Water replenishing device of wall-hanging stove
Through the design of the water replenishment device of the wall-mounted boiler, structures such as straight-through pipes, L-shaped pipes, elbow pipes and rubber sheets are used to prevent high-temperature water in the water tank from flowing to the valve, protect the seals, and solve the problem of aging of the seals caused by the heating of water in the water tank of the gas wall-mounted boiler. Burn problem, improved safety and seal life.
Patent Information
- Application Number
- CN202420040507.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-08
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2034-01-08
AI Technical Summary
During the use of the gas wall-hung boiler, the moisture in the water tank is heated, causing the valve seal to be in a high temperature state, leading to premature aging of the seal and the risk of scalding accidents.
Design a wall-mounted boiler water replenishing device. Through the combined structure of straight pipe, L-shaped pipe, bent pipe and straight tube, it ensures that water enters the water tank from the bent pipe to prevent high-temperature water from flowing to the valve. It uses high-temperature resistant rubber sheets and support nets to protect the seals. , and close the cross seam under the action of steam to prevent the diffusion of water vapor.
Effectively keeps valve seals at normal temperature, extending their service life, reducing the risk of burns, and improving safety.
Smart Images

Figure CN221811392U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a water replenishing device for a wall-mounted boiler, belonging to the technical field of wall-mounted boilers. Background Art
[0002] In order to avoid dry burning of the gas wall-mounted boiler, it is necessary to add water to the water tank of the heating water system of the gas wall-mounted boiler. Generally, a valve is installed on the surface of the wall-mounted boiler water tank. By opening the valve, the water in the water supply pipeline can enter the wall-mounted boiler water tank. The water inside the wall-mounted boiler water tank will be heated during use. The heated water will cause the sealing ring and other seals in the valve to be in a high temperature state, thereby causing the sealing ring and other seals in the valve to age prematurely due to high temperature. Therefore, it is necessary to design a water replenishing device for the wall-mounted boiler that keeps the valve at normal temperature. Utility Model Content
[0003] In view of the deficiencies in the prior art, the utility model aims to provide a water replenishing device for a wall-mounted boiler to solve the problems raised in the above-mentioned background technology. The utility model keeps the valve at room temperature to protect the sealing parts inside the valve.
[0004] In order to achieve the above-mentioned purpose, the utility model is implemented through the following technical scheme: a water replenishing device for a wall-mounted boiler, including a straight-through pipe for installation on a water supply pipeline, a valve connected to the straight-through pipe is installed on the outer surface of the straight-through pipe, a threaded cap is installed on the liquid outlet end of the valve, and the threaded cap is rotatably installed on the end of the horizontal portion of the L-shaped pipe, the end of the vertical portion of the L-shaped pipe is adjacent to and connected to the end of the horizontal portion of the curved pipe, and a steam separator for installation on the upper surface of the wall-mounted boiler water tank is installed at the lower end of the vertical portion of the curved pipe.
[0005] Furthermore, the steam isolation part includes a straight cylinder, a straight cylinder is installed at the lower end of the vertical part of the bent pipe, the lower end of the straight cylinder is open, the straight cylinder is installed on the upper surface of the wall-mounted boiler water tank by a plurality of screws, a supporting net is installed in the straight cylinder, a high-temperature resistant rubber sheet that fits the supporting net is provided on the lower side of the supporting net, a cross groove is processed in the middle position of the lower surface of the rubber sheet, and the supporting net and the rubber sheet are installed in the straight cylinder by a plurality of connecting screws.
[0006] Furthermore, a connecting ring which is connected and fixed to the straight tube is sleeved on the open end of the straight tube, and a plurality of fixing holes are equidistantly provided in a ring-shaped upper surface of the connecting ring.
[0007] Furthermore, a positioning ring is provided on the side of the support net facing away from the rubber sheet, the positioning ring is fixed in the straight tube, and the connecting screw passes through the rubber sheet and the support net and is threadedly connected to the positioning ring.
[0008] Furthermore, a circular opening is provided in the middle of the upper surface of the straight tube, and the vertical portion of the curved pipe is fixed in the circular opening.
[0009] Furthermore, a limit ring is connected and fixed at the end of the horizontal portion of the L-shaped tube, and the limit ring is slidably installed in a threaded cap. A sealing gasket is provided on the side of the limit ring away from the L-shaped tube. A hollow threaded interface is connected and fixed at the liquid outlet end of the valve, and the threaded interface is threadedly connected in the threaded cap, and the sealing gasket fits with the threaded interface.
[0010] Furthermore, a six-sided sleeve is connected and fixed to the upper end of the straight-through pipe, and an inner surface of the six-sided sleeve is processed with internal threads. A pipe joint is connected and fixed to the lower end of the straight-through pipe, and an outer surface of the pipe joint is processed with external threads.
[0011] Furthermore, a connecting ear is fixedly connected to the outer surface of the straight-through pipe, and a small hole is opened on one side of the connecting ear.
[0012] Beneficial effects of the utility model:
[0013] 1. Use a threaded cap to connect the L-shaped pipe to the valve, and then install the straight tube on the upper surface of the wall-mounted boiler water tank. After opening the valve, the water in the straight tube connected to the water supply pipeline flows into the wall-mounted boiler water tank through the channel formed by the valve, L-shaped pipe, elbow and straight tube, thereby replenishing water into the wall-mounted boiler water tank. Because the elbow is on the upper side of the wall-mounted boiler water tank, the heated water in the wall-mounted boiler water tank will not flow to the valve, so that the sealing ring and other sealing parts in the valve are at room temperature, avoiding the accelerated aging of the sealing ring and other sealing parts in the valve due to long-term high temperature. At the same time, the valve is in a low temperature state to prevent scalding accidents and improve safety.
[0014] 2. When the valve is opened, water flows into the straight tube and pushes open the cross seam on the rubber sheet, thus not affecting the water replenishment. After the water replenishment is completed, the valve is closed, and then under the action of the water vapor in the water tank of the wall-mounted boiler, the cross seam on the rubber sheet is in a closed state, thereby preventing the water vapor in the water tank of the wall-mounted boiler from diffusing to the valve, thereby protecting the seals inside the valve. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:
[0016] Figure 1 This is a structural schematic diagram of a water replenishing device for a wall-mounted boiler according to the utility model;
[0017] Figure 2 It is a schematic diagram of the assembly of a valve and a straight-through pipe in a water replenishing device for a wall-mounted boiler according to the utility model;
[0018] Figure 3 It is a schematic diagram of the assembly of a rubber sheet, a supporting net and a straight cylinder in a water replenishing device for a wall-mounted boiler of the utility model;
[0019] Figure 4 It is a three-dimensional diagram of a rubber sheet in a water replenishing device of a wall-mounted boiler of the utility model;
[0020] Figure 5 It is a schematic diagram of the assembly of a threaded cap and an L-shaped pipe in a water supply device for a wall-mounted boiler of the utility model;
[0021] In the figure: 1-straight pipe, 2-connecting ear, 3-pipe joint, 4-valve, 5-connecting ring, 6-straight cylinder, 7-elbow pipe, 8-L-shaped pipe, 9-threaded cap, 10-six-sided sleeve, 11-threaded interface, 12-small hole, 13-round mouth, 14-positioning ring, 15-rubber sheet, 16-support net, 17-cross seam, 18-sealing gasket, 19-limiting ring. DETAILED DESCRIPTION
[0022] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0023] See also Figure 1 and Figure 2 The utility model provides a technical solution: a water replenishing device for a wall-mounted boiler, comprising a straight pipe 1 for installation on a water supply pipeline, a six-sided sleeve 10 is connected and fixed to the upper end of the straight pipe 1, and the inner surface of the six-sided sleeve 10 is processed with an internal thread, a pipe joint 3 is connected and fixed to the lower end of the straight pipe 1, and the outer surface of the pipe joint 3 is processed with an external thread, and the straight pipe 1 is conveniently installed in the water supply pipeline by respectively installing the pipe joint 3 and the six-sided sleeve 10 at both ends of the straight pipe 1, a connecting ear 2 is connected and fixed to the outer surface of the straight pipe 1, and a small hole 12 is opened on one side of the connecting ear 2, so that a screw passes through the small hole 12 and is installed at the required position of the wall-mounted boiler, thereby improving the stability of the installation of the straight pipe 1.
[0024] See also Figure 1 , Figure 2 and Figure 5 A valve 4 communicating with the straight-through pipe 1 is installed on the outer surface of the straight-through pipe 1, and a threaded cap 9 is installed on the liquid outlet end of the valve 4, that is, a hollow threaded interface 11 is connected and fixed to the liquid outlet end of the valve 4, and the threaded interface 11 is threadedly connected in the threaded cap 9, and the threaded cap 9 is rotatably installed at the end of the horizontal portion of the L-shaped pipe 8, that is, a limiting ring 19 is connected and fixed to the end of the horizontal portion of the L-shaped pipe 8, and the limiting ring 19 is slidably installed in the threaded cap 9. A sealing gasket 18 is provided on the side of the limiting ring 19 away from the L-shaped pipe 8. After the threaded cap 9 is connected to the threaded interface 11, the sealing gasket 18 fits with the threaded interface 11 to improve the sealing performance of the connection between the L-shaped pipe 8 and the valve 4.
[0025] See also Figure 1 and Figure 3The end of the vertical portion of the L-shaped tube 8 is adjacent to and communicates with the end of the horizontal portion of the elbow 7. A straight tube 6 with an open lower end is installed at the lower end of the vertical portion of the elbow 7, wherein a circular opening 13 is opened in the middle of the upper surface of the straight tube 6, and the vertical portion of the elbow 7 is fixed in the circular opening 13. A connecting ring 5 connected and fixed to the straight tube 6 is sleeved at the open end of the straight tube 6. A plurality of fixing holes are opened in an annular shape and equidistantly on the upper surface of the connecting ring 5. The connecting ring 5 is installed on the upper surface of the wall-mounted boiler water tank by a plurality of screws. The L-shaped tube 8 is connected to the valve 4 by using a threaded cap 9, and then the straight tube 6 is installed on the upper surface of the wall-mounted boiler water tank, and then After opening valve 4, the water in the straight pipe 1 connected to the water supply pipeline flows into the wall-mounted boiler water tank through the channel formed by valve 4, L-shaped pipe 8, elbow 7 and straight tube 6, so as to replenish water into the wall-mounted boiler water tank. Because the elbow 7 is located on the upper side of the wall-mounted boiler water tank, the heated water in the wall-mounted boiler water tank will not flow to valve 4, so that the sealing ring and other sealing parts in valve 4 are at room temperature, avoiding the accelerated aging of the sealing ring and other sealing parts in valve 4 due to being in a high temperature state for a long time. At the same time, valve 4 is in a low temperature state, preventing scalding accidents and improving safety.
[0026] See also Figure 1 , Figure 3 and Figure 4 A support net 16 is installed in the straight cylinder 6, and a high-temperature resistant rubber sheet 15 is provided on the lower side of the support net 16 to fit the support net 16. A cross groove is processed at the middle position of the lower surface of the rubber sheet 15. The support net 16 and the rubber sheet 15 are installed in the straight cylinder 6 through a plurality of connecting screws, that is, a positioning ring 14 is provided on the side of the support net 16 away from the rubber sheet 15, and the positioning ring 14 is fixed in the straight cylinder 6. The connecting screws pass through the rubber sheet 15 and the support net 16 and are threadedly connected to the positioning ring 14. When the valve 4 is opened, water flows into the straight cylinder 6 and then pushes open the cross seam 17 on the rubber sheet 15, thereby not affecting the water replenishment. After the water replenishment is completed, the valve 4 is closed, and then under the action of the water vapor in the wall-mounted boiler water tank, the cross seam 17 on the rubber sheet 15 is in a closed state, thereby preventing the water vapor in the wall-mounted boiler water tank from diffusing to the valve 4, thereby protecting the sealing component in the valve 4.
[0027] Although this specification is described according to implementation modes, not every implementation mode includes only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A water replenishing device for a wall-mounted boiler, comprising a straight-through pipe (1) for installation on a water supply pipeline, Features: The outer surface of the straight-through pipe (1) is provided with a valve (4) in communication with the straight-through pipe (1); the liquid outlet end of the valve (4) is provided with a threaded cap (9); the threaded cap (9) is rotatably mounted on the end of the horizontal portion of the L-shaped pipe (8); the end of the vertical portion of the L-shaped pipe (8) is adjacent to and in communication with the end of the horizontal portion of the curved pipe (7); and the lower end of the vertical portion of the curved pipe (7) is provided with a steam barrier for mounting on the upper surface of a water tank of a wall-mounted boiler.
2. A water replenishing device for a wall-mounted boiler according to claim 1, Features: The steam isolation component comprises a straight cylinder (6), the lower end of the vertical portion of the curved pipe (7) is provided with the straight cylinder (6), the lower end of the straight cylinder (6) is open, the straight cylinder (6) is installed on the upper surface of the wall-mounted boiler water tank by means of a plurality of screws, a support net (16) is installed in the straight cylinder (6), a high temperature resistant rubber sheet (15) fitted with the support net (16) is provided on the lower side of the support net (16), a cross groove is processed at the middle position of the lower surface of the rubber sheet (15), and the support net (16) and the rubber sheet (15) are installed in the straight cylinder (6) by means of a plurality of connecting screws.
3. A water replenishing device for a wall-mounted boiler according to claim 2, Features: The open end of the straight tube (6) is sleeved with a connecting ring (5) connected and fixed to the straight tube (6), and the upper surface of the connecting ring (5) is provided with a plurality of fixing holes at equal intervals in a ring shape.
4. A water replenishing device for a wall-mounted boiler according to claim 2, Features: A positioning ring (14) is provided on the side of the support net (16) facing away from the rubber sheet (15), and the positioning ring (14) is fixed in the straight tube (6). The connecting screw passes through the rubber sheet (15) and the support net (16) and is threadedly connected to the positioning ring (14).
5. A water replenishing device for a wall-mounted boiler according to claim 2, Features: A circular opening (13) is provided in the middle of the upper surface of the straight tube (6), and the vertical portion of the curved tube (7) is fixed in the circular opening (13).
6. The water replenishing device for a wall-mounted boiler according to claim 1, Features: A limit ring (19) is connected and fixed to the end of the horizontal portion of the L-shaped tube (8), and the limit ring (19) is slidably installed in the threaded cap (9). A sealing gasket (18) is provided on the side of the limit ring (19) facing away from the L-shaped tube (8). A hollow threaded interface (11) is connected and fixed to the liquid outlet end of the valve (4), and the threaded interface (11) is threadedly connected in the threaded cap (9), and the sealing gasket (18) fits the threaded interface (11).
7. The water replenishing device for a wall-mounted boiler according to claim 1, Features: The upper end of the straight-through pipe (1) is connected and fixed with a six-sided sleeve (10), the inner surface of which is processed with internal threads; the lower end of the straight-through pipe (1) is connected and fixed with a pipe joint (3), the outer surface of which is processed with external threads.
8. The water replenishing device for a wall-mounted boiler according to claim 1, Features: A connecting ear (2) is fixedly connected to the outer surface of the straight-through pipe (1), and a small hole (12) is opened on one side of the connecting ear (2).