Gangue filling slurry viscosity detection device
By designing a gangue filling slurry viscosity detection device and using float valves and relays to achieve real-time online detection, the problem of gangue filling slurry viscosity detection is solved, clogging accidents are reduced, and the adjustment accuracy of the gangue and water ratio is improved.
Patent Information
- Application Number
- CN202420259318.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-01-31
Smart Images

Figure CN221803746U_ABST
Abstract
Description
Technical field:
[0001] The utility model relates to the technical field of viscosity detection of gangue-filled slurry, in particular to a device for detecting viscosity of gangue-filled slurry. Background technology:
[0002] In coal mining projects, after the minerals (coal and gangue) are mined, the gangue and coal will be completely separated after the systematic sorting of the coal preparation plant, and a separation zone will appear in the stratum. In order to prevent the stratum from collapsing downward, grouting is usually carried out into the separation zone below; and in the grouting process, the gangue is mainly ground into powder and mixed with water to form a slurry, which is pumped into the separation zone by the pressure of a high-pressure pump, and forms a support column after solidification. However, the ratio of the slurry must meet the transportation requirements of the high-pressure pump to ensure the coordination of the ratio of gangue and water, so that the viscosity of the slurry meets the standard; if there is too much water, the gangue processing capacity will be low, and if there is too little water, the viscosity will be high, which will either block the pipe or the pump, or even block the inlet of the separation zone. After the viscosity meets the standard, it will be pumped into the orifice by the pressure of the pump. At present, there is a lack of detection equipment for the viscosity of gangue filling slurry, and it is mainly judged by on-site workers based on experience. However, manual judgment is inevitably prone to errors, and it cannot provide reliable data support for adjusting the ratio of gangue and water. In addition, manual inspections to judge the viscosity of the slurry cannot obtain real-time viscosity data and cannot detect problems in a timely manner. Utility model content:
[0003] The utility model aims to provide a device for detecting viscosity of gangue-filled slurry.
[0004] The utility model is implemented by the following technical scheme: a gangue filling slurry viscosity detection device, which includes a slurry storage barrel, a detection hopper, a stop button, a start button, a first intermediate relay, a second intermediate relay, a third intermediate relay, a first time relay, a second time relay and a timer, the slurry storage barrel is connected with the feed port at the top of the detection hopper through a feed pipe, a feed solenoid valve is installed on the feed pipe, the bottom of the detection hopper is connected with a discharge pipe, a discharge solenoid valve is installed on the discharge pipe, and a float valve is installed inside the detection hopper; the start button, the normally closed contact of the float valve and the coil of the first intermediate relay are connected in series to form a first branch; the first normally open contact of the first intermediate relay and the first normally open contact of the third intermediate relay are both connected to the start button In parallel; the second normally open contact of the first intermediate relay is connected in series with the coil of the second intermediate relay to form a second branch, the second normally open contact of the second intermediate relay is connected in series with the coil of the feeding solenoid valve to form a third branch, the normally open contact of the float valve is connected in series with the coil of the first time relay to form a fourth branch, the normally open contact of the first time relay, the coil of the discharging solenoid valve and the timer are connected in series to form a fifth branch, and the coil of the second time relay is connected in parallel with the coil of the discharging solenoid valve; the normally open contact of the second time relay, the normally closed contact of the second intermediate relay and the coil of the third intermediate relay are connected in series to form a sixth branch, and the stop button is connected in series with the first branch, the second branch, the third branch, the fourth branch, the fifth branch and the sixth branch respectively, and then connected to the power supply circuit; the output end of the timer is connected to the controller.
[0005] Furthermore, the second normally open contact of the third intermediate relay is connected in parallel with the normally open contact of the second time relay.
[0006] The advantages of the utility model are as follows: when the feed solenoid valve is opened, the slurry flows from the slurry storage barrel into the detection hopper, the float is floated up by buoyancy, and the feed solenoid valve is closed after reaching the upper limit. After the slurry is stable for a certain period of time, the discharge solenoid valve is opened. When the discharge solenoid valve is opened, the slurry will flow out through the discharge pipe, and the timer starts timing at the same time, until the slurry in the detection hopper reaches the lower limit of the float, the discharge solenoid valve is closed, and the timer stops timing at the same time. The time obtained by the timer is uploaded to the controller, providing an effective basis for the staff to judge the viscosity of the slurry, which helps to reduce the occurrence of blockage accidents. In addition, by setting a third intermediate relay, real-time online detection can be achieved. Description of the drawings:
[0007] Figure 1 It is a schematic diagram of the overall structure of the utility model.
[0008] Figure 2 This is a circuit diagram of the utility model.
[0009] Tag Name
[0010] 1-slurry storage barrel, 2-detection hopper, 3-feeding pipe, 4-discharging pipe, 5-controller, K-float valve, KA1-first intermediate relay, KA2-second intermediate relay, KA3-third intermediate relay, KT1-first time relay, KT2-second time relay, SB1-stop button, SB2-start button, YM1-feeding solenoid valve, YM2-discharging solenoid valve, T-timer. Specific implementation method:
[0011] In the description of the present invention, it should be noted that if the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, if the terms "first", "second", "third" appear, they are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0012] like Figure 1 and Figure 2 As shown, the gangue filling slurry viscosity detection device includes a slurry storage barrel 1, a detection hopper 2, a stop button SB1, a start button SB2, a first intermediate relay KA1, a second intermediate relay KA2, a third intermediate relay KA3, a first time relay KT1, a second time relay KT2 and a timer T.
[0013] The slurry storage barrel 1 is connected to the feed port at the top of the detection hopper 2 through the feed pipe 3, and a feed solenoid valve YM1 is installed on the feed pipe 3. The bottom of the detection hopper 2 is connected to a discharge pipe 4, and a discharge solenoid valve YM2 is installed on the discharge pipe 4. A float valve K is installed inside the detection hopper 2;
[0014] The start button SB2, the normally closed contact of the float valve K and the coil of the first intermediate relay KA1 are connected in series to form a first branch. The first normally open contact of the first intermediate relay KA1 and the first normally open contact of the third intermediate relay KA3 are both connected in parallel with the start button SB2. The second normally open contact of the first intermediate relay KA1 and the coil of the second intermediate relay KA2 are connected in series to form a second branch.
[0015] The second normally open contact of the second intermediate relay KA2 is connected in series with the coil of the feeding electromagnetic valve YM1 to form the third branch, the normally open contact of the float valve K is connected in series with the coil of the first time relay KT1 to form the fourth branch, the normally open contact of the first time relay KT1 is connected in series with the coil of the discharging electromagnetic valve YM2 to form the fifth branch, and the coil of the second time relay KT2 is connected in parallel with the coil of the discharging electromagnetic valve YM2; the normally open contact of the second time relay KT2, the normally closed contact of the second intermediate relay KA2 and the coil of the third intermediate relay KA3 are connected in series to form the sixth branch, and the stop button SB1 is connected in series with the first branch, the second branch, the third branch, the fourth branch, the fifth branch and the sixth branch respectively, and then connected to the power supply line. The second normally open contact of the third intermediate relay KA3 is connected in parallel with the normally open contact of the second time relay KT2. The output end of the timer T is connected to the controller 5.
[0016] Working process:
[0017] First, press the start button SB2 - the coil of the first intermediate relay KA1 is energized - the first normally open contact of the first intermediate relay KA1 is closed to form a self-locking state, the second normally open contact of the first intermediate relay KA1 is closed, the coil of the second intermediate relay KA2 is energized - the first normally open contact of the second intermediate relay KA2 is closed to form a self-locking state, the second normally open contact of the second intermediate relay KA2 is closed - the coil of the feed solenoid valve YM1 is energized, and the slurry in the slurry storage barrel 1 enters the detection hopper 2 through the feed pipe 3. When the material level in the detection hopper 2 reaches the upper limit of the float valve K, the normally closed contact of the float valve K is disconnected, and the coil of the feed solenoid valve YM1 loses power;
[0018] When the normally closed contact of the float valve K is disconnected, the normally open contact of the float valve K is closed, and the coil of the first time relay KT1 is energized to start timing. When the set time is reached, the normally open contact of the first time relay KT1 is closed, and the coil of the discharge solenoid valve YM2 is energized, and the slurry in the detection hopper 2 is discharged from the discharge pipe 4. At the same time, the timer T starts timing.
[0019] When the normally open contact of the first time relay KT1 is closed, the coil of the second time relay KT2 is energized to start timing;
[0020] When the liquid level in the detection hopper 2 is lower than the lower limit of the float valve K, the normally closed contact of the float valve K is closed, the normally open contact is closed, the coil of the discharge electromagnetic valve YM2 is de-energized, the timer T stops timing and transmits the time data to the controller 5. The staff determines the viscosity of the slurry according to the material flow time; the shorter the flow time, the lower the viscosity, and the longer the flow time, the higher the viscosity.
[0021] When the coil of the discharge solenoid valve YM2 loses power, the coil of the second time relay KT2 also loses power - the normally open contact of the second time relay KT2 closes with a delay - the coil of the third intermediate relay KA3 is energized - the second normally open contact of the third intermediate relay KA3 closes to form a self-locking state, and at the same time, the first normally open contact of the third intermediate relay KA3 is closed - the coil of the first intermediate relay KA1 is energized - the second normally open contact of the first intermediate relay KA1 is closed and the normally closed contact is disconnected - the coil of the third intermediate relay KA3 loses power, and at the same time, the coil of the feeding solenoid valve YM1 is energized, and the above process is repeated to achieve real-time online detection.
[0022] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solution deviate from the scope of the technical solution of the embodiments of the utility model.
Claims
1. A device for detecting viscosity of gangue-filled slurry, characterized in that: The invention comprises a slurry storage barrel (1), a detection hopper (2), a stop button (SB1), a start button (SB2), a first intermediate relay (KA1), a second intermediate relay (KA2), a third intermediate relay (KA3), a first time relay (KT1), a second time relay (KT2) and a timer (T); the slurry storage barrel (1) is connected to a feed port at the top of the detection hopper (2) through a feed pipe (3); a feed solenoid valve (YM1) is installed on the feed pipe (3); a discharge pipe (4) is connected to the bottom of the detection hopper (2); a discharge solenoid valve (YM2) is installed on the discharge pipe (4); a float valve (K) is installed inside the detection hopper (2); the start button (SB2), the normally closed contact of the float valve (K) and the coil of the first intermediate relay (KA1) are connected in series to form a first branch circuit; the first normally open contact of the first intermediate relay (KA1) and the first normally open contact of the third intermediate relay (KA3) are both connected to the start button (SB2); B2) in parallel; the second normally open contact of the first intermediate relay (KA1) and the coil of the second intermediate relay (KA2) are connected in series to form a second branch, the second normally open contact of the second intermediate relay (KA2) and the coil of the feeding electromagnetic valve (YM1) are connected in series to form a third branch, the normally open contact of the float valve (K) and the coil of the first time relay (KT1) are connected in series to form a fourth branch, the normally open contact of the first time relay (KT1), the coil of the discharging electromagnetic valve (YM2) and the timer (T) are connected in series to form a fifth branch, the coil of the second time relay (KT2) and the coil of the discharging electromagnetic valve (YM2) are connected in parallel; the normally open contact of the second time relay (KT2), the normally closed contact of the second intermediate relay (KA2) and the coil of the third intermediate relay (KA3) are connected in series to form a sixth branch, and the stop button (SB1) is connected in series with the first branch, the second branch, the third branch, the fourth branch, the fifth branch and the sixth branch respectively and then connected to the power supply circuit; the output end of the timer (T) is connected to the controller.
2. The gangue filling slurry viscosity detection device according to claim 1, characterized in that: The second normally open contact of the third intermediate relay (KA3) is connected in parallel with the normally open contact of the second time relay (KT2).