Large workpiece hoisting and overturning clamp structure

By designing a lifting and turning fixture for large workpieces and using the lifting ring fixing plate and the driving connection structure of the electric hoist, the problem of slow speed and unsafety of the single-hook crane is solved, and the workpieces are quickly, safely turned over and lifted efficiently.

CN221821652UActive Publication Date: 2024-10-11GUANGDONG STRONG METAL TECH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421869915.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-10-11
Estimated Expiration
2034-08-05

AI Technical Summary

Technical Problem

Existing single-hook cranes are slow, inefficient, and unsafe when lifting large workpieces, and can easily cause damage or deformation of workpieces, making them unable to meet production needs.

Method used

Design a large workpiece lifting and turning fixture, including a lifting ring fixed plate and an electric hoist. The lifting ring fixed plate is connected to the crane hook. The bottom end of the hanging chain is connected to the electric hoist to form a driving connection structure. The electric hoist chain is used Achieve rapid turnover of workpieces and reduce manual contact.

Benefits of technology

It realizes the rapid turnover of large workpieces, improves work efficiency and safety, reduces the risk of workpieces slipping and being bruised, and meets production safety requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221821652U_ABST
    Figure CN221821652U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of hoisting equipment, and particularly relates to a large workpiece hoisting turnover clamp structure which comprises a hoisting ring fixing plate and an electric hoister, the upper end of the hoisting ring fixing plate is connected with a hoisting hook of a large crane, two lower connecting points are arranged at the bottom of the hoisting ring fixing plate, and the first lower connecting point is connected with the upper end of a hoisting chain. The second lower connecting point is connected with an electric elevator; the bottom end of the lifting chain is a workpiece connecting end to form a driving connecting structure for lifting a large workpiece; the electric hoister is provided with an electric hoister chain, a lifting hook is arranged at the bottom end of the electric hoister chain, and the lifting hook is used for hooking an end holding ring of the large workpiece to form a large workpiece overturning driving connection structure. The problems that in the existing large workpiece overturning process, overturning is not prone to occurring, sliding is prone to occurring, efficiency is low, and safety is not achieved can be solved, and the effects that the lifting overturning process is simple and safe, and the machining efficiency is high are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of hoisting equipment, and in particular relates to a large workpiece hoisting and turning clamp structure. Background Art

[0002] In the prior art, a single hook crane is generally used to lift one side of a large workpiece, and then the lifting and lowering angle and contact position are manually controlled to slowly lower the workpiece to achieve a flipping effect. Therefore, the existing single hook crane has problems such as slow lifting and flipping speed, low work efficiency, unsafe operation, easy to be damaged or deformed, and cannot meet production needs. Therefore, it is urgent to produce a flipping fixture that can quickly flip large workpieces and reduce manual contact with large workpieces to improve work efficiency and meet safety production requirements. Utility Model Content

[0003] The purpose of the utility model is to solve the problems of difficult flipping, easy slipping, low efficiency and unsafety in the existing large workpiece flipping process, and to provide a large workpiece lifting and flipping fixture structure, which has the advantages of simple lifting and flipping process, safer and high processing efficiency.

[0004] To achieve the purpose of the utility model, the following technical solutions can be adopted:

[0005] A large workpiece lifting and flipping fixture structure, its structural features are: it includes a lifting ring fixing plate and an electric hoist, the upper end of the lifting ring fixing plate is connected to the crane hook of the crane, the bottom of the lifting ring fixing plate has two lower connection points, the first lower connection point is connected to the upper end of the lifting chain, and the second lower connection point is connected to the electric hoist; the bottom end of the lifting chain is the workpiece connection end, forming a driving connection structure for lifting the large workpiece; the electric hoist is provided with an electric hoist chain, and the bottom end of the electric hoist chain is provided with a lifting hook, and the lifting hook is used to hook the end hanging ring of the large workpiece to form a large workpiece flipping driving connection structure.

[0006] In order to achieve the purpose of the utility model, the following technical solutions can also be adopted:

[0007] Furthermore, an upper connection point is provided on the top surface of the lifting ring fixing plate, and the upper connection point is composed of an upward hanging ring; the first lower connection point and the second lower connection point are each composed of a lower hanging ring.

[0008] Furthermore, the housing of the electric hoist is provided with a hoist hook, and the electric hoist is hooked on the second lower connection point through the hoist hook.

[0009] Furthermore, the workpiece connecting end of the lifting chain is hung on the first workpiece hanging ring of the large workpiece to form a vertical lifting connection structure; the lifting hook is hung on the second workpiece hanging ring of the large workpiece to form a flip lifting connection structure.

[0010] Furthermore, a screw hole is reserved at each end of the large workpiece, and the first workpiece hanging ring and the second workpiece hanging ring are connected to the large workpiece through the screw holes reserved at the two ends of the large workpiece.

[0011] The utility model has the following advantages:

[0012] 1. The utility model is connected to the hook of a large crane through the upper end of the lifting ring fixing plate. The bottom of the lifting ring fixing plate has two lower connection points, the first lower connection point is connected to the upper end of the lifting chain, and the second lower connection point is connected to an electric hoist; the bottom end of the lifting chain 4 is the workpiece connection end, forming a driving connection structure for lifting large workpieces; the electric hoist is provided with an electric hoist chain, and the bottom end of the electric hoist chain is provided with a hook, which is used to hook the end holding ring of the large workpiece to form a large workpiece flipping driving connection structure. Therefore, it can solve the problems of difficult flipping, easy slipping, low efficiency, and unsafety in the existing large workpiece flipping process, and has the advantages of simpler and safer lifting and flipping process and high processing efficiency.

[0013] 2. The utility model hangs the workpiece connecting end of the lifting chain on the first workpiece hanging ring of the large workpiece to form a vertical lifting connection structure; the lifting hook is hung on the first workpiece hanging ring to form a flip lifting connection structure. In addition to the characteristics of fast hanging and lifting workpieces, it can also facilitate the flipping of workpieces. Therefore, it has the advantages of convenient and fast hanging of workpieces, simple and safe lifting and flipping process, and high processing efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a structural schematic diagram of specific embodiment 1 of the utility model before lifting a workpiece.

[0015] Figure 2 It is a structural schematic diagram of specific embodiment 1 of the utility model after lifting the workpiece.

[0016] Figure 3 It is a structural schematic diagram of specific embodiment 1 of the utility model after the workpiece is turned over.

[0017] Explanation of the numbers in the figure: 1- crane; 2- lifting ring fixing plate; 3- electric hoist; 4- lifting chain; 5- electric hoist chain; 6- lifting hook; 7- second workpiece hanging ring; 8- large workpiece; 8-1- first workpiece hanging ring. DETAILED DESCRIPTION

[0018] Reference Figure 1-Figure 3The large workpiece lifting and flipping fixture structure involved in the specific embodiment 1 of the utility model includes a lifting ring fixing plate 2 and an electric hoist 3. The upper end of the lifting ring fixing plate 2 is connected to the crane hook 1-1 of the crane 1, and the bottom of the lifting ring fixing plate 2 has two lower connection points. The first lower connection point 2-2 is connected to the upper end of the lifting chain 4, and the second lower connection point 2-3 is connected to the electric hoist 3; the bottom end of the lifting chain 4 is the workpiece connection end, forming a driving connection structure for lifting the large workpiece; the electric hoist 3 is provided with an electric hoist chain 5, and the bottom end of the electric hoist chain 5 is provided with a lifting hook 6, which is used to hook the end hanging ring of the large workpiece to form a large workpiece flipping driving connection structure.

[0019] In this embodiment:

[0020] Furthermore, an upper connection point 2-1 is provided on the top surface of the lifting ring fixing plate 2, and the upper connection point 2-1 is composed of an upward hanging ring; the first lower connection point 2-2 and the second lower connection point 2-3 are each composed of a lower hanging ring.

[0021] Furthermore, the housing of the electric hoist 3 is provided with a hoist hook 3 - 1 , and the electric hoist 3 is hooked on the second lower connection point 2 - 3 via the hoist hook 3 - 1 .

[0022] Furthermore, the workpiece connecting end of the lifting chain 4 is hung on the first workpiece hanging ring 8-1 of the large workpiece to form a vertical lifting connection structure; the lifting hook 6 is hung on the second workpiece hanging ring 7 of the large workpiece to form a flip lifting connection structure.

[0023] Furthermore, a screw hole is reserved at each end of the large workpiece, and the first workpiece hanging ring 8-1 and the second workpiece hanging ring 7 are connected to the large workpiece 8 through the screw holes reserved at the two ends of the large workpiece.

[0024] When this embodiment is used, Figure 1 As shown, a large workpiece 8 is placed on flat ground, a lifting crane 1 is raised to hang a lifting ring fixing plate 2, an electric hoist 3 and a lifting chain 4 are hung under the lifting ring fixing plate 2, and the lifting chain 4 is connected to the first workpiece hanging ring 8-1 on the large workpiece 8.

[0025] For example Figure 2 As shown, the lifting crane 1 lifts the large workpiece 8 to a vertical state, the electric hoist chain 5 is extended, and the lifting hook 6 is hooked on the second workpiece hanging ring 7 of the large workpiece 8.

[0026] like Figure 3 As shown, the electric hoist 3 motor is started, and the electric hoist chain 5 is slowly tightened to rotate the large workpiece 8 until it is in a horizontal state. At this time, the large workpiece 8 has completed the overturning.

[0027] In summary, due to the large size and weight of the large workpiece, and the unreasonable structure of the lifting fixture in the prior art, it is easy to slip during the lifting and flipping process, which poses a high safety risk, and is not easy to flip and has low efficiency. During the lifting and flipping process, the large workpiece is prone to bruises or deformation. Therefore, the existing large workpieces are generally lifted by a single hook crane, and the fixed position is manually adjusted to complete the flipping of the large workpiece. With the utility model, the large workpiece 8 is lifted by the crane 1 on the workshop beam. At this time, the large workpiece 8 is in a vertical state, and the electric hoist chain 5 of the electric hoist 3 is in a relaxed state and does not bear tension. Then the electric hoist 3 is started and the electric hoist chain 5 is tightened to slowly lift one end of the large workpiece 8 until the large workpiece 8 is in a horizontal state. At this time, the large workpiece 8 has completed the flipping. In this process, the hanging rings and hooks at various places are connected, and then the operator only needs to operate the crane 1 and the electric hoist 3 at a distance to complete the lifting and flipping process. Therefore, the utility model has the advantages of convenient and fast hanging of large workpieces, simple and safe lifting and flipping processes, and high processing efficiency.

Claims

1. A large workpiece lifting and turning fixture structure, characterized in that: The invention comprises a lifting ring fixing plate (2) and an electric hoist (3), wherein the upper end of the lifting ring fixing plate (2) is connected to a hoist hook (1-1) of a hoist (1), and the bottom of the lifting ring fixing plate (2) has two lower connection points, wherein the first lower connection point (2-2) is connected to the upper end of a lifting chain (4), and the second lower connection point (2-3) is connected to the electric hoist (3); the bottom end of the lifting chain (4) is a workpiece connection end, forming a driving connection structure for lifting a large workpiece; the electric hoist (3) is provided with an electric hoist chain (5), and the bottom end of the electric hoist chain (5) is provided with a lifting hook (6), and the lifting hook (6) is used to hook the end hanging ring of the large workpiece, forming a large workpiece turning driving connection structure.

2. A large workpiece lifting and turning fixture structure according to claim 1, characterized in that: An upper connection point (2-1) is provided on the top surface of the lifting ring fixing plate (2), and the upper connection point (2-1) is composed of an upward hanging ring; the first lower connection point (2-2) and the second lower connection point (2-3) are each composed of a lower hanging ring.

3. A large workpiece lifting and turning fixture structure according to claim 1, characterized in that: The housing of the electric hoist (3) is provided with a hoist hook (3-1), and the electric hoist (3) is hooked on the second lower connection point (2-3) via the hoist hook (3-1).

4. The large workpiece lifting and turning fixture structure according to claim 1 is characterized in that: The workpiece connection end of the lifting chain (4) is hung on the first workpiece hanging ring (8-1) of the large workpiece to form a vertical lifting connection structure; the lifting hook (6) is hung on the second workpiece hanging ring (7) of the large workpiece to form a flip lifting connection structure.

5. A large workpiece lifting and turning fixture structure according to claim 4, characterized in that: A screw hole is reserved at each end of the large workpiece, and the first workpiece hanging ring (8-1) and the second workpiece hanging ring (7) are connected to the large workpiece (8) through the screw holes reserved at the ends of the large workpiece.