The invention particularly discloses an
overwintering and long-interval interlayer anti-seepage treatment method for an
asphalt concrete core wall dam in a severe
cold area. Aiming at the technical defects of poor interlayer combination and easy formation of a leakage channel caused by low-temperature freezing and thawing and long-interval construction in the wintering period of an
asphalt concrete core wall dam in severe cold and
high latitude areas, the construction method comprises the following steps: bottom layer pouring transformation before wintering / long interval, concave groove forming and two-cloth and one-membrane
geotextile embedding; and the steps of interface pretreatment after
overwintering / long interval, upper
asphalt concrete pouring and wrapping, rolling compaction and the like are conducted, and the
sandwich type water stop structure of bottom layer concrete-two-cloth-one-membrane geotechnical cloth-upper layer concrete is formed. According to the method, the seepage
path length is prolonged, the seepage-proofing reliability is improved, the method is suitable for
overwintering and long-interval interlayer seepage-proofing treatment of
asphalt concrete core wall dams in various severe cold areas, the method has the advantages of being wide in adaptability, easy and convenient to construct, high in durability and the like, the interlayer stripping seepage problem which is difficult to deal with in the traditional technology is effectively solved, and the long-term seepage-proofing safety of the dam body is guaranteed.