Pouring mechanism and prefabricated building structure pouring device
By utilizing the design of diversion blocks and air outlets in the pouring mechanism, combined with vacuum pumps and liquid level sensors, the problem of air removal during cement pouring is solved and the quality and compactness of the prefabricated building structure are improved.
Patent Information
- Application Number
- CN202323563674.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-25
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2033-12-25
AI Technical Summary
In the existing technology, prefabricated building structures cannot effectively remove excess air during the cement pouring process, resulting in insufficient concrete density and strength and affecting the quality of the finished product.
A pouring mechanism is designed, including a pouring shell, a mixing mechanism and a discharging shell. By setting flow guide blocks and air outlets in the discharging shell, the cement is broken and rolled during the flow process, causing excess air to be squeezed out. Pressure and discharge through the air outlet, combined with a vacuum pump and liquid level sensor to further reduce the air content of the cement.
It effectively reduces the air content of the cement, improves the quality and density of the prefabricated building structure, and ensures the performance of the finished product.
Smart Images

Figure CN221809445U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building structure production equipment, in particular to a casting mechanism and a prefabricated building structure casting device. Background Art
[0002] In the field of construction technology, in order to facilitate production and processing and reduce construction time, prefabricated building structures are usually manufactured in factories and then transported to the construction site for use.
[0003] Among them, the utility model patent with application number CN202310396598.X discloses a temporary casting equipment and casting construction process for prefabricated walls of assembled buildings, including a workbench, a correction mechanism for correcting the prefabricated wall is installed on the top of the workbench, and a casting mechanism used in conjunction with the correction mechanism is installed on the right side of the top of the workbench, and the casting mechanism is used to grind and cast the prefabricated wall. Among them, cement casting requires the discharge of excess air to reduce bubbles and improve the density and strength of concrete. However, this equipment cannot further remove air from cement when preparing prefabricated walls, resulting in cement containing excessive air, which affects the quality of the cast product. Utility Model Content
[0004] The utility model aims to solve at least one of the technical problems existing in the prior art. To this end, the utility model provides a pouring mechanism that can reduce the air content of cement and improve the quality of prefabricated building structures.
[0005] The utility model also provides a prefabricated building structure casting device with the casting mechanism.
[0006] According to the first aspect of the present invention, the pouring mechanism comprises a pouring shell, a stirring mechanism and a discharge shell; a storage cavity is arranged inside the pouring shell, a feeding pipe is connected to the upper side wall of the pouring shell, and a guide pipe is arranged at the lower end of the pouring shell; the stirring mechanism is built into the storage cavity for stirring cement; an air release cavity is arranged inside the discharge shell, a discharge port is arranged at the end of the discharge shell, the discharge shell is connected to the guide pipe, and the air release cavity is connected to the storage cavity, and a plurality of guide blocks are arranged in the air release cavity One end of the guide block is fixed to the inner wall of the air leakage chamber, and the other end extends to the inside of the air leakage chamber. The width of the guide block gradually increases from the inner side of the air leakage chamber to the inner wall of the air leakage chamber, so that the cross-section of the guide block is conical. In the vertical cross-section of the discharge shell, multiple guide blocks are respectively arranged on the inner walls on both sides of the air leakage chamber, and the guide blocks on the inner walls on both sides are staggered at intervals. Among the multiple guide blocks on the same side, an air outlet is arranged between two adjacent guide blocks, and the air outlet is arranged on the inner wall of the air leakage chamber.
[0007] The pouring mechanism according to the embodiment of the utility model has at least the following beneficial effects: cement will be broken, rolled and exposed when flowing between the guide blocks, so that excess air in the cement will be squeezed out and discharged through the air outlet, thereby reducing the air content of the cement and improving the quality of the prefabricated building structure.
[0008] According to some embodiments of the utility model, on the vertical cross-section of the discharge shell, the end of the guide block is an arc, the centers of the ends of multiple guide blocks are located on the same straight line, and the air release chamber is a symmetrical cavity with the straight line as the axis of symmetry.
[0009] According to some embodiments of the present utility model, in the air leakage cavity, the distance between the ends of two adjacent guide blocks is equal to or greater than the inner diameter of the air outlet.
[0010] According to some embodiments of the utility model, the upper end of the casting shell is connected to a vacuum tube, and the vacuum tube is connected to a vacuum pump.
[0011] According to some embodiments of the utility model, the storage chamber is built with a first liquid level sensor and a second liquid level sensor, the first liquid level sensor is located at 3 / 4 of the height of the storage chamber, the second liquid level sensor is located between the feeding pipe and the first liquid level sensor, and the first liquid level sensor is electrically connected to the vacuum pump.
[0012] According to some embodiments of the present utility model, the material guiding pipe is provided with an electric control valve, and the second liquid level sensor is electrically connected to the electric control valve.
[0013] According to some embodiments of the present utility model, surfaces of the casting shell and the discharge shell are both provided with a thermal insulation coating.
[0014] According to some embodiments of the utility model, the bottom of the material storage cavity is spherical, the material guide tube is connected to the bottom of the material storage cavity, and there is a smooth transition between the bottom and the side wall of the material storage cavity. The stirring mechanism includes a rotating shaft and a stirring rod, and the rotating shaft can be pivotally inserted in the material storage cavity. The upper end of the rotating shaft passes through the casting shell and is connected to a driving motor. The stirring rod is fixedly connected to the shaft body of the rotating shaft, and the stirring rod and the inner wall of the material storage cavity are spaced apart.
[0015] According to some embodiments of the present invention, the feed pipe is U-shaped.
[0016] The prefabricated building structure casting device according to the second embodiment of the utility model comprises:
[0017] The pouring mechanism of the first embodiment of the utility model;
[0018] A first track is laid on the ground, and the first track has two tracks, the two first tracks are arranged in parallel, and each of the first tracks is slidably connected to two receiving blocks, the receiving blocks are provided with receiving grooves, the two receiving grooves on the same first track are arranged opposite to each other, and the receiving blocks on the two first tracks are arranged one by one;
[0019] A pulley is rotatably connected to a rotating seat, the rotating seat is fixed to the ground, the pulleys are arranged in two rows, each row has a plurality of pulleys, the arrangement direction of the pulleys in each row is perpendicular to the extension direction of the first track, and the uppermost end of the pulley is flush with the bottom surface of the receiving groove;
[0020] A second track is arranged perpendicularly to the first track, and the second track is fixed above the first track, wherein the second track and the pulley are arranged at two ends of the first track, and at least two second tracks are arranged, and each second track is slidably connected to a slider;
[0021] A third track is fixedly connected to the slider, the third track is arranged in parallel with the first track, the third track is slidably connected with a mounting block, the casting mechanism is fixedly connected to the mounting block, so that the discharge port is arranged downward;
[0022] A mold mounting plate is detachably overlapped in the receiving groove;
[0023] The receiving block slides so that the mold mounting plate can move to below the casting mechanism or move to abut against the pulley.
[0024] The prefabricated building structure casting device according to the embodiment of the utility model has at least the following beneficial effects: cement will be broken, rolled and exposed when flowing between the guide blocks, so that excess air in the cement is squeezed out and discharged through the air outlet, thereby reducing the air content of the cement and improving the quality of the prefabricated building structure.
[0025] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The present invention is further described below with reference to the accompanying drawings and embodiments, wherein:
[0027] Figure 1 A schematic diagram of a prefabricated building structure casting device according to an embodiment of the utility model;
[0028] Figure 2A schematic diagram of an embodiment of a casting shell of an embodiment of the utility model;
[0029] Figure 3 It is a schematic diagram of another embodiment of the casting shell of the utility model embodiment.
[0030] 10. First track; 11. Receiver block; 20. Pulley; 21. Rotating seat; 30. Second track; 31. Slider; 40. Third track; 41. Mounting block; 50. Mold mounting plate; 60. Casting mechanism;
[0031] 100, casting shell; 110, material storage chamber; 120, feed pipe; 130, material guide pipe; 131, electric control valve; 140, vacuum tube; 150, first liquid level sensor; 160, second liquid level sensor;
[0032] 200, stirring mechanism; 210, rotating shaft; 220, stirring rod;
[0033] 300, discharge housing; 310, discharge port; 320, flow guide block; 321, channel; 330, air outlet;
[0034] 400, thermal insulation coating; DETAILED DESCRIPTION
[0035] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0036] In the description of the present invention, it should be understood that descriptions involving orientation, such as up, down, front, back, left, right, etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0037] In the description of the present utility model, "several" means one or more, "more" means more than two, "greater than", "less than", "exceed" etc. are understood to exclude the number itself, and "above", "below", "within" etc. are understood to include the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.
[0038] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.
[0039] Reference Figure 1 The prefabricated building structure casting device of the embodiment of the utility model comprises a first track 10, a pulley 20, a second track 30, a third track 40, a mold mounting plate 50 and a casting mechanism 60; the first track 10 is laid on the ground, and the first track 10 has two, the two first tracks 10 are arranged in parallel, and each first track 10 is slidably connected to two receiving blocks 11, and the receiving blocks 11 are provided with receiving grooves, and the two receiving grooves on the same first track 10 are arranged oppositely, and the receiving blocks 11 on the two first tracks 10 are arranged one by one; the pulley 20 is rotatably connected to a rotating seat 21, and the rotating seat 21 is fixed to the ground, and the pulley 20 is provided with two rows, and each row of pulleys 20 is provided with a plurality of pulleys, and the arrangement direction of each row of pulleys 20 is perpendicular to the extension direction of the first track 10, and the pulley 2 0 is flush with the bottom surface of the receiving groove; the second track 30 and the first track 10 are vertically arranged, and the second track 30 is fixed above the first track 10, wherein the second track 30 and the pulley 20 are respectively arranged at both ends of the first track 10, and the second track 30 is provided with at least two, and each second track 30 is slidably connected with a slider 31; the third track 40 and the slider 31 are fixedly connected, the third track 40 and the first track 10 are arranged in parallel, and the third track 40 is slidably connected with a mounting block 41, and the casting mechanism 60 and the mounting block 41 are fixedly connected so that the discharge port 310 is set downward; the mold mounting plate 50 is detachably overlapped in the receiving groove; wherein the receiving block 11 slides so that the mold mounting plate 50 can move to the bottom of the casting mechanism 60, or move to abut against the pulley 20.
[0040] In actual use, the prefabricated building structure casting device of the embodiment of the utility model has the following working steps:
[0041] Step 1: The mold mounting plate 50 is placed in the receiving grooves of the four receiving blocks 11, and the mold mounting plate 50 is constrained in position from four directions by using the four receiving grooves. At the same time, the processing mold is installed on the mold mounting plate 50;
[0042] Step 2: driving the receiving block 11 to slide on the first track 10 so that the mold mounting plate 50 placed on the receiving groove moves to the bottom of the second track 30;
[0043] Step 3: driving the slider 31 on the second track 30 to slide the third track 40 fixed on the slider 31, and slide the third track 40 above the mold mounting plate 50;
[0044] Step 4: driving the slider 31 on the third rail 40 to mount the block 41, driving the casting mechanism 60 fixedly connected to the mounting block 41 to move, and moving the casting mechanism 60 to the top of the mold mounting plate 50;
[0045] Step 5: Start the pouring mechanism 60, discharge cement from the discharge port 310 of the pouring mechanism 60, and drive the slider 31 and the mounting block 41 to adjust the position of the pouring mechanism 60 on the plane, so that the pouring mechanism 60 can be moved to different positions of the mold mounting plate 50, and pour cement into the mold to form the prefabricated building structure;
[0046] Step 6: After pouring is completed, the receiving block 11 is driven to slide on the first track 10, so that the mold mounting plate 50 placed on the receiving groove moves to a position abutting against the uppermost end of the pulley 20;
[0047] Step 7: Start the pulley 20 and use the pulley 20 to transport the mold mounting plate 50 to the processing equipment of the next step for subsequent processing.
[0048] Specifically, in step 5, the slider 31 and the mounting block 41 are moved along the extension direction of the second track 30 and the third track 40 respectively, so the moving directions of the slider 31 and the mounting block 41 are vertical, thereby indirectly enabling the casting mechanism 60 to move arbitrarily on the plane; secondly, in step 7, since the conveying direction of the pulley 20 is arranged along the arrangement direction of the pulley 20, the transport path of the mold mounting plate 50 on the pulley 20 and the transport track on the first track 10 are vertical, and at the same time, referring to Figure 1 The first rail 10 is arranged between the pulleys 20 arranged at intervals, which can avoid position interference between the pulley 20 and the first rail 10 during position installation, and can also avoid path interference of the mold mounting plate 50 during transportation.
[0049] It should be emphasized that the reference Figure 2 and Figure 3The pouring mechanism 60 includes a pouring shell 100, a stirring mechanism 200 and a discharge shell 300; a storage chamber 110 is provided inside the pouring shell 100, a feeding pipe 120 is connected to the upper side wall of the pouring shell 100, and a guide pipe 130 is provided at the lower end of the pouring shell 100; the stirring mechanism 200 is built into the storage chamber 110 for stirring cement; a degassing chamber is provided inside the discharge shell 300, a discharge port 310 is provided at the end of the discharge shell 300, the discharge shell 300 is connected to the guide pipe 130, and the degassing chamber is connected to the storage chamber 110, and a plurality of The guide block 320 has one end fixed on the inner wall of the air leakage chamber, and the other end extending to the inside of the air leakage chamber. The width of the guide block 320 gradually increases from the inner side of the air leakage chamber to the inner wall of the air leakage chamber, so that the cross-section of the guide block 320 is conical. In the vertical cross-section of the discharge shell 300, multiple guide blocks 320 are respectively arranged on the inner walls on both sides of the air leakage chamber, and the guide blocks 320 on the inner walls on both sides are staggered at intervals. Among the multiple guide blocks 320 on the same side, an air outlet hole 330 is arranged between two adjacent guide blocks 320, and the air outlet hole 330 is arranged on the inner wall of the air leakage chamber.
[0050] In actual application, the feed pipe 120 of the casting mechanism 60 is connected to a silo or processing equipment, and the feed pipe 120 is directly connected to the silo or processing equipment through a flexible pipe to extract cement into the storage chamber 110. When the cement is poured into the storage chamber 110, the stirring mechanism 200 is first used to stir the cement for a second time to cause the cement to further roll and break, and squeeze out the excess air inside the cement. The stirred cement will enter the discharge shell 300 from the guide pipe 130. When the cement enters the air release chamber, the cement will flow between multiple guide blocks 320, wherein a winding channel 321 is constructed between the guide blocks 320. The cement flows under the action of gravity and is repeatedly collided, broken, rolled and exposed in the channel 321, so that the excess air contained in the cement can be released and finally discharged from the air outlet 330 to avoid air retention. The processed cement will be discharged from the discharge port 310 to the mold on the above-mentioned mold mounting plate 50 for processing and production.
[0051] In summary, the cement will be broken, rolled and exposed when flowing between the guide blocks 320, so that the excess air in the cement will be squeezed out and discharged through the air outlet 330, thereby reducing the air content of the cement and improving the quality of the prefabricated building structure.
[0052] Specifically, refer to Figure 2 and Figure 3In the vertical section of the discharge shell 300, the end of the guide block 320 is an arc, and the centers of the ends of the multiple guide blocks 320 are located on the same straight line A, and the air release cavity is a symmetrical cavity with the straight line A as the symmetry axis. The guide block 320 is in a conical shape, and the multiple guide blocks 320 are arranged symmetrically, which can prevent the cement from being blocked between the guide blocks 320 and the guide blocks 320 during the flow process. Furthermore, in order to ensure the discharge of air and prevent cement leakage, in the air release cavity, the distance between the ends of two adjacent guide blocks 320 is equal to or greater than the inner diameter of the air outlet 330. When the cement can just flow in the channel 321 formed between the two guide blocks 320, the air outlet 330 with an inner diameter smaller than the width of the channel 321 can ensure that the cement will not leak.
[0053] In some embodiments, reference Figure 2 and Figure 3 The upper end of the casting shell 100 is connected to a vacuum tube 140, and the vacuum tube 140 is connected to a vacuum pump (not shown in the figure). Figure 2 As an embodiment of the utility model, before pouring, the discharge port 310 can be closed (using a valve or other structure to control the opening and closing of the discharge port 310), and a vacuum pump can be used to pre-evacuate the storage chamber 110 and the air release chamber so that the internal air is discharged in advance. At this time, the effect of the air outlet 330 with a smaller inner diameter on the internal air pressure will be much smaller than the effect of the vacuum pump that actively evacuates, and can be ignored. After evacuating for a period of time, cement is poured into the material storage chamber 110 through the feed pipe 120, so that the cement will not be mixed with more air in the material storage chamber 110 and the air release chamber. In addition, the material storage chamber 110 is equipped with a first liquid level sensor 150 and a second liquid level sensor 160. The first liquid level sensor 150 is located at a height of 3 / 4 of the material storage chamber 110, and the second liquid level sensor 160 is located between the feed pipe 120 and the first liquid level sensor 150. The first liquid level sensor 150 is electrically connected to the vacuum pump.
[0054] Specifically, in actual use, this embodiment has the following process:
[0055] Step A1: first evacuate the space by using a vacuum pump;
[0056] Step B1: After the vacuum degree reaches a preset value, the vacuuming is stopped and cement is injected at the same time;
[0057] Step C1: Since the cement flows slowly in the channel 321, the liquid level of the cement in the storage chamber 110 gradually rises. When the liquid level rises to the position of the first liquid level sensor 150, the vacuum pump is controlled to restart and further evacuate the remaining space in the storage chamber 110 to reduce the air content.
[0058] Step D1: When the liquid level reaches the second liquid level sensor 160, stop injecting cement;
[0059] Step E1: When the liquid level drops to the first liquid level again, turn off the vacuum pump;
[0060] Step F1: After all the cement is used up, repeat steps A1 to E1.
[0061] In step C1, a vacuum pump is used to further compress the air concentration in the storage chamber 110 to further reduce the air content of the cement, and step E1 provides a signal to turn off the vacuum pump to facilitate the remaining cement to be completely poured into the mold under gravity.
[0062] Reference Figure 3 As another embodiment of the utility model, on the basis of the above embodiment, the guide pipe 130 is provided with an electric control valve 131, and the second liquid level sensor 160 is electrically connected to the electric control valve 131. The actual use process of this embodiment is different from that of the previous embodiment, and the specific process is as follows:
[0063] Step A2: first evacuate the space by using a vacuum pump;
[0064] Step B2: After the vacuum degree reaches a preset value, the vacuum pumping is stopped, the material guide pipe 130 is closed by the electric control valve 131, and cement is injected at the same time;
[0065] Step C2: When the liquid level rises to the position of the first liquid level sensor 150, the vacuum pump is controlled to restart, and the remaining space of the storage chamber 110 is further evacuated to reduce the air content;
[0066] Step D2: When the liquid level reaches the second liquid level sensor 160, stop injecting cement, and open the material guide pipe 130 through the electric control valve 131 to allow cement to enter the discharge housing 300;
[0067] Step E2: When the liquid level drops to the first liquid level again, turn off the vacuum pump;
[0068] Step F2: After all the cement is used up, repeat steps A1 to E1.
[0069] Different from the previous embodiment, during the whole step, a certain amount of cement is stored in the storage chamber 110, and then the discharge shell 300 is used to pour cement into the mold. The advantage of this solution is that the second liquid level sensor 160 can be used to ensure that the amount of cement injected each time is constant, thereby ensuring the stability of the amount and avoiding waste.
[0070] Preferably, refer to Figure 2 and Figure 3In the above-mentioned embodiment, the feed pipe 120 is U-shaped. The U-shaped feed pipe 120 can reduce the influence of external air on the internal air pressure of the storage chamber 110 and the air release chamber, thereby ensuring the use effect of the vacuum pump.
[0071] Cement is highly sensitive to temperature during actual processing, and for this reason, the surfaces of the casting shell 100 and the discharge shell 300 are both provided with a thermal insulation coating 400 .
[0072] It is worth mentioning that, refer to Figure 2 and Figure 3 The bottom of the storage chamber 110 is spherical, the guide tube 130 is connected to the bottom of the storage chamber 110, and the bottom and side wall of the storage chamber 110 are smoothly transitioned, so that the cement improves fluidity under the stirring of the stirring mechanism 200. At the same time, the stirring mechanism 200 includes a rotating shaft 210 and a stirring rod 220. The rotating shaft 210 can be pivotally inserted into the storage chamber 110. The upper end of the rotating shaft 210 passes through the casting shell 100 and is connected to a driving motor. The stirring rod 220 is fixedly connected to the shaft body of the rotating shaft 210, and the stirring rod 220 and the inner wall of the storage chamber 110 are spaced apart. Driven by the driving motor, the rotating shaft 210 pivots, and the pivot drives the plurality of stirring rods 220 to swing, thereby rolling the cement. With the streamlined interior of the storage chamber 110, the cement can be further exposed repeatedly, and the vacuum pump is used to extract excess air.
[0073] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the relevant technical field without departing from the purpose of the present invention.
Claims
1. A casting mechanism, characterized in that: It comprises a casting shell (100), a stirring mechanism (200) and a discharge shell (300); A material storage cavity (110) is provided inside the casting shell (100), a feed pipe (120) is connected to the upper side wall of the casting shell (100), and a material guide pipe (130) is provided at the lower end of the casting shell (100); The stirring mechanism (200) is built into the material storage chamber (110) and is used to stir cement; The discharge housing (300) is provided with an air leakage chamber inside, and a discharge port (310) is provided at the end of the discharge housing (300). The discharge housing (300) is connected to the guide pipe (130), and the air leakage chamber is communicated with the storage chamber (110). A plurality of flow guide blocks (320) are provided in the air leakage chamber, one end of the flow guide block (320) is fixed to the inner wall of the air leakage chamber, and the other end extends to the inside of the air leakage chamber, and the flow guide blocks (320) extend from the inner side of the air leakage chamber to the inner wall of the air leakage chamber. The width of the block (320) gradually increases so that the cross-section of the guide block (320) is conical. In the vertical cross-section of the discharge shell (300), a plurality of the guide blocks (320) are respectively arranged on the inner walls on both sides of the air leakage cavity, and the guide blocks (320) on the inner walls on both sides are arranged alternately at intervals. Among the plurality of guide blocks (320) on the same side, an air outlet hole (330) is arranged between two adjacent guide blocks (320), and the air outlet hole (330) is arranged on the inner wall of the air leakage cavity.
2. The pouring mechanism according to claim 1, characterized in that: In the vertical cross section of the discharge shell (300), the end of the guide block (320) is in the form of an arc, the centers of the ends of the plurality of guide blocks (320) are located on the same straight line, and the air release cavity is a symmetrical cavity with the straight line as the axis of symmetry.
3. The pouring mechanism according to claim 1, characterized in that: In the air leakage cavity, the distance between the ends of two adjacent flow guide blocks (320) is equal to or greater than the inner diameter of the air outlet hole (330).
4. The pouring mechanism according to claim 1, characterized in that: The upper end of the casting shell (100) is connected to a vacuum tube (140), and the vacuum tube (140) is connected to a vacuum pump.
5. The pouring mechanism according to claim 4, characterized in that: The material storage chamber (110) is equipped with a first liquid level sensor (150) and a second liquid level sensor (160); the first liquid level sensor (150) is located at 3 / 4 of the height of the material storage chamber (110); the second liquid level sensor (160) is located between the feeding pipe (120) and the first liquid level sensor (150); and the first liquid level sensor (150) is electrically connected to the vacuum pump.
6. The pouring mechanism according to claim 5, characterized in that: The material guiding pipe (130) is provided with an electric control valve (131), and the second liquid level sensor (160) is electrically connected to the electric control valve (131).
7. The pouring mechanism according to claim 1, characterized in that: The surfaces of the casting shell (100) and the discharge shell (300) are both provided with a thermal insulation coating (400).
8. The pouring mechanism according to claim 1, characterized in that: The bottom of the material storage cavity (110) is spherical, the material guide tube (130) is connected to the bottom of the material storage cavity (110), and the bottom and side wall of the material storage cavity (110) are smoothly transitioned. The stirring mechanism (200) comprises a rotating shaft (210) and a stirring rod (220), the rotating shaft (210) is pivotally inserted in the material storage cavity (110), the upper end of the rotating shaft (210) passes through the casting shell (100) and is connected to a driving motor, the stirring rod (220) is fixedly connected to the shaft body of the rotating shaft (210), and the stirring rod (220) and the inner wall of the material storage cavity (110) are arranged at a distance.
9. The pouring mechanism according to claim 1, characterized in that: The feed pipe (120) is U-shaped.
10. A prefabricated building structure casting device, characterized in that: include: The pouring mechanism (60) according to any one of claims 1 to 9; A first track (10) is laid on the ground, the first track (10) has two, the two first tracks (10) are arranged in parallel, each of the first tracks (10) is slidably connected to two receiving blocks (11), the receiving blocks (11) are provided with receiving grooves, the two receiving grooves on the same first track (10) are arranged opposite to each other, and the receiving blocks (11) on the two first tracks (10) are arranged one by one; A pulley (20) is rotatably connected to a rotating seat (21), wherein the rotating seat (21) is fixed on the ground, wherein the pulleys (20) are arranged in two rows, wherein each row has a plurality of pulleys (20), wherein the arrangement direction of the pulleys (20) in each row is perpendicular to the extension direction of the first track (10), and the uppermost end of the pulley (20) is flush with the bottom surface of the receiving groove; A second track (30) is arranged perpendicularly to the first track (10), and the second track (30) is fixed above the first track (10), wherein the second track (30) and the pulley (20) are arranged at two ends of the first track (10), and at least two second tracks (30) are arranged, and each second track (30) is slidably connected to a slider (31); A third track (40) is fixedly connected to the slider (31), the third track (40) and the first track (10) are arranged in parallel, the third track (40) is slidably connected to a mounting block (41), and the casting mechanism (60) is fixedly connected to the mounting block (41) so that the discharge port (310) is arranged downward; A mold mounting plate (50) is detachably overlapped in the receiving groove; The receiving block (11) slides so that the mold mounting plate (50) can move below the casting mechanism (60) or move to abut against the pulley (20).