Steam heating system for corrugated paperboard production line
By designing a steam heating system in the corrugated cardboard production line, including steam recovery and softened water treatment, the problems of low energy utilization and water waste in the corrugated cardboard steam system are solved, achieving energy conservation and environmental protection.
Patent Information
- Application Number
- CN202323386057.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-12
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2033-12-12
AI Technical Summary
The existing corrugated cardboard steam system has low energy utilization efficiency in the process of manufacturing and transporting steam, and the steam temperature loss is serious, resulting in a waste of water resources.
A steam heating system for a corrugated cardboard production line is designed, including a water storage module, a softened water module, a water collection and distribution module and a heating module. Through steam recovery and softened water treatment, the loss of steam and water resources is reduced, and the steam supply pipe is used It is installed in parallel with the steam recovery pipe for insulation and isolation to improve energy utilization efficiency.
It effectively reduces the loss of steam and water resources, improves energy utilization efficiency, and achieves the goal of energy conservation and environmental protection.
Smart Images

Figure CN221819636U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of corrugated board production equipment, in particular to a steam heating system for a corrugated board production line. Background Art
[0002] The corrugated board production line consists of a wet production line and a dry production line. The wet production line mainly includes base paper holders, automatic paper splicers, preheating and preconditioning, single-sided corrugated machines, paper feed bridges, glue coating machines, double-sided machines and other mechanical equipment; the various mechanical equipment in the wet production line is the key equipment for corrugated board forming. It mainly involves the influence of factors such as paper, glue, and steam on the quality of paper forming. Steam is an important factor in the corrugated board production line. It is not only used in large quantities but also has high temperature requirements.
[0003] The existing corrugated cardboard steam system has problems such as low energy utilization, serious steam temperature loss, and waste of water resources caused by direct discharge of used steam without recycling during the process of producing and transporting steam. Utility Model Content
[0004] The utility model aims to solve at least one of the technical problems existing in the prior art. To this end, the utility model proposes a steam heating system for a corrugated cardboard production line, which reduces the loss of steam and water resources, improves the energy utilization efficiency, and is energy-saving and environmentally friendly.
[0005] A steam heating system for a corrugated cardboard production line according to an embodiment of the utility model includes:
[0006] A water storage module, wherein the water storage module is provided with at least one high-level water tank in parallel; the output ends of all the high-level water tanks are respectively connected to the main water supply pipe;
[0007] A softened water module, wherein the softened water module is provided with at least one water softener, and the input ends of all the water softeners are respectively connected to the main water supply pipe;
[0008] A water collection and distribution module, wherein the water collection and distribution module is provided with a water collection and distribution tank, wherein a steam recovery pipe and a water supply pipe are provided at the upper end of the water collection and distribution tank, and a first flow distribution pipe is provided at the lower end; the water supply pipe is connected to the output end of the softened water module;
[0009] The heating module is provided with at least one boiler, the output ends of all the boilers are connected to the steam air supply pipe, and the input ends are connected to the first distribution pipe; the steam air supply pipe and part of the steam recovery pipe are arranged in parallel.
[0010] According to some embodiments of the present invention, the vertical height of the output end of the high-level water tank is greater than the height of the input end of the water softener.
[0011] According to some embodiments of the utility model, a water supply branch pipe is provided at the upper end of each of the high-level water tanks, a float valve is provided at the output end of the water supply branch pipe, all of the water supply branch pipes are connected to the second distribution pipe, and a manual valve is provided at the second distribution pipe of the water supply branch pipe.
[0012] According to some embodiments of the utility model, the water softener includes a soft water tank and a soft water controller, and the softened water module is provided with a multi-phase flow distribution pipeline, and the multi-phase flow distribution pipeline can quickly replenish water to the water collection and distribution module.
[0013] According to some embodiments of the utility model, the multi-phase flow distribution pipeline includes a first input pipe, a first water outlet pipe, a second input pipe, a second water outlet pipe, a flow direction switching pipe, a first valve body, a second valve body, a third valve body, a fourth valve body and a quick water replenishment valve; the two ends of the first input pipe are respectively connected to the input end of the soft water controller, the two ends of the first water outlet pipe are respectively connected to the output end of the soft water controller, the two ends of the flow direction switching pipe are respectively connected to the first input pipe and the first water outlet pipe, the quick water replenishment valve is arranged on the flow direction switching pipe, and the second input pipe and the second water outlet pipe are respectively arranged on the flow direction switching pipe on both sides of the flow direction switching pipe.
[0014] According to some embodiments of the utility model, a pressure relief pipe is provided at the upper end of the water collecting and distributing tank, and a first solenoid valve is provided on the pressure relief pipe; a sewage pipe is provided at the lower end of the water collecting and distributing tank, and a second solenoid valve is provided on the sewage pipe; a third solenoid valve is provided on the steam recovery pipe, and the water make-up pipe is connected to the second water outlet pipe, and a fourth solenoid valve and a water make-up pump are provided on the water make-up pipe.
[0015] According to some embodiments of the utility model, the first distribution pipeline includes a distribution main pipe and a distribution branch pipe, the distribution main pipe is provided with a fifth solenoid valve, and the distribution branch pipe is provided with one corresponding to each boiler, one end of the distribution branch pipe is connected to the distribution main pipe, and the other end is connected to the input end of the boiler; each of the distribution branch pipes is provided with a high-level water pump and a sixth solenoid valve.
[0016] According to some embodiments of the utility model, the axis of the water collecting and distributing tank is arranged horizontally, and a hatch is arranged at one end of the water collecting and distributing tank.
[0017] According to some embodiments of the present utility model, the maximum evaporation capacity of the boiler is Gz, and the maximum flow rate of the water collection and distribution module is Q, Q≥(n-1)Gz, where n is the number of boilers.
[0018] According to some embodiments of the utility model, it also includes an insulation tank pipe, which is sleeved on the parallel parts of the steam air supply pipe and the steam recovery pipe, and insulation material is filled between the insulation tank pipe and the steam air supply pipe and the steam recovery pipe.
[0019] A steam heating system for a corrugated cardboard production line according to an embodiment of the utility model has at least the following beneficial effects:
[0020] According to the scheme of the utility model, the steam heating system of the corrugated cardboard production line is sequentially provided with a water storage module, a softening water module, a water collection and distribution module and a heating module along the water delivery direction, wherein the water storage module is used to store water, the softening water module is provided with a water softener, through which water can pass through anion and cation resins to remove calcium, magnesium, sodium and other ions in the water, which can effectively prevent scale; the water collection and distribution module is provided with a water collection and distribution tank, which is used to store water softened by the softening water module and supply it to the boiler in the heating module for heating, wherein the water collection and distribution module is provided with a steam recovery pipe, through which the steam on the corrugated cardboard production line can be recovered, and stored in the water collection and distribution tank after liquefaction, as the additional water source for supplying the boiler, because the steam recovered through the steam recovery pipe has a certain temperature, it can reduce the energy loss of the boiler when supplying the boiler. In addition, the steam air supply pipe and the steam recovery pipe are partially parallel, which can centrally insulate and isolate the steam air supply pipe and the steam recovery pipe, thereby reducing energy loss. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 A structural schematic diagram of the utility model;
[0022] Figure 2 A structural schematic diagram of a water storage module of the utility model;
[0023] Figure 3 A structural schematic diagram of a softening water module of the utility model;
[0024] Figure 4 A structural schematic diagram of a water collection and distribution module of the utility model;
[0025] Figure 5 A structural schematic diagram of the first flow distribution pipeline of the utility model;
[0026] Figure 6 A schematic diagram of the structure of the heat preservation tank pipe of the utility model;
[0027] In the figure:
[0028] 100-water storage module, 110-high-level water tank, 111-water supply branch pipe, 112-manual valve, 120-main water supply pipe, 130-second distribution pipe;
[0029] 200-softened water module, 210-water softener, 211-soft water tank, 212-soft water controller, 220-multiphase flow distribution pipeline, 221-first input pipe, 222-first water outlet pipe, 223-second input pipe, 224-second water outlet pipe, 225-flow direction switching pipe, 226-first valve body, 227-second valve body, 228-third valve body, 229-fourth valve body, 230-quick water replenishment valve;
[0030] 300-water collection and distribution module, 310-water collection and distribution tank, 311-cabin door, 320-steam recovery pipe, 321-third solenoid valve, 330-water supply pipe, 331-fourth solenoid valve, 332-water supply pump, 340-first distribution pipeline, 341-distribution main pipe, 342-distribution branch pipe, 343-fifth solenoid valve, 344-high-level water pump, 345-sixth solenoid valve, 350-pressure relief pipe, 351-first solenoid valve, 360-drain pipe, 361-second solenoid valve;
[0031] 400-heating module, 410-boiler, 420-steam air supply pipe;
[0032] 500-insulation trough pipe, 510-insulation material. DETAILED DESCRIPTION
[0033] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0034] In the description of the present invention, it should be understood that the descriptions involving orientation, such as the orientation or positional relationship indicated as up, down, etc., are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0035] In the description of the present utility model, "a plurality" means more than two. If there is a description of "first" or "second", it is only for the purpose of distinguishing the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.
[0036] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.
[0037] Reference Figures 1 to 6As shown, a steam heating system for a corrugated board production line according to an embodiment of the utility model comprises a water storage module 100, a softened water module 200, a water collection and distribution module 300 and a heating module 400, wherein the water storage module 100 is provided with at least one high-level water tank 110 in parallel; the output ends of all the high-level water tanks 110 are respectively connected to the main water supply pipe 120; the softened water module 200 is provided with at least one water softener 210, and the input ends of all the water softeners 210 are respectively connected to the main water supply pipe 120; the water collection and distribution module 300 is provided with a water softener 210, and the input ends of all the water softeners 210 are respectively connected to the main water supply pipe 120; The module 300 is provided with a water collecting and distributing tank 310, and a steam recovery pipe 320 and a water supply pipe 330 are provided at the upper end of the water collecting and distributing tank 310, and a first distribution pipe 340 is provided at the lower end; the water supply pipe 330 is connected to the output end of the softening water module 200; the heating module 400 is provided with at least one boiler 410, and the output ends of all boilers 410 are connected to the steam air supply pipe 420, and the input ends are connected to the first distribution pipe 340; the steam air supply pipe 420 and part of the steam recovery pipe 320 are arranged in parallel. Specifically, in the present embodiment, the steam heating system of the corrugated cardboard production line is sequentially provided with a water storage module 100, a softening water module 200, a water collection and distribution module 300 and a heating module 400 along the water delivery direction, wherein the water storage module 100 is used to store water, and the water storage module 100 is provided with at least one high-level water tank 110 in parallel, and the output ends of all the high-level water tanks 110 are respectively connected to the main water supply pipe 120, and water is supplied to the softening water module 200 through the main water supply pipe 120; the softening water module 200 is provided with a water softener 210, and the input ends of the water softener 210 are respectively connected to the main water supply pipe 120, and water can pass through the anion and cation resin through the water softener 210 to remove calcium, magnesium, sodium and other ions in the water, which can effectively prevent scale; the output end of the softening water module 200 is connected to the water supply pipe 330, and the water supply pipe 330 is connected to the water collection and distribution module 300. The water module 300 replenishes water; the water collecting and distributing module 300 is provided with a water collecting and distributing tank 310, the upper end of the water collecting and distributing tank 310 is provided with a steam recovery pipe 320 and a water replenishing pipe 330, and the lower end is provided with a first distribution pipe 340, and water is replenished to the boiler 410 through the first distribution pipe 340; the water collecting and distributing tank 310 is used to store the water softened by the softened water module 200 and supply it to the boiler 410 in the heating module 400 for heating, wherein the water collecting and distributing module 300 is provided with a steam recovery pipe 320, through which the steam on the corrugated cardboard production line can be recovered, and the steam is liquefied and stored in the water collecting and distributing tank 310 as the additional water source for supplying the boiler 410. Since the steam recovered through the steam recovery pipe 320 has a certain temperature, the energy loss of the boiler 410 can be reduced when it is supplied to the boiler 410. In addition, some sections of the steam supply pipe 420 and the steam recovery pipe 320 are parallel, so that the steam supply pipe 420 and the steam recovery pipe 320 can be centrally insulated and isolated, thereby reducing energy loss.
[0038] In some embodiments of the present invention, referring to Figure 1 and Figure 2 As shown, the vertical height of the output end of the high-level water tank 110 is greater than the height of the input end of the water softener 210. In this embodiment, the water storage module 100 is provided with at least one high-level water tank 110 in parallel. Specifically, in this embodiment, 6 high-level water tanks 110 are provided, and the output ends of the 6 high-level water tanks 110 are respectively connected to the main water supply pipe 120, and the vertical height of the output end of the high-level water tank 110 is greater than the height of the input end of the water softener 210. Through the design of this structure, before supplying water to the softened water module 200, the water is first stored in the high-level water tank 110. Since the vertical height of the high-level water tank 110 is relatively high, the water in the high-level water tank 110 can maintain a large gravitational potential energy, thereby forming a height difference with the softened water module 200, and then when supplying water to the softened water module 200, a certain pressure can be maintained, which is convenient for the water to be filtered and purified in the softened water module 200.
[0039] In some embodiments of the present invention, referring to Figure 1 and Figure 2 As shown, a water supply branch pipe 111 is provided at the upper end of each high-level water tank 110, and a float valve is provided at the output end of the water supply branch pipe 111. All water supply branch pipes 111 are connected to the second distribution pipe 130, and a manual valve 112 is provided at the second distribution pipe 130. In the present embodiment, a water supply branch pipe 111 is provided at the upper end of the high-level water tank 110. During operation, water is replenished into the high-level water tank 110 through the water supply branch pipe 111. A float valve is provided in the water supply branch pipe 111. When the water in the high-level water tank 110 is replenished, the float valve can automatically close to prevent the water in the high-level water tank 110 from overflowing. In the present embodiment, all the water supply branches 111 are connected to the second distribution pipe 130, and the second distribution pipe 130 is connected to an external water source. By providing a manual valve 112 at the water supply branch pipe 111 and the second distribution pipe 130, the water supply of the high-level water tank 110 can be manually controlled, thereby improving the safety performance of the water supply of the high-level water tank 110.
[0040] In some embodiments of the present invention, referring to Figure 1 and Figure 3As shown, the water softener 210 includes a soft water tank 211 and a soft water controller 212, and the softened water module 200 is provided with a multi-phase distribution pipe 220, and the multi-phase distribution pipe 220 can quickly replenish water to the water collection and distribution module 300. Specifically, in this embodiment, the water softener 210 adopts a fixed bed sodium ion exchange softening method. An exchange resin layer is provided in the soft water tank 211. When the untreated water flows into the exchange resin layer from the input end of the soft water controller 212, the calcium and magnesium ions in the untreated water exchange reaction with the sodium ions of the exchange resin layer, and then output from the output end of the soft water controller 212 to the water collection and distribution module 300, so that the untreated water is softened. In this embodiment, the exchange resin layer uses a strong acid styrene cation exchange resin, which can be regenerated by a sodium ion regeneration agent to restore the softening ability of the exchange resin layer. In this embodiment, the regeneration agent generally uses a salt solution.
[0041] In some embodiments of the present invention, referring to Figure 1 and Figure 3As shown, the multiphase distribution pipeline 220 includes a first input pipe 221, a first water outlet pipe 222, a second input pipe 223, a second water outlet pipe 224, a flow direction switching pipe 225, a first valve body 226, a second valve body 227, a third valve body 228, a fourth valve body 229 and a quick water replenishment valve 230; the two ends of the first input pipe 221 are respectively connected to the input end of the soft water controller 212, the two ends of the first water outlet pipe 222 are respectively connected to the output end of the soft water controller 212, the two ends of the flow direction switching pipe 225 are respectively connected to the first input pipe 221 and the first water outlet pipe 222, the quick water replenishment valve 230 is arranged on the flow direction switching pipe 225, and the second input pipe 223 and the second water outlet pipe 224 are respectively arranged on the flow direction switching pipe 225 on both sides of the flow direction switching pipe 225. Specifically, in this embodiment, the softened water module 200 is provided with two water softeners 210, and both water softeners 210 are provided with a soft water tank 211 and a soft water controller 212, and the two ends of the soft water controller 212 are respectively provided with an input end and an output end; when performing normal softened water operation, the quick water replenishment valve 230 is in a closed state, the main water supply pipe 120 is connected to the second input pipe 223, and the water to be treated enters the input end of the soft water controller 212 through the high-level water tank 110, the main water supply pipe 120, the second input pipe 223 and the first input pipe 221 Then, after being softened in the soft water tank 211, it is input into the water collection and distribution module 300 through the output end of the soft water controller 212, the first water outlet pipe 222, the second water outlet pipe 224 and the water replenishment pipe 330; in this embodiment, when both water softeners 210 are in use, the first valve body 226, the second valve body 227, the third valve body 228 and the fourth valve body 229 are all in an open state, and when one of the water softeners 210 is in use, the corresponding first valve body 226, the second valve body 227, the third valve body 228 and the fourth valve body 229 are opened and closed accordingly. In this embodiment, when the water collection and distribution tank 310 is in flushing mode, the quick water replenishment valve 230 is opened, and the water to be treated can directly enter the second water outlet pipe 224 through the second input pipe 223, and the water to be treated can directly enter the water collection and distribution tank 310 to flush the water collection and distribution tank 310. The design of this structure can quickly flush the water collection and distribution tank 310.
[0042] In some embodiments of the present invention, referring to Figure 1 and Figure 4As shown, a pressure relief pipe 350 is provided at the upper end of the water collecting and distributing tank 310, and a first solenoid valve 351 is provided on the pressure relief pipe 350; a sewage pipe 360 is provided at the lower end of the water collecting and distributing tank 310, and a second solenoid valve 361 is provided on the sewage pipe 360; a third solenoid valve 321 is provided on the steam recovery pipe 320, and the water supply pipe 330 is connected to the second water outlet pipe 224, and a fourth solenoid valve 331 and a water supply pump 332 are provided on the water supply pipe 330. In this embodiment, the water collecting and distributing tank 310 has multiple working modes. When in the steam recovery mode, the third solenoid valve 321 is opened, the second solenoid valve 361 and the fourth solenoid valve 331 are closed, and the steam enters the water collecting and distributing tank 310 through the steam recovery pipe 320. When passing through the steam recovery pipe 320, the steam can exchange heat with the steam recovery pipe 320 and then liquefy into water. Some unliquefied steam can enter the water collecting and distributing tank 310 and exchange heat with the water in the water collecting and distributing tank 310 and then be liquefied. When the pressure in the water collecting and distributing tank 310 reaches a pressure threshold set in the water collecting and distributing tank 310, the first solenoid valve 351 is opened, and the excess steam is released through the pressure relief pipe 350 to ensure that the pressure in the water collecting and distributing tank 310 is always maintained within a safe range. When the water collecting and distributing tank 310 is in the water replenishing mode, the fourth solenoid valve 331 and the water replenishing pump 332 are opened, and the water replenishing pump 332 draws water from the softened water module 200 into the water collecting and distributing tank 310, and supplies water to the heating module 400 through the first distribution pipe 340. When the water collecting and distributing tank 310 is in the cleaning mode, the second solenoid valve 361, the fourth solenoid valve 331 and the water replenishing pump 332 are opened, and the water in the water storage module 100 is directly drawn by the water replenishing pump 332 to clean the water collecting and distributing tank 310, and the cleaning water is discharged through the sewage pipe 360. The design of this structure has good industrial practicability.
[0043] In some embodiments of the present invention, referring to Figure 1 and Figure 5 As shown, the first distribution pipe 340 includes a distribution main pipe 341 and a distribution branch pipe 342. The distribution main pipe 341 is provided with a fifth solenoid valve 343. The distribution branch pipe 342 is provided with one corresponding to each boiler 410. One end of the distribution branch pipe 342 is connected to the distribution main pipe 341, and the other end is connected to the input end of the boiler 410. Each distribution branch pipe 342 is provided with a high-level water pump 344 and a sixth solenoid valve 345. In this embodiment, the distribution main pipe 341 has a distribution function, which can distribute the water in the water collection and distribution tank 310 to the boiler 410, ensuring that each boiler 410 in operation can obtain the water required for normal operation.
[0044] In some embodiments of the present invention, referring to Figure 1 and Figure 4As shown, the axis of the water collecting and distributing tank 310 is horizontally arranged, and a hatch 311 is arranged at one end of the water collecting and distributing tank 310. In this embodiment, the water collecting and distributing tank 310 with a horizontal design can increase the contact area between steam and the water collecting and distributing tank 310, and is stably placed and has good practicality.
[0045] In some embodiments of the present invention, referring to Figure 1 As shown, the maximum evaporation capacity of the boiler 410 is Gz, the maximum flow rate of the water collection and distribution module 300 is Q, Q ≥ (n-1) Gz, where n is the number of boilers 410. Through the design of this structure, under normal circumstances, one boiler 410 is always kept in an idle state, so that when one of the boilers 410 fails or needs maintenance, continuous operation can be achieved, thereby improving production efficiency and maintenance efficiency.
[0046] In some embodiments of the present invention, referring to Figure 6 As shown, the heat preservation groove pipe 500 is also included, and the heat preservation groove pipe 500 is sleeved on the parallel part of the steam air supply pipe 420 and the steam recovery pipe 320, and the heat preservation material 510 is filled between the heat preservation groove pipe 500 and the steam air supply pipe 420 and the steam recovery pipe 320. Preferably, the heat preservation material 510 is foamed cotton. In this embodiment, the heat preservation groove pipe 500 can reduce the heat loss of the steam air supply pipe 420 and the steam recovery pipe 320 when conveying or recovering steam.
[0047] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the relevant technical field without departing from the purpose of the present invention.
Claims
1. A steam heating system for a corrugated board production line, characterized in that: include: A water storage module, wherein the water storage module is provided with at least one high-level water tank in parallel; the output ends of all the high-level water tanks are respectively connected to the main water supply pipe; A softened water module, wherein the softened water module is provided with at least one water softener, and the input ends of all the water softeners are respectively connected to the main water supply pipe; A water collection and distribution module, wherein the water collection and distribution module is provided with a water collection and distribution tank, wherein a steam recovery pipe and a water supply pipe are provided at the upper end of the water collection and distribution tank, and a first flow distribution pipe is provided at the lower end; the water supply pipe is connected to the output end of the softened water module; The heating module is provided with at least one boiler, the output ends of all the boilers are connected to the steam air supply pipe, and the input ends are connected to the first distribution pipe; the steam air supply pipe and part of the steam recovery pipe are arranged in parallel.
2. The steam heating system for corrugated board production line according to claim 1 is characterized in that: The vertical height of the output end of the high-level water tank is greater than the height of the input end of the water softener.
3. The steam heating system for corrugated board production line according to claim 2 is characterized in that: A water supply branch pipe is arranged at the upper end of each high-level water tank, and a float valve is arranged at the output end of the water supply branch pipe. All the water supply branches are connected to the second distribution pipe, and a manual valve is arranged at the second distribution pipe.
4. The steam heating system for corrugated board production line according to claim 1, characterized in that: The water softener comprises a soft water tank and a soft water controller. The softened water module is provided with a multi-phase flow distribution pipeline, and the multi-phase flow distribution pipeline can quickly replenish water to the water collection and distribution module.
5. The steam heating system for corrugated board production line according to claim 4, characterized in that: The multiphase flow distribution pipeline includes a first input pipe, a first water outlet pipe, a second input pipe, a second water outlet pipe, a flow direction switching pipe, a first valve body, a second valve body, a third valve body, a fourth valve body and a quick water replenishment valve; the two ends of the first input pipe are respectively connected to the input end of the soft water controller, the two ends of the first water outlet pipe are respectively connected to the output end of the soft water controller, the two ends of the flow direction switching pipe are respectively connected to the first input pipe and the first water outlet pipe, the quick water replenishment valve is arranged on the flow direction switching pipe, and the second input pipe and the second water outlet pipe are respectively arranged on the flow direction switching pipe on both sides of the flow direction switching pipe.
6. The steam heating system for corrugated board production line according to claim 5, characterized in that: A pressure relief pipe is provided at the upper end of the water collecting and distributing tank, and a first solenoid valve is provided on the pressure relief pipe; a sewage pipe is provided at the lower end of the water collecting and distributing tank, and a second solenoid valve is provided on the sewage pipe; a third solenoid valve is provided on the steam recovery pipe, and the water supply pipe is connected to the second water outlet pipe, and a fourth solenoid valve and a water supply pump are provided on the water supply pipe.
7. The steam heating system for corrugated board production line according to claim 6, characterized in that: The first distribution pipeline includes a distribution main pipe and a distribution branch pipe, the distribution main pipe is provided with a fifth solenoid valve, and the distribution branch pipe is provided with one corresponding to each boiler, one end of the distribution branch pipe is connected to the distribution main pipe, and the other end is connected to the input end of the boiler; each of the distribution branch pipes is provided with a high-level water pump and a sixth solenoid valve.
8. The steam heating system for corrugated board production line according to claim 7, characterized in that: The axis of the water collecting and distributing tank is arranged horizontally, and a hatch is arranged at one end of the water collecting and distributing tank.
9. The steam heating system for corrugated board production line according to claim 1, characterized in that: The maximum evaporation capacity of the boiler is Gz, and the maximum flow rate of the water collection and distribution module is Q, Q≥(n-1)Gz, where n is the number of boilers.
10. The steam heating system for a corrugated board production line according to any one of claims 1 to 9, characterized in that: It also includes an insulation tank pipe, which is sleeved on the parallel parts of the steam air supply pipe and the steam recovery pipe, and insulation materials are filled between the insulation tank pipe and the steam air supply pipe and the steam recovery pipe.