Anti-seepage structure for heightened asphalt core wall dam
By using an anti-seepage structure of asphalt concrete core walls, panels and joint filling components in old reservoirs, the problem of water leakage caused by the loose connection between the old and new concrete layers has been solved, improving the safety and construction efficiency of the dam body and reducing costs. Construction difficulty and cost.
Patent Information
- Application Number
- CN202420372203.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-08
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the capacity expansion construction of the old reservoir, the newly poured concrete layer was not tightly integrated with the original concrete dam top, resulting in water leakage, posing safety risks, and the construction was difficult, affecting the stability of the dam body.
An anti-seepage structure combining an asphalt concrete core wall and panels is used. Through the design of joint filling components and cover plates, a complete anti-seepage system is formed to enhance the anti-seepage performance and stability of the dam body, and improve the dam through the upstream and downstream slope protection structures. overall safety of the body.
It effectively reduces the difficulty of reservoir expansion construction, ensures the normal operation of the dam, improves the safety and anti-seepage performance of the dam, reduces construction costs and workload, and extends the service life of the anti-seepage structure.
Smart Images

Figure CN221810559U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of earth-rock dam construction, in particular to an anti-seepage structure for an elevated asphalt core wall dam. Background Art
[0002] When a reservoir is initially constructed, it is often difficult to fully consider future usage needs due to construction cost constraints. For example, in terms of capacity design, as time goes by, the water supply capacity of the reservoir is difficult to match the demand for water resources. In order to further tap the water supply potential of old reservoirs, or because the water level of the reservoir is too high, floods occur, etc., it is necessary to expand the capacity of old reservoirs. The expansion construction of old reservoirs usually includes raising the dam crest and strengthening the dam body.
[0003] Among them, the old reservoir is expanded by raising the concrete dam top. During construction, the dam top of the old reservoir is usually raised layer by layer. Each layer needs to be compacted and tested to ensure the flood resistance and stability of the dam. For example, after the dam top surface is cleaned, a new concrete layer is poured directly on the dam top of the old reservoir to raise the dam top.
[0004] However, the above construction scheme has the problem that the newly poured concrete layer is not tightly bonded to the original concrete dam top, which in turn affects the construction quality of the reservoir dam body. Therefore, in the actual construction process, the existing technology often performs roughening, grooving, anchor reinforcement and other processes on the original concrete dam top to improve the adhesion of the newly poured concrete on the dam top, thereby ensuring the stability of the overall structure of the dam body. Despite this, after the old reservoir after the expansion has been used for a period of time, there is still a defect of water leakage at the junction of the newly poured concrete layer and the original concrete dam top, which poses a safety hazard. Summary of the invention
[0005] The purpose of the utility model is to provide an anti-seepage structure in the process of heightening the earth-rock dam, so as to reduce the construction difficulty of expanding the capacity of old reservoirs, ensure the normal operation of old reservoirs during construction, and improve the safety of the dam body.
[0006] In order to achieve the above purpose, the utility model adopts the following scheme:
[0007] An anti-seepage structure for an elevated asphalt core dam, comprising an asphalt concrete core, an asphalt concrete panel and a caulking assembly;
[0008] The asphalt concrete core wall is the anti-seepage body of the original asphalt core wall dam, located between the upstream filling area and the downstream filling area of the original asphalt core wall dam, and the asphalt concrete core wall is erected on the bedrock of the original asphalt core wall dam;
[0009] The asphalt concrete panel is arranged above the asphalt concrete core wall, a filling area for supporting the asphalt concrete panel is laid on the downstream filler area, the asphalt concrete panel is connected to the asphalt concrete core wall, and an anti-seepage area is formed between the asphalt concrete panel and the asphalt concrete core wall;
[0010] The caulking assembly is placed in the anti-seepage area, and the caulking assembly includes a filling body and a cover plate. The filling body is embedded in the anti-seepage area, the cover plate is attached to the outside of the anti-seepage body, one end of the cover plate is installed on the asphalt concrete core wall, and the other end of the cover plate is installed on the asphalt concrete panel.
[0011] Preferably, the outer side of the cover plate is coated with a rubber layer. In this way, the rubber layer is used to make the cover plate form a flexible fit with the asphalt concrete core wall and the asphalt concrete face plate, further improving the sealing performance of the cover plate and ensuring the anti-seepage performance of the connection between the asphalt concrete core wall and the asphalt concrete face plate.
[0012] Preferably, an upstream concrete slope protection is arranged outside the upstream filling area, and a toe plate is arranged at the bottom of the upstream concrete slope protection, and the toe plate is fixed on the bedrock. In this way, the upstream concrete slope protection and the toe plate are used to improve the stability of the original asphalt core wall dam, and further improve the safety of the dam structure.
[0013] As a preferred embodiment, the asphalt concrete panel is arranged parallel to the upstream concrete slope protection. Such an arrangement is conducive to the asphalt concrete panel serving as an anti-seepage body while forming a new slope protection structure together with the upstream concrete slope protection, thereby reducing the construction workload of the reservoir reconstruction and expansion and improving the construction efficiency.
[0014] Preferably, the filler is an EPDM rubber block. Such an arrangement is conducive to further reducing the construction cost of the anti-seepage treatment and further increasing the service life of the anti-seepage structure.
[0015] Preferably, a downstream concrete slope protection is arranged outside the filling area, which is conducive to further maintaining the stability of the filling area, reducing the erosion of the water body on the shore, and avoiding the collapse of the filling area on the downstream side of the reservoir.
[0016] Preferably, a transition layer is provided between the asphalt concrete core wall and the upstream filler area. In this way, the transition layer is used to further improve the stability of the dam structure.
[0017] Preferably, the cover plate is connected to the asphalt concrete core wall and the asphalt concrete face plate respectively by expansion bolts. In this way, by driving the expansion bolts into the asphalt concrete core wall and the asphalt concrete face plate, it is easy to quickly install the cover plate, which is conducive to applying a uniform pressing force to the filling body through the cover plate, thereby improving the anti-seepage effect.
[0018] Compared with the prior art, the anti-seepage structure for an elevated asphalt core wall dam provided by the utility model has the following substantial characteristics and progress: the anti-seepage structure for an elevated asphalt core wall dam is based on an already built old asphalt core wall dam, the top structure of the original dam body is dismantled, and an asphalt concrete panel is built on the top of the original dam body, the original asphalt concrete core wall is a first-phase anti-seepage body, the asphalt concrete panel is a second-phase anti-seepage body, and a caulking assembly is provided in the anti-seepage area between the asphalt concrete core wall and the asphalt concrete panel, so that it has a complete anti-seepage system, which completes the overall heightening of the dam body without affecting the normal operation of the original reservoir, saves construction costs, reduces the construction difficulty of expanding the old reservoir, and improves the safety of the dam body. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a structural schematic diagram of an old asphalt core wall dam in an embodiment of the utility model.
[0020] Figure 2 yes Figure 1 Schematic diagram of the structure of an old asphalt core dam with the concrete slope top removed.
[0021] Figure 3 It is a schematic diagram of construction nodes of an anti-seepage structure for an elevated asphalt core wall dam in an embodiment of the utility model.
[0022] Figure 4 It is a structural schematic diagram of an anti-seepage structure for an elevated asphalt core wall dam in an embodiment of the utility model.
[0023] Figure numerals: 1. asphalt concrete core wall; 2. transition layer; 3. upstream filling area; 4. downstream filling area; 5. bedrock; 6. upstream concrete slope protection; 7. downstream concrete slope protection; 8. toe board; 9. concrete slope top; 10. asphalt concrete panel; 11. filling area; 12. anti-seepage area; 13. cover plate. DETAILED DESCRIPTION
[0024] The specific implementation of the utility model is described in detail below with reference to the accompanying drawings.
[0025] like Figure 1-4 As shown, an anti-seepage structure for an elevated asphalt core wall dam is proposed in the embodiment of the utility model, aiming to reduce the construction difficulty of expanding the capacity of old reservoirs, ensure the normal operation of old reservoirs during construction, and improve the safety of the dam body.
[0026] like Figure 1 Combination Figure 2As shown, an anti-seepage structure for an elevated asphalt core wall dam proposed in an embodiment of the utility model is based on an old asphalt core wall dam that has been built. The concrete slope top 9 of the original dam body is removed, and an asphalt concrete panel 10 is built on the top of the original dam body. The original asphalt concrete core wall 1 is a first-phase anti-seepage body, and the asphalt concrete panel 10 is a second-phase anti-seepage body. A caulking component is provided in the anti-seepage area 12 between the asphalt concrete core wall 1 and the asphalt concrete panel 10, so that it has a complete anti-seepage system. While completing the overall heightening of the dam body, it does not affect the normal operation of the original reservoir, saves construction costs, reduces the construction difficulty of expanding the old reservoir, and improves the safety of the dam body.
[0027] like Figure 3 Combination Figure 4 As shown, an anti-seepage structure for an elevated asphalt core dam comprises an asphalt concrete core 1, an asphalt concrete panel 10 and a caulking assembly.
[0028] like Figure 3 As shown, the asphalt concrete core wall 1 is the anti-seepage body of the original asphalt core wall dam, and is located between the upstream filling area 3 and the downstream filling area 4 of the original asphalt core wall dam. The asphalt concrete core wall 1 is erected on the bedrock 5 of the original asphalt core wall dam.
[0029] The asphalt concrete panel 10 is arranged above the asphalt concrete core wall 1. A filling area 11 for supporting the asphalt concrete panel 10 is laid on the downstream filler area 4. The asphalt concrete panel 10 is connected to the asphalt concrete core wall 1. An anti-seepage area 12 is formed between the asphalt concrete panel 10 and the asphalt concrete core wall 1.
[0030] like Figure 4 As shown, the caulking assembly is placed in the anti-seepage area 12, and the caulking assembly includes a filling body and a cover plate 13. The filling body is embedded in the anti-seepage area 12, and the cover plate 13 is attached to the outside of the anti-seepage body. One end of the cover plate 13 is installed on the asphalt concrete core wall 1, and the other end of the cover plate 13 is installed on the asphalt concrete panel 10. For example, the filling body is an EPDM rubber block. Such a setting is conducive to further reducing the construction cost of the anti-seepage treatment and further improving the service life of the anti-seepage structure.
[0031] The outer side of the cover plate 13 is coated with a rubber layer. In this way, the rubber layer is used to make the cover plate 13 form a flexible fit with the asphalt concrete core wall 1 and the asphalt concrete panel 10, further improving the sealing performance of the cover plate 13 and ensuring the anti-seepage performance of the connection between the asphalt concrete core wall 1 and the asphalt concrete panel 10.
[0032] In order to further reduce the construction difficulty, the cover plate 13 is connected to the asphalt concrete core wall 1 and the asphalt concrete panel 10 respectively through expansion bolts. In this way, by driving the expansion bolts into the asphalt concrete core wall 1 and the asphalt concrete panel 10, it is convenient to quickly install the cover plate 13, which is conducive to applying a uniform pressing force to the filling body through the cover plate 13, thereby improving the anti-seepage effect.
[0033] like Figure 3 As shown, an upstream concrete slope protection 6 is arranged outside the upstream filling area 3, and a toe plate 8 is arranged at the bottom of the upstream concrete slope protection 6, and the toe plate 8 is fixed on the bedrock 5. In this way, the upstream concrete slope protection 6 and the toe plate 8 are both used to improve the stability of the original asphalt core wall dam, and further improve the safety of the dam structure.
[0034] The outer side of the filling area 11 is provided with a downstream concrete slope protection 7. Such a setting is conducive to further maintaining the stability of the filling area 11, reducing the erosion of the water body on the bank, and avoiding the collapse of the filling area 11 on the downstream side of the reservoir.
[0035] like Figure 4 As shown, the asphalt concrete panel 10 is arranged parallel to the upstream concrete slope protection 6. This arrangement is conducive to the asphalt concrete panel 10 serving as an anti-seepage body while forming a new slope protection structure together with the upstream concrete slope protection 6, thereby reducing the construction workload of the reservoir reconstruction and expansion and improving the construction efficiency. o -50 o Angle.
[0036] like Figure 2 As shown, a transition layer 2 is provided between the asphalt concrete core wall 1 and the upstream filler area 3. In this way, the transition layer 2 is used to further improve the stability of the dam structure. For example, the stone in the transition layer 2 is preferably crushed stone or gravel. Preferably, the stone in the transition layer 2 is required to be dense, hard, weathering-resistant, erosion-resistant, with continuous particle grading, and the maximum particle size should not exceed 60 mm.
[0037] When using an anti-seepage structure for an elevated asphalt core wall dam proposed in the embodiment of the utility model, on the basis of the already built asphalt core wall dam, the top structure of the original dam body is removed, and the top of the original dam body is continued to be raised according to the slope (slope) of the upstream slope until the core wall cannot be raised anymore, then the asphalt panel dam is built, and after the downstream rockfill foundation is cleaned, the asphalt panel on the upstream side of the elevated dam body is poured and the downstream rockfill is filled until the required height is reached; the original asphalt core wall is the first-phase anti-seepage body, and the asphalt panel is the second-phase anti-seepage body. The panel and the core wall are connected by a water-stop structure, so that it has a complete anti-seepage system and the overall heightening of the dam is completed. From the structural point of view, a reasonable engineering structure is proposed, which is characterized by adding an asphalt panel dam to the original asphalt core wall dam, which protects the upstream slope from being removed, does not affect the normal operation of the original reservoir, saves investment, and has a complete anti-seepage system.
[0038] The present invention is not limited to the specific technical solutions described in the above embodiments. In addition to the above embodiments, the present invention may also have other implementation modes. For those skilled in the art, any technical solutions formed by any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An anti-seepage structure for an elevated asphalt core dam, It is characterized in that Includes asphalt concrete core wall, asphalt concrete panel and caulking assembly; The asphalt concrete core wall is the anti-seepage body of the original asphalt core wall dam, located between the upstream filling area and the downstream filling area of the original asphalt core wall dam, and the asphalt concrete core wall is erected on the bedrock of the original asphalt core wall dam; The asphalt concrete panel is arranged above the asphalt concrete core wall, a filling area for supporting the asphalt concrete panel is laid on the downstream filler area, the asphalt concrete panel is connected to the asphalt concrete core wall, and an anti-seepage area is formed between the asphalt concrete panel and the asphalt concrete core wall; The caulking assembly is placed in the anti-seepage area, and the caulking assembly includes a filling body and a cover plate. The filling body is embedded in the anti-seepage area, the cover plate is attached to the outside of the anti-seepage body, one end of the cover plate is installed on the asphalt concrete core wall, and the other end of the cover plate is installed on the asphalt concrete panel.
2. The anti-seepage structure for the elevated asphalt core dam according to claim 1, It is characterized in that The outer side of the cover plate is covered with a rubber layer.
3. The anti-seepage structure for the elevated asphalt core dam according to claim 1, It is characterized in that An upstream concrete slope protection is arranged outside the upstream filling area, and a toe plate is arranged at the bottom of the upstream concrete slope protection, and the toe plate is fixed on the bedrock.
4. The anti-seepage structure for the elevated asphalt core dam according to claim 3, It is characterized in that The asphalt concrete panel is arranged parallel to the upstream concrete slope protection.
5. The anti-seepage structure for the elevated asphalt core dam according to claim 1, It is characterized in that The filler is an EPDM rubber block.
6. The anti-seepage structure for the elevated asphalt core dam according to claim 1, It is characterized in that A downstream concrete slope protection is arranged outside the filling area.
7. The anti-seepage structure for the elevated asphalt core dam according to claim 1, It is characterized in that A transition layer is provided between the asphalt concrete core wall and the upstream filler area.
8. The anti-seepage structure for the elevated asphalt core dam according to claim 1, It is characterized in that The cover plate is connected to the asphalt concrete core wall and the asphalt concrete face plate respectively through expansion bolts.