0064] pollution source At the confluence node Source attribution of pollutant mass flow rate ; Convergence node Total inflow Pollution source At the confluence node Downstream source-attributable pollutant concentration contribution ;in, Indicates entering the confluence node The Flow rate of the upstream pipeline section; Indicates pollution source In the The source-attributable pollutant concentration contribution at the outlet of the upstream pipeline section; Indicates a confluence node Inflow boundary flow corresponding to the time step; and The unit is m³ / h, and the concentration unit is mg / L.
[0065] Within the time step of 09:50, the flow rate of P3 into M2 is 105 m³ / h, the flow rate of P4 into M2 is 30 m³ / h, and M2 has no additional inflow boundary flow, with a total inflow rate of 135 m³ / h. The source-attributed pollutant mass flow rate from the B surface treatment workshop to M2 is 2465 g / h, and the source-attributed pollutant mass flow rate from the C electroplating workshop to M2 is 1190 g / h. After the confluence, the source-attributed pollutant concentration contribution from the B surface treatment workshop is 18.26 mg / L, and the source-attributed pollutant concentration contribution from the C electroplating workshop is 8.81 mg / L.
[0066] Pipeline transmission calculations show that the main arrival time for electroplating workshop A is from 02:00 to 04:10, with the source-attributed pollutant concentration contribution in the platform section being approximately 75.6 mg / L; the main arrival time for surface treatment workshop B is from 09:20 to 11:30, with the source-attributed pollutant concentration contribution in the overlapping arrival phase between surface treatment workshop B and electroplating workshop C being approximately 18.3 mg / L; the main arrival time for electroplating workshop C is from 08:50 to 11:00, with the source-attributed pollutant concentration contribution in the overlapping arrival phase between surface treatment workshop B and electroplating workshop C being approximately 8.8 mg / L.
[0067] The equivalent opening parameters of the defect are determined based on the geometric characteristics of the defect in the target leakage pipe section; the equivalent permeability parameters are determined based on the permeability characteristics of the soil surrounding the target leakage pipe section; and the leakage response parameters are formed based on the equivalent opening parameters and the equivalent permeability parameters.
[0068] In the endoscopic images of the target leaking pipe section, the identifiable length of the longitudinal crack at the leak location ranged from 0.146m to 0.153m. Five width measurement locations were selected at equal intervals along the longitudinal crack, with opening widths of 0.028m, 0.031m, 0.029m, 0.032m, and 0.030m, respectively. The defect equivalent calculation used a crack length of 0.15m and an average opening width of 0.030m, with the crack projected area taken as... .
[0069] The seepage influence path length was determined based on a local hydraulic response test of the target leaking pipe section. The local hydraulic response test was conducted during a maintenance period when production drainage of the target leaking pipe section was suspended. The upstream and downstream sides of the target leaking pipe section were isolated, and the water level inside the pipe was adjusted in stages and maintained stable at each set level. The makeup water flow required to maintain the stable water level inside the pipe was taken as the outward leakage flow rate under the corresponding hydraulic potential difference between the inside and outside of the pipe. Based on an equivalent fitting of multiple sets of outward leakage flow rates and the hydraulic potential difference between the inside and outside of the pipe, the seepage influence path length of 0.060 m was obtained. (Defect equivalent opening parameters) Calculated based on the ratio of crack projected area to seepage influence path length. The seepage influence path length represents the equivalent hydraulic path length formed by the combined effects of the seepage defect in the target seepage pipe section and the adjacent soil, and does not represent the geometric distance between the pore water pressure monitoring point and the seepage location.
[0070] The soil surrounding the target leakage section is a medium-coarse sand backfill layer. The permeability coefficients at the three in-situ permeability test locations are as follows: , and Equivalent permeability parameters The arithmetic mean of the three experimental results is taken as .
[0071] Leakage response parameters of the target leaking pipe section During endoscopic inspection, no continuous deposition cover was formed on the crack surface, and the deposition thickness near the bottom of the pipe adjacent to the crack was less than 2 mm. The equivalent opening parameters of the defect were determined based on the crack's open state at the time of inspection. The equivalent opening parameters of the defect were not updated during the evaluation period.
[0072] The hydraulic potential sequence inside the pipe is determined based on the dynamic hydraulic state of the shared pipe network of the target leaking pipe section; the hydraulic potential sequence of the soil is determined based on the hydraulic state of the soil surrounding the target leaking pipe section.
[0073] The leak is located on the lower part of the pipe wall of P5. The hydraulic potential inside the pipe at a time step ; where 12.00m represents the bottom elevation of the leaking section in the target pipe segment; Indicates the first The liquid level at the leak location of the target leaking pipe section at each time step, in meters.
[0074] The hydraulic state of the soil surrounding the target leaking pipe section was recorded by a pore water pressure monitoring point 0.30m away from the leak location. The pore water pressure was converted into the soil hydraulic potential at the same elevation datum. The initial sampling interval for pore water pressure was 30 minutes. Linear interpolation between adjacent sampling values was used to convert the values to a uniform time step. (02:30) It is 12.0960m, 03:00 It is 12.0947m, at 09:50. It is 12.1046m, 11:10 The value is 12.1036m; the number of people involved in the leakage assessment on the first day of the evaluation period is [not specified]. The range of variation is from 12.094m to 12.118m.
[0075] The difference in hydraulic potential inside and outside the pipe at the same time step ; The time step is retained as the outward leakage time step. The time step is not included in the outward leakage period, and the outward leakage flux is set to 0. Two consecutive outward leakage periods are obtained within the evaluation period: The evaluation period is from 02:10 to 04:00 on the first day of the evaluation period. The evaluation period is from 09:20 to 11:30 on the first day. Although there is a source-attributed pollutant concentration contribution from the C electroplating workshop between 08:50 and 09:20, the corresponding... The time range is not included. .
[0076] No. outward leakage flux at a time step ; First calculate based on m³ / s, then convert to L / h; hour, Set to 0. In this embodiment, the outward leakage flux represents the volume of water entering the soil surrounding the target leakage pipe section through the leakage defect of the target leakage pipe section per unit time.
[0077] 02:30 The value is 0.0027m, corresponding to an outward leakage flux of 0.29L / h; at 03:00 The value is 0.0041m, corresponding to an outward leakage flux of 0.44L / h; at 09:50 The value is 0.0370m, corresponding to an outward leakage flux of 4.00L / h; 11:10 The value is 0.0213m, corresponding to an outward leakage flux of 2.30L / h. The outward leakage fluxes at the 11 time steps were 0.14, 0.21, 0.29, 0.35, 0.41, 0.44, 0.43, 0.37, 0.31, 0.23, and 0.16 L / h, respectively. The outward leakage fluxes at the 13 time steps were 2.7, 3.3, 3.7, 4.0, 4.1, 3.9, 4.0, 3.7, 3.4, 3.1, 2.7, 2.3, and 1.9 L / h, respectively.
[0078] According to the unified time step, the source-attributed pollutant concentration contribution sequence of each pollution source is correlated with the outward leakage flux over time to obtain the source-attributed pollutant concentration contribution and outward leakage flux at each time step.
[0079] Both the source-attributed pollutant concentration contribution sequence and the outward leakage flux were time-stamped using a uniform time step. The internal 60-second results of pollutant transport calculations were arithmetically averaged over each uniform time step, while the outward leakage flux was averaged over a uniform time step.
[0080] pollution source In the The source-attributed soil load component at each time step ;in, Indicates pollution source The source-attributed pollutant concentration contribution at the time step corresponding to the leakage location of the target leakage pipe section, in mg / L; The unit is L / h.
[0081] Inner A electroplating workshop Take concentrations of 30, 60, 75, 76, 76, 76, 76, 70, 50, and 25 mg / L in sequence, and... The 11 outward leakage fluxes are multiplied one by one and then multiplied by 1 / 6h to obtain the cumulative value of electroplating workshop A. The effective soil contamination load was 37.958 mg.
[0082] Inner B Surface Treatment Workshop The concentrations were taken sequentially at 10, 15, 18, 18.3, 18.3, 18.3, 18.3, 20, 22, 23, 23.5, and 18 mg / L. Inner C electroplating workshop The concentrations were taken sequentially as follows: 8, 8.5, 8.8, 8.8, 8.8, 8.8, 8, 6, 4, 2, 0.5, and 0 mg / L. After calculating the outward leakage flux of each of the 13 internal components, the surface treatment workshop B... The effective soil contamination load was 131.693 mg. In electroplating workshop C... The effective soil contamination load was 48.660 mg.
[0083] The leakage location of the target leakage pipe section is used as the spatial division benchmark; multiple horizontal distance intervals are set according to the horizontal distance from the spatial division benchmark, and multiple depth intervals are set according to the soil depth; the soil around the park is divided according to the spatial intersection relationship of the horizontal distance intervals and the depth intervals, resulting in multiple surrounding soil evaluation units.
[0084] The spatial datum O is located near the boundary of the park. Horizontal distances are measured perpendicular to the axis of the target seepage pipe section and pointing outwards from the park. The horizontal distance intervals are set as 0-0.5m, 0.5-1.5m, and 1.5-3.0m; the soil depth intervals are set as 2.0-2.5m, 2.5-3.0m, and 3.0-3.5m. The horizontal distance intervals are numbered H1, H2, and H3, and the depth intervals are numbered Z1, Z2, and Z3. After spatial intersection, nine surrounding soil evaluation units are formed, from U11 to U33.
[0085] The horizontal distance range of the surrounding soil evaluation units U11, U12 and U13 is 0-0.5m, and the soil depth range is 2.0-2.5m, 2.5-3.0m and 3.0-3.5m respectively; the horizontal distance range of the surrounding soil evaluation units U21, U22 and U23 is 0.5-1.5m, and the soil depth range is 2.0-2.5m, 2.5-3.0m and 3.0-3.5m respectively; the horizontal distance range of the surrounding soil evaluation units U31, U32 and U33 is 1.5-3.0m, and the soil depth range is 2.0-2.5m, 2.5-3.0m and 3.0-3.5m respectively.
[0086] Based on the leakage location of the target leakage pipe section and the spatial location of each surrounding soil evaluation unit, determine the horizontal and vertical migration distances from the target leakage pipe section to each surrounding soil evaluation unit.
[0087] The spatial location of each surrounding soil evaluation unit is determined by the center of the interval. The horizontal migration distances for H1, H2, and H3 are 0.25m, 1.00m, and 2.25m, respectively; the center depths of the intervals for Z1, Z2, and Z3 are 2.25m, 2.75m, and 3.25m, respectively. The leakage location depth of the target leakage pipe section is 2.00m, and the vertical migration distances are 0.25m, 0.75m, and 1.25m, respectively.
[0088] The migration duration sequence is formed based on the time interval from each time step within each outward leakage period to the end of the evaluation period.
[0089] The evaluation period ends at 24:00 on the last day of the evaluation period. The migration time was calculated using the midpoint of the time step for the 11 time steps, and the migration time decreased from 29.906 days to 29.837 days. The 13 time steps were calculated using the same rule, and the migration duration decreased from 29.608 days to 29.524 days. The migration duration was not replaced by the average time of outward leakage; the individual source-assigned soil load component retained its independent migration duration.
[0090] Based on the horizontal migration distance, vertical migration distance, migration duration sequence, and pollutant migration parameters, the proportion of unit pollution load that reaches each surrounding soil evaluation unit at each time step is calculated according to the horizontal and vertical convection diffusion relationship.
[0091] The backfill soil at the park boundary was treated as a homogeneous medium within the evaluation scope of this embodiment, and the pore water velocity and dispersion parameters remained stable throughout the evaluation period. Pollutant migration parameters were determined by column tests and tracer tests on the backfill soil at the park boundary. Horizontal pore water velocity... Take 0.020 m / d as the vertical pore water velocity. Take 0.010 m / d as the horizontal dispersion coefficient. Take 0.008 m² / d, vertical dispersion coefficient Taking 0.003 m² / d, the blocking factor of the target pollutant nickel. Take 1.6.
[0092] and This represents the pore water flow velocity, excluding the adsorption and retardation effect of the target pollutant nickel; the effective convective displacements of the target pollutant nickel in the horizontal and vertical directions are respectively calculated according to... and Calculations. The chemical decay of nickel is not listed separately; adsorption hysteresis is determined by the retardation factor. express.
[0093] No. The unit pollution load input at each time step affects the surrounding soil assessment unit. Unnormalized migration response Unit load migration ratio ;in, Indicates the surrounding soil assessment unit The cross-sectional area perpendicular to the axis of the target leaking pipe section, Indicates the horizontal migration distance. Indicates the vertical migration distance. Indicates the migration duration.
[0094] The distance is determined by the product of the horizontal distance interval width and the depth interval thickness. An auxiliary calculation domain is set outside the fixed evaluation area, extending to a distance of 6.0m from the spatial division benchmark and 5.0m from the soil depth, and discretized into 0.5m × 0.5m auxiliary units. The unnormalized migration response of the auxiliary units is calculated according to the same migration response calculation relationship as the surrounding soil evaluation units. The unnormalized migration responses of the auxiliary units outside the coverage area of U11 to U33 are summed and divided by the sum of the unnormalized migration responses of all units in the auxiliary calculation domain. In this embodiment, the proportion of migration response outside the coverage area is less than 0.5% (an engineering-acceptable truncation error threshold). The migration responses outside the coverage area of U11 to U33 are ignored, and the sum of the unit load migration proportions of U11 to U33 is normalized to 1. The unit load migration proportion represents the relative distribution ratio among the surrounding soil evaluation units within the fixed evaluation area.
[0095] Based on the proportion of the source-attributed soil ingress load component to the effective soil ingress load during the corresponding outward leakage period at each time step, the unit load migration ratio is weighted to obtain the pollutant migration ratio of each pollution source to each surrounding soil assessment unit during each outward leakage period.
[0096] pollution source During the period of outward leakage To surrounding soil assessment units Pollutant migration ratio ;in, Indicates pollution source During the period of outward leakage The effective soil pollution load, This indicates the period number during which leakage occurred.
[0097] A electroplating workshop is in The migration ratios of pollutants corresponding to U11 to U33 are 0.385045, 0.095099, 0.002521, 0.409439, 0.101124, 0.002681, 0.003264, 0.000806, and 0.000021, respectively; Surface treatment workshop B... The corresponding ratios are 0.390276, 0.094192, 0.002384, 0.408322, 0.098547, 0.002495, 0.003034, 0.000732, and 0.000019, respectively; Electroplating workshop C... The corresponding proportions are 0.390078, 0.094226, 0.002389, 0.408366, 0.098644, 0.002502, 0.003042, 0.000735, and 0.000019, respectively. The sum of the migration proportions of each group of pollutants is 1.
[0098] Based on the pollutant migration ratio, each effective soil pollution load is allocated to the corresponding surrounding soil assessment unit, resulting in a multi-dimensional assessment of the pollution source intensity of each pollution source in terms of pollutant dimensions, outward leakage time dimension, and surrounding soil assessment unit dimension.
[0099] pollution source During the period of outward leakage Assigned to surrounding soil assessment units pollution load The results of the multidimensional assessment of pollution source intensity are saved using a four-level index: pollution source number, target pollutant, leakage period, and surrounding soil assessment unit. Individual result elements are saved simultaneously. and average pollution source intensity over time period , , Indicates the period of outward leakage. Duration Lasting 1.833 hours, Lasting 2.167 hours.
[0100] A electroplating workshop is in The pollution loads allocated to U11, U12, U13, U21, U22, U23, U31, U32, and U33 are 14.616 mg, 3.610 mg, 0.096 mg, 15.542 mg, 3.838 mg, 0.102 mg, 0.124 mg, 0.031 mg, and 0.001 mg, respectively; Surface treatment workshop B... The pollution loads allocated to U11, U12, U13, U21, U22, U23, U31, U32, and U33 are 51.397 mg, 12.404 mg, 0.314 mg, 53.773 mg, 12.978 mg, 0.329 mg, 0.400 mg, 0.096 mg, and 0.002 mg, respectively; In electroplating workshop C... The pollution loads allocated to U11, U12, U13, U21, U22, U23, U31, U32, and U33 are 18.981 mg, 4.585 mg, 0.116 mg, 19.871 mg, 4.800 mg, 0.122 mg, 0.148 mg, 0.036 mg, and 0.001 mg, respectively. The difference between the sum of the pollution loads allocated to the nine surrounding soil assessment units by each pollution source during the same outward leakage period and the corresponding effective soil-entry pollution load is displayed with three decimal places.
[0101] The time-averaged pollution source intensity of each surrounding soil assessment unit under the same pollution source and the same outward leakage period is summed. The average effective soil penetration intensity during the time period in electroplating workshop A was 20.70 mg / h. The concentration of surface treatment in Inner B workshop is 60.78 mg / h. The concentration of pollutants in electroplating workshop C was 22.46 mg / h. The discharge mass of electroplating workshop A into the shared underground gravity sewage network of the park was 10.0 kg, which was higher than that of surface treatment workshop B (5.0 kg). When the target pollutants of electroplating workshop A mainly reached the target leakage pipe section, the outward leakage flux was in the range of 0.14-0.44 L / h. When the target pollutants of surface treatment workshop B mainly reached the target leakage pipe section, the outward leakage flux was in the range of 1.9-4.1 L / h. The corresponding effective soil pollution loads were 37.958 mg and 131.693 mg, respectively.
[0102] Example 2: Based on the same inventive concept, this example also provides a multi-dimensional assessment system for the intensity of soil pollution sources around a park, the system comprising: The emission load module is used to obtain the drainage flow, target pollutant concentration, and emission time of multiple pollution sources in the park during the evaluation period; and to form the pollutant emission load sequence of each pollution source based on the drainage flow, target pollutant concentration, and emission time.
[0103] The pipeline transmission module is used to determine the dynamic hydraulic state of the shared underground gravity sewage network based on the drainage flow of each pollution source, the topology of the shared underground gravity sewage network in the park, and the hydraulic parameters of the network. Based on the dynamic hydraulic state of the shared network and the pollutant transmission parameters, the pipeline transmission module is used to calculate the pollutant emission load sequence of each pollution source, and obtain the source-attributed pollutant concentration contribution sequence of each pollution source in the target leakage pipe section connected to the surrounding soil of the park.
[0104] The soil ingress load module is used to determine the outward leakage period and the outward leakage flux during each outward leakage period based on the dynamic hydraulic state of the shared pipe network of the target leakage pipe section, the hydraulic state of the soil surrounding the target leakage pipe section, and the leakage response parameters; and to calculate the effective soil ingress pollution load of each pollution source during each outward leakage period based on the source-attributed pollutant concentration contribution sequence and the outward leakage flux within each outward leakage period.
[0105] The multidimensional assessment module is used to divide the soil around the park into multiple surrounding soil assessment units. Based on the spatial relationship between the target seepage pipe section and each surrounding soil assessment unit, pollutant migration parameters, and the migration duration from each outward seepage period to the end of the assessment period, the pollutant migration ratio is determined. Based on the pollutant migration ratio, each effective soil-entry pollution load is allocated to the corresponding surrounding soil assessment unit, resulting in a multidimensional assessment of the pollution source intensity of each pollution source in the dimensions of pollutants, outward seepage period, and surrounding soil assessment unit.
[0106] It should be noted that the specific methods by which each module performs operations in the system described in the above embodiments have been described in detail in the embodiments related to the method, and will not be elaborated here.
[0107] Finally, it should be noted that although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A multidimensional assessment method for the intensity of soil pollution sources around an industrial park, characterized in that, The method includes: Obtain the drainage flow, target pollutant concentration, and emission time of multiple pollution sources in the park during the evaluation period; and form a pollutant emission load sequence for each pollution source based on the drainage flow, target pollutant concentration, and emission time. The dynamic hydraulic state of the shared underground gravity sewage network is determined based on the drainage flow of each pollution source, the topology of the shared underground gravity sewage network in the park, and the hydraulic parameters of the network. Based on the dynamic hydraulic state of the shared network and the pollutant transmission parameters, the pollutant emission load sequence of each pollution source is calculated to obtain the source-attributed pollutant concentration contribution sequence of each pollution source in the target leakage pipe section connected to the surrounding soil of the park. Based on the dynamic hydraulic state of the shared pipe network of the target leakage pipe section, the hydraulic state of the soil surrounding the target leakage pipe section, and the leakage response parameters, the outward leakage period and the outward leakage flux of each outward leakage period are determined; based on the source-attributed pollutant concentration contribution sequence and the outward leakage flux within each outward leakage period, the effective soil pollution load of each pollution source in each outward leakage period is calculated. The soil surrounding the park is divided into multiple surrounding soil evaluation units. The pollutant migration ratio is determined based on the spatial relationship between the target leakage pipe section and each surrounding soil evaluation unit, pollutant migration parameters, and migration duration from each outward leakage period to the end of the evaluation period. Based on the pollutant migration ratio, each effective soil-entry pollution load is allocated to the corresponding surrounding soil evaluation unit, resulting in a multi-dimensional assessment of pollution source intensity in terms of pollutants, outward leakage period, and surrounding soil evaluation unit.
2. The method for multidimensional assessment of soil pollution source intensity around a park according to claim 1, characterized in that, The method for determining the dynamic hydraulic state of the shared underground gravity sewage network based on the drainage flow of each pollution source, the topology of the shared underground gravity sewage network in the industrial park, and the hydraulic parameters of the network includes: According to a unified time step, the drainage flow of each pollution source is mapped to the pollution source access node corresponding to the shared underground gravity sewage pipe network in the park, and the basic flow of the pipe network is included in the inflow boundary of the corresponding time step to obtain the inflow boundary sequence of each node. Based on the topology and hydraulic parameters of the shared underground gravity sewage pipe network in the park, continuous flow calculation of nodes and hydraulic calculation of pipe segments are performed on the inflow boundary sequence to obtain the flow rate, velocity and liquid level of each pipe segment at each time step; By combining the flow rate, velocity, and liquid level of each pipe segment at each time step in chronological order, the dynamic hydraulic state of the shared pipe network can be obtained.
3. The method for multidimensional assessment of soil pollution source intensity around a park according to claim 2, characterized in that, The method for calculating the pollutant emission load sequence of each pollution source based on the dynamic hydraulic state and pollutant transport parameters of the shared pipe network includes: Based on the topology of the shared underground gravity sewage network in the park, the pipeline transmission path from each pollution source access node to the target leakage pipe section is determined; the pollutant emission load sequence of each pollution source is set as the pollutant input boundary of the corresponding pollution source access node. Based on the dynamic hydraulic state and pollutant transport parameters of the same shared pipe network, the target pollutant concentration contribution of each pollution source is calculated for each pipe segment along the transport path of each pipe network. The target pollutant concentration contribution at the outlet of the upstream pipe segment is used as the pollutant input boundary of the adjacent downstream pipe segment, thus obtaining the source-attributed pollutant concentration contribution sequence of each pollution source in the target leakage pipe segment.
4. The method for multidimensional assessment of soil pollution source intensity around a park according to claim 3, characterized in that, The method for calculating the target pollutant concentration contribution of each pollution source along each pipeline segment of the transmission path includes: Identify the confluence nodes in each pipeline transmission path; calculate the source-attributed pollutant mass flow rate of each pollution source entering the confluence node based on the flow rate of each upstream pipe segment entering the confluence node within the same time step and the source-attributed pollutant concentration contribution of each pollution source. The total inflow to the confluence node is calculated based on the flow rates of each upstream pipe segment entering the confluence node and the inflow boundary flow rate at the corresponding time step of the confluence node; the source-attributed pollutant concentration contribution of each pollution source downstream of the confluence node is calculated based on the source-attributed pollutant mass flow rate of each pollution source and the total inflow to the confluence node.
5. The method for multidimensional assessment of soil pollution source intensity around a park according to claim 3, characterized in that, The method for determining the outward leakage period and the outward leakage flux during each outward leakage period based on the dynamic hydraulic state of the shared pipe network of the target leakage pipe section, the hydraulic state of the soil surrounding the target leakage pipe section, and leakage response parameters includes: The equivalent opening parameters of the defect are determined based on the geometric characteristics of the defect in the target leakage pipe section; the equivalent permeability parameters are determined based on the permeability characteristics of the soil surrounding the target leakage pipe section; and the leakage response parameters are formed based on the equivalent opening parameters and the equivalent permeability parameters. The hydraulic potential sequence inside the pipe is determined based on the dynamic hydraulic state of the shared pipe network of the target leaking pipe section; the hydraulic potential sequence of the soil is determined based on the hydraulic state of the soil surrounding the target leaking pipe section. Calculate the difference between the hydraulic potential inside the pipe and the hydraulic potential of the soil at the same time step to obtain the hydraulic potential difference sequence inside and outside the pipe; merge the continuous time steps where the hydraulic potential difference inside and outside the pipe is positive into the outward leakage period. The outward leakage flux at each time step is calculated based on the hydraulic potential difference between the inside and outside of the pipe and the leakage response parameters during each outward leakage period, thus obtaining the outward leakage flux for each outward leakage period.
6. The method for multidimensional assessment of soil pollution source intensity around a park according to claim 5, characterized in that, The method for calculating the effective soil ingress pollution load of each pollution source during each outflow period, based on the source-attributed pollutant concentration contribution sequence and outflow flux, includes: According to the unified time step, the source-attributed pollutant concentration contribution sequence of each pollution source is correlated with the outward leakage flux in time to obtain the source-attributed pollutant concentration contribution and outward leakage flux at each time step. The source-attributed soil load component is calculated based on the source-attributed pollutant concentration contribution, outward leakage flux, and time step length at each time step. The effective soil ingress load of each pollution source during each outflow period is obtained by accumulating the soil ingress load component according to the pollution source and the outflow period.
7. The method for multidimensional assessment of soil pollution source intensity around a park according to claim 6, characterized in that, The method for dividing the soil surrounding the park into multiple surrounding soil evaluation units includes: The leakage location of the target leakage pipe section is used as the spatial division benchmark; multiple horizontal distance intervals are set according to the horizontal distance from the spatial division benchmark, and multiple depth intervals are set according to the soil depth; the soil around the park is divided according to the spatial intersection relationship of the horizontal distance intervals and the depth intervals, resulting in multiple surrounding soil evaluation units.
8. The method for multidimensional assessment of soil pollution source intensity around a park according to claim 7, characterized in that, The method for determining the pollutant migration ratio based on the spatial relationship between the target seepage pipe section and each surrounding soil evaluation unit, pollutant migration parameters, and the migration duration from each outward seepage period to the end of the evaluation cycle includes: Based on the leakage location of the target leakage pipe section and the spatial location of each surrounding soil evaluation unit, determine the horizontal and vertical migration distances from the target leakage pipe section to each surrounding soil evaluation unit. A migration duration sequence is formed based on the time interval from each time step within each outward leakage period to the end of the evaluation period; Based on the horizontal migration distance, vertical migration distance, migration duration sequence and pollutant migration parameters, the proportion of unit pollution load input at each time step reaching each surrounding soil evaluation unit is calculated according to the horizontal and vertical convection diffusion relationship. Based on the proportion of the source-attributed soil ingress load component to the effective soil ingress load during the corresponding outward leakage period at each time step, the unit load migration ratio is weighted to obtain the pollutant migration ratio of each pollution source to each surrounding soil assessment unit during each outward leakage period.
9. A multi-dimensional assessment system for soil pollution source intensity around an industrial park, used to perform the method described in any one of claims 1 to 8, characterized in that, The system includes: The emission load module is used to obtain the drainage flow, target pollutant concentration, and emission time of multiple pollution sources in the park during the evaluation period; and to form the pollutant emission load sequence of each pollution source based on the drainage flow, target pollutant concentration, and emission time. The pipeline transmission module is used to determine the dynamic hydraulic state of the shared underground gravity sewage network based on the drainage flow of each pollution source, the topology of the shared underground gravity sewage network in the park, and the hydraulic parameters of the network. Based on the dynamic hydraulic state of the shared network and the pollutant transmission parameters, the pipeline transmission module is used to calculate the pollutant discharge load sequence of each pollution source and obtain the source-attributed pollutant concentration contribution sequence of each pollution source in the target leakage pipe section connected to the surrounding soil of the park. The soil ingress load module is used to determine the outward leakage period and the outward leakage flux during each outward leakage period based on the dynamic hydraulic state of the shared pipe network of the target leakage pipe section, the hydraulic state of the soil surrounding the target leakage pipe section, and the leakage response parameters; and to calculate the effective soil ingress pollution load of each pollution source during each outward leakage period based on the source-attributed pollutant concentration contribution sequence and the outward leakage flux within each outward leakage period. The multidimensional assessment module is used to divide the soil around the park into multiple surrounding soil assessment units. Based on the spatial relationship between the target seepage pipe section and each surrounding soil assessment unit, pollutant migration parameters, and the migration duration from each outward seepage period to the end of the assessment period, the pollutant migration ratio is determined. Based on the pollutant migration ratio, each effective soil-entry pollution load is allocated to the corresponding surrounding soil assessment unit, resulting in a multidimensional assessment of the pollution source intensity of each pollution source in the dimensions of pollutants, outward seepage period, and surrounding soil assessment unit.
