Cast-in-place pile composite hole-forming construction drill bit
Through the cooperation of the arc plate, plate body and annular plate, combined with the connecting rod and positioning block, the drill bit scraper and the spindle are separated, which solves the problem of the existing drill bit needing to replace the spindle after the cutting teeth are damaged, reduces the use cost and Improved operational efficiency.
Patent Information
- Application Number
- CN202323628742.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-12-29
AI Technical Summary
After the existing drill bits are damaged, the main spindle can only be replaced as a whole, resulting in increased usage costs.
Through the cooperation of the arc plate, plate body and annular plate, the separation between the scraper and other structures and the main shaft is realized. A single replacement of the scraper is adopted, combined with the cooperation of the connecting rod, positioning block and second screw, to achieve quick connection and economical operation. time.
It realizes the separation of the scraper and other structures from the spindle, reduces the cost of use, solves the problem of the existing drill bit needing to replace the spindle after the cutting teeth are damaged, and improves the operating efficiency.
Smart Images

Figure CN221799670U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bored pile drill bits, in particular to a bored pile composite hole-forming construction drill bit. Background Art
[0002] Concrete bored piles have become the preferred foundation form for domestic and foreign buildings (structures), especially large buildings (structures) such as bridges, oil tanks, liquefied natural gas tanks, and nuclear power plants because of their high bearing capacity, strong adaptability, and pile lengths of up to 100 meters, thereby reducing the number of piles. The main construction process of concrete bored piles is: hole formation, steel cage placement, and concrete pouring, so a composite hole construction drill bit for bored piles is provided.
[0003] In the above main construction process, hole forming is a key link. In the hole forming process, a three-wing scraper drill bit is usually used to drill into the formation.
[0004] However, when the cutting teeth of the existing drill bit are damaged, the main shaft can only be replaced as a whole, which increases the cost of use in actual use. Utility Model Content
[0005] In view of the deficiencies in the prior art, the utility model provides a composite hole-forming construction drill bit for cast-in-place piles, which solves the problem that the existing drill bit can only replace the main shaft as a whole when the cutting teeth are damaged, which increases the cost of use in actual use.
[0006] To achieve the above-mentioned purpose, the utility model is implemented through the following technical solutions: a cast-in-place pile composite hole construction drill bit, including a main shaft, two annular grooves on the outside of the main shaft are movably connected with two arc plates, the outsides of the two arc plates are fixed with two annular plates that fit each other through two plate bodies, the outsides of the annular plates are fixed with protrusions that fit each other, the inner sides of the two protrusions are fixedly connected by bolts, three scrapers are welded on the inner sides of the two annular plates, and multiple first cutting teeth are installed on the outer sides of the three scrapers, and drill tips are movably connected to the grooves below the two sides of the main shaft, and multiple second cutting teeth are installed below the drill tips.
[0007] Preferably, a scraper block is installed on the outer side of the two annular plates, and the two scraper blocks are symmetrically distributed with respect to the center of the main shaft.
[0008] Preferably, the multiple through holes of the three scrapers are all fixedly connected with an annular reinforcement piece.
[0009] Preferably, a plate body is attached to the front side of the drill tip, one side of the plate body is fixedly connected to the outer side of the main shaft, and the plate body and the drill tip are fixedly connected by a first screw.
[0010] Preferably, a circular sleeve is fixedly connected to the top of the main shaft, a connecting rod is movably connected to the top groove of the circular sleeve, two positioning blocks are fixedly connected to the outer side of the connecting rod, the outer side of the positioning block is movably connected to the inner groove of the circular sleeve, and the outer side of the connecting rod is fixedly connected to the outer side of the circular sleeve by a second screw.
[0011] Beneficial Effects
[0012] The utility model provides a composite hole-forming construction drill bit for cast-in-place piles. The utility model has the following beneficial effects: the composite hole-forming construction drill bit for cast-in-place piles realizes the separation between the scraper and other structures and the main shaft through the cooperation between the arc plate, the plate body and the annular plate. Compared with the scraper that is easily damaged, the method of replacing the scraper and other structures by a single method saves the use cost, and solves the problem that the existing drill bit can only replace the main shaft as a whole after the cutting teeth and other structures are damaged, which increases the use cost in actual use.
[0013] Through the cooperation between the connecting rod, the positioning block and the second screw, a quick connection with an external connecting rod is achieved, which makes it easy for users to find the installation position and saves operation time. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the structure of the utility model;
[0015] Figure 2 for Figure 1 A schematic diagram of the structure of the middle connecting rod, the positioning block and the second screw;
[0016] Figure 3 for Figure 1 Schematic diagram of the structure of the middle arc plate, plate body and annular plate;
[0017] Figure 4 for Figure 1 Schematic diagram of the structure of the middle drill tip, the second cutting tooth and the plate body.
[0018] In the figure: 1, main shaft, 2, connecting rod, 3, positioning block, 4, second screw, 5, arc plate, 6, plate body, 7, annular plate, 8, mud scraper block, 9, protrusion, 10, bolt, 11, round sleeve, 12, scraper, 13, first cutting tooth, 14, annular reinforcement, 15, drill tip, 16, second cutting tooth, 17, plate body, 18, first screw. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] When the cutting teeth of the existing drill bit are damaged, the main shaft can only be replaced as a whole, which increases the cost of use in actual use.
[0021] In view of this, a composite hole-forming construction drill bit for cast-in-place piles is provided. Through the cooperation between the arc plate, the plate body and the annular plate, the separation between the scraper and other structures and the main shaft is realized. Compared with the scraper that is easily damaged, the single replacement method of the scraper and other structures is adopted to save the use cost, and solves the problem that the existing drill bit can only replace the main shaft as a whole when the cutting teeth are damaged, which increases the use cost in actual use.
[0022] By those skilled in the art, the components in this case are connected in sequence. The specific connection and operation sequence should refer to the following working principle. The detailed connection means are well-known technologies in the art. The following mainly introduces the working principle and process.
[0023] Embodiment 1: By Figure 1 , 3 As can be seen from 4, a composite hole-forming construction drill bit for cast-in-place piles comprises a main shaft 1, two annular grooves on the outer side of the main shaft 1 are movably connected to two arc plates 5, and the arc plates 5 can be placed in the annular grooves of the main shaft 1 for positioning, and the outer sides of the two arc plates 5 are fixedly connected with two annular plates 7 that fit each other through two plate bodies 6, and the outer sides of the annular plates 7 are fixedly connected with convex blocks 9 that fit each other, and the inner sides of the two convex blocks 9 are fixedly connected by bolts 10, and three scrapers 12 are welded on the inner sides of the two annular plates 7, two of the three scrapers 12 are fixed on one annular plate 7 by welding, and the other scraper 12 is welded on the other annular plate 7, and the outer sides of the three scrapers 12 are installed with a plurality of first cutting teeth 13, and the grooves below the two sides of the main shaft 1 are movably connected with drill tips 15, and a plurality of second cutting teeth 16 are installed below the drill tips 15, and the drill tips 15, scrapers 12, first cutting teeth 13 and second cutting teeth 16 cooperate with each other to realize drilling work;
[0024] In the specific implementation process, it is worth pointing out that the bolt 10 can be used to fix the two annular plates 7. Through the cooperation between the scraper 12, the first cutting teeth 13 and the second cutting teeth 16, the separation between the scraper 12 and other structures and the main shaft 1 is realized. Compared with the scraper 12 that is easily damaged, the method of replacing the scraper 12 and other structures alone saves the use cost, and solves the problem that the existing drill bit can only replace the main shaft 1 as a whole after the cutting teeth and other parts are damaged, which increases the use cost in actual use.
[0025] Furthermore, the outer sides of the two annular plates 7 are both equipped with scraper blocks 8, and the two scraper blocks 8 are symmetrically distributed with the center of the main shaft 1 as the reference;
[0026] In the specific implementation process, it is worth pointing out that the scraper block 8 can scrape the sludge when the drill bit rotates;
[0027] Furthermore, the multiple through holes of the three scrapers 12 are all fixedly connected with an annular reinforcement member 14;
[0028] In the specific implementation process, it is worth pointing out that the annular reinforcement member 14 is an annular alloy member, which penetrates the three scrapers 12, thereby improving the strength of the scrapers 12, wherein the annular reinforcement member 14 is divided into two parts, and there is no need to disassemble the two annular plates 7;
[0029] Furthermore, a plate 17 is attached to the front of the drill tip 15, one side of the plate 17 is fixedly connected to the outer side of the spindle 1, and the plate 17 and the drill tip 15 are fixedly connected by a first screw 18;
[0030] In the specific implementation process, it is worth noting that the user can rotate the first screw 18 to fix the drill tip 15;
[0031] Specifically, when using the cast-in-place pile composite hole construction drill bit, the user can place the two arc plates 5 in the annular groove corresponding to the main shaft 1, and then the user can fix it with the bolt 10. When installing the drill tip 15, the drill tip 15 can be aligned with the groove of the main shaft 1 and inserted, and then the user can turn the first screw 18 to fix it.
[0032] Embodiment 2: By Figure 1-2 It can be seen that a round sleeve 11 is fixedly connected to the top of the main shaft 1, and a connecting rod 2 is movably connected to the top groove of the round sleeve 11. Two positioning blocks 3 are fixedly connected to the outer side of the connecting rod 2. The outer side of the positioning blocks 3 is movably connected to the inner groove of the round sleeve 11. The positioning blocks 3 can facilitate the user to find the installation position of the round sleeve 11. The outer side of the connecting rod 2 is fixedly connected to the outer side of the round sleeve 11 through the second screw 4.
[0033] In the specific implementation process, it is worth pointing out that the user can fix the round sleeve 11 by the second screw 4;
[0034] Specifically, on the basis of the above-mentioned embodiment 1, through the cooperation between the connecting rod 2, the positioning block 3 and the second screw 4, a quick connection with the external connecting rod 2 is achieved, which is convenient for the user to find the installation position and saves operation time.
[0035] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".
[0036] In the present utility model, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the utility model according to the specific circumstances.
[0037] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A composite hole-forming construction drill bit for cast-in-place piles, comprising a main shaft (1), characterized in that: The two annular grooves on the outer side of the main shaft (1) are movably connected to two arc-shaped plates (5), and the outer sides of the two arc-shaped plates (5) are fixedly connected to two annular plates (7) that fit together through two plate bodies (6). The outer sides of the annular plates (7) are fixedly connected to convex blocks (9) that fit together, and the inner sides of the two convex blocks (9) are fixedly connected by bolts (10). Three scrapers (12) are welded to the inner sides of the two annular plates (7), and the outer sides of the three scrapers (12) are each installed with a plurality of first cutting teeth (13). The grooves below the two sides of the main shaft (1) are movably connected to drill tips (15), and a plurality of second cutting teeth (16) are installed below the drill tips (15).
2. A composite hole-forming construction drill bit for cast-in-place piles according to claim 1, characterized in that: Mud scraping blocks (8) are installed on the outer sides of the two annular plates (7), and the two mud scraping blocks (8) are symmetrically distributed with the center of the main shaft (1) as a reference.
3. A composite hole-forming construction drill bit for cast-in-place piles according to claim 1, characterized in that: The multiple through holes of the three scrapers (12) are all fixedly connected with an annular reinforcement member (14).
4. A composite hole-forming construction drill bit for cast-in-place piles according to claim 1, characterized in that: A plate body (17) is attached to the front side of the drill tip (15), one side of the plate body (17) is fixedly connected to the outer side of the main shaft (1), and the plate body (17) and the drill tip (15) are fixedly connected by a first screw (18).
5. The composite hole-forming construction drill bit for cast-in-place piles according to claim 1, characterized in that: A circular sleeve (11) is fixedly connected to the top of the main shaft (1), a connecting rod (2) is movably connected to the top groove of the circular sleeve (11), two positioning blocks (3) are fixedly connected to the outer side of the connecting rod (2), the outer side of the positioning block (3) is movably connected to the inner groove of the circular sleeve (11), and the outer side of the connecting rod (2) is fixedly connected to the outer side of the circular sleeve (11) via a second screw (4).