Temporary drainage device and system for initial support section of tunnel
By designing a temporary drainage device for the initial branch of an isosceles trapezoidal tunnel that includes a bottom plate, a cover plate and a side plate, the problems of unstable drainage ditches and cumbersome construction in the existing technology are solved, and a drainage effect of high stability and strength is achieved. , which meets the high standardization requirements of tunnel construction.
Patent Information
- Application Number
- CN202420567340.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-03-22
AI Technical Summary
The drainage ditch in the initial branch section of the existing tunnel is structurally unstable and prone to collapse due to rolling by construction machinery. The construction is cumbersome and cannot meet the highly standardized tunnel construction requirements.
A temporary drainage device for the initial support section of the tunnel is designed, which includes a bottom plate, a cover plate and a side plate. It adopts an isosceles trapezoidal structure. The cover plate and side plates are connected through hinges. Openings are provided to filter large particles of debris. The horizontal braces provide Extra stability, made of Q235 steel plate, the overall structure has high strength and is easy to install and maintain.
It achieves a highly stable and strong drainage device, avoids collapse caused by construction machinery rolling, simplifies the construction process, improves construction efficiency and safety, and ensures the efficiency and aesthetics of drainage.
Smart Images

Figure CN221823876U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel construction, and in particular to a temporary drainage device and system for an initial branch section of a tunnel. Background Art
[0002] At present, water is common in the initial outflow of tunnels. In order to ensure the civilized construction of the initial branch section of the tunnel, it is necessary to centrally drain the water from the initial branch section to prevent the water from spreading everywhere. For many years, the conventional practice in tunnel construction has been to directly dig a simple drainage ditch on the side wall of the tunnel for drainage. However, since large vehicles and equipment need to frequently travel in the initial branch section during construction, the drainage ditch structure is unstable. After multiple layers of rolling on the drainage ditch, the drainage ditch may be crushed and collapsed. Therefore, it is necessary to frequently re-excavate the drainage ditch. The work is cumbersome and the appearance is ordinary, which cannot meet the increasingly high standardization requirements of today's tunnel construction. Therefore, it is necessary to design a new tunnel drainage structure that can break through the current conventional drainage measures and solve the shortcomings of ordinary drainage ditches. Utility Model Content
[0003] The purpose of the present invention is to solve at least one of the above-mentioned deficiencies in the prior art. For example, one of the purposes of the present invention is to provide a temporary drainage device for the initial branch section of a tunnel with high strength and good stability. For another example, another purpose of the present invention is to provide a temporary drainage system for the initial branch section of a tunnel that is simple and easy to install.
[0004] In order to achieve the above-mentioned purpose, the utility model provides, on the one hand, a temporary drainage device for the initial branch section of a tunnel, which may include a bottom plate, a cover plate and a side plate, wherein the side plates are respectively arranged on both sides of the bottom plate along the direction of the bottom plate, and a cover plate is arranged on the top end of the side plate to cover the space formed by the bottom plate and the side plate; the radial width of the bottom plate is smaller than the radial width of the cover plate; the cover plate is rotatably connected to the side plate; and openings are evenly arranged on the cover plate and the side plate.
[0005] According to one or more exemplary embodiments of an aspect of the present invention, the bottom plate may be parallel to the cover plate.
[0006] According to one or more exemplary embodiments of an aspect of the present invention, the cross-sectional structure of the temporary drainage device for the primary branch section of the tunnel may include an isosceles trapezoid.
[0007] According to one or more exemplary embodiments of an aspect of the present invention, the thickness of the bottom plate may be 4.5 to 5.5 mm, the thickness of the side plate may be 4.5 to 5.5 mm, and the thickness of the cover plate may be 4.5 to 5.5 mm.
[0008] According to one or more exemplary embodiments of an aspect of the present invention, the cover plate and the side plate may be connected via a hinge.
[0009] According to one or more exemplary embodiments of one aspect of the utility model, the temporary drainage device for the initial branch section of the tunnel may be provided with a plurality of cross braces at intervals along its length direction, and both ends of the cross braces are connected to the side plates.
[0010] According to one or more exemplary embodiments of an aspect of the present invention, the intervals between the horizontal braces may be 145-155 cm.
[0011] According to one or more exemplary embodiments of one aspect of the present invention, the diameter of the openings on the side plate and the cover plate may be 0.5 to 1.5 cm, and the distribution interval between adjacent openings may be 25 to 35 cm.
[0012] According to one or more exemplary embodiments of an aspect of the present invention, the material of the bottom plate, the side plate and the cover plate may include Q235 steel plate.
[0013] On the other hand, the utility model provides a temporary drainage system for an initial branch section of a tunnel, and the temporary drainage system for an initial branch section of a tunnel may include a plurality of temporary drainage devices for an initial branch section of a tunnel as described in the above exemplary embodiment that are spliced to each other.
[0014] Compared with the prior art, the beneficial effects of the present invention include at least one of the following:
[0015] (1) The temporary drainage device provided by the utility model has high strength, beautiful overall structure, is not easily damaged during tunnel construction, and can be towed to a new construction site for drainage and filtration operations as the tunnel excavation construction progresses;
[0016] (2) The overall structure of the temporary drainage device provided by the utility model is processed with openings, which can filter out larger particles of debris in the tunnel outside the device during the drainage process, thus preventing too many large particles from clogging the channel;
[0017] (3) The temporary drainage device provided by the utility model has good stability. During construction, large construction machinery can move normally on it. The drainage device will not collapse due to the movement of construction machinery on it. There is no need to frequently repair the drainage ditch, which improves the construction efficiency while ensuring the safety of tunnel construction.
[0018] (4) The temporary drainage system provided by the utility model is easy to operate and has high drainage efficiency, and does not affect the construction progress of the initial branch section of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The above and other objects and / or features of the present invention will become more apparent through the following description in conjunction with the accompanying drawings, in which:
[0020] Figure 1A schematic diagram of the overall structure of a temporary drainage device for the initial branch section of a tunnel according to an exemplary embodiment is shown;
[0021] Figure 2 A schematic cross-sectional structure diagram of a temporary drainage device for the initial branch section of a tunnel according to an exemplary embodiment is shown.
[0022] Description of reference numerals:
[0023] 1-cover plate, 2-side plate, 3-bottom plate, 4-cross brace, 5-opening, 6-connecting hinge. DETAILED DESCRIPTION
[0024] In the following, a temporary drainage device and system for the initial branch section of a tunnel of the utility model will be described in detail in combination with the accompanying drawings and exemplary embodiments. It should be noted that "first", "second", etc. are only for the convenience of description and distinction, and cannot be understood as indicating or implying relative importance. "Up", "down", "inside", "outside", etc. are only for the convenience of description and the formation of relative orientation or position relationship, and do not indicate or imply that the referred component must have this specific orientation or position.
[0025] First Exemplary Embodiment
[0026] This exemplary embodiment provides a temporary drainage device for the initial branch section of a tunnel.
[0027] Figure 1 A schematic diagram of the overall structure of a temporary drainage device for the initial branch section of a tunnel according to an exemplary embodiment is shown; Figure 2 A schematic diagram of the cross-sectional structure of a temporary drainage device for the initial branch section of a tunnel according to an exemplary embodiment is shown. Figures 1-2 To describe the temporary drainage device for the initial branch section of the tunnel of this exemplary embodiment.
[0028] In this exemplary embodiment, Figure 1 As shown in the figure, the temporary drainage device for the initial branch section of the tunnel mainly includes a bottom plate 3, a cover plate 1 and a side plate 2. The side plates are respectively arranged on both sides of the bottom plate along the direction of the bottom plate. A cover plate is arranged on the top of the side plate, and the cover plate can cover between the two side plates. Figure 2As shown in the figure, the radial width of the bottom plate 3 is smaller than the radial width of the cover plate 1, and the cover plate 1 is parallel to the bottom plate 3. The radial width of the bottom plate 3 and the radial width of the cover plate 1 can be adaptively adjusted according to the cross-sectional size of the tunnel and the water discharge situation of the tunnel. The side plate 2 is fixed obliquely between the bottom plate 3 and the cover plate 1. That is, the cross-sectional structure of the temporary drainage device for the initial branch section of the tunnel may include an isosceles trapezoid. The trapezoidal structure has the characteristics of high stability, etc., and the drainage device with a trapezoidal cross-section structure is also more convenient to install. The cover plate, the side plate and the bottom plate can be fixedly connected, such as by welding. The assembly and processing of the cover plate, the bottom plate and the side plate can be processed simultaneously during the tunnel construction. No preparation is required in advance. Compared with ordinary drainage ditches, it has a higher ability to resist deformation and damage, allows construction machinery to walk and roll on it, and will not cause the drainage ditch to collapse due to the back and forth movement of the construction machinery, which indirectly leads to frequent drainage ditch seepage and spread of the initial branch section. One side edge of the cover plate is rotatably connected to the top side of its adjacent side plate. As Figure 1 or Figure 2 As shown in , the cover plate and the adjacent side panel can be set to a flip-able connection. For example, a connecting hinge 6 is set between the cover plate and the side panel. Of course, it is not limited to connecting hinges, as long as it is a connecting piece that can achieve a flipping effect. Here, the cover plate and the side panel are set to a rotating connection, so that the drainage device as a whole can be integrated, which is convenient for moving along with the construction progress, simplifying drainage measures and saving construction costs. In addition, maintenance personnel can also regularly flip the cover plate to clean up debris in the drainage device to ensure that the device remains clean and unobstructed at all times. As shown in Figure 1 As shown in the figure, a number of openings 5 can be evenly arranged on the cover plate 1 and the side plate 2. Through the openings 5, the seepage water at the bottom of the initial branch section of the tunnel and the ground water can be filtered through the drainage device and then discharged in a centralized manner, so as to avoid the accumulation of debris in the pipeline during the discharge process, resulting in poor drainage. In addition, because the bottom plate is used for drainage, the bottom plate is not provided with openings. If the bottom plate is provided with openings, the water in the drainage device will infiltrate under the drainage device, greatly reducing the drainage effect.
[0029] In this exemplary embodiment, the bottom plate, cover plate and side plate may be made of ordinary steel plates, such as Q235 steel plates. The compressive strength of the temporary drainage device for the initial branch section of the tunnel may be 2950-3050 N / m 2 , for example 2954N / m 2 、2957N / m 2 、3000N / m 2 、3036N / m 2 or 3047N / m 2 On the basis of ensuring high strength, ordinary steel plates are used, which are convenient to obtain and have lower construction costs.
[0030] In this exemplary embodiment, the thickness of the cover plate, the bottom plate and the side plate may be 4.5-5.5 mm, such as 4.6 mm, 4.9 mm, 5.0 mm, 5.2 mm or 5.4 mm.
[0031] In this exemplary embodiment, Figure 1 The drainage device shown in or 2 is provided with a plurality of cross braces 4 at intervals along its length direction. The cross braces 4 are parallel to the cover plate 1 and the bottom plate 3, and both ends of the cross braces 4 are connected to the side plates 2. The spacing between the cross braces and the bottom plate can be 35 to 45 cm, such as 36 cm, 39 cm, 40 cm, 43 cm or 44 cm. The spacing between adjacent cross braces can be 145 to 155 cm, such as 146 cm, 147 cm, 150 cm, 151 cm or 153 cm. The cross brace material may include ordinary steel plates, such as Q235 steel plates. The cross braces and the side plates may be fixedly connected. The provision of cross braces can provide stability to the structure of the drainage device. Increase the bearing capacity of the drainage device structure.
[0032] In this exemplary embodiment, the apertures on the side plate and the cover plate may be 0.5 to 1.5 cm, such as 0.63 cm, 0.71 cm, 1.0 cm, 1.19 cm or 1.34 cm. The spacing between adjacent apertures may be 25 to 35 cm, such as 26 cm, 28 cm, 30 cm, 33 cm or 34 cm.
[0033] Second Exemplary Embodiment
[0034] This exemplary embodiment provides a temporary drainage system for the initial branch section of a tunnel.
[0035] In this exemplary embodiment, the temporary drainage system of the initial branch section of the tunnel mainly includes a plurality of temporary drainage devices of the initial branch section of the tunnel as described in the first exemplary embodiment above, which are spliced together. Adjacent drainage devices only need to be simply spliced together, and the assembly is simple and efficient. In addition, the splicing length of the temporary drainage device can be adaptively adjusted according to the drainage construction requirements.
[0036] In this exemplary embodiment, the drainage system can be set up in a range of about 30m close to the tunnel excavation face. A temporary sump can be set at the end of the drainage system, and a sewage pump can be set in the sump for uninterrupted pumping. The pumped-out accumulated water can be directly discharged to the outside of the tunnel through the formed drainage pipe. During the construction of the drainage project, a ditch for drainage can be excavated first, and then the drainage system can be directly placed in the ditch, and then the two sides of the ditch can be simply trimmed, such as simply trimming the filter residue on both sides of the ditch. It is necessary to ensure that the drainage system inside can be placed smoothly and firmly. No other fixings are required between the ditch and the drainage system. It is easy to install and operate, and does not affect the construction of the main tunnel project. The temporary drainage system of the initial branch section of the tunnel meets the high standards for tunnel construction. It can also achieve centralized processing, unified structure, and easy installation.
[0037] In summary, the advantages of the present invention may include at least one of the following:
[0038] (1) The temporary drainage device provided by the utility model can meet the high standardization requirements of current tunnels, can be processed centrally, has a unified structure, and is easy to install;
[0039] (2) The cover of the temporary drainage device provided by the utility model can be opened, and maintenance personnel can regularly open the cover to clean the inside of the net slot to ensure that the drainage device is kept clean and tidy at all times;
[0040] (3) The temporary drainage device provided by the utility model has a small construction impact range and is easy to operate. It does not need to change the existing overall structure of the tunnel, has little impact on the construction of the main tunnel project, and does not affect the construction progress of the main project;
[0041] (4) The temporary drainage system provided by the utility model has a filtering effect, a strong drainage capacity, a flat surface, a neat and beautiful appearance, and a straight line, and has little impact on the construction of the initial branch section of the tunnel.
[0042] Although a temporary drainage device and system for the primary branch section of a tunnel has been described above in combination with exemplary embodiments, those skilled in the art should be aware that various modifications and changes may be made to the exemplary embodiments of the utility model without departing from the spirit and scope defined by the claims.
Claims
1. A temporary drainage device for the initial branch section of a tunnel, characterized in that: The temporary drainage device for the initial branch section of the tunnel includes a bottom plate, a cover plate and a side plate, wherein: The side panels are arranged on both sides of the bottom panel along the direction of the bottom panel, and the top ends of the side panels are provided with cover panels to cover the space formed by the bottom panel and the side panels. The radial width of the bottom plate is smaller than the radial width of the cover plate; The cover plate is rotatably connected to the side plate; The openings are evenly distributed on the cover plate and the side plates.
2. The temporary drainage device for the initial branch section of a tunnel according to claim 1 is characterized in that: The bottom plate is parallel to the cover plate.
3. The temporary drainage device for the initial branch section of a tunnel according to claim 1 is characterized in that: The cross-sectional structure of the temporary drainage device for the initial branch section of the tunnel includes an isosceles trapezoid.
4. The temporary drainage device for the initial branch section of a tunnel according to claim 1, characterized in that: The thickness of the bottom plate is 4.5-5.5 mm, the thickness of the side plate is 4.5-5.5 mm, and the thickness of the cover plate is 4.5-5.5 mm.
5. The temporary drainage device for the initial branch section of a tunnel according to claim 1 is characterized in that: The cover plate and the side plate are connected via hinges.
6. The temporary drainage device for the initial branch section of a tunnel according to claim 1, characterized in that: The temporary drainage device for the initial branch section of the tunnel is provided with a plurality of cross braces at intervals along its length direction, and both ends of the cross braces are connected to the side plates.
7. The temporary drainage device for the initial branch section of a tunnel according to claim 6, characterized in that: The intervals between the cross braces are 145 to 155 cm.
8. The temporary drainage device for the initial branch section of a tunnel according to claim 1, characterized in that: The diameter of the openings on the side plate and the cover plate is 0.5 to 1.5 cm, and the distribution spacing between adjacent openings is 25 to 35 cm.
9. The temporary drainage device for the initial branch section of a tunnel according to claim 1, characterized in that: The material of the bottom plate, side plate and cover plate includes Q235 steel plate.
10. A temporary drainage system for the initial branch section of a tunnel, characterized in that: The temporary drainage system for the initial branch section of the tunnel comprises a plurality of temporary drainage devices for the initial branch section of the tunnel as described in any one of claims 1 to 9 which are spliced to each other.