Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

213 results about "Seawall" patented technology

A seawall (or sea wall) is a form of coastal defense constructed where the sea, and associated coastal processes, impact directly upon the landforms of the coast. The purpose of a sea wall is to protect areas of human habitation, conservation and leisure activities from the action of tides, waves, or tsunamis. As a seawall is a static feature it will conflict with the dynamic nature of the coast and impede the exchange of sediment between land and sea. The shoreline is part of the coastal interface which is exposed to a wide range of erosional processes arising from fluvial, aeolian and terrestrial sources, meaning that a combination of denudational processes will work against a seawall.

Three-dimensional dynamic whole-process simulation method for storm surge and flood routing in complex flooding areas

The invention belongs to a field of the visual simulation of a flood routing. Aiming at realizing the three-dimensional dynamic whole-process simulation of the storm surge and the flood routings, the safety management of seawalls, a quick scientific assessment of the storm surge disaster, and the scientific formulation and the implementation of rescue and relief work, the technical scheme provided is the three-dimensional dynamic whole-process simulation of the storm surge and the flood routings, comprising the following steps: (1) establishing three-dimensional mathematical models of the storm surge and the flood routings in complex flooding areas; (2) drawing bathymetric charts of the storm surge and the flood submerging in complex flooding areas (3) dynamically simulating liquid phase flows of the storm surge and the flood routings in complex flooding areas; (4) carrying out the dynamics calculation of the storm surge and the flood routings in complex areas; (5) establishing virtual-real coupling models of the storm surge and the flood routings in complex areas; (6) carrying out the post processing and the visual output of the three-dimensional dynamic whole-process simulation. The method is mainly applied in the three-dimensional dynamic whole-process simulation of the storm surge and the flood.
Owner:TIANJIN UNIV

Coastal wetland ecological revetment technical system for human and environmental needs

The invention discloses a process method of a coastal wetland ecological revetment technical system for human and environmental needs. The system comprises an ecological dam, a constructed wetland system, a purification pond, and a data monitoring and automatic control system. The method comprises the following main process steps: A) building a dam; B) forming openings in a side slope of the dam, connecting a constructed wetland, forming a natural wetland ecological system in the constructed wetland, and keeping a specific community structure of a coastal wetland ecological system on the wetland; C) leading sewage into the purification pond if a pollution incident happens, and discharging the sewage after treatment in a clear water reservoir, wherein one purification pond is additionally built every 500 meters of the length of a seawall; D) opening a valve on the purification pond to communicate with the constructed wetland if no pollution incident happens to enable the constructed wetland ecological system to be communicated with a natural wetland area and the sea; E) introducing living things into the constructed wetland, and providing a good growing space for the living things so as to form a complete interlaced zone ecological system food web; and F) monitoring related environmental parameters in real time by using the automatic control system.
Owner:BEIJING NORMAL UNIVERSITY

Pile bearing caisson seawall and construction method thereof

The invention relates to a seawall and a construction method thereof, and aims to provide a seawall with better stability, taking a large-diameter cast-in-site concrete cylindrical pile as a basis, and a construction method of the seawall, wherein the upper part of the seawall is connected with a caisson platform. The pile bearing caisson seawall comprises the caisson platform positioned on a submarine soft soil foundation in coastal engineering, wherein, the bottom of the caisson platform is equipped with at least two rows of erected bearing piles which are used for bearing the platform and are embedded into sea bottom; and the sides of the caisson platform near sea and land are equipped with the erected bearing piles which are embedded into the sea bottom as well as transverse suppression layers positioned on the top ends of the bearing piles. The seawall and the construction method have the beneficial effects that the bearing capacity and stability of the seawall are improved; and in addition, the caisson platform can be utilized as a construction platform so as to construct according to an overland construction method after construction machinery is placed on the platform, which reduces offshore ship operation and lowers construction cost, thus being capable of being widely applied to coastal dam construction engineering.
Owner:浙江海桐高新工程技术有限公司

Seawall flood season protection structure and construction method thereof

ActiveCN106939578AImprove stabilityImprove the wave breaking effectBarrages/weirsBreakwatersWave power generationEngineering
The invention discloses a seawall flood season protection structure and a construction method thereof. The seawall flood season protection structure comprises a wave dissipating device, a wave power generation device, a dam and a buffer system. The wave dissipating device is movably connected to a first supporting structure. The first supporting structure comprises two parallel first supports. The two ends of the first supporting structure are fixedly connected to a speed reducing slope and a current stabilization slope through a foundation pile and a first positioning pile correspondingly. The wave power generation device is arranged at the tail end of the first supporting structure. A second supporting structure is arranged at the other end of the first positioning pile. The buffer system penetrates through the speed reducing slope, the current stabilization slope and the dam. The method includes the steps of surveying and setting out, construction of the foundation pile and the positioning pile, construction of the buffer system, construction of the wave dissipating device and the wave power generation device, construction of the second supporting structure and construction of the dam. By means of the seawall flood season protection structure and the construction method thereof, flood season installation protection of seawalls with different lengths and widths can be met, sediment loss is reduced, a good seawall protection effect is achieved, seawater power generation can be achieved, and economical benefits are remarkable.
Owner:ZHEJIANG UNIV OF WATER RESOURCES & ELECTRIC POWER

Method for calculating and predicating post-construction settlement of suspension seawall

The invention relates to a method for calculating and predicating post-construction settlement of a suspension seawall. According to the method for calculating and predicating the post-construction settlement of the suspension seawall, the accuracy for calculating and analyzing data is improved. According to the technical scheme, the method comprises the steps of a, determining the variable quantity between soil geological parameters before and after the blast action, dividing the soil disturbance range into a plurality of disturbance areas, and determining the strength reduction coefficient f of soil of the different disturbed areas by the blast; b, setting up a whole calculating model of the seawall foundation by a finite difference software FLAC, and dividing finite element meshes according to the soil disturbance range; c, selecting an elastic-plastic constitutive model suitable for saturated soft soil; d, initializing crustal stress calculation, and verifying the reasonability and accuracy of the elastic-plastic constitutive model; e, further conducting numerical calculation, obtaining the relations between the post-construction settlement and time, between the post-construction settlement and loads and the like, analyzing and predicating the post-construction settlement, and summarizing the change law of the post-construction settlement of the foundation soil under the different working conditions.
Owner:POWERCHINA HUADONG ENG COPORATION LTD

Combined type seawall and construction method thereof

The invention discloses a combined type seawall which comprises seawall tubular piles. A row of vertical rigid cast-in-situ large-diameter ribbed seawall tubular piles (10) exposed out of sea level (C) are piled on an outer shallow sea side (A); hydraulic fillers (30) higher than the sea level are filled in the inner sea side (B) of the large-diameter ribbed seawall tubular piles; a plurality of rows of cast-in-situ large-diameter plain barrel seawall tubular piles (20) are piled on the inner sea side (B); the hydraulic fillers (30) higher than the sea level are filled in the areas of rows of plain barrel seawall tubular piles; riprap solid bases (40) of the plain barrel seawall tubular piles and the ribbed seawall tubular piles are arranged above the hydraulic fillers; and the construction method of firstly piling a row of vertical cast-in-situ large-diameter ribbed seawall tubular piles on the shallow sea side, then hydraulically filling in the inner side and then carrying out combined type bases construction on the filled inner side is adopted. The invention has the advantages of small stone consumption, small land occupation area of seawall body, high land utilization rate, short construction period, advanced construction process, obvious environmental protection benefit and the like.
Owner:浙江海桐高新工程技术有限公司

Novel flexible coast protection structure and construction method thereof

The invention discloses a novel flexible coast protection structure and a construction method of the novel flexible coast protection structure. The structure comprises a mattress tying beam and a wave dissipating platform, wherein the mattress tying beam and the wave dissipating platform are close to the designed water level; the wave dissipating platform is connected with the bottom and the top of a bank slope through a slope and a wave wall respectively; a pebble cushion layer and composite geotextiles are sequentially laid on the lower surface of the slope and the lower surface of the wave dissipating platform. Composite geotextiles and a gravel cushion layer are sequentially laid on the upper surface of the slope and the upper surface of the bottom of the bank slope. A concrete hinged mattress is laid on the gravel cushion layer. The top end of the hinged mattress is connected to the mattress tying beam. The method comprises the steps of prefabrication of concrete ballast block bodies, construction of the mattress tying beam and a bank protection structure above the mattress tying beam, splicing of the concrete hinged mattress, mattress sinking construction and the like. Compared with the existing coast protection technology, the novel flexible coast protection structure has the advantages that the integrity is good, the anti-erosion capability and the coastal erosion deformation adaptability are high, materials are easy to obtain, construction is easy, and maintenance management is convenient; the problem that a traditional rigid seawall bank protector is prone to collapse and damage on the condition of coastal washout deformation can be effectively solved, and a new approach is provided for coast protection.
Owner:HOHAI UNIV

Diversion shield tunnel traversing new sea dyke and foundation treatment method thereof

The invention relates to a pilot shield tunnel which crosses a newly-built seawall and a ground treatment method. The pilot shield tunnel is formed by that a plurality of duct pieces are assembled by bolts in a circumferential mode; the corresponding positions of the duct pieces are preinstalled with consolidated filling injection ports and operating ports of a high-pressure jet grouting pile; a plurality of high-pressure jet grouting piles are arranged at a certain distance from the bottom part of the duct pieces and form a transition layer; a reinforcing layer is formed by the consolidated filling injection in the sludge of the pilot shield tunnel which is formed by the duct pieces; the ground treatment method comprises: a plastic draining board is adopted to carry out ground foundation; the corresponding positions of the duct pieces are preinstalled with consolidated filling injection ports and operating ports of the high-pressure jet grouting pile; when the pilot shield tunnel crosses at the lower part of the foundation of the seawall, the construction of high-pressure jet grouting pile is carried out in the soft soil of a lower horizontal layer of the tunnel through the operating ports of the high-pressure jet grouting pile; the bottom of the high-pressure jet grouting pile enters a holding layer; after the construction of the high-pressure jet grouting pile is completed, consolidated filling injection is adopted at the periphery of the shield tunnel, thus having the characteristics of effectively reducing after-construction settlement of the shield tunnel which encounters the lower horizontal layer of the deep soft soil when crossing the newly-built seawall so as to prevent the tunnel from being tension fracture in the lengthways direction and further have influence of taking and draining water, and effectively improving the transverse forced state of the shield tunnel so as to prevent damage caused by the concentrated force on a single duct piece.
Owner:ZHEJIANG ELECTRIC POWER DESIGN INST

Tidal flat low-dam high-net ecological aquaculture typhoon-resistant facility

The invention discloses a tidal flat low-dam high-net ecological aquaculture typhoon-resistant facility. The inner and outer sides of a rod are arranged in a staggered mode; the upper ends of more than one rope are fixed at the upper end of the rod, and the lower ends of the ropes are fixed on a pile; a net is fixed in the middle of the rod; the upper end of the net is fixed on the rod; a stalk is fixed on a mesh at the lower end of the net; the rod, the net with a door and the ropes are connected to form a closed purse net; the lower end of the rod and the stalk are buried in a seawall; the pile is buried in the tidal flat to form a fence; a closed outer purse net which is formed by connecting by an outer rod, an outer net with an outer door and an outer rope is fixed outside the fence in a certain distance; and the lower end of the outer rod, the stalk and the outer pile are directly buried in the tidal flat to form an outer fence. The net is fixed in the middle of the rod, and the pressure of the typhoon on the fence is changed, reduced and lightened, so that the net is uniformly stressed in a disperse mode, slightly deforms and is not torn and blown away by the typhoon due to a bulge in the middle of the net; and by utilizing a double-layer fence, the impact of floating objects can be blocked by the outer fence, the typhoon resistance is improved through the inner and outer fences, the breeding industry is powerfully developed, the shortage of natural resources of marine products is offset, and vitality of the sustainable development of marine economy is increased.
Owner:胡宝华

Method for comprehensively geographically exploring hidden trouble of seawall engineering

InactiveCN103499612AQuick and effective detectionMaterial impedanceDetection using electromagnetic wavesGround conductivityGround-penetrating radar
The invention discloses a method for comprehensively geographically exploring hidden trouble of seawall engineering. The method includes exploring conductivities a seawall body at the depths of 7.5m and 15m by the aid of ground conductivity meters at exploration intervals of 10m, primarily processing monitoring data and initially locating regions corresponding to points with abnormal conductivity values; acquiring precise images of geological conditions of the regions with abnormal conductivities of the seawall body by the aid of ground penetrating radar and processing the images; analyzing possible reasons for the abnormal conductivities according to the acquired underground images, which are reflected by the ground penetrating radar, of the regions with the abnormal conductivity values, and finding out distribution of abnormal substance layers and local abnormal substances which affect abrupt change of permeability coefficients of the seawall body; rectifying and reforming an embankment with the geological safety hidden trouble. The method has the advantages that the ground conductivity meters are used with the ground penetrating radar, so that merits of instruments can be mined to the greatest extent, shortcomings of the instruments are overcome, the hidden trouble and leakage can be expectedly quickly and effectively explored, and danger can be managed in a targeted manner.
Owner:ZHEJIANG UNIV OF WATER RESOURCES & ELECTRIC POWER

Rock rip-rap concrete protection face structure and construction method thereof

The invention relates to a rock rip-rap concrete protection face structure and a construction method thereof. The rock rip-rap concrete protection face structure comprises a plurality of pouring unitsarranged in a matrix. A longitudinal parting seam is formed between every two adjacent transverse pouring units. A transverse parting seam is formed between every two adjacent longitudinal pouring units. The longitudinal parting seams are perpendicular to the transverse parting seams. The longitudinal parting seams and the transverse parting seams are filled with polyethylene panels. Each pouringunit comprises a plurality of small-sized blocky rubbles; a gap is reserved between every two adjacent small-sized blocky rubbles; and fine aggregate concrete is poured into the gaps. The rock rip-rap concrete protection face structure and the construction method have the advantages that the rubbles are laid in a single layer, due to the fact that the small-sized rubbles with high market stock are adopted, the rubbers hardly need to be laid manually, consumed labor is greatly reduced compared with that of rubble pouring laying, the construction period is significantly shortened, thus, the cost is lowered, in addition, the protection face structure of the structure is more stable, and the stability and safety of enclosure seawalls can be protected.
Owner:NANJING CHANGJIANG WATERWAY ENG BUREAU
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products