Method and apparatus for generating frequency emergency control strategies driven by event-response fusion

By using an event-response fusion-driven frequency emergency control strategy generation method, which combines event-driven and response-driven strategies to dynamically adjust emergency control resources, the frequency stability problem of the power grid system under the impact of cascading power faults is solved, thereby improving the safe and stable operation capability of the power grid.

CN123121544APending Publication Date: 2026-11-17STATE GRID CORP NORTHEAST DIVISION +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611315931.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-27
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The existing power grid system lacks real-time defense capabilities when facing the cascading power failures caused by the high proportion of new energy access, and cannot effectively cope with frequency stability problems caused by high power disturbances.

Method used

An event-response fusion-driven frequency emergency control strategy generation method is adopted. By acquiring AC short-circuit faults in the power grid system, event-driven and response-driven frequency emergency control strategies are generated. Combined with optimization models and frequency change rates, the action quantities of emergency control resources are dynamically adjusted, including the coordinated control of resources such as load shedding, electrochemical energy storage, and DC modulation.

Benefits of technology

It improves the power grid system's ability to defend against cascading power surges, ensures frequency stability and security, prevents frequency drops, and enhances the real-time response capability to uncertain faults.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123121544A_ABST
    Figure CN123121544A_ABST
Patent Text Reader

Abstract

This invention relates to the field of power system frequency emergency control technology, and provides a method and apparatus for generating frequency emergency control strategies driven by event-response fusion. The method includes: acquiring AC short-circuit faults generated in the power grid system under operating conditions; generating an event-driven frequency emergency control strategy based on the power disturbance caused by the deterministic disconnection of renewable energy and DC blocking due to the AC short-circuit fault, according to the power disturbance caused by the deterministic disconnection of renewable energy and the DC blocking; generating a response-driven frequency emergency control strategy based on the sudden change in the frequency rate of change of the power grid system due to the uncertain cascading disconnection of renewable energy caused by the AC short-circuit fault; and generating an enhanced primary frequency regulation frequency emergency control strategy for the active power deficit caused by the low-voltage ride-through of renewable energy due to the AC short-circuit fault. This method improves the defense capability of the power grid system under cascading power surges, which is beneficial to the safe and stable operation of the power system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power system frequency emergency control technology, and in particular to a method and apparatus for generating frequency emergency control strategies driven by event-response fusion. Background Technology

[0002] With a high proportion of new energy sources being connected to the power grid, high-power disturbances increase the probability of cascading power failures in the power grid system, posing a significant threat to the safe and stable operation of the power system.

[0003] Existing power grid system stability control methods typically employ event triggering and only defend against single deterministic faults (such as DC blocking). The control strategy adopts a "one-size-fits-all" approach, which cannot monitor the disconnection of new energy sources within the power grid system in real time and has virtually no defense capability against cascading power faults (i.e., large-scale disconnection of new energy sources).

[0004] Therefore, how to deal with the cascading power failures in the power grid system caused by high-power disturbances has become an urgent problem to be solved. Summary of the Invention

[0005] This invention provides a method and apparatus for generating frequency emergency control strategies driven by event-response fusion, which improves the defense capability of the power grid system under cascading power surges and is conducive to the safe and stable operation of the power system.

[0006] This invention provides a method for generating frequency emergency control strategies driven by event-response fusion, comprising the following steps.

[0007] Acquire AC short-circuit faults generated by the power grid system under operating conditions; In response to the deterministic grid disconnection of renewable energy and DC blocking caused by the AC short-circuit fault, an event-driven frequency emergency control strategy is generated based on the power disturbance caused by the deterministic grid disconnection of renewable energy and the power disturbance caused by the DC blocking. In response to the uncertain chain of new energy disconnection caused by the AC short-circuit fault, a response-driven frequency emergency control strategy is generated based on the sudden change in the frequency change rate of the power grid system. To address the active power deficit caused by low voltage ride-through of new energy sources due to the aforementioned AC short-circuit fault, an enhanced primary frequency regulation frequency emergency control strategy is generated.

[0008] According to the present invention, an event-response fusion-driven frequency emergency control strategy generation method is provided. The power grid system includes multiple renewable energy generating units. The event-driven frequency emergency control strategy includes the action quantities of each first emergency control resource. The generation of the event-driven frequency emergency control strategy based on the power disturbance of the deterministic renewable energy disconnection amount and the power disturbance caused by the DC blocking includes: during the time-domain simulation of the AC short-circuit fault, for the current renewable energy generating unit, if any point on the voltage transient process curve corresponding to the current renewable energy generating unit is outside the standard withstand curve, then the renewable energy generating unit corresponding to the current renewable energy generating unit is determined to be a disconnected unit; after traversing all renewable energy generating units, the sum of the first minimum power of each disconnected unit is used as the power disturbance of the renewable energy disconnection amount under the operating condition; the sum of the power disturbance of the renewable energy disconnection amount and the power disturbance caused by the DC blocking is used as the total power deficit; and the action quantities of each first emergency control resource in the event-driven frequency emergency control strategy under the total power deficit are calculated using the optimization model corresponding to the power grid system.

[0009] According to the present invention, an event-response fusion-driven frequency emergency control strategy generation method is provided. The response-driven frequency emergency control strategy includes the action quantities of each second emergency control resource. The step of generating the response-driven frequency emergency control strategy based on the frequency change rate mutation of the power grid system includes: estimating the actual grid disconnection amount of the power grid system in real time based on the frequency change rate mutation; if the sum of the second minimum power of each of the actual grid disconnection amounts is greater than a preset power threshold, then generating the action quantities of each second emergency control resource in the response-driven frequency emergency control strategy based on the recurring renewable energy grid disconnection fault event.

[0010] According to the present invention, an event-response fusion-driven frequency emergency control strategy generation method is provided, wherein the enhanced primary frequency regulation frequency emergency control strategy includes the power change of each fast frequency regulation resource; the generation of the enhanced primary frequency regulation frequency emergency control strategy includes: taking the product between the virtual inertia coefficient of each fast frequency regulation resource and the frequency change rate of the power grid system as the power change of each fast frequency regulation resource in the enhanced primary frequency regulation frequency emergency control strategy.

[0011] According to the present invention, an event-response fusion-driven frequency emergency control strategy generation method is provided, wherein the optimization model includes an optimization objective and constraints; wherein the optimization objective is to minimize the weighted sum of the load shedding amounts of all shelvable loads participating in frequency control in the event-driven frequency emergency control strategy; the constraints include: the load shedding amount of each shelvable load is within a preset load shedding amount range; the minimum transient frequency of the power grid system after experiencing a power disturbance is greater than or equal to the lower limit of the allowed frequency of the power grid system; and the steady-state frequency of the power grid system after experiencing a power disturbance is within the allowed operating range of the power grid system.

[0012] According to the present invention, a method for generating a frequency emergency control strategy driven by an event-response fusion is provided. The step of generating the action quantity of each second emergency control resource in the response-driven frequency emergency control strategy based on a recurring renewable energy grid disconnection fault event includes: [The method further details the action quantity of the second minimum power of each of the actual grid disconnection events, which is greater than a preset power threshold, and the subsequent event.] The secondary renewable energy grid disconnection fault event, according to the power grid system in the first The frequency change rate mutation amount corresponding to the grid disconnection failure event of the new energy source is used to calculate the action amount of each second emergency control resource in the response-driven frequency emergency control strategy.

[0013] According to the present invention, an event-response fusion-driven frequency emergency control strategy generation method is provided, wherein the method is based on the power grid system at the... The frequency change rate mutation corresponding to the grid disconnection fault event of the new energy source is used to calculate the action quantity of each second emergency control resource in the response-driven frequency emergency control strategy, including: obtaining the first... The corresponding action coefficients and system equivalent inertia under the grid disconnection fault event of the new energy source; according to the power grid system in the first The frequency change rate mutation amount, the action amount coefficient, and the system equivalent inertia corresponding to the grid disconnection fault event of the new energy are used to calculate the action amount of each second emergency control resource in the response-driven frequency emergency control strategy.

[0014] According to the event-response fusion-driven frequency emergency control strategy generation method provided by the present invention, the weighted load shedding amount of all shedding loads participating in frequency control is obtained based on the following steps: for the first of all shedding loads participating in frequency control... The shearable load is determined to be the first... The product of the control cost and the load shedding amount of each shedding load; the sum of the products of each of the shedding loads participating in frequency control is taken as the weighted load shedding amount.

[0015] According to the present invention, an event-response fusion-driven frequency emergency control strategy generation method is provided, wherein the method obtains the first... The action quantity coefficients corresponding to the grid disconnection fault event of the secondary renewable energy source include: the unit regulation power corresponding to the power grid system, system damping, the maximum allowable steady-state frequency deviation of the power grid system, the total action quantity corresponding to each of the second emergency control resources, the power disturbance caused by the DC blocking, and the first The third minimum power corresponding to the actual amount of grid disconnection in the secondary renewable energy grid disconnection fault event, and the previous The sum of uncompensated residual power deficits in the grid disconnection incidents of new energy sources is used to determine the first threshold; the first threshold is obtained from the grid system. The action quantity coefficient corresponding to the grid disconnection fault event of the new energy source is located within the coefficient range constructed by the first threshold and the preset second threshold, wherein the first threshold is less than or equal to the second threshold.

[0016] According to the present invention, an event-response fusion-driven frequency emergency control strategy generation method is provided, wherein the preceding The sum of uncompensated residual power deficits in secondary renewable energy grid disconnection incidents is obtained based on the following steps: (Regarding the aforementioned...) The first of the secondary energy grid disconnection failure events The secondary renewable energy grid disconnection fault event, obtain the first The fourth minimum power corresponding to the actual amount of grid disconnection in the secondary renewable energy grid disconnection fault event, and the first power of the grid system. The target action quantity coefficient corresponding to the grid disconnection fault event of the secondary new energy source; determine the product of the fourth minimum power and the target action quantity coefficient; and take the difference between the target action quantity coefficient and the product as the first... The uncompensated residual power deficit in the grid disconnection incident of secondary renewable energy sources; the aforementioned The sum of the uncompensated remaining power deficits corresponding to each of the new energy grid disconnection fault events is taken as the cumulative sum of the remaining power deficits.

[0017] According to the event-response fusion-driven frequency emergency control strategy generation method provided by the present invention, the first emergency control resource is a first switchable load; the second emergency control resource is a second switchable load; the fast frequency modulation resource includes electrochemical energy storage, adjustable load and DC modulation.

[0018] The present invention also provides an event-response fusion-driven frequency emergency control strategy generation device, comprising the following modules: The fault acquisition module is used to acquire AC short-circuit faults generated in the power grid system under operating conditions. The strategy generation module is used to generate an event-driven frequency emergency control strategy based on the power disturbance caused by the deterministic new energy grid disconnection and DC blocking due to the AC short-circuit fault, and the power disturbance caused by the DC blocking. For the uncertain cascading grid disconnection of new energy caused by the AC short-circuit fault, a response-driven frequency emergency control strategy is generated based on the sudden change in the frequency change rate of the power grid system. Finally, for the active power deficit caused by the low-voltage ride-through of new energy due to the AC short-circuit fault, an enhanced primary frequency regulation frequency emergency control strategy is generated.

[0019] The present invention also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the event-response fusion-driven frequency emergency control strategy generation method as described above.

[0020] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the event-response fusion-driven frequency emergency control strategy generation method as described above.

[0021] The present invention also provides a computer program product, including a computer program that, when executed by a processor, implements the event-response fusion-driven frequency emergency control strategy generation method as described above.

[0022] The present invention provides an event-response fusion-driven frequency emergency control strategy generation method and apparatus. This method acquires AC short-circuit faults generated in the power grid system under operating conditions. For deterministic renewable energy disconnection and DC blocking caused by AC short-circuit faults, an event-driven frequency emergency control strategy is generated based on the power disturbance caused by the deterministic renewable energy disconnection and the power disturbance caused by DC blocking. For uncertain cascading disconnection of renewable energy caused by AC short-circuit faults, a response-driven frequency emergency control strategy is generated based on the sudden change in the frequency change rate of the power grid system. Finally, for active power deficit caused by low-voltage ride-through of renewable energy due to AC short-circuit faults, an enhanced primary frequency regulation frequency emergency control strategy is generated. This method improves the power grid system's defense capability against cascading power surges, which is beneficial to the safe and stable operation of the power system. Attached Figure Description

[0023] To more clearly illustrate the technical solutions in this invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.

[0024] Figure 1 This is a flowchart illustrating the frequency emergency control strategy generation method driven by event-response fusion provided by the present invention.

[0025] Figure 2 This is a schematic diagram of the event-response fusion-driven frequency emergency control strategy generation device provided by the present invention.

[0026] Figure 3 This is a schematic diagram of the structure of the electronic device provided by the present invention. Detailed Implementation

[0027] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this invention. All other embodiments obtained by those skilled in the art based on the embodiments of this invention without creative effort are within the scope of protection of this invention.

[0028] It should be noted that the execution subject of the event-response fusion-driven frequency emergency control strategy generation method provided in the embodiments of the present invention can be an event-response fusion-driven frequency emergency control strategy generation device or an electronic device, and no specific limitation is made here.

[0029] Among them, the aforementioned frequency emergency control strategy generation device or electronic device is a kind of stability control system.

[0030] It is understandable that, since the existing power grid system stabilization methods often lack the necessary frequency measurement, triggering, and execution components for implementing response-driven emergency control, the stabilization system involved in this invention needs to add a response-driven component (specifically, frequency measurement, trigger discrimination, action execution, etc.) to each control substation or execution station on the basis of the original centralized architecture, forming a distributed stabilization supplementary architecture. Together with the existing centralized stabilization architecture, it forms a "centralized + distributed" control architecture to realize event-response fusion-driven frequency emergency control in order to cope with the cascading power failure impact of high-power disturbances on the power grid system.

[0031] The following uses an electronic device as an example to illustrate in detail the frequency emergency control strategy generation method driven by event-response fusion provided in this embodiment of the invention: Figure 1 This is a flowchart illustrating the frequency emergency control strategy generation method driven by event-response fusion provided by the present invention, as shown below. Figure 1 As shown, the method includes the following: Step 101: Obtain the AC short-circuit fault generated by the power grid system under operating conditions.

[0032] The power grid system is a DC receiving-end grid, which refers to a terminal AC grid that receives electrical energy through high-voltage direct current (HVDC) transmission technology. It is typically located in eastern or southern load centers and is characterized by high-power feed-in, high reactive power support requirements, and numerous densely distributed DC transmission points. Optionally, the power grid system includes multiple renewable energy generating units, and each renewable energy generating unit includes multiple renewable energy generator-end nodes.

[0033] Operating conditions refer to the specific operating state of a power grid system at a certain moment, which may include specific values ​​of parameters such as total power generation output, total load level, DC transmission power, output of new energy units, network topology, and system equivalent inertia.

[0034] AC short-circuit faults refer to asymmetrical or symmetrical short-circuit phenomena that occur in the power grid system. They can include single-phase-to-ground short circuits, two-phase short circuits, two-phase-to-ground short circuits, and three-phase short circuits, and are usually caused by lightning strikes, external damage, equipment insulation deterioration, etc.

[0035] It should be noted that the fault events caused by the aforementioned AC short-circuit faults are different. Optionally, the fault events may include: DC blocking, new energy grid disconnection, and new energy low-voltage ride-through (hereinafter referred to as new energy low-voltage ride-through), etc.

[0036] Among them, DC blocking is a permanent fault with strong determinism. An event-driven frequency emergency control strategy is adopted, and the emergency control resources are mainly shelvable loads.

[0037] New energy grid disconnection is a permanent fault with high uncertainty. An event-driven and response-driven frequency control mode is adopted, and the emergency control resources are mainly shelvable loads.

[0038] Low-voltage failures in new energy sources are temporary faults with relatively low uncertainty. A response-driven frequency control mode is adopted, and the control resources are electrochemical energy storage, adjustable load, DC modulation, and other fast frequency regulation resources.

[0039] In step 101, the electronic equipment acquires the AC short-circuit fault generated by the power grid system under operating conditions, which can provide basic input for distinguishing different types of fault events and matching the corresponding frequency emergency control strategies. This ensures that when facing different fault scenarios such as DC blocking, new energy grid disconnection, and new energy low-voltage ride-through, the corresponding control logic can be accurately triggered, thereby realizing hierarchical and zoned coordinated control of frequency stability.

[0040] Step 102: For deterministic new energy grid disconnection and DC blocking caused by AC short-circuit faults, generate an event-driven frequency emergency control strategy based on the power disturbance caused by the deterministic new energy grid disconnection and the power disturbance caused by DC blocking.

[0041] Among them, the power disturbance Δ of the amount of new energy disconnected from the grid Ptw,min It refers to the sum of the minimum power of new energy generating units that are bound to be disconnected from the grid, and is a lower limit estimate of the deterministic disconnection amount.

[0042] Power disturbance Δ caused by DC blocking P hvdc This refers to the sudden power loss caused by the failure of the power grid system to recover after an AC short-circuit fault, which triggers DC blocking. It is usually equal to the active power transmitted before the DC blocking.

[0043] Event-driven frequency emergency control strategy Ω refers to a control method that, based on fault events (such as DC blockage or deterministic grid disconnection of new energy sources), pre-determines the action setpoints of each emergency control resource through offline simulation and optimization calculations, and immediately triggers execution after the actual fault event occurs. This Ω does not rely on real-time frequency feedback and features fast response speed and strong deterministic action.

[0044] Optionally, the aforementioned Ω includes the action quantity of each first emergency control resource. The first emergency control resource is a first shelvable load.

[0045] In step 102, for deterministic new energy grid disconnection and DC blocking caused by AC short-circuit faults, the electronic equipment can first obtain the deterministic new energy grid disconnection amount Δ P tw,min and Δ caused by DC blocking P hvdc And thus the Δ P tw,min and the Δ P hvdc Ω is calculated. Based on this, after an AC short-circuit fault in the power grid system causes DC blocking, the main control station sends emergency control commands to each substation, and performs load shedding operations according to the pre-calculated control settings (i.e., the action quantities of each first emergency control resource), thereby compensating for the power deficit within a few hundred milliseconds and preventing frequency drops beyond the limit.

[0046] In some embodiments, the electronic device generates an event-driven frequency emergency control strategy based on the power disturbance caused by the deterministic power disturbance of the renewable energy disconnection and the power disturbance caused by DC blocking. This includes: during the time-domain simulation of an AC short-circuit fault, if any point on the voltage transient process curve corresponding to the current renewable energy generator node is outside the standard withstand curve, the electronic device determines the renewable energy generator unit corresponding to the current renewable energy generator node as a disconnected unit; after traversing all renewable energy generator nodes, the electronic device uses the sum of the first minimum power of each of the disconnected units as the power disturbance of the renewable energy disconnection under the operating condition; the electronic device uses the sum of the power disturbance of the renewable energy disconnection and the power disturbance caused by DC blocking as the total power deficit; and the electronic device calculates the action amount of each first emergency control resource in the event-driven frequency emergency control strategy under the total power deficit using the optimization model corresponding to the power grid system.

[0047] In this embodiment of the invention, the electronic device performs time-domain simulation of the AC short-circuit fault generated by the power grid system under operating conditions. During the time-domain simulation, the current new energy generator terminal node (i.e., the [number]th) among all new energy generator terminal nodes is simulated. (a new energy vehicle terminal node), obtain the first The voltage transient process curve corresponding to the first new energy generator terminal node is a time-domain simulation curve used to characterize the voltage transient process curve of the first new energy generator terminal node. The voltage trajectory of each new energy generator terminal node during an AC short-circuit fault over time; simultaneously, the electronic equipment acquires the low-throughput withstand curve (i.e., standard withstand curve) required by national standards, which defines the voltage trajectory of the first new energy generator terminal node. The minimum voltage tolerance boundary that allows the new energy generating units corresponding to each new energy generator terminal node to remain connected to the grid during voltage dips.

[0048] Then, the electronic device compares the voltage transient process curve with the standard withstand curve: if all points on the voltage transient process curve are higher than or equal to the standard withstand curve, it indicates that the device can maintain grid-connected operation during this AC short-circuit fault, and no operation is performed at this time; if any point on the voltage transient process curve is lower than the standard withstand curve, it indicates that the current short-circuit fault is due to a fault in the circuit. The voltage withstand capability of the new energy generator units corresponding to the first new energy generator terminal node is insufficient to support this AC short-circuit fault. Therefore, it is determined that the voltage withstand capability of the first new energy generator terminal node is insufficient to support this AC short-circuit fault. Each new energy generator terminal node corresponds to a new energy generator unit that will inevitably be disconnected from the grid and marked as a disconnected generator unit.

[0049] Next, after traversing all renewable energy generator nodes, the electronic device acquires all renewable energy units marked as necessarily disconnected from the grid, i.e., acquires all disconnected units, and uses the sum of the first minimum power of each of these disconnected units as the Δ value of renewable energy grid disconnection under the above operating conditions.P tw,min Simultaneously, the electronic device acquires the Δ caused by DC blockage due to an AC short-circuit fault. P hvdc , and thus the Δ P tw,min With the Δ P hvdc The sum of these values ​​is used as the total power deficit Δ. P d This total power deficit is used to characterize the total power loss caused by this AC short-circuit fault, that is, the total power that the power grid system needs to compensate for, where Δ P d =Δ P hvdc +Δ P tw,min Finally, the electronic device calculates Δ using the optimization model corresponding to the aforementioned power grid system. P d The action quantities of each first emergency control resource in the lower Ω.

[0050] The entire process described above enables offline pre-calculation of Ω, which can quickly and economically compensate for power deficits when actual faults occur, effectively preventing frequency drops beyond the limit.

[0051] In some embodiments, the optimization model includes optimization objectives and constraints.

[0052] The optimization objective is to minimize the sum of the weighted load shedding amounts of all shedding loads involved in frequency control in the event-driven frequency emergency control strategy. The constraints include: (1) the shedding load of each shedding load is within the preset shedding load range, i.e. ,in, This represents the first among all shelvable loads involved in frequency control. The load shedding amount is 0; 0 represents the minimum load shedding amount within the preset load shedding range. This indicates the maximum load shedding amount within the preset load shedding range; (2) Minimum transient frequency of the power grid system after experiencing a power disturbance Greater than or equal to the lower limit of the frequency allowed by the power grid system ,Right now ; (3) The steady-state frequency of the power grid system after experiencing a power disturbance Located within the permissible operating range of the power grid system, i.e. ,in, This represents the minimum steady-state frequency within the operating range; This represents the maximum steady-state frequency within the operating range.

[0053] Optionally, the weighted load shedding amount for all shelvable loads participating in frequency control is obtained based on the following steps: for the first of all shelvable loads participating in frequency control... The shearable load is determined. The product of the control cost and the load shedding amount of each shelvable load; the sum of the products of each shelvable load participating in frequency control is used as the weighted load shedding amount.

[0054] Optionally, the formula for calculating the weighted load shedding amount, i.e., the expression for the optimization objective, is as follows: .

[0055] in, This represents the total number of all shelvable loads participating in frequency control, and is an integer greater than 1. Indicates the first The control cost of load shedding.

[0056] In other words, electronic devices can build a frequency response model of the power grid system, and through the interactive iteration of the frequency response model and the particle swarm optimization algorithm, obtain the action quantity of each first emergency control resource in Ω.

[0057] Step 103: For the uncertain chain disconnection of new energy sources caused by AC short-circuit faults, generate a response-driven frequency emergency control strategy based on the sudden change in the frequency change rate of the power grid system.

[0058] Among them, the sudden change in frequency change rate can reflect the degree of power loss corresponding to the unpredictable chain disconnection of new energy in real time, and is the core trigger signal for response drive control.

[0059] The response-driven frequency emergency control strategy Φ refers to an online closed-loop control strategy that, after the cumulative actual amount of new energy disconnected from the grid exceeds the estimated value, uses the sudden change in the frequency change rate as the trigger criterion to estimate the active power deficit corresponding to each uncertain chain disconnection of new energy and dynamically calculate the load shedding amount.

[0060] Optionally, Φ above includes the action quantities of each second emergency control resource. This second emergency control resource is a second shelvable load.

[0061] It should be noted that Ω and Φ complement each other: Ω is responsible for handling predictable deterministic power deficits, immediately executing offline pre-control schemes after fault events such as DC blocking or deterministic renewable energy grid disconnection; Φ is responsible for handling unexpected, uncertain renewable energy cascading grid disconnection fault events, tracking each disconnection and dynamically calculating the load shedding amount after detecting that the actual grid disconnection exceeds the limit. Together, they constitute an event-driven + response-driven collaborative frequency control framework.

[0062] In some embodiments, the electronic device generates a response-driven frequency emergency control strategy based on the frequency change rate mutation of the power grid system, including: the electronic device estimates the actual disconnection amount of the power grid system in real time based on the frequency change rate mutation; if the sum of the second minimum power of each of the actual disconnection amounts is greater than a preset power threshold, the electronic device generates the action amount of each second emergency control resource in the response-driven frequency emergency control strategy based on the recurring renewable energy disconnection fault event.

[0063] In this embodiment of the invention, the electronic device first acquires the current frequency change rate mutation of the power grid system, and estimates the actual grid disconnection amount in real time based on the frequency change rate mutation. Then, the electronic device calculates the sum of the second minimum power of each of the actual grid disconnections, and compares the sum with a preset power threshold. If the sum is less than or equal to the preset power threshold, it indicates that the current cumulative actual grid disconnection amount has not exceeded the pre-estimated deterministic grid disconnection range (i.e., the expected range), and the instantaneous power deficit of the power grid system is still within the expected controllable range. At this time, no operation is performed, and the electronic device continues to monitor the frequency change rate in real time and remains in standby mode. If the sum is greater than the preset power threshold, it indicates that the current cumulative actual grid disconnection amount has exceeded the expected range, and an uncertain new energy grid disconnection fault event has occurred in the power grid system. At this time, the electronic device immediately activates the response drive control logic, and generates the action quantities of each second emergency control resource in Φ sequentially according to the subsequent new energy grid disconnection fault events. The entire process, through online real-time monitoring and dynamic triggering of Φ, achieves real-time perception and threshold judgment of uncertain new energy grid disconnection fault events. This ensures that response-driven control is activated only after the cumulative actual grid disconnection exceeds the expected range, avoiding frequent malfunctions of control resources due to minor fluctuations. At the same time, it provides an accurate start-up timing for subsequent successive tracking control.

[0064] In some embodiments, the electronic device generates action quantities for each second emergency control resource in a response-driven frequency emergency control strategy based on a recurring renewable energy grid disconnection fault event, including: the action quantity for the second minimum power of each of the actual grid disconnection amounts after the sum of the second minimum power values ​​exceeds a preset power threshold. The secondary renewable energy grid disconnection fault event, the electronic equipment according to the power grid system in the first The sudden change in frequency rate under the fault event of new energy grid disconnection is used to calculate the action quantity of each secondary emergency control resource in the response-driven frequency emergency control strategy. It is an integer greater than 1.

[0065] In this embodiment of the invention, the event that occurs after the sum of the second minimum power of each of the actual disconnection amounts exceeds a preset power threshold is... In the event of a new energy source disconnection from the grid, electronic equipment can first obtain information from the power grid system at the [missing information]. Sudden change in frequency rate under grid disconnection fault events of secondary renewable energy sources ,Should Used to characterize the The instantaneous jump in the rate of frequency change caused by the grid disconnection failure of secondary renewable energy sources; and consequently, the degree of this... Calculations are performed to obtain the action quantities of each second emergency control resource in Φ. The entire process enables independent response and dynamic calculation for each uncertain renewable energy grid disconnection fault event, which can improve the real-time performance and accuracy of Φ, ensuring that each renewable energy grid disconnection fault event can obtain load shedding compensation that matches its power deficit, avoiding secondary frequency impacts or insufficient recovery due to over-shearing or under-shearing, thereby improving the frequency safety margin of the power grid system in continuous uncertain renewable energy grid disconnection scenarios.

[0066] In some embodiments, according to the power grid system in the first The frequency change rate mutation corresponding to the grid disconnection fault event of the new energy source is calculated, and the action quantities of each second emergency control resource in the response-driven frequency emergency control strategy are calculated, including: electronic equipment acquiring the grid system's first... The corresponding action coefficients and system equivalent inertia under the grid disconnection fault event of the new energy source; the electronic equipment is based on the grid system in the first The frequency change rate mutation, action coefficient, and system equivalent inertia corresponding to the grid disconnection failure event of the new energy source are used to calculate the action of each second emergency control resource in the response-driven frequency emergency control strategy.

[0067] In an embodiment of the present invention, the electronic device performs the above-mentioned... During the calculation process, the first step is to obtain the first... Corresponding action quantity coefficient under the grid disconnection failure event of new energy sources Equivalent inertia of the system ,Should Used to characterize the first The action intensity coefficient of emergency control under the fault event of new energy grid disconnection. The value range is determined by the fact that the steady-state frequency deviation of the system does not exceed the limit after this round of stabilization and control actions, and its value is updated each time the new energy source is disconnected from the grid. It is a constant used to reflect the power grid system's ability to resist frequency variations; then, the electronic device... , and Calculations are performed to obtain the action quantities of each second emergency control resource in Φ. The entire process is achieved through dynamic adjustments. This can improve the adaptability of response-driven control to changes in the power grid system state: when the system inertia level changes or the effect of preceding control is not ideal, it can be updated in real time. The value of is determined to ensure that the steady-state frequency deviation of the power grid system remains within the allowable range after this round of emergency control actions, thereby improving the robustness and adaptability of the control strategy and enhancing the frequency stability control capability of the power grid system under continuous uncertain disturbances.

[0068] Optionally, the first Action quantities of each secondary emergency control resource in Φ under the event of grid disconnection of secondary renewable energy. The calculation formula is: .

[0069] In some embodiments, electronic devices acquire the first power grid system The corresponding action coefficients under the grid disconnection fault event of new energy sources include: the unit regulation power of electronic equipment according to the grid system, system damping, the maximum allowable steady-state frequency deviation of the grid system, the total action of each second emergency control resource, the power disturbance caused by DC blocking, and the first The third minimum power corresponding to the actual amount of grid disconnection in the secondary renewable energy grid disconnection fault event, and the previous The sum of uncompensated residual power deficits in new energy grid disconnection fault events is used to determine the first threshold; the electronic device acquires the first threshold value of the grid system. The action quantity coefficient corresponding to the grid disconnection failure event of the new energy source is located within the coefficient range constructed by the first threshold and the preset second threshold, where the first threshold is less than or equal to the second threshold.

[0070] Optionally, the former The sum of uncompensated residual power deficits in new energy grid disconnection incidents is obtained based on the following steps: (Regarding the previous...) The first of the secondary energy grid disconnection failure events The grid disconnection incident of secondary renewable energy sources, obtaining the first The fourth minimum power corresponding to the actual amount of grid disconnection in the secondary renewable energy grid disconnection fault event, and the first minimum power of the power grid system. The target action coefficient corresponding to the grid disconnection fault event of the secondary new energy source; determine the product of the fourth minimum power and the target action coefficient; take the difference between the target action coefficient and the product as the first... The uncompensated residual power deficit in the event of grid disconnection of new energy sources; will be the previous The sum of the uncompensated remaining power deficits corresponding to each of the new energy grid disconnection fault events is taken as the cumulative sum of remaining power deficits.

[0071] In this embodiment of the invention, the electronic device determines the frequency based on the principle that the steady-state frequency deviation of the system does not exceed the limit after the current round of stabilization and control actions. The range of coefficients. Specifically: Regarding the first For grid disconnection incidents of secondary renewable energy sources, the expression for the above principle is: ; in, Indicates the total amount of action; Indicates the first The uncompensated residual power deficit in the event of grid disconnection of new energy sources. Indicates the first The third minimum power corresponding to the actual amount of grid disconnection in the secondary renewable energy grid disconnection fault event; Indicates unit adjustment power, Indicates the first Action quantity coefficients corresponding to grid disconnection fault events of new energy sources; Indicates system damping; This indicates the maximum allowable steady-state frequency deviation of the power grid system.

[0072] Based on the above principles, we can deduce that: .

[0073] Therefore, the first threshold of the coefficient range is... The second threshold is 1.

[0074] Step 104: To address the active power deficit caused by low voltage ride-through of new energy sources due to AC short-circuit faults, generate an enhanced primary frequency regulation emergency control strategy.

[0075] Instantaneous active power deficit refers to the instantaneous power supply-demand imbalance that occurs when an AC short-circuit fault causes a low-voltage ride-through in renewable energy sources. This is because the active power output of the renewable energy units drops rapidly (usually to 0%~20% of normal output), while the load-side power of the power grid system has not yet changed accordingly. This instantaneous active power deficit is characterized by its rapid occurrence, short duration (usually hundreds of milliseconds to seconds), and large amplitude.

[0076] The enhanced primary frequency regulation frequency emergency control strategy Λ refers to a transient support strategy that utilizes the virtual inertia control of fast frequency regulation resources to quickly respond to suppress frequency drops when a transient active power deficit is caused by low-frequency ride-through of new energy sources.

[0077] Optionally, the above Λ includes the power variation of each fast frequency modulation resource.

[0078] In step 104, to address the instantaneous active power deficit caused by the low-voltage ride-through of renewable energy sources due to an AC short-circuit fault, the rapid adjustment advantage of fast frequency regulation resources is utilized to propose Λ. This Λ ​​is used to estimate the amount of renewable energy disconnection from the grid based on the frequency change rate and to match corresponding stability control actions. Specifically, the electronic equipment adopts a virtual inertia control mode. After the AC short-circuit fault occurs, the renewable energy units instantly enter the low-voltage ride-through phase, causing a significant instantaneous power deficit in the grid system, i.e., an instantaneous active power deficit. At this time, the frequency change rate of the grid system increases significantly, generating Λ. The power change amounts of each fast frequency regulation resource included in Λ can rapidly increase power and suppress frequency drops. When the low-voltage ride-through process of renewable energy ends and the voltage recovers, each fast frequency regulation resource gradually withdraws according to a preset recovery rate, returning to normal operation. It should be noted that the above-mentioned Λ achieves rapid compensation for the instantaneous active power deficit during the low-voltage ride-through of renewable energy sources, effectively improving the frequency stability of the grid system during transient processes.

[0079] In some embodiments, the electronic device generates an enhanced primary frequency regulation frequency emergency control strategy, including: the electronic device uses the product between the virtual inertia coefficient of each fast frequency regulation resource and the frequency change rate of the power grid system as the power change amount of each fast frequency regulation resource in the enhanced primary frequency regulation frequency emergency control strategy.

[0080] Optionally, Λ includes the first of a plurality of fast frequency modulation resources. Power change of a fast frequency modulation resource The calculation formula is: .

[0081] in, Indicates the first The virtual inertia coefficient of a fast frequency modulation resource; Indicates the frequency of the power grid system; This represents the rate of frequency change of the power grid system.

[0082] In this embodiment of the invention, the technical solutions described in steps 101-104 above improve the power grid system's defense capability against cascading power surges, which is beneficial to the safe and stable operation of the power system.

[0083] The event-response fusion-driven frequency emergency control strategy generation apparatus provided by the present invention is described below. The event-response fusion-driven frequency emergency control strategy generation apparatus described below and the event-response fusion-driven frequency emergency control strategy generation method described above can be referred to in correspondence with each other.

[0084] Figure 2 This is a schematic diagram of the event-response fusion-driven frequency emergency control strategy generation device provided by the present invention, as shown below. Figure 2 As shown, the device includes the following: The fault acquisition module 201 is used to acquire AC short-circuit faults generated by the power grid system under operating conditions; The strategy generation module 202 is used to generate an event-driven frequency emergency control strategy based on the power disturbance caused by the deterministic new energy grid disconnection and DC blocking due to AC short-circuit faults, and the power disturbance caused by DC blocking. For uncertain new energy cascading grid disconnection caused by AC short-circuit faults, a response-driven frequency emergency control strategy is generated based on the sudden change in the frequency change rate of the power grid system. For the active power deficit caused by low voltage ride-through of new energy due to AC short-circuit faults, an enhanced primary frequency regulation frequency emergency control strategy is generated.

[0085] Optionally, the power grid system includes multiple new energy generating units, and the event-driven frequency emergency control strategy includes the action quantities of each first emergency control resource. The strategy generation module 202 is specifically used to determine that, during the time-domain simulation of AC short-circuit faults, for the current new energy generating unit, if any point on the voltage transient process curve corresponding to the current new energy generating unit is outside the standard tolerance curve, the new energy generating unit corresponding to the current new energy generating unit is a disconnected unit. After traversing all new energy generating units, the sum of the first minimum power of each disconnected unit is used as the power disturbance of the new energy disconnection under the operating condition. The sum of the power disturbance of the new energy disconnection and the power disturbance caused by DC blocking is used as the total power deficit. The action quantities of each first emergency control resource in the event-driven frequency emergency control strategy under the total power deficit are calculated through the optimization model corresponding to the power grid system.

[0086] Optionally, the response-driven frequency emergency control strategy includes the action quantities of each second emergency control resource; the strategy generation module 202 is specifically used to estimate the actual grid disconnection amount of the power grid system in real time based on the frequency change rate mutation amount; if the sum of the second minimum power of each of the actual grid disconnection amounts is greater than the preset power threshold, then the action quantities of each second emergency control resource in the response-driven frequency emergency control strategy are generated based on the recurring renewable energy grid disconnection fault event.

[0087] Optionally, the frequency emergency control strategy of the enhanced primary frequency regulation includes the power change of each fast frequency regulation resource; the strategy generation module 202 is specifically used to take the product between the virtual inertia coefficient of each fast frequency regulation resource and the frequency change rate of the power grid system as the power change of each fast frequency regulation resource in the frequency emergency control strategy of the enhanced primary frequency regulation.

[0088] Optionally, the optimization model includes an optimization objective and constraints; wherein the optimization objective is to minimize the weighted sum of the load shedding amounts of all shelvable loads participating in frequency control in the event-driven frequency emergency control strategy; the constraints include: the load shedding amount of each shelvable load is within the preset load shedding amount range; the minimum transient frequency of the power grid system after experiencing a power disturbance is greater than or equal to the lower limit of the allowed frequency of the power grid system; and the steady-state frequency of the power grid system after experiencing a power disturbance is within the allowed operating range of the power grid system.

[0089] Optionally, the strategy generation module 202 is specifically used to address the situation where the sum of the second minimum power of each of the actual disconnections exceeds a preset power threshold, leading to the occurrence of the first disconnection. The grid disconnection incident of secondary renewable energy sources, according to the power grid system in the first The frequency change rate mutation amount corresponding to the grid disconnection failure event of the new energy source is used to calculate the action amount of each second emergency control resource in the response-driven frequency emergency control strategy.

[0090] Optionally, the strategy generation module 202 is specifically used to obtain the first... The corresponding action coefficients and system equivalent inertia under the grid disconnection fault event of the new energy source; based on the grid system in the first The frequency change rate mutation, action coefficient, and system equivalent inertia corresponding to the grid disconnection failure event of the new energy source are used to calculate the action of each second emergency control resource in the response-driven frequency emergency control strategy.

[0091] Optionally, the weighted load shedding amount for all shelvable loads participating in frequency control is obtained based on the following steps: for the first of all shelvable loads participating in frequency control... The shearable load is determined. The product of the control cost and the load shedding amount of each shelvable load; the sum of the products of each shelvable load participating in frequency control is used as the weighted load shedding amount.

[0092] Optionally, the strategy generation module 202 is specifically used to generate strategies based on the unit regulating power of the power grid system, system damping, the maximum allowable steady-state frequency deviation of the power grid system, the total amount of actions corresponding to each second emergency control resource, the power disturbance caused by DC blocking, and the first The third minimum power corresponding to the actual amount of grid disconnection in the secondary renewable energy grid disconnection fault event, and the previous The sum of uncompensated residual power deficits in new energy grid disconnection fault events is used to determine the first threshold; the first threshold is determined by obtaining the first threshold value of the power grid system. The action quantity coefficient corresponding to the grid disconnection failure event of the new energy source is located within the coefficient range constructed by the first threshold and the preset second threshold, where the first threshold is less than or equal to the second threshold.

[0093] Optionally, the former The sum of uncompensated residual power deficits in new energy grid disconnection incidents is obtained based on the following steps: (Regarding the previous...) The first of the secondary energy grid disconnection failure events The grid disconnection incident of secondary renewable energy sources, obtaining the first The fourth minimum power corresponding to the actual amount of grid disconnection in the secondary renewable energy grid disconnection fault event, and the first minimum power of the power grid system. The target action coefficient corresponding to the grid disconnection fault event of the secondary new energy source; determine the product of the fourth minimum power and the target action coefficient; take the difference between the target action coefficient and the product as the first... The uncompensated residual power deficit in the event of grid disconnection of new energy sources; will be the previous The sum of the uncompensated remaining power deficits corresponding to each of the new energy grid disconnection fault events is taken as the cumulative sum of remaining power deficits.

[0094] Optionally, the first emergency control resource is a first shelvable load; the second emergency control resource is a second shelvable load; and the fast frequency regulation resource includes electrochemical energy storage, adjustable load, and DC modulation.

[0095] Figure 3 This is a schematic diagram of the structure of the electronic device provided by the present invention, such as... Figure 3 As shown, the electronic device may include a processor 310, a communications interface 320, a memory 330, and a communication bus 340, wherein the processor 310, communications interface 320, and memory 330 communicate with each other via the communication bus 340. The processor 310 can call logical instructions in the memory 330 to execute an event-response fusion-driven frequency emergency control strategy generation method. This method includes: acquiring an AC short-circuit fault generated by the power grid system under operating conditions; generating an event-driven frequency emergency control strategy based on the power disturbance caused by the deterministic new energy grid disconnection and DC blocking resulting from the AC short-circuit fault, according to the deterministic new energy grid disconnection amount and the power disturbance caused by the DC blocking; generating a response-driven frequency emergency control strategy based on the frequency change rate mutation amount of the power grid system, for the uncertain new energy cascading grid disconnection caused by the AC short-circuit fault; and generating an enhanced primary frequency regulation frequency emergency control strategy for the active power deficit caused by the low voltage ride-through of new energy sources due to the AC short-circuit fault.

[0096] Furthermore, the logical instructions in the aforementioned memory 330 can be implemented as software functional units and, when sold or used as independent products, can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, essentially, or the part that contributes to the prior art, or a part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of the present invention. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.

[0097] On the other hand, the present invention also provides a computer program product, which includes a computer program that can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the event-response fusion-driven frequency emergency control strategy generation method provided by the above methods. The method includes: acquiring an AC short-circuit fault generated by the power grid system under operating conditions; generating an event-driven frequency emergency control strategy based on the power disturbance caused by the deterministic new energy grid disconnection and DC blocking caused by the AC short-circuit fault, according to the power disturbance caused by the deterministic new energy grid disconnection and the DC blocking; generating a response-driven frequency emergency control strategy based on the frequency change rate mutation of the power grid system caused by the uncertain new energy cascading grid disconnection caused by the AC short-circuit fault; and generating an enhanced primary frequency regulation frequency emergency control strategy for the active power deficit caused by the low voltage ride-through of new energy caused by the AC short-circuit fault.

[0098] In another aspect, the present invention also provides a non-transitory computer-readable storage medium storing a computer program thereon, which, when executed by a processor, implements an event-response fusion-driven frequency emergency control strategy generation method provided by the above methods. This method includes: acquiring an AC short-circuit fault generated by the power grid system under operating conditions; generating an event-driven frequency emergency control strategy based on the power disturbance caused by the deterministic new energy grid disconnection and DC blocking resulting from the AC short-circuit fault, according to the power disturbance caused by the deterministic new energy grid disconnection and the DC blocking; generating a response-driven frequency emergency control strategy based on the frequency change rate mutation of the power grid system resulting from the uncertain new energy cascading disconnection caused by the AC short-circuit fault; and generating an enhanced primary frequency regulation frequency emergency control strategy based on the active power deficit caused by the low-voltage ride-through of new energy sources resulting from the AC short-circuit fault.

[0099] The device embodiments described above are merely illustrative. The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the modules can be selected to achieve the purpose of this embodiment according to actual needs. Those skilled in the art can understand and implement this without any creative effort.

[0100] Through the above description of the embodiments, those skilled in the art can clearly understand that each embodiment can be implemented by means of software plus necessary general-purpose hardware platforms, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solutions, in essence or the part that contributes to the prior art, can be embodied in the form of a software product. This computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, magnetic disk, optical disk, etc., and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute the methods described in the various embodiments or some parts of the embodiments.

[0101] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for generating frequency emergency control strategies driven by event-response fusion, characterized in that, include: Acquire AC short-circuit faults generated by the power grid system under operating conditions; In response to the deterministic grid disconnection of renewable energy and DC blocking caused by the AC short-circuit fault, an event-driven frequency emergency control strategy is generated based on the power disturbance caused by the deterministic grid disconnection of renewable energy and the power disturbance caused by the DC blocking. In response to the uncertain chain of new energy disconnection caused by the AC short-circuit fault, a response-driven frequency emergency control strategy is generated based on the sudden change in the frequency change rate of the power grid system. To address the active power deficit caused by low voltage ride-through of new energy sources due to the aforementioned AC short-circuit fault, an enhanced primary frequency regulation frequency emergency control strategy is generated.

2. The event-response fusion-driven frequency emergency control strategy generation method according to claim 1, characterized in that, The power grid system includes multiple renewable energy units, and the event-driven frequency emergency control strategy includes the action quantities of each first emergency control resource; the generation of the event-driven frequency emergency control strategy based on the power disturbance caused by the deterministic renewable energy disconnection and the power disturbance caused by the DC blocking includes: In the time-domain simulation of the AC short-circuit fault, for the current new energy generator terminal node, if any point on the voltage transient process curve corresponding to the current new energy generator terminal node is outside the standard withstand curve, then the new energy generator unit corresponding to the current new energy generator terminal node is determined to be an off-grid unit. After traversing all new energy generator terminal nodes, the sum of the first minimum power of each of the off-grid units is used as the power disturbance of the new energy off-grid quantity under the operating condition. The sum of the power disturbance caused by the disconnection of the new energy source from the grid and the power disturbance caused by the DC blocking is taken as the total power deficit. Using the optimization model corresponding to the power grid system, the action amount of each first emergency control resource in the event-driven frequency emergency control strategy under the total power deficit is calculated.

3. The event-response fusion-driven frequency emergency control strategy generation method according to claim 1, characterized in that, The response-driven frequency emergency control strategy includes the action quantities of each second emergency control resource; the generation of the response-driven frequency emergency control strategy based on the frequency change rate mutation of the power grid system includes: Based on the abrupt change in the frequency change rate, the actual disconnection rate of the power grid system is estimated in real time. If the sum of the second minimum power of each of the actual grid disconnection amounts is greater than the preset power threshold, then based on the recurring new energy grid disconnection fault event, the action amount of each of the second emergency control resources in the response-driven frequency emergency control strategy is generated.

4. The event-response fusion-driven frequency emergency control strategy generation method according to claim 1, characterized in that, The enhanced primary frequency modulation frequency emergency control strategy includes the power change of each fast frequency modulation resource. The frequency emergency control strategy for generating enhanced primary frequency modulation includes: The product of the virtual inertia coefficient of each fast frequency regulation resource and the frequency change rate of the power grid system is used as the power change of each fast frequency regulation resource in the frequency emergency control strategy of the enhanced primary frequency regulation.

5. The event-response fusion-driven frequency emergency control strategy generation method according to claim 2, characterized in that, The optimization model includes the optimization objective and constraints; The optimization objective is to minimize the sum of the weighted load shedding amounts of all shedding loads involved in frequency control in the event-driven frequency emergency control strategy. The constraints include: the load shedding amount of each shedding load is within the preset load shedding amount range; The minimum transient frequency of the power grid system after experiencing a power disturbance is greater than or equal to the lower limit of the allowed frequency of the power grid system. The steady-state frequency of the power grid system after experiencing a power disturbance is within the allowable operating range of the power grid system.

6. The event-response fusion-driven frequency emergency control strategy generation method according to claim 3, characterized in that, The step of generating the action quantities of each second emergency control resource in the response-driven frequency emergency control strategy based on the recurring renewable energy grid disconnection fault event includes: The first event that occurs after the sum of the second minimum power of each of the actual disconnections exceeds the preset power threshold. The secondary renewable energy grid disconnection fault event, according to the power grid system in the first The frequency change rate mutation amount corresponding to the grid disconnection failure event of the new energy source is used to calculate the action amount of each second emergency control resource in the response-driven frequency emergency control strategy.

7. The event-response fusion-driven frequency emergency control strategy generation method according to claim 6, characterized in that, According to the power grid system in the first The frequency change rate mutation amount corresponding to the grid disconnection failure event of the new energy source is calculated, and the action amount of each second emergency control resource in the response-driven frequency emergency control strategy is calculated, including: Obtain the first power grid system The corresponding action coefficients and system equivalent inertia under the grid disconnection fault event of new energy sources; According to the power grid system in the first The frequency change rate mutation amount, the action amount coefficient, and the system equivalent inertia corresponding to the grid disconnection fault event of the new energy are used to calculate the action amount of each second emergency control resource in the response-driven frequency emergency control strategy.

8. The event-response fusion-driven frequency emergency control strategy generation method according to claim 5, characterized in that, The weighted load shedding amount for all shedding loads involved in frequency control is obtained based on the following steps: For the first of all the shelvable loads involved in frequency control The shearable load is determined to be the first... The product of the control cost of load shedding and the amount of load shedding; The sum of the products of all the shelvable loads involved in frequency control is used as the weighted load shedding amount.

9. The event-response fusion-driven frequency emergency control strategy generation method according to claim 7, characterized in that, The acquisition of the power grid system's first The action quantity coefficients corresponding to the grid disconnection failure event of the secondary new energy source include: Based on the unit regulation power of the power grid system, system damping, the maximum allowable steady-state frequency deviation of the power grid system, the total number of actions corresponding to each of the second emergency control resources, the power disturbance caused by the DC blocking, and the first The third minimum power corresponding to the actual amount of grid disconnection in the secondary renewable energy grid disconnection fault event, and the previous The first threshold is determined by summing up the uncompensated remaining power deficit in the grid disconnection incident of new energy sources. Obtain the first power grid system The action quantity coefficient corresponding to the grid disconnection fault event of the new energy source is located within the coefficient range constructed by the first threshold and the preset second threshold, wherein the first threshold is less than or equal to the second threshold.

10. The event-response fusion-driven frequency emergency control strategy generation method according to claim 9, characterized in that, The preceding The sum of uncompensated residual power deficits in grid disconnection incidents of new energy sources is obtained based on the following steps: Regarding the aforementioned The first of the secondary energy grid disconnection failure events The secondary renewable energy grid disconnection fault event, obtain the first The fourth minimum power corresponding to the actual amount of grid disconnection in the secondary renewable energy grid disconnection fault event, and the first power of the grid system. The target action quantity coefficient corresponding to the grid disconnection failure event of the new energy source; determine the product of the fourth minimum power and the target action quantity coefficient; The difference between the target motion coefficient and the product is taken as the first... Uncompensated residual power loss in the event of grid disconnection of new energy sources; The former The sum of the uncompensated remaining power deficits corresponding to each of the new energy grid disconnection fault events is taken as the cumulative sum of the remaining power deficits.

11. The event-response fusion-driven frequency emergency control strategy generation method according to any one of claims 1-10, characterized in that, The first emergency control resource is the first switchable load; The second emergency control resource is the second switchable load; The fast frequency modulation resources include electrochemical energy storage, adjustable loads, and DC modulation.

12. An event-response fusion-driven frequency emergency control strategy generation device, characterized in that, include: The fault acquisition module is used to acquire AC short-circuit faults generated in the power grid system under operating conditions. The strategy generation module is used to generate an event-driven frequency emergency control strategy based on the power disturbance caused by the deterministic new energy grid disconnection and DC blocking due to the AC short-circuit fault, and the power disturbance caused by the DC blocking. For the uncertain cascading grid disconnection of new energy caused by the AC short-circuit fault, a response-driven frequency emergency control strategy is generated based on the sudden change in the frequency change rate of the power grid system. Finally, for the active power deficit caused by the low-voltage ride-through of new energy due to the AC short-circuit fault, an enhanced primary frequency regulation frequency emergency control strategy is generated.