A method and system for incorporating new energy sources into the power balance in the medium and long term, based on monthly, ten-day, and hourly schedules.
By employing a monthly, ten-day, and time-based method for medium- and long-term power balance of new energy sources, and through three-level time-dimensional slicing and dynamic confidence matching, the problem of inaccurate reflection of the output patterns of new energy sources and the underutilization of the wind-solar complementary characteristics has been solved, thus achieving more refined medium- and long-term power balance calculations and efficient consumption of new energy sources.
Patent Information
- Application Number
- CN202611627113.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-21
- Publication Date
- 2026-11-17
AI Technical Summary
Existing methods for medium- and long-term power balance of new energy sources fail to accurately reflect the changing patterns of new energy output over time. Confidence thresholds are fixed and cannot be dynamically adjusted. Wind and solar power are calculated independently, failing to fully utilize the complementary characteristics of wind and solar power, resulting in insufficient accuracy in medium- and long-term dispatch decisions.
The method of incorporating new energy sources into the power balance in the medium and long term by month, ten-day period and time is adopted. Data is split into slices by three-level time dimensions, and an empirical cumulative distribution function of the availability simultaneity rate of wind power and photovoltaic power is constructed. Combined with dynamic confidence level, the overall reliable simultaneity rate of new energy sources is calculated, and reliable output curves by ten-day period and time are generated.
It significantly improves the accuracy of medium- and long-term power balance calculations, takes into account both reliable power supply and efficient consumption of new energy sources, expands the scope of inter-provincial and inter-regional trading, and is applicable to medium- and long-term power balance decision-making by power grid dispatching agencies at all levels.
Smart Images

Figure CN123121646A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of large power grid dispatching and operation, and specifically relates to a method and system for incorporating new energy sources into the power balance in a monthly, ten-day, and time-based manner. Background Technology
[0002] With the continuous advancement of the construction of new power systems, the installed capacity of new energy sources has maintained a rapid growth trend. The inherent randomness, intermittency, and volatility of new energy power generation have a deepening impact on the operation of the power system. The dual contradiction between grid supply and new energy consumption is becoming increasingly prominent, which puts forward higher requirements for the refinement and efficiency of power balance.
[0003] Medium- and long-term power balance is a core and fundamental link in the power grid dispatch and operation system. The balance result directly determines the organization scale and timing of inter-provincial and inter-regional medium- and long-term transactions, the planning and layout of maintenance windows for power generation, transmission and transformation equipment, and the overall formulation of monthly operation modes for conventional power sources. Deviations in the balance result may lead to power supply gaps during peak load periods and idle and wasteful surplus power from new energy sources during off-peak load periods, which has a critical impact on reliable power supply and efficient utilization of new energy sources.
[0004] Current industry-standard methods for medium- and long-term power balance in renewable energy have several technical limitations: First, output values are calculated using a single-point, monthly standard, failing to differentiate between the characteristics of renewable energy output across different ten-day periods within a month and different time periods within a day. This results in coarse-grained time analysis, failing to accurately reflect the objective laws governing the change in renewable energy output over time. Second, confidence thresholds are fixed, using a uniform standard to calculate reliable output throughout the year. This fails to dynamically adjust confidence levels based on core objectives at different operational stages, such as supply assurance and consumption, leading to insufficient scenario adaptability. Third, wind and solar power are calculated independently and then arithmetically superimposed, neglecting the natural complementarity between the two over time and systematically underestimating the overall power supply support capacity of renewable energy. These shortcomings collectively result in traditional methods failing to accurately reflect the medium- and long-term support capacity of renewable energy, making it difficult to support refined medium- and long-term dispatch decisions in scenarios with a high proportion of renewable energy. Summary of the Invention
[0005] The purpose of this invention is to provide a method and system for the long-term inclusion of new energy sources into the power balance by month, ten-day period, and time period. This method can accurately mine the output patterns of new energy sources at multiple time scales, dynamically adapt to different power grid operation scenarios, and fully utilize the complementary and synergistic characteristics of wind and solar power. It improves the problems of the existing methods for the long-term inclusion of new energy sources into the power balance by the large calculation accuracy and insufficient adaptability to operation scenarios.
[0006] To achieve the above objectives, the solution of the present invention is:
[0007] A method for incorporating new energy sources into the power balance in the medium and long term, based on monthly, ten-day, and time-based schedules, includes:
[0008] Obtain historical data on available wind and solar power output and concurrent installed capacity data. After removing abnormal samples, slice the data into three time dimensions: month, ten days within the month, and time period within the day. Calculate the simultaneous availability rate of wind and solar power under each time dimension.
[0009] Based on the simultaneous availability rates of wind power and solar power by month, ten-day period, and time period, the empirical cumulative distribution function of the simultaneous availability rates of wind power and solar power in each time period is obtained.
[0010] Based on the power grid dispatch and operation focus targets for different months, set corresponding dynamic confidence levels; combine the dynamic confidence levels of the months in which the empirical cumulative distribution function is located to obtain the reliable simultaneity rates of wind power and photovoltaic power at the corresponding confidence levels;
[0011] Based on the historical data of available wind power and photovoltaic power output after the slice is split and the data of installed capacity in the same period, the overall simultaneity rate of new energy in each period is obtained, and then the overall reliable simultaneity rate of new energy is obtained through inverse distribution calculation.
[0012] Based on the overall reliable simultaneous rate of new energy sources for the current month, and combined with the wind power installed capacity and photovoltaic installed capacity for the current month, the reliable output of new energy sources for each ten-day period is obtained.
[0013] This involves acquiring historical data on available wind and solar power output and concurrent installed capacity data. After removing outliers, the data is sliced into segments based on three time dimensions: month, ten-day periods within the month, and intraday time periods. The availability simultaneity rate of wind and solar power under each time dimension is then calculated, including...
[0014] Historical data on available wind and solar power output and concurrent installed capacity data were obtained. After removing output data under non-natural power output conditions, the data was sliced and split according to three time dimensions: month, ten-day periods within the month, and intraday periods. The ten-day periods within the month were divided into the first ten-day period, the middle ten-day period, and the last ten-day period within the day, and the intraday periods were divided into 24 hourly periods.
[0015] Based on the acquired data, the available wind or solar power output at each time dimension is obtained.
[0016]
[0017] In the formula, For the first Month, First Ten days, the first Available wind or solar power output during certain periods For the first Month, First Ten days, the first Actual output of wind or solar power during a given period For the first Month, First Ten days, the first Wind or solar power curtailment during certain periods;
[0018] Based on the available output of wind power or solar power, the availability factor of wind power or solar power is obtained.
[0019]
[0020] In the formula, For the first Monthly installed capacity The available concurrent rate for the corresponding time period, with a value range of [value range missing]. .
[0021] Among them, based on the simultaneous availability rates of wind power and solar power by month, ten-day period, and time period, the empirical cumulative distribution function of the simultaneous availability rates of wind power and solar power in each time period is obtained, including,
[0022] For the Month, First Ten days, the first For a given time period, let the historical sample sequence of wind or solar power availability simultaneity rate be { },in The total number of valid historical samples under this subdivision; construct the empirical cumulative distribution function of the wind power or photovoltaic availability simultaneity rate for this period. This indicates that the availability rate is not greater than the independent variable. The probability,
[0023]
[0024] In the formula, For indicator functions; The available simultaneous rate is the independent variable, and its value range is [value range missing]. ; The range of values is .
[0025] Specifically, based on the power grid dispatching and operation focus targets for different months, corresponding dynamic confidence levels are set, including...
[0026] Based on the different control priorities of power grid dispatching and operation in different months, the scenarios are divided into power supply guarantee scenario and renewable energy consumption scenario. Among them, the power supply guarantee scenario covers the peak load months of summer and winter, and is matched with high confidence level; the renewable energy consumption scenario covers the months of spring and autumn when renewable energy is generated in large quantities, and is matched with medium confidence level, and the medium confidence level value is lower than that of high confidence level.
[0027] Among them, by combining the dynamic confidence level of the month in which the empirical cumulative distribution function is located, the reliable simultaneity rate of wind power and photovoltaic power at the corresponding confidence level is obtained, including,
[0028] Setting dynamic confidence ,
[0029]
[0030] In the formula, This is a set of months corresponding to power supply guarantee scenarios. This is a set of months corresponding to new energy consumption scenarios; For indicator functions, when the first The moon belongs to the set When the condition is met, the function takes the value 1; otherwise, it takes the value 0.
[0031] Reliable Simultaneity Defined as satisfying the cumulative distribution probability equal to the confidence level. Simultaneous rate quantiles,
[0032]
[0033]
[0034] In the formula, For the first Month, First Ten days, the first Confidence level corresponding to time period The empirical cumulative distribution function; This represents the maximum lower bound of the set.
[0035] Specifically, based on the historical available output data of wind power and photovoltaic power after being sliced and the installed capacity data of the same period, the overall concurrent rate of new energy in each time period is obtained. Then, the overall reliable concurrent rate of new energy is obtained through inverse distribution calculation, including...
[0036] Calculate the first according to the following formula. Month, First Ten days, the first Overall simulcast rate of new energy sources during the period ,
[0037]
[0038] In the formula, For the first Month, First Ten days, the first Simultaneous availability of wind power during a given period For the first Month, First Ten days, the first The concurrent availability rate of photovoltaic power during a given time period; , The first Monthly wind power and photovoltaic installed capacity;
[0039] Constructing the empirical cumulative distribution function of the overall availability simultaneity rate of new energy sources The overall reliable simultaneity rate of new energy sources is obtained through inverse distribution calculation.
[0040]
[0041] In the formula, For the first Month, First Ten days, the first The overall reliability and simultaneity rate of new energy sources during the time period.
[0042] Specifically, based on the overall reliable simultaneous rate of new energy sources for the current month, and combined with the wind power installed capacity and photovoltaic installed capacity for the current month, the reliable output of new energy sources for each ten-day period is obtained, including:
[0043] Get the wind power installed capacity for the current month With photovoltaic installed capacity ;
[0044] Based on the overall reliable simultaneous rate of new energy under the corresponding month and scenario confidence level, calculate the reliable output of new energy in each ten-day period and time period.
[0045]
[0046] In the formula, For the first Month, First Ten days, the first Time period, confidence level Reliable output of new energy sources; For the first Month, First Ten days, the first The overall reliability and simultaneity rate of new energy sources during the time period.
[0047] This includes obtaining the reliable output of new energy sources for each ten-day period and time period, as well as calculating the minimum operating capacity of thermal power units and the maximum power that can be transmitted from the entire grid based on the reliable output of new energy sources for each ten-day period and time period.
[0048]
[0049]
[0050]
[0051] In the formula, For the first Month, First Ten days, the first Minimum operating capacity of thermal power units during certain periods For the first The resistance rate of the Moonfire generator unit, with a value range of [value missing]. ; For the first Month, First Ten days, the first Total network power load during the specified time period; For the first Month, First Ten days, the first During the specified time period, the entire network transmits electricity externally, with positive output and negative input. Reserve capacity; For the first Month, First Ten days, the first Time period, confidence level Reliable output of new energy sources; For the first Month, First Ten days, the first Maximum generating capacity of conventional power sources other than thermal power during the specified time period; For the first Month, First Ten days, the first The maximum power that the entire network can transmit during a given period is positive for external transmission and negative for internal transmission. For the first Month, First Ten days, the first Maximum power generation capacity of conventional power sources during the specified time period.
[0052] The method further includes forming a three-dimensional standardized simultaneity rate dataset by month, ten-day period, and hour based on the calculation results of the availability simultaneity rate of wind power and photovoltaic power based on all historical samples; supplementing the dataset with the complete actual operation data of new energy for the year at the end of each year, and updating the simultaneity rate samples and distribution function parameters on a rolling basis.
[0053] A method for integrating new energy sources into the power balance system in a phased, monthly, ten-day, and time-based manner includes,
[0054] The wind power and solar power availability simultaneity acquisition module is configured to acquire historical data of wind power and solar power available output and concurrent installed capacity data. After removing abnormal samples, the data is sliced and split into three time dimensions: month, ten days within the month, and time period within the day, and the wind power and solar power availability simultaneity under each time dimension is calculated.
[0055] The empirical cumulative distribution function acquisition module is configured to obtain the empirical cumulative distribution function of wind power and photovoltaic availability simultaneity rate for each time period based on the monthly, ten-day, and time period simultaneity rates of wind power and photovoltaic availability simultaneity rate.
[0056] The wind power and photovoltaic reliable simultaneity rate acquisition module is configured to set corresponding dynamic confidence levels based on the grid dispatch operation focus targets for different months; and combine the dynamic confidence levels of the month in which the empirical cumulative distribution function is located to obtain the wind power and photovoltaic reliable simultaneity rates at the corresponding confidence levels.
[0057] The module for obtaining the overall reliable concurrency rate of new energy sources is configured to obtain the overall concurrency rate of new energy sources for each time period based on the historical available output data of wind power and photovoltaic power after being sliced and the installed capacity data of the same period, and then obtain the overall reliable concurrency rate of new energy sources through inverse distribution calculation; and,
[0058] The new energy reliable output acquisition module is configured to obtain the new energy reliable output for each ten-day period and time period based on the overall reliable simultaneous rate of new energy in the current month, combined with the wind power installed capacity and photovoltaic installed capacity in the current month.
[0059] A computer device includes a memory, a processor, and a computer program stored in the memory and executable on the processor; when the processor executes the computer program, it implements the steps of the method for incorporating new energy sources into the power balance in a monthly, ten-day, and hourly manner as described above.
[0060] A computer-readable storage medium storing a computer program; when executed by a processor, the computer program implements the steps of the method for incorporating new energy sources into the power balance in a monthly, ten-day, and time-based manner as described above.
[0061] By adopting the above scheme, this invention addresses the shortcomings of traditional methods for medium- and long-term power balance in renewable energy, such as coarse time granularity, fixed confidence levels throughout the year, and systematic underestimation of support capabilities in independent wind and solar power calculations. It constructs a three-dimensional standardized simultaneity rate dataset by month, ten-day period, and hour, establishes a dynamic confidence level matching mechanism for different scenarios of supply guarantee and consumption, extracts reliable simultaneity rates for wind and solar power based on an empirical cumulative distribution function, calculates the overall reliable simultaneity rate of renewable energy using a wind-solar coupling method, generates reliable output curves for each month, ten-day period, and hour, and ultimately conducts refined medium- and long-term power balance calculations. This invention significantly improves the accuracy of medium- and long-term power balance calculations, balances the dual objectives of reliable power supply and efficient renewable energy consumption, effectively expands the scope of inter-provincial and inter-regional trading, and is applicable to medium- and long-term power balance decision-making by power grid dispatching agencies at all levels.
[0062] Compared with the prior art, the present invention has the following advantages and effects:
[0063] (1) Traditional methods for incorporating new energy sources into the medium- and long-term power balance use a single fixed proportion or value for the entire month as the basis for incorporating the new energy support capacity into the balance. This does not distinguish between the differences in each ten-day period within the month and the diurnal fluctuations within the day, which can easily lead to calculation errors such as insufficient margin during peak hours and redundant margin during off-peak hours. This invention constructs a three-level time scale method for incorporating new energy sources into the medium- and long-term power balance, which upgrades the traditional single-point output for the entire month to three sets of 24-point time-based output curves for each month. This accurately matches the variation of new energy output with meteorological rhythms and diurnal changes, significantly improving the accuracy of the medium- and long-term power balance and providing more refined balance calculation results for dispatching decisions.
[0064] (2) Traditional methods for including new energy sources in the medium- and long-term power balance adopt a uniform confidence level throughout the year. The confidence level is not dynamically adjusted according to the core objectives of different operating stages such as supply guarantee and consumption. There is a risk of insufficient supply during the critical periods of peak summer and winter supply guarantee, and the method is too conservative during the windy period, which wastes the surplus space for cross-provincial and cross-regional power transmission. This invention establishes a scenario-based dynamic confidence level matching mechanism to replace the traditional one-size-fits-all approach. In peak load months such as peak summer and peak winter, a high confidence level adapted to supply guarantee is adopted to reduce the risk of inclusion in the balance and prevent power supply gaps caused by extreme low output of new energy sources. In the spring and autumn months when new energy sources generate a lot of electricity, a low confidence level adapted to consumption is adopted to increase the inclusion ratio in the balance, fully release the utilization efficiency of cross-provincial and cross-regional power transmission channels, and improve the level of new energy consumption.
[0065] (3) Traditional methods for incorporating new energy sources into the medium- and long-term power balance calculations involve calculating the reliable output of wind power and photovoltaic power separately, and then directly summing the results arithmetically. This does not take into account the complementary characteristics of wind and photovoltaic power during the day and night, and systematically underestimates the overall support capacity of new energy sources. This invention proposes a method for calculating the overall reliable output of wind and photovoltaic power coupling. Based on the probability distribution of the overall availability simultaneity rate of new energy sources, the method directly solves for the coupled reliable output, making full use of the time-sharing complementary characteristics of wind power and photovoltaic power during the day. This corrects the underestimation bias of traditional methods, effectively expands the medium- and long-term inter-provincial and inter-regional trading space, and improves the level of new energy consumption and the utilization efficiency of transmission channels. Attached Figure Description
[0066] Figure 1 This is a flowchart of the present invention;
[0067] Figure 2 This is a comparison chart of the monthly, ten-day, and hourly wind power medium- and long-term included balance output curves for each ten-day period;
[0068] Figure 3 This is a comparison chart of the monthly, ten-day, and hourly renewable energy medium- and long-term balanced output curves in this invention and traditional methods. Detailed Implementation
[0069] This invention provides a method for incorporating new energy sources into the power balance in a monthly, ten-day, and time-based manner, including:
[0070] Step 1: Construct a standardized dataset of historical power output of new energy sources at multiple time scales.
[0071] Data on wind power and photovoltaic power output, curtailment, and corresponding installed capacity for the same period were collected for five or more consecutive calendar years. Abnormal samples due to equipment failure, dead count errors, or other non-natural output conditions were removed. The data was sliced into segments according to a three-level time dimension: "month - ten-day periods within the month - intraday periods". The ten-day periods within the month were divided into the first, middle, and last ten days, and the intraday periods were divided into 24 hourly periods.
[0072] Calculate the availability and simultaneity rates of wind power and photovoltaic power under each subdivision, complete data standardization processing, and eliminate the interference of changes in installed capacity on the analysis of new energy output characteristics.
[0073] The availability rate is the ratio of available output to concurrent installed capacity, where available output is the sum of actual output and abandoned power. Month, First Ten days, the first The formula for calculating the wind power availability simultaneity rate during a given period is:
[0074]
[0075]
[0076] In the formula, For the first Month, First Ten days, the first Available wind power output during a given time period, measured in megawatts (MW). For the first Month, First Ten days, the first Actual wind power output during the time period, in megawatts; For the first Month, First Ten days, the first The amount of wind power curtailed during the time period is 0 during non-curtailed periods, and the unit is megawatts; For the first Monthly wind power installed capacity, in megawatts; The wind power availability simultaneity rate for the corresponding time period, with a value range of [value range missing]. .
[0077] No. Month, First Ten days, the first The formula for calculating the photovoltaic availability simultaneity rate during a given period is:
[0078]
[0079]
[0080] In the formula, For the first Month, First Ten days, the first Available photovoltaic output during a given time period, measured in megawatts (MW). For the first Month, First Ten days, the first Actual photovoltaic output during the time period, in megawatts; For the first Month, First Ten days, the first The amount of curtailed photovoltaic power during the specified time period is 0 during non-curtailed time periods, and the unit is megawatts. For the first Monthly photovoltaic installed capacity, in megawatts; The photovoltaic availability simultaneity rate for the corresponding time period, with a value range of [value range missing]. .
[0081] Based on the calculation results of the availability simultaneity rate of wind power and photovoltaic power from all historical samples, a three-dimensional standardized simultaneity rate dataset is formed by month, ten-day period, and hour.
[0082] Step 2: Establish dynamic confidence matching rules and quantification formulas for different scenarios.
[0083] Based on the different control focus targets of power grid dispatching in different months, two typical operation scenarios are divided and matched with corresponding confidence thresholds: (1) Power supply guarantee scenario: covering peak summer (July-August) and peak winter (December-January) months of the entire network's electricity load, matched with high confidence thresholds. (2) New energy consumption scenarios: covering months with high new energy output, such as spring (March-May) and autumn (October-November), and matching medium confidence levels. ,in Increase the proportion of power included in the balance, fully release the utilization efficiency of inter-provincial and inter-regional power transmission channels, and improve the level of new energy consumption.
[0084] Define the set of months corresponding to power supply guarantee scenarios as follows: The set of months corresponding to new energy consumption scenarios is as follows Introducing indicator functions When the first The moon belongs to the set When the condition is met, the function takes the value 1; otherwise, it takes the value 0. Then the... Dynamic confidence level of monthly matches The calculation formula is:
[0085]
[0086] This formula enables the automatic matching of confidence thresholds for corresponding scenarios by month, replacing the traditional method of fixing confidence values throughout the year.
[0087] Step 3: Extract the reliable simultaneous rate of wind and light by month, ten-day period and time based on probability distribution.
[0088] For each month in the three-dimensional standardized wind power and solar power availability simultaneity dataset ,ten days Time period We construct empirical cumulative probability distribution functions for the availability simultaneity rate of wind power and photovoltaic power at the given time scale to quantify the statistical distribution law of the output simultaneity rate. Then, based on the monthly dynamic confidence level determined in step 2, we extract the reliable simultaneity rate of wind power and photovoltaic power at the corresponding confidence level through inverse operation of the distribution function.
[0089] In step 3, the probability distribution function of the simultaneous availability rate of wind power is constructed as follows:
[0090] For the Month, First Ten days, the first Let the historical sample sequence of wind power availability simultaneity rate be { },in This represents the total number of valid historical samples within this specific dimension. Construct the empirical cumulative distribution function of the wind power availability simultaneity rate for this period. This indicates that the wind power availability simultaneity rate is no greater than the independent variable. The probability of:
[0091]
[0092] In the formula, For indicator functions; The available simultaneous rate is the independent variable, and its value range is [value range missing]. ; The range of values is This reflects the probability distribution characteristics of the simultaneous availability rate of wind power.
[0093] In step 3, the reliable simultaneity rate of wind power is calculated using the following method:
[0094] Given the monthly confidence score output in step 2 Wind power reliability and simultaneity Defined as satisfying the cumulative distribution probability equal to the confidence level. Simultaneous rate quantiles, i.e., the inverse operation of the cumulative distribution function:
[0095]
[0096]
[0097] In the formula, This represents the maximum lower bound of the set, and its physical meaning is: within the corresponding time period, the probability that the actual availability rate of wind power is lower than this reliable availability rate is no greater than [a certain value]. This can represent the supporting capacity of available wind power output at the corresponding confidence level.
[0098] The method for calculating the reliable simultaneity rate of photovoltaic power in step 3 is the same as that for wind power, that is, first constructing the first... Month, First Ten days, the first Empirical cumulative distribution function of photovoltaic availability simultaneity rate over time period The reliable simultaneity rate of photovoltaic power is then calculated using the inverse distribution function, as shown in the following formula:
[0099]
[0100]
[0101] Step 4: Calculate the overall reliable simultaneity rate of wind power and photovoltaic coupling, i.e., the overall reliable simultaneity rate of new energy.
[0102] Based on the original historical output samples from step 1, the overall availability simultaneity rate of new energy is calculated along the same time dimension. Then, the overall reliable simultaneity rate of new energy is calculated using the probability distribution statistical methods in steps 2 and 3. This replaces the traditional simple superposition method of "reliable wind power output + reliable photovoltaic output," and explores the intraday time-sharing complementary characteristics of wind power and photovoltaics. The specific calculation method is as follows:
[0103] First, calculate the... Month, First Ten days, the first Overall simultaneity rate of new energy sources during the time period:
[0104]
[0105] Using the probability distribution statistical methods described in steps 2 and 3, construct an empirical cumulative distribution function for the overall availability rate of new energy sources. And obtain the first by inverse distribution operation Month, First Ten days, the first Overall reliable simultaneous rate of new energy sources during the time period:
[0106]
[0107] Because wind power and photovoltaics exhibit significant day-night time-sharing complementarity, the following relationship exists at the same confidence level:
[0108]
[0109] In the formula, , , The first Month, First Ten days, the first Time period confidence level The overall reliability of new energy sources, wind power, and photovoltaic power is within the range of [value range missing]. ; , The first Monthly wind power and photovoltaic installed capacity, in megawatts.
[0110] In other words, the overall reliable simultaneity rate of new energy calculated by coupling is higher than the weighted average of the reliable simultaneity rates of wind power and photovoltaic power calculated independently. The calculation method of the overall reliable simultaneity rate of new energy can truly restore the overall supply support capability of new energy.
[0111] Step 5: Generate reliable long-term power output curves for new energy sources by month, ten-day period, and time.
[0112] Obtain the wind power installed capacity for the current month. With photovoltaic installed capacity Based on the overall reliable simultaneous rate of new energy under the corresponding month and scenario confidence level calculated in step 4, the reliable output of new energy in each ten-day period and time period is further calculated:
[0113]
[0114] In the formula, For the first Month, First Ten days, the first Time period, confidence level The reliable output of new energy sources is measured in megawatts.
[0115] A reliable power output time series curve containing 24 time periods is generated for the first, middle, and last ten days of the month. A total of 3 sets of 24-point new energy medium- and long-term power output curves are obtained, which replaces the traditional method of including the power output of a single point in the medium- and long-term power balance for the whole month.
[0116] Step 6: Incorporate new energy sources into medium- and long-term power balance applications and rolling optimization.
[0117] As one application of this invention, the reliable output curves of new energy sources calculated in step 5 are substituted into the monthly power balance formula to conduct refined power balance calculations by ten-day period and time period, and to quantitatively assess the power supply guarantee capacity, the space for new energy consumption, and the demand for inter-provincial and inter-regional transactions. The method is as follows:
[0118]
[0119]
[0120]
[0121] In the formula, For the first Month, First Ten days, the first Minimum operating capacity of thermal power units during a given period, in megawatts; For the first The resistance rate of the Moonfire generator unit, with a value range of [value missing]. ; For the first Month, First Ten days, the first Total grid power load for the specified time period, in megawatts; For the first Month, First Ten days, the first The power transmitted from the entire network during the specified time period is positive for external transmission and negative for internal transmission, with the unit being megawatts. Reserve capacity, in megawatts; For the first Month, First Ten days, the first The maximum generating capacity of conventional power sources other than thermal power during the time period, in megawatts; For the first Month, First Ten days, the first The maximum power that the entire network can transmit during a given time period is represented by positive values for external transmission and negative values for internal transmission, with the unit being megawatts. For the first Month, First Ten days, the first Maximum generating capacity of conventional power sources during a given time period, measured in megawatts (MW).
[0122] Based on the monthly, ten-day, and time-of-day refined power balance calculation results, firstly, the minimum operating demand of thermal power units during peak load periods can be determined, and the monthly maintenance windows for power generation, transmission, and transformation equipment can be arranged in a coordinated manner to reduce the risk of insufficient power supply; secondly, the capacity margin for cross-provincial and cross-regional power transmission during periods of high renewable energy generation can be calculated to improve renewable energy power transmission and optimize the timing and scale of cross-provincial and cross-regional medium- and long-term transactions.
[0123] Step 7: To improve data accuracy, at the end of each year, complete actual operation data of new energy for that year is added to the historical dataset. The simultaneous rate sample and distribution function parameters are updated on a rolling basis to adapt to the changes in output patterns brought about by the expansion of new energy installed capacity and changes in resource characteristics, thus ensuring the accuracy of the method.
[0124] The technical solution and beneficial effects of the present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
[0125] This embodiment uses the calculation of the medium- and long-term power balance of new energy sources in the Northeast China Power Grid as a practical application scenario. Based on years of operational data from the Northeast China Power Grid, it implements the monthly, ten-day, and time-based method for incorporating the medium- and long-term power balance of new energy sources as described in this invention. The implementation process is fully explained, and the overall process is as follows: Figure 1 As shown, the specific steps are as follows:
[0126] Step 1: Construct a standardized dataset of historical power output of new energy sources at multiple time scales.
[0127] Data on actual wind and solar power output, curtailed power, and corresponding installed capacity for each time period in the Northeast China Power Grid from 2021 to 2025 were collected, and abnormal samples due to equipment failures, dead counts, or errors were removed. The data was segmented into three time dimensions: month, ten-day periods within the month, and time periods within the day, divided into three segments: the first ten days (1st-10th), the middle ten days (11th-20th), and the last ten days (21st-end of the month), each with 24 hourly time periods (0:00-23:00). The simultaneous output rate of wind and solar power was calculated for each segment.
[0128] The formulas for calculating the wind power simultaneity rate in the i-th month, j-th ten-day period, and t-th time period are as follows:
[0129]
[0130]
[0131] In the formula, For the first Month, First Ten days, the first Available wind power output during a given time period, measured in megawatts (MW). For the first Month, First Ten days, the first Actual wind power output during the time period, in megawatts; For the first Month, First Ten days, the first The amount of wind power curtailed during the time period is 0 during non-curtailed periods, and the unit is megawatts; For the first Monthly wind power installed capacity, in megawatts; The wind power availability simultaneity rate for the corresponding time period, with a value range of [value range missing]. .
[0132] Similarly, calculate the first... Month, First Ten days, the first Photovoltaic simulcast rate during the time period:
[0133]
[0134]
[0135] In the formula, the definitions of each parameter are consistent with those of the corresponding parameters for wind power.
[0136] Based on the calculation results of the availability simultaneity rate of wind power and photovoltaic power from all historical samples, a three-dimensional standardized simultaneity rate dataset is formed, consisting of 24 time periods in each of the three ten-day periods of each month over 12 months.
[0137] Step 2: Establish dynamic confidence matching rules and quantitative calculations for different scenarios.
[0138] Based on the control focus of the Northeast Power Grid dispatch operation, two typical operation scenarios are divided and matched with corresponding confidence thresholds: (1) Power supply guarantee scenario: covering the peak summer (July-August) and peak winter (December-January) months of the entire network's electricity load, matched with 98% high confidence. (2) New energy consumption scenarios: covering months excluding critical supply periods (February-June, September-November), with a 95% medium confidence level. This will fully unleash the utilization efficiency of inter-provincial and inter-regional power transmission channels and improve the level of new energy consumption.
[0139] Define the set of months corresponding to power supply guarantee scenarios as follows: The set of months corresponding to new energy consumption scenarios is as follows Introducing indicator functions When the first The moon belongs to the set When the condition is met, the function takes the value 1; otherwise, it takes the value 0. Then the... Dynamic confidence level of monthly matches The calculation formula is:
[0140]
[0141] Step 3: Extract the reliable simultaneous rate of wind and light by month, ten-day period and time based on probability distribution.
[0142] For each month in the three-dimensional standardized wind power and solar power availability simultaneity dataset ,ten days Time period We construct empirical cumulative probability distribution functions for the availability simultaneity rate of wind power and solar power at the given time scale. We quantify the statistical distribution law of the output simultaneity rate, and then extract the reliable simultaneity rate of wind power and solar power at the corresponding confidence level through inverse operation of the distribution function.
[0143] For the Month, First Ten days, the first Let the historical sample sequence of wind power availability simultaneity rate be { },in This represents the total number of valid historical samples within this specific dimension. Construct the empirical cumulative distribution function of the wind power availability simultaneity rate for this period. This indicates that the wind power availability simultaneity rate is no greater than the independent variable. The probability of:
[0144]
[0145] In the formula, For indicator functions; The available simultaneous rate is the independent variable, and its value range is [value range missing]. ; The range of values is This reflects the probability distribution characteristics of the simultaneous availability rate of wind power.
[0146] Given monthly confidence level Wind power reliability and simultaneity Defined as satisfying the cumulative distribution probability equal to the confidence level. Simultaneous rate quantiles, i.e., the inverse operation of the cumulative distribution function:
[0147]
[0148]
[0149] Similarly, the reliable simultaneity rate of photovoltaic systems can be calculated:
[0150]
[0151]
[0152] Step 4: Calculate the overall reliable simultaneity rate of wind power and photovoltaic coupling, i.e., the overall reliable simultaneity rate of new energy.
[0153] Based on the original historical output samples from step 1, the overall availability simultaneity rate of new energy is calculated according to the same time dimension, and then the overall reliable simultaneity rate of new energy is calculated using the probability distribution statistical methods in steps 2 and 3.
[0154] First, calculate the... Month, First Ten days, the first Overall simultaneity rate of new energy sources during the time period:
[0155]
[0156] Using the probability distribution statistical methods described in steps 2 and 3, construct an empirical cumulative distribution function for the overall availability rate of new energy sources. And obtain the first by inverse distribution operation Month, First Ten days, the first Overall reliable simultaneous rate of new energy sources during the time period:
[0157]
[0158] Step 5: Generate reliable long-term power output curves for new energy sources by month, ten-day period, and time.
[0159] Obtain the wind power installed capacity for the current month. With photovoltaic installed capacity Based on the overall reliable simultaneous rate of new energy under the corresponding month and scenario confidence level calculated in step 4, the reliable output of new energy in each ten-day period and time period is further calculated:
[0160]
[0161] In the formula, For the first Month, First Ten days, the first Time period, confidence level The reliable output of new energy sources is measured in megawatts.
[0162] For the first, middle, and last ten days of the month, a reliable power output time series curve containing 24 time periods is generated, resulting in a total of 3 sets of 24-point new energy medium- and long-term included balance power output curves.
[0163] Step 6: Incorporate new energy sources into medium- and long-term power balance applications and rolling optimization.
[0164] Substitute the reliable output curves of new energy sources calculated in step 5 into the monthly power balance formula to carry out refined power balance calculations by ten days and time period, and quantitatively assess the power supply guarantee capacity, the space for new energy consumption and the demand for cross-provincial and cross-regional transactions.
[0165] Step 7: At the end of each year, supplement the historical dataset with the complete actual operation data of new energy for that year, and continuously update the simultaneous rate sample and distribution function parameters to adapt to the shift in output patterns brought about by the expansion of new energy installed capacity and changes in resource characteristics, so as to ensure the long-term applicability of the method.
[0166] Taking September 2026 as an example, influenced by the increasing wind resources in autumn, the overall support capacity of new energy in the latter part of the month is higher than that in the middle of the month, and the middle of the month is higher than that in the first part of the month. Between 10:00 AM and 4:00 PM, with the combined effect of high photovoltaic power generation, the reliable output of new energy reaches its daily peak. After the photovoltaic power generation ceases at night, only wind power provides basic support output. The curve fully reflects the differences between the ten-day periods and the diurnal fluctuation characteristics. The results are as follows... Figure 2 As shown, the wind power support capacity in September increased by an average of 870,000 kilowatts in the middle of the month compared to the beginning of the month, and by an average of 2.56 million kilowatts in the latter half of the month compared to the middle of the month. Compared to the traditional single-point fixed output for the whole month, the renewable energy output at noon was increased by 13.27 million kilowatts, while the renewable energy output at night was reduced by 2.78 million kilowatts.
[0167] like Figure 3 It can be seen that, compared with the traditional method of fixed output at a single point throughout the month, the method of incorporating new energy sources into the power balance in a monthly, ten-day, and time-based manner according to the present invention can accurately match the actual output characteristics of new energy sources in different time periods by using the refined output curve of the present invention, thus avoiding the calculation deviation of "insufficient margin during peak hours and redundant margin during off-peak hours".
[0168] This invention also provides a method for integrating new energy sources into the power balance system in a monthly, ten-day, and time-based manner, including:
[0169] The wind power and solar power availability simultaneity acquisition module is configured to acquire historical data of wind power and solar power available output and concurrent installed capacity data. After removing abnormal samples, the data is sliced and split into three time dimensions: month, ten days within the month, and time period within the day, and the wind power and solar power availability simultaneity under each time dimension is calculated.
[0170] The empirical cumulative distribution function acquisition module is configured to obtain the empirical cumulative distribution function of wind power and photovoltaic availability simultaneity rate for each time period based on the monthly, ten-day, and time period simultaneity rates of wind power and photovoltaic availability simultaneity rate.
[0171] The wind power and photovoltaic reliable simultaneity rate acquisition module is configured to set corresponding dynamic confidence levels based on the grid dispatch operation focus targets for different months; and combine the dynamic confidence levels of the month in which the empirical cumulative distribution function is located to obtain the wind power and photovoltaic reliable simultaneity rates at the corresponding confidence levels.
[0172] The module for obtaining the overall reliable concurrency rate of new energy sources is configured to obtain the overall concurrency rate of new energy sources for each time period based on the historical available output data of wind power and photovoltaic power after being sliced and the installed capacity data of the same period, and then obtain the overall reliable concurrency rate of new energy sources through inverse distribution calculation; and,
[0173] The new energy reliable output acquisition module is configured to obtain the new energy reliable output for each ten-day period and time period based on the overall reliable simultaneous rate of new energy in the current month, combined with the wind power installed capacity and photovoltaic installed capacity in the current month.
[0174] This invention also provides another computer device, including a processor and a memory configured to store a computer program capable of running on the processor; wherein, when the processor is configured to run the computer program, it performs the method steps described in the foregoing embodiments.
[0175] In practical applications, the aforementioned processor includes a Field-Programmable Gate Array (FPGA), and the processor can be a Central Processing Unit (CPU) or a Digital Signal Processor (DSP). It is understood that for different devices, the electronic devices used to implement the above-mentioned processor functions can also be other types, and this embodiment of the invention does not impose specific limitations.
[0176] The aforementioned memory can be volatile memory, such as random-access memory (RAM); or non-volatile memory, such as read-only memory (ROM), flash memory, hard disk drive (HDD), or solid-state drive (SSD); or a combination of the above types of memory, and provides instructions and data to the processor.
[0177] In an exemplary embodiment, the present invention also provides a computer-readable storage medium for storing a computer program.
[0178] Optionally, the computer-readable storage medium can be applied to any of the methods in the embodiments of the present invention, and the computer program causes the computer to execute the corresponding processes implemented by the processor in the various methods of the embodiments of the present invention. For the sake of brevity, these will not be described in detail here.
[0179] In the several embodiments provided by this invention, it should be understood that the disclosed devices and methods can be implemented in other ways. The device embodiments described above are merely illustrative. For example, the division of units is only a logical functional division, and in actual implementation, there may be other division methods, such as: multiple units or components can be combined, or integrated into another system, or some features can be ignored or not executed. In addition, the coupling, direct coupling, or communication connection between the various components shown or discussed can be through some interfaces, and the indirect coupling or communication connection between devices or units can be electrical, mechanical, or other forms.
Claims
1. A method for incorporating new energy sources into the power balance in a monthly, ten-day, and time-based manner, characterized in that: include, Obtain historical data on available wind and solar power output and concurrent installed capacity data. After removing abnormal samples, slice the data into three time dimensions: month, ten days within the month, and time period within the day. Calculate the simultaneous availability rate of wind and solar power under each time dimension. Based on the simultaneous availability rates of wind power and solar power by month, ten-day period, and time period, the empirical cumulative distribution function of the simultaneous availability rates of wind power and solar power in each time period is obtained. Based on the power grid dispatch and operation focus targets for different months, set corresponding dynamic confidence levels; combine the dynamic confidence levels of the months in which the empirical cumulative distribution function is located to obtain the reliable simultaneity rates of wind power and photovoltaic power at the corresponding confidence levels; Based on the historical data of available wind power and photovoltaic power output after the slice is split and the data of installed capacity in the same period, the overall simultaneity rate of new energy in each period is obtained, and then the overall reliable simultaneity rate of new energy is obtained through inverse distribution calculation. Based on the overall reliable simultaneous rate of new energy sources for the current month, and combined with the wind power installed capacity and photovoltaic installed capacity for the current month, the reliable output of new energy sources for each ten-day period is obtained.
2. The method as described in claim 1, characterized in that: Historical data on available wind and solar power output and concurrent installed capacity were obtained. After removing outliers, the data was sliced into segments according to three time dimensions: month, ten-day periods within the month, and time periods within the day. The availability simultaneity rate of wind and solar power under each time dimension was calculated, including... Historical data on available wind and solar power output and concurrent installed capacity data were obtained. After removing output data under non-natural power output conditions, the data was sliced and split according to three time dimensions: month, ten-day periods within the month, and intraday periods. The ten-day periods within the month were divided into the first ten-day period, the middle ten-day period, and the last ten-day period within the day, and the intraday periods were divided into 24 hourly periods. Based on the acquired data, the available wind or solar power output at each time dimension is obtained. , In the formula, For the first Month, First Ten days, the first Available wind or solar power output during certain periods For the first Month, First Ten days, the first Actual output of wind or solar power during a given period For the first Month, First Ten days, the first Wind or solar power curtailment during certain periods; Based on the available output of wind power or solar power, the availability factor of wind power or solar power is obtained. , In the formula, For the first Monthly installed capacity The available concurrent rate for the corresponding time period, with a value range of [value range missing]. .
3. The method as described in claim 1, characterized in that: Based on the simultaneous availability rates of wind and solar power by month, ten-day period, and time period, the empirical cumulative distribution function of the simultaneous availability rates of wind and solar power in each time period is obtained, including: For the Month, First Ten days, the first For a given time period, let the historical sample sequence of wind or solar power availability simultaneity rate be { },in The total number of valid historical samples under this subdivision; construct the empirical cumulative distribution function of the wind power or photovoltaic availability simultaneity rate for this period. This indicates that the availability rate is not greater than the independent variable. The probability, , In the formula, For indicator functions; The available simultaneous rate is the independent variable, and its value range is [value range missing]. ; The range of values is .
4. The method as described in claim 1, characterized in that: Based on the key objectives of power grid dispatching and operation in different months, corresponding dynamic confidence levels are set. include, Based on the different control priorities of power grid dispatching and operation in different months, the scenarios are divided into power supply guarantee scenarios and renewable energy consumption scenarios. Among them, the power supply guarantee scenario covers the peak load months during the summer and winter peak seasons and is matched with high confidence levels. The renewable energy consumption scenarios cover the peak renewable energy generation months in spring and autumn, and are matched with medium confidence levels. Furthermore, the medium confidence level value is smaller than the high confidence level value.
5. The method as described in claim 4, characterized in that: By combining the dynamic confidence level of the month in which the empirical cumulative distribution function is located, the reliable simultaneity rates of wind power and photovoltaic power at the corresponding confidence levels are obtained, including: Setting dynamic confidence , , In the formula, This is a set of months corresponding to power supply guarantee scenarios. This is a set of months corresponding to new energy consumption scenarios; For indicator functions, when the first The moon belongs to the set When the condition is met, the function takes the value 1; otherwise, it takes the value 0. Reliable Simultaneity Defined as satisfying the cumulative distribution probability equal to the confidence level. Simultaneous rate quantiles, , , In the formula, For the first Month, First Ten days, the first Confidence level corresponding to time period The empirical cumulative distribution function; This represents the maximum lower bound of the set.
6. The method as described in claim 5, characterized in that: Based on the historical available power output data of wind power and photovoltaic power after being sliced and the installed capacity data of the same period, the overall concurrent rate of new energy in each time period is obtained. Then, the overall reliable concurrent rate of new energy is obtained through inverse distribution calculation, including... Calculate the first according to the following formula. Month, First Ten days, the first Overall simulcast rate of new energy sources during the period , , In the formula, For the first Month, First Ten days, the first Simultaneous availability of wind power during a given period For the first Month, First Ten days, the first The concurrent availability rate of photovoltaic power during a given time period; , The first Monthly wind power and photovoltaic installed capacity; Constructing the empirical cumulative distribution function of the overall availability simultaneity rate of new energy sources The overall reliable simultaneity rate of new energy sources is obtained through inverse distribution calculation. , In the formula, For the first Month, First Ten days, the first The overall reliability and simultaneity rate of new energy sources during the time period.
7. The method as described in claim 5, characterized in that: Based on the overall reliable concurrent rate of new energy sources for the current month, and combined with the wind power installed capacity and photovoltaic installed capacity for the current month, the reliable output of new energy sources for each ten-day period is obtained, including: Get the wind power installed capacity for the current month With photovoltaic installed capacity ; Based on the overall reliable simultaneous rate of new energy under the corresponding month and scenario confidence level, calculate the reliable output of new energy in each ten-day period and time period. , In the formula, For the first Month, First Ten days, the first Time period, confidence level Reliable output of new energy sources; For the first Month, First Ten days, the first The overall reliability and simultaneity rate of new energy sources during the time period.
8. The method as described in claim 1, characterized in that: After obtaining the reliable output of new energy sources for each ten-day period and time period, the calculation also includes determining the minimum operating capacity of thermal power units and the maximum power that can be transmitted from the entire grid based on the reliable output of new energy sources for each ten-day period and time period. , , , In the formula, For the first Month, First Ten days, the first Minimum operating capacity of thermal power units during certain periods For the first The resistance rate of the Moonfire generator unit, with a value range of [value missing]. ; For the first Month, First Ten days, the first Total network power load during the specified time period; For the first Month, First Ten days, the first During the specified time period, the entire network transmits electricity externally, with positive output and negative input. Reserve capacity; For the first Month, First Ten days, the first Time period, confidence level Reliable output of new energy sources; For the first Month, First Ten days, the first Maximum generating capacity of conventional power sources other than thermal power during the specified time period; For the first Month, First Ten days, the first The maximum power that the entire network can transmit during a given period is positive for external transmission and negative for internal transmission. For the first Month, First Ten days, the first Maximum power generation capacity of conventional power sources during the specified time period.
9. The method as described in claim 1, characterized in that: It also includes, Based on the calculation results of the availability simultaneity rate of wind power and photovoltaic power from all historical samples, a three-dimensional standardized simultaneity rate dataset is formed by month, ten-day period, and hour. At the end of each year, the complete actual operation data of new energy for that year is added to the dataset, and the simultaneity rate samples and distribution function parameters are updated on a rolling basis.
10. A method for integrating new energy sources into the power balancing system in a monthly, ten-day, and time-based manner, characterized in that: include, The wind power and solar power availability simultaneity acquisition module is configured to acquire historical data of wind power and solar power available output and concurrent installed capacity data. After removing abnormal samples, the data is sliced and split into three time dimensions: month, ten days within the month, and time period within the day, and the wind power and solar power availability simultaneity under each time dimension is calculated. The empirical cumulative distribution function acquisition module is configured to obtain the empirical cumulative distribution function of wind power and photovoltaic availability simultaneity rate for each time period based on the monthly, ten-day, and time period simultaneity rates of wind power and photovoltaic availability simultaneity rate. The wind power and photovoltaic reliable simultaneity rate acquisition module is configured to set corresponding dynamic confidence levels based on the grid dispatch operation focus targets for different months; and combine the dynamic confidence levels of the month in which the empirical cumulative distribution function is located to obtain the wind power and photovoltaic reliable simultaneity rates at the corresponding confidence levels. The module for obtaining the overall reliable concurrency rate of new energy sources is configured to obtain the overall concurrency rate of new energy sources for each time period based on the historical available output data of wind power and photovoltaic power after being sliced and the installed capacity data of the same period, and then obtain the overall reliable concurrency rate of new energy sources through inverse distribution calculation; and, The new energy reliable output acquisition module is configured to obtain the new energy reliable output for each ten-day period and time period based on the overall reliable simultaneous rate of new energy in the current month, combined with the wind power installed capacity and photovoltaic installed capacity in the current month.
11. A computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor; characterized in that: When the processor executes the computer program, it implements the steps of the method for incorporating new energy sources into the power balance in a monthly, ten-day, and hourly manner as described in any one of claims 1 to 9.
12. A computer-readable storage medium storing a computer program; characterized in that: When the computer program is executed by the processor, it implements the steps of the method for incorporating new energy sources into the power balance in a monthly, ten-day, and hourly manner as described in any one of claims 1 to 9.