Water conservancy construction positioning device

By designing the water conservancy construction positioning device and using movable wheels, adjustment mechanisms and positioning mechanisms, the problems of high manpower consumption and slow positioning speed in water conservancy construction are solved, fast and automatic channel excavation route marking is achieved, and construction efficiency is improved.

CN221822841UActive Publication Date: 2024-10-11SHANDONG MINSHENG CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323487948.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2024-10-11
Estimated Expiration
2033-12-19

AI Technical Summary

Technical Problem

In water conservancy construction, the existing technology requires a lot of manpower and is slow in positioning, and cannot efficiently mark the location of channel excavation.

Method used

A positioning device for water conservancy construction is designed, including positioning pillars, adjustment mechanisms and positioning mechanisms. Through movable wheels, connecting ferrules, drag rods, drive motors and extrusion screws, rapid adjustment and lime extrusion are achieved, and the channel excavation route is marked. .

Benefits of technology

It realizes rapid and automatic marking of channel excavation routes in water conservancy construction, improves positioning speed and efficiency, and reduces manpower consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822841U_ABST
    Figure CN221822841U_ABST
Patent Text Reader

Abstract

The utility model discloses a water conservancy construction positioning device, and relates to the field of water conservancy construction. Comprising a positioning supporting column, movable wheels are movably installed at the two ends of the positioning supporting column, a connecting clamping sleeve is arranged in the middle of the positioning supporting column, a tow bar is fixedly installed on the connecting clamping sleeve, adjusting mechanisms are arranged on the two sides of the positioning supporting column, an adjusting supporting column is movably installed in the positioning supporting column, and an adjusting hole is formed in the adjusting supporting column; a limiting supporting column is movably installed in the mechanism shell, a spring seat is fixedly installed on the limiting supporting column in the mechanism shell, a limiting spring is arranged on the limiting supporting column in the mechanism shell in a sleeving mode, and a positioning mechanism is fixedly installed at the tail end of the adjusting supporting column. After the position of the positioning mechanism is adjusted, the whole equipment can be pulled to move forwards, a driving motor can be started after the whole equipment moves forwards, and after the driving motor is started, an extrusion screw rod can rotate, so that lime is extruded out, and a channel excavation route is quickly marked on the ground.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of water conservancy construction, in particular to a water conservancy construction positioning device. Background Art

[0002] Water conservancy projects are projects built to control and allocate natural surface water and groundwater to achieve the purpose of eliminating harm and promoting benefits. Before the canal is dug, lime lines need to be sprinkled on the ground according to its location to determine the location of the canal excavation and facilitate the workers to carry out construction. However, the actual operation process requires a lot of manpower and the positioning speed is slow. Utility Model Content

[0003] The main purpose of the utility model is to provide a water conservancy construction positioning device, which can effectively solve the problems mentioned in the background technology.

[0004] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0005] A water conservancy construction positioning device, comprising a positioning pillar, movable wheels are movably installed at both ends of the positioning pillar, a connecting sleeve is provided in the middle position of the positioning pillar, a towing rod is fixedly installed on the connecting sleeve, and adjustment mechanisms are provided at both sides of the positioning pillar, the adjustment mechanism comprises an adjusting pillar, an adjusting hole, a mechanism shell, a limiting pillar, a limiting spring and a spring seat, the adjusting pillar is movably installed in the positioning pillar, the adjusting pillar is provided with an adjusting hole, the mechanism shell is fixedly installed on the positioning pillar, the limiting pillar is movably installed in the mechanism shell, a spring seat is fixedly installed on the limiting pillar in the mechanism shell, a limiting spring is sleeved on the limiting pillar in the mechanism shell, a positioning mechanism is fixedly installed at the end of the adjusting pillar, the positioning mechanism comprises a driving motor, a sealing upper cover, an extrusion screw, a storage box and a discharge port, the storage box is fixedly installed at the end of the adjusting pillar, the discharge port is fixedly installed at the bottom of the storage box, a sealing upper cover is provided at the upper end of the storage box, a driving motor is fixedly installed on the upper surface of the sealing upper cover, and an extrusion screw is provided at the output end of the driving motor.

[0006] Furthermore, a through hole is opened on the surface of the positioning pillar, and the limiting pillar extends into the interior of the positioning pillar through the through hole.

[0007] Furthermore, the limit pillar is movably installed in the mechanism housing through a spring seat, one end of the limit spring is connected to the spring seat, the other end of the limit spring is connected to the upper end of the mechanism housing, and the limit pillar is embedded in the adjustment pillar through the adjustment hole.

[0008] Furthermore, a screw is provided at the end of the adjusting pillar, and the mechanism housing is fixed to the end of the adjusting pillar by the screw.

[0009] Furthermore, the drive motor is arranged at the upper end of the storage box through a sealing upper cover, a through hole is provided in the middle of the sealing upper cover, the output end of the drive motor extends into the storage box through the through hole, and the extrusion screw is movably installed in the storage box through the drive motor.

[0010] Furthermore, the positioning mechanism is installed at both ends of the positioning pillar through an adjustment mechanism.

[0011] Compared with the prior art, the utility model has the following beneficial effects:

[0012] When in use, the lime can be loaded into the storage box, and then the limiting support can be lifted upward. After lifting the limiting support upward, the support can be adjusted to move within the positioning support, so as to adjust the position of the positioning mechanism according to the spacing of the excavated channels. After the position adjustment of the positioning mechanism is completed, the entire device can be pulled forward. After the entire device moves forward, the drive motor can be started. After starting the drive motor, the extrusion screw will rotate, thereby squeezing out the lime, and then quickly mark the channel excavation route on the ground to position the channel. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0014] Figure 2 It is a schematic diagram of the adjustment mechanism of the utility model;

[0015] Figure 3 It is a schematic diagram of the positioning mechanism of the utility model.

[0016] In the figure: 1. movable wheel; 2. positioning pillar; 3. connecting sleeve; 4. drag rod; 5. adjusting mechanism; 501. adjusting pillar; 502. adjusting hole; 503. mechanism housing; 504. limiting pillar; 505. limiting spring; 506. spring seat; 6. positioning mechanism; 601. driving motor; 602. sealing upper cover; 603. extrusion screw; 604. storage box; 605. discharge port. DETAILED DESCRIPTION

[0017] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.

[0018] like Figure 1 to Figure 3As shown, a water conservancy construction positioning device includes a positioning pillar 2, movable wheels 1 are movably installed at both ends of the positioning pillar 2, a connecting sleeve 3 is provided in the middle position of the positioning pillar 2, a towing rod 4 is fixedly installed on the connecting sleeve 3, and adjustment mechanisms 5 are provided on both sides of the positioning pillar 2. The adjustment mechanism 5 includes an adjusting pillar 501, an adjusting hole 502, a mechanism housing 503, a limiting pillar 504, a limiting spring 505 and a spring seat 506. A positioning mechanism 6 is fixedly installed at the end of the adjusting pillar 501, and the positioning mechanism 6 is installed at both ends of the positioning pillar 2 through the adjusting mechanism 5.

[0019] An adjustment mechanism 5 is provided at both sides of the positioning pillar 2, and the adjustment mechanism 5 includes an adjustment pillar 501, an adjustment hole 502, a mechanism housing 503, a limit pillar 504, a limit spring 505 and a spring seat 506. The adjustment pillar 501 is movably installed in the positioning pillar 2, and an adjustment hole 502 is opened on the adjustment pillar 501. The mechanism housing 503 is fixedly installed on the positioning pillar 2. The limit pillar 504 is movably installed in the mechanism housing 503. A spring seat 506 is fixedly installed on the limit pillar 504 in the mechanism housing 503. A limit spring 505 is sleeved on the limit pillar 504 in the mechanism housing 503. A positioning mechanism 6 is fixedly installed at the end of the adjustment pillar 501. The positioning mechanism 6 includes a driving motor 601, a sealing upper cover 602, an extrusion screw 603, and a storage box 604. and a discharge port 605, a storage box 604 is fixedly installed at the end of the adjusting support 501, a discharge port 605 is fixedly installed at the bottom of the storage box 604, a sealing upper cover 602 is provided at the upper end of the storage box 604, a driving motor 601 is fixedly installed on the upper surface of the sealing upper cover 602, an extrusion screw 603 is provided at the output end of the driving motor 601, after the limiting support 504 is lifted upwards, the adjusting support 501 can move in the positioning support 2, so as to adjust the position of the positioning mechanism 6 according to the spacing of the excavated channel, after the position adjustment of the positioning mechanism 6 is completed, the whole device can be pulled forward, after the whole device moves forward, the driving motor 601 can be started, after starting the driving motor 601, the extrusion screw 603 will rotate, so as to squeeze out the lime, and then quickly mark the channel excavation route on the ground.

[0020] It should be noted that the utility model is a water conservancy construction positioning device. In actual use, the lime is first loaded into the storage box 604, and then the limiting pillar 504 can be lifted upward. Since a through hole is opened on the surface of the positioning pillar 2, the limiting pillar 504 extends into the interior of the positioning pillar 2 through the through hole. The limiting pillar 504 is movably installed in the mechanism housing 503 through the spring seat 506. One end of the limiting spring 505 is connected to the spring seat 506, and the other end of the limiting spring 505 is connected to the upper end of the mechanism housing 503. The limiting pillar 504 is embedded in the adjusting pillar 501 through the adjusting hole 502. Therefore, after the limiting pillar 504 is lifted upward, it will be separated from the adjusting hole 502. After the limiting pillar 504 is separated from the adjusting hole 502, the adjusting pillar 501 can move in the positioning pillar 2, so that The position of the positioning mechanism 6 is adjusted according to the spacing of the excavated channel. After the position adjustment of the positioning mechanism 6 is completed, the entire device can be pulled forward. After the entire device is moved forward, the driving motor 601 can be started. Since a screw is provided at the end of the adjusting pillar 501, the mechanism housing 503 is fixed to the end of the adjusting pillar 501 by screws, and the driving motor 601 is arranged at the upper end of the storage box 604 through the sealing upper cover 602. A through hole is provided in the middle position of the sealing upper cover 602. The output end of the driving motor 601 extends into the storage box 604 through the through hole. The extrusion screw 603 is movably installed in the storage box 604 through the driving motor 601. Therefore, after starting the driving motor 601, the extrusion screw 603 will rotate, thereby squeezing out the lime, and then quickly marking the channel excavation route on the ground.

[0021] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A water conservancy construction positioning device, characterized in that: The invention comprises a positioning pillar (2), wherein movable wheels (1) are movably mounted at both ends of the positioning pillar (2), a connecting sleeve (3) is provided in the middle of the positioning pillar (2), a towing rod (4) is fixedly mounted on the connecting sleeve (3), and an adjustment mechanism (5) is provided at both sides of the positioning pillar (2), wherein the adjustment mechanism (5) comprises an adjustment pillar (501), an adjustment hole (502), a mechanism housing (503), a limit pillar (504), a limit spring (505) and a spring seat (506), wherein the adjustment pillar (501) is movably mounted in the positioning pillar (2), an adjustment hole (502) is provided on the adjustment pillar (501), the mechanism housing (503) is fixedly mounted on the positioning pillar (2), a limit pillar (504) is movably mounted in the mechanism housing (503), and a limit spring (505) is provided in the mechanism housing (503). A spring seat (506) is fixedly mounted on the limiting pillar (504); a limiting spring (505) is sleeved on the limiting pillar (504) in the mechanism housing (503); a positioning mechanism (6) is fixedly mounted on the end of the adjusting pillar (501); the positioning mechanism (6) comprises a driving motor (601), a sealing upper cover (602), an extrusion screw (603), a storage box (604) and a discharge port (605); the storage box (604) is fixedly mounted at the end of the adjusting pillar (501); a discharge port (605) is fixedly mounted on the bottom of the storage box (604); a sealing upper cover (602) is provided at the upper end of the storage box (604); a driving motor (601) is fixedly mounted on the upper surface of the sealing upper cover (602); and an extrusion screw (603) is provided at the output end of the driving motor (601).

2. A water conservancy construction positioning device according to claim 1, characterized in that: A through hole is provided on the surface of the positioning pillar (2), and the limiting pillar (504) extends into the interior of the positioning pillar (2) through the through hole.

3. A water conservancy construction positioning device according to claim 2, characterized in that: The limiting pillar (504) is movably installed in the mechanism housing (503) through a spring seat (506); one end of the limiting spring (505) is connected to the spring seat (506); the other end of the limiting spring (505) is connected to the upper end of the mechanism housing (503); and the limiting pillar (504) is embedded in the adjusting pillar (501) through the adjusting hole (502).

4. A water conservancy construction positioning device according to claim 3, characterized in that: The end of the adjusting pillar (501) is provided with a screw, and the mechanism housing (503) is fixed to the end of the adjusting pillar (501) by means of the screw.

5. A water conservancy construction positioning device according to claim 4, characterized in that: The driving motor (601) is arranged at the upper end of the storage box (604) through a sealing upper cover (602); a through hole is provided in the middle of the sealing upper cover (602); the output end of the driving motor (601) extends into the storage box (604) through the through hole; and the extrusion screw (603) is movably installed in the storage box (604) through the driving motor (601).

6. A water conservancy construction positioning device according to claim 5, characterized in that: The positioning mechanism (6) is installed at both ends of the positioning pillar (2) through the adjustment mechanism (5).