Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

3086results about "Moles" patented technology

Wave dissipation stabilizing structure for seawall

PendingCN119021146AStable multi-angle adjustmentGood wave dissipation effectBreakwatersClimate change adaptationSea wavesSea dike
The invention relates to the technical field of seawall wave dissipation, and discloses a seawall wave dissipation stabilizing structure which comprises a seawall, a permeable plate is detachably mounted at the top end of the seawall, an adjusting structure is arranged at one end of the seawall and comprises a fixing frame, and a first rack is slidably mounted on the fixing frame through a rack box; the fixing frame is fixedly connected with one end of a first rack through an electric push rod, a first gear is fixedly mounted on the fixing frame through a rotating shaft, a fixing cylinder is fixedly mounted on the rotating shaft through a fixing seat, and a first sliding rod is slidably arranged in the fixing cylinder through a first piston. The wave-dissipating plate can be stably adjusted at multiple angles, the stability of the structure can be kept under the condition of big waves or strong wind, the wave-dissipating plate can be buffered, the impact energy of the sea waves can be gradually converted and released, and the wave-dissipating plate can flexibly cope with the sea waves with different sizes and strengths.
Owner:ZHEJIANG INST OF HYDRAULICS & ESTUARY

Breakwater for reducing long-period waves based on water wave resonance principle

ActiveCN119021145AReduce long period wavesincrease the areaBreakwatersClimate change adaptationWave baseWavelength
The invention relates to the technical field of coast engineering, and discloses a breakwater for reducing long-period waves based on a water wave resonance principle, the breakwater comprises a C-shaped resonator and a plurality of pile legs, a base is connected between the C-shaped resonator and the plurality of pile legs, the C-shaped resonator is detachably connected with the upper end of the base through a bolt, and the C-shaped resonator is detachably connected with the lower end of the base through a bolt. The multiple pile legs are circumferentially distributed at the lower end of the base, the base, the C-shaped resonators and the multiple pile legs jointly form a wave absorbing unit, the wave absorbing units are arranged in a rectangular array to form the breakwater, the outer diameters, the inner diameters and the opening sizes of every two adjacent C-shaped resonators in the array gradually change according to a certain rule, and the C-shaped resonators are of a structure with large cavities and small openings. The method comprises the following steps of: inducing resonance to subtract a long wave which is several times of the wavelength of a cylindrical characteristic size, enabling waves with different frequencies to generate local resonance wave absorption at different spatial positions of the array type breakwater, effectively subducting long-period waves in a wide-frequency domain range, and forming a sheltering water area which is stable in operation behind the breakwater.
Owner:DALIAN UNIV OF TECH

Lateral berthing structure of launching barge tower

The invention belongs to the technical field of ships, and particularly relates to a launching barge tower broadside berthing structure which comprises a launching barge body. The launching barge body comprises a main body buoyancy tank in the middle and launching barge towers arranged at four corners of the main body buoyancy tank; the launching barge body can be berthed in the dock platform; and the berthing assembly is arranged on the launching barge tower building, the berthing assembly is arranged on the side, close to the dock platform, of the launching barge tower building, and the berthing assembly can fill and level up a protruding main body structure of the launching barge tower building, so that the broadside structure is flat and can safely berth the dock platform. By arranging the berthing assembly, the bottom of the protruding main body structure is filled and leveled up, so that the broadside structure is flat and can safely berth the dock platform, the broadside structure form of a launching barge tower building is changed, the safety requirement of the berthing dock platform is met, the functions and purposes of the launching barge berthing dock platform are improved, and traditional unsafe operation is eradicated.
Owner:GUANGDONG COSCO SHIPPING HEAVY IND CO LTD

Ecological landscape type disaster reduction seawall and design method thereof

The invention relates to an ecological landscape type disaster reduction seawall, the section form of the seawall is a gentle slope into-sea multi-stage composite type, and the seawall structurally comprises a seawall foot on the seaside, a first-stage planting platform, a gentle slope, a second-stage planting platform, a waterside platform, a wave wall and a road which are sequentially arranged from sea to land; on the basis of ensuring safety, the seawall is subjected to ecological landscape design, so that the seawall can play roles in intercepting silt and purifying water; the effects of weakening wave energy and reducing marine disaster threats can be achieved; and meanwhile, the hydrophilicity of the seawall can be improved, and a leisure activity space is provided for people. The invention further relates to a design method of the ecological landscape type disaster reduction seawall and a method for determining the crest elevation of the ecological landscape type disaster reduction seawall. The section form of the seawall can be determined according to the wave height and the height difference between the sea level and the road surface, the crest elevation of the seawall can be effectively reduced, the engineering cost is reduced, and the seawall ecological function is increased.
Owner:CCCC THIRD HARBOR CONSULTANTS

Marine ecological restoration seawall based on sand beach and construction method thereof

The invention relates to the field of seawalls, in particular to a marine ecological restoration seawall based on a sand beach and a construction method thereof. The seawall comprises three defensive lines, the first defensive line serves as a wave dissipation platform by laying an artificial sand beach, and an original wave wall and a riprap protection bottom are transformed to construct a first-stage wave wall; curbs are heightened and transformed into secondary wave walls by the middle road defense line, and a levee top road is laid to serve as a wave dissipation platform; a flower bed is transformed on a rear defense line, a low retaining wall is a three-stage wave wall, a drainage system is arranged, and residents are protected by combining buildings behind the road and flood prevention measures. The three-dimensional defense line can achieve wave dissipation and damp blocking, and the wave overtopping amount is reduced. The method aims at the shoreline with the requirement for the dike crest elevation and insufficient moisture-proof capacity in marine ecological restoration, and is particularly suitable for constructing a mature urban dike. The damp-proof flood-proof seawall aims at keeping the original appearance of the seawall as much as possible, reducing damage to existing roads and environments, improving the damp-proof capacity, promoting organic fusion of the seawall and surrounding characteristics and building the damp-proof flood-proof seawall for marine ecological restoration.
Owner:TIANJIN UNIV +1

Ecological restoration method for wading bird habitat in coastal mudflat wetland

An ecological restoration method for wading bird habitat in coastal mudflat wetland comprises:S1. performing micro terrain renovation on a candidate area of coastal mudflat wetland, to make ground slope from land to sea in the candidate area ≤5°, and restoring matrix in the candidate area;S2. controlling water level of water in the candidate area at 5-15 cm, with the water surface area accounting for 40-60% of the candidate area;S3. controlling vegetation coverage of the candidate area to be ≤30% and ≥10%, with vegetation height of ≤50 cm, planting and / or restoring salt tolerant vegetation areas;S4. selecting and / or restoring ecological pinch points and / or ecological barrier points in the candidate area to construct ecological corridors; andS5. constructing wading bird habitats in the candidate area.The restoration method can increase the number of wading birds in the coastal mudflat wetland by 33%-75%, and the restoration effect is remarkable.
Owner:INSTITUTE OF ECOLOGICAL PROTECTION & RESTORATION CHINESE ACADEMY OF FORESTRY SCIENCE

An ecological protection system for eroded coasts

An erosion coast ecological protection system comprises: ecological submerged dikes, tidal flat habitats, vegetation habitats and ecological breeding areas arranged in sequence from sea to land on the erosion coast; the ecological submerged dikes are arranged in the subtidal zone parallel to the coast, the overall structure is composed of multiple sections of submerged dikes and gates, and the length of a single section of submerged dikes is not less than 8 times the wavelength; the tidal flat habitat is connected with the ecological submerged dike and is properly decorated according to the tidal flat terrain to form a multiple habitat consisting of shallow water areas and deep water areas; the vegetation habitat area is located in the intertidal zone, and its outer edge is arranged with riprap to avoid tidal channels, the slope is about 1:2-1:3, and a vegetation belt of not less than 50m wide is planted on the land side; the ecological breeding area is provided with a plurality of breeding ponds with field-shaped channels, the top width of the channel is about 4-6m, and several rows of tamarisks are planted to form a wind-resistant buffer zone.
Owner:SHANGHAI WATERWAY ENG DESIGN & CONSULTING CO LTD

Ecological seawall structure

The utility model relates to an ecological seawall structure, which belongs to the technical field of bank protection engineering and comprises a seawall foundation, the seawall foundation comprises a slope top and a slope body, and a retaining wall structure is arranged at the joint of the slope top and the slope body. An arc-shaped wave dissipation ridge is arranged at the position, spaced by a certain distance from the retaining wall structure, of the top end of the slope body, a cushion layer is laid at the position, located between the arc-shaped wave dissipation ridge and the retaining wall structure, of the top end of the slope body, and the cushion layer comprises a dry stone cushion layer and a broken stone cushion layer which are sequentially arranged from top to bottom. A first block stone cushion layer is laid at the position, located on the side, away from the retaining wall structure, of the arc-shaped wave dissipation ridge, of the top end of the slope body, extends to the bottom of the slope body and further extends outwards to be connected with a second horizontal block stone cushion layer, and a first concrete retaining wall is arranged at the joint of the first block stone cushion layer and the second block stone cushion layer. The accropode is laid at the top end of the second block stone cushion layer and located on the outer side of the first concrete retaining wall. The safety of the seawall can be effectively guaranteed, and the stability of the seawall structure is guaranteed.
Owner:FUJIAN PROVINCIAL INVESTIGATION DESIGN & RES INST OF WATER CONSERVANCY & HYDROPOWER

Construction method of protection system suitable for corrosive silt silt coast

The invention relates to the field of silt silt coast restoration, in particular to a protection system construction method suitable for an erosive silt silt coast, which adopts engineering measures such as a water-permeable offshore submerged embankment and a riprap protection bank on the seaside of a vegetation restoration area to dissipate waves, and adopts the riprap protection bank to prevent a high beach from being further eroded. By reserving the tide passageway, the vegetation restoration area is kept to be communicated with a water system of an open sea, more suitable conditions are provided for vegetation restoration, and the survival rate of plants for vegetation restoration on an erosive beach is increased. The degraded wetland habitat of an erosive beach is recovered, the structural integrity and the functional stability of a coastal zone ecological system are improved, the capability of resisting marine disasters is improved, and the regional ecological safety is guaranteed.
Owner:CHINA DESIGN GROUP CO LTD

Flow-permeable wave-dissipating dam unit, flow-permeable wave-dissipating dam, flow-permeable wave-dissipating dam system and construction method

The invention relates to the technical field of wave dissipation dams, in particular to a flow-permeable wave dissipation dam unit, a flow-permeable wave dissipation dam, a flow-permeable wave dissipation dam system and a construction method. The invention discloses a flow-through wave-dissipating dam unit. A first-stage flow-through wave-blocking assembly comprises a first-stage wave-blocking wall body and a first-stage channel; the second-stage flow-through wave-blocking assembly comprises a second-stage wave-blocking wall body and a second-stage channel; the first-stage channel and the second-stage channel are arranged in a staggered mode and communicate with each other, and a second-stage inwards-concave part facing the first-stage channel is formed in the second-stage wave blocking wall. According to the permeable wave dissipation dam unit, the wall bodies including the first-stage wave blocking wall body and the second-stage wave blocking wall body are mainly used as main components, the cost is effectively reduced, the cost performance is higher, and the permeable wave dissipation dam unit is a technical scheme of more sustainable development. And the number of structure parameters adjustable according to different sea conditions is far larger than that of existing wave dissipation dams which are all cylinders from top to bottom, and therefore special requirements under different working conditions can be better met, and the wave dissipation dam can have better cost performance under the corresponding working conditions.
Owner:SOUTHERN BRANCH OF CHINA COMM CONSTR CO LTD

Prefabricated square block mounting method

The invention relates to a prefabricated square block mounting method, belongs to the technical field of wharf building construction, and aims to solve the problems of insufficient flatness of a foundation bed, large alignment deviation of prefabricated square blocks and poor seam sealing performance in a traditional mounting method. A trapezoidal tenon is pre-embedded in the bottom surface of the prefabricated square block and is matched with a groove in the top surface, and accurate embedding of the tenon and the groove is realized by combining sectional descending speed control of a crane ship, total station and RTK positioning data fusion deviation correction and underwater camera alignment confirmation; and after installation, scanning is conducted through a depth sounding system, a secondary leveling program is started, the wharf structure installation precision and the overall stability are improved, and the later settlement risk is reduced.
Owner:CHINA HARBOUR ENGINEERING

Fabricated wharf revetment structure adopting buried sand piles and implementation method of fabricated wharf revetment structure

The invention discloses a fabricated wharf revetment structure adopting buried sand piles and an implementation method of the fabricated wharf revetment structure. The fabricated wharf revetment structure comprises the buried sand piles, lower bucket foundations, upper box structures, unloading breast walls, berthing components, horizontal supports, bollards, rubber fenders, joint plugging steel structures and inverted filters. The buried sand pile is located at the bottom, and the lower barrel type foundation is arranged on the upper portion. The adjacent lower barrel type foundations are connected through an inverted filter body, and joint plugging steel structures are arranged on the two sides of the inverted filter body; the upper box-type structure is arranged at the upper part of the lower barrel-type foundation; the unloading type breast wall is arranged at the top end of the upper box type structure, a bollard is arranged at the top end of the unloading type breast wall, and a rubber fender is arranged on the side edge of the unloading type breast wall; a berthing component and a horizontal support are arranged at the bottom of the rubber fender; the horizontal support is located on the upper portion of the berthing component. The fabricated design concept is adopted, the wharf function can be met through one-time building, the revetment structure can also be directly used as a hydraulic reclamation land boundary, the construction speed is high, stability is high, and the influence of stormy waves is small.
Owner:CCCC THIRD HARBOR CONSULTANTS

Fabricated floating ecological breakwater combined with artificial fish reef

The invention provides an assembly type floating ecological breakwater combined with an artificial fish reef, the breakwater is mainly composed of a floating wave blocking structure, a mooring system and an anchoring structure combined with the artificial fish reef, a three-dimensional multi-layer wave blocking structure from the water surface to the water bottom is formed, and formation of a rich and stable ecological system is facilitated. The prefabricated structure is adopted, all the components can be transported to a designated sea area to be assembled and launched after being manufactured in a land prefabrication site, and the advantages of being convenient to construct, low in manufacturing cost, environmentally friendly and the like are achieved.
Owner:ZHONGCHUAN NO 9 DESIGN & RES INST

Composite tension sand blocking and silt reducing facility and method

The invention provides a composite tension sand blocking and silt reducing facility and method.The facility is composed of one or more units, each unit comprises a floating body, a composite tension curtain and an anchor point located at the bottom of a water body, one end of the composite tension curtain is connected to the floating body, and the other end of the composite tension curtain is connected to the anchor point; the composite tension curtain forms a sand blocking surface in the water between the bottom of the water body and the floating body by virtue of the buoyancy of the floating body, and the floating body is positioned on the water surface or suspended in the water; the composite tension curtain is formed by sewing two layers of geotechnical cloth together, a plurality of steel cables are inserted between the two layers of geotechnical cloth, a composite tension structure is formed to serve as a sand blocking and silt reducing curtain face, and main water flow force and wave force are borne by the steel cables. The flexible sand blocking curtain structure facility is economical, convenient to construct, suitable for large flow velocity and wave conditions and capable of blocking sand and reducing silt.
Owner:SHANGHAI JIAOTONG UNIV +2

Interlocking ecological frame retaining wall and construction method

The invention discloses a chain ecological sash retaining wall and a construction method, the chain ecological sash retaining wall comprises a wall body with an inner cavity, the two sides of the wall body are provided with a first concave structure and a second concave structure, the middle of the first concave structure is provided with a first connecting lug which is horizontally arranged, and the middle of the second concave structure is provided with a second connecting lug which is horizontally arranged; vertical connecting holes are formed in the middle of the first connecting lug and the middle of the second connecting lug, connecting rod bodies are installed in the vertical connecting holes, a plant growing groove is formed in the front side of the wall body, and the plant growing groove is communicated with the interior of the wall body. Gridding cloth is arranged on the inner wall of the plant growth groove. The side portions of the wall bodies are arranged in an inward-concave mode, the connecting lugs are matched with the inward-concave structures, the two adjacent wall bodies are connected and fixed through the connecting rod pieces, the wall bodies can be filled with broken stones, meanwhile, the plant growing grooves are formed in the bottoms of the wall bodies, and green plant growing platforms are provided through the plant growing grooves.
Owner:CHINA MCC17 GRP CO LTD

Slope protection device for hydraulic flood prevention

The invention relates to the technical field of hydraulic flood prevention, in particular to a slope protection device for hydraulic flood prevention. Comprising a support frame; the protection plate is hinged to the supporting frame, and the protection plate is used for preventing water flow from impacting the slope surface; the rotating frame is hinged to the supporting frame, the rotating frame is connected with a sliding block in a sliding mode, and the sliding block is hinged to a connecting rod; the guide frame is fixedly connected to the supporting frame; the push plate is arranged on the connecting rod, the push plate is connected with the guide frame in a sliding mode, and the push plate is used for applying downward force to the connecting rod by means of resistance generated when the push plate pushes water flow to move. When water flow impacts the protection plate, the protection plate is driven to rotate to buffer the impact force of the water flow, meanwhile, downward force is applied to the supporting frame through resistance generated when the push plate moves in water, reinforcing of the connecting position of the supporting frame and the ground is achieved, and therefore the probability that connection between the supporting frame and the ground is loosened is reduced.
Owner:LIAOCHENG DONGCHANGFU DISTRICT WATER CONSERVANCY DEV CORP

Caisson wharf and construction method thereof

According to the caisson wharf and the construction method thereof, a layered structure of a steel slag-rubber particle composite lower layer and a regenerated resin-basalt fiber composite upper layer is adopted for a base, and interface bonding is enhanced in combination with a silane coupling agent; the foundation bed is assembled by precast concrete modules and is poured by nano mortar; the caisson main body is provided with a positioning plate which is inserted into the guide groove, the caisson main body is filled with multi-graded steel slag fragments, and an independent airbag cavity is pre-buried in a bottom plate; the buoyancy control system dynamically adjusts the water injection rate based on multi-sensor data; the ecological permeable pipeline network adopts a diatomite-zeolite coating; the prestressed steel strand towing system is regulated and controlled in real time through the friction damper. The caisson wharf and the construction method thereof have the remarkable advantages in the aspects of structural stability, ecological friendliness, construction efficiency, intelligence and automation, the problems existing in a traditional caisson wharf can be effectively solved, and the requirements of modern port construction are met.
Owner:CHINA HARBOUR ENGINEERING

Floating breakwater capable of breaking and preventing combination

PendingCN119083367AGood wave dissipation effectTo achieve the purpose of anti-waveBreakwatersClimate change adaptationChinese charactersStructural engineering
The breaking and preventing combined floating breakwater comprises a wave resisting system, a wave breaking system and an anchoring system, the wave resisting system is arranged in the rear area of the wave breaking system and comprises columnar water bags, the columnar water bags are filled with water and connected through cables to form a wave reflecting wall, and the wave breaking system comprises a wave breaking pile array which is distributed in a grid shape like a Chinese character'tian '; the wave resisting system and the wave breaking system are fixed through the anchoring system. The wave resisting system and the wave breaking system are combined, firstly, the grid shaped like the Chinese character'tian 'is distributed in front of a shield area to break waves, then the columnar water bag is used for resisting waves behind the shield area, the breakwater is fixed through the piles and the anchors, the wave dissipating performance is improved to the maximum extent, the wave resisting purpose is achieved, and therefore the effect of protecting the coastline or related facilities is achieved; the structure is simple, the cost is low, the processing and the arrangement are easier, and the method is suitable for large-area construction; and the device is small in storage and transportation volume, light in weight and suitable for body transportation and storage.
Owner:WUHAN SUANDA CONSTR RUBBER & PLASTIC PROD CO LTD +1

High-pile wharf structure for LNG loading and unloading and construction method of high-pile wharf structure

The invention discloses a high-pile wharf structure for LNG loading and unloading and a construction method of the high-pile wharf structure. The high-pile wharf structure comprises pile foundation groups, pile caps, frame beams, cast-in-place joint plates, prefabricated plates and cast-in-place bridge deck slabs. The pile foundation group comprises a plurality of tubular piles which are longitudinally and transversely arranged in rows; the pile cap is correspondingly buckled to the top end of the pipe pile, and a through hole correspondingly communicating with an inner cavity of the pipe pile is formed in the pile cap so that core grouting concrete can be poured into the pipe pile. A high-pile wharf frame is formed by the multiple frame beams, and a pouring gap is formed between the two opposite end faces of every two adjacent frame beams; the cast-in-place joint plate is engaged with the frame beam in the pouring gap; the precast slab is laid on the top surface of the frame beam; the cast-in-place bridge deck is poured on the top face of the frame. The pipe piles are used as the wharf foundation, the pile caps can be solidified with the core grouting concrete to form a whole, the prefabricated plates are used as frame plates and form the wharf upper panel structure with the cast-in-place bridge panel, the pipe piles and the prefabricated cast-in-place are connected to form the high-pile wharf, the construction efficiency is effectively improved, and the construction cost is reduced.
Owner:CHINA HARBOUR ENGINEERING

Curtain type semi-submersible flexible breakwater

A curtain type semi-submersible flexible breakwater relates to the technical field of breakwaters, the flexible breakwater is arranged at a double effective wave height below a designed high water level of fluid a, two flexible porous films arranged side by side are arranged on two sides of a central axis of the bottom of the flexible breakwater, and weights for tensioning the flexible porous water-permeable films are arranged at the bottoms of the flexible porous water-permeable films. The curtain type semi-submersible flexible breakwater comprises a flexible porous water-permeable thin film and a fluid a, the fluid a is arranged in the flexible porous water-permeable thin film and used for keeping the shape and tension of the flexible porous water-permeable thin film, the flexible breakwater can suspend in the fluid a, and an anchoring device used for fixing the flexible breakwater underwater is arranged at the bottom of the flexible breakwater. The wave attenuation structure can effectively resist impact of waves on the structure in the marine environment, especially has a remarkable attenuation effect on medium and long waves which are difficult to eliminate in the ocean, and in addition, the structure has good adaptability and economical efficiency and can be widely applied to the fields of coast protection engineering and the like.
Owner:CHANGJIANG RIVER SCI RES INST CHANGJIANG WATER RESOURCES COMMISSION

Maritime work concrete with salt corrosion resistance and self-repairing function and preparation method thereof

The invention provides marine concrete with salt corrosion resistance and self-repairing and a preparation method thereof.The marine concrete is prepared from, by weight, 190-210 parts of cement, 91-100 parts of a natural mineral activating group, 10-15 parts of a composite corrosion inhibitor, 30-35 parts of an exciting agent, 3-6 parts of a high-efficiency water reducing agent, 4-8 parts of a polyamide / polyether sulfone copolymer and 20-25 parts of microcapsules; the preparation method comprises the following steps: preparing the composite corrosion inhibitor and the microcapsule; mixing the cement, the natural mineral activating group, the composite corrosion inhibitor, the exciting agent and the high-efficiency water reducing agent, adding the treated polypropylene fibers and the microcapsules, reacting and curing. According to the invention, the long-acting protection and self-repairing functions of the marine concrete in a high-salt environment are realized by utilizing the cooperation of multiple physical and chemical mechanisms of various formula materials.
Owner:SHENZHEN ZHONGTIANYUAN IND CO LTD

Construction method for front edge double-pile supporting beam and berthing component

The invention relates to the technical field of wharf construction processing, in particular to a construction method for a front-edge double-pile bearing beam and a berthing component, according to a support building method, hoops are installed on front-edge double-row PHC piles to serve as anchoring points, cantilever beams are welded to the front edge sides of the hoops to serve as structures for supporting the berthing component, and the whole installation mode is simple, convenient and reliable; the double-layer hoops are adopted on the front-edge double-row PHC piles to serve as supports of different layers of structures, so that installation stability is guaranteed, later adjustment can be facilitated, and particularly, the installation levelness of the cantilever beam can be adjusted conveniently. In addition, the cross beams at the upper ends of the front-edge double-row PHC piles are connected through the supporting I-shaped steel oblique beams, so that the connecting stability between the front-edge double-row PHC piles and the rear-row double piles can be guaranteed, and the front-edge double-row PHC piles and the rear-row double piles are matched in different directions. The installation efficiency can be effectively improved by prefabricating the berthing component.
Owner:POLY CHANGSHA PORT & SHIPPING ENG CO LTD

Integrally modularized and prefabricated assembly type high-pile wharf structure and assembling method

The invention relates to an overall modular prefabricated assembly type high-pile wharf structure and an assembling method. The structure comprises an upper structure main module part, an upper structure secondary module part, a pile cap module part, a node connecting part, a pile foundation part and an ancillary facility part. The upper structure main module part and the upper structure secondary module part are arranged in a staggered mode in the longitudinal direction of a wharf, the pile cap module part is located on the lower portion of the upper structure main module part, the pile foundation part is located on the lower portions of the upper structure main module part and the pile cap module part, and the node connecting part is connected with all modules. And the subsidiary facility part is mounted on the upper structure main module part and the upper structure secondary module part. The upper structure is composed of multiple sets of standardized integrally prefabricated modules, the number of connecting joints of components and the field workload can be greatly reduced, the assembly rate of the high-pile wharf is increased, large-scale crane ship machine equipment is fully utilized, the labor cost is saved, the dependence of engineering construction on the construction window period is reduced, the construction risk is reduced, and the construction efficiency is improved. Construction is rapid, and economic cost is low.
Owner:SHANGHAI DONGHUA CONSTR MANAGEMENT

High-pile wharf beam and slab erecting integrated equipment

The invention relates to the technical field of wharf construction, in particular to high-pile wharf beam and slab erection integrated equipment which comprises a cross beam, and a longitudinal beam capable of transversely moving is arranged at the top of the cross beam; the hoisting trolley can longitudinally move on the longitudinal beam, and the hoisting trolley is used for hoisting the beam plate; the supporting leg assembly supports the cross beam, a longitudinal moving rail is arranged at the bottom of the supporting leg assembly, and the supporting leg assembly longitudinally moves on the longitudinal moving rail; the two ends of the longitudinal beam are provided with cantilever sections, the cantilever sections extend to the longitudinal outer sides of the supporting leg assemblies, during beam lifting, the longitudinal moving rails are laid on the long-piled wharf, the supporting leg assemblies drive the cross beam to longitudinally move to the edge of the long-piled wharf on the longitudinal moving rails, then the crane carriage is moved to the cantilever sections, and the crane carriage can move to the outer side of the edge of the long-piled wharf; and the crane carriage can hoist the beam plate outside the long-piled wharf, so that the step of reversing the beam through equipment such as a gantry crane and a beam transporting vehicle is avoided, the construction procedure is simplified, and the construction efficiency of the long-piled wharf is improved.
Owner:THE SECOND ENG COMPANY OF CCCC FOURTH HARBOR ENG +1

Riverbank revetment construction method

A riverbank revetment construction method, comprising the following steps: along a riverbank revetment, laying a composite structure consisting of alternating long piles and short piles, each long pile being divided into two parts, one part being independent, and the other part combining with a short pile to form a composite pile; using a static pressing method to press the independent part of the long pile into a laying position along the riverbank revetment, then pressing the composite pile onto the independent part of the long pile, and connecting the long pile part of the composite pile to the already-pressed independent part of the long pile to form a whole; on the side of the short pile, continuing to statically press the independent part of another long pile, and during the process, using a limiting structure between the short pile and the independent part of the long pile for limited pressing thereof; repeating the process in the laying direction of the riverbank revetment, so as to press the composite structure consisting of the long piles and the short piles; and replacing soil enclosed by the short pile within each composite pile with a replacement material which is a material having water permeability. The riverbank revetment construction method has the advantages of simple structure, good mechanical property, convenient construction and excellent soil retaining property and water permeability.
Owner:CHINA RAILWAY SHANGHAI DESIGN INST GRP CO LTD

Wave dissipation device for water conservancy project

The utility model discloses a wave dissipation device for a water conservancy project, and relates to the technical field of water conservancy projects. Comprising a dam, a backflow guide plate and expansion bolts, the backflow guide plate facilitating buffering is fixedly installed on one side of the dam through the expansion bolts, a plurality of wave dissipation grooves facilitating wave dissipation are formed in the inner side of the backflow guide plate, and a plurality of rotating seats are fixedly connected to the inner side of the backflow guide plate. Furthermore, after the wave blocking plate is impacted by water waves, the two springs can absorb a part of resistance of the water, meanwhile, under rotation of the wave blocking plate, the impacted water waves can be further counteracted and blocked by the wave blocking plate, then impact of the water waves on the dam is greatly reduced, and under cooperation of the multiple wave dissipating plates, the wave dissipating effect of the dam is greatly improved. And therefore, the situation that the water wave blocking and eliminating effect is reduced due to continuous impact of the water waves is avoided, and the wave eliminating effect of the device is further improved.
Owner:HENAN HUARUN HYDRAULIC & HYDRO-POWER ENG CO LTD

Adjustable floating breakwater suitable for long waves

The adjustable floating breakwater comprises a front floating box and a rear floating box which are fixedly connected, a water guide plate capable of rotating around a rotating shaft in the left-right direction is arranged on the upper end face of the front floating box, a plurality of water guide grooves are formed in the rear end of the water guide plate, and a power generation mechanism is arranged at the position, corresponding to the water guide grooves, of the front end of the water guide plate; the rear end of the upper end face of the front buoyancy tank is rotationally connected with a water guide arc plate, the water guide arc plate is located above the rear end of the water guide plate, and the arc-shaped concave face of the water guide arc plate is a wave facing face. A plurality of guide plates are arranged between the front buoyancy tank and the rear buoyancy tank; the first driving mechanism drives the water guide plate to rotate up and down so as to adjust the inclination angle of the water guide plate; the second driving mechanism drives the water guide arc plate to rotate front and back so as to adjust forward thrust to the front buoyancy tank, and meanwhile drives the flow guide plate to rotate left and right so as to adjust the flow guide plate to form an angle with incoming flow. The floating breakwater is convenient to adjust, long-period waves are effectively reduced, long waves are used for autonomous power generation, self-generated power is used for controlling components on the breakwater, and meanwhile the stability of the floating breakwater is improved.
Owner:JIANGSU UNIV OF SCI & TECH

Siltation promotion device for coastal zone regulation and restoration

The invention relates to the technical field of coastal zone renovation and repair, in particular to a siltation promotion device for coastal zone renovation and repair, which comprises a siltation promotion assembly and a caisson which are sequentially arranged from top to bottom, the siltation promotion assembly comprises a plurality of siltation promotion modules which are connected through side edges, and the top side of the siltation promotion assembly is used for being fixedly connected with a coast; each siltation promotion module comprises a frame and a plurality of anti-flow plates, the multiple anti-flow plates are sequentially arranged in the frame from top to bottom, the two ends of each anti-flow plate are rotationally connected with the two opposite sides of the frame correspondingly, and every two adjacent siltation promotion modules are rotationally connected through one side edge of the frame; a sedimentation cavity is formed in the top of the caisson, a permeable material is arranged in the sedimentation cavity, flow guide holes penetrating through the two sides are formed in the upstream face and the downstream face of the caisson correspondingly, and the bottom side of the siltation promotion module is connected with the caisson and located above the sedimentation cavity; the siltation promotion device is formed in a splicing mode, the siltation promotion device can be well suitable for complex terrains, and the anti-flow plate is arranged to effectively resist water flow impact.
Owner:GUANGZHOU URBAN PLANNING & DESIGN SURVEY RES INST

Dry-piled vegetation retaining wall

The utility model discloses a dry building vegetation retaining wall which comprises undisturbed soil, a concrete foundation and a first concrete coping, the concrete foundation is arranged on the side, close to a riverway, of the undisturbed soil, the first concrete coping is arranged on the top layer of the undisturbed soil, and a riverway retaining wall is arranged above the concrete foundation. A broken stone hardcore is arranged on the slope face of the undisturbed soil, an ecological retaining wall is arranged above the broken stone hardcore, and an ecological protection slope is arranged in the ecological retaining wall. The concrete foundation is built beside the riverway, the riverway retaining wall is built on the concrete foundation so as to reduce direct contact between a riverway water source and undisturbed soil, meanwhile, the ecological retaining wall is laid on the riverway slope through the broken stone hardcore, and in the weather with a large amount of rainfall, the slope protection upper layer is protected by the ecological retaining wall. Silt and stones are prevented from being scoured, and the overall protection performance of the retaining wall is effectively improved.
Owner:ANHUI KEMIAO ECOLOGICAL TECH CO LTD

Sea wave energy dissipation mechanism, concrete prefabricated structure and wave wall

The invention relates to a sea wave energy dissipation mechanism, a concrete prefabricated structure and a wave wall, in particular to the technical field of damping of the concrete prefabricated structure, by arranging a base, an energy dissipation component and a protective cover, a mounting side and a working side are formed on the two sides of the base correspondingly, and the mounting side is used for being connected with an external concrete prefabricated block; the energy dissipation component comprises an energy dissipation assembly and a connecting plate, the energy dissipation assembly is installed on the working side, the connecting plate is installed at the end, away from the base, of the energy dissipation assembly, the protective cover is installed at the end, away from the energy dissipation assembly, of the connecting plate, the protective cover surrounds the periphery of the connecting plate, the periphery of the energy dissipation assembly and the periphery of the base, and the protective cover is in sliding fit with the base. Under the condition that the sea wave energy dissipation mechanism enters a seawater area, when the protective cover is configured to slide from the working side to the mounting side relative to the base under the action of impact force of sea waves, the impact force can be conducted to the energy dissipation assembly through the connecting plate for energy dissipation, and the function of eliminating the impact force generated by the sea waves is achieved; and the service life of the concrete prefabricated structure is prolonged.
Owner:DALIAN SANFENG CONCRETE PRECAST COMPONENT CO LTD