Tunnel portal section reinforcing structure and tunnel portal section underpass diversion canal system

By using a combination of an arch structure and a temporary channel modification structure at the tunnel entrance section, the problem of water flow interruption caused by settlement during the construction of the diversion channel under the tunnel entrance section was solved, and stable support and settlement control of the diversion channel were achieved, ensuring that Continuity of water flow in aqueducts.

CN221823805UActive Publication Date: 2024-10-11GUANGXI NEW DEV TRANSPORT GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323646891.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-10-11
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

During the construction of the diversion channel under the tunnel entrance section, the conventional support structure caused the tunnel to settle too much, and the diversion channel was prone to cracking, causing the problem of water flow interruption.

Method used

A set-of-arch structure is adopted, including several layers of steel arch frames and pipe shed structures. The settlement of the tunnel entrance section is prevented through longitudinal support and soil grouting reinforcement. Temporary modification of the channel structure and truss support are also used to avoid enclosure during the construction of the diversion channel. Disruption of water flow caused by rock sinking.

Benefits of technology

Effectively control the settlement of the tunnel entrance section, prevent settlement and cracking of the diversion channel, ensure the stability of the water flow in the diversion channel, and restore normal water flow after the construction is completed to avoid excessive settlement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221823805U_ABST
    Figure CN221823805U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of tunnel underpass engineering, in particular to a tunnel portal section reinforcing structure and a tunnel portal section underpass diversion canal system.The tunnel portal section reinforcing structure comprises a cover arch, the cover arch is arranged in a portal section so as to support the tunnel portal section, and the cover arch comprises a plurality of layers of steel arch frames; each layer of steel arch frame is provided with a pipe shed structure, so that a plurality of layers of pipe shed structures are arranged in the cover arch, the arch crown surrounding rock of the hole section below the diversion canal is longitudinally supported through the plurality of layers of steel arch frames and the plurality of layers of pipe shed structures, and the arch crown surrounding rock of the hole section can be grouted and reinforced by the pipe shed structures, so that the conditions of the arch crown surrounding rock are improved; the multiple layers of pipe shed structures and the multiple layers of steel arch frames can reinforce more soil bodies on the arch top of the opening section, so that the opening section can bear larger pressure, and the diversion canal is stably supported.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel engineering, in particular to a tunnel portal reinforcement structure and a tunnel portal underpass water diversion channel system. Background Art

[0002] With the development of highway construction, more and more mountain tunnels are being built, and more and more challenges are being encountered. One of them is the water diversion channel that cannot be interrupted when passing under the tunnel portal. The surrounding rock of the portal section is loose and broken. Under conventional tunnel support, the initial support deformation of the tunnel portal section is too large, causing surface collapse from time to time. If conventional tunnel support is used to pass under the water diversion channel, the tunnel settlement will inevitably be too large, causing the water diversion channel to crack, thereby interrupting the flow of water in the water diversion channel. For this reason, a strong support structure is needed that can control the settlement of the tunnel vault when the tunnel is under the water diversion channel to avoid the water diversion channel cracking caused by tunnel excavation and construction, which will interrupt the flow of water. Utility Model Content

[0003] The purpose of the invention of the utility model is to provide a tunnel portal section reinforcement structure and a tunnel portal section underpass water diversion channel system in order to solve the problem that when the existing tunnel portal section passes under a water diversion channel that cannot be interrupted, the water diversion channel structure is easily sunken and cracked due to tunnel excavation, thereby interrupting the water flow of the water diversion channel.

[0004] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0005] A tunnel portal reinforcement structure comprises a sleeve arch, which is arranged in the portal section and comprises several layers of steel arch frames. A pipe shed structure is arranged on each layer of the steel arch frames, and the pipe shed structure can inject grout into the portal section.

[0006] The utility model discloses a tunnel portal reinforcement structure, comprising a sleeve arch, which is arranged in the portal section to support the tunnel portal section, and the sleeve arch comprises a plurality of layers of steel arch frames, each layer of the steel arch frame is provided with a pipe shed structure, so that the sleeve arch has a plurality of layers of pipe shed structures, and the portal section located below the water diversion channel is longitudinally supported by the plurality of layers of steel arch frames and the plurality of layers of pipe shed structures, and the pipe shed structure can also perform grouting reinforcement on the soil and surrounding rock of the portal section to prevent excessive settlement during excavation of the tunnel portal section, thereby preventing The water diversion channel stopped above the tunnel entrance section experiences settlement, cracking, etc., thereby avoiding interruption of water flow in the water diversion channel, thereby making the tunnel entrance section reinforcement structure described in the utility model have strong advanced support ability and settlement control ability. At the same time, compared with the single-layer pipe shed, the several-layer pipe shed structure and the several-layer steel arch frame can reinforce more soil and surrounding rock in the tunnel entrance section to form a thicker arch structure, so that the tunnel entrance section can withstand greater pressure, and the several-layer steel arch frame has a stronger bearing capacity, thereby stably supporting the water diversion channel.

[0007] As a preferred solution of the utility model, the pipe shed structure on each layer of the steel arch frame includes a plurality of shed pipes, a plurality of grouting holes are arranged on the pipe wall of the shed pipes, and the shed pipes are grouted into the cave entrance section through the grouting holes.

[0008] As a preferred solution of the utility model, the steel arch frame is connected to the orifice pipe through fixing ribs, and the shelf pipe is installed in the orifice pipe.

[0009] As a preferred solution of the utility model, a steel cage is arranged inside the shed pipe, and the steel cage is arranged along the length direction of the shed pipe.

[0010] As a preferred solution of the utility model, the steel cage includes an inner sleeve and reinforcing ribs, the reinforcing ribs are arranged circumferentially around the inner sleeve, and the inner sleeve and the reinforcing ribs are both arranged along the length direction of the shed pipe.

[0011] As a preferred solution of the present utility model, the pipe roof structure is located in an area corresponding to the outer side of the steel arch frame.

[0012] As a preferred embodiment of the present invention, two layers of the several layers of steel arch frames are respectively defined as an outer steel arch frame and an inner steel arch frame, the outer steel arch frame is located outside the inner steel arch frame, the pipe shed structure arranged on the outer steel arch frame is the outer pipe shed structure, and the pipe shed structure arranged on the inner steel arch frame is the inner pipe shed structure.

[0013] The utility model also discloses a water diversion channel system under a tunnel portal section, comprising a temporary channel diversion structure, a truss and a tunnel portal section reinforcement structure described in the utility model, wherein the truss is located above the portal section, the temporary channel diversion structure is connected to the top of the truss, and the truss is used to support the temporary channel diversion structure.

[0014] The utility model discloses a tunnel portal section underpass water diversion channel system, comprising a temporary channel modification structure, a truss and the tunnel portal section reinforcement structure disclosed in the utility model. The truss is located above the portal section, the temporary channel modification structure is connected to the top of the truss, and the truss is used to support the temporary channel modification structure. The water flow direction of the water diversion channel is first changed by the temporary channel modification structure, so that the water diversion channel above the portal section is suspended. After the construction of the tunnel portal section reinforcement structure disclosed in the utility model is completed, the temporary channel modification structure is removed to restore the water flow of the water diversion channel, thereby effectively avoiding the problem of cracking of the water diversion channel and interruption of water flow in the water diversion channel due to sinking of the surrounding rock of the portal section during the construction of the water diversion channel under the portal section. At the same time, the tunnel portal section reinforcement structure can provide support and bearing for the water diversion channel above the portal section, ensuring that the water diversion channel does not experience excessive settlement after the water flow is restored.

[0015] As a preferred solution of the utility model, a plurality of support tubes are connected to the bottom of the truss, and the support tubes support the truss.

[0016] As a preferred solution of the utility model, full-bridge frames are further provided at both ends of the truss, and the full-bridge frames are used to support the temporary channel diversion structure.

[0017] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:

[0018] 1. The tunnel portal reinforcement structure described in the utility model includes a sleeve arch, which is arranged in the portal section to support the tunnel portal section. The sleeve arch includes several layers of steel arch frames, and each layer of the steel arch frame is provided with a pipe shed structure, so that there are several layers of pipe shed structures in the sleeve arch. The portal section located below the water diversion channel is longitudinally supported by the several layers of steel arch frames and the several layers of pipe shed structures, and the pipe shed structure can also perform grouting reinforcement on the soil and surrounding rock of the portal section to prevent excessive settlement during excavation of the tunnel portal section, thereby Preventing the water diversion channel located above the tunnel entrance section from sinking, cracking, etc., avoiding interruption of water flow in the water diversion channel, thereby making the tunnel entrance section reinforcement structure described in the utility model have strong advanced support ability and settlement control ability. At the same time, compared with the single-layer pipe shed, the several-layer pipe shed structure and the several-layer steel arch frame can reinforce more soil and surrounding rock in the tunnel entrance section to form a thicker arch structure, so that the tunnel entrance section can withstand greater pressure, and the several-layer steel arch frame has a stronger bearing capacity, thereby stably supporting the water diversion channel.

[0019] 2. A water diversion channel system under a tunnel portal section described in the utility model comprises a temporary channel modification structure, a truss and the tunnel portal section reinforcement structure described in the utility model. The truss is located above the portal section, and the temporary channel modification structure is connected to the top of the truss. The truss is used to support the temporary channel modification structure. The water flow direction of the water diversion channel is first changed by the temporary channel modification structure, so that the water diversion channel above the portal section is suspended. After the construction of the tunnel portal section reinforcement structure described in the utility model is completed, the temporary channel modification structure is removed to restore the water flow of the water diversion channel, thereby effectively avoiding the problem of cracking of the water diversion channel due to the sinking of the surrounding rock of the portal section and the interruption of the water flow of the water diversion channel during the construction of the water diversion channel under the portal section. At the same time, the tunnel portal section reinforcement structure can provide support and bearing for the water diversion channel above the portal section, ensuring that the water diversion channel does not experience excessive settlement after the water flow is restored. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the tunnel portal section reinforcement structure of the utility model.

[0021] Figure 2 yes Figure 1 A partial enlarged view of point A.

[0022] Figure 3 It is a schematic diagram of the arrangement of the orifice pipes of the utility model.

[0023] Figure 4 It is a cross-sectional diagram of the pipe roof.

[0024] Figure 5 It is a schematic diagram of a water diversion channel system under a tunnel portal section of the utility model.

[0025] Figure 6 yes Figure 5 Top view of the .

[0026] Figure 7 This is a schematic diagram of the temporary channel modification structure.

[0027] Markings in the figure: 1-arch foundation, 2-arch, 3-outer steel arch frame, 4-inner steel arch frame, 5-outer pipe shed structure, 6-inner pipe shed structure, 7-fixing reinforcement, 8-orifice pipe, 9-shed pipe, 10-rebar cage, 101-inner casing, 102-reinforcement ribs, 11-temporary channel modification structure, 12-full frame, 14-truss, 15-support pipe, 16-tunnel left tunnel entrance section, 17-tunnel right tunnel entrance section, 18-water diversion channel. DETAILED DESCRIPTION

[0028] The utility model is described in detail below in conjunction with the accompanying drawings.

[0029] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0030] Example 1

[0031] like Figure 1-Figure 2 As shown, a tunnel portal section reinforcement structure described in this embodiment includes a casing arch 2, which is arranged in the portal section. The casing arch 2 includes several layers of steel arch frames, and each layer of steel arch frames is provided with a pipe roof structure, which can inject grout into the side wall of the portal section.

[0032] The tunnel portal reinforcement structure described in this embodiment includes a sleeve arch 2, which is arranged in the portal section to support the tunnel portal section. The sleeve arch 2 includes several layers of steel arch frames, and each layer of the steel arch frame is provided with a pipe shed structure, so that the sleeve arch 2 has several layers of pipe shed structures. The portal section located below the water diversion channel 18 is longitudinally supported by the several layers of steel arch frames and the several layers of pipe shed structures. The pipe shed structure can also perform grouting reinforcement on the soil and surrounding rock of the portal section, improve the conditions of the arch top surrounding rock, and prevent the tunnel portal section from being excavated. Excessive settlement can be prevented, thereby preventing the water diversion channel 18 located above the tunnel entrance section from settling or cracking, and avoiding interruption of water flow in the water diversion channel 18. As a result, the tunnel tunnel entrance section reinforcement structure described in the utility model has a strong advance support capability and settlement control capability. At the same time, compared with a single-layer pipe shed, several layers of pipe shed structures and several layers of steel arch frames can reinforce more soil and surrounding rock in the tunnel entrance section, forming a thicker arch structure, so that the tunnel entrance section can withstand greater pressure, thereby stably supporting the water diversion channel 18.

[0033] A preferred method is as follows Figure 2 As shown, the pipe shed structure on each layer of the steel arch frame includes a plurality of shed pipes 9, and a plurality of grouting holes are arranged on the wall of the shed pipes 9. The shed pipes 9 inject grout into the tunnel section through the grouting holes. The shed pipes 9 adopt a steel pipe with a diameter of 108 mm, and a tapered end with a length of 10 cm. A plurality of grouting holes are arranged on the wall of the steel pipe. When injecting grout into the tunnel section through the shed pipes 9, the slurry is injected into the shed pipes 9, and the slurry enters the soil or surrounding rock of the tunnel section through the grouting holes on the wall of the shed pipes 9.

[0034] A preferred method is as follows Figure 3 As shown, the steel arch frame is connected with the orifice pipe 8 through the fixing rib 7, and the shelf pipe 9 is installed in the orifice pipe 8. The orifice pipe 8 is fixed to each layer of the steel arch frame through the fixing rib 7. In actual construction, the fixing rib 7 is a steel bar with a diameter of 22 mm. The orifice pipe 8 is welded and fixed to each layer of the steel arch frame by the fixing rib 7. The orifice pipe 8 is used to fix the position and the driving angle of the shelf pipe 9, so that the shelf pipe 9 of each layer of the pipe-shelf structure can be driven into the soil and surrounding rock of the cave entrance section through the orifice pipe 8, and then the soil and surrounding rock are grouted after the shelf pipe 9 of each layer of the pipe-shelf structure is driven into the soil and surrounding rock of the cave entrance section, so as to realize the grouting reinforcement of the surrounding rock of the cave entrance section.

[0035] A preferred method is as follows Figure 4As shown, a steel cage 10 is arranged inside the shed pipe 9, and the steel cage 10 is arranged along the length direction of the shed pipe 9. The steel cage 10 is arranged inside the shed pipe 9 to increase the rigidity of the shed pipe 9, thereby enhancing the bearing capacity of each layer of the pipe-shed structure. Further, the steel cage 10 includes an inner sleeve 101 and reinforcing ribs 102, and the reinforcing ribs 102 are circumferentially arranged around the inner sleeve 101. The inner sleeve 101 and the reinforcing ribs 102 are both arranged along the length direction of the shed pipe 9, wherein the length of the inner sleeve 101 is consistent with the length of the shed pipe 9, and four reinforcing ribs 102 are circumferentially connected to the outer side of the inner sleeve 101 to form the steel cage 10, the inner sleeve 101 is a steel pipe with a diameter of 42 mm, and the reinforcing ribs 102 are steel bars with a diameter of 16 mm.

[0036] A preferred method is as follows Figure 1 As shown, the pipe-roof structure is located in the external area of ​​the corresponding steel arch frame, so that the pipe-roof structure can be used to grout and reinforce the arch surrounding rock of the portal section, improve the arch surrounding rock conditions, and prevent excessive settlement during excavation of the tunnel portal section.

[0037] In a preferred manner, two layers of the plurality of steel arch frames are respectively defined as an outer steel arch frame 3 and an inner steel arch frame 4, the outer steel arch frame 3 is located outside the inner steel arch frame 4, the pipe shed structure arranged on the outer steel arch frame 3 is an outer pipe shed structure 5, and the pipe shed structure arranged on the inner steel arch frame 4 is an inner pipe shed structure 6;

[0038] Among them, Figure 1-Figure 2 As shown, the outer pipe rack structure 5 is composed of a plurality of pipe racks 19. In the outer pipe rack structure 5, the rack pipes 9 are arranged along the length direction of the outer steel arch frame 3. The circumferential spacing between the rack pipes 9 is 80 cm. The number of rack pipes 9 arranged is 18 to 20. Among them, the angle between the two rack pipes 9 at the ends of both sides is θ1, and θ1 is 105° to 120°. Further, as shown in FIG. Figure 1-Figure 2 As shown, the inner pipe rack structure 6 is composed of a plurality of pipe racks 19. In the inner pipe rack structure 6, the pipe racks 19 are arranged along the length direction of the inner steel arch frame 4. The circumferential spacing between the rack pipes 9 is 30 cm. The number of rack pipes 9 arranged is 50 to 52. Among them, the angle between the two rack pipes 9 located at the ends on both sides is θ2, θ2 is 128° to 132°, and the spacing between the outer steel arch frame 3 and the inner steel arch frame 4 is 75 cm.

[0039] A preferred method is as follows Figure 1 As shown, the sleeve arch 2 is constructed on the sleeve arch foundation 1, and the sleeve arch foundation 1 is arranged on the ground of the tunnel portal section, wherein the sleeve arch 2 has a thickness of 1.4 m and a longitudinal length of 2 m.

[0040] Example 2

[0041] like Figure 5-Figure 6As shown, based on Example 1, a tunnel portal section underpasses a water diversion channel system described in this example, including a temporary channel diversion structure 11, a truss 14 and a tunnel portal section reinforcement structure described in Example 1, wherein the truss 14 is located above the portal section, the temporary channel diversion structure 11 is connected to the top of the truss 14, and the truss 14 is used to support the temporary channel diversion structure 11.

[0042] A tunnel portal section underpass water diversion channel system described in this embodiment comprises a temporary channel modification structure 11, a truss 14 and the tunnel portal section reinforcement structure described in Example 1, wherein the truss 14 is located above the portal section, the temporary channel modification structure 11 is connected to the top of the truss 14, and the truss 14 is used to support the temporary channel modification structure 11. The water flow direction of the water diversion channel 18 is first changed by the temporary channel modification structure 11, so that the water diversion channel 18 above the portal section is suspended. After the construction of the tunnel portal section reinforcement structure is completed, the temporary channel modification structure 11 is removed to restore the water flow of the water diversion channel 18, thereby effectively avoiding the problem of cracking of the water diversion channel 18 and interruption of water flow in the water diversion channel 18 due to the sinking of the surrounding rock of the portal section during the construction of the tunnel portal section underpass water diversion channel 18. At the same time, the tunnel portal section reinforcement structure can provide support and bearing for the water diversion channel 18 above the portal section, ensuring that the water diversion channel 18 does not sink too much after the water flow is restored.

[0043] Furthermore, by arranging a truss 14 above the tunnel entrance section to support the temporary channel diversion structure 11, the temporary channel diversion structure 11 can be stably supported in the area above the tunnel entrance section, thereby being more stable, so that when water flows through the temporary channel diversion structure 11, the temporary channel diversion structure 11 is not easy to shake or deflect. Further, the temporary channel diversion structure 11 is welded to the truss 14, so that the temporary channel diversion structure 11 and the truss 14 are firmly connected. In this embodiment, the tunnel entrance section includes a left tunnel entrance section 16 and a right tunnel entrance section 17. The truss 14 is erected above the left tunnel entrance section 16 and the right tunnel entrance section 17, thereby effectively supporting the temporary channel diversion structure 11. Figure 5-Figure 6 .

[0044] A preferred method is as follows Figure 5 As shown, the bottom of the truss 14 is also connected to a plurality of support tubes 15, and the truss 14 is supported by the support tubes 15 to keep the truss 14 stable, wherein at least two support tubes 15 are arranged in the area between the left tunnel entrance section 16 and the right tunnel entrance section 17, thereby effectively supporting the truss 14, as shown in FIG. Figure 5 , the support pipe 15 is a steel pipe with a diameter of 426 mm.

[0045] In a preferred manner, full-frames 12 are also provided at both ends of the truss 14, and the full-frames 12 are used to support the temporary channel diversion structure 11. By providing the full-frames 12, the temporary channel diversion structure 11 can be effectively supported in the area away from the tunnel portal section, thereby maintaining the stability of the temporary channel diversion structure 11.

[0046] A preferred method is as follows Figure 7 As shown, the temporary channel modification structure 11 is assembled from steel plates, that is, the steel plates are assembled into a groove shape, wherein the thickness of the steel plates is not less than 5 mm.

[0047] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A tunnel portal reinforcement structure, characterized in that: It comprises a sleeve arch (2), the sleeve arch (2) is arranged in the tunnel section, the sleeve arch (2) comprises a plurality of layers of steel arch frames, each layer of the steel arch frames is provided with a pipe shed structure, and the pipe shed structure can inject grout into the tunnel section; The pipe shed structure on each layer of the steel arch frame comprises a plurality of shed pipes (9), a plurality of grouting holes are arranged on the pipe wall of the shed pipes (9), and the shed pipes (9) are grouted into the opening section through the grouting holes; The steel arch frame is connected to an orifice pipe (8) via a fixing rib (7), and the shelf pipe (9) is installed in the orifice pipe (8).

2. A tunnel portal reinforcement structure according to claim 1, characterized in that: A steel cage (10) is arranged inside the scaffolding pipe (9), and the steel cage (10) is arranged along the length direction of the scaffolding pipe (9).

3. A tunnel portal reinforcement structure according to claim 2, characterized in that: The steel cage (10) comprises an inner sleeve (101) and reinforcing ribs (102); the reinforcing ribs (102) are arranged circumferentially around the inner sleeve (101); and the inner sleeve (101) and the reinforcing ribs (102) are both arranged along the length direction of the scaffolding pipe (9).

4. A tunnel portal reinforcement structure according to claim 1, characterized in that: The pipe roof structure is located in an area corresponding to the outer side of the steel arch frame.

5. A tunnel portal reinforcement structure according to any one of claims 1 to 4, characterized in that: Two layers of the plurality of steel arch frames are defined as an outer steel arch frame (3) and an inner steel arch frame (4), respectively; the outer steel arch frame (3) is located outside the inner steel arch frame (4); the pipe shed structure arranged on the outer steel arch frame (3) is an outer pipe shed structure (5); and the pipe shed structure arranged on the inner steel arch frame (4) is an inner pipe shed structure (6).

6. A tunnel portal section underpass water diversion channel system, characterized in that: It comprises a temporary channel diversion structure (11), a truss (14) and a tunnel portal section reinforcement structure as described in any one of claims 1 to 5, wherein the truss (14) is located above the portal section, the temporary channel diversion structure (11) is connected to the top of the truss (14), and the truss (14) is used to support the temporary channel diversion structure (11).

7. A tunnel portal section underpass water diversion channel system according to claim 6, characterized in that: A plurality of support tubes (15) are also connected to the bottom of the truss (14), and the support tubes (15) support the truss (14).

8. A tunnel portal section underpass water diversion channel system according to claim 6, characterized in that: Full-frames (12) are also provided at both ends of the truss (14), and the full-frames (12) are used to support the temporary channel diversion structure (11).