Soft soil foundation reinforcing structure
By using a combined structure of columns and connecting rods on a soft soil foundation, the problem of pile tipping caused by instability in soft soil is solved, and the stability of the columns and the reinforcement effect are improved.
Patent Information
- Application Number
- CN202323489384.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-21
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-12-21
AI Technical Summary
When dealing with soft soil foundations, the pile driving reinforcement method may cause the piles to topple due to the instability of the soft soil, and cannot effectively fix the soft soil layer, resulting in poor reinforcement results.
A soft soil foundation reinforcement structure including columns and connecting rods is adopted. Connecting rods are installed on the side surfaces of the columns to form a rectangular whole. Vertical connecting nails and positioning nails are used to enhance the stability of the columns, and the soil layers are divided through connecting rods to increase the horizontal direction. Tension to prevent the column from tipping over.
It effectively avoids the toppling of a single column, enhances the stability of the column in soft soil, and ensures the stability and fixation effect of the reinforced structure.
Smart Images

Figure CN221798397U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of soft soil foundation reinforcement, in particular to a soft soil foundation reinforcement structure. Background Art
[0002] Soft soil refers to fine-grained soil with high natural water content, large porosity, high compressibility and low shear strength deposited in coastal areas, lakes, valleys and riverbanks. It has the characteristics of high natural water content, large natural porosity, high compressibility, low shear strength, small consolidation coefficient, long consolidation time, high sensitivity, high disturbance, poor permeability, complex layered distribution of soil layers, and large differences in physical and mechanical properties between layers.
[0003] When dealing with soft soil foundations, if the soil layer is reinforced by piling, due to the instability of the soft soil, the piles may topple over and fail to fix the soft soil layer. Therefore, a soft soil foundation reinforcement structure is needed to meet people's needs. Utility Model Content
[0004] The purpose of the utility model is to provide a soft soil foundation reinforcement structure to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a soft soil foundation reinforcement structure, including a reinforcement structure main body; the reinforcement structure main body is provided with columns, and the side surfaces of the columns are installed with connecting rods, four of the columns form a rectangle, and two connecting rods are installed between two adjacent columns, and vertical connecting nails and positioning nails are installed at both ends of the connecting rods.
[0006] Preferably, the columns are provided with lower interfaces and upper interfaces, and the columns are provided with vertical nail holes.
[0007] Preferably, the lower interfaces on the columns are all located directly below the upper interfaces, and the vertical nail holes vertically penetrate the lower interfaces and the upper interfaces.
[0008] Preferably, a connecting rod side block is installed at one end of the connecting rod, and a connecting rod inner block is installed at the other end of the connecting rod.
[0009] Preferably, the connecting rod side block and the connecting rod inner block are both provided with vertical nail holes, and the vertical connecting nails and positioning nails are respectively slidably installed in the vertical nail holes.
[0010] Preferably, the corresponding two groups of the connecting rod side blocks and the connecting rod inner blocks are installed together on the same lower interface, and the corresponding two groups of the connecting rod side blocks and the connecting rod inner blocks are installed together on the same upper interface.
[0011] Preferably, the vertical nail hole is matched with the vertical nail hole, and the vertical connecting nail passes through the vertical nail hole and the vertical nail hole at the same time.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] The utility model combines and splices two groups of connecting rod side blocks and connecting rod inner blocks, and inserts them into the lower interface and the upper interface, so that the connecting rod and the column are connected together, and then the vertical connecting nails are inserted into the column, and pass through the vertical nail holes on the connecting rod side blocks and the connecting rod inner blocks, so that the two layers of connecting rods and the columns are fixedly connected together again, so that the columns are combined into a rectangle through the connecting rods, so that the columns form a whole, and the single column is prevented from tipping over. At the same time, the soil layer is divided by the connecting rods, the lateral pulling force is strengthened, and the stability of the column in soft soil is increased. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 A three-dimensional structural schematic diagram of a soft soil foundation reinforcement structure proposed by the utility model;
[0015] Figure 2 This is a schematic diagram of placing a soft soil foundation reinforcement structure in a foundation pit proposed by the utility model;
[0016] Figure 3 This is a structural schematic diagram of a soft soil foundation reinforcement structure including columns and connecting rods proposed by the utility model;
[0017] Figure 4 The utility model provides a structural schematic diagram of a connecting rod and vertical connecting nails and other structures of a soft soil foundation reinforcement structure.
[0018] In the figure: 1. reinforcement structure body; 2. column; 3. connecting rod; 4. vertical connecting nail; 5. positioning nail; 21. lower interface; 22. upper interface; 23. vertical nail hole; 31. connecting rod side block; 32. connecting rod inner block; 33. vertical nail hole. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] Example: See Figure 1-4The utility model provides a technical solution: a soft soil foundation reinforcement structure, including a reinforcement structure main body 1; in order to solve the problem that piles driven into the soft soil layer may fall down due to the instability of the soft soil, a column 2 is provided on the reinforcement structure main body 1, and a lower interface 21 and an upper interface 22 are opened on the column 2, and a vertical nail hole 23 is opened on the column 2. The lower interface 21 on the column 2 is located directly below the upper interface 22, and the vertical nail hole 23 vertically penetrates the lower interface 21 and the upper interface 22. In order to increase the stability of the column 2 and prevent a single column 2 from falling down in the soft soil, a connecting rod 3 is installed on the side surface of the column 2, and the four columns 2 form a rectangle. The four columns 2 are connected into a rectangle through the connecting rod 3, so that the column 2 forms a whole To prevent a single column 2 from tipping over, two connecting rods 3 are installed between two adjacent columns 2. Vertical connecting nails 4 and positioning nails 5 are installed at both ends of the connecting rod 3, and a connecting rod side block 31 is installed at one end of the connecting rod 3, and a connecting rod inner block 32 is installed at the other end of the connecting rod 3. The corresponding two groups of connecting rod side blocks 31 and connecting rod inner blocks 32 are installed together on the same lower interface 21, and the corresponding two groups of connecting rod side blocks 31 and connecting rod inner blocks 32 are installed together on the same upper interface 22. The two groups of connecting rod side blocks 31 and connecting rod inner blocks 32 are combined and spliced, and inserted into the lower interface 21 and the upper interface 22, so that the connecting rod 3 is connected to the column 2 together, and the connecting rod side blocks 31 and the connecting rod inner blocks 32 are provided. There are vertical nail holes 33, and the vertical connecting nails 4 and the positioning nails 5 are slidably installed in the vertical nail holes 33 respectively. The vertical nail holes 33 are adapted to the vertical nail holes 23, and the vertical connecting nails 4 penetrate the vertical nail holes 23 and the vertical nail holes 33 at the same time. When reinforcing the soft soil foundation, the soft soil is first dug out, the soft soil is dried to remove the moisture contained in the soil, and then the column 2 is inserted into the foundation pit. The four columns 2 form a rectangle. After the columns 2 are inserted, the partially dried soil is backfilled into the foundation pit and the backfill soil is compacted until the backfill soil is flush with the lower interface 21 on the column 2, and the connecting rod side blocks 31 and the connecting rod inner blocks 32 at both ends of the connecting rod 3 are respectively inserted into the lower interface 21, and the two sets of connecting rod side blocks 31 and the connecting rod inner blocks 32 completely fill the lower interface 21. At this time The columns 2 are connected to each other through the connecting rod 3, and the connecting rod 3 exposed outside is used to pass the positioning nail 5 through the corresponding connecting rod side block 31 and the vertical nail hole 33 on the connecting rod inner block 32, and the bottom of the positioning nail 5 is inserted into the bottom of the foundation pit, and the connecting rod 3 exposed outside is fixed by the positioning nail 5. After the connecting rod 3 is inserted into the lower interface 21, the backfill soil is filled and compacted into the foundation pit again until the backfill soil is flush with the upper interface 22 on the column 2, and the connecting rod side blocks 31 and the connecting rod inner blocks 32 at both ends of the connecting rod 3 are respectively inserted into the upper interface 22, and the two groups of connecting rod side blocks 31 and connecting rod inner blocks 32 completely fill the upper interface 22, and the columns 2 are connected to each other again, and the vertical nail hole 33 at the end of the connecting rod 3 exposed outside is sleeved on the positioning nail 5.At this time, the vertical connecting nail 4 is inserted into the column 2 through the vertical nail hole 23 at the top of the column 2. The vertical connecting nail 4 will pass through the upper interface 22 and the lower interface 21, and at the same time pass through the vertical nail hole 33 on the connecting rod side block 31 and the connecting rod inner block 32, and the two layers of connecting rods 3 are fixedly connected to the column 2 again. Finally, the remaining soil is backfilled into the pit to bury the reinforcement structure body 1, and the foundation is fixed through the column 2 and the connecting rod 3.
[0021] The working principle is as follows: when reinforcing the soft soil foundation, first dig out the soft soil part, dry the soft soil, remove the moisture contained in the soil, and then insert the column 2 into the foundation pit. The four columns 2 form a rectangle. After the column 2 is inserted, the partially dried soil is backfilled into the foundation pit and the backfill soil is compacted until the backfill soil is flush with the lower interface 21 on the column 2, and the connecting rod side blocks 31 and the connecting rod inner blocks 32 at both ends of the connecting rod 3 are respectively inserted into the lower interface 21. The two groups of connecting rod side blocks 31 and the connecting rod inner blocks 32 completely fill the lower interface 21. At this time, the columns 2 are connected to each other through the connecting rod 3, and the connecting rod 3 exposed outside is passed through the positioning nail 5 through the corresponding connecting rod side blocks 31 and the vertical nail holes 33 on the connecting rod inner blocks 32. The bottom of the positioning nail 5 is inserted into the bottom of the foundation pit, and the connecting rod 3 exposed outside is fixed by the positioning nail 5, and the connecting rod 3 is inserted into the lower interface 2 After that, fill and tamp the backfill soil into the foundation pit again until the backfill soil is flush with the upper interface 22 on the column 2, insert the connecting rod side blocks 31 and the connecting rod inner blocks 32 at both ends of the connecting rod 3 into the upper interface 22 respectively, and the two sets of connecting rod side blocks 31 and the connecting rod inner blocks 32 will completely fill the upper interface 22, and connect the columns 2 to each other again, and the vertical nail holes 33 at the ends of the connecting rod 3 exposed to the outside are sleeved on the positioning nails 5. At this time, the vertical connecting nails 4 are inserted into the column 2 through the vertical nail holes 23 at the top of the column 2. The vertical connecting nails 4 will pass through the upper interface 22 and the lower interface 21, and at the same time pass through the vertical nail holes 33 on the connecting rod side blocks 31 and the connecting rod inner blocks 32, and the two layers of connecting rods 3 are fixedly connected to the column 2 again, and finally the remaining soil is backfilled into the pit, the reinforcement structure body 1 is buried, and the foundation is fixed by the column 2 and the connecting rod 3.
[0022] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A soft soil foundation reinforcement structure, comprising a reinforcement structure main body (1); characterized in that: The reinforcement structure body (1) is provided with a column (2), and a connecting rod (3) is installed on the side surface of the column (2). Four of the columns (2) form a rectangle, and two connecting rods (3) are installed between two adjacent columns (2). Vertical connecting nails (4) and positioning nails (5) are installed at both ends of the connecting rod (3).
2. A soft soil foundation reinforcement structure according to claim 1, characterized in that: The columns (2) are each provided with a lower interface (21) and an upper interface (22), and the columns (2) are each provided with a vertical nail hole (23).
3. A soft soil foundation reinforcement structure according to claim 2, characterized in that: The lower interfaces (21) on the upright posts (2) are all located directly below the upper interfaces (22), and the vertical nail holes (23) vertically penetrate the lower interfaces (21) and the upper interfaces (22).
4. The soft soil foundation reinforcement structure according to claim 2, characterized in that: A connecting rod side clamping block (31) is installed at one end of the connecting rod (3), and a connecting rod inner clamping block (32) is installed at the other end of the connecting rod (3).
5. The soft soil foundation reinforcement structure according to claim 4, characterized in that: The connecting rod side block (31) and the connecting rod inner block (32) are both provided with vertical nail holes (33), and the vertical connecting nails (4) and the positioning nails (5) are respectively slidably installed in the vertical nail holes (33).
6. The soft soil foundation reinforcement structure according to claim 4, characterized in that: The two corresponding groups of the connecting rod side blocks (31) and the connecting rod inner blocks (32) are installed together on the same lower interface (21), and the two corresponding groups of the connecting rod side blocks (31) and the connecting rod inner blocks (32) are installed together on the same upper interface (22).
7. The soft soil foundation reinforcement structure according to claim 5, characterized in that: The vertical nail hole (33) is matched with the vertical nail hole (23), and the vertical connecting nail (4) passes through the vertical nail hole (23) and the vertical nail hole (33) at the same time.
