By acquiring water level and quality data from acidic reservoirs, and combining this data with pollution indices and pre-set rules, the reservoirs can be dynamically managed. This solves the problem of not being able to respond promptly to the risk of acidic wastewater leakage, and enables early warning and reduction of environmental risks.
Patent Information
- Application Number
- CN202611246184.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-17
- Publication Date
- 2026-11-17
AI Technical Summary
Existing technologies are unable to respond promptly to the risk of acidic wastewater leakage from acidic reservoirs, and cannot provide early warnings, resulting in a high risk of potential environmental pollution.
By acquiring water level and water quality data of acidic reservoirs, risk levels are determined based on pollution indices. An indicator system is constructed using preset risk prediction rules, risk indices are calculated, and acidic reservoirs are dynamically managed, forming an intelligent management process of data collection, initial risk screening, model weighting, and strategy updates.
It enables early response to the risk of acidic water leakage, reduces the environmental risk of leakage, and improves the safety and intelligent management level of acidic water reservoirs.
Smart Images

Figure CN123117616A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of acidic reservoir management technology, and in particular to an acidic reservoir management method, apparatus, terminal equipment and storage medium. Background Technology
[0002] Acidic wastewater is generated during the mining, beneficiation, and tailings storage processes in metal mines. This wastewater has a low pH value and high levels of heavy metals and sulfates. If not properly treated, it can cause irreversible damage to the environment.
[0003] Currently, acidic wastewater is often stored in acidic reservoirs. Downstream of these reservoirs, vertical curtain grouting systems are frequently installed to prevent seepage. These vertical curtains form a relatively closed seepage barrier by injecting cement-clay or chemical grout into the ground, confining the acidic water within their area. However, if the vertical curtains have quality defects, insufficient design depth, or fail to effectively connect with the impermeable layer, acidic wastewater leakage may occur. Current methods for assessing the risk of acidic wastewater leakage include evaluating groundwater quality and performing stability calculations on the dam structure. However, these methods are mostly static or phased and cannot respond promptly to changes in the state of the acidic reservoir, thus failing to provide early warning of potential leakage risks. Summary of the Invention
[0004] In view of this, embodiments of this application provide a method, apparatus, terminal equipment, and storage medium for managing acidic reservoirs, which can effectively solve the problem of the inability to achieve early response to the risk of acidic wastewater leakage from acidic reservoirs.
[0005] In a first aspect, embodiments of this application provide a method for managing acidic reservoirs, including: Obtain water level and water quality data from acidic reservoirs; The risk level of acidic reservoirs is determined based on water level data and pollution index, with the pollution index determined based on water quality data. When the risk level of an acidic reservoir is the target risk level, the evaluation indicators and the corresponding weights of each evaluation indicator are determined by using preset risk prediction rules. The risk index is determined based on the evaluation indicators and their corresponding weights. Based on the risk index, update the management strategy for acidic reservoirs.
[0006] In some embodiments, the pollution index is determined by the following steps: calculating the Nemerow index based on water quality data; using the acidity or alkalinity of the water in the acidic reservoir as a penalty factor to penalize the Nemerow index, thereby obtaining the pollution index; the acidity or alkalinity is inversely proportional to the penalty factor.
[0007] In some embodiments, water quality data include the concentrations of various solutes; the pollution index, Nemerow index, and pH satisfy the following relationship: ; ;in, Used to represent the pollution index. This is used to represent the maximum value of a single pollution index corresponding to a solute. The single pollution index corresponding to a solute is determined by the concentration of the solute. The average value of a single contamination index used to represent multiple solutes. Used to represent the Nemero index. Used to represent the penalty intensity coefficient Used to represent the penalty factor Used to indicate a preset acidity / alkalinity threshold. Used to indicate acidity or alkalinity.
[0008] In some embodiments, the risk level of an acidic reservoir includes a first risk level, a second risk level, a third risk level, and a fourth risk level; the higher the risk level, the higher the risk of acidic water leakage from the acidic reservoir; determining the risk level of an acidic reservoir based on water level data and a pollution index includes: determining the acidic reservoir as a first risk level when the water level data indicates a non-positive water level difference and the pollution index is less than or equal to a target threshold; the water level difference is the average groundwater level inside the reservoir minus the average groundwater level outside the reservoir; determining the acidic reservoir as a second risk level when the water level data indicates a non-positive water level difference and the pollution index is greater than the target threshold; determining the acidic reservoir as a third risk level when the water level data indicates a positive water level difference and the pollution index is less than or equal to the target threshold; and determining the acidic reservoir as a fourth risk level when the water level data indicates a positive water level difference and the pollution index is greater than the target threshold.
[0009] In some embodiments, the target threshold is determined by the following steps: acquiring historical water quality data of an acidic reservoir at a preset number of historical time points; determining a preset number of historical pollution indices based on the preset number of historical water quality data; determining a basic threshold based on the preset number of historical pollution indices; and determining the current target threshold based on the basic threshold, the previous target threshold, and the weight corresponding to the basic threshold.
[0010] In some embodiments, the target risk level includes a second risk level and a third risk level; the method further includes: maintaining the current management strategy for the acidic reservoir when the risk level of the acidic reservoir is the first risk level; implementing emergency investigation measures when the risk level of the acidic reservoir is the third risk level; and implementing emergency response measures when the risk level of the acidic reservoir is the fourth risk level.
[0011] In some embodiments, the preset risk prediction rules include one or more of the following: driving force indicators, pressure indicators, state indicators, impact indicators, and response indicators; the driving force indicators are used to characterize the factors that cause acidic reservoirs; the pressure indicators are used to characterize the load on acidic reservoirs caused by the driving force indicators; the state indicators are used to characterize the environmental conditions of acidic reservoirs; the impact indicators are used to characterize the negative environmental impacts of acidic reservoirs; and the response indicators are used to characterize the measures taken to address the negative impacts of acidic reservoirs.
[0012] Secondly, embodiments of this application provide an acidic reservoir management device, comprising: an acquisition module for acquiring water level data and water quality data of the acidic reservoir; and a processing module for: determining the risk level of the acidic reservoir based on the water level data and a pollution index, wherein the pollution index is determined based on the water quality data; determining evaluation indicators and the corresponding weights of each evaluation indicator using preset risk prediction rules when the risk level of the acidic reservoir is the target risk level; determining a risk index based on the evaluation indicators and their corresponding weights; and determining a management strategy for the acidic reservoir based on the risk index.
[0013] Thirdly, embodiments of this application provide a terminal device, including a processor and a memory, wherein the memory stores a computer program, and the processor is used to execute the computer program to implement any of the acidic reservoir management methods in the first aspect.
[0014] Fourthly, embodiments of this application provide a computer-readable storage medium storing a computer program, which, when executed on a processor, implements any of the acidic reservoir management methods in the first aspect.
[0015] The embodiments of this application have the following beneficial effects: the assessment of acid water leakage risk combines water level data and pollution index determined by water quality data, which can capture early signals of leakage before pollutants exceed the standard in downstream water bodies, enabling early response to acid water leakage risk, reducing the potential environmental risk of acid water leakage, providing dynamic decision-making basis for the precise operation and maintenance of anti-seepage projects such as vertical curtain walls, and significantly enhancing the safety and intelligent management level of long-term operation of acid reservoirs. Attached Figure Description
[0016] To more clearly illustrate the technical solutions of the embodiments of this application, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of this application and should not be regarded as a limitation of the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.
[0017] Figure 1This illustration shows a scenario of acidic wastewater leakage according to an embodiment of this application. Figure 2 A flowchart illustrating an acidic reservoir management method provided in an embodiment of this application is shown. Figure 3 This illustration shows an application scenario diagram of an acidic reservoir management method provided in an embodiment of this application; Figure 4 A logical schematic diagram of an acidic reservoir management method provided in an embodiment of this application is shown; Figure 5 A schematic diagram of an acidic reservoir management method provided in an embodiment of this application is shown. Detailed Implementation
[0018] The technical solutions in the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments.
[0019] The components of the embodiments of this application described and illustrated in the accompanying drawings can be arranged and designed in a variety of different configurations. Therefore, the following detailed description of the embodiments of this application provided in the drawings is not intended to limit the scope of the claimed application, but merely to illustrate selected embodiments of the application. All other embodiments obtained by those skilled in the art based on the embodiments of this application without inventive effort are within the scope of protection of this application.
[0020] In the following text, the terms "comprising," "having," and their cognates, which may be used in various embodiments of this application, are intended only to indicate a particular feature, number, step, operation, element, component, or combination thereof, and should not be construed as primarily excluding the presence of one or more other features, numbers, steps, operations, elements, components, or combinations thereof, or adding the possibility of one or more combinations thereof. Furthermore, the terms "first," "second," "third," etc., are used only for distinguishing descriptions and should not be construed as indicating or implying relative importance.
[0021] Unless otherwise specified, all terms used herein (including technical and scientific terms) shall have the same meaning as commonly understood by one of ordinary skill in the art to which the various embodiments of this application pertain. Terms (such as those defined in commonly used dictionaries) shall be interpreted as having the same meaning as in their contextual meaning in the relevant technical field and shall not be construed as having an idealized or overly formal meaning, unless clearly defined in the various embodiments of this application.
[0022] As described in the background section, even if an acidic reservoir has a vertical curtain, there is still a risk of acidic wastewater leakage.
[0023] Taking sulfate and lead, two typical pollutants in acidic wastewater, as examples, when an acidic water leak occurs, the early warning results for the migration of sulfate and lead in groundwater can be as follows: Figure 1 As shown, the concentrations of sulfate and lead in the groundwater downstream of the acidic reservoir significantly exceed the standards, posing a direct threat to the downstream water source.
[0024] Acidic wastewater poses a significant threat to the environment. Current management solutions for acidic reservoirs are mostly static or phased, failing to respond promptly to changes in the reservoir's condition and lacking early warning capabilities for acidic wastewater leakage risks. Therefore, a management solution for acidic reservoirs that can provide early warning of acidic wastewater leakage risks is needed.
[0025] Based on this, this application provides a method for managing acidic reservoirs. First, water level and water quality data of the acidic reservoir are acquired. Based on the pollution index determined by the water quality data, a preliminary risk level is determined. When the target risk level is determined, a preset risk prediction rule is introduced to construct an indicator system and calculate the risk index. Finally, the acidic reservoir is dynamically managed based on the risk index, forming a full-chain intelligent management process of "data acquisition - initial risk screening - model weighting - strategy update".
[0026] The assessment of acid water leakage risk combines water level data with pollution indices determined from water quality data. It can detect early signs of leakage before pollutants exceed the standards in downstream water bodies, enabling early response to acid water leakage risks. This reduces the potential environmental risks of acid water leakage and provides dynamic decision-making basis for the precise operation and maintenance of anti-seepage projects such as vertical curtain walls, significantly enhancing the safety and intelligent management level of acid reservoirs in long-term operation.
[0027] The method for managing acidic reservoirs will be described in detail below with reference to the accompanying drawings and some specific embodiments. Unless otherwise specified, the following embodiments and features can be combined with each other.
[0028] Figure 2 A flowchart illustrating an embodiment of the acidic reservoir management method of this application is shown. The acidic reservoir management method includes the following steps: S101. Obtain water level and water quality data from the acidic reservoir.
[0029] The water level data includes the difference in groundwater levels inside and outside the acidic reservoir. The water quality data specifically refers to the water quality data downstream of the acidic reservoir.
[0030] In some embodiments, groundwater monitoring points can be deployed inside and outside the vertical curtain of the acidic reservoir to monitor water level and water quality data in real time or periodically. Specifically, the groundwater monitoring points outside the vertical curtain can be deployed in locations downstream of the acidic reservoir, in geologically weak zones, or other areas where acidic water leakage is possible.
[0031] Groundwater monitoring points can specifically be groundwater monitoring wells. Water quality data is obtained by taking samples from these wells in real-time or periodically. The depth of the groundwater monitoring wells should penetrate the bottom layer of the acidic water reservoir and extend to the target aquifer. The well casing is made of acid-resistant corrosion-resistant materials, and a filter pipe is installed at the bottom.
[0032] Submersible pressure level gauges can be installed in each groundwater monitoring well. These sensors are encapsulated in a corrosion-resistant housing, provide high-precision water level measurement, and can operate stably while submerged in acidic water for extended periods. The sensors also feature a built-in temperature compensation module, which automatically corrects for the effects of water temperature changes on the measured values.
[0033] Each groundwater monitoring well can also be equipped with corresponding data acquisition equipment to periodically collect water level data from the acidic reservoir. The collected water level data can be stored in local storage. The data acquisition equipment can be powered by a combination of solar energy and batteries to ensure continuous operation when no external power source is available.
[0034] In some embodiments, the data collection frequency is adjusted according to the trend of the water level difference between the inside and outside of the acidic reservoir. For example, when the water level difference change is within a preset normal range, data is collected according to a preset period; when the water level difference change approaches 0, or when the water level difference change exceeds the preset normal range, the collection frequency is reduced and automatic encrypted sampling is performed.
[0035] In some embodiments, the collected water level and water quality data can be uploaded to the monitoring center via a wireless communication network, with cellular networks being the preferred communication method. All data is encapsulated using a unified protocol to ensure the integrity and real-time performance of the transmission.
[0036] Under normal operating conditions, the groundwater level inside an acidic reservoir should be lower than that outside, creating a water level difference. By actively pumping water to lower the upstream groundwater level and creating a hydraulic gradient, downstream clean water will replenish the reservoir area, fundamentally cutting off the channel for acidic wastewater to leak downstream. This reduces the risk of wastewater leakage through potential defects or weak points in the curtain, effectively preventing pollutants from spreading downstream with groundwater. However, when there is heavy rainfall during the flood season, seasonal hydrological changes, poor upstream drainage, or pumping system malfunctions, if the replenishment rate exceeds the design pumping capacity, the upstream water level may temporarily be higher than the downstream level. If the vertical curtain malfunctions, it will be difficult to withstand the large head pressure from upstream, leading to acidic wastewater leakage accidents. Therefore, the groundwater level difference inside and outside an acidic reservoir serves as an early signal of acidic water leakage. Incorporating this water level difference into subsequent steps allows for the early detection of acidic water leakage risks.
[0037] S102. Based on water level data and pollution index, determine the risk level of acidic reservoirs.
[0038] The pollution index is determined based on water quality data.
[0039] In some embodiments, the pollution index is determined by the following steps: calculating the Nemerow index based on water quality data; using the acidity or alkalinity of the water in the acidic reservoir as a penalty factor to penalize the Nemerow index, thereby obtaining the pollution index; the acidity or alkalinity is inversely proportional to the penalty factor.
[0040] Specifically, water quality data includes the concentrations of various solutes. The pollution index, Nemerow index, and pH value are related as follows: ; ; in, Used to represent the pollution index. This is used to represent the maximum value of a single pollution index corresponding to a solute. The single pollution index corresponding to a solute is determined by the concentration of the solute. The average value of a single contamination index used to represent multiple solutes. Used to represent the Nemero index. Used to represent the penalty intensity coefficient Used to represent the penalty factor Used to indicate a preset acidity / alkalinity threshold. Used to indicate acidity or alkalinity.
[0041] When pH is lower The penalty begins to be applied at a certain pH level, and the penalty value increases linearly as the pH decreases. The typical value is 6.5, and the typical range of β is [0.1, 0.2].
[0042] The individual pollution index corresponding to a solute can be the quotient of the solute concentration and the standard limit (the solute concentration threshold specified in the standard). For example, dividing the concentration of Fe by the standard limit corresponding to Fe yields the individual pollution index of Fe.
[0043] Optionally, the various solutes characterized by water quality data can be typical indicators in acidic mine wastewater, such as sulfate, Fe, Mn, Cu, Zn, Cd, Pb, As, etc.
[0044] For example, multiple solutes include sulfates, Fe, Mn, Cu, Zn, Cd, Pb, and As, with their respective individual pollution indices being 0.9, 1.5, 1.2, 2.8, 1.6, 0.8, 0.5, and 0.3. , Assuming a pH of 3.8, the Nemerow index is approximately 2.15. With a value of 6.5, a penalty factor of 2.7, and β of 0.15, the final calculated pollution index is approximately 3.02.
[0045] The Nemerow index reflects the overall pollution level of water. Its structure means it considers the most significant pollutant simultaneously. ) and average pollution level ( This ensures that severe exceedances of a single pollutant are not diluted or masked by the average value, and that the overall pollution load is reflected, avoiding misjudgments due to a single anomaly. Furthermore, using pH as an external penalty factor strengthens the contribution of extreme acidic conditions to risk assessment, accurately reflecting the complex pollution characteristics of acidic wastewater—"low pH + high pollutants"—and preventing the risk from being underestimated when pH is abnormal.
[0046] In some embodiments, the risk levels of an acidic reservoir include a first risk level, a second risk level, a third risk level, and a fourth risk level; the higher the risk level, the higher the risk of acidic water leakage from the acidic reservoir.
[0047] Step S102 can be specifically implemented as follows: when the water level data indicates a non-positive water level difference and the pollution index is less than or equal to the target threshold, the acidic reservoir is determined to be of the first risk level; the water level difference is the average groundwater level inside the acidic reservoir minus the average groundwater level outside the reservoir; when the water level data indicates a non-positive water level difference and the pollution index is greater than the target threshold, the acidic reservoir is determined to be of the second risk level; when the water level data indicates a positive water level difference and the pollution index is less than or equal to the target threshold, the acidic reservoir is determined to be of the third risk level; when the water level data indicates a positive water level difference and the pollution index is greater than the target threshold, the acidic reservoir is determined to be of the fourth risk level.
[0048] The target threshold can be determined through the following steps: obtaining historical water quality data of acidic reservoirs at a preset number of historical time points; determining a preset number of historical pollution indices based on the preset number of historical water quality data; determining a basic threshold based on the preset number of historical pollution indices; and determining the current target threshold based on the basic threshold, the previous target threshold, and the weight corresponding to the basic threshold.
[0049] The preset number of historical time points can be a preset number of consecutive time points during the normal and stable operation of the mine's acidic reservoir (no leakage accidents, no water quality abnormalities, and no major changes in operating conditions). For example, collecting monitoring data of the acidic reservoir for no less than 2 years during its normal and stable operation, with a monitoring frequency of no less than once a month, and monitoring data covering different seasons (high water season and low water season), and monitoring data including water quality data, and may also include auxiliary data such as water level difference data, rainfall, and reservoir capacity changes.
[0050] Using the collected water quality data, the CI coupling value at each detection time point is calculated according to the aforementioned CI coupling method, resulting in a CI value sequence under normal operating conditions. The 95th percentile in the CI value sequence can be used as the basic threshold. That is, the base threshold is greater than 95% of the values in the sequence. This base threshold is chosen to balance detection sensitivity and false alarm rate control.
[0051] Once the acidic reservoir enters normal operation, it automatically maintains CI data for a time window (e.g., the past 90 days). Daily target threshold. Update using the following formula: ; in: The 95th percentile of the CI values within the current window; The smoothing coefficient typically ranges from [0.7 to 0.9]. The larger the smoothing coefficient, the smoother the change in the target threshold.
[0052] Water level difference reflects hydrodynamic conditions, i.e., whether groundwater is replenishing the acidic reservoir or leaking out. Pollution index reflects pollution load level, i.e., the degree of chemical hazard of acidic water. Combining these two factors to determine risk level can avoid false alarms caused by a single parameter, and the accuracy and reliability of early warnings based on the risk level determined in this way are greatly improved. Furthermore, the target threshold is constantly updated to adapt to the real-time operating conditions of the acidic reservoir, which can avoid the problem of inflexible fixed thresholds leading to inaccurate judgments.
[0053] Specifically, when a major seepage prevention renovation of an acidic reservoir is completed, the scale of mining operations changes significantly, or a leakage accident is repaired, the window is automatically reset, and the baseline threshold is recalculated starting from the latest three consecutive months of normal data. This window reset mechanism in response to significant changes in operating conditions allows the target threshold to be automatically adjusted according to the operating conditions of the acidic reservoir.
[0054] S103. When the risk level of the acidic reservoir is the target risk level, the evaluation indicators and the corresponding weights of each evaluation indicator are determined by using preset risk prediction rules.
[0055] The target risk level includes the second risk level and the third risk level.
[0056] In some embodiments, the preset risk prediction rules include one or more of the following: Driving Forces (D), Pressures (P), State (S), Impacts (I), and Responses (R). Driving Forces are used to characterize the factors that lead to the potential risks of acidic reservoirs; Pressures are used to characterize the loads exerted on the acidic reservoirs by the Driving Forces; State is used to characterize the environmental conditions of the acidic reservoirs (e.g., physical, chemical, and engineering conditions); Impacts are used to characterize the negative environmental impacts of the acidic reservoirs; and Responses are used to characterize the measures taken to address the negative impacts of the acidic reservoirs (which may include preventative measures, remedial measures, and repair measures).
[0057] Specifically, driving indicators include one or more of the following: mine production scale, mine operating years, ore type, ore properties, acid-producing substance content, and mineral resource demand intensity. Mineral resource demand intensity indicates the intensity of demand for mineral resources by social or regional economic development.
[0058] Stress indicators include one or more of the following: acidic water production, acidic water volatility, initial pollutant concentration, pollutant load, acidic water inflow rate, frequency of target weather events, and intensity of target weather events. Target weather refers to weather events that significantly impact acidic reservoirs, such as heavy rain or drought. The intensity of target weather events refers to the pressure on the reservoir's capacity and stability during the occurrence of a target weather event. Pollutants can include heavy metals, sulfate, etc.
[0059] State indicators include one or more of the following: pH of the water in the acidic reservoir, water quality data of the acidic reservoir, solute content, seepage prevention conditions of the acidic reservoir, treatment methods of the acidic reservoir, treatment efficiency of the acidic reservoir, water level of the acidic reservoir, transportation methods of acidic water, transportation conditions of acidic water, airtightness of acidic water, and the difference in groundwater levels between the inside and outside of the upstream and downstream areas of the acidic reservoir. Among these, the difference in groundwater levels between the inside and outside of the acidic reservoir is a crucial indicator and should be selected when determining state indicators unless there are special circumstances. Seepage prevention conditions for the acidic reservoir can include the permeability coefficient of the dam body and reservoir bottom, and the integrity of the lining. Wastewater treatment methods can include neutralization and sedimentation, biological treatment, etc. Transportation methods for acidic water can include pipeline transportation, open channel transportation, etc.
[0060] The influencing indicators include one or more of the following: surface water function category, hydraulic connection between surface water and the acidic reservoir, hydraulic connection within the pre-set area of the acidic reservoir, groundwater function, aquifer vulnerability, soil function, background heavy metal content in the soil, distribution of basic farmland downstream of the acidic reservoir, heavy metal content in basic farmland, distance to the target area downstream of the acidic reservoir, ecological value of the target area downstream of the acidic reservoir, connectivity of potential pollution diffusion pathways of the acidic reservoir, and groundwater quality data downstream of the acidic reservoir. Among these, downstream groundwater quality data is a crucial indicator and should be selected when determining the influencing indicators unless there are special circumstances. Groundwater function can include drinking water sources, ecological base flows, etc. Soil function can include agricultural functions, forestry functions, animal husbandry functions, etc. Target areas can be centralized drinking water sources, residential areas, nature reserves, important aquatic habitats, etc.
[0061] Response indicators include one or more of the following: the completeness of the risk monitoring system, the completeness and accessibility of emergency measures, the relevance, operability, and drill frequency of emergency plans, and the monitoring and early warning mechanism for downstream groundwater quality data of acidic reservoirs. The completeness of the risk monitoring system can be characterized by monitoring points, monitoring frequency, and monitoring parameters. Emergency measures may include material reserves and interception dams.
[0062] By employing multiple evaluation indicators, risk assessment is expanded to encompass multiple levels, including driving forces, pressures, states, impacts, and responses. Combined with various lower-level indicators, this provides a more comprehensive and accurate reflection of the overall risk status of acidic reservoirs. Furthermore, the numerical values of these indicators reveal the causes of risk, facilitating risk identification by management personnel. Moreover, risk index calculations are only performed using evaluation indicators at the second and third risk levels, avoiding the waste of computational resources associated with complex calculations across all time periods and areas. This achieves an optimal balance between detection sensitivity and system economy.
[0063] In some embodiments, the weights of each evaluation indicator can be determined using methods such as the Analytic Hierarchy Process (AHP), the entropy weight method, or the Delphi method. Alternatively, the weights of each evaluation indicator can be determined by combining AHP, the entropy weight method, or the Delphi method with a systematic investigation, source tracing analysis, and expert consultation on historical and potential mine acid reservoir pollution events.
[0064] S104. Determine the risk index based on the evaluation indicators and their corresponding weights.
[0065] The Risk Index (ERI) and each evaluation indicator, as well as the weights of the evaluation indicators, satisfy the following relationship: ; in: These represent the weights corresponding to the five evaluation indicators: driving force (D), pressure (P), state (S), influence (I), and response (R), and satisfy the following conditions: .
[0066] These represent the comprehensive evaluation values of each evaluation indicator after standardization (dimensionless, with a value range of 0 to 10, obtained by weighted summation of its subordinate indicators).
[0067] S105. Update the management strategy for acidic reservoirs based on the risk index.
[0068] Specifically, the probability of the risk index is divided into four ranges: the first range is equivalent to the first risk level, the second range is equivalent to the second risk level, the third range is equivalent to the third risk level, and the fourth range is equivalent to the fourth risk level.
[0069] When the risk index falls into the first or second range, routine inspections and monitoring should be conducted, and daily management should be maintained. The updated management strategy remains the same as the original management strategy for acidic reservoirs. When the risk index falls into the third range, the updated management strategy can be the same as the management strategy for acidic reservoirs corresponding to the third risk level. When the risk index falls into the fourth range, an emergency response should be initiated, and the updated management strategy can be the same as the management strategy for acidic reservoirs corresponding to the fourth risk level.
[0070] For example, the first range can be (-∞, 2.5], the second range can be (2.5, 4], the third range can be (4, 6], and the fourth range can be (6, +∞).
[0071] By using the four ranges corresponding to the risk index, the risk level is essentially assessed again. The specific value of the risk index can correspond to the pre-configured countermeasures, transforming the quantified value into actionable instructions.
[0072] In some embodiments, major risk sources (high D, P values) and key risk links (high S, I values) can be identified based on various evaluation indicators, the effectiveness and inadequacy of existing response measures (R value) can be evaluated, response measures can be initiated, and targeted risk prevention and control, emergency response capability improvement and management optimization recommendations can be determined.
[0073] In some embodiments, if the risk level of the acidic reservoir is at the first risk level, the current management strategy for the acidic reservoir is maintained; if the risk level of the acidic reservoir is at the third risk level, emergency investigation measures are also implemented; and if the risk level of the acidic reservoir is at the fourth risk level, emergency response measures are implemented.
[0074] Based on the target threshold, four zones can be identified: safe zone, attention zone, warning zone, and danger zone. For example... Figure 3 As shown, the safe zone corresponds to the first risk level, the attention zone corresponds to the second risk level, the danger zone corresponds to the third risk level, and the warning zone corresponds to the fourth risk level.
[0075] When the water level difference and CI index fall into the safe zone, that is, when it is determined to be the first risk level, routine inspections and testing of acidic reservoirs should be carried out, and daily management should be maintained. The updated management strategy is the same as the original management strategy for acidic reservoirs.
[0076] When the water level difference and CI index fall into the attention zone, that is, when it is determined to be the second risk level, the risk index calculation process is carried out, trend analysis and risk index early warning are conducted, and the management strategy of acidic reservoirs is updated based on the risk index.
[0077] When the water level difference and CI index fall into the warning zone, that is, when it is determined to be the third risk level, the risk index calculation process is carried out and the emergency investigation is initiated.
[0078] When the water level difference and CI index fall into the danger zone, that is, when it is determined to be the fourth risk level, the emergency response is activated and a high-risk response state is entered.
[0079] Table 1 below shows the criteria for risk level assessment and corresponding management strategies: Table 1
[0080] For example, an acidic reservoir at a copper mine (designed capacity of 800,000 m³, service life of 20 years) is located in a rainy mountainous area, with a township drinking water source 3 km downstream. A vertical curtain anti-seepage system is installed downstream of the reservoir, and groundwater monitoring wells are installed both inside the acidic reservoir and downstream of the vertical curtain to monitor water level (once per hour) and water quality (once per week) in real time.
[0081] After continuous rainfall in a certain month of a certain year, the following was detected: the difference in groundwater level inside and outside the reservoir. (The pollution level inside the reservoir is higher than outside, indicating an early sign of leakage). The calculated pollution index is: The current target threshold is (Based on the past 90 days of sliding window updates) The pollution index of downstream water has not yet exceeded the threshold.
[0082] According to Table 1, the water level difference and CI index fall into the warning zone, which means it is judged as the third risk level. At this time, the risk index calculation process is initiated and emergency investigation is carried out simultaneously.
[0083] The scores and corresponding weights of the sub-indicators for each evaluation indicator are shown in Table 2 below: Table 2
[0084] The weights corresponding to each evaluation indicator are as follows: , , , , The calculated risk index ERI is approximately 5.48, falling into the third range, indicating a medium-to-high risk status. An emergency investigation is initiated: immediately organize non-destructive testing and leakage detection of the curtain wall; intensify water level monitoring inside and outside the reservoir (once per hour → once every 15 minutes); conduct daily monitoring of water quality at downstream water sources; increase pumping efficiency and lower the water level inside the reservoir.
[0085] In another example, downstream of the vertical curtain of an acidic reservoir in a copper mine, there is a naturally weak geological zone (a fractured area) where the curtain is not fully embedded in the impermeable layer, resulting in seepage around the water.
[0086] Traditional solutions use "regular water quality testing" to warn of the risk of acidic water leakage. The traditional solution and the solution proposed in this application are run simultaneously to compare the warning lead time of the solution proposed in this application and the traditional solution when seepage occurs around the bottom of the vertical curtain (seepage flows around the bottom of the curtain or the weak zone on the side and enters the downstream).
[0087] Traditional approach: Water quality in downstream observation wells is sampled and tested every 7 days, and an alert is issued if any indicator exceeds the standard.
[0088] The method of this application is to monitor the difference in groundwater level ΔH between the inside and outside of the acidic reservoir in real time (once per hour) and water quality data.
[0089] The corresponding mechanisms after seepage occurs are compared in Table 3 below: Table 3
[0090] This proposed solution can issue an early warning as early as the 3rd day after seepage occurs, while the traditional solution only issues a warning on the 8th day. This proposed solution provides an early warning time 5 days earlier than the traditional solution. These 5 days can be used to investigate seepage channels, control the inflow into the reservoir, strengthen downstream monitoring, or initiate emergency curtain repairs to prevent further spread of pollution. This proposed solution has a significant advantage in using the change in groundwater level difference between the inside and outside of the acidic reservoir as an early signal of leakage (including seepage around the reservoir).
[0091] Another example is the comparison of the false alarm rate and false negative rate of the proposed solution with that of the traditional solution, which examines the risk identification capability for various leakage types (including seepage around the source, curtain defect leakage, etc.).
[0092] Historical data from four acidic water reservoirs in mines were selected (two had experienced leakage incidents, and two remained safe for a long time), totaling approximately 600 sets of sample data. The causes of leakage incidents included: seepage around the reservoir due to the curtain not being embedded with an impermeable layer (one reservoir), and localized leakage due to defects in the curtain grouting quality (one reservoir). Two different methods were used for back-substitution: Traditional approach: Based solely on whether the downstream water quality exceeds the standard.
[0093] This application proposes to calculate the ERI based on 22 sub-indicators of the five-dimensional evaluation index, with an ERI > 4.0 as the risk threshold.
[0094] Three months before the seepage occurred at a certain reservoir, the downstream water quality met all standards. However, the pH inside the reservoir had dropped to 2.8, the overlap between the curtain and the impermeable layer was insufficient, and there were farmland areas downstream. Traditional methods would determine it as "safe," but the proposed method can identify the gradually approaching zero groundwater level difference in the state indicator (S) and the high risk in the target area in the impact indicator (I), thus issuing an early warning.
[0095] The comparison between false alarm rate and false negative rate is shown in Table 4 below: Table 4
[0096] This application integrates information on the entire process of driving force, pressure, status, impact, and response. Furthermore, the water level difference detection can capture early signals such as seepage around the water level, rather than relying solely on lagging water quality indicators. Compared with traditional methods, it reduces the false alarm rate from 22% to 6% and the false alarm rate from 52% to 17%, significantly improving the accuracy of risk identification.
[0097] Based on the above method, the device executing this method can be divided into the following functional modules: The data detection module is used to acquire detection data from acidic water reservoirs; The risk assessment and response triggering module is used to classify risk levels based on detection data and trigger corresponding response processes. The risk prediction and assessment module has built-in preset risk prediction rules, which are used to predict risks and calculate risk indices under the target risk level. The results output and application module is used to output risk levels, key risk source identification results, and management optimization suggestions.
[0098] In general, such as Figure 4 As shown, the logic of the solution in this application is as follows: Under normal operating conditions, groundwater level and water quality are monitored, and routine inspections are conducted. Risk levels are determined based on the detected groundwater level and water quality, including: safe zone / first risk level, concern zone / second risk level, warning zone / third risk level, and danger zone / fourth risk level. Under the first risk level, continuous monitoring of groundwater level and water quality, and routine inspections will be conducted. In the case of the second risk level, the risk index calculation process is initiated; In the case of the third risk level, the risk index calculation process will be initiated to conduct an emergency investigation; If the calculated risk index falls into the fourth range, an emergency response will be initiated; otherwise, routine patrols will continue. In the case of Level 4 risk, an emergency response will be initiated.
[0099] Figure 5 A schematic diagram of an acidic reservoir management device according to an embodiment of this application is shown. Exemplarily, the acidic reservoir management device 200 includes an acquisition module 201 and a processing module 202.
[0100] The module 201 is used to acquire water level data and water quality data of the acidic reservoir; the processing module 202 is used to: determine the risk level of the acidic reservoir based on the water level data and the pollution index, wherein the pollution index is determined based on the water quality data; determine the evaluation indicators and the corresponding weights of each evaluation indicator by using preset risk prediction rules when the risk level of the acidic reservoir is the target risk level; determine the risk index based on the evaluation indicators and the corresponding weights of the evaluation indicators; and determine the management strategy of the acidic reservoir based on the risk index.
[0101] In some embodiments, the processing module 202 is further configured to: calculate the Nemerow index based on water quality data; use the acidity or alkalinity of the water in the acidic reservoir as a penalty factor to penalize the Nemerow index, thereby obtaining a pollution index; the acidity or alkalinity is inversely proportional to the penalty factor.
[0102] In some embodiments, water quality data include the concentrations of various solutes; the pollution index, Nemerow index, and pH satisfy the following relationship: ; ;in, Used to represent the pollution index. This is used to represent the maximum value of a single pollution index corresponding to a solute. The single pollution index corresponding to a solute is determined by the concentration of the solute. The average value of a single contamination index used to represent multiple solutes. Used to represent the Nemero index. Used to represent the penalty intensity coefficient Used to represent the penalty factor Used to indicate a preset acidity / alkalinity threshold. Used to indicate acidity or alkalinity.
[0103] In some embodiments, the risk levels of acidic reservoirs include a first risk level, a second risk level, a third risk level, and a fourth risk level; the higher the risk level, the higher the risk of acidic water leakage from the acidic reservoir; the processing module 202 is specifically used to: determine the acidic reservoir as a first risk level when the water level data indicates a non-positive water level difference and the pollution index is less than or equal to a target threshold; the water level difference is the value of the average groundwater level inside the acidic reservoir minus the average groundwater level outside the reservoir; determine the acidic reservoir as a second risk level when the water level data indicates a non-positive water level difference and the pollution index is greater than a target threshold; determine the acidic reservoir as a third risk level when the water level data indicates a positive water level difference and the pollution index is less than or equal to a target threshold; and determine the acidic reservoir as a fourth risk level when the water level data indicates a positive water level difference and the pollution index is greater than a target threshold.
[0104] In some embodiments, the processing module 202 is further configured to: acquire historical water quality data of acidic reservoirs at a preset number of historical time points; determine a preset number of historical pollution indices based on the preset number of historical water quality data; determine a basic threshold based on the preset number of historical pollution indices; and determine the current target threshold based on the basic threshold, the previous target threshold, and the weight corresponding to the basic threshold.
[0105] In some embodiments, the target risk level includes a second risk level and a third risk level; the processing module 202 is further configured to: maintain the current management strategy for the acidic reservoir when the risk level of the acidic reservoir is the first risk level; implement emergency investigation measures when the risk level of the acidic reservoir is the third risk level; and implement emergency response measures when the risk level of the acidic reservoir is the fourth risk level.
[0106] In some embodiments, the preset risk prediction rules include one or more of the following: driving force indicators, pressure indicators, state indicators, impact indicators, and response indicators; the driving force indicators are used to characterize the factors that cause acidic reservoirs; the pressure indicators are used to characterize the load on acidic reservoirs caused by the driving force indicators; the state indicators are used to characterize the environmental conditions of acidic reservoirs; the impact indicators are used to characterize the negative environmental impacts of acidic reservoirs; and the response indicators are used to characterize the measures taken to address the negative impacts of acidic reservoirs.
[0107] It is understood that the apparatus in this embodiment corresponds to the acidic reservoir management method in the above embodiment, and the options in the above embodiment are also applicable to this embodiment, so they will not be described again here.
[0108] This application also provides a terminal device, exemplary of which includes a processor and a memory, wherein the memory stores a computer program, and the processor executes the computer program to enable the terminal device to perform the functions of the various modules in the above-described acidic reservoir management method or the above-described acidic reservoir management device.
[0109] The processor can be an integrated circuit chip with signal processing capabilities. The processor can be a general-purpose processor, including at least one of a Central Processing Unit (CPU), Graphics Processing Unit (GPU), Network Processor (NP), Digital Signal Processor (DSP), Application-Specific Integrated Circuit (ASIC), Field-Programmable Gate Array (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, or discrete hardware components. The general-purpose processor can be a microprocessor or any conventional processor, capable of implementing or executing the methods, steps, and logic block diagrams disclosed in the embodiments of this application.
[0110] The memory can be, but is not limited to, Random Access Memory (RAM), Read Only Memory (ROM), Programmable Read-Only Memory (PROM), Erasable Programmable Read-Only Memory (EPROM), Electrically Erasable Programmable Read-Only Memory (EEPROM), etc. The memory is used to store computer programs, and the processor can execute the computer programs accordingly after receiving execution instructions.
[0111] This application also provides a computer-readable storage medium for storing the computer program used in the aforementioned terminal device. For example, the computer-readable storage medium may include, but is not limited to, various media capable of storing program code, such as a USB flash drive, a portable hard drive, a read-only memory (ROM), a random access memory (RAM), a magnetic disk, or an optical disk.
[0112] In the several embodiments provided in this application, it should be understood that the disclosed apparatus and methods can also be implemented in other ways. The apparatus embodiments described above are merely illustrative. For example, the flowcharts and block diagrams in the accompanying drawings show the architecture, functionality, and operation of possible implementations of apparatus, methods, and computer program products according to various embodiments of this application. In this regard, each block in a flowchart or block diagram may represent a module, segment, or portion of code containing one or more executable instructions for implementing a specified logical function. It should also be noted that, in alternative implementations, the functions marked in the blocks may occur in a different order than those marked in the drawings. For example, two consecutive blocks may actually be executed substantially in parallel, and they may sometimes be executed in reverse order, depending on the functions involved. It should also be noted that each block in the block diagram and / or flowchart, and combinations of blocks in the block diagram and / or flowchart, can be implemented using a dedicated hardware-based system that performs the specified function or action, or using a combination of dedicated hardware and computer instructions.
[0113] In addition, the functional modules or units in the various embodiments of this application can be integrated together to form an independent part, or each module can exist independently, or two or more modules can be integrated to form an independent part.
[0114] If the aforementioned functions are implemented as software functional modules and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, or a part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a smartphone, personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of this application.
[0115] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any changes or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application.
Claims
1. A method for managing acidic reservoirs, characterized in that, include: Obtain water level and water quality data from acidic reservoirs; Based on the water level data and pollution index, the risk level of the acidic reservoir is determined, wherein the pollution index is determined based on the water quality data; When the risk level of the acidic reservoir is the target risk level, the evaluation indicators and the weights corresponding to each evaluation indicator are determined by using preset risk prediction rules. Based on the evaluation indicators and their corresponding weights, a risk index is determined. The management strategy for the acidic reservoir is updated based on the risk index.
2. The method according to claim 1, characterized in that, The pollution index is determined through the following steps: The Nemerow index was calculated based on the aforementioned water quality data. The pH value of the water in the acidic reservoir is used as a penalty factor to penalize the Nemerow index, thus obtaining the pollution index; the pH value is inversely proportional to the penalty factor.
3. The method according to claim 2, characterized in that, The water quality data includes the concentrations of various solutes; The pollution index, the Nemerow index, and the pH value satisfy the following relationship: ; ; in, Used to represent the pollution index. This is used to represent the maximum value of a single pollution index corresponding to a solute. The single pollution index corresponding to a solute is determined by the concentration of the solute. The average value of a single contamination index used to represent multiple solutes. Used to represent the Nemerow index. Used to represent the penalty intensity coefficient Used to represent the penalty factor Used to indicate a preset acidity / alkalinity threshold. Used to indicate the acidity or alkalinity.
4. The method according to claim 1, characterized in that, The risk levels of the acidic reservoir include a first risk level, a second risk level, a third risk level, and a fourth risk level; the higher the risk level, the higher the risk of acidic water leakage from the acidic reservoir. The process of determining the risk level of the acidic reservoir based on the water level data and pollution index includes: If the water level difference is a non-positive number and the pollution index is less than or equal to the target threshold, the acidic reservoir is determined to be of the first risk level; the water level difference is the average groundwater level inside the acidic reservoir minus the average groundwater level outside the reservoir. If the water level data indicates that the water level difference is a non-positive number and the pollution index is greater than the target threshold, the acidic reservoir is determined to be of the second risk level. If the water level data indicates that the water level difference is positive and the pollution index is less than or equal to the target threshold, the acidic reservoir is determined to be at the third risk level. If the water level data indicates that the water level difference is positive and the pollution index is greater than the target threshold, the acidic reservoir is determined to be of the fourth risk level.
5. The method according to claim 4, characterized in that, The target threshold is determined through the following steps: Obtain historical water quality data of the acidic reservoir at a preset number of historical time points; Based on a preset number of historical water quality data, a preset number of historical pollution indices are determined; A basic threshold is determined based on a preset number of historical pollution indices. The current target threshold is determined based on the base threshold, the previous target threshold, and the weight corresponding to the base threshold.
6. The method according to claim 4, characterized in that, The target risk level includes the second risk level and the third risk level; The method further includes: If the risk level of the acidic reservoir is the first risk level, the current management strategy for the acidic reservoir shall continue to be implemented; If the risk level of the acidic reservoir is the third risk level, emergency investigation measures shall be implemented; If the risk level of the acidic reservoir is the fourth risk level, emergency response measures shall be implemented.
7. The method according to claim 1, characterized in that, The evaluation indicators determined using the preset risk prediction rules include one or more of the following: driving force indicators, pressure indicators, state indicators, impact indicators, and response indicators. The driving force index is used to characterize the factors that lead to the acidic reservoir; The pressure index is used to characterize the load exerted on the acidic reservoir by the driving force index; The status indicators are used to characterize the environmental conditions of the acidic reservoir; The impact indicators are used to characterize the negative environmental impacts of the acidic reservoir; The response indicators are used to characterize the measures taken to mitigate the negative impacts of the acidic reservoir.
8. A device for managing an acidic reservoir, characterized in that, include: The acquisition module is used to acquire water level and water quality data from acidic reservoirs. Processing module, used for: Based on the water level data and pollution index, the risk level of the acidic reservoir is determined, wherein the pollution index is determined based on the water quality data; When the risk level of the acidic reservoir is the target risk level, the evaluation indicators and the weights corresponding to each evaluation indicator are determined by using preset risk prediction rules. Based on the evaluation indicators and their corresponding weights, a risk index is determined. Based on the risk index, a management strategy for the acidic reservoir is determined.
9. A terminal device, characterized in that, The terminal device includes a processor and a memory, the memory storing a computer program, and the processor executing the computer program to implement the acidic reservoir management method according to any one of claims 1-7.
10. A computer-readable storage medium, characterized in that, It stores a computer program that, when executed on a processor, implements the acidic reservoir management method according to any one of claims 1-7.