Earth excavation backfilling device for engineering construction

By designing an earth excavation and backfill device that includes a support plate, an oil cylinder, an earth digging bucket, a cylinder, a moving component and a soil loosening component, the existing technology problems of high site area requirements and soil purity are solved, and the problem of small area is achieved. Efficient and safe earth excavation and backfilling on site.

CN221798547UActive Publication Date: 2024-10-01HUBEI XIAOTIAN WATER CONSERVANCY & HYDROPOWER CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420359749.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-27
Publication Date
2024-10-01
Estimated Expiration
2034-02-27

AI Technical Summary

Technical Problem

The existing earth excavation and backfilling work requires a large construction site area, and it is difficult to ensure the purity of the soil by directly using an excavator to backfill the soil, and it is easy to damage the facilities.

Method used

An earth excavation and backfill device including a support plate, an oil cylinder, an earth digging bucket, a cylinder, a moving component and a loosening component is designed. By adjusting the depth and angle of the excavation, the moving component and the loosening component are used to achieve convenient soil excavation. and backfill to prevent stones from directly damaging the facility.

Benefits of technology

It achieves efficient earth excavation and backfilling on a small area, reduces manpower requirements, ensures soil purity, and avoids damage to facilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221798547U_ABST
    Figure CN221798547U_ABST
Patent Text Reader

Abstract

The utility model is suitable for the technical field of constructional engineering, and provides an earth excavation backfilling device for engineering construction. The oil cylinder is arranged on the supporting plate and is used for adjusting the digging depth; the mounting plate is fixed on an output rod of the oil cylinder; the earth cutting bucket is hinged to the bottom of the mounting plate and is used for cutting and storing earth; the air cylinder is hinged to the bottom of the supporting plate and used for adjusting the angle of the earth cutting bucket, and an output rod of the air cylinder is hinged to the earth cutting bucket. According to the earth excavation backfilling device for engineering construction provided by the scheme, the structure is relatively simple, the requirement for operation specialty is relatively low, hardened soil can be loosened before excavation, the digging difficulty is reduced, meanwhile, discharged soil can be screened, and the situation that facilities in pits are damaged due to the fact that stones in the soil directly fall off is prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of construction engineering, and particularly relates to an earth excavation and backfilling device for engineering construction. Background Art

[0002] Earthwork is one of the main projects in construction projects, including all aspects of earth (stone) excavation, filling, transportation, drainage, precipitation, etc. In civil engineering, earthwork includes: site leveling, roadbed excavation, civil air defense project excavation, ground filling, roadbed filling and foundation pit backfilling.

[0003] Existing earth excavation and backfilling work is mostly completed by excavators, which is not suitable for construction in small areas. At the same time, it is difficult to ensure the purity of the soil by directly backfilling the soil with excavators, and directly throwing mixed stones in the soil can easily damage the facilities in the pit. Utility Model Content

[0004] In order to solve the technical problem that the existing earth excavation and backfilling device for engineering construction has a high requirement on the area of ​​the construction site when completing the earth excavation and backfilling work, the utility model provides an earth excavation and backfilling device for engineering construction.

[0005] The utility model is implemented as follows: an earth excavation and backfilling device for engineering construction comprises: a support plate; a cylinder installed on the support plate for adjusting the depth of a pit; a mounting plate fixed on the output rod of the cylinder; a digging bucket hinged on the bottom of the mounting plate for digging and storing soil; a cylinder hinged on the bottom of the support plate for adjusting the angle of the digging bucket, the output rod of the cylinder being hinged to the digging bucket; a moving component arranged at the bottom of the support plate for assisting in the transfer of the device; and a loosening component installed at the bottom of the support plate, the loosening component being used to loosen compacted soil.

[0006] Preferably, the moving assembly includes a support frame arranged at the bottom of the support plate, and a plurality of moving wheels are rotatably mounted on the support frame; two second motors are mounted on the support frame, and the output shafts of the two second motors are respectively fixedly connected to any two of the moving wheels.

[0007] Preferably, the loosening assembly includes two screws rotatably mounted on the support plate; two first motors fixed on the support plate, and the output shafts of the two first motors are respectively fixedly connected to the two screws; a slide plate threadedly sleeved on the two screws, and the bottom of the slide plate is provided with a plurality of loosening cones that can be inserted into the ground.

[0008] Preferably, an electric telescopic rod is fixedly mounted on the support frame, a resistance plate is fixedly mounted on the output rod of the electric telescopic rod, an anti-skid pad is fixedly mounted on the bottom of the resistance plate, and the anti-skid pad can contact any one of the moving wheels.

[0009] Preferably, a screen is installed at the bottom of the digging bucket, and a plurality of clamping plates are fixed at the bottom of the digging bucket. The same baffle is slidably installed between the plurality of clamping plates, and the baffle can cover the bottom of the screen.

[0010] Preferably, a plurality of limit blocks are fixedly mounted on the bottom of the baffle, the plurality of limit blocks are in contact with a plurality of clamping plates respectively, and a plurality of earth-breaking cones are fixedly mounted on the top of the digging bucket.

[0011] Preferably, a sieve plate is placed in the digging bucket, and a plurality of limit rods are fixedly installed on the bottom of the sieve plate, and the plurality of limit rods can extend into the meshes of the sieve.

[0012] Preferably, a plurality of mounting grooves and solar panels are provided on the top of the support plate, and a limiting bolt is threadedly installed on the baffle plate, and the limiting bolt can be threadedly connected to the bottom of the digging bucket.

[0013] Compared with the related art, the earth excavation and backfilling device for engineering construction provided by the utility model has the following beneficial effects:

[0014] The device can be moved without any effort by arranging a moving component, compacted soil can be loosened by arranging a loosening component to facilitate subsequent digging, and a digging bucket can be provided to dig a hole on the ground, and the digging bucket can be used to store soil and then discharge it to fill the hole. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the main cross-sectional structure of an earth excavation and backfilling device for engineering construction provided by the utility model;

[0016] Figure 2 It is a rear view structural schematic diagram of the mobile component in the utility model;

[0017] Figure 3 This is a schematic diagram of the main cross-sectional structure of the earth-digging bucket in the utility model;

[0018] Figure 4 It is a schematic diagram of the three-dimensional structure of the clamping plate and the baffle in the utility model.

[0019] Figure numerals: 1. support plate; 2. oil cylinder; 3. mounting plate; 4. digging bucket; 5. cylinder; 6. screw; 7. first motor; 8. slide plate; 9. loosening cone; 10. support frame; 11. moving wheel; 12. second motor; 13. screen; 14. clamping plate; 15. baffle; 16. limit block; 17. breaking cone; 18. electric telescopic rod; 19. resistance plate. DETAILED DESCRIPTION

[0020] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by technicians in the technical field of this application; the terms used in the specification of the application herein are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" and any variations thereof in the specification and claims of this application and the above-mentioned drawings are intended to cover non-exclusive inclusions. The terms "first", "second", etc. in the specification and claims of this application or the above-mentioned drawings are used to distinguish different objects, not to describe a specific order.

[0021] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0022] The utility model provides an earth excavation and backfilling device for engineering construction, such as Figure 1-4 As shown, the earth excavation and backfilling device for engineering construction includes: a support plate 1; a cylinder 2 installed on the support plate 1 for adjusting the depth of the pit; a mounting plate 3 fixed on the output rod of the cylinder 2; a digging bucket 4 hinged on the bottom of the mounting plate 3 for digging and storing soil; a cylinder 5 hinged on the bottom of the support plate 1 for adjusting the angle of the digging bucket 4, the output rod of the cylinder 5 is hinged to the digging bucket 4; a moving component arranged at the bottom of the support plate 1 for assisting the transfer of the device; a loosening component installed at the bottom of the support plate 1, the loosening component is used to loosen compacted soil.

[0023] It should be noted that the existing earth excavation and backfilling work is mostly completed by excavators. The excavators are large in size. For small-area projects, it is difficult for the excavators to move to a suitable position, so the size of the construction site is relatively high. At the same time, the excavators need professionals to operate the excavation, which requires high professionalism and is inconvenient to construct. At the same time, the excavators are large in size, and the workers in the excavator cannot detect whether there are stones mixed in the excavation head. If the soil mixed with stones is directly backfilled, the stones can easily damage the facilities in the pit. For example, the water pipes arranged in the pit will be cracked by stones, which will cause seepage, and even the soil will be mixed in the clean water to pollute the clean water. Replacing the new water pipes again will cause waste.

[0024] In the present device, when it is necessary to excavate the soil, the air cylinder 5 is turned on, and the output rod of the air cylinder 5 is extended to adjust the angle of the digging bucket 4. Then the oil cylinder 2 is turned on to extend the output rod of the oil cylinder 2. At this time, the digging bucket 4 contacts the ground, so that a hole can be dug on the ground. When digging, the output rod of the air cylinder 5 is retracted to store the excavated soil, and the soil is transferred to the soil delivery point. Storing the soil in the digging bucket 4 is also convenient for subsequent filling work.

[0025] In a further preferred embodiment of the utility model, the moving component includes a support frame 10 arranged at the bottom of the support plate 1, and a plurality of moving wheels 11 are rotatably mounted on the support frame 10; two second motors 12 are mounted on the support frame 10, and the output shafts of the two second motors 12 are respectively fixedly connected to any two of the moving wheels 11.

[0026] In this embodiment, when the device needs to be moved, the second motor 12 is turned on, and the second motor 12 drives the moving wheel 11 to rotate to drive the device to move. During the process, the staff does not need to rely solely on manpower to push the device, thereby saving manpower.

[0027] In a further preferred embodiment of the utility model, the loosening assembly includes two screws 6 rotatably mounted on the support plate 1; two first motors 7 fixed on the support plate 1, and the output shafts of the two first motors 7 are respectively fixedly connected to the two screws 6; a slide plate 8 threadedly sleeved on the two screws 6, and the bottom of the slide plate 8 is provided with a plurality of loosening cones 9 that can be inserted into the ground.

[0028] In this embodiment, before excavating the soil, when the soil is relatively compacted, the first motor 7 is turned on. The first motor 7 drives the screw 6 to rotate to adjust the height of the slide plate 8. The slide plate 8 is lowered to allow the loosening cone 9 to be inserted into the ground, thereby drilling holes in the compacted soil, loosening the compacted soil, facilitating subsequent excavation, and reducing the difficulty of excavation by the excavator bucket 4.

[0029] In a further preferred embodiment of the utility model, an electric telescopic rod 18 is fixedly installed on the support frame 10, a resistance plate 19 is fixedly installed on the output rod of the electric telescopic rod 18, and an anti-slip pad is fixedly installed on the bottom of the resistance plate 19, and the anti-slip pad can contact any one of the moving wheels 11.

[0030] In this embodiment, when the device needs to be stabilized, the electric telescopic rod 18 is turned on, and the output rod of the electric telescopic rod 18 is extended to make the contact plate 19 close to the moving wheel 11. At this time, the anti-slip pad contacts the moving wheel 11, thereby preventing the moving wheel 11 from rotating when the device is in a static state and causing the device to move as a whole, thereby increasing the overall stability of the device.

[0031] In a further preferred embodiment of the utility model, a screen 13 is installed at the bottom of the digging bucket 4, and multiple clamping plates 14 are fixed to the bottom of the digging bucket 4. The same baffle 15 is slidably installed between the multiple clamping plates 14, and the baffle 15 can cover the bottom of the screen 13.

[0032] In this embodiment, when it is necessary to fill a hole on the ground, the soil is first excavated using the digging bucket 4, and then the device is moved above the hole, and the baffle 15 is pulled to expose the screen 13. At this time, the soil in the digging bucket 4 falls to fill the hole, and the screen 13 can prevent large pieces of stone from falling directly into the hole and causing damage to the facilities in the hole.

[0033] In a further preferred embodiment of the utility model, a plurality of limit blocks 16 are fixedly installed on the bottom of the baffle 15, and the plurality of limit blocks 16 are respectively in contact with the plurality of clamping plates 14, and a plurality of earth-breaking cones 17 are fixedly installed on the top of the digging bucket 4.

[0034] In this embodiment, the limit block 16 cooperates with the clamping plate 14 to increase the stability of the baffle 15, preventing the baffle 15 from falling off directly when pulling the baffle 15. The assistance of the breaking cone 17 can increase the convenience of the excavator bucket 4 in digging the soil, making it easier to destroy the integrity of the soil surface.

[0035] In a further preferred embodiment of the utility model, a sieve plate is placed in the digging bucket 4, and a plurality of limit rods are fixedly installed on the bottom of the sieve plate, and the plurality of limit rods can extend into the meshes of the sieve 13.

[0036] In this embodiment, stones of different sizes can be screened by replacing screen plates of different finenesses, and the stability of the screen plate can be increased by the limit rods and the screen mesh 13.

[0037] In a further preferred embodiment of the utility model, a plurality of mounting grooves and solar panels are provided on the top of the support plate 1 , and a limiting bolt is threadedly installed on the baffle 15 , and the limiting bolt can be threadedly connected to the bottom of the digging bucket 4 .

[0038] In this embodiment, solar energy can be converted into electrical energy and stored through solar panels for use in the operation of power supply components. The stability of the baffle 15 can be increased by limiting bolts to prevent the baffle 15 from shifting when the device is moved, causing the soil in the digging bucket 4 to fall, making it difficult to achieve the expected filling effect.

[0039] To sum up, the device has a relatively simple structure and requires low professional operation skills. It can loosen the compacted soil before excavation to reduce the difficulty of digging the pit. At the same time, it can screen the discharged soil to prevent stones in the soil from falling directly and causing damage to the facilities in the pit.

[0040] Compared with the related art, the present device can be transferred without any effort by setting a moving component, and can loosen the compacted soil by setting a loosening component to facilitate subsequent digging. By setting an excavation bucket 4, a hole can be dug on the ground, and the soil can be stored and discharged by the excavation bucket 4 to fill the hole.

[0041] It is worth noting that the circuits, electronic components and modules involved in the present utility model are all prior art and can be fully implemented by those skilled in the art. Needless to say, the content protected by the present utility model does not involve improvements to software and methods.

[0042] In the several embodiments provided in the present application, it should be understood that the disclosed device can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of the above-mentioned units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or communication connection shown or discussed can be through some interfaces, and the indirect coupling or communication connection between devices or units can be in the form of telecommunication or other forms.

[0043] The above embodiments are only used to illustrate the technical solutions of the utility model, rather than to limit the protection scope of the utility model. Obviously, the described embodiments are only some embodiments of the utility model, rather than all embodiments. Based on these embodiments, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model. Although the utility model has been described in detail with reference to the above embodiments, ordinary technicians in this field can still combine, add, delete or make other adjustments to the features in the various embodiments of the utility model according to the circumstances without conflict, without making creative work, so as to obtain different other technical solutions that do not deviate from the concept of the utility model in essence, and these technical solutions also belong to the scope of protection of the utility model.

Claims

1. An earth excavation and backfilling device for engineering construction, characterized in that: include: Support plate (1); An oil cylinder (2) mounted on the support plate (1) and used for adjusting the depth of the pit; A mounting plate (3) fixed on the output rod of the oil cylinder (2); A digging bucket (4) hinged to the bottom of the mounting plate (3) and used for digging and storing soil; A cylinder (5) is hingedly connected to the bottom of the support plate (1) and is used to adjust the angle of the digging bucket (4), wherein the output rod of the cylinder (5) is hingedly connected to the digging bucket (4); A moving component arranged at the bottom of the support plate (1) for assisting in the transfer of the device; A soil loosening assembly is installed at the bottom of the support plate (1), and is used to loosen compacted soil.

2. The earth excavation and backfilling device for engineering construction as claimed in claim 1, characterized in that: The mobile assembly comprises: A support frame (10) is arranged at the bottom of the support plate (1), and a plurality of moving wheels (11) are rotatably mounted on the support frame (10); Two second motors (12) are mounted on the support frame (10), and the output shafts of the two second motors (12) are respectively fixedly connected to any two of the moving wheels (11).

3. The earth excavation and backfilling device for engineering construction as claimed in claim 1, characterized in that: The loosening component comprises: Two screw rods (6) rotatably mounted on the support plate (1); Two first motors (7) fixed on the support plate (1), the output shafts of the two first motors (7) being fixedly connected to the two screw rods (6) respectively; A slide plate (8) is threadably sleeved on the two screw rods (6), and a plurality of loosening cones (9) that can be inserted into the ground are arranged at the bottom of the slide plate (8).

4. The earth excavation and backfilling device for engineering construction as claimed in claim 2, characterized in that: An electric telescopic rod (18) is fixedly mounted on the support frame (10), a contact plate (19) is fixedly mounted on the output rod of the electric telescopic rod (18), an anti-skid pad is fixedly mounted on the bottom of the contact plate (19), and the anti-skid pad can contact any one of the moving wheels (11).

5. The earth excavation and backfilling device for engineering construction as claimed in claim 1, characterized in that: A screen (13) is installed at the bottom of the digging bucket (4), and a plurality of clamping plates (14) are fixed at the bottom of the digging bucket (4). A same baffle (15) is slidably installed between the plurality of clamping plates (14), and the baffle (15) can cover the bottom of the screen (13).

6. The earth excavation and backfilling device for engineering construction as claimed in claim 5, characterized in that: A plurality of limit blocks (16) are fixedly mounted on the bottom of the baffle (15), and the plurality of limit blocks (16) are respectively in contact with the plurality of clamping plates (14), and a plurality of earth-breaking cones (17) are fixedly mounted on the top of the digging bucket (4).

7. The earth excavation and backfilling device for engineering construction as claimed in claim 5, characterized in that: A sieve plate is placed in the digging bucket (4), and a plurality of limit rods are fixedly mounted on the bottom of the sieve plate. The plurality of limit rods can extend into the meshes of the sieve (13).

8. The earth excavation and backfilling device for engineering construction as claimed in claim 5, characterized in that: The top of the support plate (1) is provided with a plurality of mounting grooves and solar panels, and a limit bolt is threadedly mounted on the baffle (15), and the limit bolt can be threadedly connected to the bottom of the digging bucket (4).