Anti-clogging device for coal mine underground crossing drain hole

By arranging a wire rope and a wire pulley in the underground drainage hole of the coal mine, and using a manual crank to drive the wire rope to rotate cyclically, the problem of silt blockage was solved, the timely discharge of accumulated water was realized, and the safety and smooth progress of underground construction were ensured.

CN221823873UInactive Publication Date: 2024-10-11HENAN YONGJIN ENERGY CO LTD YUNGAISHAN COAL MINE NO 2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420550302.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-21
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The drainage holes in underground coal mines are easily blocked by silt, resulting in delayed discharge of accumulated water, which affects construction safety.

Method used

An anti-siltation and clogging device is designed that includes a casing, a steel wire rope, a first wire pulley and a second wire pulley. The wire rope is driven by a manual crank to rotate cyclically to clear the silt in the casing and prevent clogging.

Benefits of technology

It effectively avoids the blockage of the drainage hole, ensures the smooth discharge of accumulated water, ensures the smooth progress of underground construction, and is simple to operate and easy to promote.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221823873U_ABST
    Figure CN221823873U_ABST
Patent Text Reader

Abstract

The utility model discloses an underground coal mine penetrating layer drain hole anti-clogging device which comprises a casing pipe and a steel wire rope, a first clamp is arranged at the top of the casing pipe, a support is arranged above the first clamp, a wire guide wheel is rotatably connected to the middle of the support, a manual crank is arranged on one side of the first wire guide wheel, a U-shaped frame is arranged at the bottom of the casing pipe, and the steel wire rope is arranged on the U-shaped frame. A second wire guide wheel is arranged in the middle of the U-shaped frame, a steel wire rope is arranged between the first wire guide wheel and the second wire guide wheel, and the U-shaped frame is fixedly connected with the bottom of the sleeve through a second clamp. The steel wire rope is arranged between the first wire guide wheel and the second wire guide wheel, the steel wire rope is driven by rotation of the manual crank to circularly rotate in a casing pipe, sludge in the casing pipe can be brought out, meanwhile, the situation that accumulated water is not discharged in time due to blockage in the casing pipe is avoided, smooth underground construction is guaranteed, and the use method is convenient. Operation is simple, and popularization is easy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to an anti-blocking device, in particular to an anti-blocking device for a layer-penetrating drainage hole in an underground coal mine, belonging to the technical field of coal mine drilling. Background Art

[0002] When the staff were mining the working face which was lower in the west and higher in the east, a large amount of water was easily accumulated because the cut-eye opening of the working face was located at the lowest point of the working face. If the accumulated water could not be discharged in time, it would seriously affect the safe mining of the working face. For this reason, the staff dug drainage holes in the tunnel. However, during the use of the drainage holes, the hole walls would be blocked by mud and sand, which would seriously affect the discharge of the accumulated water. Utility Model Content

[0003] The technical problem to be solved by the utility model is to overcome the deficiencies of the prior art and provide a device for preventing underground through-layer drainage holes in coal mines, so as to avoid silt blockage in the drainage holes and ensure smooth removal of accumulated water.

[0004] The technical solution adopted by the utility model to solve the technical problem is:

[0005] A device for preventing clogging of underground through-layer drainage holes in a coal mine comprises a casing and a steel wire rope, wherein a first clamp is arranged on the top of the casing, a bracket is arranged above the first clamp, a first guide wheel is rotatably connected in the middle of the bracket, a manual crank is arranged on one side of the first guide wheel, a U-shaped frame is arranged at the bottom of the casing, a second guide wheel is arranged in the middle of the U-shaped frame, the positions of the first guide wheel and the second guide wheel correspond to each other in the upper and lower parts, a steel wire rope is arranged between the first guide wheel and the second guide wheel, and the U-shaped frame is fixedly connected to the bottom of the casing through the second clamp.

[0006] The bracket is composed of two support rods, and a first wire wheel is rotatably connected between the two support rods. One end of the manual crank passes through one of the support rods and is fixedly connected to the first wire wheel.

[0007] The manual crank is rotatably connected with the bracket.

[0008] Support blocks are correspondingly arranged on both sides of the outer wall of the first clamp, and through holes are dug on the support blocks. Pillars are arranged at the positions corresponding to the through holes at the bottom of the bracket, and the pillars penetrate the support blocks and are fixed by tightening bolts, and the tightening bolts are located on the outer wall of the support blocks.

[0009] The steel wire rope is wound around the outside of the first guide wheel and the second guide wheel.

[0010] Slots are respectively dug at both ends of the top of the U-shaped frame, the lower end of the sleeve is inserted into the slot, and the U-shaped frame and the lower end of the sleeve are fixedly connected together through a second clamp.

[0011] The positive beneficial effects of the utility model are:

[0012] The utility model discloses the ... BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the structure of the utility model;

[0014] Figure 2 It is a structural schematic diagram of the shaking handle and the first guide wheel of the utility model;

[0015] Figure 3 This is a schematic diagram of the structure of the U-shaped frame of the utility model;

[0016] Figure 4 This is a diagram of the use state of the utility model;

[0017] Wherein: 1-sleeve, 2-first clamp, 3-second clamp, 4-support block, 5-bracket, 6-pillar, 7-first wire wheel, 8-manual crank, 9-U-shaped frame, 901-slot, 10-second wire wheel, 11-wire rope. DETAILED DESCRIPTION

[0018] The utility model is further explained and illustrated below in conjunction with the accompanying drawings:

[0019] For example, see Figure 1-Figure 4 A device for preventing siltation of underground through-layer drainage holes in a coal mine comprises a casing 1 and a steel wire rope 11. A first clamp 2 is arranged on the top of the casing 1, a bracket 5 is arranged above the first clamp 2, a first wire wheel 7 is rotatably connected in the middle of the bracket 5, a manual crank 8 is arranged on one side of the first wire wheel 7, a U-shaped frame 9 is arranged at the bottom of the casing 1, a second wire wheel 10 is arranged in the middle of the U-shaped frame 9, the positions of the first wire wheel 7 and the second wire wheel 10 correspond to each other, and a steel wire rope 11 is arranged between the first wire wheel 7 and the second wire wheel 10, and the U-shaped frame 9 is fixedly connected to the bottom of the casing 1 through the second clamp 3.

[0020] The bracket 5 is composed of two supporting rods, and a first wire wheel 7 is rotatably connected between the two supporting rods. One end of the manual crank (8) passes through one of the supporting rods and is fixedly connected to the first wire wheel 7.

[0021] The manual crank 8 is rotatably connected to the bracket 5 .

[0022] Support blocks 4 are correspondingly arranged on both sides of the outer wall of the first clamp 2, through holes are dug on the support blocks 4, and pillars 6 are arranged at the positions corresponding to the through holes at the bottom of the bracket 5. The pillars 6 penetrate the support blocks 4 and are fixed by tightening bolts, which are located on the outer wall of the support blocks 4.

[0023] The wire rope 11 is wound around the outside of the first guide wheel 7 and the second guide wheel 10 .

[0024] Slots 901 are respectively dug at both ends of the top of the U-shaped frame 9 , and the lower end of the sleeve 1 is inserted into the slots 901 , and the U-shaped frame 9 and the lower end of the sleeve 1 are fixedly connected together through a second clamp 3 .

[0025] In the above description, a second wire pulley is disposed in the middle of the U-shaped frame, and second connecting columns are rotatably connected to both sides of the second wire pulley, and the second connecting columns are fixedly connected to the U-shaped frame.

[0026] In the above description, first connecting columns are fixedly connected to both sides of the first wire wheel, the first connecting columns are rotatably connected to the bracket, and one end of the manual crank is fixedly connected to one of the first connecting columns. When in use, the first wire wheel and the second wire wheel can be driven to rotate by rotating the manual crank, thereby causing the wire rope to rotate in a cycle.

[0027] In the above description, the drilling was completed after the Φ113mm drill bit was used to drill 1.0m and the blowout prevention device was installed. The whole section was constructed to the designed position, and then the Φ180mm and 260mm drill bits were used to expand the whole section. After the drilling construction was completed, the hole was swept, and then the Φ219mm casing was installed throughout the whole process (for drilling holes with a depth of more than 40m, if the casing cannot be installed throughout the whole process, the casing can be installed only in the soft rock section to protect the hole wall). After the casing was installed, grouting was carried out to fix the pipe. For the holes that did not penetrate into the transport drift of the 23303 working face, the holes were sealed in time after the rods were pulled out.

[0028] In the above description, you also need to pay attention to the following during construction:

[0029] ① Before lowering the casing, the hole depth must be corrected, the casing depth and installation position must be determined, and the casing must be lowered step by step according to the designed layer to ensure that the casing depth and installation position are accurate;

[0030] ② Check the casings one by one. Those that do not meet the quality requirements shall not be put into the hole. Each section of casing is butt-jointed with threaded joints. Considering the processing quality of the threaded joints and ensuring that the threaded joints have sufficient strength when the drilling rig drives the casing to rotate;

[0031] ③. The casing operation should be under unified command and coordinated with each other. The operation should be steady and accurate. The lowering speed should not be too fast. When encountering obstacles in the middle, it is not allowed to lift hard. The casing can be properly lifted up and down and rotated slowly. If it still cannot be lowered, the casing should be lifted out and the obstacles in the hole should be cleared before lowering;

[0032] ④. The pressure resistance of this construction shall not be less than 2MPa. The cement slurry concentration (water-cement weight ratio) during grouting and burying pipes shall be 1:1.5. A seismic-resistant pressure gauge shall be installed at the grouting hole mouth, and the pressure shall not be less than 2MPa.

[0033] ⑤. The actual drilling position can deviate from the design by 0.2m, the azimuth angle can deviate by ±1°, and the inclination angle can deviate by ±0.5°. The designed drilling position can be adjusted appropriately according to the site conditions;

[0034] ⑥. A blowout preventer must be installed during drilling construction, and the blowout preventer must be opened normally during coal drilling.

[0035] ⑥. When each borehole is under construction and there is 10m left to the designed final hole position, the pumping team will notify the comprehensive excavation team to withdraw the construction personnel of 23303 transport drift, set up a warning rope, and no one is allowed to be within 30m of the through-hole position, and protect the cables, pipelines, equipment and facilities in the tunnels near the through-hole position.

[0036] The utility model discloses the ...

Claims

1. A device for preventing siltation of underground drainage holes in coal mines, comprising a casing (1) and a steel wire rope (11), characterized in that: A first clamp (2) is arranged at the top of the sleeve (1), a bracket (5) is arranged above the first clamp (2), a first wire wheel (7) is rotatably connected in the middle of the bracket (5), a manual crank (8) is arranged on one side of the first wire wheel (7), a U-shaped frame (9) is arranged at the bottom of the sleeve (1), a second wire wheel (10) is arranged in the middle of the U-shaped frame (9), the first wire wheel (7) and the second wire wheel (10) are located in corresponding positions up and down, a steel wire rope (11) is arranged between the first wire wheel (7) and the second wire wheel (10), and the U-shaped frame (9) is fixedly connected to the bottom of the sleeve (1) through a second clamp (3).

2. The device for preventing siltation of underground coal mine drainage holes according to claim 1, characterized in that: The support (5) is composed of two support rods, and a first guide wheel (7) is rotatably connected between the two support rods. One end of the manual crank (8) passes through one of the support rods and is fixedly connected to the first guide wheel (7).

3. The device for preventing clogging of underground drainage holes in coal mines according to claim 2, characterized in that: The manual crank (8) is rotatably connected to the bracket (5).

4. The device for preventing siltation of underground drainage holes in coal mines according to claim 1, characterized in that: Support blocks (4) are correspondingly arranged on both sides of the outer wall of the first clamp (2), and a through hole is excavated on the support block (4). A support column (6) is arranged at the bottom of the bracket (5) at a position corresponding to the through hole. The support column (6) passes through the support block (4) and is fixed by a tightening bolt. The tightening bolt is located on the outer wall of the support block (4).

5. The device for preventing clogging of underground drainage holes in coal mines according to claim 1, characterized in that: The steel wire rope (11) is wound around the outside of the first guide wheel (7) and the second guide wheel (10).

6. The device for preventing clogging of underground coal mine drainage holes according to claim 1, characterized in that: Slots (901) are respectively provided at both ends of the top of the U-shaped frame (9), the lower end of the sleeve (1) is inserted into the slots (901), and the U-shaped frame (9) and the lower end of the sleeve (1) are fixedly connected together via a second clamp (3).