A multi-terminal collaborative intelligent control system for low-voltage switchgear
By using a multi-terminal collaborative intelligent control system for low-voltage cabinets, a risk priority queue is generated using fault detection and cascaded risk assessment modules. This queue is then directly matched with a pre-calculated task allocation template, and communication time slots are rearranged. This solves the problem of delayed protection task allocation in existing technologies and enables rapid response and timely protection actions.
Patent Information
- Application Number
- CN202611543795.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-08
- Publication Date
- 2026-11-17
AI Technical Summary
In existing power distribution terminal protection schemes, the allocation of protection tasks needs to be calculated in real time after a fault occurs. The exchange of protection data between terminals is constrained by a fixed time slot period, which makes it impossible to quickly coordinate and schedule computing and communication resources, thus affecting the timeliness of protection actions.
The low-voltage switchgear multi-terminal collaborative intelligent control system is adopted, including a fault detection module, a cascaded risk assessment module, a template matching module, a task preemption module, a communication scheduling module, and a protection execution module. By calculating the coupling influence coefficient, a cascaded fault risk priority queue is generated, which directly matches the pre-calculated task allocation template, rearranges the communication time slots, and prioritizes the allocation of protection tasks to ensure rapid response.
It enables rapid allocation of protection tasks and data exchange, reduces the possibility of cascaded faults spreading to adjacent circuits, shortens task allocation response time, and improves the timeliness of protection actions.
Smart Images

Figure CN123122002A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power distribution network protection and control technology, and in particular to a multi-terminal collaborative intelligent control system for low-voltage switchgear. Background Technology
[0002] In a power distribution network, multiple feeder circuits are electrically coupled through busbars. When a fault such as a short circuit occurs in one circuit, the rapid change in fault current may propagate through the busbars to adjacent circuits, triggering cascading faults.
[0003] In existing power distribution terminal protection schemes, the method of real-time calculation of task allocation after fault detection is usually adopted, and the communication time slots between terminals are arranged in a preset fixed period mode.
[0004] The above scheme has the following shortcomings: After a fault occurs, the allocation of protection tasks needs to be calculated in real time, and the exchange of protection data between terminals is constrained by a fixed time slot period, which makes it impossible to quickly coordinate and schedule computing resources and communication resources. The response of protection actions is delayed, which affects the timely suppression of cascading faults. Summary of the Invention
[0005] The purpose of this invention is to provide a low-voltage switchgear multi-terminal collaborative intelligent control system to solve the above-mentioned problems.
[0006] To achieve the above objectives, the present invention adopts the following technical solution:
[0007] A low-voltage switchgear multi-terminal collaborative intelligent control system includes:
[0008] The fault detection module is used to collect instantaneous current waveform data of each feeder circuit, extract the current change rate of each circuit between adjacent sampling times, summarize the circuits whose current change rate exceeds the fault mutation threshold, and generate a set of fault candidate circuit identifiers.
[0009] The cascaded risk assessment module is used to calculate the coupling influence coefficient of the current mutation of each fault candidate circuit propagating to adjacent circuits, and to generate a cascaded fault risk priority queue based on the coupling influence coefficient.
[0010] The template matching module is used to match pre-calculated task allocation templates from the fault scenario task allocation template library to generate an emergency protection task allocation scheme.
[0011] The task preemption module is used to mark interruptible tasks with lower priority than protection tasks in each power distribution terminal, and assign protection tasks to power distribution terminals with sufficient computing resources according to the order of the cascaded fault risk priority queue.
[0012] The communication scheduling module is used to merge power distribution terminal pairs with data dependencies into protection coordination time slot groups, arrange the time slots of the protection coordination time slot groups in the continuous time slot segment at the beginning of the scheduling cycle, generate an emergency time slot rescheduling scheme, and send it to each power distribution terminal.
[0013] The protection execution module is used to perform bidirectional exchange of protection data and calculation of protection criteria within the continuous time slots corresponding to the protection coordination time slot group, output protection action commands, and restore the normal operation state after the protection task is completed.
[0014] Preferably, the rate of change of current is the ratio of the difference in current amplitude between adjacent sampling moments to the sampling time interval;
[0015] Let the first The current amplitude at each sampling time is , No. The current amplitude at each sampling time is The sampling time interval is Then the rate of change of current for: ,in This is the sequence number of the sampling time.
[0016] Preferably, the generation of the fault candidate circuit identifier set further includes: extracting the waveform distortion feature value of each circuit, wherein the waveform distortion feature value is used to characterize the degree of deviation of the current waveform from the normal power frequency waveform; when the current change rate of a circuit exceeds the fault mutation threshold and the waveform distortion feature value exceeds the preset distortion threshold, the circuit is marked as an over-threshold circuit.
[0017] Preferably, the coupling influence coefficient is calculated based on the impedance distribution ratio between the faulty loop and the adjacent loop at the bus node; let the equivalent impedance of the faulty loop at the bus node be... Adjacent circuits The equivalent impedance at the bus node is ,in If the adjacent loops are numbered, then the adjacent loops Coupling influence coefficient for: In the cascaded fault risk priority queue, loops with higher coupling impact coefficients are ranked higher.
[0018] Preferably, the step of matching the pre-calculated task allocation template from the fault scenario task allocation template library includes: using the fault type identifier and the number of affected loops as search keys, accurately comparing the fault type identifier of the current fault with the fault type identifier of the pre-calculated task allocation template, and selecting the pre-calculated task allocation template with the smallest difference between the number of affected loops and the current number of affected loops from the template subset with the same fault type; the fault scenario task allocation template library is divided into multiple index partitions according to the fault type identifier, and during matching, the corresponding index partition is first located according to the current fault type identifier, and the nearest neighbor matching is performed within the index partition according to the number of affected loops.
[0019] Preferably, assigning protection tasks to distribution terminals with sufficient computing resources includes: comparing the computing resources required for each protection task with the computing resources released by each distribution terminal one by one; when the computing resources released by a distribution terminal are not less than the computing resources required for the protection task, the distribution terminal is deemed to meet the resource constraint condition; if multiple distribution terminals meet the resource constraint condition for the same protection task, the distribution terminal with the largest amount of released computing resources is selected as the target terminal; the number of protection tasks assigned to each distribution terminal does not exceed a preset single-terminal task upper limit; when the number of protection tasks assigned to a distribution terminal reaches the single-terminal task upper limit, subsequent protection tasks skip that distribution terminal.
[0020] Preferably, merging distribution terminal pairs with data dependencies into protection coordination time slot groups includes: extracting the identifier of each distribution terminal and its protection task type code according to the emergency protection task allocation scheme; matching the set of terminal pairs with protection data exchange requirements based on a predefined protection task data dependency rule table; calculating the minimum number of consecutive time slots required for each group to complete protection data exchange, generating the aggregated time slot requirement of each protection coordination time slot group; setting the priority of the protection coordination time slot group higher than all regular coordination time slot groups, and generating a hybrid sorting queue headed by the protection coordination time slot group.
[0021] Preferably, arranging the time slots of the protection coordination time slot group in the continuous time slot segment at the beginning of the scheduling cycle includes: for terminal pairs within the protection coordination time slot group, first allocating a time slot for the distribution terminal in the data transmission direction to send protection data, then allocating a time slot for the reverse distribution terminal to send response data or reverse protection data, and so on alternately until all interaction rounds are completed; the time slots of the regular coordination time slot group and the independent distribution terminal fill the remaining time slot area after the protection coordination time slot group; reserving a minimum guaranteed time slot number of not less than a preset proportion for the regular coordination time slot group, and when the sum of the aggregated time slot demand of the protection coordination time slot group and the minimum guaranteed time slot number exceeds the total available bus bandwidth, performing time slot compression on the protection coordination time slot group with the lowest cascade risk priority.
[0022] Preferably, the method further includes: within the continuous time slot segment corresponding to the protection coordination time slot group, each distribution terminal performs bidirectional exchange of protection data and performs protection criterion calculation, and outputs protection action instructions; after the protection task is completed, the highest priority flag of the protection coordination time slot group is removed, the time slot occupied by the distribution terminal is released, the normal coordination time slot arrangement scheme is restored, and the execution thread of the suspended interruptible task is restored; wherein, the protection criterion calculation includes differential protection criterion calculation and directional protection criterion calculation;
[0023] When the protection type of the circuit is required to be differential protection, the difference between the locally sampled current data and the current data sent by the associated distribution terminal is calculated. When the absolute value of the difference exceeds the differential protection action threshold, a differential protection action command is output. When the protection type of the circuit is required to be directional protection, the fault power direction is calculated based on the locally sampled voltage and current data. When the power direction points into the line, a directional protection action command is output.
[0024] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0025] 1. This invention generates a cascade fault risk priority queue by calculating the coupling influence coefficient, so that the allocation order of protection tasks corresponds to the degree of cascade risk. Circuits with higher risks are given priority to obtain protection resources, which reduces the possibility of cascade faults spreading to adjacent circuits.
[0026] 2. This invention obtains the emergency protection task allocation scheme by directly matching the pre-calculated task allocation template from the pre-stored fault scenario task allocation template library, avoiding the process of real-time execution of task allocation calculation after the fault occurs, and shortening the response time of the task allocation process. Attached Figure Description
[0027] Further details, features, and advantages of this application are disclosed in the following description of exemplary embodiments in conjunction with the accompanying drawings, in which:
[0028] Figure 1 This is a system structure diagram of the present invention. Detailed Implementation
[0029] Several embodiments of this application will now be described in more detail with reference to the accompanying drawings to enable those skilled in the art to implement this application. This application may be embodied in many different forms and for various purposes and should not be limited to the embodiments set forth herein. These embodiments are provided to make this application thorough and complete, and to fully convey the scope of this application to those skilled in the art. The embodiments described do not limit this application.
[0030] Unless otherwise defined, all terms used herein (including technical and scientific terms) shall have the same meaning as commonly understood by one of ordinary skill in the art to which this application pertains. It will be further understood that terms such as those defined in commonly used dictionaries shall be interpreted as having a meaning consistent with their meaning in the relevant field and / or the context of this specification, and shall not be interpreted in an idealized or overly formal sense unless expressly defined herein.
[0031] Example 1
[0032] Its specific implementation method is combined with the appendix Figure 1 Please provide a detailed explanation.
[0033] In this embodiment, it includes:
[0034] In a distribution network, multiple feeder circuits are electrically coupled through busbars. When a fault such as a short circuit occurs in one circuit, the rapid change in fault current can propagate through the busbar to adjacent circuits, triggering cascading faults. In existing distribution terminal protection schemes, the allocation of protection tasks after fault detection typically requires real-time calculation, and the communication time slots between terminals are arranged in a preset fixed-period pattern. This results in response delays in the allocation of protection tasks and the exchange of protection data between terminals after a fault occurs, hindering the rapid coordinated scheduling of computing and communication resources and affecting the timeliness of protection actions.
[0035] The hardware environment involved in this implementation includes: power distribution terminals deployed on each feeder circuit, each power distribution terminal having the ability to acquire current waveforms and independent computing processing capabilities; each power distribution terminal being interconnected through a communication bus, the communication bus allocating bandwidth in units of time slots; and a master station or edge computing node with centralized scheduling capabilities, used to perform task allocation and time slot orchestration.
[0036] A distribution network fault coordinated response method according to an embodiment of the present invention includes the following modules:
[0037] Module 1, Fault Detection Module:
[0038] Collect instantaneous current waveform data of each feeder circuit and generate a set of fault candidate circuit identifiers;
[0039] Instantaneous current waveform data of each feeder circuit is acquired in real time with a microsecond sampling period. Based on the acquired instantaneous current waveform data, the rate of change of current in each circuit between adjacent sampling times is extracted. The rate of change of current in each circuit is compared with a preset fault mutation threshold. Circuits with a rate of change of current exceeding the fault mutation threshold are marked as over-threshold circuits. The identifiers of all over-threshold circuits are summarized to generate a set of fault candidate circuit identifiers.
[0040] It should be noted that the aforementioned rate of change of current is the ratio of the difference in current amplitude between adjacent sampling times to the sampling time interval. Specifically, let the first... The current amplitude at each sampling time is , No. The current amplitude at each sampling time is The sampling time interval is Then the rate of change of current for:
[0041] ;
[0042] in, This is the sequence number of the sampling time. The dimension of is current units divided by time units, which is consistent with the dimension of the fault mutation threshold, and the two can be directly compared.
[0043] In one embodiment, in addition to the current change rate, waveform distortion feature values for each circuit are also extracted. These waveform distortion feature values characterize the degree of deviation of the current waveform from the normal power frequency waveform. When the current change rate of a circuit exceeds a fault mutation threshold and the waveform distortion feature value exceeds a preset distortion threshold, the circuit is marked as an over-threshold circuit. By simultaneously satisfying both conditions for marking, false marking caused by non-fault conditions such as load mutations can be reduced.
[0044] Waveform distortion characteristic values are obtained by harmonic decomposition of the current waveform, extracting the effective value of the fundamental component. Passing the exam RMS value of subharmonic components Calculate waveform distortion eigenvalues ;
[0045] in, Represents waveform distortion characteristic values; Represents the effective value of the fundamental current; Representing the RMS value of subharmonic current; This represents the preset maximum harmonic order.
[0046] Module 2, Cascaded Risk Assessment Module:
[0047] Calculate the coupling effect coefficient and generate a cascaded fault risk priority queue;
[0048] For each circuit in the fault candidate circuit identifier set, extract the topological connection relationship between each circuit and the bus, and obtain the set of adjacent circuits that share the same bus node with each fault candidate circuit. Calculate the coupling effect coefficient of the current surge of each fault candidate circuit propagating to adjacent circuits. Based on the coupling effect coefficient, cascade risk ranking is performed on all affected adjacent circuits to generate a cascade fault risk priority queue.
[0049] It should be noted that the aforementioned coupling effect coefficient is used to characterize the magnitude of the impact of the current surge in the faulted loop on the current distribution of adjacent loops, and is calculated based on the impedance distribution ratio between the faulted loop and adjacent loops at the bus node. Let the equivalent impedance of the faulted loop at the bus node be... Adjacent circuits The equivalent impedance at the bus node is ,in If the adjacent loops are numbered, then the adjacent loops Corresponding coupling influence coefficient for:
[0050] ;
[0051] It represents the ratio of two dimensionless impedances, and is a dimensionless value that can be directly used for ranking and comparison. The larger the value, the more likely it is to be an adjacent loop. The greater the impact of fault current, the higher the priority of the cascaded fault risk queue. Loops with higher coupling impact coefficients are ranked higher.
[0052] Module 3, Template Matching Module:
[0053] Match the pre-calculated task allocation template to generate an emergency protection task allocation scheme;
[0054] Based on the protection type requirements of each circuit in the cascaded fault risk priority queue, pattern matching is performed from a pre-stored fault scenario task allocation template library. Using the fault type identifier and the number of affected circuits as search keys, the pre-calculated task allocation template with the highest similarity to the current fault mode is retrieved from the fault scenario task allocation template library. Based on the matched pre-calculated task allocation template, an emergency protection task allocation scheme is generated.
[0055] It should be noted that the aforementioned fault scenario task allocation template library pre-stores multiple pre-calculated task allocation templates. Each pre-calculated task allocation template corresponds to a combination of a fault type identifier and a range of affected loop counts. During matching, the fault type identifier of the current fault is precisely compared with the fault type identifier of the pre-calculated task allocation template. In the subset of pre-calculated task allocation templates with the same fault type, the pre-calculated task allocation template with the smallest difference between the number of affected loops and the current number of affected loops is selected as the matching result.
[0056] In this embodiment, to reduce the time spent retrieving pre-computed task allocation templates, the fault scenario task allocation template library is divided into multiple index partitions according to the fault type identifier. During matching, the corresponding index partition is first located based on the current fault type identifier, and nearest neighbor matching is performed within the index partition according to the number of affected circuits, thereby narrowing the search scope.
[0057] Module 4, Task Preemption Module:
[0058] Preempt low-priority tasks and assign protection tasks to the target terminal;
[0059] Obtain the list of tasks currently being executed by each power distribution terminal and the priority label of each task. Mark regular tasks with a priority lower than protection tasks as interruptible tasks. Calculate the amount of computing resources released after each power distribution terminal interrupts an interruptible task.
[0060] The emergency protection task allocation scheme is constrained and matched with the amount of computing resources released by each distribution terminal. Following the order of the cascaded fault risk priority queue, each protection task is assigned one by one to a distribution terminal whose computing resources meet the execution requirements of the protection task. A preemptive execution command is sent to the target terminal, causing the target terminal to suspend the execution thread of interruptible tasks and load the execution thread of the protection task.
[0061] It should be noted that the above constraint matching refers to comparing the amount of computational resources required for each protection task with the amount of computational resources released by each distribution terminal. When the amount of computational resources released by a distribution terminal is not less than the amount of computational resources required for the protection task, the distribution terminal is considered to meet the resource constraint conditions. If multiple distribution terminals meet the resource constraint conditions for the same protection task, the distribution terminal that releases the largest amount of computational resources is selected as the target terminal for that protection task.
[0062] In this embodiment, to avoid execution delays caused by a single power distribution terminal carrying too many protection tasks, a terminal load balancing constraint is introduced during constraint matching: the number of protection tasks assigned to each power distribution terminal does not exceed a preset single-terminal task limit. When the number of protection tasks assigned to a power distribution terminal reaches the single-terminal task limit, subsequent protection tasks skip that power distribution terminal and are assigned to the next power distribution terminal that meets the resource constraint conditions.
[0063] Module 5, Communication Scheduling Module:
[0064] Extract protection data exchange requirements and generate protection coordination time slot groups and hybrid sorting queues;
[0065] For each distribution terminal that has completed the assigned protection task, Module 5 can be further implemented. Module 5 may specifically include:
[0066] Module 501: Based on the emergency protection task allocation scheme, extract the identifiers of each distribution terminal assigned a protection task and their protection task type codes. Based on a predefined protection task data dependency rule table, match the set of terminal pairs with protection data exchange requirements, and extract the data exchange direction, interaction rounds, and maximum allowable delay parameters between each pair of distribution terminals.
[0067] Module 502: Merges distribution terminal pairs with mutual data dependencies into protection coordination time slot groups. Calculates the minimum number of consecutive time slots required for each group to complete protection data exchange, and generates the aggregated time slot requirements for each protection coordination time slot group.
[0068] It should be noted that the minimum number of consecutive time slots mentioned above is obtained by adding the number of interaction rounds of the terminal pair to the number of time slots occupied by each round of data exchange.
[0069] Module 503: Sets the priority of the protection coordination time slot group to the highest level, which is higher than all regular coordination time slot groups. The protection coordination time slot group, regular coordination time slot group, and independent distribution terminals are sorted according to priority, generating a mixed sorting queue with the protection coordination time slot group at the top.
[0070] It should be noted that each rule in the aforementioned protection task data dependency rule table includes the source terminal task type code, the target terminal task type code, the data exchange direction identifier, the number of interaction rounds, and the maximum allowable delay parameter. During matching, the protection task type code of each distribution terminal is compared with the source terminal and target terminal task type codes in the protection task data dependency rule table, respectively. Successfully matched terminal pairs are included in the set of terminal pairs with protection data exchange requirements.
[0071] Module 6, Protection Execution Module:
[0072] Rearrange communication time slots and issue an emergency time slot rearrangement plan;
[0073] Based on the hybrid sorting queue and the total available bus bandwidth, the time slots of associated distribution terminals within the protection coordination time slot group are alternately arranged in the continuous time slot segment at the beginning of the scheduling cycle according to the data exchange direction. The time slots of the regular coordination time slot group and independent distribution terminals are filled in the remaining time slot area after the protection coordination time slot group. An emergency time slot rescheduling scheme is generated, issued to each distribution terminal, and takes effect immediately.
[0074] It should be noted that the above-mentioned alternating arrangement according to the data exchange direction means that for terminal pairs within a protection coordination time slot group, a time slot is first allocated to the distribution terminal in the data sending direction for sending protection data, followed by a time slot allocated to the distribution terminal in the reverse direction for sending response data or reverse protection data, and so on, alternating until all the required interaction rounds of the protection coordination time slot group are completed. This arrangement allows the terminal pairs to complete the full protection data exchange within consecutive time slots, reducing waiting delays caused by time slot intervals.
[0075] In this embodiment, to prevent the protection coordination time slot group from occupying all bandwidth and causing a complete interruption of regular task communication, a minimum guaranteed time slot number of not less than a preset proportion is reserved for the regular coordination time slot group during the time slot allocation process. When the sum of the aggregated time slot demand of the protection coordination time slot group and the minimum guaranteed time slot number exceeds the total available bus bandwidth, time slot compression is performed on the protection coordination time slot group with the lowest cascaded risk priority, reducing its interaction rounds to the number of rounds that meet the minimum protection criterion requirements.
[0076] Module 7: Executes protection criterion calculations and outputs protection action commands to restore normal operation.
[0077] Within the continuous time slots corresponding to the protection coordination time slot group, each distribution terminal performs bidirectional exchange of protection data. Based on the received electrical quantity data from associated distribution terminals and local sampled data, each distribution terminal performs protection criterion calculations and outputs protection action commands. The specific type of protection criterion is determined by the protection type requirements of each circuit in the emergency protection task allocation scheme.
[0078] After the protection task is completed, the highest priority flag of the protection coordination time slot group is removed, and the time slots occupied by the distribution terminal are released back to the reallocatable resource pool. The normal coordination time slot orchestration scheme is restored, and the execution threads of the suspended interruptible tasks are resumed.
[0079] In one embodiment, the protection criterion calculation includes two types: differential protection criterion calculation and directional protection criterion calculation. When the circuit's protection type requires differential protection, the difference between the locally sampled current data and the current data sent by the associated distribution terminal is calculated. When the absolute value of the difference exceeds the differential protection action threshold, a differential protection action command is output. When the circuit's protection type requires directional protection, the fault power direction is calculated based on the locally sampled voltage and current data. When the power direction points inwards into the line, a directional protection action command is output.
[0080] The aforementioned cascaded risk assessment module, template matching module, and communication scheduling module are not simply functional superpositions; they form a collaborative relationship through a closed-loop data flow. The cascaded fault risk priority queue output by the cascaded risk assessment module directly determines the allocation order of protection tasks in the template matching module and the reduction order when the communication scheduling module performs time slot compression. The template matching module skips real-time calculation based on risk priority and directly locks the pre-calculated task allocation template, reducing the task allocation response time from millisecond-level calculation to microsecond-level retrieval. The communication scheduling module reconstructs time slots in real time based on the terminal pairing relationship in the task allocation scheme, arranging the protection coordination time slot group in the continuous time slot segment at the beginning of the scheduling cycle, ensuring that high-priority protection data completes bidirectional exchange at the beginning of the scheduling cycle. Through the collaborative mechanism of "risk sorting, template matching, and time slot rescheduling," the overall delay from fault detection to protection action command output is compressed into one scheduling cycle, significantly reducing the probability of cascaded faults spreading to adjacent circuits and achieving unexpected technical effects.
[0081] Example 2
[0082] The power distribution network of an industrial park consists of four feeder circuits (circuit 1 to circuit 4) originating from a 110kV substation via a 10kV busbar, supplying power to the precision manufacturing plant, data center, chemical workshop, and public facilities area within the park. All four feeder circuits are interconnected through the same 10kV busbar node, and six distribution terminals (terminals A to F) are deployed at the ends and branch nodes of each circuit. The master station edge computing node is deployed within the substation, responsible for task allocation and time slot scheduling. The communication bus uses a passive optical network (PON) with a scheduling cycle of 20ms, divided into 40 time slots, each 0.5ms long. In the early morning of a certain day in 20XX, a single-phase ground fault occurred in the chemical workshop (circuit 3) due to equipment insulation aging, triggering the full-process response of this method.
[0083] Each distribution terminal continuously collects instantaneous current waveform data of its respective circuit at 10μs sampling intervals. At the moment of the fault, the current amplitude of circuit 3 exhibits a sharp jump between two adjacent sampling moments, and its rate of change... The current change rate of the loop 3 far exceeds the preset fault mutation threshold. Simultaneously, the waveform distortion characteristic value of loop 3 also exceeds the distortion threshold. Since both conditions are met, loop 3 is marked as an over-threshold loop. The current change rate of the other three loops does not exceed the fault mutation threshold. The set of fault candidate loop identifiers is thus generated, containing only loop 3, as shown in Table 1 below.
[0084] Table 1 Comparison of current change rate and threshold for each loop
[0085]
[0086] The cascaded risk assessment module extracts the topological connection relationship between loop 3 and the 10kV busbar node, identifying loops 1, 2, and 4 as adjacent loops sharing the same busbar node with loop 3. Based on... Calculate the coupling influence coefficients of the three adjacent loops respectively, where Let be the equivalent impedance of loop 3 at the bus node. This represents the equivalent impedance of each adjacent loop at the bus node. Loop 2 (data center) has a lower feeder impedance. The lower coefficient of coupling effect results in the highest coefficient of coupling effect, which ranks it first in the cascade failure risk priority queue, as shown in Table 2 below.
[0087] Table 2 Coupling Influence Coefficients and Risk Ranking of Adjacent Loops
[0088]
[0089] The template matching module uses the fault type identifier "single-phase grounding" and the number of affected circuits (3) as search keys to perform nearest-neighbor matching within the "single-phase grounding" index partition of the fault scenario task allocation template library. The pre-calculated task allocation template in the library with 3 affected circuits is completely consistent with the current fault mode, resulting in a successful match. This template specifies that: circuit 3 is protected by differential protection from terminal C; circuit 2 is protected by directional protection jointly implemented by terminals B and D; circuit 1 is protected by directional protection from terminal A; and circuit 4 is monitored by over-level protection from terminal E. The emergency protection task allocation scheme is directly generated from the template without real-time calculation, as shown in Table 3 below.
[0090] Table 3 Template Matching Results and Emergency Protection Task Allocation Scheme
[0091]
[0092] The task preemption module reads the current task list of each distribution terminal. Terminals A through E all carry routine tasks such as load forecasting and data reporting, and their priority tags are all lower than protection tasks. These routine tasks are marked as interruptible tasks, and the amount of computing resources released after each terminal suspends its corresponding execution thread is calculated. Constraint matching is performed one by one, starting from terminal C corresponding to loop 3, according to the cascaded fault risk priority queue. Terminal C releases the most computing resources and takes priority in undertaking differential protection tasks; the resource amounts of terminals B and D meet the dual-terminal coordination requirements for directional protection; terminal A meets the directional protection requirements for loop 1; and terminal E meets the over-level protection monitoring requirements for loop 4. The number of protection tasks assigned to each terminal is 1, which does not exceed the single terminal task limit of 2. The master station issues preemption execution instructions to the five target terminals, and each terminal loads the protection task execution thread, as shown in Table 4 below.
[0093] Table 4: Resource Release and Task Assignment for Each Distribution Terminal
[0094]
[0095] The communication scheduling module matches data according to the protection task data dependency rule table. Terminal B (DIR-02, transmitter) and Terminal D (DIR-02, receiver) have a bidirectional data dependency relationship, and Terminal C and Terminal F have a differential current data exchange requirement. These two pairs of terminals are merged into protection coordination time slot groups G1 and G2. G1 (Terminal C and Terminal F) requires two rounds of interaction, each round occupying two time slots, with a total time slot requirement of 4. G2 (Terminal B and Terminal D) also requires two rounds of interaction, each round occupying two time slots, with a total time slot requirement of 4. Terminals A and E have no mutual data dependency and are treated as independent distribution terminals. The protection coordination time slot groups G1 and G2 are set to the highest priority, and the mixed sorting queue is as follows: G1, G2, regular coordination time slot group, Terminal A, Terminal E, and the remaining independent terminals, as shown in Table 5 below.
[0096] Table 5 Protection Coordination Time Slot Group Aggregation Time Slot Requirements
[0097]
[0098] Time slot rescheduling begins at the start of the scheduling cycle. The four time slots of G1 are arranged alternately from time slot 1 to time slot 4, with terminal C sending and terminal F responding; the four time slots of G2 are arranged alternately from time slot 5 to time slot 8, with terminal B sending and terminal D responding. The two protection coordination time slot groups occupy a total of eight time slots. Regular coordination time slot groups and independent terminals fill time slots 9 to 40 to ensure uninterrupted regular communication (32 guaranteed time slots, exceeding the preset minimum guarantee ratio requirement of 20 time slots). The emergency time slot rescheduling scheme is issued to all terminals and takes effect immediately, as shown in Table 6 below.
[0099] Table 6 Emergency Time Slot Rescheduling Scheme (Start Segment of Scheduling Cycle)
[0100]
[0101] Within the consecutive time slots corresponding to time slots 1 to 8, terminal C and terminal F complete bidirectional exchange of differential current data, and terminal B and terminal D complete bidirectional exchange of directional protection data. Terminal C performs a difference calculation between the locally sampled current and the current data sent by terminal F. If the absolute value of the difference exceeds the differential protection action threshold, it outputs a differential protection action command to isolate the fault segment of loop 3. Terminals B and D calculate the fault power direction based on their respective voltage and current sampling data, both pointing inwards from the line, and output directional protection action commands to prevent loop 2 from being affected and tripping. Terminal A independently completes the directional protection criterion calculation for loop 1, with the power direction pointing outwards from the line, and does not output an action command. Terminal E completes the over-level protection monitoring for loop 4 and detects no abnormalities. After the protection tasks are completed, the master station removes the highest priority flags for G1 and G2, releases the corresponding time slots back to the reassignable resource pool, restores the normal time slot scheduling scheme, and each terminal resumes its suspended normal task execution threads.
[0102] Throughout the response process, data is generated from instantaneous current waveform sampling of each circuit. The current change rate is calculated and compared with a threshold to create a set of candidate fault circuit identifiers. Coupling influence coefficient calculation transforms fault source information into a cascaded risk ranking of adjacent circuits. Template matching maps the risk ranking to specific task allocation schemes. Resource constraint matching implements the task allocation schemes to each distribution terminal. Protection data exchange requirement extraction transforms the terminal allocation results into a time slot group structure. Time slot rescheduling transforms the time slot group structure into a specific time slot layout within the scheduling cycle. Finally, protection criterion calculation transforms the exchanged electrical quantity data into protection action commands. The output of each module directly serves as the input of the next module, ensuring continuous data transmission throughout the process. Computational resource scheduling and communication resource scheduling are collaboratively completed within the same fault response process.
[0103] The foregoing has only described certain exemplary embodiments of the present invention by way of illustration. Undoubtedly, those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the foregoing drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.
[0104] In addition, the functional units in the various embodiments of this application can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit.
[0105] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
Claims
1. A low-voltage switchgear multi-terminal collaborative intelligent control system, characterized in that, include: The fault detection module is used to collect instantaneous current waveform data of each feeder circuit, extract the current change rate of each circuit between adjacent sampling times, summarize the circuits whose current change rate exceeds the fault mutation threshold, and generate a set of fault candidate circuit identifiers. The cascaded risk assessment module is used to calculate the coupling influence coefficient of the current mutation of each fault candidate circuit propagating to adjacent circuits, and to generate a cascaded fault risk priority queue based on the coupling influence coefficient. The template matching module is used to match pre-calculated task allocation templates from the fault scenario task allocation template library to generate an emergency protection task allocation scheme. The task preemption module is used to mark interruptible tasks with lower priority than protection tasks in each power distribution terminal, and assign protection tasks to power distribution terminals with sufficient computing resources according to the order of the cascaded fault risk priority queue. The communication scheduling module is used to merge power distribution terminal pairs with data dependencies into protection coordination time slot groups, arrange the time slots of the protection coordination time slot groups in the continuous time slot segment at the beginning of the scheduling cycle, generate an emergency time slot rescheduling scheme, and send it to each power distribution terminal. The protection execution module is used to perform bidirectional exchange of protection data and calculation of protection criteria within the continuous time slots corresponding to the protection coordination time slot group, output protection action commands, and restore the normal operation state after the protection task is completed.
2. The low-voltage switchgear multi-terminal collaborative intelligent control system according to claim 1, characterized in that, The rate of change of current is the ratio of the difference in current amplitude between adjacent sampling moments to the sampling time interval; Let the first The current amplitude at each sampling time is , No. The current amplitude at each sampling time is The sampling time interval is Then the rate of change of current for: ,in This is the sequence number of the sampling time.
3. The low-voltage switchgear multi-terminal collaborative intelligent control system according to claim 1, characterized in that, The generation of a set of candidate fault circuit identifiers also includes: extracting waveform distortion feature values for each circuit, wherein the waveform distortion feature values are used to characterize the degree of deviation of the current waveform from the normal power frequency waveform; when the current change rate of a circuit exceeds the fault mutation threshold and the waveform distortion feature value exceeds a preset distortion threshold, the circuit is marked as an over-threshold circuit.
4. The low-voltage switchgear multi-terminal collaborative intelligent control system according to claim 1, characterized in that, The coupling effect coefficient is calculated based on the impedance distribution ratio between the faulty loop and the adjacent loop at the bus node; let the equivalent impedance of the faulty loop at the bus node be... Adjacent circuits The equivalent impedance at the bus node is ,in If the adjacent loops are numbered, then the adjacent loops Coupling influence coefficient for: In the cascaded fault risk priority queue, loops with higher coupling impact coefficients are ranked higher.
5. The low-voltage switchgear multi-terminal collaborative intelligent control system according to claim 1, characterized in that, Matching pre-calculated task allocation templates from the fault scenario task allocation template library includes: using the fault type identifier and the number of affected loops as search keys, accurately comparing the fault type identifier of the current fault with the fault type identifier of the pre-calculated task allocation template, and selecting the pre-calculated task allocation template with the smallest difference between the number of affected loops and the current number of affected loops from the template subset with the same fault type; the fault scenario task allocation template library is divided into multiple index partitions according to the fault type identifier. During matching, the corresponding index partition is first located according to the current fault type identifier, and nearest neighbor matching is performed within the index partition according to the number of affected loops.
6. The low-voltage switchgear multi-terminal collaborative intelligent control system according to claim 1, characterized in that, Assigning protection tasks to distribution terminals with sufficient computing resources includes: comparing the computing resources required for each protection task with the computing resources released by each distribution terminal one by one; when the computing resources released by a distribution terminal are not less than the computing resources required for the protection task, the distribution terminal is deemed to meet the resource constraint condition; if multiple distribution terminals meet the resource constraint condition for the same protection task, the distribution terminal with the largest amount of released computing resources is selected as the target terminal; the number of protection tasks assigned to each distribution terminal does not exceed a preset single-terminal task limit; when the number of protection tasks assigned to a distribution terminal reaches the single-terminal task limit, subsequent protection tasks skip that distribution terminal.
7. The low-voltage switchgear multi-terminal collaborative intelligent control system according to claim 1, characterized in that, Merging distribution terminal pairs with data dependencies into protection coordination time slot groups includes: extracting the identifier of each distribution terminal and its protection task type code according to the emergency protection task allocation scheme; matching the set of terminal pairs with protection data exchange requirements based on a predefined protection task data dependency rule table; calculating the minimum number of consecutive time slots required for each group to complete protection data exchange, and generating the aggregated time slot requirement for each protection coordination time slot group; setting the priority of the protection coordination time slot group higher than all regular coordination time slot groups, and generating a hybrid sorting queue with the protection coordination time slot group as the head.
8. The low-voltage switchgear multi-terminal collaborative intelligent control system according to claim 7, characterized in that, Arranging the time slots of the protection coordination time slot group in the continuous time slot segment at the beginning of the scheduling cycle includes: for terminal pairs within the protection coordination time slot group, first allocate a time slot for the distribution terminal in the data transmission direction to send protection data, then allocate a time slot for the reverse distribution terminal to send response data or reverse protection data, and so on alternately until all interaction rounds are completed; the time slots of the regular coordination time slot group and the independent distribution terminal fill the remaining time slot area after the protection coordination time slot group; reserve a minimum guaranteed time slot number of not less than a preset proportion for the regular coordination time slot group, and when the sum of the aggregated time slot demand of the protection coordination time slot group and the minimum guaranteed time slot number exceeds the total available bus bandwidth, perform time slot compression on the protection coordination time slot group with the lowest cascade risk priority.
9. The low-voltage switchgear multi-terminal collaborative intelligent control system according to claim 1, characterized in that, Also includes: Within the continuous time slots corresponding to the protection coordination time slot group, each distribution terminal performs bidirectional exchange of protection data and performs protection criterion calculation, and outputs protection action commands; After the protection task is completed, the highest priority flag of the protection coordination time slot group is removed, the time slot occupied by the distribution terminal is released, the normal coordination time slot arrangement scheme is restored, and the execution thread of the suspended interruptible task is restored; wherein, the protection criterion calculation includes differential protection criterion calculation and directional protection criterion calculation; When the protection type of the circuit is required to be differential protection, the difference between the locally sampled current data and the current data sent by the associated distribution terminal is calculated. When the absolute value of the difference exceeds the differential protection action threshold, a differential protection action command is output. When the protection type of the circuit is required to be directional protection, the fault power direction is calculated based on the locally sampled voltage and current data. When the power direction points into the line, a directional protection action command is output.