Self-lubricating heavy ball rapid stowage system

By designing a self-lubricating heavy ball rapid loading system in the elevator, and using the sliding door and ball pushing mechanism to quickly adjust the heavy ball, the problems of long elevator loading time and high energy consumption are solved, and more efficient and safer elevator operations are achieved. .

CN221821619UActive Publication Date: 2024-10-11BEIJING XINWEN PINGNENG ELEVATOR CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323073340.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-15
Publication Date
2024-10-11
Estimated Expiration
2033-11-15

AI Technical Summary

Technical Problem

Existing elevators have insufficient safety, limited operating speed, huge energy consumption, long loading time, excessive fixed counterweights, and operating vibration and noise problems caused by guiding power to crawl through the main rails. As the elevator speed increases, , the wind resistance of the car in the hoistway becomes one of the energy consumers.

Method used

A self-lubricating heavy ball rapid loading system is designed. By setting up a loading box and a filling ball storage box in the elevator shaft, the sliding door and ball pushing mechanism are used to realize the rapid transportation and adjustment of heavy balls, reducing the demand for traction power. , and coat the surface of the heavy ball with a polytetrafluoroethylene outer coating to reduce frictional resistance.

Benefits of technology

It achieves rapid loading, reduces the weight and energy consumption of the elevator, simplifies the structure, improves the operating efficiency and safety of the elevator, and reduces noise and difficulty in mechanical speed changes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221821619U_ABST
    Figure CN221821619U_ABST
Patent Text Reader

Abstract

The utility model discloses a self-lubricating heavy ball rapid stowage system which comprises a lift car assembly located in an elevator shaft, and the lift car assembly is connected with a stowage counterweight housing through a counterweight plate strip. The middle part of the counterweight plate belt bypasses the plate belt fixing pulley; the device further comprises a stowage box body, a filling ball storage box and a plurality of heavy balls. The stowage box body is arranged on the stowage counterweight housing; the plurality of filling ball storage boxes are arranged at intervals along the height of the elevator shaft; and a heavy ball conveying structure capable of mutually conveying heavy balls between the stowage box body and the filling ball storage box is arranged between the stowage box body and the filling ball storage box. According to the self-lubricating heavy ball rapid stowage system, the stowage travel of the stowage box body is short, stowage can be rapidly completed in a short time, and the elevator operation efficiency is improved on the premise that safe operation of an elevator is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of elevator counterweights, in particular to a self-lubricating heavy ball rapid loading system. Background Art

[0002] The principle of today's elevators: the car and counterweight are connected by traction cables. The elevator's power, brakes, and counterweight are all achieved through the cables, and the elevator's operation is achieved by controlling the cables.

[0003] Limited by the performance bottleneck of the traction rope, existing elevators have obvious shortcomings:

[0004] 1) Insufficient safety: Major elevator accidents and minor safety incidents often occur.

[0005] 2) Limited operating speed: Today’s high-speed elevators generally run at 2m / s, and ultra-high-speed elevators only run at 5m / s.

[0006] 3) Elevators consume huge amounts of energy: In large and medium-sized cities, elevators consume about 5% of the city’s total electricity consumption. The larger the city, the higher the percentage, with the highest even approaching 8%.

[0007] In order to fundamentally overcome the shortcomings of existing elevators, after years of research and development, the "Pingneng Elevator" (safe and energy-saving elevator) project, which covers technologies such as patents 2021107209338 and 2021107219255, has passed simulation and mathematical research at Tsinghua University. The project's engineering prototype test, technical improvement, model design, and relevant specification formulation are also progressing smoothly. On this basis, the "lightweight and fast-loading Pingneng elevator" was developed.

[0008] According to the project research report, the "Pingneng Elevator" can achieve the goals of high safety, significant energy saving, and higher elevator speed, but there are still areas that need to be improved, including:

[0009] 1) The loading time is too long, resulting in a poor riding experience.

[0010] 2) The fixed counterweight is too heavy, resulting in a lot of room for improvement in the energy consumption of elevator acceleration and deceleration.

[0011] 3) The guiding power is realized through the crawling of the main rail, which becomes one of the operating vibrations and noises, and at the same time increases the difficulty of mechanical speed change.

[0012] 4) As the elevator speed increases, the wind resistance of the car in the hoistway becomes one of the energy consumption factors that need to be considered.

[0013] Based on the need for improvement and optimization of "flat energy elevators", "lightweight and fast loading flat energy elevators" need to achieve the following goals:

[0014] 1) Rapid loading, controlling the loading time within 5 seconds.

[0015] 2) Greatly reduce the weight of the car and control the weight of the car within 10% of the rated load of the elevator.

[0016] 3) The guiding power is no longer achieved by crawling on the main rails, but by the low-power traction power in the machine room.

[0017] 4) Add a fairing to the car to reduce the drag coefficient.

[0018] The self-lubricating heavy ball rapid loading system is a key system among the four core systems of lightweight rapid loading flat energy elevators. Utility Model Content

[0019] The utility model aims to provide a self-lubricating heavy ball rapid loading system which can solve the above technical problems.

[0020] To achieve the above-mentioned purpose, the utility model provides a self-lubricating heavy ball rapid loading system, including a car assembly located in the elevator shaft, the car assembly is connected to the loading counterweight frame through a counterweight plate belt; the middle part of the counterweight plate belt passes around the plate belt fixing pulley; it also includes a loading box, a loading ball storage box and a plurality of heavy balls; the loading box is arranged on the loading counterweight frame, and the loading ball storage boxes are multiple and arranged at intervals along the height of the elevator shaft; a heavy ball conveying structure is provided between the loading box and the loading ball storage box, which can convey the heavy balls between the two.

[0021] Furthermore, a first sliding door is provided on one side of the loading box, and the first sliding door is linked to a door pusher; a loading layer is provided in the loading box; the heavy ball conveying structure includes a ball pushing mechanism arranged on the loading box and used to push the heavy balls located in the loading layer toward the loading ball storage box.

[0022] Furthermore, the ball pushing mechanism includes an advance and retreat plate drive motor, a first transmission assembly, an advance and retreat plate transmission screw and a power advance and retreat plate that are linked in sequence; the advance and retreat plate transmission screw is threadedly matched with the power advance and retreat plate, the power advance and retreat plate is located in the loading layer and the two are slidably matched.

[0023] Furthermore, the door pusher includes a door push motor, a second transmission assembly, a threaded sleeve, and a door push screw that are linked in sequence, and the door push screw is connected to the first sliding door; a first door guide rail is provided on the loading box, and the first sliding door is adapted to the first door guide rail.

[0024] Furthermore, at least two loading layers are provided in the loading box, and each loading layer is arranged up and down.

[0025] Furthermore, the loading ball storage box includes a ball storage box body, and a second sliding door is slidably connected to the side of the ball storage box body facing the loading box body through a second door guide rail; the heavy ball conveying structure also includes a slightly sloped ball storage layer arranged in the ball storage box body, and the bottom surface of the slightly sloped ball storage layer is inclined toward the direction of the loading box body.

[0026] Furthermore, the first sliding door is provided with an electric latch, which is matched with the second sliding door of the ball filling and storage box; the second sliding door is provided with a latch linkage sliding hole, and the electric latch is plugged and matched with the latch linkage sliding hole.

[0027] Furthermore, the second door guide rail is arranged at an angle; the latch linkage sliding hole is set on a slider that slides with the second sliding door; the second sliding door is also provided with a longitudinal strip hole, and the pin rod of the electric latch passes through the longitudinal strip hole and is plugged into and matched with the latch linkage sliding hole of the slider, and the width of the longitudinal strip hole is greater than the width of the pin rod of the electric latch.

[0028] Furthermore, there are at least two micro-slope ball storage layers arranged vertically in the ball storage box, and the upper and lower adjacent micro-slope ball storage layers are separated by a micro-slope bearing plate; the outer surface of the heavy ball is provided with a self-lubricating layer; the self-lubricating layer is a polytetrafluoroethane outer film.

[0029] Furthermore, a loading layer is provided in the loading box, the loading ball storage box includes a ball storage box body, and a ball storage layer is provided in the ball storage box body; the heavy ball conveying structure includes a second ball pushing mechanism which is only arranged in the ball storage layer or is simultaneously arranged in the ball storage layer and the loading layer.

[0030] Beneficial Effects

[0031] Compared with the prior art, the advantages of the self-lubricating heavy ball rapid loading system of the utility model are:

[0032] 1. When the elevator car stops at the corresponding floor and the weight increases due to loading of goods or people, the first sliding door of the stowage box connected to the car through the plate belt opens, and the heavy balls in the loading and storage box enter the stowage box, so that the weight of the car and the stowage box are basically the same. When the weight in the car becomes lighter, the ball pushing mechanism of the stowage box pushes the heavy balls in the stowage box to the loading and storage box until the weight of the car and the stowage box are basically the same. This structure allows the elevator traction power assembly to only provide a small traction power to move the car up and down. Due to the large number of heavy balls, precise weight adjustment can be achieved, and because the stroke of the heavy balls entering and exiting the stowage box is extremely short, the stowage can be completed quickly in a short time, improving the elevator operation efficiency while ensuring the safe operation of the elevator.

[0033] 2. Both the loading box and the ball storage box are multi-layer structures. After the first and second sliding doors are opened, the heavy balls in multiple layers can be pushed to move at the same time, which is conducive to controlling the stroke of the heavy balls in and out of the loading box within 0.25m, further improving the loading speed.

[0034] 3. The slightly sloped ball storage layer of the ball storage box is conducive to the heavy balls rolling toward the loading box by their own weight, saving energy.

[0035] 4. The first sliding door is plugged into and matched with the second sliding door through an electric latch, which can realize synchronous movement of the first and second sliding doors while reducing the number of driving mechanisms, simplifying the structure and reducing costs.

[0036] 5. The second door guide rail is arranged at an angle with a slope of 1-1.5%, which allows the second sliding door to close by its own gravity and reduces the resistance when the door is closed in linkage.

[0037] 6. The pin rod of the electric bolt passes through the longitudinal strip hole and is plugged into the bolt linkage sliding hole of the slider, allowing the electric bolt to have a certain degree of freedom up and down to meet the up and down movement of the second sliding door relative to the first sliding door when the second sliding door is linked to the switch; at the same time, the longitudinal strip hole is slightly wider than the bolt on the left and right, allowing the electric bolt to have a certain degree of freedom left and right to meet the first sliding door and the second sliding door when the second sliding door is closed. Cut off the heavy ball one after the other to reduce resistance.

[0038] 7. The outer surface of the heavy ball is provided with a self-lubricating layer; the self-lubricating layer is a polytetrafluoroethane outer film, which greatly reduces the flow friction resistance of the heavy ball; at the same time, it greatly reduces the volume of the loading system, making the new lightweight and fast loading flat energy elevator highly compatible with the existing ladder shaft facilities.

[0039] The present invention will become more clear through the following description in conjunction with the accompanying drawings, which are used to explain the embodiments of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0041] Figure 1 It is a schematic diagram of the self-lubricating heavy ball rapid loading system of Example 1;

[0042] Figure 2 It is a top cross-sectional view of the working process of the self-lubricating heavy ball quick loading and docking structure of Example 1;

[0043] Figure 3 It is a top view of the stowage box of Example 1;

[0044] Figure 4 It is a top view of the loading layer of the loading box of Example 1;

[0045] Figure 5 It is a top view of the equipment layer of the stowage box of Example 1;

[0046] Figure 6 It is a front cross-sectional view of the stowage box of Example 1;

[0047] Figure 7 It is a left side view of the stowage box of Example 1;

[0048] Figure 8 It is a front view of the stowage box of Example 1;

[0049] Fig. 9 It is a top view of the ball storage box loaded with the embodiment 1;

[0050] Fig.10 It is a right side view of the ball storage box of Example 1;

[0051] Fig.11 It is an enlarged view of the longitudinal strip hole and the latch-linked sliding hole of the slider in Example 1;

[0052] Fig.12 It is a front sectional view of the ball storage box loaded with the embodiment 1;

[0053] Fig.13 It is a top sectional view of the ball storage box loaded with balls in Example 1;

[0054] Fig.14 Schematic diagram of the internal structure of the loading box and the ball storage box of Example 2;

[0055] Fig.15 Schematic diagram of the internal structure of the loading box and the ball storage box of Example 3. DETAILED DESCRIPTION

[0056] Embodiments of the present invention will now be described with reference to the accompanying drawings.

[0057] Example 1

[0058] The specific implementation of the utility model is as follows Figures 1 to 13As shown, a self-lubricating heavy ball fast loading system includes a car assembly 8 located in the elevator shaft, and the car assembly 8 is connected to the loading counterweight frame 22 through a counterweight plate belt 21. The middle part of the counterweight plate belt 21 passes around the plate belt fixed pulley 211. It also includes a loading box 1, a loading ball storage box 7 and a plurality of heavy balls 6. The loading box 1 is arranged on the loading counterweight frame 22, and the loading ball storage boxes 7 are multiple and arranged at intervals along the height of the elevator shaft. A heavy ball conveying structure is provided between the loading box 1 and the loading ball storage box 7, which can convey the heavy balls 6 between the two.

[0059] A first sliding door 2 is provided on one side of the loading box 1, and the first sliding door 2 is linked to a door pusher 4. A loading layer 15 is provided in the loading box 1. The heavy ball conveying structure includes a ball pushing mechanism 5 arranged on the loading box 1 and used for pushing the heavy balls 6 located in the loading layer 15 to the loading ball storage box 7.

[0060] The ball pushing mechanism 5 includes an advance and retreat plate drive motor 51, a first transmission assembly 52, an advance and retreat plate drive screw 53 and a power advance and retreat plate 54 which are linked in sequence. The advance and retreat plate drive screw 53 is threadedly matched with the power advance and retreat plate 54, and the power advance and retreat plate 54 is located in the loading layer 15 and the two are slidably matched. In this embodiment, the first transmission assembly 52 is a gear set structure, and the gear set structure includes meshing driving gears and driven gears, the driving gear is connected to the output shaft of the advance and retreat plate drive motor 51, and the driven gear is connected to the advance and retreat plate drive screw 53. Both ends of the advance and retreat plate drive screw 53 are rotationally connected to the loading box 1. The advance and retreat plate drive motor 51 is fixed on the loading box 1.

[0061] The door pusher 4 includes a door pusher motor 41, a second transmission assembly 45, a threaded sleeve 42, and a door pusher screw 44, which are linked in sequence. A pusher bearing support 43 is provided on the loading box 1, and the threaded sleeve 42 and the pusher bearing support 43 are rotated through the bearing. The door pusher screw 44 is connected to the first sliding door 2. In this embodiment, the second transmission assembly 45 adopts a gear set structure. The loading box 1 is provided with a first door guide rail 11, and the first sliding door 2 is adapted to the first door guide rail 11. The door pusher motor 41 and the second transmission assembly 45 are both located in the equipment layer 14 in the loading box 1, and the door pusher motor 41 is fixedly connected to the equipment layer 14. In this embodiment, the first sliding door 2 is two and symmetrical, and each first sliding door 2 is connected to a door pusher screw 44, and the door pusher screws 44 on the left and right sides have opposite thread rotation directions. When the threaded sleeve 42 rotates relative to the push-pull device bearing support 43, the door push-pull screws 44 on the left and right sides can move away from or close to each other, thereby realizing the opening or closing of the two first sliding doors 2. In this embodiment, each first sliding door 2 has three first door guide rails 11 arranged sequentially from top to bottom, and the first sliding door 2 is provided with a first door ball 20 that rolls with the first door guide rail 11 to reduce resistance.

[0062] At least two loading layers 15 are arranged in the loading box 1, and each loading layer 15 is arranged up and down. The more the number of loading layers 15 is, the narrower the width of the loading box 1 and the ball storage box 7 can be designed, and the smaller the thickness of both can be, which is conducive to reducing the stroke required for the heavy ball 6 to enter and exit, shortening the time required for each weight adjustment of the loading box 1, and improving efficiency.

[0063] The ball storage box 7 includes a ball storage box body 71, and a second sliding door 72 is slidably connected to the side of the ball storage box body 71 facing the stowage box body 1 through a second door guide rail 73. The heavy ball conveying structure also includes a slightly sloped ball storage layer 741 arranged in the ball storage box body 71, and the bottom surface of the slightly sloped ball storage layer 741 is inclined toward the stowage box body 1. In this embodiment, there are two second sliding doors 72 and they are symmetrical. Each second sliding door 72 corresponds to three second door guide rails 73, and the second door guide rails 73 are arranged in sequence from top to bottom. The second sliding door 72 is provided with a second door ball 75 that rolls with the second door guide rail 73 to reduce resistance.

[0064] The first sliding door 2 is provided with an electric latch 3, which is specifically an electromagnetic latch, and a retractable pin is provided on the side of the electric latch 3 facing the second sliding door 72. The electric latch 3 is adapted to the second sliding door 72 of the ball storage box 7. The second sliding door 72 is provided with a latch linkage sliding hole 721, and the electric latch 3 is plugged and matched with the latch linkage sliding hole 721.

[0065] In this embodiment, the second door guide rail 73 is arranged obliquely. The latch linkage sliding hole 721 is set on the slider that slides with the second sliding door 72. The second sliding door 72 is also provided with a longitudinal strip hole 722, and the pin rod of the electric latch 3 passes through the longitudinal strip hole 722 and plugs into the latch linkage sliding hole 721 of the slider. The width of the longitudinal strip hole 722 is greater than the width of the pin rod of the electric latch 3. The electric latch 3 is allowed to have a certain degree of freedom up and down to meet the up and down movement of the second sliding door 72 relative to the first sliding door 2 when the second sliding door 72 is linked to the switch. At the same time, the longitudinal strip hole 722 is slightly wider than the pin rod of the latch, allowing the pin rod of the electric latch to have a certain degree of freedom left and right to meet the first sliding door 2 and the second sliding door 72 can cut off the heavy ball 6 one after the other when the second sliding door 72 is closed, reducing resistance. The inclined second door guide rail 73 allows the two second sliding doors 72 to have a tendency to close each other without external force. The slope of the second door guide rail 73 is 1-1.5%.

[0066] There are at least two micro-slope ball storage layers 741 arranged vertically in the loading and storage ball box 7, and the adjacent upper and lower micro-slope ball storage layers 741 are separated by a micro-slope bearing plate 74. When the first sliding door 2 and the second sliding door 72 are opened, the slope of the micro-slope ball storage layer 741 does not need to be too large, and it can ensure that the heavy balls 6 in the loading and storage ball box 7 roll towards the loading layer 15 under their own weight, effectively realizing the weight increase of the loading box body 1. In this embodiment, the number of layers of the micro-slope ball storage layer 741 is the same as that of the loading layer 15 one by one.

[0067] In order to reduce the thickness of the ball storage box body 71 and increase the capacity of the ball storage box body 71 at the same time, it is necessary to increase the width of the ball storage box body 71. The heavy ball inlet and outlet of the ball storage box body 71 is less than the width of the ball storage box body 71 in order to match the width of the loading layer 15 of the loading box body 1. In order to ensure that all the heavy balls 6 in the micro-slope ball storage layer 741 can roll out from the heavy ball inlet and outlet, the left and right ends of the micro-slope bearing plate 74 are higher than the middle part, so that the heavy balls 6 located at the left and right ends of the micro-slope bearing plate 74 can also roll towards the middle part under their own action and then roll out from the heavy ball inlet and outlet.

[0068] A self-lubricating layer is provided on the outer surface of the heavy ball 6. The self-lubricating layer is a polytetrafluoroethylene outer film, which can greatly reduce the flow friction resistance of the heavy ball.

[0069] The specific description is as follows:

[0070] The maximum capacity of the loading box body 1 is 1Q (Q is the rated load of the elevator). Suppose there are n1 loading layers 15, and the maximum load of each loading layer 15 is q1 = 1Q / n1.

[0071] Each loading layer 15 of the loading box body 1 is provided with n2 rows of heavy balls 6, with n3 heavy balls 6 in each row. The weight of each heavy ball 6 is q3, then the minimum loading unit q2 = n3 * q3.

[0072] When the bolt of the electric bolt 3 pops out, the first sliding door 2 and the second sliding door 72 are linked. When the bolt retracts, the first sliding door 2 and the second sliding door 72 are separated.

[0073] The rapid loading of the loading box body 1 is completed by pushing out or retracting the power advancing and retreating plate 54.

[0074] The maximum capacity of the loading and storage ball box 7 on the standard floor is M (M = 4Q, Q is the rated load of the elevator). The loading and storage ball box 7 is provided with n1 micro-slope ball storage layers 741, and the maximum ball storage weight m1 of each micro-slope ball storage layer 741 is m1 = M / n1. The normal ball storage weight m2 of the loading and storage ball box 7 on the standard floor should be controlled within the range of 0.25m1 < m2 < 0.75m1.

[0075] The maximum capacity of the loading and storage ball box 7 on the top floor is M d (M d=10Q, Q is the rated load of the elevator), the ball storage box 7 is provided with n1 micro-slope ball storage layers 741, and the maximum ball storage weight of each micro-slope ball storage layer 741 is m d1 =M d / n1. The normal ball storage weight of the ball storage box 7 on the top floor m d2 Should be controlled at 0.25m d1 <m d2 <0.75m d1 within the range.

[0076] The width of the heavy ball inlet and outlet of the ball filling storage box 7 matches the loading box 1. By setting a slope of 0.5-1% on each floor, the heavy ball 6 forms a filling pressure on the heavy ball inlet and outlet of the ball storage box, and the filling pressure should be controlled within 3-5kg.

[0077] The loading box 1 cooperates with the ball storage box 7 to quickly complete the loading process (the time from starting loading to loading completion is controlled within 5 seconds):

[0078] 1) The elevator stops;

[0079] 2) The loading box 1 and the floor loading ball storage box 7 are docked in place;

[0080] 3) The pin rod of the electric bolt pops out to realize the linkage between the first sliding door and the second sliding door;

[0081] 4) The first sliding door and the second sliding door are opened;

[0082] 5) The elevator door begins to close and loading starts;

[0083] 6) According to the computer calculation results, the power advance and retreat plates 54 of each layer of the loading box 1 are started to quickly push out or pour in the heavy ball 6, thereby quickly completing the loading;

[0084] 7) A first sliding door and a second sliding door;

[0085] 8) The pin of the electric bolt retracts and loading is completed.

[0086] 1. Key points of the design:

[0087] (1) The specific design of the loading box 1 and the ball storage box 7 involves many factors, which are interrelated and mutually restricted. You can use the "Elevator Loading System Calculation Table" below to perform a trial calculation, and select the best solution that meets various specific requirements as the specific design basis.

[0088] (2) The thrust of the door push-pull motor of the loading box 1 is controlled at 5 ~ Within the range of 8kg, the thrust of the driving motor of each layer of the advance and retreat plate is controlled at 3 ~ Within 5kg range.

[0089] (3) Determination of the design power W0 of the two motors of the loading box 1: The maximum thrust Fz*design speed V determined by the design is taken as the basic power, the energy conversion rate of converting electrical energy into kinetic energy is taken as 85%, and the design safety coefficient C is taken as 1.1-1.3, then:

[0090] W0=(Fz*V / 0.85)*C

[0091] (4) The diameter d of the self-lubricating heavy ball and the gap b between the stowage box and the ball storage box when the door is fully opened should meet the condition: d>6b to ensure that the self-lubricating heavy ball moves smoothly across the gap.

[0092] (5) The smaller the minimum load unit q2, the better the energy saving effect. However, due to the constraints of many factors such as the diameter d of the self-lubricating heavy ball, the value of q2 is generally 15 ~ Between 30kg.

[0093] 2. Case

[0094] Take an elevator with a speed of 2m / s, a rated load of 1T, and a total height of 100m as an example, and design and determine the key parameters of the stowage box and the ball storage box. Calculate the design power of the stowage box motor, and measure and compare the energy consumption of the stowage system.

[0095] Elevator loading system calculation table

[0096]

[0097] According to the above "Elevator Loading System Calculation Table", trial calculation is performed and "Case 3" is selected as the basis for the design of key parameters of the loading system.

[0098]

[0099] It can be seen from the above table that the loading box requires a total of 16 5w.h motors and 1 60w.h motor, and the total power of the loading box motors is only 0.15kw.h.

[0100] The following is an average of 6 maximum power consumption loadings in a complete journey to specifically compare the proportion of the loading system energy consumption in the entire elevator energy consumption.

[0101] Loading box energy consumption calculation table

[0102]

[0103]

[0104] Energy consumption ratio of loading system

[0105]

[0106] From the above comparison, it can be seen that the energy consumption of the loading system accounts for a very low proportion of the energy consumption of the entire elevator.

[0107] Example 2

[0108] like Fig.14 As shown, the difference from Example 1 is that a loading layer 15 is provided in the loading box 1, and the loading ball storage box 7 includes a ball storage box 71, and a ball storage layer is provided in the ball storage box 71. The heavy ball conveying structure includes a second ball pushing mechanism that is simultaneously arranged in the ball storage layer and the loading layer 15, and at this time, the bottoms of the loading layer 15 of the loading box 1 and the ball storage layer of the ball storage box 71 are both horizontal. The structure of the second ball pushing mechanism can be the same as the structure of the ball pushing mechanism 5 in Example 1. According to the required counterweight of the loading box 1, the second ball pushing mechanism of the ball storage box 71 on the corresponding floor pushes the heavy ball 6 into the loading layer 15 of the loading box 1, or the second ball pushing mechanism of the loading box 1 pushes the heavy ball 6 out of the loading layer 15.

[0109] A first sliding door 2 is provided on one side of the loading box 1 , and a second sliding door 72 is provided on one side of the ball storage box 71 .

[0110] Example 3

[0111] like Fig.15 As shown, the difference from Example 2 is that the heavy ball conveying structure includes a second ball pushing mechanism which is only arranged in the ball storage layer of the ball storage box 71. At this time, the bottom of the loading layer 15 is inclined toward the side of the ball storage box 71, so that the heavy balls 6 in the loading layer 15 tend to roll toward the ball storage box 71.

[0112] The present invention is described above in conjunction with the best embodiments, but the present invention is not limited to the embodiments disclosed above, but should cover various modifications and equivalent combinations based on the essence of the present invention.

Claims

1. A self-lubricating heavy ball rapid loading system, comprising a car assembly (8) located in an elevator shaft, characterized in that: The car assembly (8) is connected to the counterweight frame (22) through a counterweight plate belt (21); the middle part of the counterweight plate belt (21) passes around a plate belt fixed pulley (211); it also includes a loading box (1), a loading ball storage box (7) and a plurality of heavy balls (6); the loading box (1) is arranged on the counterweight frame (22), and the loading ball storage boxes (7) are multiple and arranged at intervals along the height of the elevator shaft; a heavy ball conveying structure capable of conveying the heavy balls (6) between the loading box (1) and the loading ball storage box (7) is provided between the loading box (1) and the loading ball storage box (7); a first sliding door (2) is provided on one side of the loading box (1), and the first sliding door (2) is linked to a door pusher (4); the loading box (1) has a plurality of heavy balls (6) in it. A loading layer (15) is provided; the heavy ball conveying structure comprises a ball pushing mechanism (5) arranged on the loading box (1) and used for pushing the heavy balls (6) located in the loading layer (15) to the filling ball storage box (7); the ball pushing mechanism (5) comprises an advance and retreat plate driving motor (51), a first transmission assembly (52), an advance and retreat plate transmission screw (53) and a power advance and retreat plate (54) which are linked in sequence; the advance and retreat plate transmission screw (53) and the power advance and retreat plate (54) are threadedly matched, and the power advance and retreat plate (54) is located in the loading layer (15) and the two are slidably matched; at least two loading layers (15) are provided in the loading box (1), and the loading layers (15) are arranged up and down.

2. A self-lubricating heavy ball rapid loading system according to claim 1, characterized in that: The door pusher (4) comprises a door push motor (41), a second transmission assembly (45), a threaded sleeve (42), and a door push screw (44) which are linked in sequence, and the door push screw (44) is connected to the first sliding door (2); a first door guide rail (11) is provided on the loading box (1), and the first sliding door (2) is adapted to the first door guide rail (11).

3. A self-lubricating heavy ball rapid loading system according to claim 1, characterized in that: The ball loading storage box (7) comprises a ball storage box body (71), and a second sliding door (72) is slidably connected to the side of the ball storage box body (71) facing the loading box body (1) via a second door guide rail (73); the heavy ball conveying structure also comprises a slightly sloping ball storage layer (741) arranged in the ball storage box body (71), and the bottom surface of the slightly sloping ball storage layer (741) is inclined in the direction of the loading box body (1).

4. A self-lubricating heavy ball rapid loading system according to claim 3, characterized in that: The first sliding door (2) is provided with an electric latch (3), which is matched with the second sliding door (72) of the ball storage box (7); the second sliding door (72) is provided with a latch linkage sliding hole (721), and the electric latch (3) is plugged and matched with the latch linkage sliding hole (721).

5. A self-lubricating heavy ball rapid loading system according to claim 4, characterized in that: The second door guide rail (73) is arranged obliquely; the latch linkage sliding hole (721) is arranged on a slider that slides with the second sliding door (72); the second sliding door (72) is also provided with a longitudinal strip hole (722), the pin rod of the electric latch (3) passes through the longitudinal strip hole (722) and is plugged into the latch linkage sliding hole (721) of the slider, and the width of the longitudinal strip hole (722) is greater than the width of the pin rod of the electric latch (3).

6. A self-lubricating heavy ball rapid loading system according to claim 3, characterized in that: The ball storage box (7) has at least two micro-slope ball storage layers (741) arranged vertically, and the upper and lower adjacent micro-slope ball storage layers (741) are separated by a micro-slope support plate (74); the outer surface of the heavy ball (6) is provided with a self-lubricating layer; the self-lubricating layer is a polytetrafluoroethane outer coating.