Method for integrated molding of clamped shelf piping and chemical composition of clamped shelf

By using an integrated molding method for clamped layer pipes, and utilizing the pre-embedded casting of prefabricated pipes and mold positioning, the problems of high difficulty and high cost in traditional pipe processing are solved, and battery clamped layer with high efficiency temperature control and reliable connection is achieved.

CN123120942APending Publication Date: 2026-11-17GUANGDONG LYRIC ROBOT INTELLIGENT AUTOMATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611539706.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2026-03-31
Filing Date
2026-09-30
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Traditional pipeline processing methods are difficult and costly when processing complex structures, require specialized equipment, and are inefficient, making it difficult to meet the high-efficiency temperature control requirements of battery temperature regulation.

Method used

The method of integrated molding of clamp-type layered pipes is adopted. The internal pipes are formed by pre-embedded casting of prefabricated pipe fittings. Combined with mold positioning and multiple casting processes, the precise positioning and integrated molding of the pipes are ensured.

Benefits of technology

It reduces processing difficulty and cost, improves production efficiency, expands the freedom of pipeline design, achieves efficient temperature control and reliable pipeline connection, and simplifies installation and maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123120942A_ABST
    Figure CN123120942A_ABST
Patent Text Reader

Abstract

This invention discloses a method for integrated molding of clamped shelf pipes and a molded, form-fitting clamped shelf. The method includes the following steps: obtaining a prefabricated pipe; placing the prefabricated pipe in a casting station and then sequentially performing pipe-shape fixing and complete casting processes to obtain a shelf casting containing internal pipes. This method allows for direct casting of the required pipes into the shelf, achieving integrated molding of the shelf pipes and reducing processing difficulty.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the technical field of chemical forming fixture manufacturing, and particularly to a method for integrated forming of fixture layers and pipelines, and a chemical forming and compatibility fixture layer. Background Technology

[0002] During the formation and capacity testing process, the battery is often clamped and pressurized by the clamping plates, and the battery temperature is regulated by the heating pipes or water pipes embedded in the plates.

[0003] Traditional pipe processing methods require deep hole drilling on thick metal plates to form heating pipes or water pipes.

[0004] However, when faced with relatively complex pipeline structures, traditional pipeline processing methods are difficult and costly. Moreover, drilling deep and long holes requires specialized deep hole drilling equipment, resulting in low processing efficiency, rapid tool wear, and high manufacturing costs. Summary of the Invention

[0005] This invention aims to solve at least one of the technical problems existing in the prior art. To this end, this invention proposes an integrated molding method for jig-mounted layer plates and piping, which can directly cast the required piping into the layer plate, achieving integrated molding of the layer plate and piping, and reducing processing difficulty.

[0006] The present invention also proposes a chemically composed clamping layer made using the above-described clamping layer piping integrated molding method.

[0007] According to a first aspect of the present invention, a method for integral molding of clamp-layer piping includes the following steps: Obtain prefabricated pipe fittings; The prefabricated pipe fittings are placed in the casting station and then sequentially processed for pipe shape fixing and complete casting to obtain a layered casting containing internal pipes.

[0008] The integrated molding method for clamp-layer piping according to embodiments of the present invention has at least the following beneficial effects: 1. This invention pre-prepares pipe fittings and then casts them as inserts, directly using the pre-prepared pipe fittings as pipelines inside the layer plate, thus achieving integrated molding of the layer plate pipelines. This avoids the core difficulty of deep hole drilling in traditional pipeline processing methods, reduces processing difficulty, and eliminates the need for expensive special equipment and a large amount of tool consumption, which helps to reduce manufacturing costs.

[0009] 2. This invention transforms the traditional pipeline machining process into a highly efficient casting process. By casting pre-embedded pipe fittings, layered castings with internal pipelines can be formed, which significantly shortens the production cycle and improves production efficiency.

[0010] 3. This invention uses prefabricated pipe fittings for pre-embedded casting to form the internal pipelines of the layer plate casting. The prefabricated pipe fittings can be pre-processed into any complex shape as required. Compared with the traditional deep hole drilling which can only process straight holes, the forming method of this invention greatly expands the design freedom of the internal pipelines of the layer plate, which is conducive to meeting the better temperature control requirements of the layer plate.

[0011] 4. This invention achieves the integral molding of the layer plate pipeline by pre-embedding and casting pre-fabricated pipe fittings into the internal pipeline of the layer plate casting. This allows the prefabricated pipe fittings and the layer plate base material to be fused together to form a strong metallurgical bond, ensuring close contact between the prefabricated pipe fittings and the layer plate and good heat conduction.

[0012] 5. This invention first performs tube-shape fixing processing on the prefabricated pipe fittings before performing complete casting processing. It is understood that the prefabricated pipe fittings are slender strip structures, which are prone to deformation, displacement, or bending under the impact of the flowing liquid during the complete casting process. By performing tube-shape fixing processing on the prefabricated pipe fittings before the complete casting process, the tube shape of the prefabricated pipe fittings can be fixed, improving the deformation resistance of the prefabricated pipe fittings. This makes it less likely for the prefabricated pipe fittings to deform, displace, or bend during the complete casting process, which is beneficial to improving the positional accuracy of the internal pipelines in the layered casting.

[0013] According to some embodiments of the present invention, the step of placing the prefabricated pipe fitting in a casting station and then sequentially performing pipe-shaped fixing processing and complete casting processing to obtain a layered casting containing internal pipes includes the following steps: After the tubular shape is fixed, the prefabricated pipe is placed in the second mold of the casting station, and the end of the prefabricated pipe abuts against the cavity sidewall of the second mold or extends to the outside of the cavity of the second mold. The cavity of the second mold is cast to obtain a layered casting with externally located internal pipe end interfaces.

[0014] The advantages of this invention are: by having the end of the prefabricated pipe abut against the sidewall of the mold cavity or extend directly outside the mold cavity, the interface of the pipeline is naturally formed on the surface or outside of the layer plate casting after casting. External water channels can be directly connected through the end of the prefabricated pipe, or heating material can be filled in, eliminating the complex process of drilling holes in the layer plate to locate and connect internal pipelines. This makes the connection between external pipelines and internal pipelines in the layer plate direct, simple, and reliable. Simultaneously, during the casting process, the mold positions the end of the prefabricated pipe, allowing precise control of the position and size of the interface on the final layer plate, ensuring product consistency and interchangeability. Furthermore, the end of the prefabricated pipe is effectively sealed by the sidewall of the mold cavity or extends outside the mold cavity, preventing high-temperature molten liquid from entering the prefabricated pipe during casting and causing pipeline blockage, thus ensuring pipeline unobstructed flow.

[0015] According to some embodiments of the present invention, the step of placing the prefabricated pipe fitting in a casting station and then sequentially performing pipe-shaped fixing processing and complete casting processing to obtain a layered casting containing internal pipes includes the following steps: The precast pipe is placed in the casting station for a single casting process to form a retainer that fixes the shape of the precast pipe, thereby obtaining a fixed pipe. The fixed pipe fitting is placed in the casting station for secondary casting to obtain a layered casting containing internal pipes.

[0016] The advantages of this invention are: Through two casting steps, the first casting step involves casting a retainer onto the prefabricated pipe, fixing its shape. Then, the complete structure is cast in the second casting step. This allows for the formation of a more rigid, fixed pipe component before the second casting of the complete structure. This prevents the buoyancy and impact of the molten liquid from directly acting on the prefabricated pipe during the casting of the complete structure, thus avoiding displacement, deformation, or floating. This ensures accurate pipe positioning, prevents pipe displacement and skewing, and eliminates the need for subsequent correction processes. Furthermore, for long pipes, if completely suspended within the mold cavity, complex support structures are required. This invention, by creating a fixed pipe component in the first casting, provides a stable base for the assembly, making it easier to place and position during the second casting, thus reducing the requirements for mold design.

[0017] According to some embodiments of the present invention, the step of placing the prefabricated pipe fitting in a casting station for a single casting to form a retainer that fixes the shape of the prefabricated pipe fitting on the prefabricated pipe fitting, thereby obtaining a fixed pipe fitting, includes the following steps: The prefabricated pipe fitting is placed on the first mold of the casting station; The first mold is closed so that the first mold clamps and positions part of the prefabricated pipe fitting. The first mold is cast to form a retainer for fixing the precast pipe on the precast pipe, thereby obtaining a fixed pipe.

[0018] The advantages of this invention are: by using a first mold to clamp and position a portion of the precast pipe in the first casting step, the precast pipe can be positioned by the first mold, so that the precast pipe will not move due to gravity or slight disturbance of the molten liquid, ensuring that the retainer can be accurately formed in the preset position, and ensuring the relative positional accuracy between the retainer and the precast pipe.

[0019] According to some embodiments of the present invention, placing the fixed pipe fitting in a casting station for secondary casting to obtain a layered casting containing internal pipes includes the following steps: The fixed pipe fitting is placed on the second mold of the casting station; Position the fixed pipe fitting; The second mold is cast to obtain a layered casting containing internal piping.

[0020] The advantage of this invention is that by positioning the fixed pipe on the second mold before the second casting, the relative positional accuracy between the fixed pipe and the final formed layer plate casting is ensured, thereby guaranteeing the relative positional accuracy between the internal pipeline of the layer plate casting and the layer plate casting.

[0021] According to some embodiments of the present invention, positioning the fixed pipe fitting includes the following steps: Obtain the precast groove, clamp the exposed part of the precast pipe in the fixed pipe, and clamp the side of the precast groove away from the fixed pipe in one of the front mold and rear mold of the second mold; Obtain the positioning pin, place one end of the positioning pin against the side of the fixed pipe fitting away from the precast groove, and lock the other end of the positioning pin into the other of the front mold and the rear mold to position the fixed pipe fitting. Remove the positioning pin, and then assemble the front mold and the rear mold.

[0022] The advantages of this invention are: by utilizing the cooperation of the prefabricated groove and the positioning pin to directly position the exposed part of the original prefabricated pipe, rather than acting on the retainer, it ensures that the positioning reference during the second casting process is completely consistent with the prefabricated pipe itself, avoiding positioning deviations introduced by the dimensional errors of the retainer, and improving the positional accuracy of the internal pipelines of the layered casting. Specifically, the prefabricated groove clamps the prefabricated pipe from one direction and rests against one side of the second mold, restricting the movement and rotation of the prefabricated pipe in that direction. The positioning pin pushes against the prefabricated pipe from the opposite direction, and its other end is clamped on the other side of the mold, thereby accurately positioning the prefabricated pipe on the second mold. Moreover, removing the positioning pin before the second casting can prevent the positioning pin from obstructing the mold closing action of the second mold. At the same time, the prefabricated groove remains in the second mold to support the prefabricated pipe, reducing the suspended position of the prefabricated pipe on the second mold, effectively resisting the impact of the molten liquid during casting, and ensuring the stability of the shape and position of the exposed part of the prefabricated pipe in the cavity.

[0023] According to some embodiments of the present invention, obtaining the prefabricated pipe fitting includes the following steps: Fabrication of prefabricated pipe fittings; The prefabricated pipe is bent to obtain a prefabricated pipe with a curved structure.

[0024] The advantages of this invention are: by bending prefabricated pipes before casting, prefabricated pipes with various curved structures such as serpentine and U-shaped can be obtained. This allows the prefabricated pipes to form various curved structures such as serpentine and U-shaped within the layer casting, which maximize the heat exchange area and optimize fluid distribution, thereby greatly improving the temperature control efficiency and uniformity during the battery formation and capacity testing process. Moreover, by combining the pipe bending process with the casting process, a more favorable pipe topology structure for heat conduction can be optimized in the layer, obtaining a highly efficient heat-conducting pipe structure that cannot be achieved by machining. This makes it economically feasible to manufacture fixture layers with complex and efficient temperature-controlled flow channels. By making pipe fabrication and bending a pre-casting step, the complex flow channel processing is simplified into a simple pipe bending process, which helps to lower the manufacturing threshold.

[0025] According to a second aspect of the present invention, a form-forming and compressive fixture shelf is manufactured using an integrated forming method for fixture shelf piping according to a first aspect of the present invention. The form-forming and compressive fixture shelf includes a shelf casting and prefabricated pipes embedded in the shelf casting. The prefabricated pipes are used to form the internal piping of the shelf casting.

[0026] The decomposition and dispensing fixture shelf according to embodiments of the present invention has at least the following beneficial effects: 1. This invention utilizes prefabricated pipes embedded in the layer plate casting to form the internal pipelines of the layer plate casting. This means that the internal pipelines of the clamping layer plate are not drilled out, but are composed of prefabricated pipes that are metallurgically bonded to the base material. This achieves the integral molding of the layer plate pipelines, avoiding the core difficulty of deep hole drilling in traditional pipeline processing methods, reducing processing difficulty, and eliminating the need for expensive special equipment and a large amount of tool consumption, which helps to reduce manufacturing costs. Moreover, it ensures close contact between the prefabricated pipes and the layer plate, resulting in good heat conduction.

[0027] 2. By using prefabricated tubing, the present invention enables the fixture layer to achieve various complex internal flow channel designs, thereby providing the most optimized temperature control solution for different battery types and formation and capacity testing processes.

[0028] According to some embodiments of the present invention, the end of the prefabricated pipe extends beyond the layer casting to separate the end of the prefabricated pipe from the outer surface of the layer casting, and the end of the prefabricated pipe is used to form an external interface of the internal pipeline.

[0029] The advantages of this invention are: By extending the ends of the prefabricated pipe fittings outside the layer casting, forming an externally located internal pipe interface structure, the external prefabricated pipe fitting ends can be directly connected to external water channels or filled with heating material, greatly simplifying the installation and subsequent maintenance of the layer. Furthermore, since the prefabricated pipe fittings in the layer casting are components in direct contact with the temperature-regulating medium, when the temperature-regulating medium is injected into the prefabricated pipe fittings, especially if the medium is a cooling medium, the prefabricated pipe fittings will shrink due to thermal expansion and contraction, easily causing gaps between the outer wall of the prefabricated pipe fittings and the layer. If the ends of the prefabricated pipe fittings are flush with the surface of the layer casting, water can easily seep into the layer casting at these gaps. This solution addresses this by extending the ends of the prefabricated pipe fittings... The interface connecting to the external water channel extends beyond the outer surface of the layer plate casting, separating the interface from the outer surface of the layer plate casting. Because the interface is external, it is no longer flush with the side of the layer plate casting. The connection between the interface and the external water channel is also separated from the gap between the side of the layer plate casting and the outer wall of the prefabricated pipe. When the temperature regulating medium is a cooling medium that causes the prefabricated pipe to shrink, even if there is a small amount of cooling medium or leakage at the interface, the leaked cooling medium will flow directly to the outside of the layer plate casting and will not enter the interior of the layer plate casting along the gap between the layer plate casting and the outer wall of the prefabricated pipe. This avoids the formation of a water seepage gap between the layer plate casting and the outer wall of the prefabricated pipe due to thermal expansion and contraction of the prefabricated pipe.

[0030] According to some embodiments of the present invention, the prefabricated pipe has a curved structure, which is located inside the layer casting.

[0031] The advantage of this invention is that by setting a curved structure in the prefabricated pipe and placing the curved structure inside the layer casting, the pipes inside the layer casting can form various curved structures such as serpentine and U-shaped pipes that can maximize the heat exchange area and optimize the fluid distribution, thereby greatly improving the temperature control efficiency and uniformity during the battery formation and capacity testing process.

[0032] According to some embodiments of the present invention, at least two temperature probes are disposed on the layer casting, the temperature probes are used to monitor the temperature of the layer casting, the temperature information collected by at least one of the temperature probes is used as the basis for the closed-loop control of the layer temperature of the formwork equipment, and the temperature information collected by at least another temperature probe is configured to be compared with the temperature information collected by other temperature probes in order to identify the failure of the temperature probe.

[0033] The advantages of this invention are: by setting at least two temperature-sensing probes in the layer plate casting for monitoring the temperature of the layer plate casting, and by using the temperature information collected by at least one temperature-sensing probe to participate in the closed-loop temperature control of the formation and capacity testing equipment, the layer plate temperature can be adjusted according to the cell formation requirements. Furthermore, by comparing the temperature information collected by at least one other temperature-sensing probe with the temperature information collected by other temperature-sensing probes, a cross-verification mechanism is established between the temperature-sensing probes. This allows for the identification of whether a temperature-sensing probe has failed based on the difference in temperature information between the probes, improving the reliability of temperature monitoring information and helping to prevent erroneous temperature information collected by a failed temperature-sensing probe from being transmitted to the cell. This solution addresses issues such as overcooling, overheating, or temperature fluctuations in the forming plate casting, thereby improving the safety and stability of cell temperature control during the formation and capacity testing process. Furthermore, this solution enables the forming plate to not only monitor temperature but also diagnose temperature probe failures. Failure identification can be achieved during temperature monitoring without the need for complex external testing devices, reducing modification costs and improving equipment automation. Additionally, when abnormal temperature information is detected, it indicates a potential temperature probe failure, providing a basis for equipment alarms, switching to a normal probe, shutdown maintenance, or manual repair. This helps reduce the risk of misjudgments and downtime due to temperature probe failure.

[0034] According to some embodiments of the present invention, the decomposition and filling fixture layer further includes a retainer configured to be embedded in a second mold for casting the layer casting, the retainer being used to support and position the precast pipe, and the retainer being able to abut against the inner wall of the cavity of the second mold to fix it within the cavity of the second mold.

[0035] The advantages of this invention are: by using a retainer to support and position the pre-embedded pipe fitting, and by abutting the retainer against the inner wall of the second mold cavity, the retainer obtains stable support within the cavity. In this way, during the pouring of molten metal, the impact of molten metal, the effect of buoyancy, and the solidification shrinkage, the pre-fabricated pipe fitting is less likely to shift, sink, or deflect, which helps to improve the positional accuracy of the pre-fabricated pipe fitting. Moreover, since the retainer is configured to be pre-embedded in the second mold cavity, it can be combined with the layer plate casting after casting or remain in the layer plate casting without having to be removed separately, which helps to simplify subsequent processing.

[0036] Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. Attached Figure Description

[0037] To more clearly illustrate the technical solutions of the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0038] Figure 1 This is a flowchart of the method for integrated molding of clamping layer and piping according to the first aspect of the present invention; Figure 2 for Figure 1 The flowchart shown is for step S10000; Figure 3 for Figure 1 The first flowchart of step S20000 is shown; Figure 4 for Figure 1 The second flowchart of step S20000 is shown; Figure 5 for Figure 4 The flowchart of step S22100 is shown; Figure 6 for Figure 4 The flowchart of step S22200 is shown; Figure 7 for Figure 6 The flowchart of step S22220 is shown; Figure 8 This is a schematic diagram of the structure of the decomposition and dispensing fixture layer according to a second aspect embodiment of the present invention; Figure 9 for Figure 8 An internal structural perspective view is shown. Figure 10 for Figure 8 An internal structural perspective view shown from another angle; Figure 11 for Figure 8 A schematic diagram of the internal structure of another embodiment is shown; Figure 12 for Figure 8 A schematic diagram of the internal structure of another embodiment is shown.

[0039] Reference numerals: 100-Prefabricated pipe fitting, 110-Layer plate casting, 120-Bent structure, 130-Temperature probe, 140-Retainer. Detailed Implementation

[0040] Embodiments of the present invention are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention.

[0041] In the description of this invention, it should be understood that the orientation descriptions, such as up, down, front, back, left, right, etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this invention and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this invention.

[0042] In the description of this invention, "several" means one or more, "more than" means two or more, "greater than," "less than," and "exceeding" are understood to exclude the stated number, while "above," "below," and "within" are understood to include the stated number. If "first" and "second" are mentioned, this is only for the purpose of distinguishing technical features and should not be construed as indicating or implying relative importance, or implicitly indicating the number of indicated technical features, or implicitly indicating the order of the indicated technical features.

[0043] In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation, connection, and linkage" should be interpreted broadly. For example, they can refer to fixed connections, detachable connections, or integral connections; they can refer to mechanical connections or electrical connections; they can refer to direct connections or indirect connections through an intermediate medium; and they can refer to the internal communication between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0044] The following is in conjunction with the appendix Figure 1 -Appendix Figure 12 This invention describes a method for integral molding of clamping layer piping and a molding and compatibility clamping layer according to embodiments of the present invention.

[0045] The present invention aims to provide a method for integral molding of clamping layer piping and an embodiment of forming a compressive clamping layer.

[0046] Reference Figure 1 The method for integral molding of clamping layer and pipeline according to the first aspect of the present invention may include, but is not limited to, steps S10000 to S20000.

[0047] Step S10000: Obtain prefabricated pipe fitting 100.

[0048] In step S20000, the prefabricated pipe fitting 100 is placed in the casting station and then the pipe shape fixing process and the complete casting process are carried out in sequence to obtain the layered plate casting 110 containing the pipeline inside.

[0049] It is understood that steps S10000 to S20000 of the embodiments of the present invention involve pre-preparing pipe fittings and then casting the pre-prepared pipe fittings 100 as inserts, directly using the pre-prepared pipe fittings 100 as pipelines inside the layer plate, thereby achieving the integral molding of the layer plate pipelines. This avoids the core difficulty of deep hole drilling in traditional pipeline processing methods, reduces processing difficulty, and eliminates the need for expensive special equipment and a large amount of tool consumption, which helps to reduce manufacturing costs.

[0050] In addition, steps S10000 to S20000 of the embodiments of the present invention transform the traditional pipeline machining process into a highly efficient casting process. By casting pre-embedded pipe fittings, a layered casting 110 with internal pipelines can be formed, which greatly shortens the production cycle and improves production efficiency.

[0051] Moreover, in steps S10000 to S20000 of the embodiments of the present invention, the internal pipeline of the layer plate casting 110 is formed by pre-embedding the pre-cast pipe 100. The pre-cast pipe 100 can be pre-processed into any complex shape as required. Compared with the traditional deep hole drilling which can only process straight holes, the forming method of the present invention greatly expands the design freedom of the internal pipeline of the layer plate, which is conducive to meeting the better temperature control requirements of the layer plate.

[0052] Furthermore, in steps S10000 to S20000 as shown in the embodiments of the present invention, the prefabricated pipe fitting 100 is pre-embedded and cast to form the internal pipeline of the layer plate casting 110, thereby realizing the integral molding of the layer plate pipeline. This allows the prefabricated pipe fitting 100 to be fused together with the layer plate matrix material to form a strong metallurgical bond, ensuring close contact between the prefabricated pipe fitting 100 and the layer plate and good heat conduction.

[0053] Furthermore, in steps S10000 to S20000 of the embodiments of the present invention, by first performing tube-shaped fixing processing on the prefabricated pipe 100 and then performing complete casting processing, it can be understood that the prefabricated pipe 100 is a slender strip structure, which is prone to deformation, displacement or bending under the impact of the flowing liquid during the complete casting process. By performing tube-shaped fixing processing on the prefabricated pipe 100 before the complete casting process, the tube shape of the prefabricated pipe 100 can be fixed, improving the deformation resistance of the prefabricated pipe 100, making it less likely to deform, displace or bend during the complete casting process, which is beneficial to improving the positional accuracy of the internal pipelines of the layer casting 110.

[0054] Reference Figure 2 In some embodiments, step S10000, obtaining the prefabricated pipe fitting 100, may include, but is not limited to, steps S11000 to S12000.

[0055] Step S11000: Fabricate prefabricated pipe fittings 100.

[0056] Step S12000: The prefabricated pipe fitting 100 is bent to obtain a prefabricated pipe fitting 100 with a bent structure 120.

[0057] It is understood that steps S11000 to S12000 of the embodiments of the present invention involve bending the prefabricated pipe 100 before casting to obtain a prefabricated pipe 100 with various bending structures 120 such as serpentine and U-shaped. This allows the prefabricated pipe 100 to form various bending structures 120 such as serpentine and U-shaped within the layer casting 110, which maximizes the heat exchange area and optimizes the fluid distribution. This greatly improves the temperature control efficiency and uniformity during the battery formation and capacity testing process. Moreover, by combining the pipe bending and casting processes, a more favorable pipe topology can be optimized in the layer, resulting in a highly efficient heat-conducting pipe structure that cannot be achieved by machining. This makes it economically feasible to manufacture fixture layers with complex and efficient temperature-controlled flow channels. By making pipe fabrication and bending a pre-casting step, the complex flow channel processing is simplified into a simple pipe bending process, which helps to lower the manufacturing threshold.

[0058] Reference Figure 3 In some embodiments, in step S20000, the prefabricated pipe 100 is placed in the casting station and then the pipe shape fixing process and the complete casting process are performed in sequence to obtain the layered casting 110 containing the pipeline inside, which may include, but is not limited to, steps S21100 to S21200.

[0059] In step S21100, after completing the tubular fixing process, the prefabricated pipe 100 is placed in the second mold of the casting station, and the end of the prefabricated pipe 100 abuts against the cavity sidewall of the second mold or extends to the outside of the cavity of the second mold.

[0060] Step S21200: Cast the cavity of the second mold to obtain the layer casting 110 with external internal pipe end interface.

[0061] It is understood that, in steps S21100 to S21200 of the embodiments of the present invention, by having the end of the prefabricated pipe 100 abut against the sidewall of the cavity or extend directly out of the cavity, after casting, the interface of the pipeline is naturally formed on the surface or outside of the layer plate casting 110. The end of the prefabricated pipe 100 can be directly connected to the external water channel or filled with heating material, eliminating the complex process of drilling holes in the layer plate to find and connect the internal pipeline. This makes the connection between the external pipeline and the internal pipeline of the layer plate direct, simple and reliable. At the same time, during the casting process, the end of the prefabricated pipe 100 is positioned by the mold, which can accurately control the position and size of the interface on the final layer plate, ensuring the consistency and interchangeability of the product. Moreover, the end of the prefabricated pipe 100 is effectively blocked by the sidewall of the cavity or extends to the outside of the cavity, avoiding the high-temperature molten liquid from entering the interior of the prefabricated pipe 100 during the casting process and causing pipeline blockage, thus ensuring the unobstructed flow of the pipeline.

[0062] Reference Figure 4 In some embodiments, in step S20000, the prefabricated pipe 100 is placed in the casting station and then the pipe shape fixing process and the complete casting process are performed in sequence to obtain the layered casting 110 containing the pipeline inside. This may include, but is not limited to, steps S22100 to S22200.

[0063] In step S22100, the prefabricated pipe fitting 100 is placed in the casting station for a single casting to form a retainer that fixes the shape of the prefabricated pipe fitting 100 on the prefabricated pipe fitting 100, thereby obtaining a fixed pipe fitting.

[0064] Step S22200: The fixed pipe fitting is placed in the casting station for secondary casting to obtain a layered casting 110 containing internal pipes.

[0065] It is understood that steps S22100 to S22200 of the embodiments of the present invention involve two casting steps. In the first casting step, a retainer is cast on the prefabricated pipe 100 to fix the shape of the prefabricated pipe 100. Then, the complete structure is cast in the second casting step. This allows a more rigid fixed pipe sub-component to be formed before the second casting of the complete structure. This avoids the buoyancy and impact force of the molten liquid acting directly on the prefabricated pipe 100 during the casting of the complete structure of the layer plate, which could cause the prefabricated pipe 100 to shift, deform, or float. This ensures accurate pipe positioning, prevents pipe displacement and skewing, and avoids subsequent correction processes. Moreover, for long pipes, if they are completely suspended in the cavity, a complex support structure is required. The present invention manufactures a fixed pipe in the first casting, and this assembly has a stable base, making it easier to place and position during the second casting, thus reducing the requirements for mold design.

[0066] Reference Figure 5 In some embodiments, in step S22100, the prefabricated pipe 100 is placed in a casting station for casting to form a retainer that fixes the shape of the prefabricated pipe 100 on the prefabricated pipe 100, thereby obtaining a fixed pipe. This may include, but is not limited to, steps S22110 to S22130.

[0067] Step S22110: Place the prefabricated pipe fitting 100 on the first mold of the casting station.

[0068] Step S22120: Close the first mold so that the first mold clamps and positions part of the prefabricated pipe fitting 100.

[0069] Step S22130: Cast the first mold to form a retainer for fixing the precast pipe 100 on the precast pipe 100, thereby obtaining the fixed pipe.

[0070] It is understood that steps S22110 to S22130 of the embodiments of the present invention, by using the first mold to clamp and position part of the precast pipe 100 in the first casting step, the precast pipe 100 can be positioned by the first mold, so that the precast pipe 100 will not move due to gravity or slight disturbance of the molten liquid, ensuring that the retainer can be accurately formed in the preset position, and ensuring the relative positional accuracy between the retainer and the precast pipe 100.

[0071] Reference Figure 6 In some embodiments, step S22200 involves placing the fixed pipe fitting in a casting station for secondary casting to obtain a layered casting 110 containing internal pipes. This may include, but is not limited to, steps S22210 to S22230.

[0072] Step S22210: Place the fixed pipe fitting on the second mold at the casting station.

[0073] Step S22220: Position the fixed pipe fitting.

[0074] Step S22230: Cast the second mold to obtain a layered casting 110 containing internal pipes.

[0075] It is understood that steps S22210 to S22230 of the embodiments of the present invention, by positioning the fixed pipe on the second mold before the second casting, ensure the relative positional accuracy between the fixed pipe and the finally formed layer plate casting 110, thereby ensuring the relative positional accuracy between the internal pipe of the layer plate casting 110 and the layer plate casting 110.

[0076] Reference Figure 7In some embodiments, step S22220 involves positioning the fixed pipe, which may include, but is not limited to, steps S22221 to S22223.

[0077] Step S22221: Obtain the precast groove, attach the precast groove to the exposed part of the precast pipe 100 in the fixed pipe, and attach the side of the precast groove away from the fixed pipe to one of the front mold and rear mold of the second mold.

[0078] Step S22222: Obtain the positioning pin, place one end of the positioning pin against the side of the fixed pipe fitting away from the precast groove, and lock the other end of the positioning pin into the other of the front mold and rear mold to position the fixed pipe fitting.

[0079] Step S22223: Remove the locating pin, and then assemble the front mold and the rear mold.

[0080] It is understood that steps S22221 to S22223 of the embodiments of the present invention directly position the exposed part of the original precast pipe fitting 100 by utilizing the cooperation of the precast groove and the positioning pin, rather than acting on the retainer. This ensures that the positioning reference in the second casting process is completely consistent with the precast pipe fitting 100 itself, avoiding positioning deviations introduced by the dimensional errors of the retainer, and is beneficial to improving the positional accuracy of the internal pipelines of the layer casting 110. Specifically, the precast groove clamps the precast pipe fitting 100 from one direction and rests against one side of the second mold, restricting the precast pipe fitting. As part 100 moves and rotates in this direction, the positioning pin presses against the precast pipe part 100 from the opposite direction, and the other end is stuck on the other side of the mold, thereby accurately positioning the precast pipe part 100 on the second mold. Moreover, removing the positioning pin before the second casting can prevent the positioning pin from obstructing the mold closing action of the second mold. At the same time, the precast groove remains in the second mold to support the precast pipe part 100, reducing the suspended position of the precast pipe part 100 on the second mold. This can effectively resist the impact of the molten liquid during casting and ensure that the exposed part of the precast pipe part 100 is stable in shape and position in the cavity.

[0081] It should be noted that the precast groove is left in the second mold and cast together with the fixed pipe as an embedded part, so that the precast groove forms part of the layer plate casting 110.

[0082] It should also be noted that multiple precast grooves and positioning pins can be set, thereby positioning multiple positions of the exposed part of the precast pipe 100 in the fixed pipe fitting, thus making the position of the precast pipe 100 more accurate.

[0083] Reference Figure 8 , Figure 9 and Figure 10The second aspect of the present invention describes a form-forming capacity clamping shelf, which is manufactured using the integrated forming method of clamping shelf piping of the first aspect of the present invention. The form-forming capacity clamping shelf includes a shelf casting 110 and a prefabricated pipe 100 embedded in the shelf casting 110. The prefabricated pipe 100 is used to form the internal piping of the shelf casting 110.

[0084] It is understood that, in this embodiment of the invention, the internal pipeline of the layer plate casting 110 is formed by using prefabricated pipe fittings 100 embedded in the layer plate casting 110. This means that the internal pipeline of the clamping layer plate is not drilled out, but is composed of prefabricated pipe fittings that are metallurgically bonded to the base material. This achieves the integral forming of the layer plate pipeline, which avoids the core difficulty of deep hole drilling in traditional pipeline processing methods, reduces processing difficulty, and eliminates the need for expensive special equipment and a large amount of tool consumption, thus helping to reduce manufacturing costs. Moreover, it ensures close contact between the prefabricated pipe fittings 100 and the layer plate, resulting in good heat conduction.

[0085] Moreover, by using prefabricated tubing 100, the embodiments of the present invention enable the fixture layer to achieve various complex internal flow channel designs, thereby providing the most optimized temperature control solution for different battery types and formation and capacity testing processes.

[0086] In some specific embodiments, the end of the prefabricated pipe 100 extends beyond the layer casting 110 to separate the end of the prefabricated pipe 100 from the outer surface of the layer casting 110, and the end of the prefabricated pipe 100 is used to form an external interface for the internal pipeline.

[0087] It is understood that, by extending the end of the prefabricated pipe fitting 100 to the outside of the layer plate casting 110, the present invention forms a structure with the internal pipe interface externally located. This allows direct connection to external water channels or filling with heating material through the external prefabricated pipe fitting 100 end, greatly simplifying the installation and subsequent maintenance of the layer plate. Furthermore, since the prefabricated pipe fitting 100 in the layer plate casting is in direct contact with the temperature-regulating medium, when the temperature-regulating medium is injected into the prefabricated pipe fitting 100, if the temperature-regulating medium is a cooling medium, the prefabricated pipe fitting 100 will shrink due to thermal expansion and contraction, easily causing gaps between the outer wall of the prefabricated pipe fitting 100 and the layer plate. If the end of the prefabricated pipe fitting 100 is flush with the surface of the layer plate casting, water can easily seep into the layer plate casting at these gaps. The design extends the interface on the prefabricated pipe fitting 100 that connects to the external water system to the outer surface of the layered casting, separating the interface from the outer surface of the layered casting. Because the interface is external, it is no longer flush with the side of the layered casting. The connection between the interface and the external water system is also separated from the gap between the side of the layered casting and the outer wall of the prefabricated pipe fitting 100. When the temperature regulating medium is a cooling medium that causes the prefabricated pipe fitting 100 to shrink, even if there is a small amount of cooling medium or leakage at the interface, the leaked cooling medium will flow directly to the outside of the layered casting and will not enter the interior of the layered casting along the gap between the layered casting and the outer wall of the prefabricated pipe fitting 100. This avoids the formation of a water-seeping gap between the layered casting and the outer wall of the prefabricated pipe fitting 100 due to thermal expansion and contraction.

[0088] In some specific embodiments, when the end of the prefabricated pipe 100 extends to the outer surface of the layer casting 110, an internal thread can be provided at the end of the prefabricated pipe 100, so that the internal pipes of the layer casting 110 can be directly threaded to the external water pipes or heating material filling pipes through the internal thread; when the end of the prefabricated pipe 100 extends beyond the outer surface of the layer casting 110, an external thread or an internal thread can be provided at the end of the prefabricated pipe 100, so that the internal pipes of the layer casting 110 can be directly threaded to the external water pipes or heating material filling pipes through the external thread or internal thread, which helps to reduce the difficulty of connecting and installing the internal pipes of the layer casting 110 with the external water pipes or heating material filling pipes.

[0089] In some specific embodiments, the prefabricated pipe fitting 100 has a bent structure 120, which is located inside the layer casting 110.

[0090] It is understood that, by setting a bending structure 120 in the prefabricated pipe 100 and placing the bending structure 120 inside the layer casting 110, the pipes inside the layer casting 110 can form various bending structures 120 such as serpentine and U-shaped pipes that can maximize the heat exchange area and optimize the fluid distribution, thereby greatly improving the temperature control efficiency and uniformity during the battery formation and capacity testing process.

[0091] Reference Figure 11 In some specific embodiments, at least two temperature probes 130 are configured on the layer casting 110. The temperature probes 130 are used to monitor the temperature of the layer casting 110. The temperature information collected by at least one temperature probe 130 is used as the basis for the closed-loop control of the layer temperature of the batching and capacity-forming device. The temperature information collected by at least another temperature probe 130 is configured to be compared with the temperature information collected by other temperature probes 130 in order to identify the failure of the temperature probe 130.

[0092] For example, two temperature probes 130 are installed in the shelf casting 110, one as the main temperature probe 130 and the other as the auxiliary temperature probe 130. The temperature information collected by the main temperature probe 130 is sent to the temperature closed-loop control module of the formation and capacity testing equipment. The temperature closed-loop control module adjusts the flow rate, temperature, or heat exchange power of the temperature regulating medium based on the deviation between this temperature information and the target temperature, thereby performing temperature closed-loop control on the shelf casting 110. The temperature information collected by the auxiliary temperature probe 130 is not directly used as the main basis for closed-loop control, but is compared with the temperature information collected by the main temperature probe 130. If the two temperature probes 130 should collect similar temperatures under normal conditions, then when the temperature difference between the two exceeds a preset threshold, such as exceeding three degrees Celsius and lasting for more than five seconds, or when the temperature change rate is significantly inconsistent, the fault identification module can determine that one of the temperature probes 130 may have abnormalities such as failure, drift, poor contact, open circuit, short circuit, or detachment. At this time, the formation and capacity testing equipment can issue an alarm to prompt the operator to perform maintenance, or it can automatically block the data from the abnormal temperature probe 130 and switch to the normal temperature probe 130 to continue participating in closed-loop control.

[0093] It is understood that this embodiment sets at least two temperature probes 130 in the layer casting 110 to monitor the temperature of the layer casting 110, and the temperature information collected by at least one temperature probe 130 is used to participate in the closed-loop temperature control of the formation and capacity testing equipment, so that the layer temperature can be adjusted according to the cell formation requirements. Furthermore, by comparing the temperature information collected by at least one other temperature probe 130 with the temperature information collected by other temperature probes 130, a cross-verification mechanism is established between the temperature probes 130. This allows for the identification of whether a temperature probe 130 has failed based on the difference in temperature information between the temperature probes 130, improving the reliability of temperature monitoring information and helping to prevent failure of the temperature probe 130. Incorrect temperature information collected by the 0-type sensor can cause the layer casting 110 to become overcooled, overheated, or experience temperature fluctuations, thereby improving the safety and stability of cell temperature control during the formation and capacity testing process. Furthermore, this solution enables the formation layer to not only have temperature monitoring capabilities but also to diagnose the failure of the temperature sensor 130. Failure identification can be achieved during temperature monitoring without the need for additional complex external testing devices, which helps reduce modification costs and improve equipment automation. Additionally, when abnormal temperature information is detected, it can be used to determine if the temperature sensor 130 may be faulty, providing a basis for equipment alarms, switching to a normal sensor, shutdown maintenance, or manual repair, thus reducing the risk of misjudgments and shutdowns due to temperature sensor 130 failure.

[0094] Reference Figure 12 In some specific embodiments, the batching fixture layer also includes a retainer 140, which is configured to be embedded in a second mold for casting the layer casting 110. The retainer 140 is used to support and position the prefabricated pipe 100 and can abut against the inner wall of the cavity of the second mold to be fixed in the cavity of the second mold.

[0095] It is understood that in this embodiment, by using the retainer 140 to support and position the pre-embedded pipe fitting, and by abutting the retainer 140 against the inner wall of the second mold cavity, the retainer 140 obtains stable support within the cavity. In this way, during the pouring of molten metal, the impact of molten metal, the effect of buoyancy, and the solidification shrinkage, the pre-fabricated pipe fitting 100 is less likely to shift, sink, or deflect, which is beneficial to improving the positional accuracy of the pre-fabricated pipe fitting 100. Moreover, since the retainer 140 is configured to be pre-embedded in the second mold cavity, it can be combined with the layer plate casting 110 or remain in the layer plate casting 110 after casting, without the need for additional removal, which is beneficial to simplifying subsequent processing.

[0096] Furthermore, the retainer 140 may be provided with multiple positioning holes, which accommodate the prefabricated pipe 100 to support and position the prefabricated pipe 100.

[0097] It should be noted that the molding method described in the first aspect embodiment is applicable to the forming and filling fixture shelf of the second aspect embodiment. The specific functions implemented by the forming and filling fixture shelf of the second aspect embodiment are the same as those of the molding method described in the first aspect embodiment, and the beneficial effects achieved are also the same as those achieved by the molding method described in the first aspect embodiment.

[0098] In the description of this specification, the references to terms such as "an embodiment, some embodiments, illustrative embodiments, example, specific example, or examples," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of the present invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.

[0099] The terms "first," "second," "third," "fourth," etc. (if applicable) in the specification, claims, and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments described herein can be implemented in a sequence other than that illustrated or described herein.

[0100] It should also be noted that, in the description of this specification, relational terms such as first and second are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations.

[0101] Furthermore, the terms “comprising” and “having”, and any variations thereof, are intended to cover non-exclusive inclusion, such that a process, method, system, product, or apparatus that includes a series of steps or units is not necessarily limited to those steps or units that are explicitly listed, but may also include other steps or units that are not explicitly listed or that are inherent to such processes, methods, products, or apparatus.

[0102] Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0103] The embodiments of the present invention have been described in detail above with reference to the accompanying drawings. However, the present invention is not limited to the above embodiments. Within the scope of knowledge possessed by those skilled in the art, various changes can be made without departing from the spirit of the present invention.

Claims

1. A method for integrated molding of clamped layered pipes, characterized in that, Includes the following steps: Obtain prefabricated pipe fittings (100); The prefabricated pipe fitting (100) is placed in the casting station and then the pipe shape is fixed and the whole casting is carried out in sequence to obtain the layered plate casting (110) containing the pipeline inside.

2. The method for integrated molding of clamp-layer piping according to claim 1, characterized in that, The process of placing the prefabricated pipe fitting (100) in the casting station and then sequentially performing pipe-shaped fixing and complete casting to obtain a layered casting (110) containing internal pipes includes the following steps: After completing the tubular fixing process, the prefabricated pipe (100) is placed in the second mold of the casting station, and the end of the prefabricated pipe (100) abuts against the cavity sidewall of the second mold or extends to the outside of the cavity of the second mold; The cavity of the second mold is cast to obtain a layered casting (110) with external internal pipe end interfaces.

3. The method for integrated molding of clamp-layer piping according to claim 1, characterized in that, The process of placing the prefabricated pipe fitting (100) in the casting station and then sequentially performing pipe-shaped fixing and complete casting to obtain a layered casting (110) containing internal pipes includes the following steps: The precast pipe fitting (100) is placed in the casting station for casting to form a retainer (140) that fixes the shape of the precast pipe fitting (100) on the precast pipe fitting (100) to obtain a fixed pipe fitting; The fixed pipe fitting is placed in the casting station for secondary casting to obtain a layered casting (110) containing internal pipes.

4. The method for integrated molding of clamp-layer piping according to claim 3, characterized in that, The step of placing the prefabricated pipe fitting (100) in a casting station for a single casting to form a retainer (140) on the prefabricated pipe fitting (100) to fix the shape of the prefabricated pipe fitting (100) and obtaining a fixed pipe fitting includes the following steps: The precast pipe fitting (100) is placed on the first mold of the casting station; The first mold is closed so that the first mold clamps and positions a portion of the prefabricated pipe fitting (100); The first mold is cast to form a retainer (140) on the precast pipe (100) to fix the shape of the precast pipe (100), thereby obtaining a fixed pipe.

5. The method for integrated molding of clamp-layer piping according to claim 3, characterized in that, The step of placing the fixed pipe fitting in the casting station for secondary casting to obtain a layered casting (110) containing internal pipes includes the following steps: The fixed pipe fitting is placed on the second mold of the casting station; Position the fixed pipe fitting; The second mold is cast to obtain a layered casting (110) containing internal pipes.

6. The method for integrated molding of clamp-layer piping according to claim 5, characterized in that, Positioning the fixed pipe fitting includes the following steps: Obtain the precast groove, clamp the exposed portion of the precast pipe (100) in the fixed pipe, and clamp the side of the precast groove away from the fixed pipe in one of the front mold and rear mold of the second mold; Obtain the positioning pin, place one end of the positioning pin against the side of the fixed pipe fitting away from the precast groove, and lock the other end of the positioning pin into the other of the front mold and the rear mold to position the fixed pipe fitting. Remove the positioning pin, and then assemble the front mold and the rear mold.

7. The method for integrated molding of clamp-layer piping according to claim 1, characterized in that, The process of obtaining the prefabricated pipe fitting (100) includes the following steps: Fabricate precast pipe fittings (100); The prefabricated pipe fitting (100) is bent to obtain a prefabricated pipe fitting (100) with a bent structure (120).

8. A batching and dispensing fixture shelf, characterized in that, The fixture layer is manufactured using the integral molding method of any one of claims 1 to 7. The modularized containerized fixture layer includes a layer casting (110) and a prefabricated pipe (100) embedded in the layer casting (110). The prefabricated pipe (100) is used to form the internal pipeline of the layer casting (110).

9. The decomposition and dispensing fixture shelf according to claim 8, characterized in that, The end of the prefabricated pipe fitting (100) extends outside the layer casting (110) so that the end of the prefabricated pipe fitting (100) is separated from the outer surface of the layer casting (110), and the end of the prefabricated pipe fitting (100) is used to form the external interface of the internal pipeline. And / or, the prefabricated pipe fitting (100) has a curved structure (120) located inside the layer casting (110).

10. The decomposition and dispensing fixture shelf according to claim 8, characterized in that, At least two temperature probes (130) are configured on the layer casting (110). The temperature probes (130) are used to monitor the temperature of the layer casting (110). The temperature information collected by at least one of the temperature probes (130) is used as the basis for the closed-loop control of the layer temperature of the capacity-forming device. The temperature information collected by at least one other temperature probe (130) is configured to be compared with the temperature information collected by other temperature probes (130) to identify the failure of the temperature probe (130). And / or, the decomposition and filling fixture layer also includes a retainer (140) configured to be embedded in a second mold for casting the layer casting (110), the retainer (140) for supporting and positioning the prefabricated pipe (100), the retainer (140) being able to abut against the inner wall of the cavity of the second mold to be fixed within the cavity of the second mold.