Device for avoiding deformation of pipe orifice in foundation construction of sound barrier riser

By using chucks, mandrels and hoop devices in the sound barrier riser, the piling force of the large pile driver is evenly dispersed, reducing the deformation of the end of the riser, solving the problems of insufficient soil penetration depth and substandard quality during construction, and achieving for more efficient construction.

CN221810584UActive Publication Date: 2024-10-08SHANDONG HIGHWAY & BRIDGE CONSTR GRP TRANSPORTATION DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420270056.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-04
Publication Date
2024-10-08
Estimated Expiration
2034-02-04

AI Technical Summary

Technical Problem

During the construction of the sound barrier standpipe foundation, due to the unevenness of the underground soil layer, the penetration depth of the small pile driver is insufficient when driving piles. When using a large pile driver, the end of the standpipe is prone to deformation or cracks, which cannot meet the construction quality requirements.

Method used

A device is designed, including a chuck, a mandrel and a hoop. The mandrel and the hoop are connected to the sound barrier riser. The piling force is transmitted through the chuck, increasing the stress area, reducing the load on the end face, and using elastic supports. and pressure sensors to protect the risers.

Benefits of technology

It effectively avoids deformation and cracks at the end of the riser, ensures that the depth of penetration meets the drawing requirements and construction quality, and improves construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221810584U_ABST
    Figure CN221810584U_ABST
Patent Text Reader

Abstract

The utility model provides a device for avoiding deformation of a pipe orifice in foundation construction of a sound barrier riser, which comprises a chuck, the lower part of the chuck is connected with three mandrels in a sliding manner, hoops for tightly holding the sound barrier riser are arranged outside the mandrels, and the hoops are connected with the lower end surface of the chuck. The device can effectively solve the problems of deformation and cracks of the end face of the sound barrier riser foundation through internal support of the mandrel and external fixation of the hoop.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of road construction, and specifically discloses a device for preventing the pipe mouth from being deformed during the construction of a sound barrier riser foundation. Background Art

[0002] Sound barriers are mainly used for sound insulation and noise reduction of highways, expressways, elevated composite roads and other noise sources. A facility is inserted between the sound source and the receiver to make the sound wave propagation have a significant additional attenuation, thereby reducing the noise impact in a certain area where the receiver is located. Regarding the construction of the sound barrier foundation, the drawings have the following requirements: Use medium ø140 steel pipe pile foundation, with an effective length of not less than 2.5m. During the construction of the sound barrier foundation, due to the existence of soil layers with high water content, gravel layers with high sand content and other soil layers with uneven properties underground, when a small pile driver is used for piling, the effective length of the sound barrier riser foundation cannot reach the required depth of burial in the ground as required by the drawings, and the construction cannot proceed normally. A large pile driver must be used for piling. When a large pile driver is used for piling, the sound barrier riser will cause deformation or cracks at the end under the longitudinal compression force at the end, which cannot meet the construction quality requirements. Utility Model Content

[0003] In view of the above problems, the utility model provides a device for preventing the pipe mouth from being deformed during the construction of the sound barrier riser foundation. The device can effectively solve the problems of deformation and cracks on the end face of the sound barrier riser foundation.

[0004] A device for preventing the pipe mouth from being deformed during the construction of a sound barrier riser foundation comprises a chuck, the lower part of which is slidably connected with three core shafts, the outer part of which is provided with a clamp for clamping the sound barrier riser, and the clamp is connected to the lower end surface of the chuck.

[0005] Preferably, a transfer block is provided at the upper end of each mandrel, and the chuck is slidably connected to the transfer block.

[0006] Preferably, the three core shafts form a cylindrical structure that cooperates with the inner surface of the sound barrier riser.

[0007] Preferably, elastic supporting members are provided on opposite sides of two adjacent core shafts.

[0008] Preferably, a pressure sensor is provided on the outer side of the core shaft.

[0009] Preferably, a connecting piece is provided at the upper end of the clamp, and the connecting piece is connected to the lower end surface of the chuck via screws.

[0010] Preferably, the clamp is composed of two semicircular ring structures connected together.

[0011] Preferably, the clamp is an elastic ring with a side opening.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] The utility model arranges a mandrel inside the sound barrier riser and a clamp outside, and the mandrel and the clamp are both connected to the chuck. When piling, the pile driver directly acts on the chuck, and transmits the piling force to the sound barrier riser through the mandrel and the clamp, so that the force-bearing area of ​​the sound barrier riser is increased, the load-bearing burden of the end face is reduced, and the deformation and cracking of the end of the sound barrier riser can be effectively alleviated. The problem that the depth of soil does not meet the requirements of the drawings and the construction quality does not meet the relevant requirements due to the deformation of the sound barrier riser when using a large pile driver for construction is completely solved. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the technical solution of the implementation mode of the utility model, the drawings required for use in the implementation mode will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0015] Figure 1 This is a schematic diagram of the overall structure of the utility model Figure 1 ;

[0016] Figure 2 This is a schematic diagram of the overall structure of the utility model Figure 2 ;

[0017] Figure 3 It is a diagram of the mandrel structure;

[0018] Figure 4 It is a diagram of the chuck structure;

[0019] Figure 5 It is a hoop structure Figure 1 ;

[0020] Figure 6 It is a hoop structure Figure 2 ;

[0021] Explanation of the accompanying drawings: 1. Chuck, 1-1. Slide groove, 1-2. First connecting hole, 2. Hoop, 2-1. Connecting plate, 2-2. Second connecting hole, 2-3. Docking plate, 2-4. Third connecting hole, 3. Sound barrier riser, 4. Core shaft, 4-1. Adapter block. DETAILED DESCRIPTION

[0022] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.

[0023] like Figure 1-6 As shown, the utility model discloses a device for preventing the pipe mouth from being deformed during the foundation construction of the sound barrier riser. The device is connected to the force-applying end of the large pile driver and is used to evenly distribute the force originally applied to the upper end of the sound barrier riser to the end and side wall of the sound barrier riser, effectively protect the sound barrier riser and prevent the end from being deformed. The device includes a chuck 1, which is modified from a three-jaw chuck for machine tools in the prior art. There are three chute 1-1 evenly distributed along the circumferential direction at the lower part of the chuck 1. Each chute 1-1 is matched with an adapter block 4-1. The adapter block 4-1 is connected to the internal thread of the chuck 1 through the thread at the upper end, and the slide block 4-1 is moved along the direction of the slide 1-1 on the chuck 1 through the guiding effect of the slide 1-1. The lower end of each slide block 4-1 is connected to a core shaft 4, and the core shafts connected by the three slide blocks just form a cylindrical structure, which is used to be installed inside the sound barrier riser to effectively support the sound barrier riser.

[0024] Multiple groups of first connection holes 1-2 are processed on the lower end face of the chuck 1. The multiple groups of first connection holes are symmetrically distributed along a certain end face axis of the chuck, and each group of first connection holes is located on a straight line passing through the center of the chuck. It can also be understood that multiple groups of first connection holes are located on the same circumference of different diameters. The hoop 2 is a hollow cylindrical structure composed of two semicircular rings connected together. A connecting piece 2-1 is welded on the upper end of each semicircular ring. The second connection hole 2-2 is processed on the connecting piece. After the connecting piece 2-1 is connected to the chuck 1, the first connection hole 1-2 and the second connection hole 2-2 are fixed by screws to achieve the fastening of the hoop 2 and the chuck 1.

[0025] The sides of the two semicircular rings that form the clamp are both provided with docking plates 2-3. When the docking plates of the two semicircular rings are docked with each other, they just form a cylindrical shape, which embraces the sound barrier riser 3 and is then fastened with screws.

[0026] In order to enable the core shaft 4 to fully support the sound barrier riser, elastic support members are arranged on the sides of two adjacent core shafts. The elastic support members are preferably compression springs, which establish effective support inside the sound barrier riser through the deformation restoring force of the springs to avoid deformation of the pipe wall when the end of the sound barrier riser is subjected to force.

[0027] The clamp in this scheme can also be selected as an elastic ring with a side opening. The deformation of the elastic ring is used to put it on the outside of the sound barrier riser, and then the opening of the elastic ring is connected and fixed with screws to achieve the function of encircling and fixing the sound barrier riser.

[0028] The process of using the device is as follows:

[0029] First, install the chuck at the force-applying end of the large pile driver, and then use the tool to rotate the internal motion mechanism of the chuck. Under the transmission action of the motion mechanism, the adapter block drives the core to move toward the center. When the diameter of the cylinder composed of three mandrels is smaller than the inner diameter of the sound barrier riser, insert the mandrel into the sound barrier riser, and then rotate the internal motion mechanism of the chuck in the opposite direction. The adapter block drives the mandrel to move outward until it contacts the sound barrier riser to support the sound barrier riser. Here, a pressure sensor can be installed on the side wall of the mandrel in advance. The pressure sensor is connected to an external display screen or alarm. The degree of contact between the mandrel and the sound barrier riser can be intuitively sensed through the pressure sensor. Then, the clamp is encircled and fixed to the sound barrier riser and connected to the chuck, and the large pile driver can be started to carry out the foundation construction of the sound barrier riser.

[0030] Take the construction project of a certain section of a highway for example. The project starts from the starting pile number K176+587 and ends at the end pile number K201+487, with a total length of 24.9 kilometers and a design speed of 120km / h. Among them, our unit is responsible for the construction of a bridge at K187+176 and all projects such as the roadbed and pavement, bridges and culverts greening from K189+810 to K201+487. The roadbed length is 11.677 kilometers (Jiaxiang West Interchange 1.230km, main line 10.447km). Bridges: 1 large bridge of 736m; 3 medium bridges of 135m; 2 small bridges of 26m; 4 separated interchanges of 271m; 1 overpass of 75m; 26 passages; 11 culverts; 1 interchange. 101,000 cubic meters of earthwork was excavated, 54,000 cubic meters of earthwork was used, and 620,000 cubic meters of borrowed earthwork was used for filling.

[0031] The sound barriers of this project are mainly distributed from K190+500 to K192+175, totaling 3.35 kilometers. Regarding the construction of the sound barrier foundation, the drawings mainly require the following:

[0032] 1. The concrete strength grade of bored piles and ground beams is C30;

[0033] 2. During foundation construction, the earthwork shall not be over-excavated, and the foundation bottom solidity shall be more than 90%;

[0034] 3. Use medium ø140 steel pipe pile foundation, with a length of not less than 2.5m; concrete strength grade C30;

[0035] 4. When setting the bar beam reinforcement, if there is a steel pipe pile foundation, the steel pipe pile foundation should be contained inside the steel structure or the lower part of the reinforcement should be disconnected and welded to the steel pipe, welded to the steel pipe wall, single-sided welding, and the weld length should not be less than 10d;

[0036] 5. If culverts or passages are encountered during the construction process, dynamic adjustments can be made according to the on-site construction conditions;

[0037] 6. The foundation needs to be disconnected according to the location of the slope rapids trough, and the disconnected foundation should avoid the location of the embedded parts. Reserve the location of the edge drainage ø8 horizontal PYC pipe;

[0038] 7. An expansion joint with a width of 6mm is set every 10m on the ground beam. The expansion joint serves as a drainage device and should be set away from the embedded parts. The expansion joint is filled with hemp asphalt.

[0039] According to feedback from on-site construction personnel, the depth of the round column in the soil was insufficient when using a 65 small pile driver to drive piles, so they went to the construction site to understand the situation and discuss solutions to the problem. After discussion, it was initially determined that the equipment was too small, so the 65 small pile driver was replaced with a 115 large pile driver and the piling situation was observed. According to the piling situation of the large pile driver, it can be clearly seen that the soil penetration of the round column has met the requirements of the drawings, but the upper end of the round column is severely deformed and does not meet the construction quality requirements. After multiple consultations and on-site discussions, it was finally decided to customize the mandrel and clamp suitable for the specifications of the column and use a large pile driver for piling. According to the large pile driver using the clamp for piling, the soil penetration of the round column meets the requirements of the drawings, and the round column is basically not deformed, which has met the construction quality requirements. After multiple implementations of this plan in the later period, the construction efficiency and construction quality have been significantly improved.

[0040] The above description is only a preferred implementation method of the utility model and is not intended to limit the utility model. For those skilled in the art, the utility model can be modified and varied in various ways. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A device for preventing the pipe orifice from being deformed during the construction of a sound barrier riser foundation, characterized in that: It comprises a chuck (1), the lower part of which is slidably connected to three core shafts (4), the outer part of which is provided with a clamp (2) for clamping a sound barrier riser (3), and the clamp (2) is connected to the lower end surface of the chuck (1).

2. A device for preventing the pipe orifice from being deformed during the construction of the sound barrier riser foundation according to claim 1, characterized in that: An adapter block (4-1) is provided at the upper end of each core shaft (4), and the chuck (1) is slidably connected to the adapter block (4-1).

3. A device for preventing the pipe orifice from being deformed during the construction of the sound barrier riser foundation according to claim 1, characterized in that: The three core shafts (4) form a cylindrical structure, which cooperates with the inner surface of the sound barrier riser (3).

4. A device for preventing the pipe orifice from being deformed during the construction of the sound barrier riser foundation according to claim 1, characterized in that: Elastic support members are arranged on opposite sides of two adjacent core shafts (4).

5. The device for preventing the pipe orifice from being deformed during the construction of the sound barrier riser foundation according to claim 1, characterized in that: A pressure sensor is provided on the outer side of the core shaft (4).

6. A device for preventing the pipe orifice from being deformed during the construction of the sound barrier riser foundation according to claim 1, characterized in that: A connecting piece (2-1) is provided at the upper end of the clamp (2), and the connecting piece (2-1) is connected to the lower end surface of the chuck (1) via screws.

7. A device for preventing the pipe orifice from being deformed during the construction of the sound barrier riser foundation according to claim 1, characterized in that: The clamp (2) is composed of two semicircular ring structures connected together.

8. The device for preventing the pipe orifice from being deformed during the construction of the sound barrier riser foundation according to claim 1, characterized in that: The hoop (2) is an elastic ring body with a side opening.