Penetration test structure for steep dip angle wide fault

By designing the permeability test structure for steeply inclined and wide fault zones, the problem of deviation in on-site original sample test results and blockage of water conduction channels in steeply inclined and wide fault zones has been solved, achieving the accuracy and reliability of the test results and meeting the requirements of hydraulic concrete testing. Maintenance time requirements of the regulations.

CN221803755UActive Publication Date: 2024-10-01XINJIANG WATER RESOURCES & HYDROPOWER SURVEY DESIGN & RES INST CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323042004.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-10
Publication Date
2024-10-01
Estimated Expiration
2033-11-10

AI Technical Summary

Technical Problem

Existing technology makes it difficult to conduct on-site intact sample permeability tests in steeply inclined and wide fault zones, resulting in deviations in test results and blockage problems in water conduction channels.

Method used

A permeability test structure for steeply inclined and wide faults was designed, including the original site, a water inlet bin and a water outlet bin. There is a cushion layer and a yellow mud layer on the top, and a concrete layer and a steel bar layer around it. It is sealed through multiple pourings. space to reduce the deviation of water seepage, and additional vent holes at the top of the water inlet and outlet bins to avoid clogging of the water conduit channels.

Benefits of technology

It effectively reduces the deviation of the test results, meets the optimal curing time requirements in the hydraulic concrete test regulations, solves the problem of blockage of the water conduction channel, and improves the accuracy and reliability of the test.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221803755U_ABST
    Figure CN221803755U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of penetration tests, in particular to a penetration test structure for a steep dip angle wide fault. The device comprises an on-site undisturbed sample, a water inlet bin is arranged on one side of the on-site undisturbed sample, a water outlet bin is arranged on the other side of the on-site undisturbed sample, cushion layers are arranged at the tops of the water inlet bin and the water outlet bin, exhaust holes are fixedly communicated between the water inlet bin and the cushion layers, a water inlet pipe is fixedly communicated in the water inlet bin close to the bottom, and a water outlet pipe is fixedly communicated in the water outlet bin close to the top. According to the utility model, the on-site undisturbed sample forms an effective closed space through multiple times of pouring, so that the deviation of a test result caused by water seepage of the sample in the test process is reduced, and the overall curing time meets the requirements of the optimal curing time in the standard hydraulic concrete test regulation through multiple times of pouring; the cushion layers are additionally arranged on the tops of the water inlet bin and the water outlet bin, and yellow mud is laid on the cushion layers, so that the problem of clogging of the water guide channel caused by pouring of concrete samples on the tops can be effectively avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of permeability test, in particular to a permeability test structure with a steep inclination and wide fault. Background Art

[0002] The fault zone mainly consists of the fault fracture zone in the middle and the influence zones on both sides. The fault fracture zone mainly develops fault breccia and fault mud. This is because the rocks on both sides are severely broken under the action of stress, and are arranged in the form of randomly arranged breccias; the influence zone is mainly distributed in limited areas on both sides of the fault or in the area where the stress is released at the end of the fault. The rocks in this zone are not broken, and only small-scale and multi-order cracks are developed. The cracks are later filled with mud, iron, calcite, etc. The fault zone has the characteristics of low strength, large deformation and good permeability. It is often the main channel for groundwater flow and the weakest zone on the underground engineering structure surface in the dam site area. Therefore, the research work on the on-site original sample test of the steep-angle fault zone is of great significance for the long-term infiltration safety and stability of the water conservancy project hub under complex engineering geological conditions.

[0003] Indoor tests, field tests and in-situ tests are the main methods for obtaining the permeability characteristic parameters of fault zones. Among them, field tests include pumping tests, water pressure tests and field original sample 1 tests. Indoor tests, pumping tests and water pressure tests are small in size and simple in test methods. Their results are affected by the size effect and have large anisotropy differences. In-situ tests are studies conducted in actual engineering environments. They can better reflect the actual stress state of broken rock mass under high-pressure water, but the sample production cost is high and the engineering cycle is long. On-site original sample tests are permeability tests conducted when a sealed space is formed and the stress conditions are relieved. They are often an effective means to understand the permeability characteristics of fault zones.

[0004] At present, most of the in-situ undisturbed sample permeability test studies are conducted on the conditions of gently inclined interlayer dislocation zones, and the in-situ samples to be tested are basically carried out in a way that the middle is an interlayer dislocation zone and the two sides are bedrock. It is not convenient to conduct in-situ undisturbed sample permeability deformation sample tests on steeply inclined wide fault zones.

[0005] In view of this, the utility model provides a permeability test structure with a steep inclination and wide fault. Utility Model Content

[0006] The utility model provides a permeability test structure for steep-angle wide faults, which comprises an original sample on site, a sampling position is arranged on the top of the original sample on site, a branch hole is excavated at the top 0.5m to 0.7m above the upper end of the original sample on site, and the branch hole is square and surrounds the original sample on site;

[0007] A water inlet bin is provided on one side of the original on-site sample, and a water outlet bin is provided on the other side of the original on-site sample. A cushion layer is provided on the top of the water inlet bin and the water outlet bin. An exhaust hole is fixedly connected between the water inlet bin and the cushion layer. A water inlet pipe is fixedly connected inside the water inlet bin near the bottom, and a water outlet pipe is fixedly connected inside the water outlet bin near the top.

[0008] As a further improvement of the technical solution, a concrete layer is provided around the water inlet bin and the water outlet bin, a yellow mud layer is provided on the top of the cushion layer, and a steel bar layer is provided between the yellow mud layer and the top of the concrete layer.

[0009] As a further improvement of the technical solution, the on-site original sample is a square structure, the left and right sides and the top of the on-site original sample are fixed with steel plates, and the repaired part of the branch hole is supported by pad stones or steel plates.

[0010] As a further improvement of the technical solution, the water inlet bin and the water outlet bin are tied with steel bars and formed into molds around the original on-site sample. The water inlet bin and the water outlet bin maintain a cm thick distance from the original on-site sample, and the inside of the water inlet bin and the water outlet bin are filled with pebbles.

[0011] Compared with the prior art, the utility model has the following beneficial effects:

[0012] Through multiple pouring, the original sample on site forms an effective enclosed space, reducing the deviation of the test results caused by water seepage of the sample during the test. Through multiple pouring, the overall curing time meets the optimal curing time requirements in the standard hydraulic concrete test procedures. By adding cushion layers on the top of the water inlet and outlet bins and laying yellow mud on the cushion layers, the problem of clogging of the water guide channel caused by pouring concrete samples on the top can be effectively avoided. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] The present invention is described in more detail below by way of example with reference to the accompanying drawings, in which:

[0014] Figure 1 It is a cross-sectional schematic diagram of the original sample 1 on site after the cross section of the utility model is poured;

[0015] Figure 2 It is a schematic diagram of the first pouring of concrete of the original sample 1 section on site of the utility model;

[0016] Figure 3 It is a schematic diagram of the second pouring of concrete of the original on-site sample 1 section of the utility model;

[0017] Figure 4 It is a schematic diagram of the excavation support structure of the utility model.

[0018] The meanings of the numbers in the figure are: 1. On-site original sample 1; 2. Sampling location; 3. Branch hole; 4. Water inlet tank; 5. Water outlet tank; 6. Concrete layer; 7. Yellow mud layer; 8. Steel bar layer; 9. Water inlet pipe; 10. Water outlet pipe; 11. Exhaust hole; 12. Cushion layer. DETAILED DESCRIPTION

[0019] like Figure 1-4 As shown, the device comprises an original sample 1, a sampling position 2 is arranged on the top of the original sample 1, a branch hole 3 is excavated at 0.5m to 0.7m above the upper end of the original sample 1, and the branch hole 3 is in a square shape and surrounds the original sample 1;

[0020] A water inlet bin 4 is provided on one side of the original sample 1, and a water outlet bin 5 is provided on the other side of the original sample 1. A cushion layer 12 is provided on the top of the water inlet bin 4 and the water outlet bin 5. An exhaust hole 11 is fixedly connected between the water inlet bin 4 and the cushion layer 12. A water inlet pipe 9 is fixedly connected to the inside of the water inlet bin 4 near the bottom, and a water outlet pipe 10 is fixedly connected to the inside of the water outlet bin 5 near the top.

[0021] In order to conveniently solve the problem of clogging of the water channel caused by the concrete sample, a concrete layer 6 is provided around the water inlet bin 4 and the water outlet bin 5, a yellow mud layer 7 is provided on the top of the cushion layer 12, and a steel bar layer 8 is provided between the yellow mud layer 7 and the top of the concrete layer 6. By laying a 2-3 cm thick layer of plastic yellow mud on the original sample 1 and the top of the cushion layer 12 on site, the reserved steel bars are tied between the water outlet bin 5 and the water inlet bin 4, and the water inlet bin 4 is vented through the vent hole 11. Concrete about 20 cm thick is poured around the water inlet bin 4 and the water outlet bin 5, and maintained for 5-7 days to alleviate the clogging of the water channel caused by the concrete sample.

[0022] In order to facilitate the excavation of the sample, the original sample 1 on site is in a square structure. The left and right sides and the top of the original sample 1 on site are fixed with steel plates. The repaired part of the branch hole 3 is supported by pad stones or steel plates. The original sample 1 on site is planned to have a size of "length × width × height = 50cm × 40cm × 40cm". After determining the sampling position 2 of the original sample 1 on site, a branch hole 3 is excavated at the top 0.5m to 0.7m above the upper end of the original sample 1 on site by manual excavation and tunneling operations. The width and depth of the excavated branch hole 3 are both greater than 0.5m. Then, a branch hole 3 is excavated inside the original sample 1 on site. Finally, the two ends of the sample are tunneled and penetrated in the same way to form a complete block structure.

[0023] In order to facilitate the mold pouring, steel bars are tied and molds are erected around the original sample 1 on site at the water inlet bin 4 and the water outlet bin 5. A 20 cm thick gap is maintained between the water inlet bin 4 and the water outlet bin 5 and the original sample 1 on site. The inside of the water inlet bin 4 and the water outlet bin 5 is filled with pebbles. By tying steel bars and erecting molds around the original sample 1 on site and the water inlet bin 4 and the water outlet bin 5, a 20 cm thick gap is maintained between the mold and the water inlet bin 4, the water outlet bin 5 and the original sample 1 on site. After the one-time poured concrete is compacted with a vibrating rod, it is cured for 7 to 14 days, and the reserved tops of the water inlet bin 4 and the water outlet bin 5 are chiseled open. After the water inlet pipe 9 and the water outlet pipe 10 are installed, the pebbles with a particle size of about 2 to 4 cm are filled in the bin.

[0024] The improvement of this embodiment is that: by setting the size of the original sample 1 to be "length × width × height = 50cm × 40cm × 40cm", after determining the sampling position 2 of the original sample 1, a branch hole 3 is excavated at the top 0.5m to 0.7m above the upper end of the original sample 1 by manual excavation and driving operation, and the width and depth of the excavated branch hole 3 are both greater than 0.5m, and then a branch hole 3 is excavated inside the original sample 1, and finally the two ends of the sample are driven and penetrated in the same way to form a complete block structure, and by tying steel bars around the original sample 1 and the water inlet bin 4 and the water outlet bin 5 and erecting a mold, a 20cm thick gap is maintained between the mold and the water inlet bin 4, the water outlet bin 5 and the original sample 1 , after compacting the one-time poured concrete with a vibrating rod, it is cured for 7 to 14 days, and the tops of the reserved water inlet bin 4 and the water outlet bin 5 are chiseled open, and after the water inlet pipe 9 and the water outlet pipe 10 are installed, the pebbles with a particle size of about 2 to 4 cm are filled in the bin. Through multiple pouring, the overall curing time meets the optimal curing time requirements in the standard hydraulic concrete test procedures. By laying a 2 to 3 cm thick layer of plastic yellow mud on the top of the original sample 1 and the cushion layer 12 on site, the reserved steel bars are tied between the water outlet bin 5 and the water inlet bin 4, and the water inlet bin 4 is vented through the exhaust hole 11, and about 20 cm thick concrete is poured around the water inlet bin 4 and the water outlet bin 5, and cured for 5 to 7 days, the clogging of the water guide channel caused by the concrete sample is alleviated;

[0025] In summary, the working principle of this solution is as follows:

[0026] By setting the size of the original sample 1 to "length × width × height = 50cm × 40cm × 40cm", after determining the sampling position 2 of the original sample 1, a branch hole 3 was excavated at the top 0.5m to 0.7m above the upper end of the original sample 1 by manual excavation and tunneling. The width and depth of the branch hole 3 were both greater than 0.5m, and then a branch hole 3 was excavated inside the original sample 1. Finally, the two ends of the sample were tunneled and penetrated in the same way to form a complete block structure, and the width and inclination of the fault zone, The five exposed structural surfaces of the original sample 1 were manually trimmed to avoid the sample surface being too rough, and then wrapped with geotextiles. The left and right sides and the top of the original sample were fixed with steel plates, and a 2-3 cm thick concrete layer 6 was poured, which was manually vibrated and compacted. After curing for 5-7 days, the original sample 1 was repaired section by section, and the repaired part was supported by pad stones or steel plates until it was repaired as a whole. It was then transported to the designated area by a trolley, and one side of the sample was drilled with an electric drill, etc. Drill holes at intervals until the fault fracture zone is drilled, and bury the pore water pressure gauge in the pre-drilled hole, backfill with crushed materials or fine sand, seal the outer end with concrete, and install the prefabricated water inlet silo 4 and water outlet silo 5 at both ends of the sample along the seepage direction. By tying steel bars around the original sample 1 and the water inlet silo 4 and the water outlet silo 5 and setting up a mold, a 20cm thick gap is maintained between the mold and the water inlet silo 4, the water outlet silo 5 and the original sample 1 on site. After the one-time pouring concrete is compacted with a vibrating rod, it is cured for 7 to 14 days and chiseled. Open the top of the reserved water inlet bin 4 and the water outlet bin 5, install the water inlet pipe 9 and the water outlet pipe 10, fill the bin with pebbles with a particle size of about 2 to 4 cm, lay a 2 to 3 cm thick layer of plastic yellow mud on the top of the original sample 1 and the cushion layer 12 on site, tie the reserved steel bars between the water outlet bin 5 and the water inlet bin 4, vent the water inlet bin 4 through the exhaust hole 11, and pour about 20 cm thick concrete around the water inlet bin 4 and the water outlet bin 5, and maintain for 5 to 7 days to alleviate the clogging of the water guide channel caused by the concrete sample.

[0027] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.

Claims

1. A permeability test structure for steeply inclined wide faults, comprising an on-site undisturbed sample (1), characterized in that: A sampling position (2) is provided on the top of the original on-site sample (1), and a branch hole (3) is excavated at the top 0.5m to 0.7m above the upper end of the original on-site sample (1). The branch hole (3) is in a square shape and surrounds the original on-site sample (1); A water inlet bin (4) is provided on one side of the original on-site sample (1), and a water outlet bin (5) is provided on the other side of the original on-site sample (1); cushion layers (12) are provided on the tops of the water inlet bin (4) and the water outlet bin (5); an exhaust hole (11) is fixedly connected between the water inlet bin (4) and the cushion layer (12); a water inlet pipe (9) is fixedly connected to the inside of the water inlet bin (4) near the bottom, and a water outlet pipe (10) is fixedly connected to the inside of the water outlet bin (5) near the top.

2. The permeability test structure for steep-angle wide faults according to claim 1, characterized in that: A concrete layer (6) is provided around the water inlet bin (4) and the water outlet bin (5), a yellow mud layer (7) is provided on the top of the cushion layer (12), and a steel bar layer (8) is provided between the yellow mud layer (7) and the top of the concrete layer (6).

3. The permeability test structure for steep-angle wide faults according to claim 1, characterized in that: The original on-site sample (1) is a square structure. The left and right sides and the top of the original on-site sample (1) are fixed with steel plates. The repaired part of the branch hole (3) is supported by pad stones or steel plates.

4. The permeability test structure for steep-angle wide faults according to claim 1, characterized in that: The water inlet bin (4) and the water outlet bin (5) are tied with steel bars and formed into a mold around the original on-site sample (1). The water inlet bin (4) and the water outlet bin (5) are spaced 20 cm apart from the original on-site sample (1). The inside of the water inlet bin (4) and the water outlet bin (5) are filled with pebbles.