Systems and methods for performing orbital power telemetry in a system-on-a-chip (SOC)

By sensing the average value of the output voltage and calculating the load current in the SoC, the interface bandwidth limitation and latency issues in the orbital power telemetry system are resolved, enabling more efficient power management and performance optimization.

CN123125560APending Publication Date: 2026-11-17QUALCOMM INC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202580029065.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2024-05-03
Filing Date
2025-03-04
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing track power telemetry systems suffer from interface bandwidth limitations and latency issues within the SoC. Dedicated interface configurations increase cost and logic complexity, impacting power management efficiency and performance.

Method used

The average value of the output voltage is sensed in the subsystem of the SoC, and the load current is calculated using arithmetic logic, avoiding the use of a dedicated interface. The load current is calculated by the formula I_load = (VOUT_AVG – VOUT_REQ) / - slope, reducing interface latency and cost.

Benefits of technology

It improves power management efficiency, reduces interface latency and cost, and optimizes SoC performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123125560A_ABST
    Figure CN123125560A_ABST
Patent Text Reader

Abstract

A system and method are provided for performing track power telemetry in a SoC by providing circuitry to a subsystem of the SoC, the circuitry sensing the average value of a corresponding output voltage delivered to the corresponding subsystem by a voltage regulator over a predetermined time period, and using the sensed average output voltage to calculate the load current on the corresponding load line.
Need to check novelty before this filing date? Find Prior Art

Description

Related technical descriptions

[0001] Computing devices may include multiple processor-based subsystems. Such computing devices may be, for example, portable computing devices (“PCDs”), such as laptops or handheld computers, cellular phones or smartphones, portable digital assistants, portable game consoles, etc. Other types of PCDs may be included in automotive and Internet of Things (“IoT”) applications. Computing devices may also be stationary computers, such as personal computers (PCs) or various types of desktop computers or workstation computers.

[0002] Such processor-based subsystems can be included within the same integrated circuit chip or on different chips. A "system-on-a-chip" (SoC) is an example of such a chip, integrating numerous subsystems to provide system-level functionality. For example, an SoC may include one or more types of processors, such as a central processing unit ("CPU"), a graphics processing unit ("GPU"), a digital signal processor ("DSP"), and a neural processing unit ("NPU"). An SoC may also include other subsystems, such as a transceiver or "modem" subsystem providing wireless connectivity, a memory subsystem, etc.

[0003] SoC power management solutions use track power telemetry systems to dynamically adjust the power budget of voltage-regulated subsystems within the SoC, such as GPUs, NPUs, and CPU cores. Track power telemetry systems typically connect the SoC to a voltage regulator. The voltage regulator can be part of a power management IC (PMIC) external to the SoC, or it can be part of one or more other types of ICs.

[0004] Current orbital power telemetry systems sense the load current being used by a subsystem of the SoC and use built-in dynamic regulation circuitry to dynamically adjust the output voltage delivered to the subsystem based on the sensed current value to maintain the subsystem's supply voltage at the desired level. Different orbital power telemetry system configurations have been employed for this purpose. One known configuration uses a single interface between the PMIC and the SoC to connect all voltage regulators of the PMIC to the SoC's subsystems. Another known orbital power telemetry system configuration uses dedicated interfaces to connect each voltage regulator to its corresponding subsystem of the SoC.

[0005] One drawback of using a shared interface configuration is that periodic telemetry readings sent through the interface limit the interface's bandwidth (BW) and introduce interface latency, since telemetry readings and all other communication between the PMIC and the SoC are sent via the shared interface. This interface latency negatively impacts power management efficiency and performance.

[0006] The disadvantage of using a dedicated interface configuration is that, while it reduces interface latency, there is an increased cost associated with the increased number of pins and logic required to implement the dedicated interface on the PMIC and SoC. Furthermore, the number of pins and logic required to implement a dedicated interface increases as the number of subsystems requiring voltage regulation increases. Summary of the Invention

[0007] Systems, methods, and other examples for performing orbital power telemetry in a SoC are disclosed.

[0008] An exemplary implementation of the method includes: in a subsystem of the SoC, sensing the average value of an output voltage delivered to the subsystem by a voltage regulator over a predetermined time period via a load line. The method may further include calculating a load current on a corresponding load line using at least the average value of the corresponding output voltage.

[0009] An exemplary embodiment of the system includes at least one subsystem disposed on a SoC and electrically coupled to a load line, through which an output voltage is delivered by a voltage regulator. The subsystem includes voltage sensing and averaging circuitry and arithmetic logic. The voltage sensing and averaging circuitry is configured to sense the average value of the output voltage delivered to the subsystem over a predetermined time period. The arithmetic logic is configured to calculate the load current on the load line using at least the average value of the output voltage.

[0010] An exemplary embodiment of a computer program executed by a processor for performing track power telemetry in a System-on-a-Chip (SoC) includes a first set of computer instructions and a second set of computer instructions. The computer program is implemented on a non-transitory computer-readable medium. A voltage regulator delivers an output voltage to a subsystem of the SoC via a load line. The subsystem includes processing logic for executing the computer instructions. The first set of computer instructions obtains an average value of the corresponding output voltage delivered to the subsystem over a predetermined time period. The second set of computer instructions calculates the load current on the load line based at least on the average value of the output voltage calculated by the first set of computer instructions.

[0011] These and other features and advantages will become apparent from the following description, drawings and claims. Attached Figure Description

[0012] In the accompanying drawings, unless otherwise indicated, similar reference numerals are used throughout the various views to refer to similar parts.

[0013] Figure 1 A block diagram of an orbital power telemetry system is illustrated, which has a dedicated interface configuration for a 1:1 arrangement between the voltage regulator and the SoC subsystems.

[0014] Figure 2This is a graph showing the load current versus output voltage, depicting the voltage regulator's operation using a load current versus output voltage. Figure 1 The voltage regulator circuit shown senses the load current to dynamically adjust the output voltage supplied to the subsystem on the load line.

[0015] Figure 3 This is a block diagram of the orbital power telemetry system of this disclosure based on a representative implementation scheme.

[0016] Figure 4 This is a flowchart illustrating a method for performing orbital power telemetry in a SoC according to a representative implementation.

[0017] Figure 5 It is based on the representative implementation plan Figure 3 The block diagrams of circuits 320 and 330 are shown.

[0018] Figure 6 It is based on another representative implementation plan. Figure 3 The block diagrams of circuits 320 and 330 are shown.

[0019] Figure 7 Examples include Figure 3 The example shown is a PCD of a SoC, which has Figure 3 The subsystem shown is configured to execute Figure 4 The method is represented by the flowchart. Detailed Implementation

[0020] Representative embodiments of this disclosure relate to a system and method for performing track power telemetry in a SoC by providing circuitry to a subsystem of the SoC, the circuitry sensing the average value of a corresponding output voltage delivered to the corresponding subsystem by a voltage regulator over a predetermined time period, and using the sensed average output voltage to calculate the load current on the corresponding load line.

[0021] The following detailed discussion of representative embodiments of a power rail telemetry system and method is illustrated with reference to the accompanying drawings. In the detailed description below, exemplary or representative embodiments with specific details disclosed are set forth for purposes of explanation and not limitation, to provide a thorough understanding of embodiments according to the present teachings. The word “exemplary” is used herein to mean “serving as an example, instance, or illustration.” The words “illustrative” or “representative” are used herein synonymously with “exemplary.” Any aspect described herein as “exemplary” is not necessarily to be construed as preferred or advantageous over other aspects. However, it will be apparent to those skilled in the art, who benefit from this disclosure, that other embodiments of the present teachings that depart from the specific details disclosed herein remain within the scope of the appended claims. Furthermore, descriptions of well-known devices and methods may be omitted so as not to obscure the description of exemplary embodiments. Such methods and apparatus are clearly within the scope of the present teachings.

[0022] The terminology used herein is for the purpose of describing exemplary or representative embodiments only and is not intended to be limiting. The defined terms are supplementary to their technical and scientific meanings as commonly understood and accepted in the technical field of this teaching.

[0023] Unless the context clearly indicates otherwise, the terms “a,” “an,” and “the” as used in the specification and appended claims include both singular and plural references. Thus, for example, “an apparatus” includes one apparatus and multiple apparatuses.

[0024] Relative terms are used to describe the relationships between individual elements, as illustrated in the accompanying drawings. In addition to the orientations depicted in the drawings, these relative terms are intended to cover different orientations of the equipment and / or elements.

[0025] It should be understood that when an element is described as being "connected to," "coupled to," or "electrically coupled to" another element, the element may be directly connected or coupled, or there may be intermediate elements present.

[0026] As used herein, the term "memory device" is intended to mean a non-transitory computer-readable storage medium that stores computer instructions or computer code that can be executed by one or more processors. References to "memory device" herein should be interpreted as including one or more memory devices.

[0027] As used herein, the term "processor" encompasses an electronic component capable of executing computer programs or executable computer instructions. References to a computer including "processor" herein should be interpreted as one or more processors. A processor may, for example, be a multi-core processor comprising multiple processing cores, each of which may include multiple processing stages in a processing pipeline. A processor may also refer to a collection of processors within a single system or distributed across multiple systems.

[0028] As used herein, the term "logic" refers to digital circuitry that is combined and configured in a particular way to implement one or more functions, such as digital gate structures. For example, control logic can be a combination of digital circuitry that has been combined and configured in a particular way to implement one or more control functions, whether alone in hardware or in a combination of hardware, software, and / or firmware.

[0029] Computing devices may include multiple subsystems, cores, or other components. Such computing devices may be, for example, personal computing devices (PCDs), such as laptops or handheld computers, cellular phones or smartphones, portable digital assistants, portable game consoles, car security systems, etc., or non-portable computing devices (NPCDs), such as PCs, desktop computers, or workstation computers.

[0030] Figure 1 A block diagram of an orbital power telemetry system 100 with the aforementioned dedicated interface configuration is illustrated. System 100 includes N voltage regulators 101 for regulating the supply voltage of N subsystems 102 of SoC 103 via N dedicated interfaces 104, where N is a positive integer. This configuration is sometimes referred to as a load-line based orbital power telemetry system because it uses load-line sensing feedback to determine the necessary adjustments to the output voltage supplied by the voltage regulators 101 to the respective subsystems 102. Load lines 105 typically include circuit elements such as inductors 106 and capacitors 107 that electrically couple the output of the voltage regulators 101 to the circuitry of the respective subsystems 102.

[0031] Each subsystem 102 includes interface logic and pins, in Figure 1 This is represented by IF block 111. Similarly, each voltage regulator 101 includes interface logic and pins, in Figure 1The IF blocks 111 and 112 are represented by IF blocks 112. These IF blocks 111 and 112 are interconnected via wires 104a and 104b of interface 104. Wires 104a and 104b respectively carry clock and data signals between IF blocks 111 and 112 to transmit commands, data, and acknowledgments between voltage regulator 101 and subsystem 102, thereby obtaining telemetry readings. Furthermore, the sensing circuit 114 in voltage regulator 101 uses feedback 113 to sense the load current on load line 105 and uses the sensed load current to calculate the adjustment to the output voltage on load line 105.

[0032] Figure 2 Graph 200 shows the load current versus output voltage, illustrating how voltage regulator 101 dynamically adjusts the output voltage supplied to subsystem 102 on load line 105 using load current sensed by voltage regulator 101. Graph 200 represents the output voltage V of voltage regulator 101 on load line 105. OUT With the load current I on the load line 105 负载 The curves represent the changes. In curve 200, the load current and output voltage values ​​are respectively represented on the X and Y axes of a Cartesian coordinate system. The straight line 201 with a negative slope corresponds to the following formula: V OUT =(-slope x I) 负载 )+ V OUT_REQ Formula 1 Where V OUT_REQ The output voltage requested by subsystem 102 from voltage regulator 101 (or from PMIC), - slope is the slope of line 201 and I 负载 This is the load current sensed on load line 105. The slope is a value specified by the original equipment manufacturer (OEM). Based on the known slope and V... OUT_REQ The value and based on I 负载 Based on the sensed value, voltage regulator 101 calculates the new V. OUT It is then delivered to subsystem 102 via load line 105.

[0033] As pointed out above, Figure 1 One drawback of the dedicated interface configuration shown is that dedicated interface 104 increases cost because additional pins and logic are required in the PMIC and SoC 103 to implement the dedicated interface. Furthermore, there is interface latency associated with the communication protocol used by IF blocks 111 and 112 to communicate with each other via lines 104a and 104b. For example, V OUT_REQThe value is sent by subsystem 102 to the corresponding voltage regulator 101 (or to the PMIC including voltage regulator 101) via interface 104. Furthermore, current orbital power telemetry requirements necessitate that subsystem 102 obtain the sensed load current value so that subsystem 102 can know its own load.

[0034] Generally, the communication protocol of dedicated interface 104 uses handshake technology to ensure that IF blocks 111 and 112 are ready to send or receive data, and then send and receive data through interface 104. If the reception is successful, the receive IF block 111 or 112 then sends a reception acknowledgment through interface 104. All these activities consume power consumption (BW) and introduce latency, which adversely affects power management and overall performance.

[0035] The representative implementation described below relates to an orbital power telemetry system, which preferably has a one-to-one arrangement of voltage regulators and subsystems (with...). Figure 1 The system 100 shown is similar, but it no longer requires a dedicated interface 104 to enable subsystems 102 to obtain their own current load values ​​from the voltage regulator 101. Therefore, the interface delay associated with interface 104 and its adverse performance impact are avoided. Furthermore, the cost associated with a dedicated interface is also avoided.

[0036] Figure 3 This is a block diagram of the orbital power telemetry system 300 of this disclosure according to a representative implementation scheme. (and) Figure 1 Similar to system 100 shown, system 300 includes N voltage regulators 301 for regulating the supply voltage of the N subsystems 302 of SoC 310. (And...) Figure 1 Unlike system 100 shown, each subsystem 302 of system 300 includes an output voltage sensing and averaging circuit 320 and arithmetic logic 330. The voltage sensing and averaging circuit 320 is configured to sense the average output voltage V on the load line 105. OUT_AVG Arithmetic logic 330 includes components configured to be V-based. OUT_AVG And based on V OUT_REQ The load current I on load line 105 is calculated using the known value of the slope. 负载 The logic. (See above for reference.) Figure 1 As pointed out, Figure 1 In the dedicated interface configuration of the type shown, subsystem 102 is configured to provide V to voltage regulator 101 via dedicated interface 104. OUT_REQ Value. Therefore, subsystem 102 knows or is configured to easily determine V. OUT_REQ value. Figure 3 Subsystem 302 of system 300 shown is also configured to know or easily determine V. OUT_REQThe slope is specified by the OEM and therefore subsystem 302 knows the value.

[0037] Using these known values ​​and the measured or sensed V OUT_AVG Value, Arithmetic Logic 330 uses the rearrangement of the terms in Formula 1 above and V OUT_AVG Replace V in Formula 1 OUT The following formula is used to calculate I. 负载 : I 负载 =(V OUT_AVG – V OUT_REQ Slope Formula 2 Using this formula, I 负载 The value is calculated by subsystem 302, and does not need to be obtained from voltage regulator 302.

[0038] Figure 4 This is a flowchart illustrating a method for performing track power telemetry in a SoC, based on a representative implementation. Block 401 shows the use of a voltage regulator to convert the output voltage V via the load line. OUT The step of delivering to at least one subsystem of the SoC. Box 402 represents the step of sensing the average value of the output voltage VOUT_AVG delivered to the subsystem over a predetermined time period in the subsystem. Box 403 represents the step of using the sensed average output voltage VOUT_AVG in the subsystem. OUT_AVG To calculate the load current I on the load line. 负载 The steps are as follows. As indicated above, the load current I... 负载 Formula 2 can be used based on the sensed V OUT_AVG Value and V OUT_REQ It is calculated using the known value of the slope.

[0039] It should be noted that it is possible to Figure 4 Add steps to the flowchart, and you can get from Figure 4 The steps can be removed from the flowchart without departing from the scope of this application. For example, the calculated load current value can be used internally by subsystem 302 for power management or other purposes and / or forwarded to other subsystems 302 of SoC 310. Therefore, Figure 4 The process illustrated in the flowchart may include Figure 4 Additional steps not described in the text.

[0040] I is calculated using Formula 2. 负载 This value can be used in a SoC for many reasons, as those skilled in the art will understand from the description provided herein. For example, the SoC's power management system can use this value. 负载 Values ​​are used to perform power budgeting and / or load peak current management.

[0041] Figure 5 Examples are given based on representative implementation schemes. Figure 3 The block diagrams of circuits 320 and 330 shown are used to determine V. OUT_AVG The value is used in Formula 2 to calculate I. 负载 Value. A variety of digital and analog circuits can be used to perform... Figure 3 The operation of circuits 320 and 330 is shown. According to this implementation, digital logic is used to calculate V. OUT_AVG and I 负载 The voltage sampling circuit 501 samples the voltage on the load line 105 within a predetermined time period, converts the sampled value into a digital value, and stores the digital sampled value in the sampling memory 502. The summation and division by N logic 503 reads the sampled values ​​from the sampling memory 502, sums them, and divides the summed value by N to obtain V. OUT_AVG Where N is the number of samples used to calculate the average. The sampling memory 502 is not necessary in all cases, such as when summing and dividing by N. Logic 503 includes some type of buffer for storing sampled values ​​obtained within a sampling period corresponding to a predetermined time period. Arithmetic logic 330 includes logic configured to perform the process represented by Equation 2, based on V. OUT_AVG And based on V OUT_REQ The load current I on load line 105 is calculated using the known value of the slope. 负载 .

[0042] Passive and active analog circuits can also be used to perform calculations V OUT_AVG And use it in Formula 2 to calculate I 负载 The process is as those skilled in the art will understand from the description provided herein. For example, a resistor network can be used as a passive averaging circuit, and an integrator operational amplifier (Op Amp) with a capacitor in its feedback loop can be used as an active averaging circuit. The predetermined time period for averaging the voltage on load line 105 can be based on the loop response time of the voltage regulator. For example, if the loop response time of the voltage regulator is 2 microseconds (µs), then the predetermined time period for averaging the voltage can also be 2µs.

[0043] Figure 6 An example is given based on another representative implementation scheme. Figure 3 The block diagrams of circuits 320 and 330 shown are used to determine V. OUT_AVG The value is used in Formula 2 to calculate I. 负载 Value. According to this implementation scheme, the analog integrator Op Amp circuit 601 is used to calculate V. OUT_AVG and I 负载 Value. The output of the integrator Op Amp circuit 601 is V. OUT_AVG The analog-to-digital converter (ADC) 602 will convert V...OUT_AVG Value converted to number V OUT_AVG Value and output the number V OUT_AVG The value is converted to arithmetic logic 330, which performs the process represented by Equation 2, based on V. OUT_AVG And based on V OUT_REQ The load current I on load line 105 is calculated using the known value of the slope. 负载 .

[0044] It should be noted that, except for Figure 6 The analog circuit shown is an external analog circuit to obtain V. OUT_AVG Value. As noted above, the average voltage value can be obtained using a passive circuit that includes a resistor network. Alternatively, this can be achieved using a combination of analog and digital circuits.

[0045] Figure 7 Examples of PCD 700 are illustrated, such as mobile phones or smartphones, for example, exemplary embodiments of systems, methods, computer-readable media, and other examples in which the inventive principles and concepts of this disclosure may be implemented. PCD 700 includes Figure 3 The system 300 shown includes Figure 3 The SoC 310 shown is illustrated. For clarity, Figure 7 Some interconnects, signals, etc. are not shown.

[0046] As noted above, the SoC 310 may include various subsystems, such as, for example, a CPU 701, a memory subsystem 702, an NPU 705, a GPU 706, a DSP 707, an analog signal processor 708, a modem / transceiver 754, etc. The CPU 701 may include one or more CPU cores, such as a first CPU core 7011, a second CPU core 7012, etc., up to the Mth CPU core 701. M .

[0047] Display controller 709 and touchscreen controller 712 may be coupled to CPU 701. A touchscreen display 714 external to SoC 310 may be coupled to display controller 709 and touchscreen controller 712. PCD 700 may also include a video decoder 716 coupled to CPU 701. Video amplifier 718 may be coupled to video decoder 716 and touchscreen display 714. Video port 720 may be coupled to video amplifier 718. Universal Serial Bus (“USB”) controller 722 may also be coupled to CPU 701, and USB port 724 may be coupled to USB controller 722. User identity module (“SIM”) card 726 may also be coupled to CPU 701.

[0048] Memory subsystem 702 may be coupled to CPU 701. Memory subsystem 702 may include volatile memory and non-volatile memory. Examples of volatile memory include static random access memory (“SRAM”) and dynamic random access memory (“DRAM”). One or more memories may include local cache memory and system-level cache memory (e.g., Level 3 (L3) cache memory). CPU 701 may also include cache memory, such as Level 1 (L1) and Level 2 (L2) cache memory.

[0049] A stereo audio codec 734 can be coupled to an analog signal processor 708. Additionally, an audio amplifier 736 can be coupled to the stereo audio codec 734. A first stereo speaker 738 and a second stereo speaker 740 can be coupled to the audio amplifier 736, respectively. Furthermore, a microphone amplifier 742 can be coupled to the stereo audio codec 734, and a microphone 744 can be coupled to the microphone amplifier 742. An FM radio tuner 746 can be coupled to the stereo audio codec 734. An FM antenna 748 can be coupled to the FM radio tuner 746. Additionally, a stereo headset 750 can be coupled to the stereo audio codec 734. Other devices that can be coupled to the CPU 701 include one or more digital (e.g., CCD or CMOS) cameras 752.

[0050] The modem / transceiver 754 can be coupled to the analog signal processor 708 and the CPU 701. The RF switch 756 can be coupled to the modem / transceiver 754 and the RF antenna 758. Additionally, a keypad 760 and a mono headset 762 with a microphone can be coupled to the analog signal processor 708. The SoC 310 may have one or more internal or on-chip thermal sensors 770. A power supply 774 and a PMIC 776 can power the SoC 310.

[0051] Firmware or software may be stored in any of the memories described above, or in local memory directly accessible to the processor hardware executing the software or firmware thereon. (See above references.) Figure 4 The described methods may be executed alone in hardware or in a combination of hardware and software and / or firmware. Any software and / or firmware may be stored in any suitable storage device, whether local to the subsystem or external. Any such memory or other non-transitory storage medium having firmware or software stored therein in a computer-readable form may be an example of a non-transitory "computer-readable medium," as understood in the patent dictionary.

[0052] Specific implementation examples are described in the following numbered clauses:

[0053] 1. A method for performing orbital power telemetry in a system-on-a-chip (SoC), the method comprising: In the subsystem of the SoC: The average value of the output voltage delivered to the subsystem by the voltage regulator through the load line over a predetermined time period is sensed; and The load current on the load line is calculated using at least the average value of the output voltage.

[0054] 2. The method according to Clause 1, wherein the step of calculating the load current on the load line using at least the average value of the output voltage comprises: calculating the load current using the average value of the output voltage in combination with a known slope of the load current-output voltage relationship specified for the SoC and a known output voltage requested by the subsystem.

[0055] 3. The method according to any one of Clauses 1 to 2, wherein the voltage regulator includes circuitry for sensing load current on the load line and circuitry for calculating a new output voltage to be delivered to the subsystem based at least in part on the sensed load current.

[0056] 4. The method according to Clause 3, further comprising: Using the circuit for sensing the load current on the load line, the load current on the load line is sensed; and The circuitry used to calculate the new output voltage to be delivered to the subsystem based at least in part on the sensed load current uses the sensed load current and a known slope of the load current-output voltage relationship specified for the SoC to determine the new output voltage.

[0057] 5. The method according to any one of clauses 1 to 4, wherein the step of sensing the average value of the output voltage delivered to the subsystem over a predetermined time period includes: The output voltage delivered to the subsystem within the predetermined time period is sampled to obtain N sample values, where N is a positive integer greater than one; The N sample values ​​are summed to obtain a total value; and Divide the sum by N.

[0058] 6. The method according to any one of clauses 1 to 4, wherein the step of sensing the average value of the output voltage delivered to the subsystem over a predetermined time period comprises: The output voltage delivered to the subsystem within the predetermined time period is integrated to obtain the average value of the output voltage.

[0059] 7. The method according to any one of clauses 1 to 6, wherein the step of calculating the load current on the load line using the average value of the output voltage comprises: processing the value according to the following formula: I 负载 =(V OUT_AVG – V OUT_REQ ) / - slope, Among them I 负载 The calculated load current, V OUT_AVG It is the sensed average value of the output voltage, V OUT_REQ The known output voltage is requested by the subsystem and the slope is a known value specified for the SoC.

[0060] 8. A system for performing orbital power telemetry in a system-on-a-chip (SoC), the system comprising: At least one subsystem, disposed on the SoC and electrically coupled to a load line, wherein an output voltage is delivered to the subsystem by a voltage regulator via the load line, the subsystem comprising: A voltage sensing and averaging circuit, configured to sense the average value of the output voltage delivered to the subsystem over a predetermined time period; and Arithmetic logic, configured to calculate the load current on the load line using at least the average value of the output voltage.

[0061] 9. The system according to Clause 8, wherein the arithmetic logic is configured to calculate the load current using the average output voltage in combination with the known slope of the load current-output voltage curve specified for the SoC and the known output voltage requested by the subsystem.

[0062] 10. The system according to any one of Clauses 7 to 8, wherein the voltage regulator includes circuitry configured to sense a load current on the load line and circuitry configured to calculate a new output voltage to be output on the load line based at least in part on the sensed load current.

[0063] 11. The system according to Clause 10, wherein the circuitry configured to calculate the new output voltage to be delivered to the subsystem based at least in part on the sensed load current uses the sensed load current and a known slope of the load current-output voltage relationship specified for the SoC to determine the new output voltage.

[0064] 12. The system according to any one of clauses 8 to 11, wherein the voltage sensing and averaging circuitry comprises: A voltage sampling circuit is configured to sense the output voltage delivered to the subsystem within the predetermined time period to obtain N sample values, where N is a positive integer greater than one; and The logic is configured to sum the N sample values ​​to obtain a sum, and divide the sum by N to obtain the average value of the output voltage.

[0065] 13. The system according to any one of clauses 8 to 11, wherein the voltage sensing and averaging circuitry comprises: An integrator circuit configured to integrate the output voltage delivered to the subsystem over the predetermined time period to obtain the average value of the output voltage.

[0066] 14. The system according to any one of clauses 8 to 13, wherein the arithmetic logic is configured to use the average output voltage according to the following formula: I 负载 =(V OUT_AVG – V OUT_REQ ) / - slope, Among them I 负载 The calculated load current, V OUT_AVG It is the sensed average value of the output voltage, V OUT_REQ The known output voltage is requested by the subsystem and the slope is a known value specified for the SoC.

[0067] 15. A computer program for performing track power telemetry in a system-on-a-chip (SoC), the computer program being implemented on a non-transitory computer-readable medium, wherein a voltage regulator delivers an output voltage to a subsystem of the SoC via a load line, and wherein the subsystem includes processing logic for executing computer instructions, the computer instructions comprising: A first set of computer instructions is used to obtain the average value of the output voltage delivered to the subsystem over a predetermined time period; and A second set of computer instructions is used to calculate the load current on the load line based at least on the average value of the output voltage calculated by the first set of computer instructions.

[0068] 16. The computer program according to Clause 15, wherein the second set of computer instructions calculates the load current on the load line based at least on the average value of the output voltage calculated by the first set of computer instructions, a known slope of the load current-output voltage relationship specified for the SoC, and a known output voltage requested by the subsystem.

[0069] 17. A computer program according to any one of clauses 15 to 16, wherein the first set of computer instructions obtains the average value of the output voltage delivered to the subsystem during the predetermined time period by: Obtain N sampled values ​​of the output voltage delivered to the subsystem within the predetermined time period, where N is a positive integer greater than one; The N sample values ​​are summed to obtain a total value; and Divide the sum by N.

[0070] 18. A computer program according to any one of clauses 15 to 17, wherein the second set of computer instructions calculates the load current according to the following formula: I 负载 =(V OUT_AVG – V OUT_REQ ) / - slope, Among them I 负载 The calculated load current, V OUT_AVG It is the sensed average value of the output voltage, V OUT_REQ The known output voltage is requested by the subsystem and the slope is a known value specified for the SoC.

[0071] 19. A computer program according to any one of clauses 15, 16, and 18, wherein the first set of computer instructions obtains the average value of the output voltage delivered to the subsystem during the predetermined time period by: The digital output of the integrator circuit is received, which averages the output voltage delivered to the subsystem over the predetermined time period.

[0072] 20. A computer program pursuant to Clause 19, wherein the second set of computer instructions calculates the load current according to the following formula: I 负载 =(V OUT_AVG – V OUT_REQ ) / - slope, Among them I 负载 The calculated load current, V OUT_AVG It is the sensed average value of the output voltage, V OUT_REQ The known output voltage is requested by the subsystem and the slope is a known value specified for the SoC.

[0073] In view of this disclosure, alternative embodiments will become apparent to those skilled in the art to which this invention pertains. Therefore, although alternative aspects have been illustrated and described in detail, it should be understood that various substitutions and changes may be made therein.

Claims

1. A method for performing orbital power telemetry in a system-on-a-chip (SoC), the method comprising: In the subsystem of the SoC: The average value of the output voltage delivered to the subsystem by the voltage regulator through the load line over a predetermined time period is sensed; as well as The load current on the load line is calculated using at least the average value of the output voltage.

2. The method of claim 1, wherein the step of calculating the load current on the load line using at least the average of the output voltage comprises: The load current is calculated using the average value of the output voltage, combined with the known slope of the load current-output voltage relationship specified for the SoC, and the known output voltage requested by the subsystem.

3. The method of claim 1, wherein the voltage regulator includes circuitry for sensing load current on the load line and circuitry for calculating a new output voltage to be delivered to the subsystem based at least in part on the sensed load current.

4. The method according to claim 3, further comprising: The load current on the load line is sensed using the circuit for sensing the load current on the load line; as well as The circuitry used to calculate the new output voltage to be delivered to the subsystem based at least in part on the sensed load current uses the sensed load current and a known slope of the load current-output voltage relationship specified for the SoC to determine the new output voltage.

5. The method of claim 1, wherein the step of sensing the average value of the output voltage delivered to the subsystem over a predetermined time period comprises: The output voltage delivered to the subsystem is sampled within the predetermined time period to obtain N sample values; The N sample values ​​are summed to obtain a total value; as well as Divide the sum by N.

6. The method of claim 1, wherein the step of sensing the average value of the output voltage delivered to the subsystem over a predetermined time period comprises: The output voltage delivered to the subsystem within the predetermined time period is integrated to obtain the average value of the output voltage.

7. The method of claim 1, wherein the step of using the average of the output voltage to calculate a load current on the load line comprises: The value is processed according to the following formula: I 负载 = (V OUT_AVG – V OUT_REQ ) / slope, where I 负载 is the calculated load current, V OUT_AVG is the sensed average value of the output voltage, V OUT_REQ is a known output voltage requested by the subsystem and the slope is a known value specified for the SoC.

8. A system for performing orbital power telemetry in a system-on-a-chip (SoC), the system comprising: At least one subsystem, disposed on the SoC and electrically coupled to a load line, wherein an output voltage is delivered to the subsystem by a voltage regulator via the load line, the subsystem comprising: A voltage sensing and averaging circuit, configured to sense the average value of the output voltage delivered to the subsystem over a predetermined time period; and Arithmetic logic, configured to calculate the load current on the load line using at least the average value of the output voltage.

9. The system of claim 8, wherein the arithmetic logic is configured to calculate the load current using the average output voltage in combination with a known slope of a load current-output voltage curve specified for the SoC and a known output voltage requested by the subsystem.

10. The system of claim 8, wherein the voltage regulator comprises a circuit configured to sense a load current on the load line, and a circuit configured to compute a new output voltage to be output on the load line based at least in part on the sensed load current.

11. The system of claim 10, wherein the circuit configured to compute the new output voltage to be delivered to the subsystem based at least in part on the sensed load current uses the sensed load current and a known slope of a load current-output voltage relationship specified for the SoC to determine the new output voltage.

12. The system of claim 8, wherein the voltage sensing and averaging circuit comprises: a voltage sampling circuit configured to sense the output voltage delivered to a respective the subsystem over the predetermined time period to obtain N sample values, where N is a positive integer greater than one; and and logic configured to sum the N sample values to obtain a sum value, and divide the sum value by N to obtain the average value of the output voltage.

13. The system of claim 8, wherein the voltage sensing and averaging circuit comprises: an integrator circuit configured to integrate the output voltage delivered to the subsystem over the predetermined time period to obtain the average value of the output voltage.

14. The system of claim 8, wherein the arithmetic logic is configured to use the average output voltage according to the following formula: I 负载 = (V OUT_AVG – V OUT_REQ ) / slope, where I 负载 is the calculated load current, V OUT_AVG is the sensed average value of the output voltage, V OUT_REQ is a known output voltage requested by the subsystem and the slope is a known value specified for the SoC.

15. A computer program for performing rail power telemetry in a system on a chip (SoC), the computer program embodied on a non-transitory computer readable medium, wherein a voltage regulator delivers an output voltage to a subsystem of the SoC via a load line and wherein each of the subsystems comprises processing logic for executing computer instructions, the computer instructions comprising: a first set of computer instructions for obtaining an average value of the output voltage delivered to the subsystem over a predetermined time period; and a second set of computer instructions for computing a load current on the load line based at least on the average value of the output voltage computed by the first set of computer instructions.

16. The computer program of claim 15, wherein the second set of computer instructions computes the load current on the load line based at least on the average value of the output voltage computed by the first set of computer instructions, a known slope of a load current-output voltage relationship specified for the SoC, and a known output voltage requested by the subsystem.

17. The computer program of claim 15, wherein the first set of computer instructions obtains the average value of the output voltage delivered to the subsystem over the predetermined time period by: obtaining N sample values of the output voltage delivered to the subsystem over the predetermined time period, where N is a positive integer greater than one; summing the N sample values to obtain a sum value; and dividing the sum value by N.

18. The computer program of claim 17, wherein the second set of computer instructions calculates the load current according to the following formula: I 负载 = (V OUT_AVG – V OUT_REQ ) / slope, where I 负载 is the calculated load current, V OUT_AVG is the sensed average value of the output voltage, V OUT_REQ is a known output voltage requested by the subsystem and the slope is a known value specified for the SoC.

19. The computer program of claim 15, wherein the first set of computer instructions obtains the average value of the output voltage delivered to the subsystem over the predetermined time period by: receiving a digitized output of an integrator circuit that averages the output voltage delivered to the subsystem over the predetermined time period.

20. The computer program of claim 19, wherein the second set of computer instructions calculates the load current according to the following formula: I 负载 = (V OUT_AVG – V OUT_REQ ) / slope, where I 负载 is the calculated load current, V OUT_AVG is the sensed average value of the output voltage, V OUT_REQ is a known output voltage requested by the subsystem and the slope is a known value specified for the SoC.