Hydraulic engineering pipeline erecting and supporting device
By introducing adjusting legs and fixed plug-ins into the water conservancy project pipeline erection support device, the problem of difficulty in adjusting the height and balance of traditional devices in complex ground environments is solved, achieving higher flexibility and stability, and is suitable for complex ground Environmental piping erection.
Patent Information
- Application Number
- CN202420372142.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-02-28
AI Technical Summary
It is difficult to adjust the height and balance of traditional water conservancy project pipeline erection support devices in complex ground environments, resulting in unstable erection and affecting construction efficiency and safety.
A support device including adjustable legs and wheel components is designed. By adjusting the length of the legs and the position of the fixed plug-in, the height and balance of the support platform can be adjusted, thereby enhancing the flexibility and stability of the erection support device.
It effectively improves the flexibility and stability of the erection support device, is suitable for complex ground environments, and improves the applicable scope and construction efficiency of pipeline erection.
Smart Images

Figure CN221824690U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy projects, in particular to a water conservancy project pipeline erection support device. Background Art
[0002] Water conservancy projects require the construction of different types of hydraulic structures such as dams, dikes, spillways, sluices, water inlets, channels, ferries, rafts, fishways, etc. In water conservancy projects, it is often necessary to build pipelines in parallel.
[0003] At present, in the process of laying pipelines, due to the large size and heavy weight of the pipelines, it is necessary to use an erection support device for auxiliary work. The traditional erection support device is generally used for functions such as binding, supporting and moving the pipelines. However, its adjustable performance is insufficient. For example, the ground flatness in the construction area is not high, and the ground soil is uneven, resulting in the height of the erected pipeline and its balance cannot be well adjusted. At the same time, the bottom of the erection support device is a pulley structure, resulting in insufficient stability during the erection construction. For this reason, the utility model proposes a water conservancy project pipeline erection support device. Utility Model Content
[0004] The purpose of the utility model is to provide a hydraulic engineering pipeline erection support device to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a support device for the installation of pipelines in water conservancy projects, comprising a support platform, wherein adjusting legs are installed at the four corners of the lower surface of the support platform, a wheel assembly is installed at the lower end of the adjusting leg, a fixed plug-in is movably installed on the wheel assembly, the adjusting leg comprises a sleeve fixedly connected to the support platform, an adjusting support rod is movably sleeved on the bottom inner surface of the sleeve, and a spring lock is installed on one side wall of the adjusting support rod, the spring lock comprises a fixing sleeve fixedly connected to the adjusting support rod, a convex column is movably installed on the fixing sleeve, and the convex column and the fixing sleeve are connected by a compression spring, a plurality of adjustment holes matched with the convex column are evenly distributed on the sleeve, a mounting recess is fixedly installed on the upper surface of the support platform, a groove for accommodating a pipeline is opened on the surface of the mounting recess, and a binding piece is installed on the top of the mounting recess.
[0006] As a preferred technical solution of the utility model, the wheel assembly includes a plug plate fixedly connected to the lower end of the adjusting support rod, and a pulley is rotatably installed on the lower end of the plug plate, and the fixed plug-in includes a plurality of plug rods movably plugged into the plug plate.
[0007] As a preferred technical solution of the utility model, each of the insertion rods is arranged vertically, the upper end of each of the insertion rods is fixedly connected to the same connecting frame, and one side of the connecting frame is fixedly connected to a pedal.
[0008] As a preferred technical solution of the utility model, an insert cone is provided at the lower end of each insert rod, and the shape of the insert cone is an inverted cone structure.
[0009] As a preferred technical solution of the utility model, a horizontally arranged first threaded hole is opened at the top and bottom positions of the inner surface of each of the insertion rods, a horizontally arranged second threaded hole is opened on the inner surface of the insertion plate, and the same screw is installed in the first threaded hole and the second threaded hole.
[0010] As a preferred technical solution of the utility model, the binding comprises a first connecting block and a second connecting block respectively fixedly connected to both sides of the upper surface of the mounting recess, the upper end of the first connecting block is hinged with a first hinge, the upper end of the second connecting block is hinged with a second hinge, the upper end of the first hinge is fixedly connected with a binding strap, and the end of the binding strap away from the first hinge is fixedly connected with a clamp, and the clamp is clamped with the second hinge.
[0011] As a preferred technical solution of the utility model, an inner groove is provided on the groove of the mounting recess, and a plurality of ball grooves are evenly distributed on the inner groove, and a ball is rotatably installed in each of the ball grooves.
[0012] As a preferred technical solution of the utility model, a mounting seat is fixedly connected to the lower surface of the mounting recess, and the mounting seat is fixedly connected to the support platform, and handles are fixedly connected to both sides of the support platform.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] 1. The utility model provides a support device for the installation of pipelines in a water conservancy project. Four groups of adjustable legs are arranged at the bottom of the support platform. The support lengths of the four adjustable legs are adjusted respectively according to the actual ground height. Thus, the support platform can still maintain a good height and balance on a complex ground, which is convenient for the installation of pipelines, thereby effectively improving the flexibility of the installation support device and increasing its applicable range.
[0015] 2. The utility model provides a water conservancy project pipeline erection support device. By arranging a fixed plug-in on the wheel assembly, the installation position of the fixed plug-in can be adjusted to achieve the ground support of the wheel assembly replaced by the fixed plug-in, thereby preventing the instability caused by the use of traditional wheel assembly support, making the erection support device more stable when it does not need to be moved, and facilitating the subsequent erection and docking installation of the pipeline.
[0016] Other features and advantages of the present invention will be described in detail in the following specific embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0018] Figure 2 It is a structural schematic diagram of the adjustable legs of the utility model;
[0019] Figure 3 For the utility model Figure 2 A schematic diagram of the enlarged structure in the middle;
[0020] Figure 4 This is a schematic diagram of the structure of the fixed plug-in of the utility model;
[0021] Figure 5 It is a structural schematic diagram of the mounting recess of the utility model;
[0022] In the figure: 1. support platform; 11. mounting base; 12. handle; 2. adjustment leg; 21. sleeve; 22. adjustment support rod; 23. spring lock; 231. fixing sleeve; 232. boss; 233. compression spring; 24. adjustment hole; 3. fixing plug-in; 31. plug-in rod; 32. first threaded hole; 33. connecting frame; 34. pedal; 35. plug-in cone; 4. wheel assembly; 41. plug-in plate; 42. second threaded hole; 43. screw; 44. pulley; 5. mounting recess; 51. inner groove; 52. bead groove; 53. ball; 6. binding piece; 61. first connecting block; 62. second connecting block; 63. first hinge; 64. second hinge; 65. binding strap; 66. clamp. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] In the description of the present invention, it should be noted that the terms "vertical", "up", "down", "horizontal", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0025] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0026] See also Figure 1-5 In the present embodiment, a support device for erecting a pipeline of a water conservancy project is provided, comprising a support platform 1, wherein four corners of the lower surface of the support platform 1 are provided with adjustable legs 2, a wheel assembly 4 is provided at the lower end of the adjustable legs 2, a fixed plug-in 3 is movably provided on the wheel assembly 4, the adjustable legs 2 comprise a sleeve 21 fixedly connected to the support platform 1, an adjustable support rod 22 is movably sleeved on the bottom inner surface of the sleeve 21, and a spring lock 23 is provided on one side wall of the adjustable support rod 22, the spring lock 23 comprises a fixed sleeve 231 fixedly connected to the adjustable support rod 22, a convex column 232 is movably provided on the fixed sleeve 231, and the convex column 232 and the fixed sleeve 231 are movably provided with a fixed plug-in 3, and the fixed plug-in 3 is ... The two support platforms 1 are connected by a compression spring 233, and a plurality of adjustment holes 24 that are compatible with the convex columns 232 are evenly distributed on the sleeve 21. A mounting recess 5 is fixedly installed on the upper surface of the support platform 1. A groove for accommodating the pipeline is opened on the surface of the mounting recess 5, and a binding piece 6 is installed on the top of the mounting recess 5. By arranging four groups of adjustment legs 2 at the bottom of the support platform 1, the supporting lengths of the four adjustment legs 2 are adjusted respectively according to the actual ground height, so that the support platform 1 can still maintain a good height and balance on a complex ground, which is convenient for the installation of pipelines, thereby effectively improving the flexibility of the mounting support device and improving its scope of application.
[0027] In this embodiment, the wheel assembly 4 includes a plug plate 41 fixedly connected to the lower end of the adjustment support rod 22, and a pulley 44 is rotatably mounted on the lower end of the plug plate 41. The fixed plug 3 includes a plurality of plug rods 31 movably plugged into the plug plate 41.
[0028] In this embodiment, each insertion rod 31 is arranged vertically, and the upper end of each insertion rod 31 is fixedly connected to the same connecting frame 33, and a pedal 34 is fixedly connected to one side of the connecting frame 33. By arranging a fixed plug-in 3 on the wheel assembly 4, the installation position of the fixed plug-in 3 can be adjusted to achieve the fixed plug-in 3 replacing the ground support of the wheel assembly 4, thereby preventing the instability caused by the use of traditional wheel assembly 4 support, making the erection support device more stable when it does not need to be moved, which is helpful for the subsequent erection and docking installation of the pipeline.
[0029] In this embodiment, a cone 35 is provided at the lower end of each insertion rod 31, and the shape of the cone 35 is an inverted cone structure. By providing the cone 35, the bottom of the insertion rod 31 can be better inserted into the ground, thereby further improving the supporting and stabilizing effect of the insertion rod 31.
[0030] In this embodiment, a horizontally arranged first threaded hole 32 is provided at the top and bottom positions of the inner surface of each insertion rod 31, and a horizontally arranged second threaded hole 42 is provided on the inner surface of the insertion plate 41, and the same screw 43 is installed in the first threaded hole 32 and the second threaded hole 42. When the insertion rod 31 is needed to replace the support of the wheel assembly 4 on the ground, it is only necessary to step on the pedal 34 downward so that the pedal 34 drives the connecting frame 33 and the insertion rod 31 to move downward synchronously. When the insertion rod 31 moves downward, the first threaded hole 32 at its top position is just on the same horizontal plane as the second threaded hole 42. At this time, the screw 43 is horizontally installed in the first threaded hole 32 and the second threaded hole 42, so that the insertion rod 31 and the insertion plate 41 can be fixed, and the insertion rod 31 can replace the support of the wheel assembly 4 on the ground. Conversely, after unlocking the screw 43, the pedal 34 is lifted upward to complete the support of the wheel assembly 4 on the ground, which is convenient for the movement of the erection support device.
[0031] In this embodiment, the binding 6 includes a first connecting block 61 and a second connecting block 62 which are respectively fixedly connected to both sides of the upper surface of the mounting recess 5, the upper end of the first connecting block 61 is hinged with a first hinge 63, the upper end of the second connecting block 62 is hinged with a second hinge 64, the upper end of the first hinge 63 is fixedly connected with a strap 65, and the end of the strap 65 away from the first hinge 63 is fixedly connected with a clamp 66, and the clamp 66 is clamped with the second hinge 64, wherein the clamp 66 and the second hinge 64 on the binding 6 can facilitate the installation or disassembly of the strap 65, and the pipe on the mounting recess 5 can be better fixed during installation, thereby improving the stability during movement.
[0032] In this embodiment, an inner groove 51 is opened on the groove of the mounting recess 5, and a plurality of ball grooves 52 are evenly distributed on the inner groove 51, and a ball 53 is rollingly installed in each ball groove 52, wherein the ball 53 can be used to facilitate the axial rotation of the pipe on the mounting recess 5, and facilitate the position adjustment of the pipe on the mounting support device when the pipe is docked.
[0033] In this embodiment, the lower surface of the mounting recess 5 is fixedly connected with a mounting seat 11, and the mounting seat 11 is fixedly connected to the support platform 1, and handles 12 are fixedly connected to both sides of the support platform 1, wherein the mounting seat 11 can facilitate the installation or separation of the mounting recess 5 and the support platform 1, and the mounting recess 5 can be disassembled or replaced as needed.
[0034] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.
Claims
1. A water conservancy project pipeline erection support device, characterized in that: The invention comprises a support platform (1), wherein the four corners of the lower surface of the support platform (1) are all provided with adjustment legs (2), the lower end of the adjustment legs (2) is provided with a wheel assembly (4), a fixed plug-in unit (3) is movably provided on the wheel assembly (4), the adjustment legs (2) comprise a sleeve (21) fixedly connected to the support platform (1), an adjustment rod (22) is movably sleeved on the bottom inner surface of the sleeve (21), and a spring lock (23) is provided on a side wall of the adjustment rod (22), the spring lock (23) comprises a fixed connection A fixing sleeve (231) is arranged on the adjusting support rod (22), a boss (232) is movably mounted on the fixing sleeve (231), and the boss (232) and the fixing sleeve (231) are connected via a compression spring (233), a plurality of adjustment holes (24) are evenly distributed on the sleeve (21) and are adapted to the boss (232), a mounting recess (5) is fixedly mounted on the upper surface of the supporting platform (1), a groove for accommodating a pipeline is provided on the surface of the mounting recess (5), and a binding piece (6) is mounted on the top of the mounting recess (5).
2. A water conservancy project pipeline erection support device according to claim 1, characterized in that: The wheel assembly (4) comprises a plug plate (41) fixedly connected to the lower end of the adjustment support rod (22), and a pulley (44) is rotatably mounted on the lower end of the plug plate (41), and the fixed plug-in unit (3) comprises a plurality of plug rods (31) movably plugged into the plug plate (41).
3. A water conservancy project pipeline erection support device according to claim 2, characterized in that: Each of the insertion rods (31) is arranged vertically, and the upper end of each of the insertion rods (31) is fixedly connected to the same connecting frame (33), and one side of the connecting frame (33) is fixedly connected to a pedal (34).
4. A water conservancy project pipeline erection support device according to claim 3, characterized in that: The lower end of each of the insert rods (31) is provided with an insert cone (35), and the shape of the insert cone (35) is an inverted cone structure.
5. A water conservancy project pipeline erection support device according to claim 4, characterized in that: A first threaded hole (32) arranged horizontally is provided at the top and bottom of the inner surface of each of the insertion rods (31), a second threaded hole (42) arranged horizontally is provided on the inner surface of the insertion plate (41), and the same screw (43) is installed in the first threaded hole (32) and the second threaded hole (42).
6. A water conservancy project pipeline erection support device according to claim 1, characterized in that: The binding member (6) comprises a first connecting block (61) and a second connecting block (62) which are respectively fixedly connected to both sides of the upper surface of the mounting recess (5); the upper end of the first connecting block (61) is hinged with a first hinge (63); the upper end of the second connecting block (62) is hinged with a second hinge (64); the upper end of the first hinge (63) is fixedly connected with a binding belt (65); and the end of the binding belt (65) away from the first hinge (63) is fixedly connected with a clamp (66); the clamp (66) is clamped with the second hinge (64).
7. A water conservancy project pipeline erection support device according to claim 1, characterized in that: An inner groove (51) is provided on the recess of the mounting recess (5), and a plurality of ball grooves (52) are evenly distributed on the inner groove (51), and a ball (53) is rollingly installed in each of the ball grooves (52).
8. A water conservancy project pipeline erection support device according to claim 1, characterized in that: The lower surface of the mounting recess (5) is fixedly connected to a mounting seat (11), and the mounting seat (11) is fixedly connected to the support platform (1), and handles (12) are fixedly connected to both sides of the support platform (1).