A method, apparatus, equipment and medium for operation control of a power distribution network.

By acquiring initial measurement data in the distribution network, constructing a set of active supplementary measurement actions, collecting new measurement data, constructing an extended measurement dataset, and calculating real-time evaluation parameters, the problem of evaluation deviation caused by insufficient measurement equipment in existing technologies is solved, and the control accuracy is improved.

CN123121787APending Publication Date: 2026-11-17YUNNAN POWER GRID CO LTD ELECTRIC POWER RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611174140.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-04
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The existing power distribution network has an insufficient number of measuring devices and suffers from data delays and communication packet loss, resulting in biased operational status assessments and low control accuracy.

Method used

By acquiring initial measurement data, calculating state evaluation parameters, constructing a set of proactive supplementary measurement actions, collecting new measurement data, constructing an extended measurement dataset, calculating real-time evaluation parameters, and adjusting operations based on real-time reliability.

Benefits of technology

Under sparse measurement conditions, supplementary measurement actions improve the accuracy of distribution network status assessment and control, and reduce assessment errors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123121787A_ABST
    Figure CN123121787A_ABST
Patent Text Reader

Abstract

This invention discloses a method, apparatus, equipment, and medium for operation control of a distribution network, belonging to the field of distribution network control. The method includes: acquiring initial measurement data of the distribution network and calculating the distribution network's state assessment parameters based on the initial measurement data; constructing a set of supplementary measurement actions containing multiple active supplementary measurement actions based on the values ​​of the state assessment parameters, and collecting new measurement data based on the active supplementary measurement actions in the supplementary measurement action set; constructing an extended measurement dataset using the new measurement data and calculating the real-time assessment parameters of the distribution network based on the extended measurement dataset; calculating the real-time reliability based on the real-time assessment parameters, and performing operation control processing on the distribution network based on the real-time reliability. This invention can construct supplementary measurement actions based on sparsely collected measurement data and then perform supplementary measurements, combining the two sets of data for control, avoiding errors in state assessment due to data loss, thereby improving the accuracy of distribution network state assessment and control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the technical field of power distribution network control, and in particular to a method, apparatus, equipment and medium for power distribution network operation control. Background Technology

[0002] With the rapid development of urban and rural economies, higher demands are being placed on the reliability of power distribution networks, and users increasingly hope for fewer or no power outages. From the power grid's perspective, in the past, power outages required users to report them, followed by locating the fault and then adjusting and repairing the distribution network. This reactive approach to repairs is detrimental to both speed and quality.

[0003] To improve the stability of the distribution network and ensure power supply for users, one common method for distribution network control is to install various measuring devices in the distribution network, rely on the local electrical quantity data provided by these devices, and use methods such as state estimation and power flow inversion to infer the operating status of the power grid. Then, based on the assessed operating status, the distribution network is regulated to reduce the probability of distribution network failures and minimize power outages.

[0004] However, the above method has the following technical problems: the number of real-time available measurement devices is usually far less than the number of network nodes, and the measurement devices have problems such as AMI reporting delay, communication packet loss, privacy restrictions and frequent changes in device access. This makes the distribution network in a "partially observable" state for a long time, which leads to bias in the assessment of the operation status of the distribution network, resulting in errors in subsequent control and low control accuracy. Summary of the Invention

[0005] This invention provides a method, apparatus, equipment, and medium for the operation control of a power distribution network, which can solve one or more technical problems existing in the prior art.

[0006] A first aspect of this invention provides a method for operating and controlling a power distribution network, the method comprising: Acquire initial measurement data of the distribution network, and calculate the state assessment parameters of the distribution network based on the initial measurement data, wherein the initial assessment parameters include: initial residual, initial state covariance and initial topological ambiguity. Based on the values ​​of the state evaluation parameters, a set of supplementary measurement actions containing multiple active supplementary measurement actions is constructed, and new measurement data is collected based on the active supplementary measurement actions in the set of supplementary measurement actions. An extended measurement dataset is constructed using the initial measurement data and the newly added measurement data, and real-time evaluation parameters of the distribution network are calculated based on the extended measurement dataset. The real-time evaluation parameters include: real-time residuals and real-time state covariance. The real-time reliability is calculated based on the real-time evaluation parameters, and the power distribution network is then subjected to operation control processing based on the real-time reliability.

[0007] In conjunction with the first aspect, in one implementation, acquiring initial measurement data of the distribution network and calculating the state assessment parameters of the distribution network based on the initial measurement data includes: Obtain node parameters and initial measurement data of distribution network nodes, and construct the state vector of the distribution network based on the node parameters, wherein the node parameters include: node voltage parameters, phase angle state, active power state and reactive power state; An initial measurement vector is constructed using the state vector and the initial measurement data, and the initial state recovery parameters are defined using the initial measurement vector. The initial residual, initial state covariance, and initial topological ambiguity are calculated based on the initial state recovery parameters to obtain the state assessment parameters of the distribution network.

[0008] In conjunction with the first aspect, in one implementation, the step of constructing a set of supplementary measurement actions containing multiple active supplementary measurement actions based on the values ​​of the state evaluation parameters, and collecting new measurement data based on the active supplementary measurement actions of the set of supplementary measurement actions, includes: Based on the numerical values ​​of the state evaluation parameters, multiple active supplementary testing actions are defined, and a supplementary testing action set is constructed using the multiple active supplementary testing actions. Determine the comprehensive utility score of each active supplementary test action within the supplementary test action set, and filter the supplementary test action set based on the comprehensive utility score to obtain an optimized action set; Data is collected according to the active supplementary measurement actions within the optimized action set to obtain new measurement data.

[0009] In conjunction with the first aspect, in one implementation, determining the comprehensive utility score of each active supplementary test action within the supplementary test action set, and filtering the supplementary test action set based on the comprehensive utility score to obtain an optimized action set, includes: Determine the action scoring parameters for each active supplementary test action within the supplementary test action set, wherein the action scoring parameters include: information gain, topology discrimination, and action cost. The action scoring parameters are normalized to obtain normalized scoring parameters, and the comprehensive utility score of each active retest action is calculated using the normalized scoring parameters. The actions in the supplementary action set are filtered based on the comprehensive utility score to obtain an optimized action set.

[0010] In conjunction with the first aspect, in one implementation, filtering the actions of the supplementary test action set based on the value of the comprehensive utility score to obtain an optimized action set includes: A preset filtering algorithm is invoked to filter active supplementary testing actions that meet preset constraints from the supplementary testing action set based on the value of the comprehensive utility score, and an optimized action set is constructed using the active supplementary testing actions that meet the preset constraints. The preset constraints include: supplementary test budget constraints, communication resource constraints, equipment availability constraints, and disturbance constraints. The preset screening algorithms include: 0-1 optimization algorithm, exhaustive search algorithm, or greedy selection algorithm.

[0011] In conjunction with the first aspect, in one implementation, the step of constructing an extended measurement dataset using the initial measurement data and the newly added measurement data, and calculating real-time evaluation parameters of the distribution network based on the extended measurement dataset, includes: The newly added measurement data and the newly added measurement data are combined to obtain an extended measurement dataset, and the extended measurement covariance matrix of the extended measurement dataset is determined. The joint problem is solved using the extended measurement covariance matrix to obtain updated parameters, which include updated state, updated topology, and updated phase label. The real-time residuals and real-time state covariance are calculated using the updated parameters.

[0012] In conjunction with the first aspect, in one implementation, the step of calculating real-time reliability based on the real-time evaluation parameters and performing operation control processing on the distribution network based on the real-time reliability includes: Real-time reliability is calculated using the extended measurement covariance matrix, the real-time residual, and the real-time state covariance. If the real-time reliability, the real-time residual, the real-time state covariance, and the initial topological ambiguity all satisfy the corresponding control conditions, then the operating state of the distribution network will be controlled to the topological state corresponding to the updated topology. If any of the real-time reliability, real-time residual, real-time state covariance, and initial topological ambiguity does not meet the corresponding control conditions, then the operation of collecting new measurement data based on the active supplementary measurement action set according to the supplementary measurement action set will be re-executed.

[0013] A second aspect of the present invention provides an operation control device for a power distribution network, the device comprising: The acquisition module is used to acquire initial measurement data of the distribution network and calculate the state assessment parameters of the distribution network based on the initial measurement data. The initial assessment parameters include: initial residual, initial state covariance and initial topological ambiguity. The supplementary measurement module is used to construct a set of supplementary measurement actions containing multiple active supplementary measurement actions based on the values ​​of the state evaluation parameters, and to collect new measurement data based on the active supplementary measurement actions in the set of supplementary measurement actions. The evaluation module is used to construct an extended measurement dataset using the initial measurement data and the newly added measurement data, and to calculate the real-time evaluation parameters of the distribution network based on the extended measurement dataset. The real-time evaluation parameters include: real-time residuals and real-time state covariance. The control module is used to calculate the real-time reliability based on the real-time evaluation parameters, and to perform operation control processing on the distribution network based on the real-time reliability.

[0014] Compared to existing technologies, the present invention provides a method, apparatus, equipment, and medium for operating control of a distribution network, which offers the following advantages: The present invention can acquire initial measurement data of the distribution network and calculate the distribution network's state assessment parameters based on this initial measurement data; construct a set of supplementary measurement actions containing multiple active supplementary measurement actions based on the values ​​of the state assessment parameters, and collect new measurement data based on the active supplementary measurement actions in the supplementary measurement action set; construct an extended measurement dataset using the new measurement data and calculate the real-time assessment parameters of the distribution network based on the extended measurement dataset; calculate the real-time reliability based on the real-time assessment parameters, and perform operation control processing on the distribution network based on the real-time reliability. The present invention can construct supplementary measurement actions based on sparsely collected measurement data and then perform supplementary measurements, combining the two sets of data for control, avoiding errors in state assessment due to data loss, thereby improving the accuracy of distribution network state assessment and control. Attached Figure Description

[0015] Figure 1 This is a flowchart illustrating an operation control method for a power distribution network according to an embodiment of the present invention. Figure 2 This is a schematic diagram of the structure of a power distribution network operation control device provided in an embodiment of the present invention. Detailed Implementation

[0016] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0017] To address the aforementioned issues, the following detailed embodiments will be used to describe and explain a power distribution network operation control method, apparatus, equipment, and medium provided in this application.

[0018] To address the technical problems of biased control in existing technologies and low control accuracy in distribution networks, this paper refers to... Figure 1 The diagram shows a flowchart of an operation control method for a power distribution network according to an embodiment of the present invention.

[0019] As an example, the operation control method of the distribution network may include: S11. Obtain initial measurement data of the distribution network and calculate the state assessment parameters of the distribution network based on the initial measurement data, wherein the initial assessment parameters include: initial residual, initial state covariance and initial topological ambiguity.

[0020] In one embodiment, initial measurement data of the distribution network can be obtained. For example, a distribution network basic set, three-phase state vector, sparse measurement vector, etc., can be defined, and then a measurement selection matrix M is used. t It characterizes issues such as missing field measurements and packet loss in communication.

[0021] Next, a least-squares optimization objective with multiple regularization terms can be constructed based on the initial measurement data: measurement residual term + graph topology Laplace regularization (network physical constraints) + time-series smoothing regularization (continuity of state at different times); then, by substituting the prior topology, prior phase, historical, load, and distributed power source prediction data, the initial evaluation parameters can be obtained.

[0022] In one embodiment, acquiring initial measurement data of the distribution network and calculating the state assessment parameters of the distribution network based on the initial measurement data may include the following sub-steps: S111. Obtain the node parameters and initial measurement data of the distribution network nodes, and construct the state vector of the distribution network based on the node parameters, wherein the node parameters include: the voltage parameters, phase angle state, active power state and reactive power state of the nodes.

[0023] S112. Construct an initial measurement vector using the state vector and the initial measurement data, and define the initial state recovery parameters using the initial measurement vector.

[0024] S113. Calculate the initial residual, initial state covariance and initial topological ambiguity according to the initial state recovery parameters to obtain the state assessment parameters of the distribution network.

[0025] In one embodiment, node parameters and initial measurement data of distribution network nodes can be obtained, assuming the distribution network node set is as follows: The set of branches is The separate sets are , at all times The state vector of the distribution network is constructed based on the node parameters. Specifically, the state vector can be represented by the following equation: ; in, This refers to voltage parameters, specifically the voltage amplitude or square value of each phase at each node. Indicates the phase angle state. and These represent the active and reactive state variables injected into nodes or branch power flows, respectively. The initial measurement vector can be constructed as shown in the following equation: ; in, The measurement selection matrix for the current moment is used to represent the initial measurement data where only a portion of the measurements are available in real time; For topology And different tags The determined nonlinear measurement function; To measure noise, satisfy the covariance matrix .

[0026] Given a prior topology and prior labels Under the given conditions, we define the initial state recovery problem and obtain the initial state recovery parameters, which can be represented by the following formula: ; in, The prior state is given by historical data, load forecasting, and distributed generation forecasting. The graph Laplacian matrix corresponding to the prior topology. For graph prior regularization weights, For time smoothing weights, This is the state estimate from the previous time step.

[0027] Next, the initial residual, initial state covariance, and initial topological ambiguity can be calculated based on the initial state recovery parameters to obtain the state assessment parameters of the distribution network.

[0028] In one embodiment, the initial residual can be expressed as follows: ; set up Given the Jacobian matrix of the measurement function with respect to the state, the initial state covariance can be approximated as follows: ; in, This is the identity matrix. To quantify local state uncertainty, for nodes... The uncertainty index can be defined as follows: ; in, Represents nodes The relevant state covariance sub-block.

[0029] To quantify the initial topological ambiguity, a candidate topology set is defined. The candidate phase set is For any candidate pair Define the cost of consistency: ; in, This is a penalty term for topological radiality or feasibility. For consistency penalty items, and Let be the weight. Define the margin between the optimal and second-best candidates as: ; in, and These are the minimum and second-minimum consistency costs, respectively. If The value is very small, indicating that the current measurement is insufficient to effectively distinguish multiple candidate topologies.

[0030] In this embodiment, the calculation of initial residuals, initial state covariance, and initial topological ambiguity serves as the basis for subsequent active supplementary measurement triggering, supplementary measurement action selection, joint updates, and result release. Specifically, the initial residual is used to measure the degree of consistency between the current measurement value and the predicted measurement value obtained based on prior topology and initial state estimation. When the residual is large or concentrated in a feeder, transformer area, switch neighborhood, or phase region, it indicates that the current estimation result may have measurement anomalies, unobservable local states, incorrect switch states, incorrect local connection relationships, or incorrect user phase identification. Therefore, this residual can be used to locate suspected areas that require further supplementary measurement or verification.

[0031] The initial state covariance is used to characterize the uncertainty of the initial state estimation results. If the covariance of some nodes or branches is large, it indicates that the observability of these areas is insufficient under the existing sparse measurement conditions. In the future, priority should be given to smart meter supplementary sampling, feeder terminal encrypted sampling, or PMU snapshot actions that can reduce the uncertainty of these areas.

[0032] The initial topology ambiguity is used to measure whether existing measurements can effectively distinguish multiple candidate topologies or candidate phase combinations. When the difference in consistency cost between the best and second-best candidate topologies is small, it indicates that multiple topology or phase interpretations may be valid. In this case, supplementary measurement actions with topology discrimination capabilities, such as switch remote signaling verification, local connection relationship verification, or inverter perturbation probing, should be triggered first.

[0033] Therefore, the initial residual, initial state covariance, and initial topological ambiguity together constitute the triggering and selection criteria for active supplementary testing, and are recalculated after the supplementary testing is completed to determine whether the updated state-topology-phase results meet the reliable release conditions.

[0034] S12. Construct a set of supplementary measurement actions containing multiple active supplementary measurement actions based on the values ​​of the state evaluation parameters, and collect new measurement data based on the active supplementary measurement actions in the set of supplementary measurement actions.

[0035] Since the number of available measurement devices in real time is usually far less than the number of network nodes, in order to supplement missing data, a set of supplementary measurement actions is constructed based on the values ​​of the state assessment parameters, which includes multiple proactive supplementary measurement actions. Data is then collected based on the proactive supplementary measurement actions in the set, thereby acquiring new measurement data. By supplementing the missing data with new measurement data, the accuracy of distribution network assessment is improved and the assessment error is reduced.

[0036] In an optional embodiment, the step of constructing a set of supplementary measurement actions containing multiple active supplementary measurement actions based on the values ​​of the state evaluation parameters, and collecting new measurement data based on the active supplementary measurement actions of the set of supplementary measurement actions, may include the following sub-steps: S121. Define multiple active supplementary testing actions based on the numerical values ​​of the state evaluation parameters, and construct a supplementary testing action set using the multiple active supplementary testing actions.

[0037] S122. Determine the comprehensive utility score of each active supplementary test action within the supplementary test action set, and filter the supplementary test action set according to the comprehensive utility score to obtain an optimized action set.

[0038] S123. Data is collected according to the active supplementary measurement actions in the optimized action set to obtain the newly added measurement data.

[0039] Based on the initial residual, initial state covariance, node uncertainty and initial topological ambiguity obtained from the above steps, the suspected areas and suspected objects that need to be supplemented can be determined, and a set of supplementation actions for candidate active supplementation actions can be constructed.

[0040] In one embodiment, multiple proactive supplementary measurement actions can be defined based on the numerical values ​​of the state assessment parameters. Specifically, for load node areas with concentrated residuals or high uncertainty, actions such as rapid supplementary sampling of smart meters, temporary encrypted sampling of feeder terminals, or μPMU snapshots are prioritized; for switches, branches, or transformer areas with high topological ambiguity or concentrated candidate topological differences, actions such as switch remote signaling verification, local connection relationship verification, or inverter perturbation probing are prioritized, resulting in multiple proactive supplementary measurement actions.

[0041] The set of supplementary measurement actions in this step is not generated in a fixed manner, but rather driven by the initial residuals, initial state covariance, node uncertainties, and initial topological ambiguity from the previous steps. Specifically, for nodes, transformer areas, or feeder sections with large residuals or high state uncertainties, candidate supplementary measurement actions such as rapid supplementary sampling of smart meters, temporary encrypted sampling of feeder terminals, or μPMU snapshots can be generated first. For switches, branches, or user phase areas with high topological ambiguity and concentrated candidate topological differences, candidate supplementary measurement actions such as switch remote signaling verification, local connection relationship verification, or inverter perturbation probing can be generated first. Therefore, the set of candidate active supplementary measurement actions is not a fixed static set, but is dynamically driven by the current estimation uncertainty and topological ambiguity.

[0042] Assume the set of actions to be tested is , indicating time The set of candidate active supplementary testing actions generated below can be specifically expressed as follows: ; in, This represents the set of rapid data collection actions performed on smart meters. This represents the set of high-frequency sampling actions of the feeder terminal. This represents the set of actions captured by the μPMU. This represents the set of remote signaling verification actions for the switch. This represents the set of inverter perturbation probing actions.

[0043] in, Indicates time The generated candidate active supplementary testing action set, each element in the set This refers to a specific supplementary testing action that can be invoked, including but not limited to rapid supplementary sampling of a specified smart meter, high-frequency sampling of a specified feeder terminal, instantaneous capture of a specified μPMU, remote signaling verification of a specified switch status, and probing actions that apply active or reactive power disturbances to a specified inverter and collect the response. The candidate actions only indicate actions that are available for selection; whether they are actually executed is determined by further optimization in subsequent steps.

[0044] Active supplementary testing action for any candidate Define its linearized measurement model: ; in, For action The new measurement matrix introduced, The covariance is the newly added measurement noise. .

[0045] If the action is inverter probing, then define the probing control vector: ; in, and The first The active and reactive disturbances of the inverter participating in probing are: The corresponding response model is: ; in, The probing response matrix is ​​related to the topology and phase. This is for probing response noise. To ensure power quality and equipment constraints, the following conditions must also be met: ; In one embodiment, the set of candidate active supplementary measurement actions is not the final actual supplementary measurement action, but rather an optimized set of executable actions generated under the current fault or operating scenario, based on the initial residual, initial state covariance, node uncertainty, and initial topological ambiguity, combined with available measurement and control resources on-site. This optimized action set's action pool is used to limit the search scope for subsequent optimization selections, avoiding indiscriminate searching across all devices and measurement types. Specifically, when residuals are concentrated in certain load nodes or distribution areas, relevant smart meter rapid supplementary sampling, feeder terminal temporary encrypted sampling, or μPMU snapshots can be included in the candidate action set; when topological ambiguity is concentrated in certain switches, branches, or local connection relationships, switch remote signaling verification, local connection relationship verification, or inverter perturbation probing can be included in the candidate action set.

[0046] Subsequently, the comprehensive utility score of each active supplementary test action within the supplementary test action set is determined. The supplementary test action set is then filtered based on the comprehensive utility score to obtain an optimized action set. An action space is constructed, and optimal testing is performed within this space. Data is then collected according to the active supplementary test actions within the optimized action set to obtain new measurement data.

[0047] In one embodiment, determining the comprehensive utility score of each active supplementary test action within the supplementary test action set, and filtering the supplementary test action set based on the comprehensive utility score to obtain an optimized action set, may include the following sub-steps: S1221. Determine the action scoring parameters for each active supplementary test action within the supplementary test action set, wherein the action scoring parameters include: information gain, topology discrimination, and action cost.

[0048] S1222. Normalize the action scoring parameters to obtain normalized scoring parameters, and use the normalized scoring parameters to calculate the comprehensive utility score of each active supplementary action.

[0049] S1223. Filter the actions in the supplementary action set according to the value of the comprehensive utility score to obtain an optimized action set.

[0050] In one embodiment, after obtaining the constructed set of supplementary test actions... Instead of executing all candidate actions, the optimal supplementary action is selected from the candidate set that can minimize state uncertainty, enhance topology differentiation capability, and satisfy action cost constraints, thus obtaining the optimized action set.

[0051] For any candidate action It can calculate the posterior covariance, information gain, topological discrimination, and action cost after the action is executed, and filter the actions of the supplementary action set accordingly to obtain the optimized action set.

[0052] The information gain of each candidate supplementary test action can be calculated from the initial state covariance obtained in the above steps and the posterior covariance after the action is executed. Therefore, the state covariance directly participates in the selection of the optimal supplementary test action.

[0053] The topology discrimination is determined by the candidate topology set and the topology consistency cost analysis results in the aforementioned steps, and is used to measure the ability of a certain supplementary test action to distinguish different candidate topologies or combinations of candidate phases. When the state covariance is large, supplementary test actions that can significantly reduce posterior covariance can be selected first; when the topology ambiguity is high, switch verification or probing actions with higher topology discrimination can be selected first.

[0054] For any candidate action First, the new measurement matrix can be determined based on the new measurement type, measurement location, and measurement accuracy corresponding to the action. and the newly added measurement noise covariance The predicted posterior covariance after performing this action can be calculated as follows: ; in, The state estimation covariance obtained from the above steps before the supplementary measurement, To perform candidate actions based on assumptions The subsequent posterior covariance of the prediction.

[0055] Candidate actions are defined based on the changes in covariance before and after the retest. The information gain can be expressed as follows: ; in, To prevent the covariance matrix from having singularly small positive numbers. The larger the value, the more significant the compression of the state estimation uncertainty after executing the candidate action, and the more suitable the action is for supplementing the observation information needed for state recovery.

[0056] ; The corresponding information gain is defined as: ; That is, action The degree of entropy reduction or uncertainty compression that results.

[0057] At the same time, in order to measure the action The ability to distinguish topological ambiguities is defined as the topological distinguishability: ; in, For action The nominal input or sampling method, Indicating in candidate topology The response matrix below. The larger this value, the more significant the action. The better it can distinguish multiple candidate topologies.

[0058] To evaluate candidate actions Regarding the ability to eliminate topological or phase ambiguities, let the candidate topological-phase combination set obtained from the above steps be: ; in, Indicates the first Candidate topologies This represents the corresponding candidate phase label. The consistency cost is calculated based on the candidate combination. Its credibility weight can be defined as: ; in, This is a positive parameter used to adjust the weight distribution. For candidate actions... Calculate its predicted measurement response under different candidate topology-phase combinations. If candidate action For a normal supplementary test, then It is predicted by the measurement function under the corresponding candidate topology and phase; if the candidate action For inverter perturbation probing, then: ; in, Representing candidate topology-phase combinations The probing response matrix below, This represents the probing perturbation input. Candidate actions are defined accordingly. The topological distinguishability is: ; in, The larger the value, the more significant the difference in predicted response under different candidate topologies or candidate phase combinations, and therefore the more helpful it is in eliminating topological or phase ambiguity.

[0059] To standardize the comparison of different types of candidate supplementary test actions, information gain, topological discrimination, and action cost are normalized: ; ; ; Then define candidate actions. Overall utility score: ; in, , , These are the weighting coefficients for information gain, topological discriminative power, and action cost, respectively. When the state covariance is large and the topological ambiguity is small, it can improve... Prioritize actions that can significantly reduce state uncertainty; when multiple candidate topologies or phase combinations are difficult to distinguish, improve... Prioritize supplementary testing actions with strong topology differentiation capabilities, such as switch remote signaling verification, local connection verification, or inverter perturbation probing.

[0060] Let the cost of the action be... The total budget is The optimal set of supplementary test actions can be solved as follows: ; satisfy: ; in, This is the weighting coefficient. If topological ambiguity needs to be eliminated first, then increase it. If more concern is with reducing state covariance, then improve... .

[0061] For the probing action, the perturbation vector can be further optimized: ; satisfy: ; in, For the perturbation cost weight, The feasible region is defined by inverter capacity, ramp rate, and power quality limits.

[0062] After obtaining the set of proactive supplementary measurement actions, state estimation covariance, candidate topology set, candidate phase set, topology consistency cost, and the budget for this round of supplementary measurement, not all candidate supplementary measurement actions are executed directly. Instead, each candidate action is pre-evaluated. For any candidate supplementary measurement action, the predicted posterior covariance after execution is calculated based on the type of measurement, measurement location, and measurement noise that the action may add. The information gain of the action is obtained from the decrease in covariance before and after the supplementary measurement. The larger the information gain, the better the action can reduce the uncertainty of state estimation such as node voltage, branch power flow, or injected power.

[0063] Simultaneously, based on the multiple candidate topologies or candidate phase combinations obtained from the above steps, the measurement response differences of the supplementary testing action under different candidate topologies are predicted, and the topology discrimination is calculated accordingly. The larger the topology discrimination, the more helpful the action is in distinguishing currently difficult-to-determine switch states, local connection relationships, or user phases. Subsequently, the information gain, topology discrimination, and action cost are normalized, and a comprehensive utility score is constructed. Under the constraints of the supplementary testing budget, communication resources, equipment availability, and probing perturbation, the set of actions with the highest comprehensive utility is selected as the optimal supplementary testing action set. If the number of candidate actions is small, 0-1 optimization or exhaustive search can be used to solve the problem; if the number of candidate actions is large, a greedy selection method based on marginal comprehensive utility can be used, that is, each time the action with the largest current marginal information gain and marginal topology discrimination and the acceptable cost is selected, and the posterior covariance and remaining budget are updated until the budget is exhausted or the benefit of adding new actions is lower than the threshold. For inverter perturbation probing actions, after selecting the probing target, it is necessary to further optimize the active and reactive power amplitudes of the perturbation to maximize the response differences between candidate topologies while meeting inverter capacity, voltage deviation, and power quality constraints. Through the above process, the selection process from the candidate set of supplementary testing actions to the optimal set of supplementary testing actions can be clearly realized.

[0064] Indeed, within the candidate set of proactive supplementary testing actions, the optimal supplementary testing action or the optimal set of supplementary testing actions is selected based on the expected information gain, topology distinguishability, and action cost of each action, combined with communication budget, disturbance constraints, and equipment availability constraints.

[0065] In one embodiment, filtering the actions of the supplementary action set based on the value of the comprehensive utility score to obtain an optimized action set may include the following sub-steps: S1231. Call the preset filtering algorithm to filter active supplementary testing actions that meet the preset constraints from the supplementary testing action set according to the value of the comprehensive utility score, and use the active supplementary testing actions that meet the preset constraints to construct an optimized action set. The preset constraints include: supplementary test budget constraints, communication resource constraints, equipment availability constraints, and disturbance constraints. The preset screening algorithms include: 0-1 optimization algorithm, exhaustive search algorithm, or greedy selection algorithm.

[0066] In the actual solution process, the following steps can be used to select the optimal set of actions for the best supplementary test actions, as follows: The first step is to obtain the set of active supplementary testing actions based on the steps described above. Eliminate candidate actions that are currently unavailable due to communication issues, uncontrollable equipment, unacceptable measurement quality, or infeasible probing constraints. The second step is to process each remaining candidate action. Calculate its newly added measurement matrix , New measurement noise covariance and the predicted posterior covariance after execution ; The third step is to calculate the information gain of the candidate actions based on the changes in covariance before and after the retest. This is used to evaluate the ability of the action to reduce state uncertainty; The fourth step involves predicting the measurement responses of candidate actions under different topologies or phase combinations based on the candidate topology-phase combination set, and calculating the topology discrimination. ; The fifth step is to normalize the information gain, topological discrimination, and action cost, and then calculate the overall utility score. ; Step 6: Budget for supplementary testing Under constraints, greedy methods such as 0-1 optimization, exhaustive search, or sorting by marginal utility are used to determine the optimal solution from the given conditions. Select the optimal set of supplementary test actions ; Step 7: For the selected inverter perturbation probing action, further optimize its active and reactive perturbation vectors to maximize topology distinguishability and information gain while meeting the constraints of inverter capacity, voltage deviation, power quality and perturbation amplitude. Step 8: Obtain the optimal set of supplementary test actions. The data is sent to the corresponding smart meters, feeder terminals, μPMUs, switch terminals, or inverter control terminals for execution, and the newly added observation results are input into the subsequent extended measurement fusion and state-topology-phase joint update steps.

[0067] A comprehensive credibility score is defined, and combined with the above-mentioned initial estimation residual, state estimation covariance, node uncertainty index, topological ambiguity, and comprehensive credibility score, it forms the basis for the active supplementary testing triggering and testing selection of this invention.

[0068] Specifically, the initial estimation residual is used to determine whether the existing measurements are consistent with the current state estimation and the prior topology. When the residual amplitude exceeds the preset threshold, or when the residual is concentrated in a certain local feeder, switch neighborhood, transformer area or phase area, the area is marked as a suspected state abnormality area or a suspected topology abnormality area.

[0069] State estimation covariance and node uncertainty indices are used to measure the degree of uncertainty of the state recovery results of each node or branch; when the uncertainty of a node or local area exceeds a preset threshold, it is designated as a priority area for supplementary measurement.

[0070] Topological ambiguity is used to determine whether the existing measurements are sufficient to distinguish multiple candidate topologies or candidate phase combinations. When the consistency cost interval between the best candidate and the second-best candidate is small, it indicates that the current measurements are not good at distinguishing topologies or phases, and the supplementary measurement action that can distinguish candidate topologies or candidate phases will be selected first.

[0071] in, As weight, It is a very small positive number. The lower the value, the more necessary it is to trigger proactive retesting.

[0072] S13. Construct an extended measurement dataset using the initial measurement data and the newly added measurement data, and calculate the real-time evaluation parameters of the distribution network based on the extended measurement dataset, wherein the real-time evaluation parameters include: real-time residual and real-time state covariance.

[0073] In one embodiment, an extended measurement dataset can be constructed by combining newly added measurement data. Then, real-time evaluation parameters of the distribution network can be calculated based on the extended measurement dataset, wherein the real-time evaluation parameters include: real-time residuals and real-time state covariance.

[0074] Specifically, the real-time residuals and real-time state covariance can be calculated using an extended measurement dataset, referring to the methods described above for initial residuals and initial state covariance.

[0075] In one embodiment, the step of constructing an extended measurement dataset using the initial measurement data and the newly added measurement data, and calculating real-time evaluation parameters of the distribution network based on the extended measurement dataset, may include the following sub-steps: S131. Combine the newly added measurement data and the newly added measurement data to obtain an extended measurement dataset, and determine the extended measurement covariance matrix of the extended measurement dataset.

[0076] S132. Solve the joint problem using the extended measurement covariance matrix to obtain the update parameters, wherein the update parameters include the update state, update topology, and update phase label.

[0077] S133. Calculate the real-time residual and the real-time state covariance using the updated parameters.

[0078] In one embodiment, after the active supplementary measurement is completed, the newly added measurement data and the newly added measurement data can be combined to obtain an extended measurement dataset, which can be represented by the following formula: ; The extended measurement covariance matrix corresponding to the extended measurement dataset is: Then, the joint update problem is solved to obtain the update parameters, which include the update state, update topology, and update phase label.

[0079] Specifically, the joint update problem can be solved as follows: ; in, This is the initial estimate before the supplementary measurement. , , These are the updated status, updated topology, and updated phase labels after the supplementary test.

[0080] The updated parameters are then used to calculate the real-time residuals and real-time state covariance. Specifically, the updated real-time residuals and real-time state covariance are shown in the following equations: ; .

[0081] S14. Calculate the real-time reliability based on the real-time evaluation parameters, and perform operation control processing on the distribution network based on the real-time reliability.

[0082] Next, the real-time reliability can be calculated based on the real-time evaluation parameters, and the real-time state corresponding to the real-time state covariance can be determined based on the real-time reliability to see if it matches the real-time state of the distribution network. If they match, operation and control processing is performed. Otherwise, if they do not match, the evaluation can be performed again.

[0083] In one embodiment, the step of calculating real-time reliability based on the real-time evaluation parameters and performing operation control processing on the distribution network based on the real-time reliability may include the following sub-steps: S141. Calculate the real-time reliability using the extended measurement covariance matrix, the real-time residual, and the real-time state covariance.

[0084] S142. If the real-time reliability, the real-time residual, the real-time state covariance, and the initial topology ambiguity all satisfy the corresponding control conditions, then the operating state of the distribution network will be controlled to the topology state corresponding to the updated topology.

[0085] S143. If any one of the real-time reliability, the real-time residual, the real-time state covariance, and the initial topological ambiguity does not meet the corresponding control conditions, then the operation of collecting new measurement data according to the active supplementary measurement action set based on the supplementary measurement action set is re-executed.

[0086] In one embodiment, the real-time reliability can be expressed as follows: .

[0087] After the supplementary testing and joint update are completed, the real-time residual, real-time state covariance, topological ambiguity, and comprehensive credibility score are recalculated and used as the basis for result release or conservative mode switching.

[0088] If the real-time reliability, real-time residual, real-time state covariance, and initial topology ambiguity all meet the corresponding control conditions, then the operating state of the distribution network will be controlled to the topology state corresponding to the updated topology.

[0089] Conversely, if any of the real-time reliability, real-time residual, real-time state covariance, and initial topological ambiguity does not meet the corresponding control conditions, the operation of collecting new measurement data based on the active supplementary measurement action set will be re-executed.

[0090] In practice, if the updated real-time residual decreases, the state covariance shrinks, the topological ambiguity decreases, and the real-time reliability reaches the release threshold, the operating status of the distribution network will be updated according to the updated state and topological results. If the above indicators still do not meet the requirements, the network will continue to be tested or enter a conservative operation mode, and the operation of collecting new measurement data based on the active testing action set will be re-executed.

[0091] Specifically, the release threshold can be defined as follows: in, For indicator functions, As a credibility threshold, The upper limit of the allowed consistency cost.

[0092] when When the updated status and topology results are released to the self-healing, voltage regulation, dynamic running envelope, or flexible scheduling modules; when When this happens, it enters conservative mode and adopts the shrunk conservative operating boundary: ; ; in, For nominal operating boundaries, As a conservative boundary when credibility is insufficient, This is the scaling factor. This mechanism allows "estimated confidence level" to be directly translated into "control level of permission".

[0093] This invention breaks through the traditional perception framework of fixed sensors and fixed measurement sets. By automatically determining "when to perform supplementary measurements and which measurement points to supplement" through residuals, covariance, and topological ambiguity, it significantly reduces state estimation errors under sparse measurements. Moreover, it simultaneously identifies topological defects during state estimation, eliminates topological ambiguity through proactive supplementary measurements, and improves perception accuracy bidirectionally, adapting to scenarios with frequent topological changes in distribution areas. Inverter probing is transformed from an independent identification tool into an optional supplementary measurement action. Disturbance benefits are evaluated through information gain and topological discrimination, and it is only activated when topological ambiguity is severe, avoiding power quality impacts and communication resource waste caused by indiscriminate disturbances. A new reliability-based release mechanism is subsequently added, which does not simply output state values ​​but quantifies the reliability of the estimation results, directly mapping them to the operating boundaries of distribution network equipment. When reliability is insufficient, the control range is automatically tightened, avoiding scheduling errors caused by perception distortion from the source, facilitating on-site engineering implementation.

[0094] In this embodiment, the present invention provides an operation control method for a distribution network, the advantages of which are as follows: The present invention can acquire initial measurement data of the distribution network and calculate the state assessment parameters of the distribution network based on the initial measurement data; construct a set of supplementary measurement actions containing multiple active supplementary measurement actions according to the values ​​of the state assessment parameters, and collect new measurement data according to the active supplementary measurement actions of the supplementary measurement action set; construct an extended measurement dataset using the new measurement data and calculate the real-time assessment parameters of the distribution network based on the extended measurement dataset; calculate the real-time reliability based on the real-time assessment parameters, and perform operation control processing on the distribution network based on the real-time reliability. The present invention can construct supplementary measurement actions based on sparsely collected measurement data and then perform supplementary measurements, combining the two sets of data for control, avoiding errors in state assessment due to data loss, thereby improving the accuracy of distribution network state assessment and control.

[0095] This invention also provides an operation control device for a power distribution network, see [link to relevant documentation]. Figure 2 The diagram shows a schematic diagram of the operation control device for a power distribution network provided in an embodiment of the present invention.

[0096] As an example, the operation control device of the power distribution network may include: The acquisition module 201 is used to acquire initial measurement data of the distribution network and calculate the state assessment parameters of the distribution network based on the initial measurement data. The initial assessment parameters include: initial residual, initial state covariance and initial topological ambiguity. The supplementary measurement module 202 is used to construct a set of supplementary measurement actions containing multiple active supplementary measurement actions based on the values ​​of the state evaluation parameters, and to collect new measurement data based on the active supplementary measurement actions in the set of supplementary measurement actions. Evaluation module 203 is used to construct an extended measurement dataset using the initial measurement data and the newly added measurement data, and to calculate real-time evaluation parameters of the distribution network based on the extended measurement dataset, wherein the real-time evaluation parameters include: real-time residuals and real-time state covariance; The control module 204 is used to calculate the real-time reliability based on the real-time evaluation parameters, and to perform operation control processing on the distribution network based on the real-time reliability.

[0097] Optionally, acquiring initial measurement data of the distribution network and calculating the state assessment parameters of the distribution network based on the initial measurement data includes: Obtain node parameters and initial measurement data of distribution network nodes, and construct the state vector of the distribution network based on the node parameters, wherein the node parameters include: node voltage parameters, phase angle state, active power state and reactive power state; An initial measurement vector is constructed using the state vector and the initial measurement data, and the initial state recovery parameters are defined using the initial measurement vector. The initial residual, initial state covariance, and initial topological ambiguity are calculated based on the initial state recovery parameters to obtain the state assessment parameters of the distribution network.

[0098] Optionally, the step of constructing a set of supplementary measurement actions containing multiple active supplementary measurement actions based on the values ​​of the state evaluation parameters, and collecting new measurement data based on the active supplementary measurement actions of the set of supplementary measurement actions, includes: Based on the numerical values ​​of the state evaluation parameters, multiple active supplementary testing actions are defined, and a supplementary testing action set is constructed using the multiple active supplementary testing actions. Determine the comprehensive utility score of each active supplementary test action within the supplementary test action set, and filter the supplementary test action set based on the comprehensive utility score to obtain an optimized action set; Data is collected according to the active supplementary measurement actions within the optimized action set to obtain new measurement data.

[0099] Optionally, determining the comprehensive utility score of each active supplementary test action within the supplementary test action set, and filtering the supplementary test action set based on the comprehensive utility score to obtain an optimized action set, includes: Determine the action scoring parameters for each active supplementary test action within the supplementary test action set, wherein the action scoring parameters include: information gain, topology discrimination, and action cost. The action scoring parameters are normalized to obtain normalized scoring parameters, and the comprehensive utility score of each active retest action is calculated using the normalized scoring parameters. The actions in the supplementary action set are filtered based on the comprehensive utility score to obtain an optimized action set.

[0100] Optionally, filtering the actions in the supplementary action set based on the value of the comprehensive utility score to obtain an optimized action set includes: A preset filtering algorithm is invoked to filter active supplementary testing actions that meet preset constraints from the supplementary testing action set based on the value of the comprehensive utility score, and an optimized action set is constructed using the active supplementary testing actions that meet the preset constraints. The preset constraints include: supplementary test budget constraints, communication resource constraints, equipment availability constraints, and disturbance constraints. The preset screening algorithms include: 0-1 optimization algorithm, exhaustive search algorithm, or greedy selection algorithm.

[0101] Optionally, the step of constructing an extended measurement dataset using the initial measurement data and the newly added measurement data, and calculating real-time evaluation parameters of the distribution network based on the extended measurement dataset, includes: The newly added measurement data and the newly added measurement data are combined to obtain an extended measurement dataset, and the extended measurement covariance matrix of the extended measurement dataset is determined. The joint problem is solved using the extended measurement covariance matrix to obtain updated parameters, which include updated state, updated topology, and updated phase label. The real-time residuals and real-time state covariance are calculated using the updated parameters.

[0102] Optionally, the step of calculating real-time reliability based on the real-time evaluation parameters and performing operation control processing on the distribution network based on the real-time reliability includes: Real-time reliability is calculated using the extended measurement covariance matrix, the real-time residual, and the real-time state covariance. If the real-time reliability, the real-time residual, the real-time state covariance, and the initial topological ambiguity all satisfy the corresponding control conditions, then the operating state of the distribution network will be controlled to the topological state corresponding to the updated topology. If any of the real-time reliability, real-time residual, real-time state covariance, and initial topological ambiguity does not meet the corresponding control conditions, then the operation of collecting new measurement data based on the active supplementary measurement action set according to the supplementary measurement action set will be re-executed.

[0103] Those skilled in the art will understand that, for ease of description and brevity, the specific working process of the device described above can be referred to the corresponding process in the foregoing method embodiments, and will not be repeated here.

[0104] Furthermore, this application also provides an electronic device, including: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the power distribution network operation control method as described in the above embodiments.

[0105] Furthermore, embodiments of this application also provide a computer-readable storage medium storing a computer-executable program, the computer-executable program being used to cause a computer to execute the power distribution network operation control method as described in the above embodiments.

[0106] In the description of the embodiments of the present invention, it should be noted that the terms "above," "below," etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing the embodiments of the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the present invention. When an element such as a layer, region, or substrate is referred to as being "above" or "on top of" another element, it may be directly on the other element, or there may be an intermediate element. Conversely, when an element is referred to as being "directly on" or "above" another element, there is no intermediate element. It should also be understood that when an element is referred to as being "below" or "under" another element, it may be directly below or under the other element, or there may be an intermediate element. Conversely, when an element is referred to as being "directly below" or "under" another element, there is no intermediate element. Unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to fixed connections, detachable connections, or integral connections; they can refer to mechanical connections or electrical connections; they can refer to direct connections or indirect connections through an intermediate medium; and they can refer to the internal connection between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0107] Those skilled in the art will understand that embodiments of this application may also include computer program products. Therefore, this application may take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this application may take the form of a computer program product embodied on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0108] This application is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), devices, and computer program products according to embodiments of this application. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart... Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.

[0109] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.

[0110] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.

[0111] The above description is only a preferred embodiment of the present invention. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the technical principles of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.

Claims

1. A method for operation control of a power distribution network, characterized in that, The method includes: Acquire initial measurement data of the distribution network, and calculate the state assessment parameters of the distribution network based on the initial measurement data, wherein the initial assessment parameters include: initial residual, initial state covariance and initial topological ambiguity. Based on the values ​​of the state evaluation parameters, a set of supplementary measurement actions containing multiple active supplementary measurement actions is constructed, and new measurement data is collected based on the active supplementary measurement actions in the set of supplementary measurement actions. An extended measurement dataset is constructed using the initial measurement data and the newly added measurement data, and real-time evaluation parameters of the distribution network are calculated based on the extended measurement dataset. The real-time evaluation parameters include: real-time residuals and real-time state covariance. The real-time reliability is calculated based on the real-time evaluation parameters, and the distribution network is then subjected to operation control processing based on the real-time reliability.

2. The operation control method for a power distribution network according to claim 1, characterized in that, The process of acquiring initial measurement data of the distribution network and calculating the state assessment parameters of the distribution network based on the initial measurement data includes: Obtain node parameters and initial measurement data of distribution network nodes, and construct the state vector of the distribution network based on the node parameters, wherein the node parameters include: node voltage parameters, phase angle state, active power state and reactive power state; An initial measurement vector is constructed using the state vector and the initial measurement data, and the initial state recovery parameters are defined using the initial measurement vector. The initial residual, initial state covariance, and initial topological ambiguity are calculated based on the initial state recovery parameters to obtain the state assessment parameters of the distribution network.

3. The operation control method for a power distribution network according to claim 2, characterized in that, The step of constructing a set of supplementary measurement actions containing multiple active supplementary measurement actions based on the values ​​of the state evaluation parameters, and collecting new measurement data based on the active supplementary measurement actions of the set of supplementary measurement actions, includes: Based on the numerical values ​​of the state evaluation parameters, multiple active supplementary testing actions are defined, and a set of supplementary testing actions is constructed using the multiple active supplementary testing actions. Determine the comprehensive utility score of each active supplementary test action within the supplementary test action set, and filter the supplementary test action set based on the comprehensive utility score to obtain an optimized action set; Data is collected according to the active supplementary measurement actions within the optimized action set to obtain new measurement data.

4. The operation control method for a power distribution network according to claim 3, characterized in that, The process involves determining the comprehensive utility score of each active supplementary test action within the supplementary test action set, filtering the supplementary test action set based on the comprehensive utility score to obtain an optimized action set, including: Determine the action scoring parameters for each active supplementary test action within the supplementary test action set, wherein the action scoring parameters include: information gain, topology discrimination, and action cost. The action scoring parameters are normalized to obtain normalized scoring parameters, and the comprehensive utility score of each active retest action is calculated using the normalized scoring parameters. The actions in the supplementary action set are filtered based on the comprehensive utility score to obtain an optimized action set.

5. The operation control method for a power distribution network according to claim 4, characterized in that, The step of filtering the actions in the retest action set based on the comprehensive utility score to obtain an optimized action set includes: A preset filtering algorithm is invoked to filter active supplementary testing actions that meet preset constraints from the supplementary testing action set based on the value of the comprehensive utility score, and an optimized action set is constructed using the active supplementary testing actions that meet the preset constraints. The preset constraints include: supplementary test budget constraints, communication resource constraints, equipment availability constraints, and disturbance constraints. The preset screening algorithms include: 0-1 optimization algorithm, exhaustive search algorithm, or greedy selection algorithm.

6. The operation control method for a power distribution network according to any one of claims 1-5, characterized in that, The step of constructing an extended measurement dataset using the initial measurement data and the newly added measurement data, and calculating real-time evaluation parameters of the distribution network based on the extended measurement dataset, includes: The newly added measurement data and the newly added measurement data are combined to obtain an extended measurement dataset, and the extended measurement covariance matrix of the extended measurement dataset is determined. The joint problem is solved using the extended measurement covariance matrix to obtain updated parameters, which include updated state, updated topology, and updated phase label. The real-time residuals and real-time state covariance are calculated using the updated parameters.

7. The operation control method for a power distribution network according to claim 6, characterized in that, The step of calculating real-time reliability based on the real-time evaluation parameters and performing operation control processing on the distribution network based on the real-time reliability includes: Real-time reliability is calculated using the extended measurement covariance matrix, the real-time residual, and the real-time state covariance. If the real-time reliability, the real-time residual, the real-time state covariance, and the initial topological ambiguity all satisfy the corresponding control conditions, then the operating state of the distribution network will be controlled to the topological state corresponding to the updated topology. If any of the real-time reliability, real-time residual, real-time state covariance, and initial topological ambiguity does not meet the corresponding control conditions, then the operation of collecting new measurement data based on the active supplementary measurement action set according to the supplementary measurement action set will be re-executed.

8. A power distribution network operation control device, characterized in that, The device includes: The acquisition module is used to acquire initial measurement data of the distribution network and calculate the state assessment parameters of the distribution network based on the initial measurement data. The initial assessment parameters include: initial residual, initial state covariance and initial topological ambiguity. The supplementary measurement module is used to construct a set of supplementary measurement actions containing multiple active supplementary measurement actions based on the values ​​of the state evaluation parameters, and to collect new measurement data based on the active supplementary measurement actions in the set of supplementary measurement actions. The evaluation module is used to construct an extended measurement dataset using the initial measurement data and the newly added measurement data, and to calculate the real-time evaluation parameters of the distribution network based on the extended measurement dataset. The real-time evaluation parameters include: real-time residuals and real-time state covariance. The control module is used to calculate the real-time reliability based on the real-time evaluation parameters, and to perform operation control processing on the distribution network based on the real-time reliability.

9. An electronic device, comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, when the processor executes the program, it implements the operation control method for a power distribution network as described in any one of claims 1-7.