The invention belongs to the field of drain hole construction, and particularly discloses a
roller compacted concrete construction drain hole
pipe drawing process which comprises the following specific steps: S1, preparing appliances; s2, positioning and marking; s3, installing a drawing
pipe; s4, concrete is poured; s5, carrying out full-section rolling; s6,
tube drawing; s7, performing real-time monitoring; and S8, ending. S9, optimizing the process; according to the method, the concrete is poured and paved to be flush with the top of the steel drawing
pipe, large-area rolling compaction can be directly conducted through a
machine, the concrete compactness is improved, meanwhile, the working efficiency is improved, the labor intensity of constructors is reduced,
economic benefits are quite considerable, a
simulation model is established by collecting real-
time data, and the construction cost is reduced. According to the method, the construction result is compared with
model prediction, the accuracy of the model is improved, then different technological processes are simulated by adjusting parameters, and the current technological process and technological parameters are optimized, so that a better effect is achieved, material waste and construction time are reduced, and the total cost is reduced.