A method, device, equipment, and medium for coordinated scheduling of pumped storage and energy storage based on operating condition judgment.
By identifying the operating status of pumped storage and electrochemical energy storage devices, calculating available capacity and call permissions, and constructing an optimized scheduling model, the problem of equipment status not participating in scheduling in existing technologies is solved, and efficient coordinated scheduling and power balance of the power grid are realized.
Patent Information
- Application Number
- CN202611457046.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-18
- Publication Date
- 2026-11-17
AI Technical Summary
In the current regional power grid day-ahead dispatch, the operating status of pumped storage and electrochemical energy storage equipment is not included in the differentiated calculation of available capacity, the calling authority is not adjusted according to the calling scenario, and the optimized dispatch model fails to effectively consider the real-time operating status of the equipment, resulting in a mismatch between the dispatch results and the actual operating status.
By obtaining the day-ahead pre-clearance plans of pumped storage and electrochemical energy storage equipment in various regions, identifying the operating status of each time period, calculating the available capacity and call permissions under different operating conditions, constructing an optimized scheduling model with the goal of minimizing the power shortage of the entire network, and solving for the call power and operating condition switching plan of the equipment.
It has achieved coordinated scheduling of pumped storage and energy storage, and the scheduling results correspond to the real-time operating status of the equipment, which optimizes the power balance and resource utilization of the power grid and reduces the power shortage.
Smart Images

Figure CN123121847A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of power dispatching technology, and in particular to a method, device, equipment and medium for coordinated dispatching of pumped storage and energy storage based on operating condition judgment. Background Technology
[0002] With the deepening of the construction of new power systems, the installed capacity of new energy sources such as wind power and photovoltaics continues to increase. The randomness, intermittency, and volatility of their power output pose severe challenges to the safe and stable operation of the power grid. Pumped storage and electrochemical energy storage, as important flexible regulation resources, play an increasingly important role in smoothing out new energy fluctuations, alleviating grid peak-shaving pressure, and ensuring power supply security. In the day-ahead dispatching of regional power grids, how to coordinate and optimize multiple types of resources such as pumped storage and electrochemical energy storage, and achieve efficient cross-regional mutual assistance through interconnection lines, has become a key issue in ensuring the safe and stable operation of the power grid.
[0003] In existing regional power grid day-ahead dispatching, the pre-clearing plans for pumped storage and electrochemical energy storage devices are typically obtained. These two types of resources are then treated as available capacity, and the available capacity is calculated based on the difference between rated power and pre-clearing power. A unified dispatching rule is then applied for dispatching. Regarding the optimization dispatching model, existing schemes generally aim to minimize the overall power shortage. An optimization model is constructed by combining power balance constraints and tie-line transmission constraints to solve for the dispatching power and dispatching plan for each device.
[0004] In this scheme, the operating conditions of pumped storage and electrochemical energy storage devices at different times are generally not included in the differentiated calculation of available capacity, and the access permissions are not adjusted according to changes in the access scenario. The optimized scheduling model mainly focuses on power balance and transmission security constraints. Existing technologies cannot achieve coordinated scheduling of pumped storage and energy storage based on operating condition discrimination. Summary of the Invention
[0005] This application provides a method, device, equipment, and medium for coordinated scheduling of pumped storage and energy storage based on operating condition judgment, which can realize coordinated scheduling of pumped storage and energy storage based on operating condition judgment.
[0006] To achieve the above objectives, this application adopts the following technical solution: Firstly, this application provides a method for coordinated scheduling of pumped storage and energy storage based on operating condition discrimination, including: Obtain the first-day advance clearance plan for pumped storage equipment in each region, and the second-day advance clearance plan for electrochemical energy storage equipment in each region; Based on the pre-clearance plan of the first day, the first real-time operating status of each pumped storage device in each time period is identified. The first real-time operating status includes power generation, pumping and shutdown. Based on the pre-clearance plan of the second day, the second real-time operating status of each electrochemical energy storage device in each time period is identified. The second real-time operating status includes discharge, charging and quiescent. Calculate the first available capacity of each pumped storage device under power generation, pumping and shutdown conditions in each time period; calculate the second available capacity of each electrochemical energy storage device under discharge, charging and stationary conditions in each time period. Determine the current dispatch scenario based on the power shortage situation in each region; Based on the current calling scenario, determine the first calling authority of each pumped storage device under each operating condition, and determine the second calling authority of each electrochemical energy storage device under each operating condition. With the goal of minimizing the power shortage across the entire network, an optimized scheduling model is constructed based on the first available capacity, the first call authority, the second available capacity, and the second call authority. Solving the optimized scheduling model yields the power consumption and operating condition switching plans for each pumped storage and electrochemical energy storage device.
[0007] Optionally, the first pre-clearance plan includes power generation and pumping power, and the step of identifying the first real-time operating status of each pumped storage unit in each time period according to the first pre-clearance plan includes: If the power generation of the pumped storage equipment is greater than zero, the pumped storage equipment is determined to be in power generation mode; if the pumping power of the pumped storage equipment is greater than zero, the pumped storage equipment is determined to be in pumping mode; if both the power generation and pumping power of the pumped storage equipment are zero, the pumped storage equipment is determined to be in shutdown mode. The second pre-clearance plan includes discharge power and charging power. The step of identifying the second real-time operating status of each electrochemical energy storage device in each time period according to the second pre-clearance plan includes: If the discharge power of the electrochemical energy storage device is greater than zero, the electrochemical energy storage device is determined to be in a discharge state; if the charging power of the electrochemical energy storage device is greater than zero, the electrochemical energy storage device is determined to be in a charging state; if both the discharge power and the charging power of the electrochemical energy storage device are zero, the electrochemical energy storage device is determined to be in a stationary state.
[0008] Optionally, the step of calculating the first available capacity of each pumped storage unit under power generation, pumping, and shutdown conditions at different time periods includes: When the pumped storage equipment is in power generation mode, the first available capacity is the first rated power minus the power generation; when the pumped storage equipment is in pumping mode, the first available capacity is the pumping power; when the pumped storage equipment is in shutdown mode, the first available capacity is the first rated power. The calculation of the second available capacity of each electrochemical energy storage device under discharge, charging, and idle conditions at different time periods includes: When the electrochemical energy storage device is in discharge mode, the second available capacity is the second rated power minus the discharge power; when the electrochemical energy storage device is in charging mode, the second available capacity is the charging power; when the electrochemical energy storage device is in quiescent mode, the second available capacity is the second rated power.
[0009] Optionally, the current invocation scenario includes local replenishment scenarios and cross-regional mutual aid scenarios. The step of determining the first invocation permission of each pumped storage device under each operating condition, and determining the second invocation permission of each electrochemical energy storage device under each operating condition, based on the current invocation scenario, includes: When the current invocation scenario is a local fill scenario or a cross-regional mutual assistance scenario, the first invocation permission for the pumped storage equipment in power generation mode is "allow invocation," and the first invocation power meets the requirements. The first call permission for pumped storage equipment in shutdown condition is "allowed," and the first call power meets the following requirements. ; When the current calling scenario is a local replenishment scenario or a cross-regional mutual assistance scenario, the second calling permission of the electrochemical energy storage device in the discharge state is allowed, and the second calling power meets the requirements. The second call permission for electrochemical energy storage devices in a static operating state is allowed, and the second call power meets the following requirements. ; When the current scenario is a local fill scenario, the first calling permission for the pumped storage equipment in pumping mode is "allowed," and the first calling power meets the requirements. , Set 1 to release capacity by stopping pumping; the second call permission of the electrochemical energy storage device in charging condition is allowed, and the second call power meets the following requirements. , Set to 1 to release capacity by stopping charging; When the current calling scenario is a cross-regional mutual assistance scenario, the first calling permission of the pumped storage equipment in pumping operation is not allowed, and the first calling power meets the requirements. , Setting the power to 0, the first call power is constrained to zero; the second call permission for electrochemical energy storage devices in charging mode is not allowed, and the second call power satisfies... , Setting it to 0, the power of the second call is constrained to zero; in, This is the initial power output for pumped storage hydroelectric power generation. This is the second power draw for electrochemical energy storage devices. For the first rated power, For the second rated power, For power generation, This refers to the pumping power. For discharge power, For charging power, For the power generation operating condition, there are two state variables. For the pumping operation, there are two state variables. For the shutdown condition, a binary state variable; For the discharge condition, there are two state variables. For charging conditions, there are two state variables. For static operating conditions, there are two state variables.
[0010] Optionally, the optimized scheduling model includes power ramping constraints, energy conversion efficiency constraints, minimum operating condition duration constraints, and operating condition transition indication constraints; The expression for the power ramp constraint is:
[0011] in, For device type exist The power generation or discharge power at any given moment. For device type exist Power consumption at any given time For device type Maximum power ramp rate; The expression for the energy conversion efficiency constraint is:
[0012]
[0013] in, For device type exist State of charge at time t, For device type exist State of charge at time t, For device type The minimum state of charge, For device type Maximum state of charge, For device type Charging efficiency, For device type exist The pumping power or charging power at any given time. For time intervals, For device type The discharge efficiency; The expression for the minimum operating condition duration constraint is:
[0014]
[0015] in, For device type exist A binary state variable that is constantly in either power generation or power discharge mode. For device type exist A binary state variable that is constantly in either power generation or power discharge mode. Indicates device type exist A binary state variable that is constantly in either power generation or power discharge mode. For device type exist A binary state variable that is constantly in pumping or charging mode. For device type exist A binary state variable that is constantly in pumping or charging mode. For device type exist A binary state variable that is constantly in pumping or charging mode. This refers to the shortest duration of either the power generation or discharge operation. This refers to the shortest duration of either pumping or charging operation. This is the starting time period when the operating condition transition occurs; for The following period; The expression for the operating condition transition indication constraint is:
[0016]
[0017]
[0018] in, This is a variable indicating the change of operating conditions; a value of 1 indicates the equipment type. Device e in Operating condition changes occur constantly; a value of 0 indicates that no operating condition change has occurred. For device type exist A binary state variable that is always in a stopped or stationary state. Indicates device type exist A binary state variable that is always in a stopped or stationary state.
[0019] Optionally, the method further includes: Monitor the reserve margin indicators and renewable energy consumption pressure indicators of the entire network; Based on the aforementioned reserve margin indicators, reserve thresholds, new energy consumption pressure indicators, and consumption thresholds, the operating scenarios are divided into supply guarantee scenarios, consumption scenarios, or conventional scenarios. Adjust the priority of pumped storage and electrochemical energy storage equipment based on the supply guarantee scenario, consumption scenario, or normal scenario.
[0020] Optionally, the objective function of the optimized scheduling model includes a working condition transition penalty term, which is determined based on the working condition transition indicator variable, the working condition transition cost coefficient, and the scenario adaptive weight coefficient. Specifically, in the supply guarantee scenario, the scenario adaptive weight coefficient takes a first value; in the consumption scenario, the scenario adaptive weight coefficient takes a second value; and in the normal scenario, the scenario adaptive weight coefficient takes a third value, wherein the third value is greater than or equal to the first value and less than or equal to the second value.
[0021] Secondly, this application provides a pumped-storage and energy storage coordinated dispatching device based on operating condition judgment, comprising: The acquisition module is used to acquire the first-day pre-clearance plan for pumped storage equipment in each region, and the second-day pre-clearance plan for electrochemical energy storage equipment in each region. The processing module is used to identify the first real-time operating status of each pumped storage device in each time period according to the pre-clearing plan of the first day, the first real-time operating status including power generation, pumping, and shutdown; and to identify the second real-time operating status of each electrochemical energy storage device in each time period according to the pre-clearing plan of the second day, the second real-time operating status including discharging, charging, and idle. It calculates the first available capacity of each pumped storage device in each time period under power generation, pumping, and shutdown conditions; calculates the second available capacity of each electrochemical energy storage device in each time period under discharging, charging, and idle conditions; determines the current dispatch scenario based on the power shortage situation in each region; determines the first dispatch permission of each pumped storage device in each operating status and the second dispatch permission of each electrochemical energy storage device in each operating status based on the current dispatch scenario; and constructs an optimized scheduling model based on the first available capacity, first dispatch permission, second available capacity, and second dispatch permission, with the goal of minimizing the power shortage of the entire network. The solution module is used to solve the optimized scheduling model to obtain the call power and operating condition switching plan for each pumped storage device and each electrochemical energy storage device.
[0022] Thirdly, this application provides a computing device, including a memory and a processor; The memory stores one or more computer programs, the one or more computer programs including instructions; when the instructions are executed by the processor, the computing device performs the method as described in any one of the first aspects.
[0023] Fourthly, this application provides a computer-readable storage medium for storing a computer program for performing the method as described in any one of the first aspects.
[0024] As can be seen from the above technical solution, this application has at least the following beneficial effects: This application obtains the first-day pre-clearance plans for pumped-storage hydropower equipment and the second-day pre-clearance plans for electrochemical energy storage equipment in various regions. It identifies the power generation, pumping, and shutdown conditions of each pumped-storage hydropower equipment and the discharge, charging, and idle conditions of each electrochemical energy storage equipment in different time periods. It then calculates the first available capacity of each pumped-storage hydropower equipment under these conditions and the second available capacity under these conditions, thus differentiating the available capacity under different operating conditions. Based on this, it determines the current dispatch scenario according to the power shortage situation in each region and determines the first dispatch authority and second dispatch authority of each pumped-storage hydropower equipment under each operating condition based on the current dispatch scenario, thereby ensuring the dispatch authority... Corresponding to the call scenario, and with the goal of minimizing the power shortage across the entire network, an optimized scheduling model is constructed based on the first available capacity, the first call permission, the second available capacity, and the second call permission. This model solves for the call power and operating condition switching plans of each pumped storage and electrochemical energy storage device. Compared with existing technologies that treat both types of resources as callable capacity, calculate available capacity uniformly based on the difference between rated power and pre-cleared power, adopt unified call rules, and whose optimization models are mainly constrained by power balance and tie-line transmission, this technical solution involves operating condition status in the calculation of available capacity and the determination of call permission. It also includes operating condition status, available capacity, and call permission in the optimized scheduling model, thereby ensuring that the solved call power and operating condition switching plans correspond to the real-time operating condition status of each device. This achieves coordinated scheduling of pumped storage and energy storage based on operating condition status discrimination.
[0025] It should be understood that the descriptions of technical features, technical solutions, beneficial effects, or similar language in this application do not imply that all features and advantages can be achieved in any single embodiment. Rather, it is understood that the description of a feature or beneficial effect means that a specific technical feature, technical solution, or beneficial effect is included in at least one embodiment. Therefore, the descriptions of technical features, technical solutions, or beneficial effects in this specification do not necessarily refer to the same embodiment. Furthermore, the technical features, technical solutions, and beneficial effects described in this embodiment can be combined in any suitable manner. Those skilled in the art will understand that embodiments can be implemented without one or more specific technical features, technical solutions, or beneficial effects of a particular embodiment. In other embodiments, additional technical features and beneficial effects may be identified in specific embodiments that do not embody all embodiments. Attached Figure Description
[0026] Figure 1 A schematic diagram illustrating an application scenario provided in an embodiment of this application; Figure 2A flowchart of a method for coordinated scheduling of pumped storage and energy storage based on operating condition discrimination is provided in an embodiment of this application; Figure 3 A schematic diagram of a pumped-storage and energy storage coordinated scheduling device based on operating condition discrimination provided in this application embodiment; Figure 4 This is a schematic diagram of a computing device provided in an embodiment of this application. Detailed Implementation
[0027] The terms "first," "second," and "third," etc., used in this application specification and accompanying drawings are used to distinguish different objects, not to limit a specific order.
[0028] In the embodiments of this application, the terms "exemplary" or "for example" are used to indicate that something is an example, illustration, or description. Any embodiment or design that is described as "exemplary" or "for example" in the embodiments of this application should not be construed as being more preferred or advantageous than other embodiments or design. Specifically, the use of the terms "exemplary" or "for example" is intended to present the relevant concepts in a specific manner.
[0029] Current solutions treat pumped storage and electrochemical energy storage equipment as a single available capacity, calculating usable capacity based solely on the difference between rated power and pre-cleared power. However, they fail to identify the power generation, pumping, and shutdown conditions of each pumped storage unit at different times based on the pre-clearing plan one day in advance, nor do they identify the discharge, charging, and idle conditions of each electrochemical energy storage unit at different times based on the pre-clearing plan two days in advance. Furthermore, they fail to determine the current dispatch scenario based on the power shortage situation in different regions, nor do they determine the first dispatch authority and second dispatch authority for each pumped storage unit under each operating condition based on the current dispatch scenario. The optimized scheduling model does not incorporate the first available capacity, first dispatch authority, second available capacity, and second dispatch authority; it only constructs the model based on power balance and tie-line transmission constraints. This results in the dispatch power and operating condition transition plans for each pumped storage and electrochemical energy storage unit not corresponding to the real-time operating conditions of the equipment. Therefore, a collaborative scheduling method for pumped storage and energy storage based on operating condition identification is needed.
[0030] In view of this, embodiments of this application provide a method for coordinated scheduling of pumped-storage and energy storage based on operating condition discrimination. This method can be executed by a processing device. The processing device can be a terminal or a server. Terminals include, but are not limited to, smartphones, tablets, laptops, personal digital assistants, or smart wearable devices. Servers can be cloud servers, such as central servers in a central cloud computing cluster or edge servers in an edge cloud computing cluster. Of course, servers can also be servers in a local data center. A local data center refers to a data center directly controlled by the user.
[0031] To address the issues in existing regional power grid day-ahead dispatching where the operating status of pumped storage and electrochemical energy storage devices is not included in available capacity calculations at different times, dispatch permissions are not adjusted according to changes in dispatch scenarios, and the optimized dispatching model is primarily based on power balance constraints and tie-line transmission constraints, leading to a mismatch between dispatched power and operating condition transition plans and the actual operating status of the equipment, this application first obtains the first-day pre-clearance plan for pumped storage devices and the second-day pre-clearance plan for electrochemical energy storage devices in each region; then, based on this, it identifies the power generation, pumping, and shutdown operating conditions of the pumped storage devices, and identifies the electrochemical energy storage devices. The system is designed to handle the discharge, charging, and idle operating conditions. Then, it calculates the first and second available capacities for each operating condition. Next, it determines the current dispatch scenario based on the power shortage in each region, and establishes the first and second dispatch permissions for each operating condition according to the current dispatch scenario. Finally, with the goal of minimizing the overall power shortage, the first available capacity, first dispatch permission, second available capacity, and second dispatch permission are incorporated into the optimization scheduling model to solve for the dispatch power and operating condition conversion plan of each pumped storage and electrochemical energy storage device, ensuring that the scheduling results correspond to the real-time operating conditions of the equipment.
[0032] To make the technical solution of this application clearer and easier to understand, the application scenarios of the technical solution of this application are described below with reference to the accompanying drawings. Figure 1 As shown in the figure, this figure is a schematic diagram of an application scenario provided by an embodiment of this application.
[0033] In this application scenario, the processing device obtains the first-day pre-clearance plan for pumped storage equipment and the second-day pre-clearance plan for electrochemical energy storage equipment from the regional dispatch centers via a communication interface. Based on the first-day pre-clearance plan, the processing device identifies the first real-time operating status of each pumped storage unit in each time period, including power generation, pumping, and shutdown status. Based on the second-day pre-clearance plan, it identifies the second real-time operating status of each electrochemical energy storage unit in each time period, including discharging, charging, and idle status. The processing device calculates the first available capacity of each pumped storage unit under power generation, pumping, and shutdown status in each time period, and calculates the first available capacity of each unit under each power generation, pumping, and shutdown status. The second available capacity of the chemical energy storage equipment under discharge, charging, and idle conditions at different times; the processing equipment determines the current call scenario based on the power shortage situation in each region, and determines the first call authority of each pumped storage device under each operating condition, as well as the second call authority of each electrochemical energy storage device under each operating condition; with the goal of minimizing the power shortage of the entire network, the processing equipment constructs an optimized scheduling model based on the first available capacity, first call authority, second available capacity, and second call authority, and solves the optimized scheduling model to obtain the call power and operating condition conversion plan of each pumped storage device and each electrochemical energy storage device, thereby completing the coordinated scheduling of pumped storage and energy storage based on operating condition judgment.
[0034] To make the technical solution of this application clearer and easier to understand, the following describes a method for coordinated scheduling of pumped storage and energy storage based on operating condition discrimination, using the above application scenarios as an example. Figure 2 As shown, this figure is a flowchart of a method for coordinated scheduling of pumped-storage and energy storage based on operating condition discrimination, provided in an embodiment of this application. In this embodiment, the method includes: S201. The processing equipment obtains the first-day pre-clearance plan for pumped storage equipment in each region, and the second-day pre-clearance plan for electrochemical energy storage equipment in each region.
[0035] The pre-clearance plan for the first day includes power generation and pumping capacity. The pre-clearance plan for the second day includes power discharge and charging capacity.
[0036] The processing equipment obtains the first-day pre-clearance plan for pumped storage equipment and the second-day pre-clearance plan for electrochemical energy storage equipment from the regional dispatch centers via communication interfaces.
[0037] S202. According to the pre-clearance plan of the first day, the processing equipment identifies the first real-time operating status of each pumped storage device in each time period. The first real-time operating status includes power generation, pumping and shutdown. According to the pre-clearance plan of the second day, the processing equipment identifies the second real-time operating status of each electrochemical energy storage device in each time period. The second real-time operating status includes discharge, charging and quiescent.
[0038] Power generation is the power injected into the grid by a pumped-storage hydroelectric device during power generation. Pumping power is the power absorbed from the grid by a pumped-storage hydroelectric device during pumping. Power generation is the operating state of the pumped-storage hydroelectric device when it injects power into the grid. Pumping is the operating state of the pumped-storage hydroelectric device when it absorbs power from the grid. Shutdown is the operating state of the pumped-storage hydroelectric device when it does not participate in power exchange. Power discharge is the power injected into the grid by an electrochemical energy storage device during discharge. Power charging is the power absorbed from the grid by an electrochemical energy storage device during charging. Discharge is the operating state of the electrochemical energy storage device when it injects power into the grid. Charging is the operating state of the electrochemical energy storage device when it absorbs power from the grid. Stagnation is the operating state of the electrochemical energy storage device when it does not participate in power exchange.
[0039] In some embodiments, if the power generation of the pumped storage device is greater than zero, the pumped storage device is determined to be in power generation mode; if the pumping power of the pumped storage device is greater than zero, the pumped storage device is determined to be in pumping mode; if both the power generation and pumping power of the pumped storage device are zero, the pumped storage device is determined to be in shutdown mode. If the discharge power of the electrochemical energy storage device is greater than zero, the electrochemical energy storage device is determined to be in a discharge state; if the charging power of the electrochemical energy storage device is greater than zero, the electrochemical energy storage device is determined to be in a charging state; if both the discharge power and the charging power of the electrochemical energy storage device are zero, the electrochemical energy storage device is determined to be in a stationary state.
[0040] S203. The processing equipment calculates the first available capacity of each pumped storage device under power generation, pumping and shutdown conditions in each time period; and calculates the second available capacity of each electrochemical energy storage device under discharge, charging and quiescent conditions in each time period.
[0041] The first available capacity is the capacity that can be mobilized by the pumped-storage hydropower equipment under power generation, pumping, or shutdown conditions. The first rated power is the maximum power that the pumped-storage hydropower equipment can output under power generation or shutdown conditions. The second available capacity is the capacity that can be mobilized by the electrochemical energy storage equipment under discharging, charging, or resting conditions. The second rated power is the maximum power that the electrochemical energy storage equipment can output under discharging or resting conditions.
[0042] In some embodiments, when the pumped storage device is in power generation mode, the first available capacity is the first rated power minus the power generation; when the pumped storage device is in pumping mode, the first available capacity is the pumping power; when the pumped storage device is in shutdown mode, the first available capacity is the first rated power. When the electrochemical energy storage device is in discharge mode, the second available capacity is the second rated power minus the discharge power; when the electrochemical energy storage device is in charging mode, the second available capacity is the charging power; when the electrochemical energy storage device is in quiescent mode, the second available capacity is the second rated power.
[0043] S204. The processing equipment determines the current call scenario based on the power shortage situation in each region.
[0044] The power shortage situation refers to the degree to which the power supply in each region is less than the power demand in the day-ahead dispatch, including whether a power shortage exists and the capacity of the shortage. The current dispatch scenario is a dispatch scenario determined based on the power shortage situation in each region, including local filling scenarios and cross-regional mutual assistance scenarios.
[0045] Specifically, the processing equipment determines whether a power shortage exists in each region and the shortage capacity based on the comparison between the reserve requirement and the reserve setting for each region. If the reserve requirement for a region is less than the reserve setting, the processing equipment determines that a power shortage exists in that region; if the reserve requirement for a region is greater than or equal to the reserve setting, the processing equipment determines that there is no power shortage in that region. Based on the power shortage situation in each region, the processing equipment determines the current dispatch scenario: when there is a power shortage in the local region, the processing equipment determines the current dispatch scenario as a local power supply scenario; when there is no power shortage in the local region but there are power shortages in other regions, the processing equipment determines the current dispatch scenario as a cross-regional mutual assistance scenario. The processing equipment obtains the current dispatch scenario, which indicates whether the current scheduling is used to fill the power shortage in the local region or to provide power support to other regions.
[0046] In power system dispatching, the reserve capacity available for upward adjustment in a given region during the day-ahead dispatching period is measured. It equals the region's power output plus the power received via tie lines, minus the load. A reserve capacity greater than zero indicates that the region still has available reserve capacity after meeting the load demand; a reserve capacity less than zero indicates that the sum of the region's power output and tie line power reception is insufficient to meet the load demand, i.e., a power shortage exists. The reserve capacity setting is the minimum reserve capacity that should be achieved for a given region, used to determine whether a power shortage exists in that region.
[0047] S205. The processing equipment determines the first calling authority of each pumped storage device under each operating condition based on the current calling scenario, and determines the second calling authority of each electrochemical energy storage device under each operating condition.
[0048] The first access permission determines whether the pumped-storage hydroelectric power station is permitted to be accessed under various operating conditions. The second access permission determines whether the electrochemical energy storage power station is permitted to be accessed under various operating conditions.
[0049] In some embodiments, regardless of whether the current invocation scenario is a local fill scenario or a cross-regional mutual assistance scenario, the first invocation permission of the pumped storage equipment in power generation mode is allowed, and the first invocation power meets the requirements. The first call permission for pumped storage equipment in shutdown condition is "allowed," and the first call power meets the following requirements. ; Regardless of whether the current call scenario is a local replenishment scenario or a cross-regional mutual assistance scenario, the second call permission for electrochemical energy storage devices in discharge mode is allowed, and the second call power meets the requirements. The second call permission for electrochemical energy storage devices in a static operating state is allowed, and the second call power meets the following requirements. ; When the current scenario is a local fill scenario, the first calling permission for the pumped storage equipment in pumping mode is "allowed," and the first calling power meets the requirements. , Set 1 to release capacity by stopping pumping; the second call permission of the electrochemical energy storage device in charging condition is allowed, and the second call power meets the following requirements. , Set to 1 to release capacity by stopping charging; When the current scenario is a cross-regional mutual assistance scenario, the first calling permission for pumped storage equipment in pumping mode is not allowed, and the first calling power meets the requirements. , Setting the power to 0, the first call power is constrained to zero; the second call permission for electrochemical energy storage devices in charging mode is not allowed, and the second call power satisfies... , Setting it to 0, the power of the second call is constrained to zero; in, This is the initial power output for pumped storage hydroelectric power generation. This is the second power draw for electrochemical energy storage devices. For the first rated power, For the second rated power, For power generation, This refers to the pumping power. For discharge power, For charging power, For the power generation operating condition, there are two state variables. For the pumping operation, there are two state variables. For the shutdown condition, a binary state variable; For the discharge condition, there are two state variables. For charging conditions, there are two state variables. For static operating conditions, there are two state variables.
[0050] In some embodiments, This refers to the first available capacity of the pumped storage hydroelectric power plant under power generation conditions. This refers to the initial usable capacity of the pumped storage equipment under pumping conditions. This refers to the first available capacity of the pumped storage equipment when it is in shutdown condition. This represents the second available capacity of the electrochemical energy storage device under discharge conditions. This refers to the second available capacity of the electrochemical energy storage device under charging conditions. This is the second available capacity of the electrochemical energy storage device under quiescent operating conditions.
[0051] The mutually exclusive constraints for the operating conditions of pumped storage equipment are:
[0052] The power and operating condition coupling constraints of pumped storage equipment are:
[0053]
[0054] The mutually exclusive constraints for the operating conditions of electrochemical energy storage devices are:
[0055] The power and operating condition coupling constraints of electrochemical energy storage devices are:
[0056]
[0057] S206. The processing equipment aims to minimize the power shortage of the entire network and constructs an optimized scheduling model based on the first available capacity, the first calling authority, the second available capacity, and the second calling authority.
[0058] Minimizing the overall power shortage means minimizing the sum of the remaining power shortages in each region that cannot be filled even after dispatching.
[0059] The processing equipment aims to minimize the overall power shortage in the power grid. It reads the first available capacity of each pumped-storage hydropower unit in each time period, the first call permission of each pumped-storage hydropower unit under each operating condition, the second available capacity of each electrochemical energy storage unit in each time period, and the second call permission of each electrochemical energy storage unit under each operating condition. These first available capacity, first call permission, second available capacity, and second call permission are used as inputs and constraints to construct an optimized scheduling model. The processing equipment obtains the optimized scheduling model. This optimized scheduling model characterizes how to determine the call power and operating condition switching plan for each pumped-storage hydropower unit and each electrochemical energy storage unit, under the constraints of their operating conditions, available capacity, and call permissions, to minimize the overall power shortage in the power grid.
[0060] The objective function expression for optimizing the scheduling model is:
[0061] in, The objective function value, The gap penalty coefficient, For the region exist The remaining power gap at any given time This is the first call-up cost coefficient for pumped storage equipment. This is the initial power output for pumped storage hydroelectric power generation. This is the second call-up cost coefficient for electrochemical energy storage devices. This is the second power draw for electrochemical energy storage devices. For scene-adaptive weighting coefficients, This is the cost coefficient for changing operating conditions. This is a variable indicating the change of operating conditions; a value of 1 indicates the equipment type. Device e in Operating condition changes occur constantly; a value of 0 indicates that no operating condition change has occurred. , This refers to pumped storage equipment. Indicates electrochemical energy storage devices, This indicates a penalty for changing operating conditions.
[0062] The optimized scheduling model includes power ramping constraints, energy conversion efficiency constraints, minimum operating condition duration constraints, and operating condition transition indication constraints. The expression for the power ramp constraint is:
[0063] in, For device type equipment exist The power generation or discharge power at any given moment. For device type equipment exist Power consumption at any given time For device type equipment Maximum power ramp rate, , This refers to pumped storage equipment. Indicates electrochemical energy storage equipment; The expression for the energy conversion efficiency constraint is:
[0064]
[0065] in, For device type exist State of charge at time t, For device type exist State of charge at time t, For device type The minimum state of charge, For device type Maximum state of charge, For device type Charging efficiency, For device type exist The pumping power or charging power at any given time. For time intervals, For device type The discharge efficiency; The expression for the minimum operating condition duration constraint is:
[0066]
[0067] in, For device type exist A binary state variable that is constantly in either power generation or power discharge mode. For device type exist A binary state variable that is constantly in either power generation or power discharge mode. Indicates device type exist A binary state variable that is constantly in either power generation or power discharge mode. For device type exist A binary state variable that is constantly in pumping or charging mode. For device type exist A binary state variable that is constantly in pumping or charging mode. For device type exist A binary state variable that is constantly in pumping or charging mode. This refers to the shortest duration of either the power generation or discharge operation. This refers to the shortest duration of either pumping or charging operation. This is the starting time period when the operating condition transition occurs; for The following period; The expression for the operating condition transition indication constraint is:
[0068]
[0069]
[0070] in, This is a variable indicating the change of operating conditions; a value of 1 indicates the equipment type. Device e in Operating condition changes occur constantly; a value of 0 indicates that no operating condition change has occurred. For device type exist A binary state variable that is always in a stopped or stationary state. Indicates device type exist A binary state variable that is always in a stopped or stationary state.
[0071] S207. The processing equipment solves the optimization scheduling model to obtain the call power and operating condition conversion plan for each pumped storage device and each electrochemical energy storage device.
[0072] The power to be called up is the power that each pumped storage or electrochemical energy storage device increases or decreases based on the pre-clearance plan. The operating condition switching plan is the arrangement of whether each pumped storage or electrochemical energy storage device will switch operating conditions at different times on the following day, and what kind of operating condition switching will occur.
[0073] The processing equipment calls a mixed-integer linear programming solver to solve the constructed optimal scheduling model. Under the conditions of satisfying power ramp-up constraints, energy conversion efficiency constraints, minimum operating condition duration constraints, operating condition transition indication constraints, and call permission constraints, the objective function is minimized. This yields the first call power for each pumped storage unit in each time period, the first call power for pumping operation, and the first call power for shutdown operation; the second call power for each electrochemical energy storage unit in each time period, the second call power for discharging operation, the second call power for charging operation, and the second call power for idling operation; and the values of binary indicator variables indicating whether each unit undergoes an operating condition transition in each time period. Based on the values of these binary indicator variables, the transition plans for each pumped storage unit between power generation, pumping, and shutdown operations, as well as the transition plans for each electrochemical energy storage unit between discharging, charging, and idling operations, are determined.
[0074] The method also includes: The processing equipment monitors the entire network's reserve margin indicators and new energy consumption pressure indicators; based on the reserve margin indicators, reserve thresholds, new energy consumption pressure indicators, and consumption thresholds, the operating scenarios are divided into supply guarantee scenarios, consumption scenarios, or normal scenarios; based on the supply guarantee scenarios, consumption scenarios, or normal scenarios, the operating priority of pumped storage equipment and electrochemical energy storage equipment is adjusted.
[0075] The reserve margin index reflects the adequacy of the entire network's reserve capacity, and is equal to the sum of the actual reserve levels of all regions minus the required reserve values. The reserve threshold is a preset value used to determine whether the reserve margin is under strain. The renewable energy consumption pressure index reflects the degree of wind and solar curtailment, and is equal to the sum of the predicted wind and solar power output of all regions minus the sum of the actual wind and solar power output. The consumption threshold is a preset value used to determine whether the renewable energy consumption pressure is excessive. The supply guarantee scenario is the operating scenario when the reserve margin index is less than the reserve threshold, indicating a tight reserve situation, requiring priority to ensure power supply. The consumption scenario is the operating scenario when the reserve margin index is greater than or equal to the reserve threshold and the renewable energy consumption pressure index is greater than the consumption threshold, indicating a surge in renewable energy generation, requiring priority to promote consumption. The normal scenario refers to other operating scenarios besides the supply guarantee and consumption scenarios, indicating normal operation. Operating condition call priority refers to the order in which pumped storage and electrochemical energy storage equipment are called up under different operating conditions.
[0076] The processing equipment monitors the entire network's reserve margin and renewable energy consumption pressure indicators. It compares the reserve margin indicators with reserve thresholds and the renewable energy consumption pressure indicators with consumption thresholds. When the reserve margin indicator is less than the reserve threshold, the processing equipment determines the current operating scenario as a supply guarantee scenario; when the reserve margin indicator is greater than or equal to the reserve threshold and the renewable energy consumption pressure indicator is greater than the consumption threshold, the processing equipment determines the current operating scenario as a consumption scenario; when neither of these conditions is met, the processing equipment determines the current operating scenario as a normal scenario.
[0077] The formula for calculating the reserve margin index is:
[0078] in, As a reserve margin indicator; For the region exist Actual reserve level at any given time; For the region exist The standby requirement value at any given time.
[0079] The formula for calculating the pressure index of new energy consumption is:
[0080] in, As a pressure indicator for the consumption of new energy sources; For the region exist Forecasted wind power output at any given time; For the region exist Predicted photovoltaic output at any given time; For the region exist The actual output of wind power at any given moment; For the region exist The actual output of photovoltaic power at any given moment.
[0081] Based on the identified supply guarantee scenario, consumption scenario, or normal scenario, the processing equipment adjusts the operating priority of pumped storage and electrochemical energy storage equipment: When the operating scenario is a supply guarantee scenario, the processing equipment will adjust the priority of calling the operating conditions of pumped storage equipment to power generation mode over shutdown mode, and shutdown mode over pumping mode; and adjust the priority of calling the operating conditions of electrochemical energy storage equipment to discharge mode over static mode, and static mode over charging mode.
[0082] When the operating scenario is a consumption scenario, the processing equipment will adjust the priority of calling the operating conditions of pumped storage equipment to pumping mode over shutdown mode, and shutdown mode over power generation mode; and adjust the priority of calling the operating conditions of electrochemical energy storage equipment to charging mode over stationary mode, and stationary mode over discharging mode.
[0083] When the operating scenario is a normal scenario, the processing equipment will adjust the priority of calling the operating conditions of pumped storage equipment to power generation mode over pumping mode, and pumping mode over shutdown mode; and adjust the priority of calling the operating conditions of electrochemical energy storage equipment to discharge mode over charging mode, and charging mode over stationary mode.
[0084] The processing equipment obtains the operating scenario and the priority of operation conditions. The operating scenario represents the adequacy of the entire network's backup and the pressure on renewable energy consumption, while the priority of operation conditions represents the order in which pumped storage and electrochemical energy storage equipment are preferentially called up under the current operating scenario.
[0085] The objective function of the optimized scheduling model includes a working condition transition penalty term, which is determined based on the working condition transition indicator variable, the working condition transition cost coefficient, and the scenario adaptive weight coefficient. Specifically, in the supply guarantee scenario, the scenario adaptive weight coefficient takes the first value; in the consumption scenario, the scenario adaptive weight coefficient takes the second value; and in the normal scenario, the scenario adaptive weight coefficient takes the third value. The third value is greater than or equal to the first value and less than or equal to the second value.
[0086] The operating condition transition penalty term is a term in the objective function used to suppress frequent operating condition transitions of the equipment. The operating condition transition indicator variable is a binary indicator variable that indicates whether an operating condition transition has occurred at a certain moment; a value of 1 indicates that an operating condition transition has occurred, and a value of 0 indicates that an operating condition transition has not occurred.
[0087] In the supply guarantee scenario, the scenario adaptive weight coefficient is 0.1, which is relatively small and imposes a lighter penalty on the operation mode transition, allowing pumped storage and electrochemical energy storage devices to make necessary operation mode transitions to prioritize power supply. In the consumption scenario, the scenario adaptive weight coefficient is 1.0, which is relatively large and imposes a heavier penalty on the operation mode transition, suppressing frequent operation mode transitions of pumped storage and electrochemical energy storage devices. In the normal scenario, the scenario adaptive weight coefficient is 0.5, which is between the two values and imposes a moderate penalty on the operation mode transition.
[0088] Based on the above description, this application has the following beneficial effects: This application obtains the first-day pre-clearance plans for pumped-storage hydropower equipment and the second-day pre-clearance plans for electrochemical energy storage equipment in various regions. It identifies the power generation, pumping, and shutdown conditions of each pumped-storage hydropower equipment and the discharge, charging, and idle conditions of each electrochemical energy storage equipment in different time periods. It then calculates the first available capacity of each pumped-storage hydropower equipment under these conditions and the second available capacity under these conditions, thus differentiating the available capacity under different operating conditions. Based on this, it determines the current dispatch scenario according to the power shortage situation in each region and determines the first dispatch authority and second dispatch authority of each pumped-storage hydropower equipment under each operating condition based on the current dispatch scenario, thereby ensuring the dispatch authority... Corresponding to the call scenario, and with the goal of minimizing the power shortage across the entire network, an optimized scheduling model is constructed based on the first available capacity, the first call permission, the second available capacity, and the second call permission. This model solves for the call power and operating condition switching plans of each pumped storage and electrochemical energy storage device. Compared with existing technologies that treat both types of resources as callable capacity, calculate available capacity uniformly based on the difference between rated power and pre-cleared power, adopt unified call rules, and whose optimization models are mainly constrained by power balance and tie-line transmission, this technical solution involves operating condition status in the calculation of available capacity and the determination of call permission. It also includes operating condition status, available capacity, and call permission in the optimized scheduling model, thereby ensuring that the solved call power and operating condition switching plans correspond to the real-time operating condition status of each device. This achieves coordinated scheduling of pumped storage and energy storage based on operating condition status discrimination.
[0089] The above text combined Figures 1 to 2 The pumped storage and energy storage coordinated scheduling method based on operating condition discrimination provided in the embodiments of this application has been described in detail. The apparatus and equipment provided in the embodiments of this application will be described below with reference to the accompanying drawings.
[0090] like Figure 3 As shown in the figure, this is a schematic diagram of a pumped-storage and energy storage coordinated scheduling device based on operating condition discrimination provided in an embodiment of this application. The device includes: The acquisition module 301 is used to acquire the first day's pre-clearance plan for pumped storage equipment in each region, and the second day's pre-clearance plan for electrochemical energy storage equipment in each region. Processing module 302 is used to: identify the first real-time operating status of each pumped storage device in each time period according to the first day's pre-clearing plan, the first real-time operating status including power generation, pumping, and shutdown; identify the second real-time operating status of each electrochemical energy storage device in each time period according to the second day's pre-clearing plan, the second real-time operating status including discharging, charging, and idle; calculate the first available capacity of each pumped storage device in each time period under power generation, pumping, and shutdown conditions; calculate the second available capacity of each electrochemical energy storage device in each time period under discharging, charging, and idle conditions; determine the current dispatch scenario based on the power shortage situation in each region; determine the first dispatch permission of each pumped storage device in each operating status and the second dispatch permission of each electrochemical energy storage device in each operating status based on the current dispatch scenario; and construct an optimized scheduling model based on the first available capacity, first dispatch permission, second available capacity, and second dispatch permission, with the goal of minimizing the power shortage of the entire network. The solution module 303 is used to solve the optimization scheduling model to obtain the call power and operating condition conversion plan of each pumped storage device and each electrochemical energy storage device.
[0091] Optionally, the processing module 302 is specifically used to determine that the pumped storage equipment is in power generation mode if the power generation power of the pumped storage equipment is greater than zero; to determine that the pumped storage equipment is in pumping mode if the pumping power of the pumped storage equipment is greater than zero; and to determine that the pumped storage equipment is in shutdown mode if both the power generation power and the pumping power of the pumped storage equipment are zero. If the discharge power of the electrochemical energy storage device is greater than zero, the electrochemical energy storage device is determined to be in a discharge state; if the charging power of the electrochemical energy storage device is greater than zero, the electrochemical energy storage device is determined to be in a charging state; if both the discharge power and the charging power of the electrochemical energy storage device are zero, the electrochemical energy storage device is determined to be in a stationary state.
[0092] Optionally, the processing module 302 is specifically used to: when the pumped storage equipment is in power generation mode, the first available capacity is the first rated power minus the power generation; when the pumped storage equipment is in pumping mode, the first available capacity is the pumping power; when the pumped storage equipment is in shutdown mode, the first available capacity is the first rated power. When the electrochemical energy storage device is in discharge mode, the second available capacity is the second rated power minus the discharge power; when the electrochemical energy storage device is in charging mode, the second available capacity is the charging power; when the electrochemical energy storage device is in quiescent mode, the second available capacity is the second rated power.
[0093] Optionally, processing module 302 is specifically used to ensure that, when the current calling scenario is a local filling scenario or a cross-regional mutual assistance scenario, the first calling permission of the pumped storage equipment in power generation mode is allowed, and the first calling power meets the requirements. , The first available capacity; the first call permission for pumped storage units in shutdown condition is allowed, and the first call power meets the following requirements. ; When the current calling scenario is a local replenishment scenario or a cross-regional mutual assistance scenario, the second calling permission of the electrochemical energy storage device in the discharge state is allowed, and the second calling power meets the requirements. , This is the second available capacity; the second call permission for electrochemical energy storage devices in a quiescent state is allowed, and the second call power meets the following requirements. ; When the current scenario is a local fill scenario, the first calling permission for the pumped storage equipment in pumping mode is "allowed," and the first calling power meets the requirements. , Set 1 to release capacity by stopping pumping; the second call permission of the electrochemical energy storage device in charging condition is allowed, and the second call power meets the following requirements. , Set to 1 to release capacity by stopping charging; When the current scenario is a cross-regional mutual assistance scenario, the first calling permission for pumped storage equipment in pumping mode is not allowed, and the first calling power meets the requirements. , Setting the power to 0, the first call power is constrained to zero; the second call permission for electrochemical energy storage devices in charging mode is not allowed, and the second call power satisfies... , Setting it to 0, the power of the second call is constrained to zero; in, This is the initial power output for pumped storage hydroelectric power generation. This is the second power draw for electrochemical energy storage devices. For the first rated power, For the second rated power, For power generation, This refers to the pumping power. For discharge power, For charging power, This is a binary state variable representing the power generation condition, where 1 indicates that the system is in power generation condition and 0 indicates that it is not in power generation condition. For the pumping operation, there are two state variables. For the shutdown condition, a binary state variable; For the discharge condition, there are two state variables. For charging conditions, there are two state variables. For static operating conditions, there are two state variables.
[0094] Optionally, the processing module 302 is also used to monitor the reserve margin indicators and new energy consumption pressure indicators of the entire network; Based on the aforementioned reserve margin indicators, reserve thresholds, new energy consumption pressure indicators, and consumption thresholds, the operating scenarios are divided into supply guarantee scenarios, consumption scenarios, or conventional scenarios. Adjust the priority of pumped storage and electrochemical energy storage equipment based on the supply guarantee scenario, consumption scenario, or normal scenario.
[0095] The pumped-storage and energy storage coordinated scheduling device based on operating condition condition discrimination according to the embodiments of this application can correspondingly execute the method described in the embodiments of this application, and the other operations and / or functions of each module / unit of the pumped-storage and energy storage coordinated scheduling device based on operating condition condition discrimination are respectively for realizing Figure 2 For the sake of brevity, the corresponding processes of each method in the illustrated embodiments will not be described in detail here.
[0096] This application also provides a computing device. For example... Figure 4 As shown in the figure, this is a schematic diagram of a computing device provided in an embodiment of this application. The computing device 400 includes a bus 401, a processor 402, a communication interface 403, and a memory 404. The processor 402, the memory 404, and the communication interface 403 communicate with each other via the bus 401.
[0097] Bus 401 can be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. Buses can be categorized as address buses, data buses, control buses, etc. For ease of representation, Figure 4 The bus is represented by a single thick line, but this does not mean that there is only one bus or one type of bus.
[0098] Processor 402 can be any one or more of the following processors: central processing unit (CPU), graphics processing unit (GPU), microprocessor (MP), or digital signal processor (DSP).
[0099] Communication interface 403 is used for communication with external devices.
[0100] Memory 404 may include volatile memory, such as random access memory (RAM). Memory 404 may also include non-volatile memory, such as read-only memory (ROM), flash memory, hard disk drive (HDD), or solid state drive (SSD).
[0101] The memory 404 stores executable code, and the processor 402 executes the executable code to perform the aforementioned pumped storage and energy storage coordinated scheduling method based on operating condition judgment.
[0102] Specifically, in achieving Figure 3 In the case of the illustrated embodiment, and Figure 3 In the embodiment, when each module or unit of the pumped-storage and energy storage coordinated scheduling device based on operating condition judgment is implemented through software, the execution... Figure 3 The software or program code required for the functions of each module / unit can be partially or entirely stored in the memory 404. The processor 402 executes the program code corresponding to each unit stored in the memory 404, and executes the aforementioned pumped storage and energy storage coordinated scheduling method based on operating condition judgment.
[0103] This application also provides a computer-readable storage medium. The computer-readable storage medium can be any available medium that a computing device can store, or a data storage device such as a data center containing one or more available media. The available medium can be a magnetic medium (e.g., floppy disk, hard disk, magnetic tape), an optical medium (e.g., DVD), or a semiconductor medium (e.g., solid-state drive). The computer-readable storage medium includes instructions that instruct the computing device to execute the above-described pumped-storage and energy storage coordinated scheduling method based on operating condition determination.
[0104] This application also provides a computer program product comprising one or more computer instructions. When the computer instructions are loaded and executed on a computing device, all or part of the processes or functions described in this application are generated.
[0105] The computer instructions may be stored in a computer-readable storage medium or transmitted from one computer-readable storage medium to another. For example, the computer instructions may be transmitted from one website, computer, or data center to another website, computer, or data center via wired (e.g., coaxial cable, fiber optic, digital subscriber line) or wireless (e.g., infrared, microwave, etc.) means.
[0106] When the computer program product is executed by a computer, the computer executes any of the aforementioned methods of the pumped-storage and energy storage coordinated scheduling method based on operating condition judgment. The computer program product can be a software installation package; when any of the aforementioned methods of the pumped-storage and energy storage coordinated scheduling method based on operating condition judgment needs to be used, the computer program product can be downloaded and executed on the computer.
[0107] The descriptions of the processes or structures corresponding to the above figures each have their own emphasis. For parts of a process or structure that are not described in detail, please refer to the relevant descriptions of other processes or structures.
[0108] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any changes or substitutions within the technical scope disclosed in this application should be covered within the scope of protection of this application.
Claims
1. A method for coordinated scheduling of pumped-storage and energy storage based on operating condition discrimination, characterized in that, The method includes: Obtain the first-day advance clearance plan for pumped storage equipment in each region, and the second-day advance clearance plan for electrochemical energy storage equipment in each region; Based on the pre-clearance plan of the first day, the first real-time operating status of each pumped storage device in each time period is identified. The first real-time operating status includes power generation, pumping and shutdown. Based on the pre-clearance plan of the second day, the second real-time operating status of each electrochemical energy storage device in each time period is identified. The second real-time operating status includes discharge, charging and quiescent. Calculate the first available capacity of each pumped storage device under power generation, pumping and shutdown conditions in each time period; calculate the second available capacity of each electrochemical energy storage device under discharge, charging and stationary conditions in each time period. Determine the current dispatch scenario based on the power shortage situation in each region; Based on the current calling scenario, determine the first calling authority of each pumped storage device under each operating condition, and determine the second calling authority of each electrochemical energy storage device under each operating condition. With the goal of minimizing the power shortage across the entire network, an optimized scheduling model is constructed based on the first available capacity, the first call authority, the second available capacity, and the second call authority. Solving the optimized scheduling model yields the power consumption and operating condition switching plans for each pumped storage and electrochemical energy storage device.
2. The method according to claim 1, characterized in that, The first pre-clearance plan includes power generation and pumping power. The step of identifying the first real-time operating status of each pumped storage unit in each time period based on the first pre-clearance plan includes: If the power generation of the pumped storage equipment is greater than zero, the pumped storage equipment is determined to be in power generation mode; if the pumping power of the pumped storage equipment is greater than zero, the pumped storage equipment is determined to be in pumping mode; if both the power generation and pumping power of the pumped storage equipment are zero, the pumped storage equipment is determined to be in shutdown mode. The second pre-clearance plan includes discharge power and charging power. The step of identifying the second real-time operating status of each electrochemical energy storage device in each time period according to the second pre-clearance plan includes: If the discharge power of the electrochemical energy storage device is greater than zero, the electrochemical energy storage device is determined to be in a discharge state; if the charging power of the electrochemical energy storage device is greater than zero, the electrochemical energy storage device is determined to be in a charging state; if both the discharge power and the charging power of the electrochemical energy storage device are zero, the electrochemical energy storage device is determined to be in a stationary state.
3. The method according to claim 2, characterized in that, The calculation of the first available capacity of each pumped storage unit under power generation, pumping, and shutdown conditions at different time periods includes: When the pumped storage equipment is in power generation mode, the first available capacity is the first rated power minus the power generation; when the pumped storage equipment is in pumping mode, the first available capacity is the pumping power; when the pumped storage equipment is in shutdown mode, the first available capacity is the first rated power. The calculation of the second available capacity of each electrochemical energy storage device under discharge, charging, and idle conditions at different time periods includes: When the electrochemical energy storage device is in discharge mode, the second available capacity is the second rated power minus the discharge power; when the electrochemical energy storage device is in charging mode, the second available capacity is the charging power; when the electrochemical energy storage device is in quiescent mode, the second available capacity is the second rated power.
4. The method according to claim 1, characterized in that, The current invocation scenarios include local replenishment scenarios and cross-regional mutual aid scenarios. The process of determining the first invocation authority of each pumped storage device under each operating condition, and determining the second invocation authority of each electrochemical energy storage device under each operating condition, based on the current invocation scenarios, includes: When the current invocation scenario is a local fill scenario or a cross-regional mutual assistance scenario, the first invocation permission for the pumped storage equipment in power generation mode is "allow invocation," and the first invocation power meets the requirements. , The first available capacity; the first call permission for pumped storage units in shutdown condition is allowed, and the first call power meets the following requirements. ; When the current calling scenario is a local replenishment scenario or a cross-regional mutual assistance scenario, the second calling permission of the electrochemical energy storage device in the discharge state is allowed, and the second calling power meets the requirements. , This is the second available capacity; the second call permission for electrochemical energy storage devices in a quiescent state is allowed, and the second call power meets the following requirements. ; When the current scenario is a local fill scenario, the first calling permission for the pumped storage equipment in pumping mode is "allowed," and the first calling power meets the requirements. , Set 1 to release capacity by stopping pumping; the second call permission of the electrochemical energy storage device in charging condition is allowed, and the second call power meets the following requirements. , Set to 1 to release capacity by stopping charging; When the current scenario is a cross-regional mutual assistance scenario, the first calling permission for pumped storage equipment in pumping mode is not allowed, and the first calling power meets the requirements. , Setting the power to 0, the first call power is constrained to zero; the second call permission for electrochemical energy storage devices in charging mode is not allowed, and the second call power satisfies... , Setting it to 0, the power of the second call is constrained to zero; in, This is the initial power output for pumped storage hydroelectric power generation. This is the second power draw for electrochemical energy storage devices. For the first rated power, For the second rated power, For power generation, This refers to the pumping power. For discharge power, For charging power, This is a binary state variable representing the power generation condition, where 1 indicates that the system is in power generation condition and 0 indicates that it is not in power generation condition. For the pumping operation, there are two state variables. For the shutdown condition, a binary state variable; For the discharge condition, there are two state variables. For charging conditions, there are two state variables. For static operating conditions, there are two state variables.
5. The method according to claim 1, characterized in that, The optimized scheduling model includes power ramping constraints, energy conversion efficiency constraints, minimum operating condition duration constraints, and operating condition transition indication constraints. The expression for the power ramp constraint is: in, For device type exist The power generation or discharge power at any given moment. For device type exist Power consumption at any given time For device type Maximum power ramp rate, , This refers to pumped storage equipment. Indicates electrochemical energy storage equipment; The expression for the energy conversion efficiency constraint is: in, For device type exist State of charge at time t, For device type exist State of charge at time t, For device type The minimum state of charge, For device type Maximum state of charge, For device type Charging efficiency, For device type exist The pumping power or charging power at any given time. For time intervals, For device type The discharge efficiency; The expression for the minimum operating condition duration constraint is: in, For device type exist A binary state variable that is constantly in either power generation or power discharge mode. For device type exist A binary state variable that is constantly in either power generation or power discharge mode. Indicates device type exist A binary state variable that is constantly in either power generation or power discharge mode. For device type exist A binary state variable that is constantly in pumping or charging mode. For device type exist A binary state variable that is constantly in pumping or charging mode. For device type exist A binary state variable that is constantly in pumping or charging mode. This refers to the shortest duration of either the power generation or discharge operation. This refers to the shortest duration of either pumping or charging operation. This is the starting time period when the operating condition transition occurs; for The following period; The expression for the operating condition transition indication constraint is: in, This is a variable indicating the change of operating conditions; a value of 1 indicates the equipment type. Device e in Operating condition changes occur constantly; a value of 0 indicates that no operating condition change has occurred. For device type exist A binary state variable that is always in a stopped or stationary state. Indicates device type exist A binary state variable that is always in a stopped or stationary state.
6. The method according to claim 1, characterized in that, The method further includes: Monitor the reserve margin indicators and renewable energy consumption pressure indicators of the entire network; Based on the aforementioned reserve margin indicators, reserve thresholds, new energy consumption pressure indicators, and consumption thresholds, the operating scenarios are divided into supply guarantee scenarios, consumption scenarios, or conventional scenarios. Adjust the priority of pumped storage and electrochemical energy storage equipment based on the supply guarantee scenario, consumption scenario, or normal scenario.
7. The method according to claim 6, characterized in that, The objective function of the optimized scheduling model includes a working condition transition penalty term, which is determined based on the working condition transition indicator variable, the working condition transition cost coefficient, and the scenario adaptive weight coefficient. Specifically, in the supply guarantee scenario, the scenario adaptive weight coefficient takes a first value; in the consumption scenario, the scenario adaptive weight coefficient takes a second value; and in the normal scenario, the scenario adaptive weight coefficient takes a third value. The third value is greater than or equal to the first value and less than or equal to the second value.
8. A pumped-storage and energy storage coordinated dispatching device based on operating condition judgment, characterized in that, The device includes: The acquisition module is used to acquire the first-day pre-clearance plan for pumped storage equipment in each region, and the second-day pre-clearance plan for electrochemical energy storage equipment in each region. The processing module is used to identify the first real-time operating status of each pumped storage device in each time period according to the pre-clearing plan of the first day, the first real-time operating status including power generation, pumping, and shutdown; and to identify the second real-time operating status of each electrochemical energy storage device in each time period according to the pre-clearing plan of the second day, the second real-time operating status including discharging, charging, and idle. It calculates the first available capacity of each pumped storage device in each time period under power generation, pumping, and shutdown conditions; calculates the second available capacity of each electrochemical energy storage device in each time period under discharging, charging, and idle conditions; determines the current dispatch scenario based on the power shortage situation in each region; determines the first dispatch permission of each pumped storage device in each operating status and the second dispatch permission of each electrochemical energy storage device in each operating status based on the current dispatch scenario; and constructs an optimized scheduling model based on the first available capacity, first dispatch permission, second available capacity, and second dispatch permission, with the goal of minimizing the power shortage of the entire network. The solution module is used to solve the optimized scheduling model to obtain the call power and operating condition switching plan for each pumped storage device and each electrochemical energy storage device.
9. A computing device, characterized in that, Including memory and processor; The memory stores one or more computer programs, the one or more computer programs including instructions; when the instructions are executed by the processor, the computing device performs the method as described in any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that, The computer-readable storage medium is used to store a computer program for performing the method as described in any one of claims 1 to 7.