Multi-core series forward osmosis membrane assembly
Through the design of multi-core series forward osmosis membrane modules and the use of forward osmosis membrane materials with insufficient width, the problems of resource waste and insufficient module universality are solved, and a more efficient forward osmosis process and cost savings are achieved.
Patent Information
- Application Number
- CN202420221842.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-30
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2034-01-30
AI Technical Summary
In the existing technology, there is a lack of solutions for making forward osmosis membrane modules using forward osmosis membrane materials with insufficient width, resulting in a waste of resources and insufficient universality of the modules.
Multi-core series forward osmosis membrane components are used. Several core components are connected in series. Each core component includes a flange and an intermediate pipe. The connecting pipe is used to realize the matching connection of the flange and liquid transportation, thereby improving the sealing performance and liquid flow distribution. Uniformity.
Effective use of forward osmosis membrane materials with insufficient width improves the universality and sealing properties of the components, reduces liquid leakage, increases forward osmosis speed and utilization, and saves costs.
Smart Images

Figure CN221808483U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a forward osmosis membrane component, in particular to a multi-core series-connected forward osmosis membrane component. Background Art
[0002] In forward osmosis pure water technology, forward osmosis membrane material is the core material. While processing the target forward osmosis membrane components, a large amount of forward osmosis membrane material with insufficient width will be generated. Since it cannot meet user needs, the forward osmosis membrane material with insufficient width is often treated as waste. At present, there is no solution for making forward osmosis membrane components for forward osmosis membrane material with insufficient width in forward osmosis pure water technology. It is of great significance to improve the universality of forward osmosis membrane components and save resources. Therefore, how to use forward osmosis membrane cores that do not meet the length specification requirements to produce conventional components has become a new topic. Utility Model Content
[0003] In order to solve the deficiencies existing in the above-mentioned technology, the utility model provides a multi-core series forward osmosis membrane assembly.
[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is a multi-core series forward osmosis membrane assembly, including a plurality of core assemblies connected in series in sequence, each core assembly including a core shell, flanges are installed at both ends of the core shell, an inlet for drawn liquid is preset on the flange at one end, and an outlet for drawn liquid is preset on the flange at the other end, and an intermediate pipe is passed between the flanges at both ends;
[0005] When the core body components are connected in series, the flanges of the two adjacent core body components of the front and rear stages are matched and connected, the suction liquid inlet of the front core body component corresponds to the suction liquid inlet of the rear core body component, and the intermediate tube of the front core body component is connected to the intermediate tube of the rear core body component through a connecting tube.
[0006] Furthermore, after several core assemblies are connected in series in sequence, the middle tube of the frontmost core assembly is penetrated forward with a flange to form a raw liquid inlet, and the middle tube of the last core assembly is penetrated backward with a flange to form a raw liquid outlet.
[0007] Furthermore, the flange of the core assembly has multiple drawn liquid inlets and outlets, and the multiple drawn liquid inlets or outlets are formed between several partitions on the flange that are uniformly divergent on the side wall of the central tube and centered on the middle tube.
[0008] Furthermore, both the raw liquid inlet and the raw liquid outlet are provided with threaded inner ports.
[0009] Furthermore, both ends of the connecting pipe have threaded outer ports matching the threaded inner ports, and the raw liquid outlet of the front-stage core assembly and the raw liquid inlet of the rear-stage core assembly are detachably connected via the connecting pipe.
[0010] The utility model discloses a multi-core series forward osmosis membrane component. By connecting a plurality of core components in series, when the core components are connected in series, flanges of two adjacent core components of the front and rear stages are connected by a connecting pipe, thereby achieving the goal of producing conventional components by using forward osmosis membrane cores that do not meet length specification requirements; at the same time, the tightness and sealing of the flange connection are improved, liquid leakage and seepage are effectively prevented, and stable operation of the system is ensured, while more uniform liquid flow distribution and effective fluid mixing are achieved, thereby increasing the speed of forward osmosis, and the utilization rate of forward osmosis membranes with insufficient width is improved under the comprehensive effect, and the cost is directly saved. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a cross-sectional view of the utility model.
[0012] Figure 2 A perspective view of a single core assembly.
[0013] In the figure: 1. intermediate tube; 2. connecting tube; 3. partition plate; 4. raw liquid outlet; 5. core shell; 6. flange; 7. raw liquid inlet; 8. drawn liquid inlet; 9. drawn liquid outlet. DETAILED DESCRIPTION
[0014] The utility model is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0015] like Figure 1 and Figure 2 The multi-core series forward osmosis membrane assembly shown includes several core assemblies connected in series in sequence, each core assembly includes a core shell 5, flanges 6 are installed at both ends of the core shell 5, a liquid inlet 8 is preset on the flange 6 at one end for inputting the liquid, and a liquid outlet 9 is preset on the flange 6 at the other end for outputting the liquid, and an intermediate tube 1 is passed through the flanges 6 at both ends for conveying the raw liquid; after several core assemblies are connected in series in sequence, the intermediate tube 1 of the frontmost core assembly is passed through the flange 6 forward to form a raw liquid inlet 7, and the intermediate tube 1 of the last-stage core assembly is passed through the flange 6 backward to form a raw liquid outlet 4, the raw liquid inlet 7 is used to input the raw liquid, and the raw liquid outlet 4 is used to output the raw liquid.
[0016] Among them, each core body component is prepared using a forward osmosis membrane with insufficient width, and a plurality of intermediate tube reserved channels are axially opened on the intermediate tube of each core body component. A plurality of forward osmosis membrane bags are rolled in parallel along the axial direction of the intermediate tube 1, and each forward osmosis membrane bag is formed by bonding two forward osmosis membranes with insufficient width. Each forward osmosis membrane bag is connected to two adjacent intermediate tube reserved channels, and the two adjacent intermediate tube reserved channels are blocked by water-blocking material in the intermediate tube. Specifically, the water-blocking material can be made of the same material as the intermediate tube and processed as a whole, with the purpose of completely blocking it on the inner wall of the intermediate tube. The two membrane sheets of the forward osmosis membrane bag are bonded to form a water-blocking portion, and the water-blocking portion is not completely connected between the two membrane sheets of the forward osmosis membrane bag, thereby blocking the flow channel for the original solution to flow back to the intermediate tube. In this way, after the core components are connected in series in sequence, the raw liquid enters the core component from the raw liquid inlet of the middle tube and flows along the axial direction of the middle tube; the raw liquid flows out through the reserved channel of the middle tube, and the flow between the same forward osmosis membrane is blocked by the water-blocking material and the water-blocking part between the two forward osmosis membranes to form a flow channel for the raw liquid. The raw liquid flows through the reserved channel of the middle tube and flows into the middle tube. After the raw liquid passes through the middle tube, the raw liquid continues to flow out from the reserved channel of the middle tube under the middle tube covered by the next forward osmosis membrane, and the above steps are repeated until it flows out from the raw liquid outlet of the middle tube, completing the forward osmosis process.
[0017] When the core body components are connected in series, the flanges 6 of the two adjacent core body components of the front and rear stages are matched and connected, the liquid inlet 8 of the front core body component corresponds to the liquid inlet 8 of the rear core body component, and the intermediate tube 1 of the front core body component is connected to the intermediate tube 1 of the rear core body component through the connecting tube 2. In this embodiment, the raw liquid inlet 7 and the raw liquid outlet 4 are both provided with threaded inner ports, and both ends of the connecting tube 2 have threaded outer ports matching the threaded inner ports. The raw liquid outlet 4 of the front core body component and the raw liquid inlet 7 of the rear core body component are spirally connected through the connecting tube 2 to realize the series connection of multiple core body components. The spiral connection is a kind of detachable connection, and the spiral connection has excellent water-proof performance. In other embodiments, the connecting tube adopts a plug-in method (male and female matching), but is not limited to the above connection method. In the process of spirally connecting the two core components, the connecting pipe is actually also tightening the matching connection relationship between the flanges 6 of the two adjacent core components of the front and rear stages to prevent leakage of the drawn liquid between the flanges. It should be understood that in order to further enhance the sealing between the flanges, measures to improve the sealing in the prior art can be adopted, such as adding sealing rings or opening matching sealing grooves. In this embodiment, there are multiple drawn liquid inlets 8 and drawn liquid outlets 9 on the flange 6 of the core component. The multiple drawn liquid inlets 8 or drawn liquid outlets 9 are formed on the flange with the middle tube 1 as the center and between several partitions 3 uniformly diverging outward on the side wall of the center tube. Multiple partitions can achieve more uniform liquid flow distribution and effective fluid mixing, thereby increasing the speed of forward osmosis.
[0018] The above implementation modes are not limitations of the present invention, and the present invention is not limited to the above examples. Any changes, modifications, additions or substitutions made by technicians in this technical field within the technical solution of the present invention also belong to the protection scope of the present invention.
Claims
1. A multi-core series forward osmosis membrane assembly, characterized in that: The invention comprises a plurality of core components connected in series, each core component comprising a core shell (5), flanges (6) are installed at both ends of the core shell (5), a drawn liquid inlet (8) is preset on the flange (6) at one end, and a drawn liquid outlet (9) is preset on the flange (6) at the other end, and an intermediate pipe (1) is passed between the flanges (6) at both ends; When the core body components are connected in series, the flanges (6) of the two adjacent core body components at the front and rear stages are matched and connected, the suction liquid inlet (8) of the front-stage core body component corresponds to the suction liquid inlet (8) of the rear-stage core body component, and the intermediate tube (1) of the front-stage core body component is connected to the intermediate tube (1) of the rear-stage core body component via a connecting tube (2).
2. The multi-core series forward osmosis membrane assembly according to claim 1, characterized in that: After a plurality of core components are connected in series, the middle tube (1) of the frontmost core component is penetrated forward through a flange (6) to form a raw liquid inlet (7), and the middle tube (1) of the rearmost core component is penetrated backward through a flange (6) to form a raw liquid outlet (4).
3. The multi-core series forward osmosis membrane assembly according to claim 1, characterized in that: The flange (6) of the core assembly has a plurality of drawn liquid inlets (8) and drawn liquid outlets (9), and the plurality of drawn liquid inlets (8) or drawn liquid outlets (9) are formed between a plurality of partitions (3) which are arranged on the flange with the middle tube (1) as the center and are evenly divergent outward on the side wall of the center tube.
4. The multi-core series forward osmosis membrane assembly according to claim 2, characterized in that: The raw liquid inlet (7) and the raw liquid outlet (4) are both provided with threaded inner openings.
5. The multi-core series forward osmosis membrane assembly according to claim 4, characterized in that: Both ends of the connecting pipe (2) have threaded outer openings matching the threaded inner openings, and the raw liquid outlet (4) of the front-stage core assembly and the raw liquid inlet (7) of the rear-stage core assembly are detachably connected via the connecting pipe (2).