Engineering conveying pipe erecting structure

By using elastic components and bolt connecting plates in the erection structure of the conveying pipe, the solid fixing and height adjustment of the conveying pipe are achieved, which solves the problems of shaking and poor adaptability caused by the simple fixed structure in the existing technology, and improves the construction efficiency. and security.

CN221824674UActive Publication Date: 2024-10-11QINGDAO UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420559866.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2024-10-11
Estimated Expiration
2034-03-22

AI Technical Summary

Technical Problem

The fixed structure of the existing conveyor pipe erection structure for foundation construction of construction projects is simple and cannot effectively fix the conveyor pipe, resulting in shaking or tilting. It is also difficult to adapt to conveyor pipes of different sizes, which increases the complexity and cost of construction.

Method used

The upper and lower clamps are used to connect the fixing plate through elastic components, driving the insertion rod to pressurize the spring. Combined with the bolt connection plate and the adjustment mechanism, the solid fixing and height adjustment of the feeding pipe can be achieved to adapt to feeding pipes of different sizes. .

Benefits of technology

Improves the stability and safety of the conveying pipe, reduces shaking and tilting, adapts to conveying pipes of different sizes, reduces the frequency of replacement and adjustment, improves construction efficiency and flexibility, and simplifies maintenance and repair through bolted connection design , improving the reusability of materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221824674U_ABST
    Figure CN221824674U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pipeline erection, in particular to an engineering material conveying pipe erection structure which comprises an upper clamp and a lower clamp, the sides, close to each other, of the upper clamp and the lower clamp are connected with fixing plates through elastic assemblies, a supporting plate is arranged at the lower end of the lower clamp, a vertical plate is fixedly installed at the upper end of the supporting plate, and the lower end of the vertical plate is fixedly connected with the lower clamp. The vertical plate is connected with the lower clamp through a connecting plate, the lower end of the supporting plate is connected with a bottom plate through a connecting mechanism, and an adjusting mechanism and a ground nail assembly are arranged on the bottom plate. According to the engineering material conveying pipe erecting structure, by arranging the elastic assembly, when the material conveying pipe is fixed, the fixing plate drives the inserting rod to apply pressure to the spring, so that the fixing plate is attached to the material conveying pipe, the material conveying pipe can be effectively fixed, the stability and safety of the material conveying pipe are improved, and the possibility of shaking and inclining is reduced; the device can adapt to conveying pipes of different sizes and specifications, the replacement and adjustment frequency is reduced, and the construction efficiency and flexibility are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipeline erection, in particular to an engineering material conveying pipe erection structure. Background Art

[0002] During the foundation construction of a building project, pipes are needed to transport solid slurry. When laying the pipes, supporting devices are needed to support the pipe brackets to a suitable height from the ground to achieve comprehensive utilization of space.

[0003] Chinese patent announcement number CN215806818U discloses a material delivery pipe erection structure for construction engineering foundation construction, which belongs to the technical field of pipeline erection. The utility model includes two bases and an adjustment device. The surfaces of the two bases are provided with an adjustment device. The adjustment device includes a support rod, the support rod and the base are hinged, the end of the support rod away from the base is hinged with a lower clamp, the bottom surface of the lower clamp is fixedly installed with a fixed plate, the surface of the fixed plate is rotatably connected with a threaded rod, the surface of the threaded rod is threadedly connected with a movable plate, the end of the threaded rod away from the fixed plate is fixedly installed with a rotating wheel, the surfaces of both ends of the movable plate are hinged with a traction rod, and the surface of the fixed plate is fixedly installed with a sliding rod. The utility model solves the problem that the existing material delivery pipe erection structure for construction engineering foundation construction mostly adopts an integrated structure, it is difficult to adjust the erection height of the pipeline according to the actual erection requirements, it is not convenient for the actual adjustment and erection of the pipeline, and the applicability is poor.

[0004] However, the utility model has the following problems when actually used:

[0005] When the device is in use, the fixing structure of the feed pipe is relatively simple and cannot effectively fix the feed pipe, which may cause the feed pipe to shake or tilt during use, affecting construction safety and stability. The fixed feed pipe installation structure may not be able to adapt to feed pipes of different sizes and needs to be adjusted or replaced for each size, increasing the complexity and cost of construction. Utility Model Content

[0006] 1. Technical issues to be resolved

[0007] In order to overcome the above-mentioned defects of the prior art, the utility model provides an engineering material conveying pipe erection structure, which solves the problems raised in the above-mentioned background technology:

[0008] When the device is in use, the fixing structure of the feed pipe is relatively simple and cannot effectively fix the feed pipe, which may cause the feed pipe to shake or tilt during use, affecting construction safety and stability. The fixed feed pipe installation structure may not be able to adapt to feed pipes of different sizes and needs to be adjusted or replaced for each size, increasing the complexity and cost of construction.

[0009] (II) Technical solution

[0010] To achieve the above objectives, the utility model is implemented through the following technical solutions: an engineering material conveying pipe installation structure, including an upper clamp and a lower clamp, the upper and lower clamps are connected to a fixed plate on one side close to each other through an elastic component, a support plate is provided at the lower end of the lower clamp, and a vertical plate is fixedly installed at the upper end of the support plate, and the vertical plate is connected to the lower clamp through a connecting plate, the lower end of the support plate is connected to a bottom plate through a connecting mechanism, and an adjustment mechanism and a ground nail assembly are provided on the bottom plate.

[0011] Optionally, one end of the upper clamp and the lower clamp are hingedly connected, and the other ends of the upper clamp and the lower clamp are respectively fixedly connected to connecting blocks, and the two groups of connecting blocks are connected by bolts.

[0012] Optionally, the elastic component includes a fixing sleeve, which is fixedly installed on the side where the upper clamp and the lower clamp are close to each other, and an insertion rod is movably inserted in the fixing sleeve. A spring is arranged in the fixing sleeve, and both ends of the spring are respectively connected to the fixing sleeve and the insertion rod.

[0013] Optionally, limit blocks are fixedly installed on both sides of the insertion rod, and the inner wall of the fixed sleeve is provided with a sliding groove for the limit blocks to move.

[0014] Optionally, a sliding block is fixedly connected to one end of the insertion rod away from the fixing sleeve, and the sliding block is arranged in a trapezoidal structure, and a sliding groove for the sliding block to move is arranged on the fixing plate.

[0015] Optionally, the two groups of fixing plates are both configured as arc-shaped structures, and rubber strips are evenly and fixedly distributed on the sides of the two groups of fixing plates that are close to each other.

[0016] Optionally, the connecting plates are arranged in two groups in opposite directions, and the two groups of connecting plates are respectively fixedly mounted on the left and right sides of the vertical plate, bolts are inserted into the two groups of connecting plates, and screw holes matching with the bolts are opened on the lower clamp.

[0017] Optionally, the connecting mechanism is arranged in two groups in opposite directions, and the connecting mechanism includes a connecting sleeve, the connecting sleeve is hingedly connected to the lower surface of the support plate, a plug plate is movably inserted at the lower end of the connecting sleeve, and the plug plate is hingedly connected to the upper surface of the base plate, a locking bolt is inserted on the connecting sleeve, and the plug plate is evenly provided with locking holes that cooperate with the locking bolt at upper and lower positions.

[0018] Optionally, the adjustment mechanism includes an adjustment sleeve, which is rotatably mounted on the upper surface of the base plate, and a connecting rod is threadedly inserted at the upper end of the adjustment sleeve, and the connecting rod is fixedly mounted on the lower surface of the support plate.

[0019] (III) Beneficial effects

[0020] The utility model provides an engineering material conveying pipe installation structure, which has the following beneficial effects:

[0021] 1. The feed pipe erection structure of this project is provided with an elastic component. When fixing the feed pipe, the fixing plate drives the insertion rod to press the spring, so that the fixing plate fits the feed pipe, which can effectively fix the feed pipe, improve its stability and safety, reduce the possibility of shaking and tilting, and can adapt to feed pipes of different sizes and specifications, reducing the frequency of replacement and adjustment, and improving construction efficiency and flexibility.

[0022] 2. The material conveying pipe installation structure of this project is convenient for disassembly and assembly of the connecting plate and the lower clamp by providing a connecting plate connected by bolts, which is convenient for maintenance, replacement or adjustment, reducing the time and cost of maintenance and repair. The bolt connection design allows the connecting plate and the lower clamp to be disassembled and assembled for multiple times, improving the reusability of materials, saving resources and costs. The stability of the bolt connection can ensure that the connecting plate and the lower clamp will not loosen or fall off during use, thereby improving the safety and stability of the material conveying pipe installation structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the structure of the utility model;

[0024] Figure 2 It is a schematic diagram of the exploded structure of the components of the utility model;

[0025] Figure 3 This is a schematic diagram of the component distribution structure of the utility model;

[0026] Figure 4 This is a schematic diagram of the cross-sectional exploded structure of the elastic component of the utility model;

[0027] Figure 5 This is a schematic diagram of the exploded structure of the connection mechanism of the utility model;

[0028] Figure 6 This is a schematic diagram of the exploded structure of the adjustment mechanism of the utility model;

[0029] Figure 7 This is a schematic diagram of the structure of the ground nail assembly of the utility model;

[0030] Figure 8 This is a schematic diagram of the structure of the ground nail assembly of the utility model;

[0031] Fig. 9 This is a schematic diagram of the structure of the ground nail assembly of the utility model.

[0032] In the figure: 1. upper clamp; 2. lower clamp; 3. connecting block; 4. elastic component; 401. fixing sleeve; 402. plug rod; 403. spring; 404. limit block; 405. slider; 5. fixing plate; 6. rubber strip; 7. support plate; 8. vertical plate; 9. connecting plate; 10. connecting mechanism; 1001. connecting sleeve; 1002. plug plate; 11. bottom plate; 12. adjusting mechanism; 1201. adjusting sleeve; 1202. connecting rod; 13. ground nail assembly; 1301. ground nail body; 1302. pull ring; 1303. limit sleeve; 1304. expansion sleeve; 1305. spiral sleeve. DETAILED DESCRIPTION

[0033] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0034] See also Figure 1 , Figure 2 , Figure 3 and Figure 4 The utility model provides a technical solution: an engineering material conveying pipe erection structure, including an upper clamp 1 and a lower clamp 2, the upper clamp 1 and the lower clamp 2 are connected to a fixing plate 5 on one side close to each other through an elastic component 4, a support plate 7 is provided at the lower end of the lower clamp 2, and a vertical plate 8 is fixedly installed on the upper end of the support plate 7, and the vertical plate 8 is connected to the lower clamp 2 through a connecting plate 9, the lower end of the support plate 7 is connected to a bottom plate 11 through a connecting mechanism 10, and an adjustment mechanism 12 and a ground nail component 13 are provided on the bottom plate 11, one end of the upper clamp 1 and the lower clamp 2 are hingedly connected, and the other ends of the upper clamp 1 and the lower clamp 2 are respectively fixedly connected with a connecting block 3, and the two groups of connecting blocks 3 are connected by bolts, and the elastic component 4 includes a fixing sleeve 401 , the fixed sleeve 401 is fixedly installed on the side where the upper clamp 1 and the lower clamp 2 are close to each other, and a plug rod 402 is movably inserted in the fixed sleeve 401, a spring 403 is arranged in the fixed sleeve 401, and the two ends of the spring 403 are respectively connected to the fixed sleeve 401 and the plug rod 402, and both sides of the plug rod 402 are fixedly installed with a limit block 404, and the inner wall of the fixed sleeve 401 is provided with a slide groove for the limit block 404 to move, and the end of the plug rod 402 away from the fixed sleeve 401 is fixedly connected with a slider 405, and the slider 405 is set to a trapezoidal structure, and a slide groove for the slider 405 to move is set on the fixed plate 5, and the two sets of fixed plates 5 are both set to an arc structure, and the two sets of fixed plates 5 are evenly fixedly distributed on the side where the two sets of fixed plates 5 are close to each other.

[0035] The bolted connection block 3 is convenient for locking and unlocking the upper clamp 1 and the lower clamp 2. When the feed pipe is fixed, the feed pipe conflicts with the rubber strip 6 on the surface of the fixing plate 5. The rubber strip 6 can avoid direct contact between the fixing plate 5 and the surface of the feed pipe, reduce wear, and extend the service life of the feed pipe. It can also increase the friction between the fixing plate 5 and the feed pipe, improve the stability of the feed pipe, and reduce the possibility of sliding or shaking. The fixing plate 5 drives the plunger 402 to squeeze the spring 403 in the fixing sleeve 401, and the limit block 404 can maintain the plug-in effect of the fixing sleeve 401 and the plunger 402. When the fixing plate 5 moves, it drives the slider 405 to move in the slide groove, ensuring the movement effect of the plunger 402 and the fixing effect of the feed pipe, making the feed pipe fixation more reliable;

[0036] See also Figure 5 and Figure 6 , the connecting plates 9 are arranged in two groups in opposite directions, and the two groups of connecting plates 9 are fixedly installed on the left and right sides of the vertical plate 8 respectively, the two groups of connecting plates 9 are inserted with bolts, and the lower clamp 2 is provided with screw holes matching the bolts, and the connecting mechanism 10 is arranged in two groups in opposite directions, the connecting mechanism 10 includes a connecting sleeve 1001, the connecting sleeve 1001 is hingedly connected to the lower surface of the support plate 7, the lower end of the connecting sleeve 1001 is movably inserted with a plug plate 1002, and the plug plate 1002 is hingedly connected to the upper surface of the bottom plate 11, the connecting sleeve 1001 is inserted with a locking bolt, and the plug plate 1002 is evenly provided with locking holes matching the locking bolt in the upper and lower positions, the adjusting mechanism 12 includes an adjusting sleeve 1201, the adjusting sleeve 1201 is rotatably installed on the upper surface of the bottom plate 11, the upper end of the adjusting sleeve 1201 is threadedly inserted with a connecting rod 1202, and the connecting rod 1202 is fixedly installed on the lower surface of the support plate 7;

[0037] The connecting mechanism 10 improves the stability of the support plate 7. By rotating the adjusting sleeve 1201, the connecting rod 1202 can be driven to move, and the connecting sleeve 1001 can be driven to move upward, which is convenient for adjusting the height of the feed pipe. The plug plate 1002 is locked by the locking bolt to ensure the supporting effect of the support plate 7. At the same time, it is easy to operate and improves construction efficiency.

[0038] Embodiment 1:

[0039] See also Figure 7 The ground nail assembly 13 includes a ground nail body 1301, which is movably inserted on the bottom plate 11. A pull ring 1302 is fixedly installed on the upper end of the ground nail body 1301. A limit sleeve 1303 is fixedly sleeved on the surface of the ground nail body 1301. A groove matching the limit sleeve 1303 is provided on the bottom plate 11. When in use, the ground nail body 1301 can be directly buried in the ground. This design is simple and low in cost, and is suitable for ground with solid soil and strong bearing capacity.

[0040] Embodiment 2:

[0041] See also Figure 8 The ground nail assembly 13 includes a ground nail body 1301, which is movably inserted on the bottom plate 11. A pull ring 1302 is fixedly installed on the upper end of the ground nail body 1301. A limit sleeve 1303 is fixedly sleeved on the surface of the ground nail body 1301. A groove matching the limit sleeve 1303 is provided on the bottom plate 11. An outer expansion sleeve 1304 is fixedly sleeved on the surface of the ground nail body 1301, and the outer expansion sleeve 1304 is arranged at the lower end of the limit sleeve 1303. The outer expansion sleeve 1304 increases the friction between the ground nail body 1301 and the soil, and improves the bearing capacity. This design is suitable for ground with soft soil and low bearing capacity.

[0042] Embodiment three:

[0043] See also Fig. 9 The ground nail assembly 13 includes a ground nail body 1301, which is movably inserted on the base plate 11. A pull ring 1302 is fixedly installed on the upper end of the ground nail body 1301. A limiting sleeve 1303 is fixedly sleeved on the surface of the ground nail body 1301. A groove matching the limiting sleeve 1303 is opened on the base plate 11. A spiral sleeve 1305 is fixedly sleeved on the surface of the ground nail body 1301, and the spiral sleeve 1305 is arranged at the lower end of the limiting sleeve 1303. The spiral sleeve 1305 can increase the connection area and depth between the ground nail body 1301 and the soil, thereby improving the stability and bearing capacity of the ground nail body 1301. This design is suitable for occasions requiring higher stability and bearing capacity.

[0044] In the utility model, the working steps of the device are as follows:

[0045] First, connect the connecting plate 9 and the lower clamp 2 by bolts, then rotate the adjusting sleeve 1201 according to the installation requirements, adjust the upper clamp 1 and the lower clamp 2 to the appropriate height, lock the plug plate 1002 by the locking bolt, place the feed pipe on the fixed plate 5, connect the connecting block 3 by bolts, and the fixed plate 5 drives the plug rod 402 to squeeze the spring 403 in the fixed sleeve 401, so that the rubber strip 6 fits the feed pipe.

[0046] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An engineering material conveying pipe installation structure, comprising an upper clamp (1) and a lower clamp (2), Features: The sides of the upper clamp (1) and the lower clamp (2) that are close to each other are both connected to a fixing plate (5) via an elastic component (4); a support plate (7) is provided at the lower end of the lower clamp (2); a vertical plate (8) is fixedly installed at the upper end of the support plate (7); and the vertical plate (8) is connected to the lower clamp (2) via a connecting plate (9); the lower end of the support plate (7) is connected to a bottom plate (11) via a connecting mechanism (10); and an adjustment mechanism (12) and a ground nail component (13) are provided on the bottom plate (11).

2. The engineering material delivery pipe erection structure according to claim 1, Features: One end of the upper clamp (1) and the lower clamp (2) are hingedly connected, and the other ends of the upper clamp (1) and the lower clamp (2) are respectively fixedly connected with a connecting block (3), and the two groups of connecting blocks (3) are connected by bolts.

3. The engineering material delivery pipe erection structure according to claim 1, Features: The elastic component (4) comprises a fixing sleeve (401), wherein the fixing sleeve (401) is fixedly mounted on a side where the upper clamp (1) and the lower clamp (2) are close to each other, wherein an insertion rod (402) is movably inserted in the fixing sleeve (401), and a spring (403) is arranged in the fixing sleeve (401), and the two ends of the spring (403) are respectively connected to the fixing sleeve (401) and the insertion rod (402).

4. The engineering material delivery pipe erection structure according to claim 3, Features: Limit blocks (404) are fixedly installed on both sides of the insertion rod (402), and the inner wall of the fixing sleeve (401) is provided with a sliding groove for the limit blocks (404) to move.

5. The engineering material delivery pipe erection structure according to claim 3, Features: One end of the insertion rod (402) away from the fixing sleeve (401) is fixedly connected to a sliding block (405), and the sliding block (405) is arranged in a trapezoidal structure. A sliding groove for the sliding block (405) to move is provided on the fixing plate (5).

6. The engineering material delivery pipe erection structure according to claim 1, Features: The two groups of fixing plates (5) are both configured as arc-shaped structures, and rubber strips (6) are evenly and fixedly distributed on the sides of the two groups of fixing plates (5) that are close to each other.

7. The engineering material delivery pipe erection structure according to claim 1, Features: The connecting plates (9) are arranged in two groups in opposite directions, and the two groups of connecting plates (9) are respectively fixedly mounted on the left and right sides of the vertical plate (8), and bolts are inserted into the two groups of connecting plates (9), and screw holes matching with the bolts are opened on the lower clamp (2).

8. The engineering material delivery pipe erection structure according to claim 1, Features: The connection mechanism (10) is provided with two groups in opposite directions, and the connection mechanism (10) comprises a connection sleeve (1001), the connection sleeve (1001) is hingedly connected to the lower surface of the support plate (7), a plug plate (1002) is movably inserted at the lower end of the connection sleeve (1001), and the plug plate (1002) is hingedly connected to the upper surface of the bottom plate (11), a locking bolt is inserted on the connection sleeve (1001), and the plug plate (1002) is evenly provided with locking holes that match the locking bolt at upper and lower positions.

9. The engineering material delivery pipe erection structure according to claim 1, Features: The adjustment mechanism (12) comprises an adjustment sleeve (1201), the adjustment sleeve (1201) is rotatably mounted on the upper surface of the base plate (11), a connecting rod (1202) is threadedly inserted at the upper end of the adjustment sleeve (1201), and the connecting rod (1202) is fixedly mounted on the lower surface of the support plate (7).